The document is a set of architectural drawings for the "EHRM Installation of NextGen Wi-Fi Upgrade" project at the Providence, Rhode Island VA Health Care System. The drawings detail the precise locations and installation specifications for Wi-Fi access points (APs) across five different buildings (Buildings 1-5 and T7_8), with each floor and basement having multiple access points mapped out.

The installation requirements are consistent across buildings, involving: (1) installing 4 11/16" dual gang boxes vertically or horizontally on walls at specified locations, (2) installing 3/4" conduit for wall/ceiling penetrations, (3) precise penetration, sleeving, and fire stopping, and (4) running CAT 6A cables from each access point to a designated telecommunications room (TR) or IT closet. The project encompasses approximately 23 total access points distributed across multiple floors and buildings, with each access point carefully positioned to optimize Wi-Fi coverage in specific rooms such as offices, hallways, and common areas.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 01

Drawings

16 pages

5 June 2025

Providence, Rhode Island VA Health Care System (650)

“EHRM Installation of NextGen Wi-Fi Upgrade”

Construction

Providence - Building 1 - Basement

HD/LBS

AP28

AP29

AP18

AP30

AP27

AP26

AP34

AP31

AP32

AP33

AP17

AP35

AP15

AP14

AP25

AP24

AP23

AP21

AP20

AP19

AP16

AP22

AP03

AP02

AP01

AP06 AP07

AP04

AP05

AP36

AP13

AP09

AP10

AP11

AP12

AP08

S-1

S-1

S-1

1-D1058

AP53

AP37

AP52

AP51

AP50

AP49

AP43

AP42

AP39

AP41

AP40

AP38

AP48

AP44

AP45

AP46

AP47

AP54

AP55

AP56

AP57

AP58

AP59

- Install AP50 in Room 4.

- Install a 4 11/16" dual gang box vertically on wall at AP location.

Additional junction boxes as needed.

- Install 3/4" conduit to wall and/or ceiling penetration (length of conduit and penetration location to be determined during site walk-through).

- Penetrate, sleeve, and fire stop accordingly.

- Run one CAT 6A cable from AP to TR in Room 12I.

- Install AP40 in Room 12J.

- Install a 4 11/16" dual gang box horizontally at AP location with a horizontal bracket. Additional junction boxes as needed.

- Install 3/4" conduit to wall penetration (length of conduit and penetration location to be determined during site walk-through).

- Penetrate, sleeve, and fire stop accordingly.

- Run one CAT 6A cable from AP to TR in Room 12I.

Room 12I.

Providence - Building 1 - Floor 4

AP01

AP02

AP03

AP04

AP05

AP06

AP07

AP09

AP08

AP21

AP30

AP10

AP38

AP36

AP37

AP35

AP29

AP28

AP27

AP25

AP26

AP24

AP22

AP23

AP34

AP33

AP31

AP32

AP19

AP20

AP15

AP14

AP13

AP18

AP16

AP17

AP12

AP11

LMH

AP39

AP44

AP40

AP41

AP53

AP52

AP51

AP55

AP54

AP43

AP50

AP46

AP42

AP45

AP49

AP47

AP48

AP56

- Install AP51 in Room 406. Secure Inpatient Mental Health wing.

- Install a 4 11/16" dual gang box vertically on wall at AP location. Additional junction boxes as needed.

- Install 3/4" conduit to wall and/or ceiling penetration (length of conduit and penetration location to be determined during site walk-through).

- Penetrate, sleeve, and fire stop accordingly.

- Run one CAT 6A cable from AP to TR in Room TC-4.

- Install AP39 in Room 458F.

- Install a 4 11/16" dual gang box horizontally at AP location with a horizontal bracket. Additional junction boxes as needed.

- Install 3/4" conduit to wall penetration (length of conduit and penetration location to be determined during site walk-through).

- Penetrate, sleeve, and fire stop accordingly.

- Run one CAT 6A cable from AP to TR in Room TC-4.

TC-4

Providence - Building 1 - Floor 5

AP42

AP43

AP44

AP46

AP47

AP45

AP29

AP41

AP40

AP39

AP28

AP27

AP26

AP25

AP24

AP50

AP48

S-1

AP49

AP51

AP22

AP15

AP52

AP53

AP54

AP16 AP18

AP17

AP19

AP20

S-1

AP13

AP11

AP10

AP07

AP12

AP08

AP14

AP06

AP05

AP01

AP02

AP03AP04AP09

AP21

AP23

AP33

AP31

AP32

AP30

AP37

AP38

AP36

AP35

AP34

AP70

AP64

AP69

AP62

AP63 AP61

AP65

AP66

AP60

AP67

AP56

AP57

AP55

AP58

AP59AP68

AP71

- Install AP57 in Room 512.

- Install a 4 11/16" dual gang box vertically on wall at AP location.

Additional junction boxes as needed.

- Install 3/4" conduit to wall and/or ceiling penetration (length of conduit and penetration location to be determined during site walk-through).

- Penetrate, sleeve, and fire stop accordingly.

- Run one CAT 6A cable from AP to TR in Room TC-5.

- Install AP60 in Room 540.

- Install a 4 11/16" dual gang box horizontally at AP location with a horizontal bracket. Additional junction boxes as needed.

- Install 3/4" conduit to wall and/or ceiling penetration (length of conduit and penetration location to be determined during site walk-through).

- Penetrate, sleeve, and fire stop accordingly.

- Run one CAT 6A cable from AP to TR in Room TC-5.

- Install AP66 in Room 506.

- Install a 4 11/16" dual gang box vertically on wall at AP location.

Additional junction boxes as needed.

- Install 3/4" conduit to wall and/or ceiling penetration (length of conduit and penetration location to be determined during site walk-through).

- Penetrate, sleeve, and fire stop accordingly.

- Run one CAT 6A cable from AP to TR in Room TC-5.

- Install AP65 in Room 505.

- Install a 4 11/16" dual gang box vertically on wall at AP location.

Additional junction boxes as needed.

- Install 3/4" conduit to wall and/or ceiling penetration (length of conduit and penetration location to be determined during site walk-through).

- Penetrate, sleeve, and fire stop accordingly.

- Run one CAT 6A cable from AP to TR in Room TC-5.

- Install AP68 in Room 525.

- Install a 4 11/16" dual gang box vertically on wall at AP location. Additional junction boxes as needed.

- Install 3/4" conduit to wall and/or ceiling penetration (length of conduit and penetration location to be determined during site walk-through).

- Penetrate, sleeve, and fire stop accordingly.

- Run one CAT 6A cable from AP to TR in Room TC-5.

TC-5

- Install AP59 in Room 532.

- Install a 4 11/16" dual gang box vertically on wall at AP location. Additional junction boxes as needed.

- Install 3/4" conduit to wall and/or ceiling penetration (length of conduit and penetration location to be determined during site walk-through).

- Penetrate, sleeve, and fire stop accordingly.

- Run one CAT 6A cable from AP to TR in Room TC-5.

Providence - Building 1 - Floor 6

AP12

AP13

AP11

AP10

AP36

AP35

AP34

AP33

AP31

AP26

AP09

AP07

AP08

AP06

AP40

AP39

AP04

AP05

AP03

AP01

AP02

S-1

S-1

AP28

AP24

AP32

AP29

AP30

AP27

AP25

AP17

AP14AP19

AP23

AP21 AP22

AP20

AP15

AP16

AP18

AP41

AP37

AP38

AP42

AP43

AP44

- Install AP41 in Room 651.

- Install a 4 11/16" dual gang box vertically on wall at AP location.

Additional junction boxes as needed.

- Install 3/4" conduit to wall and/or ceiling penetration (length of conduit and penetration location to be determined during site walk-through).

- Penetrate, sleeve, and fire stop accordingly.

- Run one CAT 6A cable from AP to TR in Room TC-6.

TC-6

Providence - Building 2 - Basement

AP01 AP02

HD

AP03

Providence - Building 2 - Floor 1

AP04 AP03 AP02

AP01

HD

AP05

B-B1A -Install AP05 in Room 104.

- Install AP on drop ceiling at proposed location.

- Penetrate wall to hallway, sleeve, and fire stop accordingly.

- Run one CAT 6A cable from AP to TR in Telephone Room in the basement.

Providence - Building 2 - Floor 2

AP01AP02AP03

HD

AP05

AP06

AP04

B-B1A

- Install AP04 in Room 203C.

- Install a 4 11/16" dual gang box vertically on wall at AP location.

Additional junction boxes as needed.

- Install 3/4" conduit to wall and/or floor penetration (length of conduit and penetration location to be determined during site walk-through).

- Penetrate, sleeve, and fire stop accordingly.

- Run one CAT 6A cable from AP to TR in Telephone Room in the basement.

- Install AP05 in Room 207.

- Install a 4 11/16" dual gang box vertically on wall at AP location.

Additional junction boxes as needed.

- Install 3/4" conduit to wall and/or floor penetration (length of conduit and penetration location to be determined during site walk-through).

- Penetrate, sleeve, and fire stop accordingly.

- Run one CAT 6A cable from AP to TR in Telephone Room in the basement.

- Install AP06 in Room 203A.

- Install a 4 11/16" dual gang box vertically on wall at AP location.

Additional junction boxes as needed.

- Install 3/4" conduit to wall and/or floor penetration (length of conduit and penetration location to be determined during site walk-through).

- Penetrate, sleeve, and fire stop accordingly.

Providence - Building 3 - Basement

AP01

AP02 AP03

HD

AP04

TEL

Providence - Building 3 - Floor 1

AP01

AP02

HD B-TEL

AP05

AP04

AP06

AP07

- Install AP04 in Room 104.

- Install a 4 11/16" dual gang box vertically on wall at AP location. Additional junction boxes as needed.

- Install 3/4" conduit to wall and/or floor penetration (length of conduit and penetration location to be determined during site walk-through).

- Penetrate, sleeve, and fire stop accordingly.

- Run one CAT 6A cable from AP to TR in Telephone Room in the basement.

- Install AP05 in Room 101.

- Install a 4 11/16" dual gang box vertically on wall at AP location. Additional junction boxes as needed.

- Install 3/4" conduit to wall and/or floor penetration (length of conduit and penetration location to be determined during site walk-through).

- Penetrate, sleeve, and fire stop accordingly.

- Run one CAT 6A cable from AP to TR in Telephone Room in the basement.

- Install AP06 in Room 106.

- Install a 4 11/16" dual gang box vertically on wall at AP location. Additional junction boxes as needed.

- Install 3/4" conduit to wall and/or floor penetration (length of conduit and penetration location to be determined during site walk-through).

- Penetrate, sleeve, and fire stop accordingly.

- Run one CAT 6A cable from AP to TR in Telephone Room in the basement.

Providence - Building 3 - Floor 2

AP02

AP03

AP04

AP05

AP06

HD B-TEL

AP07

- Install AP07 in Room 202.

- Install AP on drop ceiling at proposed location.

- Penetrate wall to hallway, sleeve, and fire stop accordingly.

Providence - Building 4 - Basement

AP02

AP03

HD 1-201

AP04

- Install AP04 in designated room.

- Install a 4 11/16" dual gang box horizontally at AP location with a horizontal bracket. Additional junction boxes as needed.

- Install 3/4" conduit to wall penetration (length of conduit and penetration location to be determined during site walk-through).

- Penetrate, sleeve, and fire stop accordingly.

- Run one CAT 6A cable from AP to TR in Room 201 on the first floor through vertical conduit in Room 10.

Providence - Building 4 - Floor 1

AP03

AP02

Providence - Building 5 - Basement

AP01 AP02

Providence - Building 5 - Floor 1

AP02

HD B-05

Providence - Building 5 - Floor 2

AP02

AP03

HD

AP04

B-05

- Install AP04 in Room 201.

- Install a 4 11/16" dual gang box vertically on wall at AP location. Additional junction boxes as needed.

- Install 3/4" conduit to ceiling penetration (length of conduit and penetration location to be determined during site walk-through).

- Penetrate, sleeve, and fire stop accordingly.

- Run one CAT 6A cable from AP to TR in Telephone Room in the basement.

- Existing cabling runs along rafters in attic and then down the 2nd and 1st floor walls to the basement.

Providence - T7_8 - Floor 1

AP02

HD

AP03

AP04

- Install AP03 in designated room.

- Install a 4 11/16" dual gang box vertically on wall at AP location. Additional junction boxes as needed.

- Install 3/4" conduit to wall penetrations (length of conduit and penetration locations to be determined during site walk-through).

- Penetrate, sleeve, and fire stop accordingly.

- Run one CAT 6A cable in 3/4" conduit from AP to the IT Closet.

- Install AP04 in designated room.

- Install a 4 11/16" dual gang box vertically on wall at AP location. Additional junction boxes as needed.

- Install 3/4" conduit to wall penetrations (length of conduit and penetration locations to be determined during site walk-through).

- Penetrate, sleeve, and fire stop accordingly.

- Run one CAT 6A cable in 3/4" conduit from AP to the IT Closet.