S02 Attach 4 Base Offer Price Breakdown 1 Page Excel Form.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Y1DZ--FY26: NRM (PROJ: 516-22-112) BB - Upgrade IV Mixing Room for USP 800 Compliance Lee County VA Clinic Cape Coral, FL
Solicitation number
36C24826R0113
Issued by

About this file

This is a Base Offer Price Breakdown form template for a construction project under federal contract solicitation 36C24826R0113. The form is designed for offerors to submit detailed pricing for the upgrade of an IV Mixing Room for USP 800 Compliance at the Lee County VA Clinic in Cape Coral, Florida. The pricing structure follows the CSI (Construction Specifications Institute) divisions, requiring offerors to break down costs into Labor and Material categories across 24 construction divisions, including General Requirements, Concrete, Masonry, Metals, HVAC, Electrical, Plumbing, Fire Suppression, and Earthwork, among others. Each division subtotal is calculated automatically by summing labor and material costs.

The form requires offerors to input Overhead percentage, Profit percentage, and Bond percentage, which are calculated sequentially against the Division Subtotals and cumulative costs. The final Total Base Offer Cost is derived from all divisions plus overhead, profit, and bond calculations. Offerors are instructed to provide detailed price breakdowns avoiding lump sum entries. This solicitation is a 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) entities issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8. The site visit is scheduled for May 21, 2026, with Requests for Information due May 26, 2026, and proposals due June 12, 2026, at 10:00 AM EST.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Base Offer Cost Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis

File details come from the government source that posted it. Updated .