S02- Attach 10 3_TMM1922-Combined Mechanical.pdf
PDF 4 MB Posted
- Solicitation number
- 36C24823R0091
About this file
This document provides details for a federal contract opportunity to provide construction services at the C.W. Bill Young VA Medical Center in Bay Pines, Florida. The solicitation number is 36C24823R0091 and seeks to resolve statement of conditions deficiencies through a bid build project with a magnitude between $500,000 and $1,000,000. This opportunity is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. The NAICS code is 236220 with a small business size standard of $39.5 million. Interested vendors must be verified by the VA's Center for Verification and Evaluation prior to contract award. The point of contact is Joseph Wingfield, who can be reached at 307-712-5769 or amber.milton@va.gov. The response deadline is not provided.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CO2
CO
H
HS
NO2
S
TH
TS
T
MS
CWS
CD
CDR
CR
CS
HWR
HWS
G
STM
CWR CHILLED WATER RETURN
CHILLED WATER SUPPLY
CONDENSATE DRAINAGE
CONDENSATE RETURN
CONDENSER WATER
RETURN
CONDENSER WATER
SUPPLY
HEATING WATER RETURN
HEATING WATER SUPPLY
NATURAL GAS
STEAM
REF-L
REF-S
REFRIGERANT-LIQUID
REFRIGERANT-SUCTION
2"
4"
4"
REF-HG REFRIGERANT-HOT GAS
PIPING SYMBOLS
PIPE RISE
PIPE DROP
PIPE TEE
REDUCING 45
DEGREE TEE
45 DEGREE TEE
* NOTE *
ALL OF NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER DRAWINGS IN
THIS SET. THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET MAY OR
MAY NOT BE USED IN THIS SET OF DRAWINGS.
PG PROPANE GAS
16"x8"
16"/8"
FD
SD
M
B
D
C
16"Ø
EXHAUST AIR
OUTSIDE AIR
RELIEF AIR
RETURN AIR
SUPPLY AIR
TRANSFER AIR
GRILLES, REGISTERS & DIFFUSERS TAG
CFM
THROW-150FPM/ 100FPM/ 50FPM
NECK SIZE / MODULE SIZE
EXISTING DUCT TAG
OVAL DUCT SIZE TAG (WIDTH / HEIGHT)
SQUARE DUCT SIZE TAG (WIDTH x HEIGHT)
HVAC SYMBOLS
RECTANGULAR SUPPLY/OUTSIDE AIR DUCT RISE
RECTANGULAR RETURN/TRANSFER AIR DUCT RISE
MECHANICAL EQUIPMENT TAGS
ROUND DUCT SIZE TAG (DIAMETER)
LINEAR DIFFUSER TAG
CFM
TYPE (SEE SCHEDULE) NUMBER OF SLOTS /
ACTIVE SLOT LENGTH (PLENUM LENGTH) /
NECK SIZE
DUCT BEING DEMOLISHED
ELEVATION (CENTER OF FACE)
ROUND SUPPLY/OUTSIDE AIR DUCT RISE
ROUND RETURN/TRANSFER AIR DUCT RISE
RECTANGULAR EXHAUST/RELIEF AIR DUCT RISE
ROUND EXHAUST/RELIEF AIR DUCT RISE
DROP
DROP
DROP
DROP
DROP
DROP
GREASE EXHAUST AIR
SMOKE EXHAUST AIR
EXHAUST GAS FLUE
COMBUSTION AIR
CONDITIONED OUTSIDE AIR
VAV-XX
10' - 0"
48"x2 1/2"
SLB3 400
10" / 24x24
SD3 300
12" / ---
SD9 400
LINEAR BAR GRILLE
LINEAR SLOT
DIFFUSER
PERFORATED
DIFFUSER WITH
DEFLECTORS
ROUND DIFFUSER
WITH ADJUSTABLE
PATTERNS
LOUVERED DOUBLE
DEFLECTION GRILLE
12"x10"
SG5 500
TYPE (SEE SCHEDULE)
10" / 24x24 H-5/7/1422
SD1 400
3-CONE DIFFUSER
THROW PATTERN
MAX NC RATING
1 / 4' - 0" / 8"
LSD1 200
8' - 0"AFF
1 / 4' - 0" / 8"
LSD1 200
6' - 0" 1 / 4' - 0" / 8"
LSD1 200
SECTION TOTAL TRACK LENGTH
12"x10" / 24x12
RG11 500
LOUVERED GRILLE
12"x10" / 24x24
RG2 500
EGGCRATE RETURN
GRILLE
BOTTOM OF EQUIPMENT
ELEVATION
590 lb
RTU-XX
4.0 ton
RTU-XX
115000 Btu/h
115 CFH
RTU-XX
Htg: 3.7 GPM
VAV-XX
HEATING
COIL
FLOW
OPERATING WEIGHT
NOT INCLUDING CURB
FUEL INPUT
GAS PIPE FLOW
NOMINAL COOLING
CAPACITY
VAV BOX
ROOFTOP UNIT
2" DOM. WM
PIPE ACCESSORY TAGS
DOMESTIC WATER METER
BALANCING VALVE
1/4 TURN BALL VALVE
CHECK VALVE
3-WAY MIXING VALVE
MOTORIZED CONTROL VALVE
3 WAY MOTORIZED CONTROL
VALVE
PRESSURE REDUCING VALVE
REFRIGERANT SOLENOID VALVE
BUTTERFLY VALVE
2" BALANCING
2" SHUTOFF
2" CHECK
2" TMV
2" M-CNTRL
2" 3-WAY CNTRL
2" PRV
3/8" SOLENOID
2" BUTTERFLY
DATA DEVICE TAGS
DAMPER TAGS
EQUIPMENT ID
SYMBOL
MANUAL BALANCING DAMPER
BACKDRAFT DAMPER
COMBINATION FIRE/SMOKE
DAMPER
FIRE DAMPER
SMOKE DAMPER
MOTORIZED DAMPER
CAP
PLUG
GWR
GWS
GEOTHERMAL WATER
RETURN
GEOTHERMAL WATER
SUPPLY
KEYNOTE
CONTINUATION SYMBOL
NUMBER OF SHEET WHERE DETAIL APPEARS
NUMBER OF DETAIL ON SHEET
REVISION NUMBER - SHOWN ON PLANS
GENERAL MECHANICAL SYMBOLS
ROOM NAME AND NUMBER
LIMIT OF DEMOLITION
ITEM TO BE DEMOLISHED
TYP.
Room
(E)
2"
1/8" / 12" SLOPE
PIPE SIZE TAG (DIAMETER)
ABOVE GROUND PIPING
BELOW GROUND PIPING
EXISTING PIPE TAG
PIPING BEING DEMOLISHED
INVERT: -105' - 1" PIPE INVERT ELEVATION TAG
PIPE SLOPE TAG
NEW WORK NOTES
DEMOLISHED WORK NOTES
(E)
CONNECT NEW DUCT TO EXISTING DUCT
AREA NOT IN CONTRACT
KG KILOGRAM
KG/HR KILOGRAM PER HOUR
kPa KILOPASCAL
KW KILOWATT
KWH KILOWATT HOUR
L LITER
L/h LITERS PER HOUR (or LITERS/HOUR) L/m LITERS PER MINUTE (or LITERS/MINUTE) L/s LITERS PER SECOND (or LITERS/SECOND)
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LPG LIQUEFIED PETROLEUM GAS
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN
(CLEAN)
LLHX LIQUID TO LIQUID HEAT EXCHANGER
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/S METERS PER SECOND
(OR METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1,000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN
(STEAM CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MRI MAGNETIC RESONANCE IMAGING
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NG NATURAL GAS
NGFM NATURAL GAS FLOWMETER
Nm NEWTON METER
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC &
ATMOSPHERIC ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NPSHA NET POSITIVE SUCTION HEAD
AVAILABLE
NPSHR NET POSITIVE SUCTION HEAD
REQUIRED
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTDOOR AIR DAMPER
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OFM OIL FLOWMETER
OR OPERATING ROOM
P PUMP
Pa PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PEF PROPELLER (TYPE) EXHAUST FAN
PF PRE-FILTER
PG PRESSURE GAGE
PGW PROPYLENE GLYCOL-WATER
(SOLUTION)
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE)
STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH –
ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
PTAC PACKAGED TERMINAL AIR
CONDITIONER
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD RETURN AIR DAMPER
RAF RADIO FREQUENCY
RAHX ROTARY AIR HEAT EXCHANGER
RAT RETURN AIR TEMPERATURE
RCCH REMOTE CONDENSER CHILLER
RCU RECIPROCATING CHILLER UNIT
RD REFRIGERANT DISCHARGE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RELAD RELIEF AIR DAMPER
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCI SPINAL CODE INJURY
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SD-1 SCHEMATIC DESIGN (SUBMISSION1)
SD-2 SCHEMATIC DESIGN (SUBMISSION2)
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND
DISTRIBUTION
SPRV STEAM PRESSURE REDUCING
VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT
EXCHANGER
SSR SOLID SEPARATOR
ST STEAM TRAP
SUH STEAM UNIT HEATER
SV STEAM PRESSURE REDUCING
VALVE
SVS STEAM VENT SILENCER
SW SOFTWATER
SWHX STEAM TO WATER HEAT
EXCHANGER
T&PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TG TRANSFER GRILLE
TP TRAP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TWU THRU-WALL UNIT
UC UNDER CUT
UC UNIT COOLER
UH UNIT HEATER
U UNDERWRITERS LABORATORY
URV UPBLAST UNIT VENTILATOR
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL
OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH
ADMINISTRATION
VI VIBRATION ISOLATOR
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE)
RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
WAG WASTE ANETHESIA GAS
Wb WET-BULB (TEMPERATURE)
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING UNIT
WCHP WATER COOLED HEAT PUMPS
WCPU WATER COOLED PACKAGED UNIT
WEF WALL EXHAUST FAN
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
YR YEAR
ABBREVIATIONS
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMPERATURE
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ER EXHAUST REGISTER
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
EUH ELECTRIC UNIT HEATER
EWC EVAPORATIVE WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FHX FLUE GAS/FEEDWATER HEAT
EXCHANGER
FM FLOW METER
FOP FUEL OIL PUMP
FOT FUEL OIL TANK
FOHX FUEL OIL HEAT EXCHANGER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTU FAN POWERED TERMINAL UNIT
FR FLOOR REGISTER
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT WC FEET OF WATER COLUMN
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
H HUMIDIFER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HOOD
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN
(STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HVD HOISTWAY VENT DAMPER
HX HEAT EXCHANGER
HZ HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTERGRATED PART LOAD VALUE
IRH INTRARED HEATER
IS INSECT SCREEN
IU INDUCTION UNIT
IV INLET VANES
J INTENTIALLY LEFT BLANK
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AAV AUTOMATIC AIR VENT
AB AIR BLENDER
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR COOLED CONDENSING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER,
TWO POSITION
ACU AIR CONDITIONING UNIT
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASURING STATION
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERE
AP ACCESS PANEL
APD AIR PRESSURE DROP
AQST AQUASTAT
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASHRAE AMERICAN SOCIETY OF HEATING
REFRIGERATION AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BG BOTTOM GRILLE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BMT BONE MARROW TRANSPLANT
BR BOTTOM REGISTER
BSC BIOLOGICAL SAFETY CABINETS
BT BLOWOFF TANK
BTC BLOWOFF TANK CONTROL VALVE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
BWT BOILER PLANT WATER TUBE
C CENTIGRADE (CELSIUS)
CAV CONSTANT AIR VOLUME
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CD-1 CONSTRUCTION DOCUMENTS
(SUBMISSION1)
CD-2 CONSTRUCTION DOCUMENTS
(SUBMISSION2)
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CG CEILING GRILLE
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXODE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CR CEILING REGISTER
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN (TO
COOLING TOWER)
CWS CONDENSER WATER SUPPLY (FROM
COOLING TOWER)
D DAMPER - AUTOMATIC
Db DRY-BULB TEMPERATURE
DB DECIBELS
DCW DOMESTIC COLD WATER
DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)
DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
ACCESS DOOR ON TOP OF DUCT
ACCESS DOOR ON SIDE OF DUCT
ACCESS DOOR ON BOTTOM OF DUCT
SHEET NOMENCLATURE
M P # # #
SERIES
MECHANICAL
(H) HVAC
(P) PIPING
(D) DEMO
(Z) ZONE
SERIES
0 - SYMBOLS AND NOTES
1 - PLAN VIEWS
3 - ELEVATIONS AND SECTIONS
4 - LARGE SCALE - PLANS AND SECTIONS
5 - SCHEMATICS AND DETAILS
6 - SCHEDULES
8 - CONTROLS
AD
CARBON DIOXIDE SENSOR
NITROGEN DIOXIDE SENSOR
CARBON MONOXIDE SENSOR
HUMIDITY SENSOR
HUMIDISTAT SENSOR
MANUAL SWITCH
TEMPERATURE SENSOR
THERMOSTAT
TEMPERATURE & HUMIDITY SENSORRTU-XX
VAV-XX
P R
O F
E
S S
I ONA L
EN
G
I N
E E
R
J E R
EM
Y
M. KNOW
L E
SL
I C ENS E
F L O R I D
A
No. 90210
STATE OF
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
FINAL SUBMITTAL
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
LEGENDS, ABBREVIATIONS, AND
NOTES
RESOLVE STATEMENT OF
CONDITIONS DEFICIENCIES
BAY PINES, FL
M001
516-19-111
JMK JSW06/25/2021
MECHANICAL SHEET INDEX
M001 LEGENDS, ABBREVIATIONS, AND NOTES
MD101 FIRST FLOOR INTERSTITIAL HVAC DEMOLITION FLOOR PLAN
MD102 SECOND FLOOR INTERSTITIAL HVAC DEMOLITION FLOOR PLAN
MD103 FOURTH INTERSTITIAL HVAC DEMOLITION FLOOR PLAN
M101 FIRST FLOOR INTERSTITIAL HVAC NEW WORK FLOOR PLAN
M102 SECOND FLOOR INTERSTITIAL HVAC NEW WORK FLOOR PLAN
M103 FOURTH FLOOR INTERSTITIAL HVAC NEW WORK FLOOR PLAN
M104 FIFTH FLOOR INTERSTITIAL HVAC NEW WORK FLOOR PLAN
M501 DUCTWORK AND PIPING DETAILS
GENERAL MECHANICAL NOTES
DEMOLITION MECHANICAL NOTES
PHASING MECHANICAL NOTES
A. THE TEST AND BALANCE CONTRACTOR SHALL BE A SUBCONTRACTOR TO THE
PRIME CONTRACTOR AND NOT A SUBCONTRACTOR TO THE MECHANICAL OR
ANY OTHER SUBCONTRACTOR.
B. PRE-TAB REPORT: TO ESTABLISH BASELINE PERFORMANCE BEFORE
COMMENCING WORK, THE CONTRACTOR SHALL PROVIDE A PRE-TAB REPORT
ON ALL AIR HANDLING UNITS MODIFIED IN THIS PROJECT. THE REPORT SHALL
AT A MINIMUM, PROVIDE SUPPLY AND RETURN FLOWS, PRESSURE PROFILES,
MOTOR CHARACTERISTICS, AND ANY OTHER PERFORMANCE DATA REQUIRED
TO ESTABLISH BASELINE PERFORMANCE OF EXISTING EQUIPMENT TO REMAIN.
SUBMIT REPORT TO COR FOR APPROVAL.
TEST AND BALANCE MECHANICAL NOTES
A. THE CONTRACTOR SHALL BE FAMILIAR WITH ALL THE CONDITIONS, BOTH
EXISTING AND THOSE ILLUSTRATED BY THESE DOCUMENTS, AS WELL AS
THOSE WHICH CAN BE REASONABLY ANTICIPATED INCLUDING, BUT NOT
LIMITED TO ARCHITECTURAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, AND
OTHER SYSTEMS INVOLVED ON THIS PROJECT.
B. FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM AND
SHALL CONFORM TO ALL CURRENT REQUIREMENTS FOUND IN THE UNITED
STATES DEPARTMENT OF VETERANS AFFAIRS TECHNICAL INFORMATION
LIBRARY, INCLUDING BUT NOT LIMITED TO THE PHYSICAL SECURITY MANUAL,
HVAC DESIGN MANUAL, AND STEAM, HEATING HOT WATER, AND OUTSIDE
DISTRIBUTION SYSTEM DESIGN MANUAL. ALL WORK SHALL ALSO CONFORM
TO ALL FEDERAL, STATE, AND LOCAL CODES, INCLUDING BUT NOT LIMITED TO
THE INTERNATIONAL BUILDING CODE AND INTERNATIONAL MECHANICAL
CODE.
C. INSTALL ALL EQUIPMENT AND DEVICES IN ACCORDANCE WITH THEIR
RESPECTIVE MANUFACTURER’S INSTALLATION INSTRUCTIONS AT A LEVEL OF
QUALITY AND WORKMANSHIP CONSISTENT WITH THESE DOCUMENTS. ANY
DEVIATIONS BETWEEN THE INSTALLATION INSTRUCTIONS AND THESE
DOCUMENTS WILL BE BROUGHT TO THE ATTENTION TO THE COR BEFORE ANY
COURSE OF ACTION BY THE CONTRACTOR IS INITIATED, INCLUDING
PURCHASE OF EQUIPMENT.
D. CONTRACTOR SHALL COORDINATE ALL WORK DESCRIBED AND ILLUSTRATED
IN THESE DRAWINGS. LOCATIONS OF PIPING, DUCTWORK AND EQUIPMENT AS
INDICATED ON THESE DRAWINGS ARE APPROXIMATE AND SUBJECT TO
ADJUSTMENTS IN THE FIELD. OFFSET DUCTS, PIPING, AND SHIFT EQUIPMENT
AS REQUIRED TO AVOID INTERFERENCE AND CONFLICTS IN THE FIELD.
COORDINATE DUCT AND PIPE ROUTING AND EQUIPMENT LOCATIONS WITH
PLUMBING AND ELECTRICAL INSTALLATIONS AND WITH BUILDING
STRUCTURAL MEMBERS.
E. THESE MECHANICAL DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE NOT TO
BE SCALED. BEFORE BEGINNING WORK, THE CONTRACTOR SHALL VISIT THE
SITE AND COMPLETE MEASURED SURVEY AND CREATE LAYOUT DRAWINGS AS
REQUIRED BY THE SPECIFICATIONS. WORK SHALL NOT BEGIN UNTIL ALL
LAYOUT DRAWINGS ARE APPROVED BY THE COR.
F. COORDINATE LOCATIONS OF CEILING REGISTERS AND DIFFUSERS WITH
LIGHTING LAYOUT AND ARCHITECTURAL REFLECTED CEILING PLAN.
G. DUCT SIZES INDICATED ARE MINIMUM CLEAR INSIDE DIMENSIONS. WHERE
DUCT LINER OCCURS, INCREASE SHEET METAL DUCT SIZES TO
ACCOMMODATE LINER.
H. DUCT AND PIPE SUPPORTS ARE NOT SHOWN ON DRAWINGS.
I. SUPPORT ALL DUCTS, PIPING, AND EQUIPMENT FROM PRIMARY BUILDING
STRUCTURAL MEMBERS. PROVIDE ADDITIONAL STRUCTURAL MEMBERS
WHERE NECESSARY TO ACCOMPLISH THIS REQUIREMENT.
J. NEW AND EXISTING SUPPORT, RODS, AND ASSOCIATED APPURTENANCES
SHALL NOT RESTRICT EQUIPMENT SERVICE AND MAINTENANCE ACCESS.
EXISTING SUPPORTS SHALL BE MODIFIED TO PROVIDE FOR EQUIPMENT
SERVICE AND MAINTENANCE ACCESS.
K. DUCT HANGERS SHALL BE IN STRICT ACCORDANCE WITH FIG 4-4 OF SMACNA
HVAC DUCT CONSTRUCTION STANDARDS METAL AND FLEXIBLE - SECOND
EDITION EXCEPT THAT HANGER WIRE SHALL NOT BE USED TO SUPPORT
DUCTS OR EQUIPMENT, AND HANGERS THAT REQUIRE PENETRATION OF DUCT
WITH BOLTS, RIVETS, SCREWS, WIRES OR ANY OTHER FASTENER SHALL NOT
BE USED.
L. CONTRACTOR SHALL REWORK EXISTING HANGERS AND OTHER SUPPORT FOR
DUCT AND PIPING TO COORDINATE WITH NEW EQUIPMENT AND WALL
LOCATIONS. ADD SUPPORT (TRAPEZE, CLEVIS, ETC) AT EQUIPMENT AND ON
EACH SIDE OF NEW WALLS SO FULL WEIGHT OF DUCT AND PIPING IS
SUPPORTED FROM STRUCTURE AND EQUIPMENT AND NEW WALLS BEAR NO
WEIGHT.
M. CONTRACTOR SHALL PROVIDE A LIST OF ALL MECHANICAL EQUIPMENT,
DEVICES, AND ALL APPURTENANCES REQUIRING POWER TO THE COR FOR
REVIEW AND APPROVAL AS PART OF COORDINATION FOR THIS PROJECT. LIST
ALL ELECTRICAL REQUIREMENT CHARACTERISTICS, INCLUDING BUT NOT
LIMITED TO VOLTAGE, AMPERAGE, PHASE, DISCONNECTING MEANS, OVER
CURRENT PROTECTION AND ALL CHARACTERISTICS FOR A FULLY
FUNCTIONAL AND COORDINATED SYSTEM. REFER TO ELECTRICAL DRAWINGS
FOR VOLTAGE REQUIREMENTS OF ALL EQUIPMENT.
N. DO NOT USE SCHEDULED EQUIPMENT IDENTIFICATION NUMBERS SHOWN ON
DRAWINGS FOR FINAL EQUIPMENT SIGNS AND FOR CONTROL SYSTEM
SCHEMATICS. CONTACT COR AND OBTAIN FROM REFRIGERATION AND HVAC
MAINTENANCE SUPERVISOR THE CORRECT NOMENCLATURE AND EQUIPMENT
NUMBERS FOR INCLUSION IN SIGNAGE, CONTROL SCHEMATICS, AND AS-BUILT
DRAWINGS.
O. CONTROL DEVICES ASSOCIATED WITH THE WORK OF THIS PROJECT SHALL BE
RELOCATED AS NECESSARY SO THAT THE FINAL PRODUCT RESULTS IN A
FULLY FUNCTIONAL AND FULLY ACCESSIBLE SYSTEM. CONTRACTOR SHALL
RELOCATE ALL EXISTING CONTROLS, SENSORS, PROBES, OR OTHER DEVICES
AND PROVIDE NEW WIRING, CONDUIT, AND/OR TUBING TO EXTEND SUCH
DEVICES AS NECESSARY TO PRODUCE A FULLY FUNCTIONAL SYSTEM EQUAL
OR BETTER THAN EXISTING. PROTECT AND STORE ALL SUCH RELOCATED
DEVICES.
A. EQUIPMENT INDICATED TO BE REMOVED SHALL BE REMOVED FROM THE
PROJECT SITE IN ITS ENTIRETY INCLUDING ALL HANGERS, ELECTRICAL
CONDUIT, WIRING, JUNCTION BOXES, PIPING, CONTROLS, ACCESSORIES AND
ALL APPURTENANCES THAT ARE RENDERED USELESS OR ABANDONED BY
THE REMOVAL OF THE INDICATED EQUIPMENT.
B. WHERE THESE DOCUMENTS REQUIRE REMOVAL OF DUCTWORK, PIPING,
EQUIPMENT OR ASSOCIATED APPURTENANCES, CONTRACTOR SHALL
PROTECT ALL EXISTING-TO-REMAIN COMPONENTS FROM DAMAGE.
CONTRACTOR SHALL COVER ALL OPENINGS IN DUCT, PIPING, EQUIPMENT,
AND ANY OTHER DEVICE FROM CONSTRUCTION DUST AND DEBRIS.
C. WHERE EQUIPMENT, DUCTWORK, OR PIPING IS TO BE REMOVED THAT IS IN-
SERVICE, CONTRACTOR SHALL GIVE NOTICE TO THE COR OF ANY
INTERRUPTIONS ANTICIPATED. IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO COORDINATE ALL SHUTDOWNS OR INTERRUPTIONS TO THE
SATISFACTION OF THE COR AND HOSPITAL STAFF.
A. CONTRACTOR SHALL PHASE ALL WORK AS REQUIRED TO MAINTAIN
CONTINUOUS OPERATION OF THE HOSPITAL.
B. HOSPITAL OPERATIONS SHALL NOT BE INTERRUPTED DUE TO THE WORK OF
THIS PROJECT EXCEPT FOR SCHEDULED SHUTDOWNS OF NO LONGER THAN
ONE HOUR. CONTRACTOR SHALL GIVE REASONABLE NOTICE TO COR BEFORE
ANY SUCH SHUTDOWN OR INTERRUPTION.
C. WHERE LONGER SHUTDOWNS ARE REQUIRED TO COMPLETE THE WORK
DESCRIBED IN THIS DOCUMENT, THE CONTRACTOR SHALL SCHEDULE THE
EVENT A MINIMUM OF 3 WEEKS PRIOR TO COMMENCING WORK. ALL SUCH
SHUTDOWNS AND INTERRUPTIONS SHALL BE MINIMIZED AND SHALL UTILIZE
WEEKENDS, FEDERAL HOLIDAYS, NIGHTS, AND OTHER TIMES WHEN HOSPITAL
OPERATIONS ARE MINIMIZED AND OTHER SUCH TIMES AGREEABLE TO THE
COR.
D. WHERE NECESSARY TO INTERRUPT CONTINUOUS OPERATION OF THE
HOSPITAL, THE CONTRACTOR SHALL DIVIDE WORK INTO PHASED
CONSTRUCTION THAT IS NOT NECESSARILY SHOWN ON THESE DOCUMENTS.
AS PART OF SCHEDULING AN INTERRUPTION OR SHUTDOWN, THE
CONTRACTOR SHALL PROVIDE THE COR WITH A DETAILED SHUTDOWN PLAN
INDICATING THE SYSTEMS AFFECTED, INCLUDING BUT NOT LIMITED TO
ARCHITECTURAL, ELECTRICAL, MECHANICAL, PLUMBING, FIRE PROTECTION,
AND OTHER SYSTEMS INVOLVED. THE PLAN SHALL INCLUDE THE WORK TO BE
PERFORMED, THE LENGTH OF INTERRUPTION, AND A DETAILED PHASING AND
MANNING DESCRIPTION. THE PLAN SHALL INCLUDE AND ADDRESS
CONTINGENCY FOR MITIGATING ANY DELAYS THAT MAY OCCUR IN THE
PLANNED WORK. PROVIDE THIS PLAN TO THE COR 5 WEEKS BEFORE THE
EVENT FOR APPROVAL.
KEY PLAN B100
E L E V .
P - 1 P - 2
E L E V .
P - 3
E L E V .
E L E V .
S - 6S - 5
E L E V .E L E V .
S - 4
E L E V
S - 7
E L E V
S - 8
E L E V
S - 9
E L E V
S - 1 1
E L E V
S - 1 2
E L E V
S - 1 0
AD
B C
MD101
(E)22"Ø R/A
(E)32"Ø R/A
(E)28"Ø R/A
(E )1 6" Ø R /A
(E )1 2" Ø R /A
(E)28"Ø S/A
(E )1 6" Ø S /A
(E)18"Ø S/A
(E )1 2" Ø S /A
(E)24"Ø S/A
(E )2 5" /1 2" S /A
(E)1H-70
(E )8 "Ø
S /A
(E )1 4" Ø S /A
(E)1H69
(E)10"x12" S/A
(E )8 "x 8" S /A
(E)8"Ø S/A
(E)5"Ø S/A
(E)5"Ø S/A
(E )1 0" x8 S /A
(E )2 5" /1 2" R /A
(E )1 2" Ø R /A(E)10"Ø R/A
(E)6"Ø R/A
(E)10"Ø R/A
(E )1 4" Ø R /A
(E)6"Ø R/A
(E )1 8" Ø R /A
(E)8"Ø R/A
(E )1 6" Ø S /A
(E)8"Ø S/A
(E)1H-82
(E)16"x8" S/A
(E )8 "x 8" S /A
(E )8 "Ø
S /A
(E)1H-82A
(E)8"x8" R/A
(E)6"Ø
(E)10"x4" R/A
(E)6"Ø R/A
(E )1 0" Ø R /A
(E)1H-85
(E )1 0" Ø S /A
(E)1H-86
(E)1H-87
(E)10"Ø S/A
(E)1H-88
(E )1 0" Ø S /A
(E)10"Ø R/A
(E )1 8" Ø R /A
(E )1 0" Ø S /A
(E )1 2" Ø R /A
(E )1 0" Ø R /A
(E )1 2" Ø S /A
(E)6"Ø S/A
(E)6"Ø S/A
(E)18"Ø S/A
(E )1 8" Ø R /A
(E )2 5" /1 2" R /A
(E)28"Ø R/A
(E )1 2" Ø S /A
(E )1 2" Ø R /A
(E)8"x8" S/A
(E)AHU-34
(E)40"x26"
(E )3 0" x2 0"
(E )3 0" x1 2" S /A
(E )3 0" x2 0" R /A
(E )1 2" Ø S /A
(E )1 2" Ø R /A
(E )6 "Ø
S /A
(E)6"Ø S/A
(E)1H-82A
(E )6 "Ø
S /A
(E) 2" CWR
(E) 2" CWS
G.8 G.8
G G
F.6 F.6
F.2 F.2
F.1 F.1
MD101
MD101
MD101
1 Interstitial -
Mechanical
14' - 0"
Level 2
22' - 10"
(E )2 6" x4 0"
(E)20"x30"
(E)AHU-34
REMOVE AUX DRAIN PAN
EXISTING MECHANICAL AND
ELECTRICAL TO REMAIN ACTIVE
(E)12"x30" S/A
(E)20"x30" R/A
(E)12"x30"
2" CWS/R TO
REMAIN
G
P R
O F
E
S S
I ONA L
EN
G
I N
E E
R
J E R
EM
Y
M. KNOW
L E
SL
I C ENS E
F L O R I D
A
No. 90210
STATE OF
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
FINAL SUBMITTAL
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
FIRST FLOOR INTERSTITIAL HVAC
DEMOLITION FLOOR PLAN
RESOLVE STATEMENT OF
CONDITIONS DEFICIENCIES
BAY PINES, FL
MD101
516-19-111
JMK JSW06/25/2021
0 4' 8'2'
1/4" = 1'-0"MD101
1 FIRST FLOOR INTERSTITIAL HVAC DEMOLITION PLAN
MD101 DEMOLITION NOTES
NOTE
NUMBER NOTE TEXT
1 REMOVE 30"x20" RETURN DUCT FROM BLOWER COIL UNIT TO
APPROXIMATE LOCATION AS INDICATED. PREPARE DUCT FOR NEW. SEE
SHEET M101.
2 REMOVE 8" DIA RETURN DUCT FROM FLOOR PENETRATION TO 30"x20"
RETURN DUCT. PREPARE FOR NEW WORK. SEE SHEET M101.
3 REMOVE 6" DIA RETURN DUCT FROM MAKE-UP AIR VAV TERMINAL TO
30"x20" RETURN DUCT. PREPARE FOR NEW WORK. SEE SHEET M101.
4 REMOVE 30"x20" SUPPLY DUCT FROM BLOWER COIL UNIT TO
APPROXIMATE LOCATION OF SCOPE OF WORK. PREPARE DUCT FOR
NEW. SEE SHEET M101.
5 REMOVE 6" DIA RETURN DUCT FROM FLOOR PENETRATION TO 12" DIA
RETURN DUCT.
6 REMOVE A PORTION OF THE 12" DIA RETURN DUCT APPROXIMATLY 16'-0"
FROM FACE OF WALL AND END CAP DUCT. PREPARE FOR NEW WORK.
SEE SHEET M101.
7 AHU-34 WILL REMAIN IN PLACE.
8 REMOVE APPROXIMATE 42" OF 6" DIA SUPPLY DUCT. COORDINATE WITH
NEW 30"x20" RETURN AIR DUCT. SEE NEW WORK SHEET M101.
0 4' 8'2'
1/4" = 1'-0"MD101
2 FIRST FLOOR DEMOLITION WORK INTERSTITIAL MECHANICAL - SECTION
TRUE
NORTH
PLAN
NORTH
REMOVE AUX
DRAIN PAN
NOT TO SCALEMD101
3 AHU-34 ELEVATION VIEW 1
NOT TO SCALEMD101
5 AHU-34 ELEVATION VIEW 3
NOT TO SCALEMD101
4 AHU-34 ELEVATION VIEW 2
G
F. 5
F. 2
F
E. 6
H
G. 7
G. 5
252423222120
J
D
E
15 16 17 18 19
D. 4
ROOF
ROOF
KEY PLAN B100
AD
B C
MD102
MD102
(E )1 6" x1 2" R /A
(E )1 4" Ø R /A
(E)12"x10" S/A
(E )1 6" x1 2" S /A
(E)AHU-36
(E)8"Ø S/A
(E)8"Ø S/A
(E)16"x16" R/A
(E )1 6" x1 6" R /A
(E)2E-1A
MAKE-UP
AIR
(E)40"x24" R/A
(E)8"Ø S/A
(E)8"Ø S/A
(E)A36-1
(E)A36-2
(E)8"Ø
(E)12"Ø S/A
(E)5"Ø S/A
(E)6"x6" S/A (E)6"x6" S/A
(E)10"Ø S/A
(E)2E-10
(E)2E-11
(E )1 2" Ø S /A
(E)6"x6" S/A
(E)34"Ø S/A (E)14"Ø S/A
(E)30"Ø R/A (E)32"Ø R/A
(E )1 2" Ø S /A
(E)2E-9
(E)2E-8
(E )8 "x 4" S /A
(E)8"x4" S/A
(E )5 "Ø
S /A
(E )5 "Ø
S /A
(E )8 "Ø
S /A
(E )2 1" /1 2" S /A
(E )8 "x 4" S /A
(E)10"Ø R/A (E)12"x10" S/A
(E )1 2" x1 0" S /A
(E )8 "Ø
S /A
(E)2E-7
(E)2E-6
(E )8 "Ø
S /A
(E)10"x8" S/A
(E)12"Ø R/A
(E )1 4" Ø R /A
(E)5"Ø S/A
(E)2E-5
(E )1 2" Ø S /A
(E)12"Ø R/A
(E )5 "Ø
S /A
(E )1 5" /1 2" S /A
(E )1 2" Ø R /A
(E)34"Ø S/A
(E)40"Ø R/A
(E)10"Ø S/A
(E)A36-4
(E)8"Ø S/A
(E)12"Ø R/A
(E)8"Ø S/A
(E)5"Ø S/A
(E)2E-4
(E)16"x4" S/A
(E)8"x4" S/A
(E)6"Ø R/A
(E)8"x6" S/A
(E )1 2" Ø R /A
(E)12"Ø R/A (E )1 0" Ø S /A
(E)8"Ø S/A
(E)A36-3
(E)8"Ø S/A
EXISTING
DRAIN PAN TO
REMAIN
2" CWS/R TO
REMAIN
1" DHW/R TO
REMAIN
(E)6"Ø
(E )8 "Ø
S /A
MD102
MD102
MD102
K K
J J
(E )1 0" Ø R /A
2 Interstitial -
Mechanical
42' - 0"
Level 3
50' - 10"
(E)2E-1A
MAKE-UP
AIR
(E)6"Ø
(E)16"x16" R/A
EXISTING MECHANICAL AND
ELECTRICAL TO REMAIN ACTIVE
(E)AHU-36
(E)8"Ø S/A
(E )8 "Ø
S /A
2" CWS/R TO
REMAIN
(E)A36-1
EXISTING
DRAIN PAN
1" DHW/R
TO REMAIN
(E)8"Ø S/A
(E)8"Ø S/A(E)8"Ø S/A
2 Interstitial -
Mechanical
42' - 0"
Level 3
50' - 10"
(E)8"Ø S/A
(E)A36-1
(E)12"Ø S/A
(E)AHU-36(E)16"x16" S/A
(E)8"Ø S/A
(E)8"Ø
(E)A36-2
(E)12"Ø S/A
EXISTING DRAIN
PAN TO REMAIN
(E)12"x16" S/A
2" CWS/R TO
REMAIN
EXISTING MECHANICAL AND
ELECTRICAL TO REMAIN ACTIVE
(E)24"x40" R/A
1" DHW/R
TO REMAIN
(E)10"Ø R/A(E)14"Ø R/A
(E)8"Ø S/A (E)8"Ø S/A
P R
O F
E
S S
I ONA L
EN
G
I N
E E
R
J E R
EM
Y
M. KNOW
L E
SL
I C ENS E
F L O R I D
A
No. 90210
STATE OF
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
FINAL SUBMITTAL
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
SECOND FLOOR INTERSTITIAL HVAC
DEMOLITION FLOOR PLAN
RESOLVE STATEMENT OF
CONDITIONS DEFICIENCIES
BAY PINES, FL
MD102
516-19-111
JMK JSW06/25/2021
PLAN
NORTH
TRUE
NORTH
0 4' 8'2'
1/4" = 1'-0"MD102
1 SECOND FLOOR INTERSTITIAL HVAC DEMOLITION PLAN
0 4' 8'2'
1/4" = 1'-0"MD102
2 SECOND FLOOR INTERSTITIAL HVAC DEMOLITION PLAN
0 4' 8'2'
1/4" = 1'-0"MD102
3 SECOND FLOOR INTERSTITIAL HVAC DEMOLITIO PLAN
MD102 DEMOLITION NOTES
NOTE
NUMBER NOTE TEXT
1 REMOVE RUNOUT FROM BRANCH TO TU A36-2. PATCH AND REPAIR
BRANCH DUCT.
2 REMOVE EXISTING RUNOUT AT TU 2E-1A TO THE EXTENT INDICATED FOR
REROUTING IN NEW WORK PHASE.
3 REMOVE EXISTING DUCT TO THE APPROXIMATE EXTENT INDICATED TO
INSTALL NEW FIRE DAMPER.
3 3 3
NOT TO SCALEMD102
4 AHU-36 ELEVATION VIEW 1
NOT TO SCALEMD102
5 AHU-36 ELEVATION VIEW 2
NOT TO SCALEMD102
6 AHU-36 ELEVATION VIEW 3
G . 5
2 72 6
2 52 42 32 22 12 0
F . 5
E . 6
F . 3
F
E
D . 4
D
1 91 81 71 61 5
1 41 3
H
J
K
G. 7
2 72 61 41 3
H
DN
(E)40"/36" S/A(E)36"Ø S/A(E)34"Ø S/A
(E)52"/40" R/A(E)44"/40" R/A(E)42"/40" R/A
(E )2 1" /2 2" S /A
(E )1 6" /2 2" S /A
(E )8 "Ø
S /A(E)4B-4
(E)10"x8" S/A
(E)10"x8" S/A
(E)8"Ø S/A
(E)8"Ø S/A(E)4B-5
(E)8"x8" S/A
(E )2 2" /1 6" R /A
(E)22"/16" R/A
(E)8"x8" R/A
(E )8 "Ø
R /A
(E )8 "x 8" R /A
(E)10"x8" R/A
(E)6"Ø R/A
(E)6"Ø R/A
(E )2 2" /1 6" S /A
(E )2 2" /1 6" R /A
(E)8"Ø S/A
(E)4B-6
(E)10"x8" S/A
(E)8"x4" S/A
(E )8 "x 4" S /A
(E )5 "Ø
S /A
(E)6"x6" S/A
(E )6 "x 6" S /A
(E )5 "Ø
S /A
(E)5"Ø S/A
(E)10"x8" S/A
(E)8"Ø S/A
(E)4B-7
(E)10"x8" S/A
(E)10"x8" S/A
(E )8 "Ø
S /A
(E )8 "Ø
S /A
(E)4B-9
(E)14"Ø S/A
(E)4B-10
(E )1 6" Ø R /A
(E )1 2" Ø R /A
(E)8"x8" R/A
(E )6 "Ø
R /A
(E )8 "Ø
R /A
(E)16"x8" R/A(E)8"Ø R/A
(E )6 "Ø
R /A
(E)12"x10" R/A
(E )1 2" x1 0" R /A
(E )6 "Ø
R /A
(E )1 0" Ø R /A
(E)6"Ø R/A
(E )1 4" Ø S /A
(E)6"Ø S/A
(E)4B-13
(E)10"x6" S/A
(E )1 0" x6 S /A
(E)8"Ø S/A
(E)6"Ø S/A (E)4B-14
(E)8"x8" S/A
(E )8 "Ø
S /A
(E )5 "Ø
S /A
(E)8"Ø S/A
(E)4B-15
(E)10"x14" S/A
(E )1 0" x1 4" S /A
(E)10"x14" S/A
(E)12"Ø S/A
(E )8 "Ø
S /A
(E )1 2" Ø S /A
(E)6"Ø S/A
(E)4B-16
(E )1 2" x6 S /A
(E )8 "Ø
S /A
(E)8"Ø S/A
(E)8"x8" R/A
(E )6 "Ø
R /A
(E)12"x10" R/A
(E )1 2" x1 0" R /A
(E )1 0" x1 0" R /A
(E)10"Ø R/A
(E)6"Ø R/A
(E)8"Ø R/A
(E)AHU-40
(E )1 2" Ø S /A
(E )1 4" Ø S /A
(E )1 0" Ø R /A
(E )1 2" x1 0" R /A
(E)4B-9
(E)22"Ø S/A
(E )2 2" Ø S /A
(E )2 2" Ø R /A
(E)10"Ø S/A
(E)10"Ø S/A
(E)10"Ø S/A(E)12"Ø S/A
(E )1 2" Ø S /A
(E )1 2" Ø S /A
(E)10"Ø R/A
(E )1 4" Ø S /A
(E )2 2" /1 6" S /A
(E)6"Ø S/A
(E )1 0" Ø R /A
MD103
MD103
J J
H H
MD103
MD103
MD103(E) 1 1/4" CD
Level 5
106' - 10"
4 Interstitial -
Mechanical
98' - 0"
(E)AHU-40
(E)10"Ø R/A (E)10"Ø
(E)22"Ø (E)22"Ø S/A
(E) 1" HW
EXISTING MECHANICAL AND
ELECTRICAL TO REMAIN ACTIVE
(E) 1" HW
(E) 1 1/4" CD
(E)10"x12" R/A
10"Ø R/A
8"x4" R/A 6"Ø R/A
Level 5
106' - 10"
4 Interstitial -
Mechanical
98' - 0"
(E) 1" HW
(E)AHU-40
(E)22"Ø R/A
(E)10"Ø S/A
EXISTING MECHANICAL AND
ELECTRICAL TO REMAIN ACTIVE
(E) 1" HW
(E) 1 1/4" CD
(E)12"Ø S/A
P R
O F
E
S S
I ONA L
EN
G
I N
E E
R
J E R
EM
Y
M. KNOW
L E
SL
I C ENS E
F L O R I D
A
No. 90210
STATE OF
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
FINAL SUBMITTAL
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
FOURTH INTERSTITIAL HVAC
DEMOLITION FLOOR PLAN
RESOLVE STATEMENT OF
CONDITIONS DEFICIENCIES
BAY PINES, FL
MD103
516-19-111
JMK JSW06/25/2021
TRUE
NORTH
PLAN
NORTH
0 4' 8'2'
1/4" = 1'-0"MD103
1 FOURTH FLOOR INTERSTITIAL HVAC DEMOLITION PLAN
MD103 DEMOLITION NOTES
NOTE
NUMBER NOTE TEXT
1 REMOVE 1" COPPER BALL VALVE AND INSTALL NEW COPPER PIPING AND
RE-INSULATE.
2 REMOVE EXISTING RETURN AIR DUCT FROM AIR HANDLING UNIT TO THE
EXTENT INDICATED.
3 REMOVE EXISTING SUPPLY AIR DUCT FROM AIR HANDLING UNIT TO THE
EXTENT INDICATED.
4 AHU-40 WILL REMAIN IN PLACE.
5 REMOVE APPROXIMATLY 2'-0" OF 1" COPPER PIPE TO PREPARE TO
INSTALL RELOCATED BALL VALVE.
6 REMOVE CONDENSATE PIPING TO EXTENT INDICATED.
0 4' 8'2'
1/4" = 1'-0"MD103
2 FOURTH FLOOR INTERSTITIAL HVAC DEMOTION PLAN
0 4' 8'2'
1/4" = 1'-0"MD103
3 FOURTH FLOOR INTERSTITIAL HVAC DEMOLITION PLAN
NOT TO SCALEMD103
6 AHU-40 ELEVATION VIEW 3
NOT TO SCALEMD103
4 AHU-40 ELEVATION VIEW 1
NOT TO SCALEMD103
5 AHU-40 ELEVATION VIEW 2
KEY PLAN B100
E L E V .
P - 1 P - 2
E L E V .
P - 3
E L E V .
E L E V .
S - 6S - 5
E L E V .E L E V .
S - 4
E L E V
S - 7
E L E V
S - 8
E L E V
S - 9
E L E V
S - 1 1
E L E V
S - 1 2
E L E V
S - 1 0
AD
B C
1 Interstitial -
Mechanical
14' - 0"
Level 2
22' - 10"
(E)AHU-34
12"x30" S/A
20"x30" R/A
"x R /A
MINIMUM 2" AFF
PROVIDE SUPPORT
RETURN AIR
PLENUM
NEW AUX
DRAIN PAN
NEW RATED
WALL
FD
10"x10" ACCESS DOOR
ON SIDE OF DUCT
16"x16" ACCESS DOOR ON SIDE OF
DUCT. TYPICAL OF BOTH SIDES OF
RETURN DUCT.
2" CWS/R TO
REMAIN
FD
20"x30" R/A
G
30"x20" FLEXIBLE
CONNECTOR
26"x40" R/A
APPROX
1' - 0"
HORIZONTAL OFFSET IN WALL;
CORDINATE EXACT LOCATION
WITH DUCT AND PIPING.
AD
AD
(E)22"Ø R/A
(E)32"Ø R/A
(E)28"Ø R/A
(E )1 6" Ø R /A
(E )1 2" Ø R /A
(E)28"Ø S/A
(E )1 6" Ø S /A
(E)18"Ø S/A
(E )1 2" Ø S /A
(E)24"Ø S/A
(E )2 5" /1 2" S /A
(E)1H-70
(E )8 "Ø
S /A
(E )1 4" Ø S /A
(E)1H69
(E)10"x12" S/A
(E )8 "x 8" S /A
(E)8"Ø S/A
(E)5"Ø S/A
(E)5"Ø S/A
(E )1 0" x8 S /A
(E )2 5" /1 2" R /A
(E )1 2" Ø R /A(E)10"Ø R/A
(E)6"Ø R/A
(E)10"Ø R/A
(E )1 4" Ø R /A
(E)6"Ø R/A
(E )1 8" Ø R /A
(E)8"Ø R/A
(E )1 6" Ø S /A
(E)8"Ø S/A
(E)1H-82
(E)16"x8" S/A
(E )8 "x 8" S /A
(E )8 "Ø
S /A
(E)1H-82A
(E)8"x8" R/A
(E)10"x4" R/A
(E)6"Ø R/A
(E )1 0" Ø R /A
(E)1H-85
(E )1 0" Ø S /A
(E)1H-86
(E)1H-87
(E)10"Ø S/A
(E)1H-88
(E )1 0" Ø S /A
(E)10"Ø R/A
(E )1 8" Ø R /A
(E )1 0" Ø S /A
(E )1 0" Ø R /A
(E )1 2" Ø S /A
(E)6"Ø S/A
(E)6"Ø S/A
(E)18"Ø S/A
(E )1 8" Ø R /A
(E )2 5" /1 2" R /A
(E)28"Ø R/A
(E )1 2" Ø S /A
(E )1 2" Ø R /A
(E)8"x8" S/A
(E)AHU-34
(E )3 0" x1 2" S /A
(E )3 0" x2 0" R /A
M101
T .O .D (7 6"
B .O .D 7' 0"
6" Ø R /A
60"x14"
(E )1 2" Ø S /A
(E )1 2" Ø R /A
(E )6 "Ø
S /A
(E)6"Ø S/A
(E)1H-82A
6"Ø S/A
8" Ø R /A
RETURN AIR
PLENUM
NEW AUX
DRAIN PAN
R
IS
E
R
IS
E
(E) 2" CWR
(E) 2" CWS
SEAL AND FIRE
CAULK PIPING
"x R /A
FD
FD
AD
G.8 G.8
G G
F.6 F.6
F.2 F.2
F.1 F.1
16"x16" ACCESS DOOR
ON BOTH SIDES OF
RETURN DUCT
SERVICE
ISLE
SERVICE
ISLE
(E)6"Ø S/A
FD
AD
P R
O F
E
S S
I ONA L
EN
G
I N
E E
R
J E R
EM
Y
M. KNOW
L E
SL
I C ENS E
F L O R I D
A
No. 90210
STATE OF
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
FINAL SUBMITTAL
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
FIRST FLOOR INTERSTITIAL HVAC NEW
WORK FLOOR PLAN
RESOLVE STATEMENT OF
CONDITIONS DEFICIENCIES
BAY PINES, FL
M101
516-19-111
JMK JSW06/25/2021
0 4' 8'2' 1/4" = 1'-0"M101
2 FIRST FLOOR NEW WORK INTERSTITIAL MECHANICAL - SECTION
0 4' 8'2' 1/4" = 1'-0"M101
1 FIRST FLOOR INTERSTITIAL NEW HVAC PLAN
M101 NEW WORK NOTES
NOTE
NUMBER NOTE TEXT
1 CONTRACTOR SHALL PROVIDE NEW CONNECTION TO AHU-34. PROVIDE
FLEXIBLE CONNECTOR AT UNIT CONNECTION AND RE-WORK DUCTWORK
AND TRANSITION TO MAKE CONNECTION WITH EXISTING SUPPLY AIR
DUCT.
2 CONTRACTOR SHALL CONNECT RETURN AIR PLENUM AND AHU-34 WITH
BELLMOUNTH CONNECTION. ROUTE AND CONNECT RETURN AIR DUCT
UNDER UNIT TO CREATE SERVICE AISLE AS INDICATED. PROVIDE 45
DEGREE CONNECTION AT PLENUM CONNECTION AND RELOCATE ALL
HANGERS AND SUPPORTS REQUIRED. PROVIDE FLEXIBLE CONNECTOR
IN RETURN DUCT AS INDICATED.
3 RECONNECT EXISTING RETURN AIR DUCT FROM BELOW TO NEW
RETURN AIR DUCT, FULL SIZE. (SIZE INDICATED IS APPROXIMATE.)
4 RECONNECT EXISTING TU-1H-82A TO RETURN AIR DUCT TO PROVIDE
VENTILATION AIR TO AHU-34 AS INDICATED. CONTRACTOR TO PROVIDE
FULL SIZE AS EXISTING. (SIZE INDICATED IS APPROXIMATE.)
5 REMOVE AND CAP EXISTING RETURN AIR DUCT TO CREATE A SERVICE
CLEARANCE AISLE. REMOVE ANY HANGERS AND SUPPORTS REQUIRED.
6 ROUTE NEW RETURN AIR DUCT HIGH (MIN 7’-0” A.F.F.) FROM EXISTING
RETURN AIR DUCT TO EXISTING FLOOR PENETRATION OF FLOOR
BELOW. REMOVE ANY HANGERS AND SUPPORTS REQUIRED. SUPPORT
DUCT FROM ABOVE.
7 OFF-SET SUPPLY AIR DUCT AROUND STRUCTURE TO COORDINATE WITH
NEW RETURN DUCT ROUTING.
8 PROVIDE NEW SUPPLY CONNECTION, FULL SIZE OF UNIT CONNECTION,
THROUGH WALL WITH FIRE DAMPER. TRANSITION TO 30”X12” DUCT, FULL
SIZE. (SIZE INDICATED IS APPROXIMATE)
9 ALL UTILITIES AROUND AND ABOVE UNIT TO REMAIN ACTIVE AND IN
OPERATION. SEAL AROUND ALL MECHANICAL PENETRATIONS.
TRUE
NORTH
PLAN
NORTH
F. 5
F. 2
F
E. 6
H
G. 7
G. 5
252423222120
J
D
E
15 16 17 18 19
D. 4
ROOF
ROOF
KEY PLAN B100
AD
B C
(E)34"Ø S/A
(E)40"Ø R/A
(E)34"Ø S/A
(E)32"Ø R/A
(E)14"Ø S/A
(E)30"Ø R/A
(E)5"Ø S/A
(E)2E-11
(E)6"x6" S/A
(E)6"Ø S/A
(E)10"Ø S/A
(E)2E-10
(E )1 2" Ø S /A
(E )1 2" Ø R /A
(E)6"x6" S/A
(E )1 2" Ø S /A
(E)2E-9
(E)8"Ø S/A
(E )1 4" Ø R /A
(E )2 1" /1 2" S /A
(E )8 "x 4" S /A
(E )1 5" /1 2" S /A
(E)2E-8
(E )5 "Ø
S /A
(E )8 "x 4" S /A
(E)8"x4" S/A
(E )5 "Ø
S /A
(E)10"Ø R/A
(E)2E-7
(E )8 "Ø
S /A
(E )1 4" Ø R /A
(E )1 5" /1 2" S /A
(E )1 2" x1 0" S /A
(E)2E-6
(E)2E-5
(E)5"Ø S/A
(E )8 "Ø
S /A
(E)12"Ø R/A
(E)10"x8" S/A
(E )1 2" Ø S /A
(E)32"Ø R/A
(E)6"Ø R/A
(E)8"x6" S/A
(E)16"x4" S/A
(E)2E-4 (E)5"Ø S/A
(E )1 2" Ø R /A(E
)8 "Ø
S /A
(E )8 "x 4" S /A
(E)10"Ø R/A
(E )1 4" Ø R /A
(E )1 4" Ø R /A
(E )1 0" Ø R /A
(E )1 6" x1 2" S /A
(E)16"x16" R/A
(E )1 6" x1 6" R /A
(E)AHU-36
(E)A36-2
(E )1 6" x1 2" R /A
(E )2 E -1 A
M A K E -U P
A
IR
(E )1 2" Ø R /A
(E)16"x16" S/A
(E)12"x10" S/A
(E)8"Ø S/A
(E)8"Ø S/A
(E)8"Ø S/A
(E)A36-1
(E)8"Ø S/A
(E)40"x24" R/A
(E)10"Ø R/A
(E)12"Ø R/A
(E)8"Ø S/A
(E)8"Ø S/A
(E)A36-4
(E)10"Ø S/A
(E )5 "Ø
S /A
(E )1 0" Ø S /A
FD FD
AD
AD
AD
6"Ø S/A
FD
FD
DRAIN PAN
M102
M102
AD
(E )8 "Ø
S /A
K K
J J
2" CWS/R TO
REMAIN
1" DHW/R TO
REMAIN
2 Interstitial -
Mechanical
42' - 0"
Level 3
50' - 10"
2" CWS/R
AD
(E)16"x16" S/A(E)12"x16" S/A (E)AHU-36
(E)24"x40" R/A
(E)12"Ø S/A
(E)A36-1
(E)12"Ø S/A
(E)A36-2
(E)14"Ø R/A
FD
FD
(E)8"Ø S/A
(E)10"Ø R/A
(E)8"Ø S/A
SEAL AND FIRE CAULK
ALL PIPES COMING
THROUGH NEW WALL
EXISTING
DRAIN PAN
TO REMAIN
NEW RATED
WALL
K
1" DHW/R
TO REMAIN
2 Interstitial -
Mechanical
42' - 0"
Level 3
50' - 10"
6"Ø S/AAD6"Ø S/A
(E)8"Ø S/A
(E)A36-1 (E)2E-1A
MAKE-UP
AIR
FD
(E)8"Ø S/A
2" CWS/
CWR
NEW RATED WALL(E)AHU-36
(E)16"x16" R/A
(E )8 "Ø
S /A
(E)10"Ø S/A
1" DHW/R
TO REMAIN
FIRE DAMPER IN NEW
WALL. SEE FLOOR PLAN
EXISTING
DRAIN PAN
P
R O
F E
S S
I ONA L
EN
G
I N
E E
R
J E R
EM
Y
M. KNOW
L E
SL
I C ENS E
F L O R I D
A
No. 90210
STATE OF
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
FINAL SUBMITTAL
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
SECOND FLOOR INTERSTITIAL HVAC
NEW WORK FLOOR PLAN
RESOLVE STATEMENT OF
CONDITIONS DEFICIENCIES
BAY PINES, FL
M102
516-19-111
JMK JSW06/25/2021
0 4' 8'2' 1/4" = 1'-0"M102
2 SECOND FLOOR INTERSTITIAL NEW HVAC PLAN
M102 NEW WORK NOTES
NOTE
NUMBER NOTE TEXT
1 RELOCATE EXISTING SUPPLY AIR TAKE OFF TO A36-2 TO BE INSIDE NEW
RATED ENCLOSURE.
2 ADD FIRE DAMPER WITH ACCESS PANEL TO DUCTS AT PENETRATION OF
NEW RATED ENCLOSURE.
3 ALL UTILITIES AROUND AND ABOVE UNIT TO REMAIN ACTIVE AND IN
OPERATION. SEAL AROUND ALL MECHANICAL PENETRATIONS.
0 4' 8'2' 1/4" = 1'-0"M102
3 SECOND FLOOR INTERSTITIAL NEW HVAC PLAN
0 4' 8'2' 1/4" = 1'-0"M102
4 SECOND FLOOR INTERSTITIAL NEW HVAC PLAN
2 3
TRUE
NORTH
PLAN
NORTH
G . 5
2 72 6
2 52 42 32 22 12 0
F . 5
E . 6
F . 3
F
E
D . 4
D
1 91 81 71 61 5
1 41 3
H
J
K
G. 7
2 72 61 41 3
H
DN
(E)40"/36" S/A(E)36"Ø S/A(E)34"Ø S/A
(E)52"/40" R/A(E)44"/40" R/A(E)42"/40" R/A
(E )2 2" /1 6" R /A(E)10"x8" R/A
(E)6"Ø R/A
(E)6"Ø R/A
(E )2 2" /1 6" S /A(E
)2 2" /1 6" R /A
(E)8"Ø S/A
(E)4B-6
(E)10"x8" S/A
(E)8"x4" S/A
(E )8 "x 4" S /A
(E)6"x6" S/A
(E )6 "x 6" S /A
(E )5 "Ø
S /A
(E)10"x8" S/A
(E)4B-7
(E)10"x8" S/A
(E)10"x8" S/A
(E )8 "Ø
S /A
(E)4B-9(E)14"Ø S/A
(E)4B-10
(E )1 6" Ø R /A
(E )1 2" Ø R /A
(E)8"x8" R/A
(E )6 "Ø
R /A
(E )8 "Ø
R /A
(E)16"x8" R/A
(E )8 "Ø
R /A
(E)8"Ø R/A
(E )6 "Ø
R /A
(E)12"x10" R/A
(E )1 2" x1 0" R /A
(E)10"Ø R/A
(E )6 "Ø
R /A
(E)8"Ø S/A
(E)4B-15
(E)10"x14" S/A
(E )1 0" x1 4" S /A
(E)10"x14" S/A
(E)12"Ø S/A
(E )8 "Ø
S /A
(E )1 2" Ø S /A
(E)6"Ø S/A
(E)4B-16
(E )1 2" x6 S /A
(E )8 "Ø
S /A
(E)8"Ø S/A
(E)8"x8" R/A
(E )6 "Ø
R /A
(E )6 "Ø
R /A
(E)12"x10" R/A
(E )1 2" x1 0" R /A
(E )1 0" x1 0" R /A
(E)10"Ø R/A
(E)6"Ø R/A
(E)8"Ø R/A
(E)AHU-40
(E )1 2" Ø S /A
(E )1 0" Ø R /A
(E )1 2" x1 0" R /A
(E)4B-9
(E)22"Ø S/A
(E )2 2" Ø S /A
(E)10"Ø S/A
(E )2 2" Ø R /A
(E)4B-8
(E)10"Ø R/A
(E)16"x8" R/A
(E)12"x6" S/A
(E)10"Ø S/A
(E )1 2" Ø S /A
(E )1 2" Ø S /A
(E)10"Ø S/A(E)12"Ø S/A
(E )1 6" Ø S /A
(E )2 2" /1 6" S /A
(E )1 4" Ø S /A
58"x32" R/A
M103
M103
AD
"x S /A
FD
FD
J J
H H
AD
AD
(E) 1" HW
(E) 1 1/4" CD
Level 5
106' - 10"
4 Interstitial -
Mechanical
98' - 0"
(E) 1" HW
1" SHUTOFF
(E)AHU-40
32"x58" R/A
10"Ø R/A
(E) 1" HW
AD
FD
FD
(E) 1 1/4" CD
AD
Level 5
106' - 10"
4 Interstitial -
Mechanical
98' - 0"(E) 1" HW
AD
(E) 1" HW
(E)22"Ø R/A
(E)10"Ø S/A
(E)10"Ø R/A
58"X32" R/A
PLENUM
NEW RATED WALL
(E)12"Ø S/A
(E) 1 1/4" CD
P R
O F
E
S S
I ONA L
EN
G
I N
E E
R
J E R
EM
Y
M. KNOW
L E
SL
I C ENS E
F L O R I D
A
No. 90210
STATE OF
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
FINAL SUBMITTAL
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
FOURTH FLOOR INTERSTITIAL HVAC NEW
WORK FLOOR PLAN
RESOLVE STATEMENT OF
CONDITIONS DEFICIENCIES
BAY PINES, FL
M103
516-19-111
JMK JSW06/25/2021
TRUE
NORTH
PLAN
NORTH
0 4' 8'2' 1/4" = 1'-0"M103
1 FOURTH FLOOR INTERSTITIAL HVAC PLAN
M103 NEW WORK NOTES
NOTE
NUMBER NOTE TEXT
1 PROVIDE NEW RETURN AIR PLENUM FULL SIZE UNIT CONNECTION. (SIZE
INDICATED IS APPROXIMATE.) PROVIDE FIRE DAMPER AND ACCESS
DOOR.
2 RECONNECT EXISTING RETURN AIR DUCT TO NEW PLENUM WITH
BELLMOUTH CONNECTION.
3 PROVIDE NEW SUPPLY AIR DUCT FULL SIZE OF UNIT CONNECTION
THROUGH RATED ENCLOSURE. TRANSITION TO EXISTING DUCT WORK
AS INDICATED. SIZE INDICATED IS APPROXIMATE. CONTRACTOR TO
FIELD VERIFY.
4 RELOCATE RETURN AIR TEMPATURE SENSOR AND ASSOCIATED
CONTROL WIRING TO RETURN AIR PLENUM OUTSIDE NEW RATED
ENCLOSURE.
5 AHU-40 WILL REMAIN IN PLACE.
6 RELOCATE SMOKE DETECTOR AND ASSOCIATED CONTROL WIRING TO
SUPPLY AIR DUCT OUTSIDE NEW RATED ENCLOSURE.
7 INSTALL NEW BALL VALVE. SEE MD104 FOR BALL VALVE THAT IS TO BE
RELOCATED.
8 INSTALL NEW 1" DIA COPPER PIPING AND RE-INSULATE.
9 INSTALL NEW 1 1/4" DIA CONDENSATE PIPE AND RE-INSULATE.
10 ALL UTILITIES AROUND AND ABOVE UNIT TO REMAIN ACTIVE AND IN
OPERATION. SEAL AROUND ALL MECHANICAL PENETRATIONS.
11 14"x14" ACCESS DOOR ON BOTH SIDES OF DUCT.
0 4' 8'2' 1/4" = 1'-0"M103
2 FOURTH FLOOR INTERSTITIAL HVAC PLAN
0 4' 8'2' 1/4" = 1'-0"M103
3 FOURTH FLOOR INTERSTITIAL NEW HVAC PLAN
KEY PLAN B100
P102E
P102D
P102B
P102A
P102C
ELEV.
P-1 P-2
ELEV.
P-3
ELEV.
ELEV.
S-6S-5
ELEV.ELEV.
S-4
ELEV.
MH-10
ELEV.
S-7
ELEV.
S-8
ELEV.
S-9
ELEV.
MH-11 MH-12
ELEV.
R O O F
R O O F
F.5
G.5
G
47'- 2"
D N
252423222120
F. 5
G. 5
G
E. 6
F. 3
F
E
D. 4
D
1918171615
H
J
K
G. 7
KEY PLAN B100
(E)36"x36" E/A
(E )8 0" x1 6" E /A
FD
(E )2 4" x1 8" E /A
(E )8 0" x1 6" E /A
(E )4 0" x3 6" E /A
FD
(E)36"x36" E/A
(E )8 0" x1 6" E /A
(E )8 0" x1 6" E /A
(E )4 4" x3 6" E /A
FD
(E)32"x24" E/A
(E )8 0" x1 6" E /A
(E )8 0" x1 6" E /A
(E )3 2" x2 4" E /A
FD
FD
(E )2 4" x1 8" E /A
(E )8 0" x1 6" E /A
(E )8 0" x1 6" E /A
(E)36"x36" E/A
FD
FD
(E )4 6" x3 6" E /A
(E)24"x18" E/A
AD
AD
M104
M104
M104
M104
AD
AD
(E)36"x36" E/A
AD
AD
AD
(E)
(E)
(E)
(E)
(E)
(E)
(E)
5 Interstitial -
Mechanical
129' - 0"
Level 6 Penthouse
145' - 0"
(E)36"x46" E/A
(E)80"x16" E/A
FD
(E) 80"X16" E/A
AD
(E)
5 Interstitial -
Mechanical
129' - 0"
Level 6 Penthouse
145' - 0"
(E)80"x16" E/A
(E)24"x32" E/A FD
(E) 80"X16" E/A
G.8G
AD
(E)
5 Interstitial -
Mechanical
129' - 0"
Level 6 Penthouse
145' - 0"
(E)36"x44" E/A
(E)80"x16" E/A
FD
(E) 80"X16" E/A
AD
(E)
5 Interstitial -
Mechanical
129' - 0"
Level 6 Penthouse
145' - 0"
(E)36"x40" E/A(E)18"x24" E/A
(E)80"x16" E/A
FD FD
(E) 80"X16" E/A
AD
AD
(E)(E)
P R
O F
E
S S
I ONA L
EN
G
I N
E E
R
J E R
EM
Y
M. KNOW
L E
SL
I C ENS E
F L O R I D
A
No. 90210
STATE OF
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
FINAL SUBMITTAL
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
FIFTH FLOOR INTERSTITIAL HVAC NEW
WORK FLOOR PLAN
RESOLVE STATEMENT OF
CONDITIONS DEFICIENCIES
BAY PINES, FL
M104
516-19-111
JMK JSW06/25/2021
TRUE
NORTH
PLAN
NORTH
1 2
1 3
0 4' 8'2' 1/8" = 1'-0"M104
1 FIFTH FLOOR INTERSTITIAL NEW HVAC PLAN
M104 NEW WORK NOTES
NOTE
NUMBER NOTE TEXT
1 REMOVE EXISTING DUCT ACCESS DOOR. PATCH, SEAL, AND REPAIR
EXISTING DUCTWORK.
2 PROVIDE NEW 18"x18" DUCT ACCESS DOOR.
3 PROVIDE NEW 14"x14" DUCT ACCESS DOOR.
0 4' 8'2' 1/4" = 1'-0"M104
5 FIFTH FLOOR INTERSTITIAL NEW HVAC PLAN
0 4' 8'2' 1/4" = 1'-0"M104
4 FIFTH FLOOR INTERSTITIAL NEW HVAC PLAN
0 4' 8'2' 1/4" = 1'-0"M104
3 FIFTH FLOOR INTERSTITIAL NEW HVAC PLAN
0 4' 8'2' 1/4" = 1'-0"M104
2 FIFTH FLOOR INTERSTITIAL NEW HVAC PLAN
1 1
2 2
SECTION"A-A"
"B" "B"
NOTES:
1. LATCHES SHALL BE OF THE WEDGE TYPE TO CLOSE DOORS TIGHTLY.
2. HINGES ON THE ACCESS DOORS SHALL HAVE NON-CORROSIVE PINS.
3. SEE SMACNA 2005, FIGURE 9-15
ACCESS PANEL
ACCESS DOOR
CASING
GASKET HANDLE INSIDE
FLEXIBLE
WAHER
FACTORY
FABRICATED
LATCH
SECTION "B-B"
INSULATION
DUCT
GASKET
INSULATION
INSULATION
"A"
"A"
WALL OR CEILING
2"x2"x1/4" ANGLE IRON
SIDES, MITERED AND
WELDED AT CORNERS.
OMIT FRAME ON ROOM
SIDE OF WALL WHEN
CONNECTING DIRECTLY.
FACTORY
FABRICATE 16
GAUGE SLEEVE.
DUCT
1" MINIMUM ALL ROUND
1/4" TO 1/2" CLEARANCE
FUSIBLE LINK SET AT 165 F°
'S' LOCK DUCT CONNECTIONS
DUCT ACCESS PANEL
FOLDING BLADE FIRE
DAMPER IN TYPE 'B'
FRAME, EXCEPT USE
TYPE 'C' WHEN
CONNECTING DIRECTLY
TO ROUND DUCT.
NOTES:
1. HORIZONTAL FIRE DAMPER SIMILAR. PROVIDE SPRING LOADED CURTAIN
WITH FUSIBLE LINK SET AT 165°F.
2. DETAIL FOR GENERAL GUIDANCE, INSTALL EACH FIRE DAMPER IN STRICT
ACCORDANCE WITH INSTALLATION INSTRUCTIONS PACKED WITH FIRE
DAMPER TO ENSURE UL RATING.
6"6"
DRYWALL PARTITION
INSULATED PIPE
FIRESTOP MATERIAL PIPE SLEEVE
6"6"
MASONRY PARTITION
3/4" APPROVED
FIRESTOP INSULATION
WITH VAPOR BARRIER
PARTITION SUPPORT
(ENCIRCLING PIPE)
1/2" 1/2" 1 1/2"
ROUND FLEXIBLE CONNECTION
RECTANGULAR FLEXIBLE CONNECTION
FLANGED CONNECTION ON
FAN SIDE
WASHER 1-1/2" MIN. TO 3" MAX. INSTALLED. 6" NOMINAL WITH
MATERIAL TAUT
FLEXIBLE
MATERIAL AS
SPECIFIED
1"x1/8" DRAW BAND
1"x1/8" BAND IRON
BOLT ON 4" CENTERS
5/16" FLANGE
DUCT
SHEET METAL SCREWS ON 12"
CENTERS
RIVET ON 4"
CENTERS
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
1"x1/8" BAND IRON
BOLT ON 4" CENTERS
1" FLANGE & HEMALTERNATE
POSITION OF
BOLT 1 1/2" POCKET SLIP
DUCT
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
1 1/2" MIN. TO 3" MAX. INSTALLED. 6" NOMINAL WITH
MATERIAL TAUTFLANGED
CONNECTION ON
FAN SIDE
WASHER
FLEXIBLE MATERIAL AS
SPECIFIED
P R
O F
E
S S
I ONA L
EN
G
I N
E E
R
J E R
EM
Y
M. KNOW
L E
SL
I C ENS E
F L O R I D
A
No. 90210
STATE OF
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
FINAL SUBMITTAL
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
DUCTWORK AND PIPING DETAILS RESOLVE STATEMENT OF
CONDITIONS DEFICIENCIES
BAY PINES, FL
M501
516-19-111
JMK JSW06/25/2021
0 4' 8'2'
NOT TO SCALEM501
1 ACCESS PANEL AND DOOR DETAIL
0 4' 8'2'
NOT TO SCALEM501
2 FIRE DAMPER DETAIL
0 4' 8'2' 12" = 1'-0"M501
3 PIPE PENETRATION OF FIRE/SMOKE BARRIERS
0 4' 8'2' 12" = 1'-0"M501
4 FLEXIBLE CONNECTION RECTANGULAR/ROUND
| Sheets |
| M001 - LEGENDS, ABBREVIATIONS, AND NOTES |
| M101 - FIRST FLOOR INTERSTITIAL HVAC NEW WORK FLOOR PLAN |
| M102 - SECOND FLOOR INTERSTITIAL HVAC NEW WORK FLOOR PLAN |
| M103 - FOURTH FLOOR INTERSTITIAL HVAC NEW WORK FLOOR PLAN |
| M104 - FIFTH FLOOR INTERSTITIAL HVAC NEW WORK FLOOR PLAN |
| M501 - DUCTWORK AND PIPING DETAILS |
| MD101 - FIRST FLOOR INTERSTITIAL HVAC DEMOLITION FLOOR PLAN |
| MD102 - SECOND FLOOR INTERSTITIAL HVAC DEMOLITION FLOOR PLAN |
| MD103 - FOURTH INTERSTITIAL HVAC DEMOLITION FLOOR PLAN |
File details come from the government source that posted it. Updated .