This is a set of final bid drawings for construction work at the VA Pittsburgh Healthcare System (VAPHS) University Drive Campus in Pittsburgh, Pennsylvania. The drawings document the Electronic Health Records Management (EHRM) Infrastructure Upgrades project, with a project number 646-22-700 issued on June 13, 2025.
The project scope encompasses infrastructure modernization across multiple buildings (Buildings 1, 5, 8, 29, 30, 33, and site improvements) to support implementation of a new electronic healthcare records system. Work includes construction of two new tower additions totaling approximately 11,600 square feet of new construction and modifications to approximately 3,030 square feet of existing space. The upgrades involve new and renovated telecommunications rooms, support spaces, structural systems, foundation work, mechanical/electrical/plumbing (MEP) systems, fire protection systems, technology infrastructure, security systems, and asbestos/lead mitigation. The facility is classified as a Type II 222 fully sprinklered hospital (Occupancy Group I-2) with a maximum 12-story structure. The drawings specify compliance with NFPA 101 Life Safety Code (2024 Edition), NFPA 13 sprinkler systems, NFPA 75 IT equipment fire protection, and various VA design manuals. The project documents include 343 total drawing sheets organized by discipline (General, Structural, Architecture, Fire Protection, Plumbing, Mechanical, Electrical, Telecommunications, and Physical Security), with extensive detail sheets for floor plans, demolition plans, enlarged plans, schedules, and specifications. Key requirements include phased construction with minimal disruption to ongoing hospital operations, infection control risk assessment protocols, construction sequencing limitations (no more than three telecom rooms simultaneously), and compliance with VA standards for telecommunications infrastructure with 90-meter UTP cable segment compliance verification.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
DESIGN TEAM
OWNER
ARCHITECT / CONTRACT PRIME
MECHANICAL / ELECTRICAL / PLUMBING /
FIRE PROTECTION / TECHNOLOGY ENGINEER
/ STRUCTURAL
VA PITTSBURGH HEALTHCARE SYSTEM UNIVERSITY DRIVE CAMPUS
4100 Allequippa St., Pittsburgh, PA 15240-1001
Awen Solutions Group 215 N. Payne Street, Suite 122 Alexandria, VA 22314 Contact: Amy Carr acarr@awensolutions.com
(720) 703-0640
IMEG Corp.
15 Sunnen Drive Suite 104 St. Louis, MO 63143 Contact: David Larson David.L.Larson@imegcorp.com
(314) 951-2530
EHRM INFRASTRUCTURE UPGRADES
FINAL BID DOCUMENTS
CIVIL ENGINEER
Langan Engineering and Enviromental Services 2400 Ansys Drive, Suite 403 Canonsburg, PA 15317 Contact: Rachel McCune, PE rmccune@langan.com
(724) 972-3781
ENVIROMENTAL ENGINEER
CT Consultants, Inc.
44265 Plymouth Oaks Blvd Plymouth, MI 48170 Contact: Harjot Singh hsingh@ctconsultants.com
(419) 214-5058
A u to d e s k D o c s /U n iv e rs it y D ri v e
V A
M C
E H
R M
V
/6
-2
-7
.G .P
IT
E
H R
M .r v t
/1
/2
:4
:0
A
M
00-GI000
COVER SHEET
Awen Solutions Group
215 N. Payne Street, Suite 122
Alexandria, VA 22314
06.13.2025
EHRM INFRASTRUCTURE
UPGRADES - VAPHS UNIVERSITY
DRIVE CAMPUS 0
UNIVERSITY DRIVE C,
PITTSBURGH, PA 15240
646-22-700
VAPHS - UNIVERSITY DRIVE CAMPUS
06.13.2025
UNIVERSITY DRIVE C, PITTSBURGH, PA 15240
Revisions: Date: SHEET 1 of 797SHEET 1 of 797
UNIVERSITY DRIVE
VA MEDICAL CENTER
IMEG Corp.
623 26th Avenue Rock Island, IL 61201 Contact: David Larson David.L.Larson@imegcorp.com
(314) 951-2530
, PITTSBURGH, PA 15240
SHEET 1 of 797
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
A u to d e s k D o c s /U n iv e rs it y D ri v e
V A
M C
E H
R M
V
/6
-2
-7
.G .P
IT
E
H R
M .r v t
/1
/2
:3
:0
A
M
00-GI001
SHEET INDEX
Awen Solutions Group
215 N. Payne Street, Suite 122
Alexandria, VA 22314
06.13.2025
EHRM INFRASTRUCTURE
UPGRADES - VAPHS UNIVERSITY
DRIVE CAMPUS 0
UNIVERSITY DRIVE C,
PITTSBURGH, PA 15240
646-22-700
SHEET INDEX
Sheet Number Sheet Name
00-GENERAL
00-GI000 COVER SHEET
00-GI001 SHEET INDEX
00-GI002 SHEET INDEX
00-GI003 GENERAL NOTES AND CODE REQUIREMENTS
00-GI004 GENERAL NOTES
00-GI005 TIL ABBREVIATION LIST (PG-18-4)
00-GI010 PROJECT INFORMATION
00-GI011 INFECTION CONTROL RISK ASSESSMENT - CLASS IV
00-GI012 TYPICAL ADA REQUIREMENTS - INTERIOR CLEARANCES
00-GI020 FACILITY MEDICAL REQUIREMENTS
00-GI021 FACILITY MEDICAL REQUIREMENTS
00-GI022 FACILITY MEDICAL REQUIREMENTS
00-GI023 FACILITY MEDICAL REQUIREMENTS
00-GI101 CAMPUS SITE DIAGRAM
08-ARCHITECTURE
00-AE520 INTERIOR ASSEMBLIES
00-AE521 EXTERIOR ASSEMBLIES
00-AE522 ROOF DETAILS
00-AE523 DOOR DETAILS
00-AE524 INTERIOR FRAMING DETAILS
00-AE525 INTERIOR FRAMING DETAILS
00-AE526 PARTITION AND MISCELLANEOUS DETAILS
00-AE527 CEILING DETAILS
15-ELECTRICAL
00-E000 ELECTRICAL COVERSHEET
00-E001 ELECTRICAL SHEET INDEX
00-E501 ELECTRICAL DETAILS
00-E502 ELECTRICAL DETAILS
00-E701 ELECTRICAL SCHEDULES
00-E702 ELECTRICAL SCHEDULES
16.4-PHYSICAL SECURITY
00-TY001 SECURITY NOTES, SYMBOLS, AND ABBREVIATIONS
01-GENERAL
01-GI001 COVER SHEET
01-GI002 BUILDING 1 & 29 SHEET INDEX
01-GI003 BUILDING 1 & 29 SHEET INDEX
01-GI110 EGRESS DIAGRAMS
01-GI111 EGRESS DIAGRAMS
01-GI115 SEQUENCE DIAGRAMS
01-GI116 SEQUENCE DIAGRAMS
07-STRUCTURAL
01-S000.0 GENERAL NOTES
01-S001.0 GENERAL NOTES
01-S002.0 GENERAL NOTES / SCHEDULES
01-S010.0 LOADING PLANS - NORTH TOWER
01-S011.0 LOADING PLANS - WEST TOWER
01-S199.0 OVERALL BASEMENT FOUNDATION PLAN
01-S199.1 PARTIAL BASEMENT FOUNDATION PLAN
01-S200.0 OVERALL GROUND LEVEL FRAMING PLAN
01-S200.1 PARTIAL GROUND LEVEL FRAMING PLAN
01-S201.0 OVERALL LEVEL 01 FRAMING PLAN
01-S201.1 PARTIAL LEVEL 01 FRAMING PLAN
01-S202.0 OVERALL LEVEL 02 FRAMING PLAN
01-S202.1 PARTIAL LEVEL 02 FRAMING PLAN
01-S203.0 OVERALL LEVEL 03 FRAMING PLAN
01-S203.1 PARTIAL LEVEL 03 FRAMING PLAN
01-S204.0 OVERALL LEVEL 04 FRAMING PLAN
01-S204.1 PARTIAL LEVEL 04 FRAMING PLAN
01-S205.0 OVERALL LEVEL 05 FRAMING PLAN
01-S205.1 PARTIAL LEVEL 05 FRAMING PLAN
01-S206.0 OVERALL LEVEL 06 FRAMING PLAN
01-S206.1 PARTIAL LEVEL 06 FRAMING PLAN
01-S207.0 OVERALL LEVEL 07-11 FRAMING PLAN
01-S207.1 PARTIAL LEVEL 07-11 FRAMING PLAN
01-S212.0 OVERALL ROOF LEVEL FRAMING PLAN
01-S212.1 PARTIAL ROOF FRAMING PLAN
01-S300.0 TYPICAL FOUNDATION SECTIONS AND SCHEDULES
01-S301.0 FOUNDATION SECTIONS
01-S500.0 TYPICAL STEEL SECTIONS AND SCHEDULES
01-S501.0 TYPICAL STEEL SECTIONS
01-S502.0 TYPICAL STEEL SECTIONS
01-S503.0 TYPICAL STEEL SECTIONS
01-S504.0 STEEL COLUMN SCHEDULE
01-S505.0 STEEL SECTIONS
01-S506.0 STEEL SECTIONS
01-S550.0 TOWER FACADE SUPPORT ELEVATIONS
08-ARCHITECTURE
01-AE99 BASEMENT FLOOR PLAN
01-AE100 GROUND FLOOR PLAN
01-AE101 FIRST FLOOR PLAN
01-AE102 SECOND FLOOR PLAN
01-AE103 THIRD FLOOR PLAN
01-AE104 FOURTH FLOOR PLAN
01-AE105 FIFTH FLOOR PLAN
01-AE106 SIXTH FLOOR PLAN
01-AE107 SEVENTH FLOOR PLAN
01-AE108 EIGHTH FLOOR PLAN
01-AE109 NINTH FLOOR PLAN
01-AE110 TENTH FLOOR PLAN
01-AE111 ELEVENTH FLOOR PLAN
01-AE112 PENTHOUSE FLOOR PLAN
01-AE121A BASEMENT FLOOR PLAN - AREA A
01-AE121B BASEMENT FLOOR PLAN - AREA B
01-AE121C BASEMENT FLOOR PLAN - AREA C
01-AE121D BASEMENT FLOOR PLAN - AREA D
01-AE121E BASEMENT FLOOR PLAN - AREA E
SHEET INDEX
Sheet Number Sheet Name
01-AE121F BASEMENT FLOOR PLAN - AREA F
01-AE121G BASEMENT FLOOR PLAN - AREA G
01-AE122A GROUND FLOOR PLAN - AREA A
01-AE122B GROUND FLOOR PLAN - AREA B
01-AE122C GROUND FLOOR PLAN - AREA C
01-AE122D GROUND FLOOR PLAN - AREA D
01-AE122E GROUND FLOOR PLAN - AREA E
01-AE122F GROUND FLOOR PLAN - AREA F
01-AE122G GROUND FLOOR PLAN - AREA G
01-AE122H GROUND FLOOR PLAN - AREA H
01-AE122I GROUND FLOOR PLAN - AREA I
01-AE123A FIRST FLOOR PLAN - AREA A
01-AE123B FIRST FLOOR PLAN - AREA B
01-AE123C FIRST FLOOR PLAN - AREA C
01-AE123D FIRST FLOOR PLAN - AREA D
01-AE123E FIRST FLOOR PLAN - AREA E
01-AE123F FIRST FLOOR PLAN - AREA F
01-AE123G FIRST FLOOR PLAN - AREA G
01-AE123H FIRST FLOOR PLAN - AREA H
01-AE123I FIRST FLOOR PLAN - AREA I
01-AE123J FIRST FLOOR PLAN - AREA J
01-AE124A SECOND FLOOR PLAN - AREA A
01-AE124B SECOND FLOOR PLAN - AREA B
01-AE124B2 SECOND FLOOR PLAN - AREA B2
01-AE124C SECOND FLOOR PLAN - AREA C
01-AE124D SECOND FLOOR PLAN - AREA D
01-AE124E SECOND FLOOR PLAN - AREA E
01-AE124F SECOND FLOOR PLAN - AREA F
01-AE124G SECOND FLOOR PLAN - AREA G
01-AE124H SECOND FLOOR PLAN - AREA H
01-AE124I SECOND FLOOR PLAN - AREA I
01-AE124J SECOND FLOOR PLAN - AREA J
01-AE125A THIRD FLOOR PLAN - AREA A
01-AE125B THIRD FLOOR PLAN - AREA B
01-AE125B2 THIRD FLOOR PLAN - AREA B2
01-AE125C THIRD FLOOR PLAN - AREA C
01-AE125D THIRD FLOOR PLAN - AREA D
01-AE125E THIRD FLOOR PLAN - AREA E
01-AE125F THIRD FLOOR PLAN - AREA F
01-AE125G THIRD FLOOR PLAN - AREA G
01-AE125H THIRD FLOOR PLAN - AREA H
01-AE125I THIRD FLOOR PLAN - AREA I
01-AE125J THIRD FLOOR PLAN - AREA J
01-AE126A-B2 FOURTH FLOOR PLAN - AREA A & B2
01-AE126B FOURTH FLOOR PLAN - AREA B
01-AE126C FOURTH FLOOR PLAN - AREA C
01-AE126E FOURTH FLOOR PLAN - AREA E
01-AE126F-G FOURTH FLOOR PLAN - AREA F & G
01-AE126H FOURTH FLOOR PLAN - AREA H
01-AE126I FOURTH FLOOR PLAN - AREA I
01-AE126J FOURTH FLOOR PLAN - AREA J
01-AE127A-B2 FIFTH FLOOR PLAN - AREA A & B2
01-AE127B-E FIFTH FLOOR PLAN - AREA B & E
01-AE127C FIFTH FLOOR PLAN - AREA C
01-AE127D FIFTH FLOOR PLAN - AREA D
01-AE127H FIFTH FLOOR PLAN - AREA H
01-AE127I FIFTH FLOOR PLAN - AREA I
01-AE127J FIFTH FLOOR PLAN - AREA J
01-AE128A-B2 SIXTH FLOOR PLAN - AREA A & B2
01-AE128B-E SIXTH FLOOR PLAN - AREA B & E
01-AE128C SIXTH FLOOR PLAN - AREA C
01-AE129A-B2 SEVENTH FLOOR PLAN - AREA A & B2
01-AE129B-E SEVENTH FLOOR PLAN - AREA B & E
01-AE129C SEVENTH FLOOR PLAN - AREA C
01-AE130A-B2 EIGHTH FLOOR PLAN - AREA A & B2
01-AE130B-E EIGHTH FLOOR PLAN - AREA B & E
01-AE130C EIGHTH FLOOR PLAN - AREA C
01-AE131A-B2 NINTH FLOOR PLAN - AREA A & B2
01-AE131B-E NINTH FLOOR PLAN - AREA B & E
01-AE131C NINTH FLOOR PLAN - AREA C
01-AE132A-B2 TENTH FLOOR PLAN - AREA A & B2
01-AE132B-E TENTH FLOOR PLAN - AREA B & E
01-AE132C TENTH FLOOR PLAN - AREA C
01-AE133A ELEVENTH FLOOR PLAN - AREA A
01-AE133B-E ELEVENTH FLOOR PLAN - AREA B & E
01-AE133C ELEVENTH FLOOR PLAN - AREA C
01-AE201 BUILDING ELEVATIONS
01-AE202 TOWER ELEVATIONS - NORTH
01-AE203 TOWER ELEVATIONS - WEST
01-AE301 BUILDING SECTIONS - NORTH TOWER
01-AE302 BUILDING SECTIONS - WEST TOWER
01-AE400 BC101TR - ENLARGED FLOOR PLANS, RCPS & INTERIOR
ELEVATIONS
01-AE401 BW106B - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS
01-AE402 AN306A - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS
01-AE403 CA224C - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS
01-AE403A AA162 - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS
01-AE404 GG108 - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS
01-AE405 1A243 - ENLARGED FLOOR PLANS, RCPS AND INTERIOR ELEVATIONS
01-AE406 1G111TR - ENLARGED FLOOR PLANS, RCPS AND INTERIOR
ELEVATIONS
01-AE407 1M195A - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS
01-AE408 1W121 - ENLARGED FLOOR PLANS, RCPS AND INTERIOR
ELEVATIONS
01-AE409 2M275A - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS
01-AE410 2W110D - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS
01-AE411 3A110 - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS
01-AE412 3M150 - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS
01-AE413 4A02 - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS
01-AE414 4M150 - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS
SHEET INDEX
Sheet Number Sheet Name
01-AE415 4W137 - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS
01-AE416 5M150 - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS
01-AE417 5N101A - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS
01-AE418 1N301 - ENLARGED FLOOR PLANS & RCP - 1ST FLOOR NORTH
TOWER
01-AE420 2N301 - ENLARGED FLOOR PLANS & RCP - 2ND FLOOR NORTH
TOWER
01-AE421 3N301 - ENLARGED FLOOR PLANS & RCP - 3RD FLOOR NORTH
TOWER
01-AE422 4N301 - ENLARGED FLOOR PLANS & RCP - 4TH FLOOR NORTH
TOWER
01-AE423.1 5W200 - ENLARGED DEMO & SEQUENCING PLANS - 5TH FLOOR
WEST
01-AE423.2 5W200 - ENLARGED FLOOR PLANS & RCP - 5TH FLOOR WEST TOWER
01-AE424.1 5N301 - ENLARGED DEMO & SEQUENCING PLANS - 5TH FLOOR
NORTH
01-AE424.2 5N301 - ENLARGED SLAB PLANS & INTERIOR ELEVATIONS - 5TH
FLOOR NORTH
01-AE424.3 5N301 - ENLARGED FLOOR PLANS & RCP - 5TH FLOOR NORTH
01-AE425.1 WEST TOWER - ENLARGED DEMO PLANS & RCPS - 6TH THRU 11TH
FLOOR TYPICAL
01-AE425.2 WEST TOWER ENLARGED FLOOR PLANS & RCPS - 6TH THRU 11TH
FLOOR TYPICAL
01-AE426 NORTH TOWER - ENLARGED FLOOR PLANS & RCPS - 6TH THRU
11TH FLOOR TYPICAL
01-AE427 ROOF WEST - ENLARGED FLOOR PLANS & RCPS
01-AE428 ROOF NORTH - ENLARGED FLOOR PLANS & RCPS
01-AE429 ENLARGED CHASE PLANS
01-AE430 ENLARGED FLOOR PLANS - COLUMN CONDITIONS
01-H402 AN306A - ENLARGED ABATEMENT PLAN
01-H421 3N301 - ENLARGED ABATEMENT PLANS - 3RD FLOOR NORTH
01-H424.1 5N301 - ENLARGED ABATEMENT PLANS - 5TH FLOOR NORTH
01-H425.1 ENLARGED ABATEMENT PLANS - 6TH FLOOR WEST
01-AE501 DETAILS
01-AE502 DETAILS
01-AE503 DETAILS
01-AE504 DETAILS
01-AE601 DOOR SCHEDULE AND DIAGRAMS
01-AE602 ROOM FINISH SCHEDULE
11-FIRE PROTECTION
00-FG000 FIRE PROTECTION COVERSHEET
00-FG500 FIRE PROTECTION DETAILS
01-FX099 BASEMENT PLAN - FIRE PROTECTION
01-FX100 GROUND FLOOR PLAN - FIRE PROTECTION
01-FX101 FIRST FLOOR PLAN - FIRE PROTECTION
01-FX102 SECOND FLOOR PLAN - FIRE PROTECTION
01-FX103 THIRD FLOOR PLAN - FIRE PROTECTION
01-FX104 FOURTH FLOOR PLAN - FIRE PROTECTION
01-FX105 FIFTH FLOOR PLAN - FIRE PROTECTION
01-FX106 SIXTH FLOOR PLAN - FIRE PROTECTION
01-FX107 SEVENTH FLOOR PLAN - FIRE PROTECTION
01-FX108 EIGHTH FLOOR PLAN - FIRE PROTECTION
01-FX109 NINTH FLOOR PLAN - FIRE PROTECTION
01-FX110 TENTH FLOOR PLAN - FIRE PROTECTION
01-FX111 ELEVENTH FLOOR PLAN - FIRE PROTECTION
01-FX400 ENLARGED PLANS - FIRE PROTECTION
12-PLUMBING
00-PG000 PLUMBING COVERSHEET
00-PG500 PLUMBING DETAILS
01-PD099 BASEMENT DEMOLITION PLAN - PLUMBING
01-PD100 GROUND FLOOR DEMOLITION PLAN - PLUMBING
01-PD101 FIRST FLOOR DEMOLITION PLAN - PLUMBING
01-PD102 SECOND FLOOR DEMOLITION PLAN - PLUMBING
01-PD103 THIRD FLOOR DEMOLITION PLAN - PLUMBING
01-PD104 FOURTH FLOOR DEMOLITION PLAN - PLUMBING
01-PD105 FIFTH FLOOR DEMOLITION PLAN - PLUMBING
01-PD106 SIXTH FLOOR DEMOLITION PLAN - PLUMBING
01-PP101 FIRST FLOOR PLAN - PLUMBING
01-PP102 SECOND FLOOR PLAN - PLUMBING
01-PP103 THIRD FLOOR PLAN - PLUMBING
01-PP104 FOURTH FLOOR PLAN - PLUMBING
01-PP105 FIFTH FLOOR PLAN - PLUMBING
01-PP106 SIXTH FLOOR PLAN - PLUMBING
01-PP107 SEVENTH FLOOR PLAN - PLUMBING
01-PP108 EIGHTH FLOOR PLAN - PLUMBING
01-PP109 NINTH FLOOR PLAN - PLUMBING
01-PP110 TENTH FLOOR PLAN - PLUMBING
01-PP111 ELEVENTH FLOOR PLAN - PLUMBING
01-PP112 ROOF PLAN - PLUMBING
14-MECHANICAL
00-MG000 MECHANICAL COVERSHEET
00-MG500 MECHANICAL DETAILS
00-MG501 MECHANICAL DETAILS
00-MG700 MECHANICAL SCHEDULES
00-MG800 MECHANICAL CONTROLS
00-MG801 MECHANICAL CONTROLS
01-MD099 BASEMENT DEMOLITION PLAN - MECHANICAL
01-MD100 GROUND FLOOR DEMOLITION PLAN - MECHANICAL
01-MD101 FIRST FLOOR DEMOLITION PLAN - MECHANICAL
01-MD102 SECOND FLOOR DEMOLITION PLAN - MECHANICAL
01-MD103 THIRD FLOOR DEMOLITION PLAN - MECHANICAL
01-MD104 FOURTH FLOOR DEMOLITION PLAN - MECHANICAL
01-MD105 FIFTH FLOOR DEMOLITION PLAN - MECHANICAL
01-MD108 EIGHTH FLOOR DEMOLITION PLAN - MECHANICAL
01-MD400 ENLARGED DEMOLITION PLANS - MECHANICAL
01-MD401 ENLARGED DEMOLITION PLANS - MECHANICAL
01-MH099 BASEMENT PLAN - MECHANICAL
01-MH100 GROUND FLOOR PLAN - MECHANICAL
01-MH101 FIRST FLOOR PLAN - MECHANICAL
01-MH102 SECOND FLOOR PLAN - MECHANICAL
01-MH103 THIRD FLOOR PLAN - MECHANICAL
SHEET INDEX
Sheet Number Sheet Name
01-MH104 FOURTH FLOOR PLAN - MECHANICAL
01-MH105 FIFTH FLOOR PLAN - MECHANICAL
01-MH106 SIXTH FLOOR PLAN - MECHANICAL
01-MH107 SEVENTH FLOOR PLAN - MECHANICAL
01-MH108 EIGHTH FLOOR PLAN - MECHANICAL
01-MH109 NINTH FLOOR PLAN - MECHANICAL
01-MH110 TENTH FLOOR PLAN - MECHANICAL
01-MH111 ELEVENTH FLOOR PLAN - MECHANICAL
01-MH112 ROOF PLAN - MECHANICAL
01-MH400 BASEMENT ENLARGED PLANS - MECHANICAL
01-MH401 BASEMENT ENLARGED PLANS - MECHANICAL
01-MH402 GROUND FLOOR ENLARGED PLANS - MECHANICAL
01-MH403 GROUND FLOOR ENLARGED PLANS - MECHANICAL
01-MH404 GROUND FLOOR ENLARGED PLANS - MECHANICAL
01-MH405 FIRST FLOOR ENLARGED PLANS - MECHANICAL
01-MH406 FIRST FLOOR ENLARGED PLANS - MECHANICAL
01-MH407 FIRST FLOOR ENLARGED PLANS - MECHANICAL
01-MH408 SECOND FLOOR ENLARGED PLANS - MECHANICAL
01-MH409 SECOND FLOOR ENLARGED PLANS - MECHANICAL
01-MH410 THIRD FLOOR ENLARGED PLANS - MECHANICAL
01-MH411 THIRD FLOOR ENLARGED PLANS - MECHANICAL
01-MH412 FOURTH FLOOR ENLARGED PLANS - MECHANICAL
01-MH413 FOURTH FLOOR ENLARGED PLANS - MECHANICAL
01-MH414 FIFTH FLOOR ENLARGED PLANS - MECHANICAL
01-MH415 FIFTH FLOOR ENLARGED PLANS - MECHANICAL
01-MH416 FIFTH FLOOR ENLARGED PLANS - MECHANICAL
01-MH417 FIFTH FLOOR ENLARGED PLANS - MECHANICAL
01-MH418 SIXTH FLOOR ENLARGED PLANS - MECHANICAL
01-MH419 SIXTH FLOOR ENLARGED PLANS - MECHANICAL
01-MH420 SEVENTH FLOOR ENLARGED PLANS - MECHANICAL
01-MH421 SEVENTH FLOOR ENLARGED PLANS - MECHANICAL
01-MH422 EIGHTH FLOOR ENLARGED PLANS - MECHANICAL
01-MH423 EIGHTH FLOOR ENLARGED PLANS - MECHANICAL
01-MH424 NINTH FLOOR ENLARGED PLANS - MECHANICAL
01-MH425 NINTH FLOOR ENLARGED PLANS - MECHANICAL
01-MH426 TENTH FLOOR ENLARGED PLANS - MECHANICAL
01-MH427 TENTH FLOOR ENLARGED PLANS - MECHANICAL
01-MH428 ELEVENTH FLOOR ENLARGED PLANS - MECHANICAL
01-MH429 ELEVENTH FLOOR ENLARGED PLANS - MECHANICAL
01-MH430 ROOF ENLARGED PLANS - MECHANICAL
15-ELECTRICAL
01-ED099 BASEMENT DEMOLITION PLAN - ELECTRICAL - OVERALL
01-ED100 GROUND FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL
01-ED101 FIRST FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL
01-ED102 SECOND FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL
01-ED103 THIRD FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL
01-ED104 FOURTH FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL
01-ED105 FIFTH FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL
01-ED401 FIFTH FLOOR DEMOLITION PLAN-ELECTRICAL ENLARGED
01-EP099 BASEMENT PLAN - ELECTRICAL - OVERALL
01-EP100 GROUND FLOOR PLAN - ELECTRICAL - OVERALL
01-EP101 FIRST FLOOR PLAN - ELECTRICAL - OVERALL
01-EP102 SECOND FLOOR PLAN - ELECTRICAL - OVERALL
01-EP103 THIRD FLOOR PLAN - ELECTRICAL - OVERALL
01-EP104 FOURTH FLOOR PLAN - ELECTRICAL - OVERALL
01-EP105 FIFTH FLOOR PLAN - ELECTRICAL - OVERALL
01-EP106 SIXTH FLOOR PLAN - ELECTRICAL - OVERALL
01-EP107 SEVENTH FLOOR PLAN - ELECTRICAL - OVERALL
01-EP108 EIGHTH FLOOR PLAN - ELECTRICAL - OVERALL
01-EP109 NINTH FLOOR PLAN - ELECTRICAL - OVERALL
01-EP110 TENTH FLOOR PLAN - ELECTRICAL - OVERALL
01-EP111 ELEVENTH FLOOR PLAN - ELECTRICAL - OVERALL
01-EP112 ROOF PLAN - ELECTRICAL - OVERALL
01-EP401 BUILDING 1 - GROUND & BASEMENT ENLARGED PLAN
01-EP402 BUILDING 1 - FIFTH FLOOR - ELECTRICAL ENLARGED
01-EP403 BUILDING 1 - ELECTRICAL ENLARGED PLANS
01-EP404 BUILDING 1 - ELECTRICAL ENLARGED PLANS
01-EP405 BUILDING 1 - ELECTRICAL ENLARGED PLANS
01-EP406 BUILDING 1 - ELECTRICAL ENLARGED PLANS
01-EP407 BUILDING 1 - ELECTRICAL ENLARGED PLANS
01-EP408 BUILDING 1 - ELECTRICAL ENLARGED PLANS
01-EP409 BUILDING 1 - ELECTRICAL ENLARGED PLANS
01-EP410 BUILDING 1 - ELECTRICAL ENLARGED PLANS
01-EP411 BUILDING 1 - ELECTRICAL ENLARGED PLANS
01-EP412 BUILDING 1 - ELECTRICAL ENLARGED PLANS
01-EP413 BUILDING 1 - ELECTRICAL ENLARGED PLANS
01-EP601 ELECTRICAL RISER DIAGRAM
01-EP602 ELECTRICAL RISER DIAGRAM
01-EP603 ELECTRICAL RISER DIAGRAM
01-EP604 ELECTRICAL RISER DIAGRAM
01-EP605 ELECTRICAL RISER DIAGRAM
01-EP701 ELECTRICAL SCHEDULES
01-EP702 ELECTRICAL PANEL SCHEDULES
01-EP703 ELECTRICAL PANEL SCHEDULES
01-EP704 ELECTRICAL PANEL SCHEDULES
01-EP705 ELECTRICAL PANEL SCHEDULES
01-EP706 ELECTRICAL PANEL SCHEDULES
01-EP707 ELECTRICAL PANEL SCHEDULES
01-EP708 ELECTRICAL PANEL SCHEDULES
01-EP709 ELECTRICAL PANEL SCHEDULES
01-EP710 ELECTRICAL PANEL SCHEDULES
01-EP711 ELECTRICAL PANEL SCHEDULES
01-EP712 ELECTRICAL PANEL SCHEDULES
01-EP713 ELECTRICAL PANEL SCHEDULES
01-EP714 ELECTRICAL PANEL SCHEDULES
01-EP715 ELECTRICAL PANEL SCHEDULES
16-TELECOMMUNICATION
01-T000 TECHNOLOGY COVERSHEET
01-T201 TECHNOLOGY SITE PLAN
SHEET INDEX
Sheet Number Sheet Name
01-T500 TECHNOLOGY DETAILS
01-T501 TECHNOLOGY DETAILS
01-T600 TECHNOLOGY DIAGRAMS
01-T601 TECHNOLOGY DIAGRAMS
01-T602 TECHNOLOGY DIAGRAMS
01-T603 TECHNOLOGY DIAGRAMS
01-T700 TECHNOLOGY SCHEDULES
01-TD99 BASEMENT DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD100 GROUND FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD101 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD102 SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD103 THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD104 FOURTH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD105 FIFTH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD106 SIXTH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD107 SEVENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD108 EIGHTH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD109 NINTH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD110 TENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD111 ELEVENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD112 ROOF DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD121A BASEMENT DEMOLITION PLAN - TECHNOLOGY - AREA A
01-TD121B BASEMENT DEMOLITION PLAN - TECHNOLOGY - AREA B
01-TD121E BASEMENT DEMOLITION PLAN - TECHNOLOGY - AREA E
01-TD121F BASEMENT DEMOLITION PLAN - TECHNOLOGY - AREA F
01-TD122A GROUND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A
01-TD122B GROUND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B
01-TD122C GROUND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C
01-TD122D GROUND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA D
01-TD122E GROUND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E
01-TD122F GROUND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA F
01-TD122G GROUND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA G
01-TD122H GROUND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA H
01-TD122I GROUND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA I
01-TD123A FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A
01-TD123B FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B
01-TD123C FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C
01-TD123D FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA D
01-TD123E FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E
01-TD123F FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA F
01-TD123G FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA G
01-TD123H FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA H
01-TD123I FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA I
01-TD123J FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA J
01-TD124A SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A
01-TD124B SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B
01-TD124B2 SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B2
01-TD124C SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C
01-TD124D SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA D
01-TD124E SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E
01-TD124F SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA F
01-TD124G SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA G
01-TD124H SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA H
01-TD124I SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA I
01-TD124J SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA J
01-TD125A THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A
01-TD125B THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B
01-TD125B2 THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B2
01-TD125C THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C
01-TD125D THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA D
01-TD125E THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E
01-TD125F THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA F
01-TD125G THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA G
01-TD125H THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA H
01-TD125I THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA I
01-TD125J THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA J
01-TD126A FOURTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A
01-TD126B FOURTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B
01-TD126B2 FOURTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B2
01-TD126C FOURTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C
01-TD126E FOURTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E
01-TD126F FOURTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA F
01-TD126G FOURTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA G
01-TD126I FOURTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA I
01-TD126J FOURTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA J
01-TD127A FIFTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A
01-TD127B FIFTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B
01-TD127B2 FIFTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B2
01-TD127C FIFTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C
01-TD127D FIFTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA D
01-TD127I FIFTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA I
01-TD127J FIFTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA J
TOTAL: 454
Revisions: Date: SHEET 2 of 797SHEET 2 of 797SHEET 2 of 797
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
A u to d e s k D o c s /U n iv e rs it y D ri v e
V A
M C
E H
R M
V
/6
-2
-7
.G .P
IT
E
H R
M .r v t
/1
/2
:3
:0
A
M
00-GI002
SHEET INDEX
Awen Solutions Group
215 N. Payne Street, Suite 122
Alexandria, VA 22314
06.13.2025
EHRM INFRASTRUCTURE
UPGRADES - VAPHS UNIVERSITY
DRIVE CAMPUS 0
UNIVERSITY DRIVE C,
PITTSBURGH, PA 15240
646-22-700
SHEET INDEX
SHEET
NUMBER SHEET NAME
16-TELECOMMUNICATION
01-TD128A SIXTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A
01-TD128B SIXTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B
01-TD128B2 SIXTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B2
01-TD128C SIXTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C
01-TD128E SIXTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E
01-TD128J SIXTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA J
01-TD129A SEVENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A
01-TD129B SEVENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B
01-TD129C SEVENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C
01-TD129E SEVENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E
01-TD130A EIGHTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A
01-TD130B EIGHTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B
01-TD130C EIGHTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C
01-TD130E EIGHTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E
01-TD131A NINTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A
01-TD131B NINTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B
01-TD131C NINTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C
01-TD131E NINTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E
01-TD132A TENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A
01-TD132B TENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B
01-TD132C TENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C
01-TD132E TENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E
01-TD133A ELEVENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A
01-TD133B ELEVENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B
01-TD133C ELEVENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C
01-TD133E ELEVENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E
01-TD400 EXISTING TRS TO DEMO - TECHNOLOGY
01-TD401 EXISTING TRS TO DEMO - TECHNOLOGY
01-TD402 EXISTING TRS TO DEMO - TECHNOLOGY
01-TD403 EXISTING TRS TO DEMO - TECHNOLOGY
01-TD404 EXISTING TRS TO DEMO - TECHNOLOGY
01-TD405 EXISTING TRS TO DEMO - TECHNOLOGY
01-TD406 EXISTING TRS TO DEMO - TECHNOLOGY
01-TD407 EXISTING TRS TO DEMO - TECHNOLOGY
01-TN99 BASEMENT PLAN - TECHNOLOGY - OVERALL
01-TN100 GROUND FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN101 FIRST FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN102 SECOND FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN103 THIRD FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN104 FOURTH FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN105 FIFTH FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN106 SIXTH FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN107 SEVENTH FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN108 EIGHTH FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN109 NINTH FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN110 TENTH FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN111 ELEVENTH FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN112 ROOF PLAN - TECHNOLOGY - OVERALL
01-TN121A BASEMENT PLAN - TECHNOLOGY - AREA A
01-TN121B BASEMENT PLAN - TECHNOLOGY - AREA B
01-TN121D BASEMENT PLAN - TECHNOLOGY - AREA D
01-TN121E BASEMENT PLAN - TECHNOLOGY - AREA E
01-TN121F BASEMENT PLAN - TECHNOLOGY - AREA F
01-TN122A GROUND FLOOR PLAN - TECHNOLOGY - AREA A
01-TN122B GROUND FLOOR PLAN - TECHNOLOGY - AREA B
01-TN122C GROUND FLOOR PLAN - TECHNOLOGY - AREA C
01-TN122D GROUND FLOOR PLAN - TECHNOLOGY - AREA D
01-TN122E GROUND FLOOR PLAN - TECHNOLOGY - AREA E
01-TN122F GROUND FLOOR PLAN - TECHNOLOGY - AREA F
01-TN122G GROUND FLOOR PLAN - TECHNOLOGY - AREA G
01-TN122H GROUND FLOOR PLAN - TECHNOLOGY - AREA H
01-TN122I GROUND FLOOR PLAN - TECHNOLOGY - AREA I
01-TN123A FIRST FLOOR PLAN - TECHNOLOGY - AREA A
01-TN123B FIRST FLOOR PLAN - TECHNOLOGY - AREA B
01-TN123C FIRST FLOOR PLAN - TECHNOLOGY - AREA C
01-TN123D FIRST FLOOR PLAN - TECHNOLOGY - AREA D
01-TN123E FIRST FLOOR PLAN - TECHNOLOGY - AREA E
01-TN123F FIRST FLOOR PLAN - TECHNOLOGY - AREA F
01-TN123G FIRST FLOOR PLAN - TECHNOLOGY - AREA G
01-TN123H FIRST FLOOR PLAN - TECHNOLOGY - AREA H
01-TN123I FIRST FLOOR PLAN - TECHNOLOGY - AREA I
01-TN123J FIRST FLOOR PLAN - TECHNOLOGY - AREA J
01-TN124A SECOND FLOOR PLAN - TECHNOLOGY - AREA A
01-TN124B SECOND FLOOR PLAN - TECHNOLOGY - AREA B
01-TN124B2 SECOND FLOOR PLAN - TECHNOLOGY - AREA B2
01-TN124C SECOND FLOOR PLAN - TECHNOLOGY - AREA C
01-TN124D SECOND FLOOR PLAN - TECHNOLOGY - AREA D
01-TN124E SECOND FLOOR PLAN - TECHNOLOGY - AREA E
01-TN124F SECOND FLOOR PLAN - TECHNOLOGY - AREA F
01-TN124G SECOND FLOOR PLAN - TECHNOLOGY - AREA G
01-TN124H SECOND FLOOR PLAN - TECHNOLOGY - AREA H
01-TN124I SECOND FLOOR PLAN - TECHNOLOGY - AREA I
01-TN124J SECOND FLOOR PLAN - TECHNOLOGY - AREA J
01-TN125A THIRD FLOOR PLAN - TECHNOLOGY - AREA A
01-TN125B THIRD FLOOR PLAN - TECHNOLOGY - AREA B
01-TN125B2 THIRD FLOOR PLAN - TECHNOLOGY - AREA B2
01-TN125C THIRD FLOOR PLAN - TECHNOLOGY - AREA C
01-TN125D THIRD FLOOR PLAN - TECHNOLOGY - AREA D
01-TN125E THIRD FLOOR PLAN - TECHNOLOGY - AREA E
01-TN125F THIRD FLOOR PLAN - TECHNOLOGY - AREA F
01-TN125G THIRD FLOOR PLAN - TECHNOLOGY - AREA G
01-TN125H THIRD FLOOR PLAN - TECHNOLOGY - AREA H
01-TN125I THIRD FLOOR PLAN - TECHNOLOGY - AREA I
SHEET INDEX
SHEET
NUMBER SHEET NAME
01-TN125J THIRD FLOOR PLAN - TECHNOLOGY - AREA J
01-TN126A FOURTH FLOOR PLAN - TECHNOLOGY - AREA A
01-TN126B FOURTH FLOOR PLAN - TECHNOLOGY - AREA B
01-TN126B2 FOURTH FLOOR PLAN - TECHNOLOGY - AREA B2
01-TN126C FOURTH FLOOR PLAN - TECHNOLOGY - AREA C
01-TN126E FOURTH FLOOR PLAN - TECHNOLOGY - AREA E
01-TN126F FOURTH FLOOR PLAN - TECHNOLOGY - AREA F
01-TN126G FOURTH FLOOR PLAN - TECHNOLOGY - AREA G
01-TN126H FOURTH FLOOR PLAN - TECHNOLOGY - AREA H
01-TN126I FOURTH FLOOR PLAN - TECHNOLOGY - AREA I
01-TN126J FOURTH FLOOR PLAN - TECHNOLOGY - AREA J
01-TN127A FIFTH FLOOR PLAN - TECHNOLOGY - AREA A
01-TN127B FIFTH FLOOR PLAN - TECHNOLOGY - AREA B
01-TN127B2 FIFTH FLOOR PLAN - TECHNOLOGY - AREA B2
01-TN127C FIFTH FLOOR PLAN - TECHNOLOGY - AREA C
01-TN127D FIFTH FLOOR PLAN - TECHNOLOGY - AREA D
01-TN127E FIFTH FLOOR PLAN - TECHNOLOGY - AREA E
01-TN127I FIFTH FLOOR PLAN - TECHNOLOGY - AREA I
01-TN127J FIFTH FLOOR PLAN - TECHNOLOGY - AREA J
01-TN128A SIXTH FLOOR PLAN - TECHNOLOGY - AREA A
01-TN128B SIXTH FLOOR PLAN - TECHNOLOGY - AREA B
01-TN128B2 SIXTH FLOOR PLAN - TECHNOLOGY - AREA B2
01-TN128C SIXTH FLOOR PLAN - TECHNOLOGY - AREA C
01-TN128E SIXTH FLOOR PLAN - TECHNOLOGY - AREA E
01-TN128J SIXTH FLOOR PLAN - TECHNOLOGY - AREA J
01-TN129A SEVENTH FLOOR PLAN - TECHNOLOGY - AREA A
01-TN129B SEVENTH FLOOR PLAN - TECHNOLOGY - AREA B
01-TN129C SEVENTH FLOOR PLAN - TECHNOLOGY - AREA C
01-TN129E SEVENTH FLOOR PLAN - TECHNOLOGY - AREA E
01-TN130A EIGHTH FLOOR PLAN - TECHNOLOGY - AREA A
01-TN130B EIGHTH FLOOR PLAN - TECHNOLOGY - AREA B
01-TN130C EIGHTH FLOOR PLAN - TECHNOLOGY - AREA C
01-TN130E EIGHTH FLOOR PLAN - TECHNOLOGY - AREA E
01-TN131A NINTH FLOOR PLAN - TECHNOLOGY - AREA A
01-TN131B NINTH FLOOR PLAN - TECHNOLOGY - AREA B
01-TN131C NINTH FLOOR PLAN - TECHNOLOGY - AREA C
01-TN131E NINTH FLOOR PLAN - TECHNOLOGY - AREA E
01-TN132A TENTH FLOOR PLAN - TECHNOLOGY - AREA A
01-TN132B TENTH FLOOR PLAN - TECHNOLOGY - AREA B
01-TN132C TENTH FLOOR PLAN - TECHNOLOGY - AREA C
01-TN132E TENTH FLOOR PLAN - TECHNOLOGY - AREA E
01-TN133A ELEVENTH FLOOR PLAN - TECHNOLOGY - AREA A
01-TN133B ELEVENTH FLOOR PLAN - TECHNOLOGY - AREA B
01-TN133C ELEVENTH FLOOR PLAN - TECHNOLOGY - AREA C
01-TN133E ELEVENTH FLOOR PLAN - TECHNOLOGY - AREA E
01-TN400 ENLARGED PLAN - TR BW106B - NEW - BASEMENT FLOOR
01-TN401 ENLARGED PLAN - TR BC101-PBX - NEW - BASEMENT FLOOR
01-TN405 ENLARGED PLAN - TR CA224C - NEW - GROUND FLOOR
01-TN406 ENLARGED PLAN - TR GG108 - NEW - GROUND FLOOR
01-TN407 ENLARGED PLAN - TR AN306A - REMAIN - GROUND FLOOR
01-TN408 ENLARGED PLAN - TR AA162 - REMAIN - GROUND FLOOR
01-TN410 ENLARGED PLAN - TR 1W121 - REMAIN - FIRST FLOOR
01-TN411 ENLARGED PLAN - TR 1A243 - NEW - FIRST FLOOR
01-TN412 ENLARGED PLAN - TR 1G111 - NEW - FIRST FLOOR
01-TN413 ENLARGED PLAN - TR 1M195A - REMAIN - FIRST FLOOR
01-TN414 ENLARGED PLAN - TR 1N301 - NEW - FIRST FLOOR
01-TN420 ENLARGED PLAN - TR 2W110D - REMAIN - SECOND FLOOR
01-TN421 ENLARGED PLAN - TR 2N301 - NEW - SECOND FLOOR
01-TN422 ENLARGED PLAN - TR 2M275A - REMAIN - SECOND FLOOR
01-TN430 ENLARGED PLAN - TR 3N301 - NEW - THIRD FLOOR
01-TN431 ENLARGED PLAN - TR 3A110 - REMAIN - THIRD FLOOR
01-TN432 ENLARGED PLAN - TR 3M150 - REMAIN - THIRD FLOOR
01-TN440 ENLARGED PLAN - TR 4W137 - NEW - FOURTH FLOOR
01-TN441 ENLARGED PLAN - TR 4N301 - NEW - FOURTH FLOOR
01-TN442 ENLARGED PLAN - TR 4A02 - REMAIN - FOURTH FLOOR
01-TN443 ENLARGED PLAN - TR 4M150 - REMAIN - FOURTH FLOOR
01-TN450 ENLARGED PLAN - TR 5N101B - REMAIN - FIFTH FLOOR
01-TN451 ENLARGED PLAN - TR 5W200 - NEW - FIFTH FLOOR
01-TN452 ENLARGED PLAN - TR 5M150 - REMAIN - FIFTH FLOOR
01-TN460 ENLARGED PLAN - TR 6W200 - NEW - SIXTH FLOOR
01-TN461 ENLARGED PLAN - TR 6N301 - NEW - SIXTH FLOOR
01-TN470 ENLARGED PLAN - TR 7W200 - NEW - SEVENTH FLOOR
01-TN471 ENLARGED PLAN - TR 7N301 - NEW - SEVENTH FLOOR
01-TN480 ENLARGED PLAN - TR 8W200 - NEW - EIGHTH FLOOR
01-TN481 ENLARGED PLAN - TR 8N301 - NEW - EIGHTH FLOOR
01-TN490 ENLARGED PLAN - TR 9W200 - NEW - NINTH FLOOR
01-TN491 ENLARGED PLAN - TR 9N301 - NEW - NINTH FLOOR
01-TN492 ENLARGED PLAN - TR 10W200 - NEW - TENTH FLOOR
01-TN493 ENLARGED PLAN - TR 10N301 - NEW - TENTH FLOOR
01-TN494 ENLARGED PLAN - TR 11W200 - NEW - ELEVENTH FLOOR
01-TN495 ENLARGED PLAN - TR 11N301 - NEW - ELEVENTH FLOOR
01-TN497 ENLARGED PLAN - EXISTING DATA CENTER - FIFTH FLOOR
01-TN498 ENLARGED PLAN - DATA CENTER - FIFTH FLOOR
01-TN499 ENLARGED PLAN - DATA CENTER ELEVATION - FIFTH FLOOR
16.4-PHYSICAL SECURITY
01-TY121A BASEMENT SECURITY FLOOR PLAN - AREA A
01-TY121B BASEMENT SECURITY FLOOR PLAN - AREA B
01-TY121C BASEMENT SECURITY FLOOR PLAN - AREA C
01-TY121D BASEMENT SECURITY FLOOR PLAN - AREA D
01-TY121E BASEMENT SECURITY FLOOR PLAN - AREA E
01-TY121F BASEMENT SECURITY FLOOR PLAN - AREA F
01-TY121G BASEMENT SECURITY FLOOR PLAN - AREA G
01-TY122A GROUND SECURITY FLOOR PLAN - AREA A
01-TY122B GROUND SECURITY FLOOR PLAN - AREA B
01-TY122C GROUND SECURITY FLOOR PLAN - AREA C
SHEET INDEX
SHEET
NUMBER SHEET NAME
01-TY122D GROUND SECURITY FLOOR PLAN - AREA D
01-TY122E GROUND SECURITY FLOOR PLAN - AREA E
01-TY122F GROUND SECURITY FLOOR PLAN - AREA F
01-TY122G GROUND SECURITY FLOOR PLAN - AREA G
01-TY122H GROUND SECURITY FLOOR PLAN - AREA H
01-TY122I GROUND SECURITY FLOOR PLAN - AREA I
01-TY123A FIRST SECURITY FLOOR PLAN - AREA A
01-TY123B FIRST SECURITY FLOOR PLAN - AREA B
01-TY123C FIRST SECURITY FLOOR PLAN - AREA C
01-TY123D FIRST SECURITY FLOOR PLAN - AREA D
01-TY123E FIRST SECURITY FLOOR PLAN - AREA E
01-TY123F FIRST SECURITY FLOOR PLAN - AREA F
01-TY123G FIRST SECURITY FLOOR PLAN - AREA G
01-TY123H FIRST SECURITY FLOOR PLAN - AREA H
01-TY123I FIRST SECURITY FLOOR PLAN - AREA I
01-TY123J FIRST SECURITY FLOOR PLAN - AREA J
01-TY124A SECOND SECURITY FLOOR PLAN - AREA A
01-TY124B SECOND SECURITY FLOOR PLAN - AREA B
01-TY124B2 SECOND SECURITY FLOOR PLAN - AREA B2
01-TY124C SECOND SECURITY FLOOR PLAN - AREA C
01-TY124D SECOND SECURITY FLOOR PLAN - AREA D
01-TY124E SECOND SECURITY FLOOR PLAN - AREA E
01-TY124F SECOND SECURITY FLOOR PLAN - AREA F
01-TY124G SECOND SECURITY FLOOR PLAN - AREA G
01-TY124H SECOND SECURITY FLOOR PLAN - AREA H
01-TY124I SECOND SECURITY FLOOR PLAN - AREA I
01-TY124J SECOND SECURITY FLOOR PLAN - AREA J
01-TY125A THIRD SECURITY FLOOR PLAN - AREA A
01-TY125B THIRD SECURITY FLOOR PLAN - AREA B
01-TY125B2 THIRD SECURITY FLOOR PLAN - AREA B2
01-TY125C THIRD SECURITY FLOOR PLAN - AREA C
01-TY125D THIRD SECURITY FLOOR PLAN - AREA D
01-TY125E THIRD SECURITY FLOOR PLAN - AREA E
01-TY125F THIRD SECURITY FLOOR PLAN - AREA F
01-TY125G THIRD SECURITY FLOOR PLAN - AREA G
01-TY125H THIRD SECURITY FLOOR PLAN - AREA H
01-TY125I THIRD SECURITY FLOOR PLAN - AREA I
01-TY125J THIRD SECURITY FLOOR PLAN - AREA J
01-TY126A-B2 FOURTH SECURITY FLOOR PLAN - AREA A & B2
01-TY126B FOURTH SECURITY FLOOR PLAN - AREA B
01-TY126C FOURTH SECURITY FLOOR PLAN - AREA C
01-TY126E FOURTH SECURITY FLOOR PLAN - AREA E
01-TY126F-G FOURTH SECURITY FLOOR PLAN - AREA F & G
01-TY126H FOURTH SECURITY FLOOR PLAN - AREA H
01-TY126I FOURTH SECURITY FLOOR PLAN - AREA I
01-TY126J FOURTH SECURITY FLOOR PLAN - AREA J
01-TY127A-B2 FIFTH SECURITY FLOOR PLAN - AREA A & B2
01-TY127B-E FIFTH SECURITY FLOOR PLAN - AREA B & E
01-TY127B-Ea FIFTH SECURITY FLOOR PLAN - DATA CENTER
01-TY127C FIFTH SECURITY FLOOR PLAN - AREA C
01-TY127D FIFTH SECURITY FLOOR PLAN - AREA D
01-TY127H FIFTH SECURITY FLOOR PLAN - AREA H
01-TY127I FIFTH SECURITY FLOOR PLAN - AREA I
01-TY127J FIFTH SECURITY FLOOR PLAN - AREA J
01-TY128A-B2 SIXTH SECURITY FLOOR PLAN - AREA A & B2
01-TY128B-E SIXTH SECURITY FLOOR PLAN - AREA B & E
01-TY128C SIXTH SECURITY FLOOR PLAN - AREA C
01-TY129A-B2 SEVENTH SECURITY FLOOR PLAN - AREA A & B2
01-TY129B-E SEVENTH SECURITY FLOOR PLAN - AREA B & E
01-TY129C SEVENTH SECURITY FLOOR PLAN - AREA C
01-TY130A-B2 EIGHTH SECURITY FLOOR PLAN - AREA A & B2
01-TY130B-E EIGHTH SECURITY FLOOR PLAN - AREA B & E
01-TY130C EIGHTH SECURITY FLOOR PLAN - AREA C
01-TY131A-B2 NINTH SECURITY FLOOR PLAN - AREA A & B2
01-TY131B-E NINTH SECURITY FLOOR PLAN - AREA B & E
01-TY131C NINTH SECURITY FLOOR PLAN - AREA C
01-TY132A-B2 TENTH SECURITY FLOOR PLAN - AREA A & B2
01-TY132B-E TENTH SECURITY FLOOR PLAN - AREA B & E
01-TY132C TENTH SECURITY FLOOR PLAN - AREA C
01-TY133A ELEVENTH SECURITY FLOOR PLAN - AREA A
01-TY133B-E ELEVENTH SECURITY FLOOR PLAN - AREA B & E
01-TY133C ELEVENTH SECURITY FLOOR PLAN - AREA C
05-GENERAL
05-Gl001 COVER SHEET
08-ARCHITECTURE
05-AE121 ENLARGED FLOOR PLANS - GROUND FLOOR - TR BA101
05-AE601 DOOR SCHEDULE
11-FIRE PROTECTION
05-FX101 FIRST FLOOR PLAN - FIRE PROTECTION
14-MECHANICAL
05-MD101 FIRST FLOOR DEMOLITION PLAN - MECHANICAL
05-MH101 FIRST FLOOR PLAN - MECHANICAL
15-ELECTRICAL
05-ED101 FIRST FLOOR DEMOLITION PLAN - ELECTRICAL
05-EP101 FIRST FLOOR PLAN - ELECTRICAL
05-EP401 ELECTRICAL ENLARGED PLANS
05-EP701 ELECTRICAL SCHEDULES
16-TELECOMMUNICATION
05-TD101 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY
05-TN101 FIRST FLOOR PLAN - TECHNOLOGY
05-TN400 ENLARGED PLANS - TECHNOLOGY
16.4-SECURITY
05-TY121 GROUND FLOOR SECURITY PLAN
SHEET INDEX
SHEET
NUMBER SHEET NAME
16-TELECOMMUNICATION
08-TD101 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY
08-TD102 SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY
08-TN101 FIRST FLOOR PLAN - TECHNOLOGY
08-TN102 SECOND FLOOR PLAN - TECHNOLOGY
00-GENERAL
30-GI001 COVER SHEET
08-ARCHITECTURE
30-AE099 BASEMENT FLOOR PLAN
30-AE100 GROUND FLOOR PLAN
30-AE101 FIRST FLOOR PLAN
30-AE102 SECOND FLOOR PLAN
30-AE401 BA007 - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS
30-AE402 GA131 - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS
30-AE403 1A134 - ENLARGED FLOOR PLANS, RCPS AND INTERIOR ELEVATIONS
30-AE404 2A134 - ENLARGED FLOOR PLANS, RCPS AND INTERIOR ELEVATIONS
30-AE601 DOOR SCHEDULE
11-FIRE PROTECTION
30-FX099 BASEMENT PLAN - FIRE PROTECTION
30-FX100 GROUND FLOOR PLAN - FIRE PROTECTION
30-FX101 FIRST FLOOR PLAN - FIRE PROTECTION
30-FX102 SECOND FLOOR PLAN - FIRE PROTECTION
12-PLUMBING
30-PP099 BASEMENT PLAN - PLUMBING
14-MECHANICAL
30-MD099 BASEMENT DEMOLITION PLAN - MECHANICAL
30-MD100 GROUND FLOOR DEMOLITION PLAN - MECHANICAL
30-MD101 FIRST FLOOR DEMOLITION PLAN - MECHANICAL
30-MD102 SECOND FLOOR DEMOLITION PLAN - MECHANICAL
30-MH099 BASEMENT PLAN - MECHANICAL
30-MH100 GROUND FLOOR PLAN - MECHANICAL
30-MH101 FIRST FLOOR PLAN - MECHANICAL
30-MH102 SECOND FLOOR PLAN - MECHANICAL
30-MH103 ROOF PLAN - MECHANICAL
30-MH400 ENLARGED PLANS - MECHANICAL
30-MH401 ENLARGED PLANS - MECHANICAL
15-ELECTRICAL
30-EP099 BASEMENT PLAN - ELECTRICAL
30-EP100 GROUND FLOOR PLAN - ELECTRICAL
30-EP101 FIRST FLOOR PLAN - ELECTRICAL
30-EP102 SECOND FLOOR PLAN - ELECTRICAL
30-EP401 ELECTRICAL ENLARGED PLANS
30-EP402 ELECTRICAL ENLARGED PLANS
30-EP601 ELECTRICAL RISER DIAGRAM
30-EP701 ELECTRICAL SCHEDULES
30-EP702 ELECTRICAL PANEL SCHEDULES
30-EP703 ELECTRICAL PANEL SCHEDULES
16-TELECOMMUNICATION
30-TD100 BASEMENT DEMOLITION PLAN - TECHNOLOGY
30-TD101 GROUND FLOOR DEMOLITION PLAN - TECHNOLOGY
30-TD102 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY
30-TD103 SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY
30-TN100 BASEMENT PLAN - TECHNOLOGY
30-TN101 GROUND FLOOR PLAN - TECHNOLOGY
30-TN102 FIRST FLOOR PLAN - TECHNOLOGY
30-TN103 SECOND FLOOR PLAN - TECHNOLOGY
30-TN400 BASEMENT FLOOR - TR BA007 - REMAIN - ENLARGED PLAN
30-TN410 GROUND FLOOR - TR GA131 - REMAIN - ENLARGED PLAN
30-TN420 FIRST FLOOR - TR 1A134 - REMAIN - ENLARGED PLAN
30-TN430 SECOND FLOOR - TR 2A134 - REMAIN - ENLARGED PLAN
16.4-PHYSICAL SECURITY
30-TY099 BASEMENT SECURITY FLOOR PLAN
30-TY100 GROUND SECURITY FLOOR PLAN
30-TY101 FIRST SECURITY FLOOR PLAN
30-TY102 SECOND SECURITY FLOOR PLAN
01-GENERAL
33-GI001 COVER SHEET
08-ARCHITECTURE
33-AE121 1ST & 2ND FLOOR PLAN
33-AE401 TR 104 - ENLARGED FLOOR PLANS, RCPS AND INTERIOR ELEVATION
33-AE601 DOOR SCHEDULE AND DIAGRAMS
11-FIRE PROTECTION
33-FX101 FIRST FLOOR PLAN - FIRE PROTECTION
14-MECHANICAL
33-MH101 FIRST FLOOR PLAN - MECHANICAL
15-ELECTRICAL
33-EP101 FIRST FLOOR PLAN - ELECTRICAL
33-EP701 ELECTRICAL SCHEDULES
16-TELECOMMUNICATION
33-TD101 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY
33-TD102 SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY
33-TN101 FIRST FLOOR PLAN - TECHNOLOGY
33-TN102 SECOND FLOOR PLAN - TECHNOLOGY
33-TN400 TECHNOLOGY ENLARGED PLANS
16.4-PHYSICAL SECURITY
33-TY121 1ST & 2ND SECURITY FLOOR PLAN
Grand total: 343
Revisions: Date: SHEET 3 of 797SHEET 3 of 797SHEET 3 of 797
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
A u to d e s k D o c s /U n iv e rs it y D ri v e
V A
M C
E H
R M
V
/6
-2
-7
.G .P
IT
E
H R
M .r v t
/1
/2
:1
:5
P
M
00-GI003
GENERAL NOTES AND CODE
REQUIREMENTS
Awen Solutions Group
215 N. Payne Street, Suite 122
Alexandria, VA 22314
06.13.2025
EHRM INFRASTRUCTURE
UPGRADES - VAPHS UNIVERSITY
DRIVE CAMPUS 0
UNIVERSITY DRIVE C,
PITTSBURGH, PA 15240
646-22-700
BUILDING CLASSIFICATION:
BASIC OCCUPANCY GROUP(S):
(NFPA 101 6.1.5)
OCCUPANCY GROUP I
CONSTRUCTION TYPE:
(EXISTING)
TYPE II 222, SPRINKLERED
EXISTING CONDITIONS TO BE VERIFIED
(NEW)
TYPE II 222, SPRINKLERED
BASIC ALLOWABLE AREA:
(222 FULLY SPRINKLERED)
OCCUPANCY GROUP I-2 – UNLIMITED
ACTUAL HEIGHT
12 STORY HOSPITAL + PARTIAL BASEMENT
EXISTING CONDITIONS TO BE VERIFIED
MINIMUM FIRE RESISTIVE REQUIREMENTS:
(NFPA 222, TABLE 4.1.1)
ELEMENT RATING
BEARING WALLS, EXTERIOR 2-HOUR
BEARING WALLS, INTERIOR 2-HOUR
NON-BEARING WALLS, INTERIOR 0-HOUR
STRUCTURAL FRAME 2-HOUR
STRUCTURAL FRAME, SUPPORTING ROOF ONLY 1-HOUR
SHAFT ENCLOSURES 2-HOUR
FLOORS 2-HOUR
ROOFS 1-HOUR
HORIZONTAL EXIT 2-HOUR
SMOKE BARRIER (COMPARTMENTS) 1-HOUR
HAZARDOUS AREA SEPARATIONS 1-HOUR
SOILED LINEN ROOMS 1-HOUR
STORAGE ROOMS > 100 SF 1-HOUR
CORRIDORS
(NFPA 101 CHAPTER 38.3.6.1)
EXCEPTION 3, WITHIN BUILDINGS PROTECTED THROUGHOUT
BY AN APPROVED AUTOMATIC SPRINKLER SYSTEM, 1-HOUR
FIRE RESISTANCE RATING IS NOT REQUIRED.
EXISTING CONDITIONS TO BE VERIFIED
MAXIMUM TRAVEL DISTANCE TO EXITS
(NFPA 101, CHAPTER 19)
TRAVEL DISTANCE 200-FEET
COMMON PATH OF TRAVEL 100-FEET
DEAD-END CORRIDOR 30-FEET
FIRE SUPPRESSION
THE FACILITY WILL BE FULLY SPRINKLERED PER NFPA 13
HANDHELD FIRE EXTINGUISHERS WILL BE INSTALLED IN EACH TR ROOM
OCCUPANT LOAD CALCULATIONS:
(PER NFPA 101, Table 7.3.1.2)
BUSINESS USE: 150 SF/OCC
INPATIENT TREATMENT DEPARTMENTS: 250 SF/OCC
SLEEPING DEPARTMENTS: 120 SF/OCC
AMBULATORY HEALTH CARE: 150 SF/OCC
UTILITY USE: 300 SF/OCC
USE 120 SF PER OCCUPANT (MOST RESTRICTIVE)
EXISTING CONDITIONS TO BE PROVIDED
EGRESS FACTORS
STAIR CAPACITY FACTOR = 0.3
DOOR CAPACITY FACTOR = 0.2
PROPOSED NEW CONSTRUCTION
NEW CONSTRUCTION (UTILITY / 300): 9556 SF
NEW OCC LOAD: 32 OCC
NEW CONSTRUCTION (CORRIDOR / 150): 1982 SF
NEW OCC LOAD: 13 OCC
EXISTING STAIR CAPACITIES TO BE PROVIDED
SMOKE COMPARTMENTS
EXISTING CONDITIONS TO BE VERIFIED
CODE ANALYSISPROJECT GENERAL NOTES
THIS PROJECT AT THE VA PITTSBURGH HEALTHCARE SYSTEM (VAPHS) UNIVERSITY DRIVE (UD) CAMPUS IN PITTSBURGH, PA ADDRESSES NECESSARY INFORMATION TECHNOLOGY (IT) UPGRADES TO
MODERNIZE EXISTING INFRASTRUCTURE AND SUPPORT IMPLEMENTING A NEW ELECTRONIC
HEALTHCARE RECORDS MANAGEMENT (EHRM) SYSTEM.
THE PROJECT SCOPE INCLUDES (2) NEW CONSTRUCTION TOWER ADDITIONS, A NEW DATA CENTER WITHIN THE TOWERS, UPGRADED AND NEW TR ROOMS, UPGRADED AND NEW SUPPORT ROOMS, NEW
AND RETROFIT STRUCTURAL SYSTEMS AND FOUNDATION WORK, NEW MEP AND TECHNOLOGY
EQUIPMENT AND SYSTEMS, NEW AND REVISED FLS SYSTEMS, NEW AND REVISED SECURITY SYSTEMS, ACM AND LEAD MITIGATION, A PHASED SYSTEM AND CONSTRUCTION DESIGN.
SCOPE OF WORK CODES AND STANDARDS
ENVELOPE
CLIMATE ZONE 4A
ASHRAE 90.1 - 2019
ASHRAE TABLE 5.5-44A
ROOF - INSULATION ABOVE DECK U-0.032 / R30
ROOF - METAL BUILDING U-0.037 / R19 + R11
WALLS - MASS U-0.014 / R9.5
WALLS - METAL BUILDING U-0.060 / R0 + R15.8
WALLS - STEEL FRAMED U.064 / R13 + R7.5
FLOORS - MASS U .057 / R14/6
FLOORS - STEEL JOIST U-0.038 / R30
FLOORS - SLAB ON GRADE UNHEATED F-0.520 / R15 FOR 24 INCHES
DOORS - OPAQUE SWINGING U-0.37
DOORS - OPAQUE NON SWINGING U-0.31
FENESTRATION
VERTICAL GLAZING - FIXED U.36
SHGC .36 (MAX) SHGC 1.1 (MIN)
VERTICAL GLAZING - OPERABLE U.45
SHGC .33 (MAX) SHGC 1.1 (MIN)
VERTICAL GLAZING - ENTRANCE DOOR U.63
SHGC .33 (MAX) SHGC 1.1 (MIN)
SKYLIGHT U .50 SHGC .40 (MAX)
INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES V3.1, JULY 1, 2021
VA ARCHITECTURAL DESIGN MANUAL: VS. AUGUST 1, 2014
VA ELECTRICAL DESIGN MANUAL: VS. DECEMBER 1, 2019
VA FIRE PROTECTION DESIGN MANUAL: VS. NOVEMBER 1, 2023
VA HVAC DESIGN MANUAL: REV. OCTOBER 1, 2022
VA PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL: VS. JULY 1, 2022
VA PLUMBING DESIGN MANUAL: VS. JANUARY 1, 2023
VA SITE DESIGN MANUAL: VS. APRIL 1, 2021
VA WHOLE BUILDING COMMISSIONING PROCESS MANUAL: VS. MAY 1, 2013
VA RETRO-COMMISSIONING PROCESS MANUAL: VS. JUNE 1, 2014
VA BARRIER FREE DESIGN STANDARD: REV. JUNE 1, 2024
VA STRUCTURAL DESIGN MANUAL: REV. JULY 1, 2023
PG-18-1 MASTER CONSTRUCTION SPECIFICATION INDEX
PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES
PG-18-4 STANDARD DETAILS AND CAD STANDARDS
PG-18-10 DESIGN MANUALS (BY DISCIPLINE)
PG-18-12 DESIGN GUIDES (GRAPHICAL, BY FUNCTION)
PG-18-13 BARRIER-FREE DESIGN GUIDE
PG-18-14 ROOM FINISHES, DOOR, AND HARDWARE SCHEDULES
PG-18-15 A-E SUBMISSION REQUIREMENTS
H-18-8 SEISMIC DESIGN HANDBOOK
HEPF SEP (SOCAMES 6) DESIGN ALERTS
NFPA 13 INSTALLATION OF SPRINKLER SYSTEMS: 2022 EDITION
NFPA 72 FIRE ALARM AND SIGNALING CODE: 2022 EDITION
NFPA 75 FIRE PROTECTION OF IT EQUIPMENT: 2024 EDITION
NFPA 99 HEALTHCARE FACILITIES CODE: 2024 EDITION
NFPA 101 LIFE SAFETY CODE: 2024 EDITION
NFPA 2001 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS: 2022 EDITION
INTERNATIONAL BUILDING CODE: 2021 EDITION
INTERNATIONAL MECHANICAL CODE: 2021 EDITION
INTERNATIONAL ELECTRICAL CODE: 2021 EDITION
INTERNATIONAL PLUMBING CODE: 2021 EDITION
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL
IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS,
INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR
INSPECTION FEES.
NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY
CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS
REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE.
FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A
DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT
REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC
REQUIREMENTS ARE DIFFERENT).
CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED
CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE
RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO
ENSURE A CONSISTENCY SYSTEM WIDE.
FIRE PROTECTION
1. PENETRATIONS TO BE PROTECTED WITH THROUGH PENETRATION PROTECTION SYSTEMS IN
VA FIRE PROTECTION DESIGN MANUAL 2.3.N.
2. A FINISH OR FIRE RATING INDICATION ON A WALL SHALL MEAN THE ENTIRE LENGTH OF WALL
IS TO BE FINISHED OR FIRE RATED.
3. FIRE RATED ASSEMBLIES SHALL BE PER TABLE 721.1(1), GENERIC ASSEMBLIES OF GYPSUM
HANDBOOK, OR HAVE ICC APPROVAL.
4. PENETRATIONS OF FIRE RESISTANCE-RATED HORIZONTAL ASSEMBLIES AND FIRE
RESISTANCE RATED WALLS SHALL COMPLY WITH SECTION 714 OF THE IBC, INCLUDING FIRE
DAMPERS AND SMOKE DAMPERS WHERE REQUIRED.
5. MEMBRANE PENETRATIONS BY LISTED ELECTRICAL OUTLET BOXES ARE PERMITTED
PROVIDED SUCH BOXES HAVE BEEN TESTED FOR USE IN FIRE-RESISTANCE-RATED
ASSEMBLIES AND THE BOX DOES NOT EXCEED 1/8" UNLESS LISTED OTHERWISE.
6. COMPLY WITH THE PRESCRIPTIVE REQUIREMENTS OF NFPA 75
7. PROVIDE AUTOMATIC WET-PIPE SPRINKLER SYSTEM THROUGHOUT INCLUDING ALL DEMARC
ROOMS, MAIN COMPUTER ROOMS, AND TR'S.
8. FUSIBLE LINK SPRINKLERS ARE PERMITTED TO BE USED IN THE COMPUTER AREA.
9. PROVIDE CLEAN AGENT FIRE SUPPRESSION FOR THE MAIN COMPUTER ROOM AND BACKUP
COMPUTER ROOM WHEN REQUIRED BY THE VA FIRE PROTECTION DESIGN MANUAL.
10. GASEOUS SUPPRESSION SYSTEM INCLUDE TELECOMMUNICATIONS WITH AN ANSI/TIA-942-B
RATING OF 2 OR 3 AS IDENTIFIED IN THE OIT.
11. EXISTING BUILDINGS TO BE REVIEWED AND EVALUATED ON A CASE BY CASE BASIS FOR
EXISTING FIRE PROTECTIONS SYSTEMS AND BROUGHT UP TO CURRENT STANDARD WHERE
REQUIRED.
12. REPLACE CEILING TILES AT THE END OF EACH SHIFT FOR WORK AREAS OUTSIDE OF A RATED
CONSTRUCTION BARRIER. IF THE TILES CANNOT BE REPLACED, THE SPRINKLER SYSTEM MAY
BE CONSIDERED OUT OF SERVICE IN THESE AREAS AND 1-HOUR FIRE RATED SEPARATION
WILL BE REQUIRED BETWEEN THE CONSTRUCTION AREA AND THE OCCUPIED PORTIONS OF
THE BUILDING.
13. INSTALLATION OF TEMPORARY FIRESTOPPING (MINERAL WOOL) AT THE END OF THE WORK
SHIFT IF ADDITIONAL CABLING WILL BE PULLED THROUGH A PENETRATION AT A LATER WORK
SHIFT.
14. PROVIDE CLEAN AGENT FIRE EXTINGUISHERS FOR EACH TR NO GREATER THAN 75 FEET
FROM THE REMOTE CORNER OF EACH TR, BUT NOT LOCATED WITHIN THE TR. IF NO EXISTING
FIRE CABINET HAS CAPACITY OR DOES NOT MEET THE DISTANCE CRITERIA ABOVE PROVIDE A
NEW FIRE CABINET AND COORDINATE CONFIRM LOCATION WITH THE STATION.
15. THE MINIMUM FIRE RATING FOR ALL LOAD-BEARING STRUCTURAL ELEMENTS SHALL BE
MAINTAINED. SEE COVER CODE SUMMARY TABLE FOR PROJECT REQUIRED BUILDING RATING
ELEMENTS. IF DURING CONSTRUCTION ANY DAMAGE TO FIRE PROTECTION IS OBSERVED OR
ANY MISSING WITHIN THE AREA OF…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .