S02 - Att2 - Drawings 1of3.pdf

PDF 40 MB Posted

Attached to
Construct ERHM Infrastructure Upgrades - University Drive - Pittsburgh, PA
Solicitation number
36C77626R0082_1
Issued by

About this file

This is a set of final bid drawings for construction work at the VA Pittsburgh Healthcare System (VAPHS) University Drive Campus in Pittsburgh, Pennsylvania. The drawings document the Electronic Health Records Management (EHRM) Infrastructure Upgrades project, with a project number 646-22-700 issued on June 13, 2025.

The project scope encompasses infrastructure modernization across multiple buildings (Buildings 1, 5, 8, 29, 30, 33, and site improvements) to support implementation of a new electronic healthcare records system. Work includes construction of two new tower additions totaling approximately 11,600 square feet of new construction and modifications to approximately 3,030 square feet of existing space. The upgrades involve new and renovated telecommunications rooms, support spaces, structural systems, foundation work, mechanical/electrical/plumbing (MEP) systems, fire protection systems, technology infrastructure, security systems, and asbestos/lead mitigation. The facility is classified as a Type II 222 fully sprinklered hospital (Occupancy Group I-2) with a maximum 12-story structure. The drawings specify compliance with NFPA 101 Life Safety Code (2024 Edition), NFPA 13 sprinkler systems, NFPA 75 IT equipment fire protection, and various VA design manuals. The project documents include 343 total drawing sheets organized by discipline (General, Structural, Architecture, Fire Protection, Plumbing, Mechanical, Electrical, Telecommunications, and Physical Security), with extensive detail sheets for floor plans, demolition plans, enlarged plans, schedules, and specifications. Key requirements include phased construction with minimal disruption to ongoing hospital operations, infection control risk assessment protocols, construction sequencing limitations (no more than three telecom rooms simultaneously), and compliance with VA standards for telecommunications infrastructure with 90-meter UTP cable segment compliance verification.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

DESIGN TEAM

OWNER

ARCHITECT / CONTRACT PRIME

MECHANICAL / ELECTRICAL / PLUMBING /

FIRE PROTECTION / TECHNOLOGY ENGINEER

/ STRUCTURAL

VA PITTSBURGH HEALTHCARE SYSTEM UNIVERSITY DRIVE CAMPUS

4100 Allequippa St., Pittsburgh, PA 15240-1001

Awen Solutions Group 215 N. Payne Street, Suite 122 Alexandria, VA 22314 Contact: Amy Carr acarr@awensolutions.com

(720) 703-0640

IMEG Corp.

15 Sunnen Drive Suite 104 St. Louis, MO 63143 Contact: David Larson David.L.Larson@imegcorp.com

(314) 951-2530

EHRM INFRASTRUCTURE UPGRADES

FINAL BID DOCUMENTS

CIVIL ENGINEER

Langan Engineering and Enviromental Services 2400 Ansys Drive, Suite 403 Canonsburg, PA 15317 Contact: Rachel McCune, PE rmccune@langan.com

(724) 972-3781

ENVIROMENTAL ENGINEER

CT Consultants, Inc.

44265 Plymouth Oaks Blvd Plymouth, MI 48170 Contact: Harjot Singh hsingh@ctconsultants.com

(419) 214-5058

A u to d e s k D o c s /U n iv e rs it y D ri v e

V A

M C

E H

R M

V

/6

-2

-7

.G .P

IT

E

H R

M .r v t

/1

/2

:4

:0

A

M

00-GI000

COVER SHEET

Awen Solutions Group

215 N. Payne Street, Suite 122

Alexandria, VA 22314

06.13.2025

EHRM INFRASTRUCTURE

UPGRADES - VAPHS UNIVERSITY

DRIVE CAMPUS 0

UNIVERSITY DRIVE C,

PITTSBURGH, PA 15240

646-22-700

VAPHS - UNIVERSITY DRIVE CAMPUS

06.13.2025

UNIVERSITY DRIVE C, PITTSBURGH, PA 15240

Revisions: Date: SHEET 1 of 797SHEET 1 of 797

UNIVERSITY DRIVE

VA MEDICAL CENTER

IMEG Corp.

623 26th Avenue Rock Island, IL 61201 Contact: David Larson David.L.Larson@imegcorp.com

(314) 951-2530

, PITTSBURGH, PA 15240

SHEET 1 of 797

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

A u to d e s k D o c s /U n iv e rs it y D ri v e

V A

M C

E H

R M

V

/6

-2

-7

.G .P

IT

E

H R

M .r v t

/1

/2

:3

:0

A

M

00-GI001

SHEET INDEX

Awen Solutions Group

215 N. Payne Street, Suite 122

Alexandria, VA 22314

06.13.2025

EHRM INFRASTRUCTURE

UPGRADES - VAPHS UNIVERSITY

DRIVE CAMPUS 0

UNIVERSITY DRIVE C,

PITTSBURGH, PA 15240

646-22-700

SHEET INDEX

Sheet Number Sheet Name

00-GENERAL

00-GI000 COVER SHEET

00-GI001 SHEET INDEX

00-GI002 SHEET INDEX

00-GI003 GENERAL NOTES AND CODE REQUIREMENTS

00-GI004 GENERAL NOTES

00-GI005 TIL ABBREVIATION LIST (PG-18-4)

00-GI010 PROJECT INFORMATION

00-GI011 INFECTION CONTROL RISK ASSESSMENT - CLASS IV

00-GI012 TYPICAL ADA REQUIREMENTS - INTERIOR CLEARANCES

00-GI020 FACILITY MEDICAL REQUIREMENTS

00-GI021 FACILITY MEDICAL REQUIREMENTS

00-GI022 FACILITY MEDICAL REQUIREMENTS

00-GI023 FACILITY MEDICAL REQUIREMENTS

00-GI101 CAMPUS SITE DIAGRAM

08-ARCHITECTURE

00-AE520 INTERIOR ASSEMBLIES

00-AE521 EXTERIOR ASSEMBLIES

00-AE522 ROOF DETAILS

00-AE523 DOOR DETAILS

00-AE524 INTERIOR FRAMING DETAILS

00-AE525 INTERIOR FRAMING DETAILS

00-AE526 PARTITION AND MISCELLANEOUS DETAILS

00-AE527 CEILING DETAILS

15-ELECTRICAL

00-E000 ELECTRICAL COVERSHEET

00-E001 ELECTRICAL SHEET INDEX

00-E501 ELECTRICAL DETAILS

00-E502 ELECTRICAL DETAILS

00-E701 ELECTRICAL SCHEDULES

00-E702 ELECTRICAL SCHEDULES

16.4-PHYSICAL SECURITY

00-TY001 SECURITY NOTES, SYMBOLS, AND ABBREVIATIONS

01-GENERAL

01-GI001 COVER SHEET

01-GI002 BUILDING 1 & 29 SHEET INDEX

01-GI003 BUILDING 1 & 29 SHEET INDEX

01-GI110 EGRESS DIAGRAMS

01-GI111 EGRESS DIAGRAMS

01-GI115 SEQUENCE DIAGRAMS

01-GI116 SEQUENCE DIAGRAMS

07-STRUCTURAL

01-S000.0 GENERAL NOTES

01-S001.0 GENERAL NOTES

01-S002.0 GENERAL NOTES / SCHEDULES

01-S010.0 LOADING PLANS - NORTH TOWER

01-S011.0 LOADING PLANS - WEST TOWER

01-S199.0 OVERALL BASEMENT FOUNDATION PLAN

01-S199.1 PARTIAL BASEMENT FOUNDATION PLAN

01-S200.0 OVERALL GROUND LEVEL FRAMING PLAN

01-S200.1 PARTIAL GROUND LEVEL FRAMING PLAN

01-S201.0 OVERALL LEVEL 01 FRAMING PLAN

01-S201.1 PARTIAL LEVEL 01 FRAMING PLAN

01-S202.0 OVERALL LEVEL 02 FRAMING PLAN

01-S202.1 PARTIAL LEVEL 02 FRAMING PLAN

01-S203.0 OVERALL LEVEL 03 FRAMING PLAN

01-S203.1 PARTIAL LEVEL 03 FRAMING PLAN

01-S204.0 OVERALL LEVEL 04 FRAMING PLAN

01-S204.1 PARTIAL LEVEL 04 FRAMING PLAN

01-S205.0 OVERALL LEVEL 05 FRAMING PLAN

01-S205.1 PARTIAL LEVEL 05 FRAMING PLAN

01-S206.0 OVERALL LEVEL 06 FRAMING PLAN

01-S206.1 PARTIAL LEVEL 06 FRAMING PLAN

01-S207.0 OVERALL LEVEL 07-11 FRAMING PLAN

01-S207.1 PARTIAL LEVEL 07-11 FRAMING PLAN

01-S212.0 OVERALL ROOF LEVEL FRAMING PLAN

01-S212.1 PARTIAL ROOF FRAMING PLAN

01-S300.0 TYPICAL FOUNDATION SECTIONS AND SCHEDULES

01-S301.0 FOUNDATION SECTIONS

01-S500.0 TYPICAL STEEL SECTIONS AND SCHEDULES

01-S501.0 TYPICAL STEEL SECTIONS

01-S502.0 TYPICAL STEEL SECTIONS

01-S503.0 TYPICAL STEEL SECTIONS

01-S504.0 STEEL COLUMN SCHEDULE

01-S505.0 STEEL SECTIONS

01-S506.0 STEEL SECTIONS

01-S550.0 TOWER FACADE SUPPORT ELEVATIONS

08-ARCHITECTURE

01-AE99 BASEMENT FLOOR PLAN

01-AE100 GROUND FLOOR PLAN

01-AE101 FIRST FLOOR PLAN

01-AE102 SECOND FLOOR PLAN

01-AE103 THIRD FLOOR PLAN

01-AE104 FOURTH FLOOR PLAN

01-AE105 FIFTH FLOOR PLAN

01-AE106 SIXTH FLOOR PLAN

01-AE107 SEVENTH FLOOR PLAN

01-AE108 EIGHTH FLOOR PLAN

01-AE109 NINTH FLOOR PLAN

01-AE110 TENTH FLOOR PLAN

01-AE111 ELEVENTH FLOOR PLAN

01-AE112 PENTHOUSE FLOOR PLAN

01-AE121A BASEMENT FLOOR PLAN - AREA A

01-AE121B BASEMENT FLOOR PLAN - AREA B

01-AE121C BASEMENT FLOOR PLAN - AREA C

01-AE121D BASEMENT FLOOR PLAN - AREA D

01-AE121E BASEMENT FLOOR PLAN - AREA E

SHEET INDEX

Sheet Number Sheet Name

01-AE121F BASEMENT FLOOR PLAN - AREA F

01-AE121G BASEMENT FLOOR PLAN - AREA G

01-AE122A GROUND FLOOR PLAN - AREA A

01-AE122B GROUND FLOOR PLAN - AREA B

01-AE122C GROUND FLOOR PLAN - AREA C

01-AE122D GROUND FLOOR PLAN - AREA D

01-AE122E GROUND FLOOR PLAN - AREA E

01-AE122F GROUND FLOOR PLAN - AREA F

01-AE122G GROUND FLOOR PLAN - AREA G

01-AE122H GROUND FLOOR PLAN - AREA H

01-AE122I GROUND FLOOR PLAN - AREA I

01-AE123A FIRST FLOOR PLAN - AREA A

01-AE123B FIRST FLOOR PLAN - AREA B

01-AE123C FIRST FLOOR PLAN - AREA C

01-AE123D FIRST FLOOR PLAN - AREA D

01-AE123E FIRST FLOOR PLAN - AREA E

01-AE123F FIRST FLOOR PLAN - AREA F

01-AE123G FIRST FLOOR PLAN - AREA G

01-AE123H FIRST FLOOR PLAN - AREA H

01-AE123I FIRST FLOOR PLAN - AREA I

01-AE123J FIRST FLOOR PLAN - AREA J

01-AE124A SECOND FLOOR PLAN - AREA A

01-AE124B SECOND FLOOR PLAN - AREA B

01-AE124B2 SECOND FLOOR PLAN - AREA B2

01-AE124C SECOND FLOOR PLAN - AREA C

01-AE124D SECOND FLOOR PLAN - AREA D

01-AE124E SECOND FLOOR PLAN - AREA E

01-AE124F SECOND FLOOR PLAN - AREA F

01-AE124G SECOND FLOOR PLAN - AREA G

01-AE124H SECOND FLOOR PLAN - AREA H

01-AE124I SECOND FLOOR PLAN - AREA I

01-AE124J SECOND FLOOR PLAN - AREA J

01-AE125A THIRD FLOOR PLAN - AREA A

01-AE125B THIRD FLOOR PLAN - AREA B

01-AE125B2 THIRD FLOOR PLAN - AREA B2

01-AE125C THIRD FLOOR PLAN - AREA C

01-AE125D THIRD FLOOR PLAN - AREA D

01-AE125E THIRD FLOOR PLAN - AREA E

01-AE125F THIRD FLOOR PLAN - AREA F

01-AE125G THIRD FLOOR PLAN - AREA G

01-AE125H THIRD FLOOR PLAN - AREA H

01-AE125I THIRD FLOOR PLAN - AREA I

01-AE125J THIRD FLOOR PLAN - AREA J

01-AE126A-B2 FOURTH FLOOR PLAN - AREA A & B2

01-AE126B FOURTH FLOOR PLAN - AREA B

01-AE126C FOURTH FLOOR PLAN - AREA C

01-AE126E FOURTH FLOOR PLAN - AREA E

01-AE126F-G FOURTH FLOOR PLAN - AREA F & G

01-AE126H FOURTH FLOOR PLAN - AREA H

01-AE126I FOURTH FLOOR PLAN - AREA I

01-AE126J FOURTH FLOOR PLAN - AREA J

01-AE127A-B2 FIFTH FLOOR PLAN - AREA A & B2

01-AE127B-E FIFTH FLOOR PLAN - AREA B & E

01-AE127C FIFTH FLOOR PLAN - AREA C

01-AE127D FIFTH FLOOR PLAN - AREA D

01-AE127H FIFTH FLOOR PLAN - AREA H

01-AE127I FIFTH FLOOR PLAN - AREA I

01-AE127J FIFTH FLOOR PLAN - AREA J

01-AE128A-B2 SIXTH FLOOR PLAN - AREA A & B2

01-AE128B-E SIXTH FLOOR PLAN - AREA B & E

01-AE128C SIXTH FLOOR PLAN - AREA C

01-AE129A-B2 SEVENTH FLOOR PLAN - AREA A & B2

01-AE129B-E SEVENTH FLOOR PLAN - AREA B & E

01-AE129C SEVENTH FLOOR PLAN - AREA C

01-AE130A-B2 EIGHTH FLOOR PLAN - AREA A & B2

01-AE130B-E EIGHTH FLOOR PLAN - AREA B & E

01-AE130C EIGHTH FLOOR PLAN - AREA C

01-AE131A-B2 NINTH FLOOR PLAN - AREA A & B2

01-AE131B-E NINTH FLOOR PLAN - AREA B & E

01-AE131C NINTH FLOOR PLAN - AREA C

01-AE132A-B2 TENTH FLOOR PLAN - AREA A & B2

01-AE132B-E TENTH FLOOR PLAN - AREA B & E

01-AE132C TENTH FLOOR PLAN - AREA C

01-AE133A ELEVENTH FLOOR PLAN - AREA A

01-AE133B-E ELEVENTH FLOOR PLAN - AREA B & E

01-AE133C ELEVENTH FLOOR PLAN - AREA C

01-AE201 BUILDING ELEVATIONS

01-AE202 TOWER ELEVATIONS - NORTH

01-AE203 TOWER ELEVATIONS - WEST

01-AE301 BUILDING SECTIONS - NORTH TOWER

01-AE302 BUILDING SECTIONS - WEST TOWER

01-AE400 BC101TR - ENLARGED FLOOR PLANS, RCPS & INTERIOR

ELEVATIONS

01-AE401 BW106B - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS

01-AE402 AN306A - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS

01-AE403 CA224C - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS

01-AE403A AA162 - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS

01-AE404 GG108 - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS

01-AE405 1A243 - ENLARGED FLOOR PLANS, RCPS AND INTERIOR ELEVATIONS

01-AE406 1G111TR - ENLARGED FLOOR PLANS, RCPS AND INTERIOR

ELEVATIONS

01-AE407 1M195A - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS

01-AE408 1W121 - ENLARGED FLOOR PLANS, RCPS AND INTERIOR

ELEVATIONS

01-AE409 2M275A - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS

01-AE410 2W110D - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS

01-AE411 3A110 - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS

01-AE412 3M150 - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS

01-AE413 4A02 - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS

01-AE414 4M150 - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS

SHEET INDEX

Sheet Number Sheet Name

01-AE415 4W137 - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS

01-AE416 5M150 - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS

01-AE417 5N101A - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS

01-AE418 1N301 - ENLARGED FLOOR PLANS & RCP - 1ST FLOOR NORTH

TOWER

01-AE420 2N301 - ENLARGED FLOOR PLANS & RCP - 2ND FLOOR NORTH

TOWER

01-AE421 3N301 - ENLARGED FLOOR PLANS & RCP - 3RD FLOOR NORTH

TOWER

01-AE422 4N301 - ENLARGED FLOOR PLANS & RCP - 4TH FLOOR NORTH

TOWER

01-AE423.1 5W200 - ENLARGED DEMO & SEQUENCING PLANS - 5TH FLOOR

WEST

01-AE423.2 5W200 - ENLARGED FLOOR PLANS & RCP - 5TH FLOOR WEST TOWER

01-AE424.1 5N301 - ENLARGED DEMO & SEQUENCING PLANS - 5TH FLOOR

NORTH

01-AE424.2 5N301 - ENLARGED SLAB PLANS & INTERIOR ELEVATIONS - 5TH

FLOOR NORTH

01-AE424.3 5N301 - ENLARGED FLOOR PLANS & RCP - 5TH FLOOR NORTH

01-AE425.1 WEST TOWER - ENLARGED DEMO PLANS & RCPS - 6TH THRU 11TH

FLOOR TYPICAL

01-AE425.2 WEST TOWER ENLARGED FLOOR PLANS & RCPS - 6TH THRU 11TH

FLOOR TYPICAL

01-AE426 NORTH TOWER - ENLARGED FLOOR PLANS & RCPS - 6TH THRU

11TH FLOOR TYPICAL

01-AE427 ROOF WEST - ENLARGED FLOOR PLANS & RCPS

01-AE428 ROOF NORTH - ENLARGED FLOOR PLANS & RCPS

01-AE429 ENLARGED CHASE PLANS

01-AE430 ENLARGED FLOOR PLANS - COLUMN CONDITIONS

01-H402 AN306A - ENLARGED ABATEMENT PLAN

01-H421 3N301 - ENLARGED ABATEMENT PLANS - 3RD FLOOR NORTH

01-H424.1 5N301 - ENLARGED ABATEMENT PLANS - 5TH FLOOR NORTH

01-H425.1 ENLARGED ABATEMENT PLANS - 6TH FLOOR WEST

01-AE501 DETAILS

01-AE502 DETAILS

01-AE503 DETAILS

01-AE504 DETAILS

01-AE601 DOOR SCHEDULE AND DIAGRAMS

01-AE602 ROOM FINISH SCHEDULE

11-FIRE PROTECTION

00-FG000 FIRE PROTECTION COVERSHEET

00-FG500 FIRE PROTECTION DETAILS

01-FX099 BASEMENT PLAN - FIRE PROTECTION

01-FX100 GROUND FLOOR PLAN - FIRE PROTECTION

01-FX101 FIRST FLOOR PLAN - FIRE PROTECTION

01-FX102 SECOND FLOOR PLAN - FIRE PROTECTION

01-FX103 THIRD FLOOR PLAN - FIRE PROTECTION

01-FX104 FOURTH FLOOR PLAN - FIRE PROTECTION

01-FX105 FIFTH FLOOR PLAN - FIRE PROTECTION

01-FX106 SIXTH FLOOR PLAN - FIRE PROTECTION

01-FX107 SEVENTH FLOOR PLAN - FIRE PROTECTION

01-FX108 EIGHTH FLOOR PLAN - FIRE PROTECTION

01-FX109 NINTH FLOOR PLAN - FIRE PROTECTION

01-FX110 TENTH FLOOR PLAN - FIRE PROTECTION

01-FX111 ELEVENTH FLOOR PLAN - FIRE PROTECTION

01-FX400 ENLARGED PLANS - FIRE PROTECTION

12-PLUMBING

00-PG000 PLUMBING COVERSHEET

00-PG500 PLUMBING DETAILS

01-PD099 BASEMENT DEMOLITION PLAN - PLUMBING

01-PD100 GROUND FLOOR DEMOLITION PLAN - PLUMBING

01-PD101 FIRST FLOOR DEMOLITION PLAN - PLUMBING

01-PD102 SECOND FLOOR DEMOLITION PLAN - PLUMBING

01-PD103 THIRD FLOOR DEMOLITION PLAN - PLUMBING

01-PD104 FOURTH FLOOR DEMOLITION PLAN - PLUMBING

01-PD105 FIFTH FLOOR DEMOLITION PLAN - PLUMBING

01-PD106 SIXTH FLOOR DEMOLITION PLAN - PLUMBING

01-PP101 FIRST FLOOR PLAN - PLUMBING

01-PP102 SECOND FLOOR PLAN - PLUMBING

01-PP103 THIRD FLOOR PLAN - PLUMBING

01-PP104 FOURTH FLOOR PLAN - PLUMBING

01-PP105 FIFTH FLOOR PLAN - PLUMBING

01-PP106 SIXTH FLOOR PLAN - PLUMBING

01-PP107 SEVENTH FLOOR PLAN - PLUMBING

01-PP108 EIGHTH FLOOR PLAN - PLUMBING

01-PP109 NINTH FLOOR PLAN - PLUMBING

01-PP110 TENTH FLOOR PLAN - PLUMBING

01-PP111 ELEVENTH FLOOR PLAN - PLUMBING

01-PP112 ROOF PLAN - PLUMBING

14-MECHANICAL

00-MG000 MECHANICAL COVERSHEET

00-MG500 MECHANICAL DETAILS

00-MG501 MECHANICAL DETAILS

00-MG700 MECHANICAL SCHEDULES

00-MG800 MECHANICAL CONTROLS

00-MG801 MECHANICAL CONTROLS

01-MD099 BASEMENT DEMOLITION PLAN - MECHANICAL

01-MD100 GROUND FLOOR DEMOLITION PLAN - MECHANICAL

01-MD101 FIRST FLOOR DEMOLITION PLAN - MECHANICAL

01-MD102 SECOND FLOOR DEMOLITION PLAN - MECHANICAL

01-MD103 THIRD FLOOR DEMOLITION PLAN - MECHANICAL

01-MD104 FOURTH FLOOR DEMOLITION PLAN - MECHANICAL

01-MD105 FIFTH FLOOR DEMOLITION PLAN - MECHANICAL

01-MD108 EIGHTH FLOOR DEMOLITION PLAN - MECHANICAL

01-MD400 ENLARGED DEMOLITION PLANS - MECHANICAL

01-MD401 ENLARGED DEMOLITION PLANS - MECHANICAL

01-MH099 BASEMENT PLAN - MECHANICAL

01-MH100 GROUND FLOOR PLAN - MECHANICAL

01-MH101 FIRST FLOOR PLAN - MECHANICAL

01-MH102 SECOND FLOOR PLAN - MECHANICAL

01-MH103 THIRD FLOOR PLAN - MECHANICAL

SHEET INDEX

Sheet Number Sheet Name

01-MH104 FOURTH FLOOR PLAN - MECHANICAL

01-MH105 FIFTH FLOOR PLAN - MECHANICAL

01-MH106 SIXTH FLOOR PLAN - MECHANICAL

01-MH107 SEVENTH FLOOR PLAN - MECHANICAL

01-MH108 EIGHTH FLOOR PLAN - MECHANICAL

01-MH109 NINTH FLOOR PLAN - MECHANICAL

01-MH110 TENTH FLOOR PLAN - MECHANICAL

01-MH111 ELEVENTH FLOOR PLAN - MECHANICAL

01-MH112 ROOF PLAN - MECHANICAL

01-MH400 BASEMENT ENLARGED PLANS - MECHANICAL

01-MH401 BASEMENT ENLARGED PLANS - MECHANICAL

01-MH402 GROUND FLOOR ENLARGED PLANS - MECHANICAL

01-MH403 GROUND FLOOR ENLARGED PLANS - MECHANICAL

01-MH404 GROUND FLOOR ENLARGED PLANS - MECHANICAL

01-MH405 FIRST FLOOR ENLARGED PLANS - MECHANICAL

01-MH406 FIRST FLOOR ENLARGED PLANS - MECHANICAL

01-MH407 FIRST FLOOR ENLARGED PLANS - MECHANICAL

01-MH408 SECOND FLOOR ENLARGED PLANS - MECHANICAL

01-MH409 SECOND FLOOR ENLARGED PLANS - MECHANICAL

01-MH410 THIRD FLOOR ENLARGED PLANS - MECHANICAL

01-MH411 THIRD FLOOR ENLARGED PLANS - MECHANICAL

01-MH412 FOURTH FLOOR ENLARGED PLANS - MECHANICAL

01-MH413 FOURTH FLOOR ENLARGED PLANS - MECHANICAL

01-MH414 FIFTH FLOOR ENLARGED PLANS - MECHANICAL

01-MH415 FIFTH FLOOR ENLARGED PLANS - MECHANICAL

01-MH416 FIFTH FLOOR ENLARGED PLANS - MECHANICAL

01-MH417 FIFTH FLOOR ENLARGED PLANS - MECHANICAL

01-MH418 SIXTH FLOOR ENLARGED PLANS - MECHANICAL

01-MH419 SIXTH FLOOR ENLARGED PLANS - MECHANICAL

01-MH420 SEVENTH FLOOR ENLARGED PLANS - MECHANICAL

01-MH421 SEVENTH FLOOR ENLARGED PLANS - MECHANICAL

01-MH422 EIGHTH FLOOR ENLARGED PLANS - MECHANICAL

01-MH423 EIGHTH FLOOR ENLARGED PLANS - MECHANICAL

01-MH424 NINTH FLOOR ENLARGED PLANS - MECHANICAL

01-MH425 NINTH FLOOR ENLARGED PLANS - MECHANICAL

01-MH426 TENTH FLOOR ENLARGED PLANS - MECHANICAL

01-MH427 TENTH FLOOR ENLARGED PLANS - MECHANICAL

01-MH428 ELEVENTH FLOOR ENLARGED PLANS - MECHANICAL

01-MH429 ELEVENTH FLOOR ENLARGED PLANS - MECHANICAL

01-MH430 ROOF ENLARGED PLANS - MECHANICAL

15-ELECTRICAL

01-ED099 BASEMENT DEMOLITION PLAN - ELECTRICAL - OVERALL

01-ED100 GROUND FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL

01-ED101 FIRST FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL

01-ED102 SECOND FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL

01-ED103 THIRD FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL

01-ED104 FOURTH FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL

01-ED105 FIFTH FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL

01-ED401 FIFTH FLOOR DEMOLITION PLAN-ELECTRICAL ENLARGED

01-EP099 BASEMENT PLAN - ELECTRICAL - OVERALL

01-EP100 GROUND FLOOR PLAN - ELECTRICAL - OVERALL

01-EP101 FIRST FLOOR PLAN - ELECTRICAL - OVERALL

01-EP102 SECOND FLOOR PLAN - ELECTRICAL - OVERALL

01-EP103 THIRD FLOOR PLAN - ELECTRICAL - OVERALL

01-EP104 FOURTH FLOOR PLAN - ELECTRICAL - OVERALL

01-EP105 FIFTH FLOOR PLAN - ELECTRICAL - OVERALL

01-EP106 SIXTH FLOOR PLAN - ELECTRICAL - OVERALL

01-EP107 SEVENTH FLOOR PLAN - ELECTRICAL - OVERALL

01-EP108 EIGHTH FLOOR PLAN - ELECTRICAL - OVERALL

01-EP109 NINTH FLOOR PLAN - ELECTRICAL - OVERALL

01-EP110 TENTH FLOOR PLAN - ELECTRICAL - OVERALL

01-EP111 ELEVENTH FLOOR PLAN - ELECTRICAL - OVERALL

01-EP112 ROOF PLAN - ELECTRICAL - OVERALL

01-EP401 BUILDING 1 - GROUND & BASEMENT ENLARGED PLAN

01-EP402 BUILDING 1 - FIFTH FLOOR - ELECTRICAL ENLARGED

01-EP403 BUILDING 1 - ELECTRICAL ENLARGED PLANS

01-EP404 BUILDING 1 - ELECTRICAL ENLARGED PLANS

01-EP405 BUILDING 1 - ELECTRICAL ENLARGED PLANS

01-EP406 BUILDING 1 - ELECTRICAL ENLARGED PLANS

01-EP407 BUILDING 1 - ELECTRICAL ENLARGED PLANS

01-EP408 BUILDING 1 - ELECTRICAL ENLARGED PLANS

01-EP409 BUILDING 1 - ELECTRICAL ENLARGED PLANS

01-EP410 BUILDING 1 - ELECTRICAL ENLARGED PLANS

01-EP411 BUILDING 1 - ELECTRICAL ENLARGED PLANS

01-EP412 BUILDING 1 - ELECTRICAL ENLARGED PLANS

01-EP413 BUILDING 1 - ELECTRICAL ENLARGED PLANS

01-EP601 ELECTRICAL RISER DIAGRAM

01-EP602 ELECTRICAL RISER DIAGRAM

01-EP603 ELECTRICAL RISER DIAGRAM

01-EP604 ELECTRICAL RISER DIAGRAM

01-EP605 ELECTRICAL RISER DIAGRAM

01-EP701 ELECTRICAL SCHEDULES

01-EP702 ELECTRICAL PANEL SCHEDULES

01-EP703 ELECTRICAL PANEL SCHEDULES

01-EP704 ELECTRICAL PANEL SCHEDULES

01-EP705 ELECTRICAL PANEL SCHEDULES

01-EP706 ELECTRICAL PANEL SCHEDULES

01-EP707 ELECTRICAL PANEL SCHEDULES

01-EP708 ELECTRICAL PANEL SCHEDULES

01-EP709 ELECTRICAL PANEL SCHEDULES

01-EP710 ELECTRICAL PANEL SCHEDULES

01-EP711 ELECTRICAL PANEL SCHEDULES

01-EP712 ELECTRICAL PANEL SCHEDULES

01-EP713 ELECTRICAL PANEL SCHEDULES

01-EP714 ELECTRICAL PANEL SCHEDULES

01-EP715 ELECTRICAL PANEL SCHEDULES

16-TELECOMMUNICATION

01-T000 TECHNOLOGY COVERSHEET

01-T201 TECHNOLOGY SITE PLAN

SHEET INDEX

Sheet Number Sheet Name

01-T500 TECHNOLOGY DETAILS

01-T501 TECHNOLOGY DETAILS

01-T600 TECHNOLOGY DIAGRAMS

01-T601 TECHNOLOGY DIAGRAMS

01-T602 TECHNOLOGY DIAGRAMS

01-T603 TECHNOLOGY DIAGRAMS

01-T700 TECHNOLOGY SCHEDULES

01-TD99 BASEMENT DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD100 GROUND FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD101 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD102 SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD103 THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD104 FOURTH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD105 FIFTH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD106 SIXTH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD107 SEVENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD108 EIGHTH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD109 NINTH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD110 TENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD111 ELEVENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD112 ROOF DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD121A BASEMENT DEMOLITION PLAN - TECHNOLOGY - AREA A

01-TD121B BASEMENT DEMOLITION PLAN - TECHNOLOGY - AREA B

01-TD121E BASEMENT DEMOLITION PLAN - TECHNOLOGY - AREA E

01-TD121F BASEMENT DEMOLITION PLAN - TECHNOLOGY - AREA F

01-TD122A GROUND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A

01-TD122B GROUND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B

01-TD122C GROUND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C

01-TD122D GROUND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA D

01-TD122E GROUND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E

01-TD122F GROUND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA F

01-TD122G GROUND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA G

01-TD122H GROUND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA H

01-TD122I GROUND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA I

01-TD123A FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A

01-TD123B FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B

01-TD123C FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C

01-TD123D FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA D

01-TD123E FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E

01-TD123F FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA F

01-TD123G FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA G

01-TD123H FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA H

01-TD123I FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA I

01-TD123J FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA J

01-TD124A SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A

01-TD124B SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B

01-TD124B2 SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B2

01-TD124C SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C

01-TD124D SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA D

01-TD124E SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E

01-TD124F SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA F

01-TD124G SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA G

01-TD124H SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA H

01-TD124I SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA I

01-TD124J SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA J

01-TD125A THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A

01-TD125B THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B

01-TD125B2 THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B2

01-TD125C THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C

01-TD125D THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA D

01-TD125E THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E

01-TD125F THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA F

01-TD125G THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA G

01-TD125H THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA H

01-TD125I THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA I

01-TD125J THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA J

01-TD126A FOURTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A

01-TD126B FOURTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B

01-TD126B2 FOURTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B2

01-TD126C FOURTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C

01-TD126E FOURTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E

01-TD126F FOURTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA F

01-TD126G FOURTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA G

01-TD126I FOURTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA I

01-TD126J FOURTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA J

01-TD127A FIFTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A

01-TD127B FIFTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B

01-TD127B2 FIFTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B2

01-TD127C FIFTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C

01-TD127D FIFTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA D

01-TD127I FIFTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA I

01-TD127J FIFTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA J

TOTAL: 454

Revisions: Date: SHEET 2 of 797SHEET 2 of 797SHEET 2 of 797

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

A u to d e s k D o c s /U n iv e rs it y D ri v e

V A

M C

E H

R M

V

/6

-2

-7

.G .P

IT

E

H R

M .r v t

/1

/2

:3

:0

A

M

00-GI002

SHEET INDEX

Awen Solutions Group

215 N. Payne Street, Suite 122

Alexandria, VA 22314

06.13.2025

EHRM INFRASTRUCTURE

UPGRADES - VAPHS UNIVERSITY

DRIVE CAMPUS 0

UNIVERSITY DRIVE C,

PITTSBURGH, PA 15240

646-22-700

SHEET INDEX

SHEET

NUMBER SHEET NAME

16-TELECOMMUNICATION

01-TD128A SIXTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A

01-TD128B SIXTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B

01-TD128B2 SIXTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B2

01-TD128C SIXTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C

01-TD128E SIXTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E

01-TD128J SIXTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA J

01-TD129A SEVENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A

01-TD129B SEVENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B

01-TD129C SEVENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C

01-TD129E SEVENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E

01-TD130A EIGHTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A

01-TD130B EIGHTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B

01-TD130C EIGHTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C

01-TD130E EIGHTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E

01-TD131A NINTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A

01-TD131B NINTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B

01-TD131C NINTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C

01-TD131E NINTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E

01-TD132A TENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A

01-TD132B TENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B

01-TD132C TENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C

01-TD132E TENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E

01-TD133A ELEVENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A

01-TD133B ELEVENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B

01-TD133C ELEVENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C

01-TD133E ELEVENTH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E

01-TD400 EXISTING TRS TO DEMO - TECHNOLOGY

01-TD401 EXISTING TRS TO DEMO - TECHNOLOGY

01-TD402 EXISTING TRS TO DEMO - TECHNOLOGY

01-TD403 EXISTING TRS TO DEMO - TECHNOLOGY

01-TD404 EXISTING TRS TO DEMO - TECHNOLOGY

01-TD405 EXISTING TRS TO DEMO - TECHNOLOGY

01-TD406 EXISTING TRS TO DEMO - TECHNOLOGY

01-TD407 EXISTING TRS TO DEMO - TECHNOLOGY

01-TN99 BASEMENT PLAN - TECHNOLOGY - OVERALL

01-TN100 GROUND FLOOR PLAN - TECHNOLOGY - OVERALL

01-TN101 FIRST FLOOR PLAN - TECHNOLOGY - OVERALL

01-TN102 SECOND FLOOR PLAN - TECHNOLOGY - OVERALL

01-TN103 THIRD FLOOR PLAN - TECHNOLOGY - OVERALL

01-TN104 FOURTH FLOOR PLAN - TECHNOLOGY - OVERALL

01-TN105 FIFTH FLOOR PLAN - TECHNOLOGY - OVERALL

01-TN106 SIXTH FLOOR PLAN - TECHNOLOGY - OVERALL

01-TN107 SEVENTH FLOOR PLAN - TECHNOLOGY - OVERALL

01-TN108 EIGHTH FLOOR PLAN - TECHNOLOGY - OVERALL

01-TN109 NINTH FLOOR PLAN - TECHNOLOGY - OVERALL

01-TN110 TENTH FLOOR PLAN - TECHNOLOGY - OVERALL

01-TN111 ELEVENTH FLOOR PLAN - TECHNOLOGY - OVERALL

01-TN112 ROOF PLAN - TECHNOLOGY - OVERALL

01-TN121A BASEMENT PLAN - TECHNOLOGY - AREA A

01-TN121B BASEMENT PLAN - TECHNOLOGY - AREA B

01-TN121D BASEMENT PLAN - TECHNOLOGY - AREA D

01-TN121E BASEMENT PLAN - TECHNOLOGY - AREA E

01-TN121F BASEMENT PLAN - TECHNOLOGY - AREA F

01-TN122A GROUND FLOOR PLAN - TECHNOLOGY - AREA A

01-TN122B GROUND FLOOR PLAN - TECHNOLOGY - AREA B

01-TN122C GROUND FLOOR PLAN - TECHNOLOGY - AREA C

01-TN122D GROUND FLOOR PLAN - TECHNOLOGY - AREA D

01-TN122E GROUND FLOOR PLAN - TECHNOLOGY - AREA E

01-TN122F GROUND FLOOR PLAN - TECHNOLOGY - AREA F

01-TN122G GROUND FLOOR PLAN - TECHNOLOGY - AREA G

01-TN122H GROUND FLOOR PLAN - TECHNOLOGY - AREA H

01-TN122I GROUND FLOOR PLAN - TECHNOLOGY - AREA I

01-TN123A FIRST FLOOR PLAN - TECHNOLOGY - AREA A

01-TN123B FIRST FLOOR PLAN - TECHNOLOGY - AREA B

01-TN123C FIRST FLOOR PLAN - TECHNOLOGY - AREA C

01-TN123D FIRST FLOOR PLAN - TECHNOLOGY - AREA D

01-TN123E FIRST FLOOR PLAN - TECHNOLOGY - AREA E

01-TN123F FIRST FLOOR PLAN - TECHNOLOGY - AREA F

01-TN123G FIRST FLOOR PLAN - TECHNOLOGY - AREA G

01-TN123H FIRST FLOOR PLAN - TECHNOLOGY - AREA H

01-TN123I FIRST FLOOR PLAN - TECHNOLOGY - AREA I

01-TN123J FIRST FLOOR PLAN - TECHNOLOGY - AREA J

01-TN124A SECOND FLOOR PLAN - TECHNOLOGY - AREA A

01-TN124B SECOND FLOOR PLAN - TECHNOLOGY - AREA B

01-TN124B2 SECOND FLOOR PLAN - TECHNOLOGY - AREA B2

01-TN124C SECOND FLOOR PLAN - TECHNOLOGY - AREA C

01-TN124D SECOND FLOOR PLAN - TECHNOLOGY - AREA D

01-TN124E SECOND FLOOR PLAN - TECHNOLOGY - AREA E

01-TN124F SECOND FLOOR PLAN - TECHNOLOGY - AREA F

01-TN124G SECOND FLOOR PLAN - TECHNOLOGY - AREA G

01-TN124H SECOND FLOOR PLAN - TECHNOLOGY - AREA H

01-TN124I SECOND FLOOR PLAN - TECHNOLOGY - AREA I

01-TN124J SECOND FLOOR PLAN - TECHNOLOGY - AREA J

01-TN125A THIRD FLOOR PLAN - TECHNOLOGY - AREA A

01-TN125B THIRD FLOOR PLAN - TECHNOLOGY - AREA B

01-TN125B2 THIRD FLOOR PLAN - TECHNOLOGY - AREA B2

01-TN125C THIRD FLOOR PLAN - TECHNOLOGY - AREA C

01-TN125D THIRD FLOOR PLAN - TECHNOLOGY - AREA D

01-TN125E THIRD FLOOR PLAN - TECHNOLOGY - AREA E

01-TN125F THIRD FLOOR PLAN - TECHNOLOGY - AREA F

01-TN125G THIRD FLOOR PLAN - TECHNOLOGY - AREA G

01-TN125H THIRD FLOOR PLAN - TECHNOLOGY - AREA H

01-TN125I THIRD FLOOR PLAN - TECHNOLOGY - AREA I

SHEET INDEX

SHEET

NUMBER SHEET NAME

01-TN125J THIRD FLOOR PLAN - TECHNOLOGY - AREA J

01-TN126A FOURTH FLOOR PLAN - TECHNOLOGY - AREA A

01-TN126B FOURTH FLOOR PLAN - TECHNOLOGY - AREA B

01-TN126B2 FOURTH FLOOR PLAN - TECHNOLOGY - AREA B2

01-TN126C FOURTH FLOOR PLAN - TECHNOLOGY - AREA C

01-TN126E FOURTH FLOOR PLAN - TECHNOLOGY - AREA E

01-TN126F FOURTH FLOOR PLAN - TECHNOLOGY - AREA F

01-TN126G FOURTH FLOOR PLAN - TECHNOLOGY - AREA G

01-TN126H FOURTH FLOOR PLAN - TECHNOLOGY - AREA H

01-TN126I FOURTH FLOOR PLAN - TECHNOLOGY - AREA I

01-TN126J FOURTH FLOOR PLAN - TECHNOLOGY - AREA J

01-TN127A FIFTH FLOOR PLAN - TECHNOLOGY - AREA A

01-TN127B FIFTH FLOOR PLAN - TECHNOLOGY - AREA B

01-TN127B2 FIFTH FLOOR PLAN - TECHNOLOGY - AREA B2

01-TN127C FIFTH FLOOR PLAN - TECHNOLOGY - AREA C

01-TN127D FIFTH FLOOR PLAN - TECHNOLOGY - AREA D

01-TN127E FIFTH FLOOR PLAN - TECHNOLOGY - AREA E

01-TN127I FIFTH FLOOR PLAN - TECHNOLOGY - AREA I

01-TN127J FIFTH FLOOR PLAN - TECHNOLOGY - AREA J

01-TN128A SIXTH FLOOR PLAN - TECHNOLOGY - AREA A

01-TN128B SIXTH FLOOR PLAN - TECHNOLOGY - AREA B

01-TN128B2 SIXTH FLOOR PLAN - TECHNOLOGY - AREA B2

01-TN128C SIXTH FLOOR PLAN - TECHNOLOGY - AREA C

01-TN128E SIXTH FLOOR PLAN - TECHNOLOGY - AREA E

01-TN128J SIXTH FLOOR PLAN - TECHNOLOGY - AREA J

01-TN129A SEVENTH FLOOR PLAN - TECHNOLOGY - AREA A

01-TN129B SEVENTH FLOOR PLAN - TECHNOLOGY - AREA B

01-TN129C SEVENTH FLOOR PLAN - TECHNOLOGY - AREA C

01-TN129E SEVENTH FLOOR PLAN - TECHNOLOGY - AREA E

01-TN130A EIGHTH FLOOR PLAN - TECHNOLOGY - AREA A

01-TN130B EIGHTH FLOOR PLAN - TECHNOLOGY - AREA B

01-TN130C EIGHTH FLOOR PLAN - TECHNOLOGY - AREA C

01-TN130E EIGHTH FLOOR PLAN - TECHNOLOGY - AREA E

01-TN131A NINTH FLOOR PLAN - TECHNOLOGY - AREA A

01-TN131B NINTH FLOOR PLAN - TECHNOLOGY - AREA B

01-TN131C NINTH FLOOR PLAN - TECHNOLOGY - AREA C

01-TN131E NINTH FLOOR PLAN - TECHNOLOGY - AREA E

01-TN132A TENTH FLOOR PLAN - TECHNOLOGY - AREA A

01-TN132B TENTH FLOOR PLAN - TECHNOLOGY - AREA B

01-TN132C TENTH FLOOR PLAN - TECHNOLOGY - AREA C

01-TN132E TENTH FLOOR PLAN - TECHNOLOGY - AREA E

01-TN133A ELEVENTH FLOOR PLAN - TECHNOLOGY - AREA A

01-TN133B ELEVENTH FLOOR PLAN - TECHNOLOGY - AREA B

01-TN133C ELEVENTH FLOOR PLAN - TECHNOLOGY - AREA C

01-TN133E ELEVENTH FLOOR PLAN - TECHNOLOGY - AREA E

01-TN400 ENLARGED PLAN - TR BW106B - NEW - BASEMENT FLOOR

01-TN401 ENLARGED PLAN - TR BC101-PBX - NEW - BASEMENT FLOOR

01-TN405 ENLARGED PLAN - TR CA224C - NEW - GROUND FLOOR

01-TN406 ENLARGED PLAN - TR GG108 - NEW - GROUND FLOOR

01-TN407 ENLARGED PLAN - TR AN306A - REMAIN - GROUND FLOOR

01-TN408 ENLARGED PLAN - TR AA162 - REMAIN - GROUND FLOOR

01-TN410 ENLARGED PLAN - TR 1W121 - REMAIN - FIRST FLOOR

01-TN411 ENLARGED PLAN - TR 1A243 - NEW - FIRST FLOOR

01-TN412 ENLARGED PLAN - TR 1G111 - NEW - FIRST FLOOR

01-TN413 ENLARGED PLAN - TR 1M195A - REMAIN - FIRST FLOOR

01-TN414 ENLARGED PLAN - TR 1N301 - NEW - FIRST FLOOR

01-TN420 ENLARGED PLAN - TR 2W110D - REMAIN - SECOND FLOOR

01-TN421 ENLARGED PLAN - TR 2N301 - NEW - SECOND FLOOR

01-TN422 ENLARGED PLAN - TR 2M275A - REMAIN - SECOND FLOOR

01-TN430 ENLARGED PLAN - TR 3N301 - NEW - THIRD FLOOR

01-TN431 ENLARGED PLAN - TR 3A110 - REMAIN - THIRD FLOOR

01-TN432 ENLARGED PLAN - TR 3M150 - REMAIN - THIRD FLOOR

01-TN440 ENLARGED PLAN - TR 4W137 - NEW - FOURTH FLOOR

01-TN441 ENLARGED PLAN - TR 4N301 - NEW - FOURTH FLOOR

01-TN442 ENLARGED PLAN - TR 4A02 - REMAIN - FOURTH FLOOR

01-TN443 ENLARGED PLAN - TR 4M150 - REMAIN - FOURTH FLOOR

01-TN450 ENLARGED PLAN - TR 5N101B - REMAIN - FIFTH FLOOR

01-TN451 ENLARGED PLAN - TR 5W200 - NEW - FIFTH FLOOR

01-TN452 ENLARGED PLAN - TR 5M150 - REMAIN - FIFTH FLOOR

01-TN460 ENLARGED PLAN - TR 6W200 - NEW - SIXTH FLOOR

01-TN461 ENLARGED PLAN - TR 6N301 - NEW - SIXTH FLOOR

01-TN470 ENLARGED PLAN - TR 7W200 - NEW - SEVENTH FLOOR

01-TN471 ENLARGED PLAN - TR 7N301 - NEW - SEVENTH FLOOR

01-TN480 ENLARGED PLAN - TR 8W200 - NEW - EIGHTH FLOOR

01-TN481 ENLARGED PLAN - TR 8N301 - NEW - EIGHTH FLOOR

01-TN490 ENLARGED PLAN - TR 9W200 - NEW - NINTH FLOOR

01-TN491 ENLARGED PLAN - TR 9N301 - NEW - NINTH FLOOR

01-TN492 ENLARGED PLAN - TR 10W200 - NEW - TENTH FLOOR

01-TN493 ENLARGED PLAN - TR 10N301 - NEW - TENTH FLOOR

01-TN494 ENLARGED PLAN - TR 11W200 - NEW - ELEVENTH FLOOR

01-TN495 ENLARGED PLAN - TR 11N301 - NEW - ELEVENTH FLOOR

01-TN497 ENLARGED PLAN - EXISTING DATA CENTER - FIFTH FLOOR

01-TN498 ENLARGED PLAN - DATA CENTER - FIFTH FLOOR

01-TN499 ENLARGED PLAN - DATA CENTER ELEVATION - FIFTH FLOOR

16.4-PHYSICAL SECURITY

01-TY121A BASEMENT SECURITY FLOOR PLAN - AREA A

01-TY121B BASEMENT SECURITY FLOOR PLAN - AREA B

01-TY121C BASEMENT SECURITY FLOOR PLAN - AREA C

01-TY121D BASEMENT SECURITY FLOOR PLAN - AREA D

01-TY121E BASEMENT SECURITY FLOOR PLAN - AREA E

01-TY121F BASEMENT SECURITY FLOOR PLAN - AREA F

01-TY121G BASEMENT SECURITY FLOOR PLAN - AREA G

01-TY122A GROUND SECURITY FLOOR PLAN - AREA A

01-TY122B GROUND SECURITY FLOOR PLAN - AREA B

01-TY122C GROUND SECURITY FLOOR PLAN - AREA C

SHEET INDEX

SHEET

NUMBER SHEET NAME

01-TY122D GROUND SECURITY FLOOR PLAN - AREA D

01-TY122E GROUND SECURITY FLOOR PLAN - AREA E

01-TY122F GROUND SECURITY FLOOR PLAN - AREA F

01-TY122G GROUND SECURITY FLOOR PLAN - AREA G

01-TY122H GROUND SECURITY FLOOR PLAN - AREA H

01-TY122I GROUND SECURITY FLOOR PLAN - AREA I

01-TY123A FIRST SECURITY FLOOR PLAN - AREA A

01-TY123B FIRST SECURITY FLOOR PLAN - AREA B

01-TY123C FIRST SECURITY FLOOR PLAN - AREA C

01-TY123D FIRST SECURITY FLOOR PLAN - AREA D

01-TY123E FIRST SECURITY FLOOR PLAN - AREA E

01-TY123F FIRST SECURITY FLOOR PLAN - AREA F

01-TY123G FIRST SECURITY FLOOR PLAN - AREA G

01-TY123H FIRST SECURITY FLOOR PLAN - AREA H

01-TY123I FIRST SECURITY FLOOR PLAN - AREA I

01-TY123J FIRST SECURITY FLOOR PLAN - AREA J

01-TY124A SECOND SECURITY FLOOR PLAN - AREA A

01-TY124B SECOND SECURITY FLOOR PLAN - AREA B

01-TY124B2 SECOND SECURITY FLOOR PLAN - AREA B2

01-TY124C SECOND SECURITY FLOOR PLAN - AREA C

01-TY124D SECOND SECURITY FLOOR PLAN - AREA D

01-TY124E SECOND SECURITY FLOOR PLAN - AREA E

01-TY124F SECOND SECURITY FLOOR PLAN - AREA F

01-TY124G SECOND SECURITY FLOOR PLAN - AREA G

01-TY124H SECOND SECURITY FLOOR PLAN - AREA H

01-TY124I SECOND SECURITY FLOOR PLAN - AREA I

01-TY124J SECOND SECURITY FLOOR PLAN - AREA J

01-TY125A THIRD SECURITY FLOOR PLAN - AREA A

01-TY125B THIRD SECURITY FLOOR PLAN - AREA B

01-TY125B2 THIRD SECURITY FLOOR PLAN - AREA B2

01-TY125C THIRD SECURITY FLOOR PLAN - AREA C

01-TY125D THIRD SECURITY FLOOR PLAN - AREA D

01-TY125E THIRD SECURITY FLOOR PLAN - AREA E

01-TY125F THIRD SECURITY FLOOR PLAN - AREA F

01-TY125G THIRD SECURITY FLOOR PLAN - AREA G

01-TY125H THIRD SECURITY FLOOR PLAN - AREA H

01-TY125I THIRD SECURITY FLOOR PLAN - AREA I

01-TY125J THIRD SECURITY FLOOR PLAN - AREA J

01-TY126A-B2 FOURTH SECURITY FLOOR PLAN - AREA A & B2

01-TY126B FOURTH SECURITY FLOOR PLAN - AREA B

01-TY126C FOURTH SECURITY FLOOR PLAN - AREA C

01-TY126E FOURTH SECURITY FLOOR PLAN - AREA E

01-TY126F-G FOURTH SECURITY FLOOR PLAN - AREA F & G

01-TY126H FOURTH SECURITY FLOOR PLAN - AREA H

01-TY126I FOURTH SECURITY FLOOR PLAN - AREA I

01-TY126J FOURTH SECURITY FLOOR PLAN - AREA J

01-TY127A-B2 FIFTH SECURITY FLOOR PLAN - AREA A & B2

01-TY127B-E FIFTH SECURITY FLOOR PLAN - AREA B & E

01-TY127B-Ea FIFTH SECURITY FLOOR PLAN - DATA CENTER

01-TY127C FIFTH SECURITY FLOOR PLAN - AREA C

01-TY127D FIFTH SECURITY FLOOR PLAN - AREA D

01-TY127H FIFTH SECURITY FLOOR PLAN - AREA H

01-TY127I FIFTH SECURITY FLOOR PLAN - AREA I

01-TY127J FIFTH SECURITY FLOOR PLAN - AREA J

01-TY128A-B2 SIXTH SECURITY FLOOR PLAN - AREA A & B2

01-TY128B-E SIXTH SECURITY FLOOR PLAN - AREA B & E

01-TY128C SIXTH SECURITY FLOOR PLAN - AREA C

01-TY129A-B2 SEVENTH SECURITY FLOOR PLAN - AREA A & B2

01-TY129B-E SEVENTH SECURITY FLOOR PLAN - AREA B & E

01-TY129C SEVENTH SECURITY FLOOR PLAN - AREA C

01-TY130A-B2 EIGHTH SECURITY FLOOR PLAN - AREA A & B2

01-TY130B-E EIGHTH SECURITY FLOOR PLAN - AREA B & E

01-TY130C EIGHTH SECURITY FLOOR PLAN - AREA C

01-TY131A-B2 NINTH SECURITY FLOOR PLAN - AREA A & B2

01-TY131B-E NINTH SECURITY FLOOR PLAN - AREA B & E

01-TY131C NINTH SECURITY FLOOR PLAN - AREA C

01-TY132A-B2 TENTH SECURITY FLOOR PLAN - AREA A & B2

01-TY132B-E TENTH SECURITY FLOOR PLAN - AREA B & E

01-TY132C TENTH SECURITY FLOOR PLAN - AREA C

01-TY133A ELEVENTH SECURITY FLOOR PLAN - AREA A

01-TY133B-E ELEVENTH SECURITY FLOOR PLAN - AREA B & E

01-TY133C ELEVENTH SECURITY FLOOR PLAN - AREA C

05-GENERAL

05-Gl001 COVER SHEET

08-ARCHITECTURE

05-AE121 ENLARGED FLOOR PLANS - GROUND FLOOR - TR BA101

05-AE601 DOOR SCHEDULE

11-FIRE PROTECTION

05-FX101 FIRST FLOOR PLAN - FIRE PROTECTION

14-MECHANICAL

05-MD101 FIRST FLOOR DEMOLITION PLAN - MECHANICAL

05-MH101 FIRST FLOOR PLAN - MECHANICAL

15-ELECTRICAL

05-ED101 FIRST FLOOR DEMOLITION PLAN - ELECTRICAL

05-EP101 FIRST FLOOR PLAN - ELECTRICAL

05-EP401 ELECTRICAL ENLARGED PLANS

05-EP701 ELECTRICAL SCHEDULES

16-TELECOMMUNICATION

05-TD101 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY

05-TN101 FIRST FLOOR PLAN - TECHNOLOGY

05-TN400 ENLARGED PLANS - TECHNOLOGY

16.4-SECURITY

05-TY121 GROUND FLOOR SECURITY PLAN

SHEET INDEX

SHEET

NUMBER SHEET NAME

16-TELECOMMUNICATION

08-TD101 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY

08-TD102 SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY

08-TN101 FIRST FLOOR PLAN - TECHNOLOGY

08-TN102 SECOND FLOOR PLAN - TECHNOLOGY

00-GENERAL

30-GI001 COVER SHEET

08-ARCHITECTURE

30-AE099 BASEMENT FLOOR PLAN

30-AE100 GROUND FLOOR PLAN

30-AE101 FIRST FLOOR PLAN

30-AE102 SECOND FLOOR PLAN

30-AE401 BA007 - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS

30-AE402 GA131 - ENLARGED FLOOR PLANS, RCPS & INTERIOR ELEVATIONS

30-AE403 1A134 - ENLARGED FLOOR PLANS, RCPS AND INTERIOR ELEVATIONS

30-AE404 2A134 - ENLARGED FLOOR PLANS, RCPS AND INTERIOR ELEVATIONS

30-AE601 DOOR SCHEDULE

11-FIRE PROTECTION

30-FX099 BASEMENT PLAN - FIRE PROTECTION

30-FX100 GROUND FLOOR PLAN - FIRE PROTECTION

30-FX101 FIRST FLOOR PLAN - FIRE PROTECTION

30-FX102 SECOND FLOOR PLAN - FIRE PROTECTION

12-PLUMBING

30-PP099 BASEMENT PLAN - PLUMBING

14-MECHANICAL

30-MD099 BASEMENT DEMOLITION PLAN - MECHANICAL

30-MD100 GROUND FLOOR DEMOLITION PLAN - MECHANICAL

30-MD101 FIRST FLOOR DEMOLITION PLAN - MECHANICAL

30-MD102 SECOND FLOOR DEMOLITION PLAN - MECHANICAL

30-MH099 BASEMENT PLAN - MECHANICAL

30-MH100 GROUND FLOOR PLAN - MECHANICAL

30-MH101 FIRST FLOOR PLAN - MECHANICAL

30-MH102 SECOND FLOOR PLAN - MECHANICAL

30-MH103 ROOF PLAN - MECHANICAL

30-MH400 ENLARGED PLANS - MECHANICAL

30-MH401 ENLARGED PLANS - MECHANICAL

15-ELECTRICAL

30-EP099 BASEMENT PLAN - ELECTRICAL

30-EP100 GROUND FLOOR PLAN - ELECTRICAL

30-EP101 FIRST FLOOR PLAN - ELECTRICAL

30-EP102 SECOND FLOOR PLAN - ELECTRICAL

30-EP401 ELECTRICAL ENLARGED PLANS

30-EP402 ELECTRICAL ENLARGED PLANS

30-EP601 ELECTRICAL RISER DIAGRAM

30-EP701 ELECTRICAL SCHEDULES

30-EP702 ELECTRICAL PANEL SCHEDULES

30-EP703 ELECTRICAL PANEL SCHEDULES

16-TELECOMMUNICATION

30-TD100 BASEMENT DEMOLITION PLAN - TECHNOLOGY

30-TD101 GROUND FLOOR DEMOLITION PLAN - TECHNOLOGY

30-TD102 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY

30-TD103 SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY

30-TN100 BASEMENT PLAN - TECHNOLOGY

30-TN101 GROUND FLOOR PLAN - TECHNOLOGY

30-TN102 FIRST FLOOR PLAN - TECHNOLOGY

30-TN103 SECOND FLOOR PLAN - TECHNOLOGY

30-TN400 BASEMENT FLOOR - TR BA007 - REMAIN - ENLARGED PLAN

30-TN410 GROUND FLOOR - TR GA131 - REMAIN - ENLARGED PLAN

30-TN420 FIRST FLOOR - TR 1A134 - REMAIN - ENLARGED PLAN

30-TN430 SECOND FLOOR - TR 2A134 - REMAIN - ENLARGED PLAN

16.4-PHYSICAL SECURITY

30-TY099 BASEMENT SECURITY FLOOR PLAN

30-TY100 GROUND SECURITY FLOOR PLAN

30-TY101 FIRST SECURITY FLOOR PLAN

30-TY102 SECOND SECURITY FLOOR PLAN

01-GENERAL

33-GI001 COVER SHEET

08-ARCHITECTURE

33-AE121 1ST & 2ND FLOOR PLAN

33-AE401 TR 104 - ENLARGED FLOOR PLANS, RCPS AND INTERIOR ELEVATION

33-AE601 DOOR SCHEDULE AND DIAGRAMS

11-FIRE PROTECTION

33-FX101 FIRST FLOOR PLAN - FIRE PROTECTION

14-MECHANICAL

33-MH101 FIRST FLOOR PLAN - MECHANICAL

15-ELECTRICAL

33-EP101 FIRST FLOOR PLAN - ELECTRICAL

33-EP701 ELECTRICAL SCHEDULES

16-TELECOMMUNICATION

33-TD101 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY

33-TD102 SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY

33-TN101 FIRST FLOOR PLAN - TECHNOLOGY

33-TN102 SECOND FLOOR PLAN - TECHNOLOGY

33-TN400 TECHNOLOGY ENLARGED PLANS

16.4-PHYSICAL SECURITY

33-TY121 1ST & 2ND SECURITY FLOOR PLAN

Grand total: 343

Revisions: Date: SHEET 3 of 797SHEET 3 of 797SHEET 3 of 797

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

A u to d e s k D o c s /U n iv e rs it y D ri v e

V A

M C

E H

R M

V

/6

-2

-7

.G .P

IT

E

H R

M .r v t

/1

/2

:1

:5

P

M

00-GI003

GENERAL NOTES AND CODE

REQUIREMENTS

Awen Solutions Group

215 N. Payne Street, Suite 122

Alexandria, VA 22314

06.13.2025

EHRM INFRASTRUCTURE

UPGRADES - VAPHS UNIVERSITY

DRIVE CAMPUS 0

UNIVERSITY DRIVE C,

PITTSBURGH, PA 15240

646-22-700

BUILDING CLASSIFICATION:

BASIC OCCUPANCY GROUP(S):

(NFPA 101 6.1.5)

OCCUPANCY GROUP I

CONSTRUCTION TYPE:

(EXISTING)

TYPE II 222, SPRINKLERED

EXISTING CONDITIONS TO BE VERIFIED

(NEW)

TYPE II 222, SPRINKLERED

BASIC ALLOWABLE AREA:

(222 FULLY SPRINKLERED)

OCCUPANCY GROUP I-2 – UNLIMITED

ACTUAL HEIGHT

12 STORY HOSPITAL + PARTIAL BASEMENT

EXISTING CONDITIONS TO BE VERIFIED

MINIMUM FIRE RESISTIVE REQUIREMENTS:

(NFPA 222, TABLE 4.1.1)

ELEMENT RATING

BEARING WALLS, EXTERIOR 2-HOUR

BEARING WALLS, INTERIOR 2-HOUR

NON-BEARING WALLS, INTERIOR 0-HOUR

STRUCTURAL FRAME 2-HOUR

STRUCTURAL FRAME, SUPPORTING ROOF ONLY 1-HOUR

SHAFT ENCLOSURES 2-HOUR

FLOORS 2-HOUR

ROOFS 1-HOUR

HORIZONTAL EXIT 2-HOUR

SMOKE BARRIER (COMPARTMENTS) 1-HOUR

HAZARDOUS AREA SEPARATIONS 1-HOUR

SOILED LINEN ROOMS 1-HOUR

STORAGE ROOMS > 100 SF 1-HOUR

CORRIDORS

(NFPA 101 CHAPTER 38.3.6.1)

EXCEPTION 3, WITHIN BUILDINGS PROTECTED THROUGHOUT

BY AN APPROVED AUTOMATIC SPRINKLER SYSTEM, 1-HOUR

FIRE RESISTANCE RATING IS NOT REQUIRED.

EXISTING CONDITIONS TO BE VERIFIED

MAXIMUM TRAVEL DISTANCE TO EXITS

(NFPA 101, CHAPTER 19)

TRAVEL DISTANCE 200-FEET

COMMON PATH OF TRAVEL 100-FEET

DEAD-END CORRIDOR 30-FEET

FIRE SUPPRESSION

THE FACILITY WILL BE FULLY SPRINKLERED PER NFPA 13

HANDHELD FIRE EXTINGUISHERS WILL BE INSTALLED IN EACH TR ROOM

OCCUPANT LOAD CALCULATIONS:

(PER NFPA 101, Table 7.3.1.2)

BUSINESS USE: 150 SF/OCC

INPATIENT TREATMENT DEPARTMENTS: 250 SF/OCC

SLEEPING DEPARTMENTS: 120 SF/OCC

AMBULATORY HEALTH CARE: 150 SF/OCC

UTILITY USE: 300 SF/OCC

USE 120 SF PER OCCUPANT (MOST RESTRICTIVE)

EXISTING CONDITIONS TO BE PROVIDED

EGRESS FACTORS

STAIR CAPACITY FACTOR = 0.3

DOOR CAPACITY FACTOR = 0.2

PROPOSED NEW CONSTRUCTION

NEW CONSTRUCTION (UTILITY / 300): 9556 SF

NEW OCC LOAD: 32 OCC

NEW CONSTRUCTION (CORRIDOR / 150): 1982 SF

NEW OCC LOAD: 13 OCC

EXISTING STAIR CAPACITIES TO BE PROVIDED

SMOKE COMPARTMENTS

EXISTING CONDITIONS TO BE VERIFIED

CODE ANALYSISPROJECT GENERAL NOTES

THIS PROJECT AT THE VA PITTSBURGH HEALTHCARE SYSTEM (VAPHS) UNIVERSITY DRIVE (UD) CAMPUS IN PITTSBURGH, PA ADDRESSES NECESSARY INFORMATION TECHNOLOGY (IT) UPGRADES TO

MODERNIZE EXISTING INFRASTRUCTURE AND SUPPORT IMPLEMENTING A NEW ELECTRONIC

HEALTHCARE RECORDS MANAGEMENT (EHRM) SYSTEM.

THE PROJECT SCOPE INCLUDES (2) NEW CONSTRUCTION TOWER ADDITIONS, A NEW DATA CENTER WITHIN THE TOWERS, UPGRADED AND NEW TR ROOMS, UPGRADED AND NEW SUPPORT ROOMS, NEW

AND RETROFIT STRUCTURAL SYSTEMS AND FOUNDATION WORK, NEW MEP AND TECHNOLOGY

EQUIPMENT AND SYSTEMS, NEW AND REVISED FLS SYSTEMS, NEW AND REVISED SECURITY SYSTEMS, ACM AND LEAD MITIGATION, A PHASED SYSTEM AND CONSTRUCTION DESIGN.

SCOPE OF WORK CODES AND STANDARDS

ENVELOPE

CLIMATE ZONE 4A

ASHRAE 90.1 - 2019

ASHRAE TABLE 5.5-44A

ROOF - INSULATION ABOVE DECK U-0.032 / R30

ROOF - METAL BUILDING U-0.037 / R19 + R11

WALLS - MASS U-0.014 / R9.5

WALLS - METAL BUILDING U-0.060 / R0 + R15.8

WALLS - STEEL FRAMED U.064 / R13 + R7.5

FLOORS - MASS U .057 / R14/6

FLOORS - STEEL JOIST U-0.038 / R30

FLOORS - SLAB ON GRADE UNHEATED F-0.520 / R15 FOR 24 INCHES

DOORS - OPAQUE SWINGING U-0.37

DOORS - OPAQUE NON SWINGING U-0.31

FENESTRATION

VERTICAL GLAZING - FIXED U.36

SHGC .36 (MAX) SHGC 1.1 (MIN)

VERTICAL GLAZING - OPERABLE U.45

SHGC .33 (MAX) SHGC 1.1 (MIN)

VERTICAL GLAZING - ENTRANCE DOOR U.63

SHGC .33 (MAX) SHGC 1.1 (MIN)

SKYLIGHT U .50 SHGC .40 (MAX)

INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES V3.1, JULY 1, 2021

VA ARCHITECTURAL DESIGN MANUAL: VS. AUGUST 1, 2014

VA ELECTRICAL DESIGN MANUAL: VS. DECEMBER 1, 2019

VA FIRE PROTECTION DESIGN MANUAL: VS. NOVEMBER 1, 2023

VA HVAC DESIGN MANUAL: REV. OCTOBER 1, 2022

VA PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL: VS. JULY 1, 2022

VA PLUMBING DESIGN MANUAL: VS. JANUARY 1, 2023

VA SITE DESIGN MANUAL: VS. APRIL 1, 2021

VA WHOLE BUILDING COMMISSIONING PROCESS MANUAL: VS. MAY 1, 2013

VA RETRO-COMMISSIONING PROCESS MANUAL: VS. JUNE 1, 2014

VA BARRIER FREE DESIGN STANDARD: REV. JUNE 1, 2024

VA STRUCTURAL DESIGN MANUAL: REV. JULY 1, 2023

PG-18-1 MASTER CONSTRUCTION SPECIFICATION INDEX

PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES

PG-18-4 STANDARD DETAILS AND CAD STANDARDS

PG-18-10 DESIGN MANUALS (BY DISCIPLINE)

PG-18-12 DESIGN GUIDES (GRAPHICAL, BY FUNCTION)

PG-18-13 BARRIER-FREE DESIGN GUIDE

PG-18-14 ROOM FINISHES, DOOR, AND HARDWARE SCHEDULES

PG-18-15 A-E SUBMISSION REQUIREMENTS

H-18-8 SEISMIC DESIGN HANDBOOK

HEPF SEP (SOCAMES 6) DESIGN ALERTS

NFPA 13 INSTALLATION OF SPRINKLER SYSTEMS: 2022 EDITION

NFPA 72 FIRE ALARM AND SIGNALING CODE: 2022 EDITION

NFPA 75 FIRE PROTECTION OF IT EQUIPMENT: 2024 EDITION

NFPA 99 HEALTHCARE FACILITIES CODE: 2024 EDITION

NFPA 101 LIFE SAFETY CODE: 2024 EDITION

NFPA 2001 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS: 2022 EDITION

INTERNATIONAL BUILDING CODE: 2021 EDITION

INTERNATIONAL MECHANICAL CODE: 2021 EDITION

INTERNATIONAL ELECTRICAL CODE: 2021 EDITION

INTERNATIONAL PLUMBING CODE: 2021 EDITION

LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL

IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS,

INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR

INSPECTION FEES.

NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY

CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS

REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE.

FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A

DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT

REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC

REQUIREMENTS ARE DIFFERENT).

CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED

CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE

RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO

ENSURE A CONSISTENCY SYSTEM WIDE.

FIRE PROTECTION

1. PENETRATIONS TO BE PROTECTED WITH THROUGH PENETRATION PROTECTION SYSTEMS IN

VA FIRE PROTECTION DESIGN MANUAL 2.3.N.

2. A FINISH OR FIRE RATING INDICATION ON A WALL SHALL MEAN THE ENTIRE LENGTH OF WALL

IS TO BE FINISHED OR FIRE RATED.

3. FIRE RATED ASSEMBLIES SHALL BE PER TABLE 721.1(1), GENERIC ASSEMBLIES OF GYPSUM

HANDBOOK, OR HAVE ICC APPROVAL.

4. PENETRATIONS OF FIRE RESISTANCE-RATED HORIZONTAL ASSEMBLIES AND FIRE

RESISTANCE RATED WALLS SHALL COMPLY WITH SECTION 714 OF THE IBC, INCLUDING FIRE

DAMPERS AND SMOKE DAMPERS WHERE REQUIRED.

5. MEMBRANE PENETRATIONS BY LISTED ELECTRICAL OUTLET BOXES ARE PERMITTED

PROVIDED SUCH BOXES HAVE BEEN TESTED FOR USE IN FIRE-RESISTANCE-RATED

ASSEMBLIES AND THE BOX DOES NOT EXCEED 1/8" UNLESS LISTED OTHERWISE.

6. COMPLY WITH THE PRESCRIPTIVE REQUIREMENTS OF NFPA 75

7. PROVIDE AUTOMATIC WET-PIPE SPRINKLER SYSTEM THROUGHOUT INCLUDING ALL DEMARC

ROOMS, MAIN COMPUTER ROOMS, AND TR'S.

8. FUSIBLE LINK SPRINKLERS ARE PERMITTED TO BE USED IN THE COMPUTER AREA.

9. PROVIDE CLEAN AGENT FIRE SUPPRESSION FOR THE MAIN COMPUTER ROOM AND BACKUP

COMPUTER ROOM WHEN REQUIRED BY THE VA FIRE PROTECTION DESIGN MANUAL.

10. GASEOUS SUPPRESSION SYSTEM INCLUDE TELECOMMUNICATIONS WITH AN ANSI/TIA-942-B

RATING OF 2 OR 3 AS IDENTIFIED IN THE OIT.

11. EXISTING BUILDINGS TO BE REVIEWED AND EVALUATED ON A CASE BY CASE BASIS FOR

EXISTING FIRE PROTECTIONS SYSTEMS AND BROUGHT UP TO CURRENT STANDARD WHERE

REQUIRED.

12. REPLACE CEILING TILES AT THE END OF EACH SHIFT FOR WORK AREAS OUTSIDE OF A RATED

CONSTRUCTION BARRIER. IF THE TILES CANNOT BE REPLACED, THE SPRINKLER SYSTEM MAY

BE CONSIDERED OUT OF SERVICE IN THESE AREAS AND 1-HOUR FIRE RATED SEPARATION

WILL BE REQUIRED BETWEEN THE CONSTRUCTION AREA AND THE OCCUPIED PORTIONS OF

THE BUILDING.

13. INSTALLATION OF TEMPORARY FIRESTOPPING (MINERAL WOOL) AT THE END OF THE WORK

SHIFT IF ADDITIONAL CABLING WILL BE PULLED THROUGH A PENETRATION AT A LATER WORK

SHIFT.

14. PROVIDE CLEAN AGENT FIRE EXTINGUISHERS FOR EACH TR NO GREATER THAN 75 FEET

FROM THE REMOTE CORNER OF EACH TR, BUT NOT LOCATED WITHIN THE TR. IF NO EXISTING

FIRE CABINET HAS CAPACITY OR DOES NOT MEET THE DISTANCE CRITERIA ABOVE PROVIDE A

NEW FIRE CABINET AND COORDINATE CONFIRM LOCATION WITH THE STATION.

15. THE MINIMUM FIRE RATING FOR ALL LOAD-BEARING STRUCTURAL ELEMENTS SHALL BE

MAINTAINED. SEE COVER CODE SUMMARY TABLE FOR PROJECT REQUIRED BUILDING RATING

ELEMENTS. IF DURING CONSTRUCTION ANY DAMAGE TO FIRE PROTECTION IS OBSERVED OR

ANY MISSING WITHIN THE AREA OF…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .