This file is a set of architectural and engineering drawings for mechanical, plumbing, fire protection, and electrical systems for an infrastructure upgrade project at Beckley VA Medical Center in Beckley, West Virginia.
The document represents final bid drawings (Volume 2) for the EHRM (Electronic Health Records Management) Infrastructure Upgrades project, VA Project Number 517-22-700, issued September 10, 2025. The project is located at Beckley VA Medical Center, 200 Veterans Avenue, Beckley, WV 25801. The federal agency is the U.S. Department of Veterans Affairs (VA), Office of Construction and Facilities Management. The project involves comprehensive infrastructure upgrades across multiple buildings at the medical center campus. The drawing set includes mechanical, plumbing, fire protection, and electrical systems covering 15 buildings plus a parking garage, with a total of 359 individual drawing sheets across multiple volumes. Key consultant team members include architect Ken Jones (CB Design Group, Inc., Alexandria, VA), MEP/FP/Structural Engineer Jim Kappeler (IMEG Corp., Louisville, KY), Civil Engineer Mark Dyck (Martinsburg, WV), Life Safety Consultant David McCoy (Novelty, OH), Environmental Consultant Michael Smith (Hanover, MD), and Geotech Consultant Dustin Schleifer. The project COR is Seth Buckland, and the contracting officer is Christopher Yong with the VHA Program Contracting Activity Central. The drawings establish design conditions for Beckley's altitude of 2,418 feet above sea level and include specifications for fully sprinklered systems, HVAC equipment replacements, condensate piping systems, and temperature/humidity monitoring throughout the facility.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
Revisions: Date:
/8
/4
/8
/2
/4
-1
/2
2345678910111213141516
B
C
D
E
F
G
H
J
K
1234561516
ARCHITECT / ENGINEER OF RECORD:CONSULTANTS:
CIVIL
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV 25401
(304) 266-3115
LIFE SAFETY
DAVID McCOY
8734 GALLOWAY TRAIL
NOVELTY, OH 44072
(619) 925-1647
ARCHITECT:
KEN JONES
421 KING ST. SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
891011121314
MEP / FP / STRUCTURAL
MICHAEL LONG
672 E. ROYALTON RD
BROADVIEW HEIGHTS, OH 44147
(440) 262-3070
ENVIRONMENTAL
MICHAEL SMITH
1340-B CHARWOOD RD SUITE B
HANOVER, MD 21076
(410) 859-4300
GEOTECH
DUSTIN SCHLEIFER
09/10/2025
517-22-700
CSKJ
EHRM INFRASTRUCTURE UPGRADES
FINAL BID DOCUMENTS
COVERSHEET VOL 2
GI200
-2
-7
G I2
/1
/2
.p d f
DEPARTMENT OF
VERTERANS AFFAIRS
EHRM INFRASTRUCTURE UPGRADES
BECKLEY VA MEDICAL CENTER
200 VETERANS AVENUE
BECKLEY, WV 25801
BECKLEY VA MEDICAL CENTER
200 VETERANS AVENUE
BECKLEY, WV 25801
FINAL BID DOCUMENTS
LOCATION MAP PROJECT DIRECTORY
Medical Center Director
Director of Facility Management Service
Medical Director
Project COR
Project CO
Infection Control
Safety Officer
APPROVALS
N
VOLUME 2
CONTRACTING OFFICER REPRESENTATIVE (COR)
Seth Buckland
Beckley VA Medical Center 200 Veterans Ave Beckley, WV 25801
(304) 255-2121 Ext. 4193 Seth.Buckland@va.gov
ARCHITECT
CB Design Group, INC 421 King St. Suite 301 Alexandria, VA 22314
(443) 388-7351 kjones@cbdg-ae.com
MEP/FP/STRUCTURAL ENGINEER
IMEG Corp.
101 S. Fifth Street, Suite 1640 Louisville, KY 40202
(502) 415-7814
(502) 321-3031 (mobile) case.a.hoskins@imegcorp.com
CONTRACTING SPECIALIST (CS)
Jessica Nehrenz
VHA Program Contracting Activity Central 6100 Oak Tree Blvd., Suite 490 Independence, OH 44131 Jessica.Nehrenz@va.gov
CONTRACTING OFFICER (CO)
Christopher Yong
VHA Program Contracting Activity Central 6100 Oak Tree Blvd., Suite 490 Independence, OH 44131 Christopher.yong@va.gov
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
Revisions: Date:
/8
/4
/8
/2
/4
-1
/2
2345678910111213141516
B
C
D
E
F
G
H
J
K
1234561516
ARCHITECT / ENGINEER OF RECORD:CONSULTANTS:
CIVIL
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV 25401
(304) 266-3115
LIFE SAFETY
DAVID McCOY
8734 GALLOWAY TRAIL
NOVELTY, OH 44072
(619) 925-1647
ARCHITECT:
KEN JONES
421 KING ST. SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
891011121314
MEP / FP / STRUCTURAL
MICHAEL LONG
672 E. ROYALTON RD
BROADVIEW HEIGHTS, OH 44147
(440) 262-3070
ENVIRONMENTAL
MICHAEL SMITH
1340-B CHARWOOD RD SUITE B
HANOVER, MD 21076
(410) 859-4300
GEOTECH
DUSTIN SCHLEIFER
09/10/2025
517-22-700
CSKJ
EHRM INFRASTRUCTURE UPGRADES
FINAL BID DOCUMENTS
LIST OF DRAWINGS - VOL 2
GI201
-2
-7
G I2
/0
/2
.p d f
BECKLEY VA MEDICAL CENTER
200 VETERANS AVENUE
BECKLEY, WV 25801
SHEET NO SHEET NAME
9.5 - GENERAL
GI200 COVERSHEET VOL 2
GI201 LIST OF DRAWINGS - VOL 2
10 - MECHANICAL
MH000 MECHANICAL COVERSHEET
01-MH100 BUILDING 1 - BASEMENT PLAN - MECHANICAL
01-MH101 BUILDING 1 - FIRST FLOOR PLAN - MECHANICAL
01-MH102 BUILDING 1 - SECOND FLOOR PLAN - MECHANICAL
01-MH103 BUILDING 1 - THIRD FLOOR PLAN - MECHANICAL
01-MH104 BUILDING 1 - FOURTH FLOOR PLAN - MECHANICAL
01-MH105 BUILDING 1 - FIFTH FLOOR PLAN - MECHANICAL
01-MH106 BUILDING 1 - SIXTH FLOOR PLAN - MECHANICAL
02-MH101 BUILDING 2 - BASEMENT, FIRST AND SECOND FLOOR PLANS - MECHANICAL
03-MH101 BUILDING 3 - FIRST AND SECOND FLOOR PLANS - MECHANICAL
04-MH101 BUILDING 4 - FIRST AND SECOND FLOOR PLANS - MECHANICAL
05-MH101 BUILDING 5 - FRST FLOOR PLAN - MECHANICAL
06-MH101 BUILDING 6 - BASEMENT AND FIRST FLOOR PLANS - MECHANICAL
07-MH100 BUILDING 7 - LOWER LEVEL 1 & 2 PLANS - MECHANICAL
07-MH101 BUILDING 7 - FIRST FLOOR PLAN - MECHANICAL
08-MH101 BUILDING 8 - GROUND AND FIRST FLOOR PLANS - MECHANICAL
14/15-MH101 BUILDING 14/15 - FIRST FLOOR PLAN - MECHANICAL
17-MH101 BUILDING 17 - FIRST FLOOR PLAN - MECHANICAL
29-MH101 BUILDING 29 - FIRST FLOOR PLAN - MECHANICAL
35-MH101 BUILDING 35 - GROUND AND FIRST FLOOR PLANS - MECHANICAL
PG-MH101 PARKING GARAGE - LOWER LEVEL AND FIRST FLOOR PLANS - MECHANICAL
PG-MH102 PARKING GARAGE - SECOND AND THIRD FLOOR PLANS - MECHANICAL
PG-MH103 PARKING GARAGE - FOURTH FLOOR PLAN - MECHANICAL
MH400 MECHANICAL DETAILS
MH600 MECHANICAL SCHEDULES
MH700 TEMPERATURE CONTROLS DIAGRAMS AND SEQUENCES
11 - PLUMBING
PL000 PLUMBING COVERSHEET
01-PL100 BUILDING 1 - BASEMENT PLAN - PLUMBING
01-PL101 BUILDING 1 - FIRST FLOOR PLAN - PLUMBING
01-PL102 BUILDING 1 - SECOND FLOOR PLAN - PLUMBING
01-PL103 BUILDING 1 - THIRD FLOOR PLAN - PLUMBING
01-PL104 BUILDING 1 - FOURTH FLOOR PLAN - PLUMBING
01-PL105 BUILDING 1 - FIFTH FLOOR PLAN - PLUMBING
01-PL106 BUILDING 1 - SIXTH FLOOR PLAN - PLUMBING
02-PL101 BUILDING 2 - BASEMENT, FIRST AND SECOND FLOOR PLANS - PLUMBING
03-PL101 BUILDING 3 - FIRST AND SECOND FLOOR PLANS - PLUMBING
04-PL101 BUILDING 4 - FIRST AND SECOND FLOOR PLANS - PLUMBING
05-PL101 BUILDING 5 - FIRST FLOOR PLAN - PLUMBING
06-PL101 BUILDING 6 - BASEMENT AND FIRST FLOOR PLANS - PLUMBING
07-PL100 BUILDING 7 - LOWER LEVEL 1 & 2 PLANS - PLUMBING
07-PL101 BUILDING 7 - FIRST FLOOR PLAN - PLUMBING
08-PL101 BUILDING 8 - GROUND AND FIRST FLOOR PLANS - PLUMBING
14/15-PL101 BUILDING 14/15 - FIRST FLOOR PLAN - PLUMBING
17-PL101 BUILDING 17 - FIRST FLOOR PLAN - PLUMBING
29-PL101 BUILDING 29 - FIRST FLOOR PLAN - PLUMBING
35-PL101 BUILDING 35 - GROUND AND FIRST FLOOR PLANS - PLUMBING
PG-PL101 PARKING GARAGE - LOWER LEVEL AND FIRST FLOOR PLAN - PLUMBING
PG-PL102 PARKING GARAGE - SECOND AND THIRD FLOOR PLAN - PLUMBING
PG-PL103 PARKING GARAGE - FOURTH FLOOR PLAN - PLUMBING
PL400 PLUMBING DETAILS
12 - FIRE PROTECTION
FX000 FIRE PROTECTION COVERSHEET
01-FX100 BUILDING 1 - BASEMENT PLAN - FIRE PROTECTION
01-FX101 BUILDING 1 - FIRST FLOOR PLAN - FIRE PROTECTION
01-FX102 BUILDING 1 - SECOND FLOOR PLAN - FIRE PROTECTION
01-FX103 BUILDING 1 - THIRD FLOOR PLAN - FIRE PROTECTION
01-FX104 BUILDING 1 - FOURTH FLOOR PLAN - FIRE PROTECTION
01-FX105 BUILDING 1 - FIFTH FLOOR PLAN - FIRE PROTECTION
01-FX106 BUILDING 1 - SIXTH FLOOR PLAN - FIRE PROTECTION
02-FX101 BUILDING 2 - BASEMENT, FIRST AND SECOND FLOOR PLANS - FIRE PROTECTION
03-FX101 BUILDING 3 - FIRST AND SECOND FLOOR PLANS - FIRE PROTECTION
04-FX101 BUILDING 4 - FIRST AND SECOND FLOOR PLANS - FIRE PROTECTION
05-FX101 BUILDING 5 - FIRST FLOOR PLAN - FIRE PROTECTION
06-FX101 BUILDING 6 - BASEMENT AND FIRST FLOOR PLANS - FIRE PROTECTION
07-FX100 BUILDING 7 - LOWER LEVEL 1 & 2 PLANS - FIRE PROTECTION
07-FX101 BUILDING 7 - FIRST FLOOR PLAN - FIRE PROTECTION
08-FX101 BUILDING 8 - GROUND AND FIRST FLOOR PLANS - FIRE PROTECTION
14/15-FX101 BUILDING 14/15 - FIRST FLOOR PLAN - FIRE PROTECTION
17-FX101 BUILDING 17 - FIRST FLOOR PLAN - FIRE PROTECTION
29-FX101 BUILDING 29 - FIRST FLOOR PLAN - FIRE PROTECTION
35-FX101 BUILDING 35 - GROUND AND FIRST FLOOR PLANS - FIRE PROTECTION
PG-FX101 PARKING GARAGE - LOWER LEVEL AND FIRST FLOOR PLANS - FIRE PROTECTION
PG-FX102 PARKING GARAGE - SECOND AND THIRD FLOOR PLANS - FIRE PROTECTION
PG-FX103 PARKING GARAGE - FOURTH FLOOR PLAN - FIRE PROTECTION
FX400 FIRE PROTECTION DETAILS
SHEET NO SHEET NAME
30 - ELECTRICAL
EP000 ELECTRICAL COVERSHEET AND SHEET INDEX
EP201 ELECTRICAL SITE PLAN
EP401 ELECTRICAL DETAILS
EP402 ELECTRICAL DETAILS
EP601 ELECTRICAL SCHEDULES
01-ED201 BUILDING 1 - OVERALL BASEMENT DEMO PLAN - ELECTRICAL
01-ED202 BUILDING 1 - FIRST FLOOR DEMO PLAN - ELECTRICAL
01-ED203 BUILDING 1 - SECOND FLOOR DEMO PLAN - ELECTRICAL
01-ED204 BUILDING 1 - THIRD FLOOR DEMO PLAN - ELECTRICAL
01-ED205 BUILDING 1 - FOURTH FLOOR DEMO PLAN - ELECTRICAL
01-ED206 BUILDING 1 - FIFTH FLOOR DEMO PLAN - ELECTRICAL
01-ED207 BUILDING 1 - SIXTH FLOOR DEMO PLAN - ELECTRICAL
01-EP201 BUILDING 1 - OVERALL BASEMENT PLAN - ELECTRICAL
01-EP202 BUILDING 1 - OVERALL FIRST FLOOR PLAN - ELECTRICAL
01-EP203 BUILDING 1 - OVERALL SECOND FLOOR PLAN - ELECTRICAL
01-EP204 BUILDING 1 - OVERALL THIRD FLOOR PLAN - ELECTRICAL
01-EP205 BUILDING 1 - OVERALL FOURTH FLOOR PLAN - ELECTRICAL
01-EP206 BUILDING 1 - OVERALL FIFTH FLOOR PLAN - ELECTRICAL
01-EP207 BUILDING 1 - OVERALL SIXTH FLOOR PLAN - ELECTRICAL
01-EP401 BUILDING 1 - ELECTRICAL ENLARGED PLANS
01-EP402 BUILDING 1 - ELECTRICAL ENLARGED PLANS
01-EP403 BUILDING 1 - ELECTRICAL ENLARGED PLANS
01-EP404 BUILDING 1 - ELECTRICAL ENLARGED PLANS
01-EP405 BUILDING 1 - ELECTRICAL ENLARGED PLANS
01-EP601 BUILDING 1 - ELECTRICAL ONE-LINE DIAGRAMS
01-EP602 BUILDING 1 - ELECTRICAL SCHEDULES
01-EP603 BUILDING 1 - ELECTRICAL SCHEDULES
01-EP604 BUILDING 1 - ELECTRICAL SCHEDULES
03-ED201 BUILDING 3 - FIRST FLOOR DEMO PLAN - ELECTRICAL
03-EP201 BUILDING 3 - FIRST FLOOR PLAN - ELECTRICAL
03-ED401 BUILDING 3 - ELECTRICAL ENLARGED PLANS
03-EP601 BUILDING 3 - ELECTRICAL SCHEDULES
04-ED201 BUILDING 4 - FIRST FLOOR DEMO PLAN - ELECTRICAL
04-EP201 BUILDING 4 - FIRST FLOOR PLAN - ELECTRICAL
04-EP401 BUILDING 4 - ELECTRICAL ENLARGED PLANS
04-EP601 BUILDING 4 - ELECTRICAL SCHEDULES
05-ED201 BUILDING 5 - FIRST FLOOR DEMO PLAN - ELECTRICAL
05-EP201 BUILDING 5 - FIRST FLOOR PLAN - ELECTRICAL
05-EP401 BUILDING 5 - ELECTRICAL ENLARGED PLANS
05-EP601 BUILDING 5 - ELECTRICAL SCHEDULES
06-ED201 BUILDING 6 - BASEMENT DEMO PLAN - ELECTRICAL
06-EP201 BUILDING 6 - BASEMENT PLAN - ELECTRICAL
06-EP202 BUILDING 6 - FIRST FLOOR PLAN - ELECTRICAL
06-EP401 BUILDING 6 - ELECTRICAL ENLARGED PLANS
06-EP601 BUILDING 6 - ELECTRICAL SCHEDULES
07-ED201 BUILDING 7 - FIRST FLOOR DEMO PLAN - ELECTRICAL
07-EP201 BUILDING 7 - FIRST FLOOR PLAN - ELECTRICAL
07-EP401 BUILDING 7 - ELECTRICAL ENLARGED PLANS
07-EP601 BUILDING 7 - ELECTRICAL SCHEDULES
08-ED201 BUILDING 8 - GROUND FLOOR DEMO PLAN - ELECTRICAL
08-ED202 BUILDING 8 - FIRST FLOOR DEMO PLAN - ELECTRICAL
08-EP201 BUILDING 8 - GROUND FLOOR PLAN - ELECTRICAL
08-EP202 BUILDING 8 - FIRST FLOOR PLAN - ELECTRICAL
08-EP401 BUILDING 8 - ELECTRICAL ENLARGED PLANS
08-EP601 BUILDING 8 - ELECTRICAL ONE LINE DIAGRAMS
08-EP602 BUILDING 8 - ELECTRICAL SCHEDULES
14/15-ED201 BUILDING 14/15 - FIRST FLOOR DEMO PLAN - ELECTRICAL
14/15-EP201 BUILDING 14/15 - FIRST FLOOR PLAN - ELECTRICAL
14/15-EP401 BUILDING 14/15 - ELECTRICAL ENLARGED PLANS
14/15-EP601 BUILDING 14/15 - ELECTRICAL ONE LINE DIAGRAMS
14/15-EP602 BUILDING 14/15 - ELECTRICAL SCHEDULES
29-EP201 BUILDING 29 - FIRST FLOOR PLAN - ELECTRICAL
29-EP401 BUILDING 29 - ELECTRICAL ENLARGED PLANS
29-EP601 BUILDING 29 - ELECTRICAL SCHEDULES
35-ED201 BUILDING 35 - GROUND DEMO PLAN - ELECTRICAL
35-ED202 BUILDING 35 - FIRST FLOOR DEMO PLAN - ELECTRICAL
35-EP201 BUILDING 35 - FIRST FLOOR PLAN - ELECTRICAL
35-EP202 BUILDING 35 - FIRST FLOOR PLAN - ELECTRICAL
35-EP401 BUILDING 35 - ELECTRICAL ENLARGED PLANS
35-EP601 BUILDING 35 - ELECTRICAL ONE LINE DIAGRAMS
35-EP602 BUILDING 35 - ELECTRICAL SCHEDULES
Grand total: 359
VOLUME 2
H
C
C
MECHANICAL GENERAL NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.
1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,
AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.
2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR
PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.
3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO
VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES
OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE
REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER
ACCESS.
5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO
COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR
EXPENSE TO OTHERS.
6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL
CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF
DESIGN.
7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY
AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING
MOUNTED DEVICES, OTHER THAN SPRINKLERS.
8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,
FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS
RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND
FINISH.
9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE
GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE
PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS
PANELS PRIOR TO BIDDING.
10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,
AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE
SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER
FOR OUTDOOR USE.
11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,
PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE
TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS
WITHIN ROOMS.
12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED
OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL
RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.
13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT
MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND
REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,
PIPING, DUCTWORK, ETC.
14. DO NOT BLOCK EQUIPMENT SERVICE CLEARANCES.
15. MAINTAIN A MINIMUM WORKING CLEARANCE OF 3’-6” IN FRONT OF ALL ELECTRICAL
EQUIPMENT REQUIRING MAINTENANCE, INSPECTION, AND TESTING INCLUDING BUT NOT
LIMITED TO PANELS, DISTRIBUTION PANELS, SWITCHBOARDS, MOTOR CONTROL CENTERS,
TRANSFORMERS, EQUIPMENT DISCONNECTS AND STARTERS.
16. MAINTAIN THE DEDICATED ELECTRICAL EQUIPMENT SPACE DEFINED BY THE WIDTH / DEPTH
OF ELECTRICAL EQUIPMENT MEASURED FROM THE FLOOR TO A HEIGHT 6’-0” ABOVE THE
EQUIPMENT OR THE STRUCTURAL CEILING, WHICHEVER IS LOWER. SYSTEMS FOREIGN TO
THE ELECTRICAL DISTRIBUTION SYSTEM ARE NOT ALLOWED IN THE DEDICATED
ELECTRICAL SPACE INCLUDING; DUCTWORK, PIPING, ETC.
17. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER
NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE
CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.
MECHANICAL RENOVATION NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.
1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD
SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND
REPORT ANY CONFLICTS BEFORE PROCEEDING.
2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS
BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.
3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE
FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD
CONDITIONS.
4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF THEIR WORK AND
SHALL NOTIFY THE ARCHITECT/ENGINEER PRIOR TO BIDDING IF OTHER UTILITIES ARE
REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO THEIR AREA OF WORK.
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF
ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.
CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING.
6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF
CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL
CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO
BIDDING.
7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH
NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL
EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT
DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL
SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.
8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING
CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT
REMAIN ACTIVE.
9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY
REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW
SYSTEMS ARE INSTALLED.
10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR
TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND
CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY
DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.
11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT
THAT HAS BEEN REMOVED.
MECHANICAL PHASING NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.
1. REFER TO ARCHITECTURAL DRAWINGS FOR GENERAL DESCRIPTION OF PHASES. REFER TO
ARCHITECT'S INSTRUCTIONS FOR MORE DETAILS AND PHASING SCHEDULES AND FOR
CONCURRENT WORK. MECHANICAL, ELECTRICAL AND TECHNOLOGY DRAWINGS DEPICT
THE INTENT OF THE FINAL DESIGN. THE MECHANICAL, ELECTRICAL, AND TECHNOLOGY
DRAWINGS DO NOT DEPICT THE MEANS AND METHODS TO MEET THE REQUIREMENTS OF
THE PHASING CRITERIA.
2. REVIEW PROJECT PHASING PLANS TO COORDINATE DEMOLITION WORK, OUTAGES, ETC.
WITH AFFECTED ADJACENT AREAS.
3. PROVIDE TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ZONE VALVES, ZONE
ALARMS, ETC. AS NEEDED TO MAINTAIN SERVICE TO ALL AREAS DURING ALL PHASES OF
PROJECT.
4. INSTALL TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ETC. AS NECESSARY TO KEEP
ALL OCCUPIED SPACES OPERATIONAL THROUGHOUT ALL PHASES OF THE PROJECT
5. PHASE DEMOLITION WORK TO MINIMIZE DOWNTIME.
FIRE AND SMOKE SEPARATIONS MAY NOT ALL BE SHOWN ON THESE DOCUMENTS.
CONTRACTOR SHALL REVIEW THE ARCHITECTURAL PLANS AND DETERINE THE LOCATIONS OF
ALL FIRE AND SMOKE PARTITIONS, BARRIERS, AND WALLS. THIS INCLUDES FLOOR RATINGS.
PRICING SHALL INCLUDE ALL MATERIALS AND LABOR REQUIRED TO MAINTAIN THE RATINGS OF
ALL RATED SEPARATIONS, WHETHER SHOWN ON THE ENGINEERING PLANS OR NOT.
FIRE / SMOKE BARRIER DESIGNATIONS
MECHANICAL ABBREVIATION KEY
ABBR: DESCRIPTION:
DIFFERENTIAL PRESSURE GAUGE (RANGE)DPG (0-2")
DIFFERENTIAL PRESSURE SWITCHDPS
AD ACCESS DOOR
ABOVE FINISHED FLOORAFF
NOT IN CONTRACTNIC
CFSD CONTROL/FIRE/SMOKE DAMPER
EA EXHAUST/RELIEF AIR
FD FIRE DAMPER
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
FSD FIRE/SMOKE DAMPER
MA MIXED AIR
OA OUTSIDE AIR
RA RETURN AIR
SA SUPPLY AIR
SD SMOKE DAMPER
TRANSFER DUCTTD
UC-1 DOOR UNDERCUT BY OTHERS (1" TYPICAL)
ECFSD EXISTING CONTROL FIRE SMOKE DAMPER
EFD EXISTING FIRE DAMPER
EFSD EXISTING FIRE SMOKE DAMPER
ESD EXISTING SMOKE DAMPER
TERMINAL AIR BOXTAB
TYPICALTYP
UON UNLESS OTHERWISE NOTES
NORMALLY CLOSEDN.C.
NORMALLY OPENN.O.
PRESSURE SWITCHPS
MIXING VALVEMV
ELECTRICAL TO PNEUMATIC VALVEEP
CO CLEANOUT
C COMMON
SCCR SHORT CIRCUIT CURRENT RATING
PROJECT ALTITUDE: 2,418 FT. ABOVE SEA LEVEL
MECHANICAL DESIGN CONDITIONS:
SUMMER:
WINTER:
DESIGN CONDITIONS:
INDOOR DESIGN CONDITIONS:
BASED ON WEATHER DATA FOR: BECKLEY, WEST VIRGINIA
IT EQUIPMENT INLET: 41-95°F DRY BULB, 8-80% RELATIVE HUMIDITY
TR SPACES: 64-81°F DRY BULB, 6-60% RELATIVE HUMIDITY
TE ENVIRONMENT: 41-95°F DRY BULB, 8-80% RELATIVE HUMIDITY, <82.4°F DEW POINT
REFER TO CONTROL DIAGRAMS FOR ROOM SPECIFICS.
84.8°F DRY BULB, 69.7°F WET BULB
7.5°F DRY BULB
OCCUPANCY SENSORO
HUMIDISTAT SENSOR
CARBON MONOXIDE SENSOR
CARBON DIOXIDE SENSOR
H HUMIDISTAT / SENSOR
TEMPERATURE SENSOR WITH WELL
T
THERMOMETER WITH WELL (DIAL TYPE)T
THERMOMETER WITH WELL (FILLED TYPE)
DIRECTION OF AIR FLOW
FLEXIBLE DUCT
MANUAL VOLUME DAMPER
RISE IN DIRECTION OF AIR FLOWR
DUCT CAP
DROP IN DIRECTION OF AIR FLOWD
DUCT DOWN
DUCT UP
SUPPLY/OUTSIDE AIR DUCT SECTION
RETURN AIR DUCT SECTION
EXHAUST/RELIEF AIR DUCT SECTION
4-WAY DIFFUSER WITH BLANKOFF IN ONE DIRECTION
SD-1
6/115
AIR TERMINAL PROPERTIES SYMBOL
NECK SIZE/CFM
TERMINAL AIR BOX (REFER TO SCHEDULE)###
### TERMINAL AIR BOX w/REHEAT COIL (REFER TO SCHEDULE)
HUMIDIFIERH
OPPOSED BLADE DAMPER (REFER TO SCHEDULE)
PARALLEL BLADE DAMPER (REFER TO SCHEDULE)
DIFFERENTIAL PRESSURE SENSOR
PRESSURE SENSOR/MONITORP
PRESSURE SENSOR (DUCT MOUNTED)P
THERMOSTAT/SENSORT
TEMPERATURE SENSORT
THERMOSTAT/SENSOR WITH HEAVY DUTY ENCLOSURET
MECHANICAL SYMBOL LIST
SYMBOL: DESCRIPTION:
AIRFLOW MEASUREMENT SYMBOL
XX - AHU SYMBOL
Y - SEQUENTIAL NUMBER
XX-Y
NOT ALL SYMBOLS MAY APPLY.
FAN POWERED TERMINAL AIR BOX w/REHEAT COIL
(REFER TO SCHEDULE)
CONTROL VALVE (TWO-WAY)
PITCH PIPE IN DIRECTION
DIELECTRIC CONNECTION
UNION/FLANGE
BALANCING VALVE (NUMBER INDICATES GPM)
PIPE CAP
PIPE DOWN
PIPE UP OR UP/DOWN
DIRECTION OF FLOW IN PIPE
SHUTOFF VALVE NORMALLY OPEN
SHUTOFF VALVE NORMALLY CLOSED
THROTTLING VALVE
AUTOMATIC BALANCING VALVE
MIXING VALVE
CONTROL VALVE (THREE-WAY)
SOLENOID VALVE
CHECK VALVE
SAFETY/RELIEF VALVE
PRESSURE REDUCING VALVE (LIQUID/GAS)
PRESSURE REDUCING VALVE (STEAM)
TRIPLE DUTY VALVE (ANGLE TYPE)
TRIPLE DUTY VALVE (IN-LINE TYPE)
VACUUM BREAKER
"WYE" - STRAINER
"WYE" - STRAINER W/SHUTOFF VALVE AND HOSE CONNECTION WITH CAP
BASKET STRAINER
FLEXIBLE CONNECTION
PRESSURE/TEMPERATURE TEST PLUG
REDUCER - REFERENCE SPECIFICATION
FOR CONCENTRIC/ECCENTRIC AND FOT/FOB
SUCTION DIFFUSER WITH SUPPORT FOOT
AUTOMATIC AIR VENT
MANUAL AIR VENT
DRAIN VALVE WITH HOSE CONNECTION AND CAP
T T-*
STEAM TRAP (REFER TO SCHEDULE)
T-*
F&T STEAM TRAP (REFER TO SCHEDULE)
T-*
INVERTED BUCKET STEAM TRAP (REFER TO SCHEDULE)
ALIGNMENT GUIDE
PIPE ANCHOR
EXPANSION JOINT
#.#" IS THE EXPANSION TRAVEL INCHES
COMPRESSED AIRCA
HEATING/CHILLED WATER RETURNHCR
CONDENSER WATER RETURNCR
CONDENSER WATER SUPPLYCS
CHILLED WATER RETURNCWR
CHILLED WATER SUPPLYCWS
NATURAL GASG
GLYCOL WATER RETURNGWR
GLYCOL WATER SUPPLYGWS
HIGH PRESSURE CONDENSATE (>125 TO 250 PSIG)HPC
HEATING WATER RETURNHWR
HEATING WATER SUPPLYHWS
REFRIGERANT LIQUIDLIQ
LOW PRESSURE CONDENSATE (0 TO 15 PSIG)LPC
FUEL OIL RETURNFOR
FUEL OIL SUPPLYFOS
PUMPED CONDENSATEPC
PUMPED DISCHARGEPD
REHEAT WATER RETURNRWR
REHEAT WATER SUPPLYRWS
REFRIGERANT SUCTIONSUC
SAFETY RELIEF VENTSV
HIGH PRESSURE STEAM (>125 TO 250 PSIG)HPS
LOW PRESSURE STEAM (0 TO 15 PSIG)LPS
DRAINDPP
GAS REGULATOR VENTGV
LAB VACUUMVAC
MEDICAL VACUUMMV
METERM
PUMP
STATIC SWITCH
PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P
DIFFERENTIAL PRESSURE SENSOR
PRESSURE SENSOR (FURNISHED WITH BALL VALVE)P
MECHANICAL SYMBOL LIST
SYMBOL: DESCRIPTION:
NOT ALL SYMBOLS MAY APPLY.
SP
BACKFLOW PREVENTER
EJ-#
MEDIUM PRESSURE CONDENSATE (>15 TO 125 PSIG)MPC
MEDIUM PRESSURE STEAM (>15 TO 125 PSIG)MPS
REFRIGERANTREF
PLAN OR DETAIL NUMBER
(INDICATES LOCATION IN SHEET GRID)
PLAN OR DETAIL NAME
PLAN OR DETAIL SCALE
DETAIL REFERRED TO BY SECTION CUT
SHEET DETAIL IS LOCATED ON
NAME
A1
VIEW NAME
1/8" = 1'-0"
M101
SIMSIM
INDICATES SIMILAR DETAIL REFERENCED
IN MULTIPLE LOCATIONS
LEVEL NAME
10'-0" HEIGHT ABOVE
PROJECT 0'-0"
1 INDICATES NOTE USED TO DESCRIBE
ADDITIONAL INFORMATION ABOUT
WORK REQUIRED, SPECIFIC TO THE
SHEET AND/OR DETAIL
VIEW KEY
LINE TYPE AND TAG KEY:
NEW WORK BY THIS CONTRACTOR (WIDE LINE)
NEW
EXISTING TO BE REMOVED (SHORT DASHED PATTERN)
NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)
EXISTING
EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)
EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
HALFTONING DOES NOT MODIFY SCOPE.
'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING
TAG UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL
INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST
INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL
T101
APPLICABLE CODES
CONTRACTOR SHALL COMPLY WITH APPLICABLE CODES AND LOCAL AMENDMENTS.
REFER TO ARCHITECTURAL GENERAL AND LIFE SAFETY DRAWINGS FOR LIST OF APPLICABLE
CODES.
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
Revisions: Date:
/8
/4
/8
/2
/4
-1
/2
2345678910111213141516
B
C
D
E
F
G
H
J
K
1234561516
ARCHITECT / ENGINEER OF RECORD:CONSULTANTS:
CIVIL
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV 25401
(304) 266-3115
LIFE SAFETY
DAVID McCOY
8734 GALLOWAY TRAIL
NOVELTY, OH 44072
(619) 925-1647
ARCHITECT:
KEN JONES
421 KING ST. SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
891011121314
MEP / FP / STRUCTURAL
JIM KAPPELER
15 SUNNEN DRIVE, SUITE 104
ST. LOUIS, MO 63143
(314) 390-6398
ENVIRONMENTAL
MICHAEL SMITH
1340-B CHARWOOD RD SUITE B
HANOVER, MD 21076
(410) 859-4300
GEOTECH
DUSTIN SCHLEIFER
09/10/2025
517-22-700
SMPCAH
EHRM INFRASTRUCTURE UPGRADES
FINAL BID DOCUMENTS
MECHANICAL COVERSHEET
MH000
-2
-7
M H
/0
/1
.p d f
BECKLEY VA MEDICAL CENTER
200 VETERANS AVENUE
BECKLEY, WV 25801
MECHANICAL SHEET INDEX
MH000 MECHANICAL COVERSHEET
01-MH100 BUILDING 1 - BASEMENT PLAN - MECHANICAL
01-MH101 BUILDING 1 - FIRST FLOOR PLAN - MECHANICAL
01-MH102 BUILDING 1 - SECOND FLOOR PLAN - MECHANICAL
01-MH103 BUILDING 1 - THIRD FLOOR PLAN - MECHANICAL
01-MH104 BUILDING 1 - FOURTH FLOOR PLAN - MECHANICAL
01-MH105 BUILDING 1 - FIFTH FLOOR PLAN - MECHANICAL
01-MH106 BUILDING 1 - SIXTH FLOOR PLAN - MECHANICAL
02-MH101 BUILDING 2 - BASEMENT, FIRST, AND SECOND FLOOR PLANS - MECHANICAL
03-MH101 BUILDING 3 - FIRST AND SECOND FLOOR PLANS - MECHANICAL
04-MH101 BUILDING 4 - FIRST AND SECOND FLOOR PLANS - MECHANICAL
05-MH101 BUILDING 5 - FIRST FLOOR PLAN - MECHANICAL
06-MH101 BUILDING 6 - BASEMENT AND FIRST FLOOR PLANS - MECHANICAL
07-MH100 BUILDING 7 - LOWER LEVEL 1 & 2 PLANS - MECHANICAL
07-MH101 BUILDING 7 - FIRST FLOOR PLAN - MECHANICAL
08-MH101 BUILDING 8 - GROUND AND FIRST FLOOR PLANS - MECHANICAL
14/15-MH101 BUILDING 14/15 - FIRST FLOOR PLAN - MECHANICAL
17-MH101 BUILDING 17 - FIRST FLOOR PLAN - MECHANICAL
29-MH101 BUILDING 29 - FIRST FLOOR PLAN - MECHANICAL
35-MH101 BUILDING 35 - GROUND AND FIRST FLOOR PLANS - MECHANICAL
PG-MH101 PARKING GARAGE - LOWER LEVEL AND FIRST FLOOR PLANS - MECHANICAL
PG-MH102 PARKING GARAGE - SECOND AND THIRD FLOOR PLANS - MECHANICAL
PG-MH103 PARKING GARAGE - FOURTH FLOOR PLAN - MECHANICAL
MH400 MECHANICAL DETAILS
MH600 MECHANICAL SCHEDULES
MH700 TEMPERATURE CONTROLS DIAGRAMS AND SEQUENCES
GRAND TOTAL: 26
24649P R
O
FESSIONAL ENGIN
EE
RSTATE OF
SNI
KSOHAESAC DERETSIGER
W
EST V IRGIN
IA
x
CONCR ETE SIDEWALK
C O N C R
ET
E
S
ID
E W A L K
C O
NC
R
ETE
SI DE
WA
LK
TL
O
F
-2"
+4'-6"
F.E
F.E o
H T
H T
T T
H
SITE KEY PLAN
N
SCALE: NOT TO SCALE
N
TRUE
NORTH
N
PLAN
NORTH
MCR
BB-125EMERGENCY
GENERATOR
BB-114
EMERGENCY
GENERATOR
BB-113
MEDICAL
GAS
BB-112
MECH
BB-109
ANATOMICAL
PATHOLOGY
TEACHING
FACILITY
BB-110
HSK
BB-111
ENGG
MAINT RM
BB-115
STAFF
TOILET
BB-110
STAIR 2
ST-2
HSK
BB-123B
SUPERVISOR
OFFICE
BB-123A
FOOD SERV
CHIEF
BB-124A
DIETICIAN
OFFICE
BB-124
LOCKER
BB-116
MECH
BB-123D
FREEZER
BB-134B
FREEZER
BB-134
SALAD
PREP
BB-133
NOURISHMENT
STORAGE
BB-132
TELEPHONE
SWITCH
ROOM
BB-130OFFICE
BB-131
KITCHEN
BB-123
FREEZER
BB-108
AUTOPSY
BB-107
STOR
BB-106
LAUNDRY
CHUTE
BB-105
STORAGE
BB-104
STAIR 1
BB-142
MECH
BB-103
MECH
BB-102
EQUIP
STORAGE
BB-101
EQUIP
CLEANING
BB-100
MECH
BB-123C
PUMP
BB-135
DRY
STORAGE
BB-135A
STORAGE
BB-136
FREEZER
BB-137
FREEZER
BB-137A
FREEZER
BB-138
STORAGE
BB-139
OFFICE
BB-123D
SPD STOR
BC-105B
SPD OR
SUPPLY
BC-105
OFFICE
BC-105A
HAZ WASTE
STOR
BC-104A
CHEM STOR
BC-104B
STORAGE
BC-104C
OFFICE
BC-104G
WAREHOUSE
BC-104
LOCKER
BC-104D CHEM SPILL
KIT
BC-104E
ELEC
BC-104F
SEWING
BC-103
LINEN STOR
BC-102B
LINEN STOR
BC-102
HOUSEKEEPING
OFFICE
BC-101A
HOUSEKEEPING
MEETING
RM
BC-101
PUMP
ROOM
BC-100
STORAGE
BA-123
MECH
BA-122
SPD STOR
BA-121
STORAGE
BA-124
LOBBY
BA-120
TELLER
BA-120A
MANAGER
OFFICE
BA-120C
OFFICE
BA-120F
STORAGE
BA-120E
BREAK
BA-120I
STOR
BA-120D
VAULT
BA-120B
PRINTER
ROOM
BA-117
MECH
BA-118
MECH
BA-119
PHARM
STOR
BC-107D
LOCKER
BC-107C
OFFICE
BC-107F
OFFICE
BC-107E
STORAGE
BC-107
OFFICE
BC-107G
WAREHOUSE
BC-107H
WAREHOUSE
BC-107I
STAIR 7
BB-144
OFFICE
BC-110
OFFICE
BC-108E
OFFICE
BC-108B
HKC
BC-108A
BREAK
ROOM
BC-109
SPD
STORAGE
BC-108
STEAM
ROOM
BC-108H
HSK
BA-108C
DECONT
BA-103
PREP RM
BC-108I
MECH
BB-158
ETO
STERILIZATION
BC-108K
RETAIL
BC-114
STOCK
ROOM
BC-114B
ELEC
BC-115
FREEZER
BC-111D KITCHEN
BC-111
STORAGE
BC-111A
CANTEEN
BC-112
STORAGE
BC-112A
HSK
BC-111C
RETAIL
OFFICE
BC-114A
SERVING
BC-111B
CAFE
BC-113
STAIR 5
BB-145
RETAIL
STOR
BA-105
STAIR 3
BB-146
MAIL ROOM
BA-100A
POST
OFFICE
BA-100
SORTING
BA-101
STOR
BA-101A
COMM
CLOSET
BA-101B
ABATOR
BA-103A
STORAGE
BA-117A WOMEN'S
LOCKER
BA-115C
HSK
BA-116
MEN'S
LOCKER
BA-114
STAIR 6
BB-147
SPRINKLER
BA-112
HSK / ELEC
BA-111
OFFICE
BA-110
WAITING
BA-109
OPTICAL
BA-109B
CANTEEN
STOR
BA-109A
CANTEEN
STOR
BA-109C
MECH
BA-126
TR
BA-126A
WOMEN'S
SHOWER
BB-148
WOMEN'S
SHOWER
BB-149
WOMEN'S
TOILET
BB-150
MEN'S
TOILET
BB-151
MEN'S
SHOWER
BB-152
WOMEN'S
TOILET
BB-153
MEN'S
TOILET
BB-154
MEN'S
LOCKER
BB-155
WOMEN'S
LOCKER
BB-156
STAFF
LOCKER
BB-157
TR
BC-101B
OFFICE
BB-119
OFFICE
BB-120
OFFICE
BB-120A
OFFICE
BB-121
OFFICE
BB-122
OFFICE
BB-117
OFFICE
BB-118
STOR
BB-122A
OFFICE
BB-128
OFFICE
BB-127
ENTRANCE
BB-125
OFFICE
BB-125A
OFFICE
BB-126
OFFICE
BB-126A
FREEZER
BB-134A
OXYGEN
VALVE
BB-119A
MECH
CHASE
BB-117A
TR
BB-139A
NUTRITION
CARTS
BB-123E
01-MH100
D3
01-MH100
B6
01-MH100
G601-MH100
D6
R E
F
/4
"C D
STORAGE
BB-139
8x6 SA
6x6 EA
STORAGE
BB-139
TR
BB-139A
SS-1-BB139A
SG-1
8x6/50
8x6 SA
6x6 EA
STORAGE
BB-139
TR
BB-139A
SS-1-BB139A
REF
3/4"CD
TR
BA-126A
CRU-1-AC-27
16x10 EA
16x10 OA
RG-E
12x12/600 x1
S
A
SG-E
24x12/600
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
Revisions: Date:
/8
/4
/8
/2
/4
-1
/2
2345678910111213141516
B
C
D
E
F
G
H
J
K
1234561516
ARCHITECT / ENGINEER OF RECORD:CONSULTANTS:
CIVIL
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV 25401
(304) 266-3115
LIFE SAFETY
DAVID McCOY
8734 GALLOWAY TRAIL
NOVELTY, OH 44072
(619) 925-1647
ARCHITECT:
KEN JONES
421 KING ST. SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
891011121314
MEP / FP / STRUCTURAL
JIM KAPPELER
15 SUNNEN DRIVE, SUITE 104
ST. LOUIS, MO 63143
(314) 390-6398
ENVIRONMENTAL
MICHAEL SMITH
1340-B CHARWOOD RD SUITE B
HANOVER, MD 21076
(410) 859-4300
GEOTECH
DUSTIN SCHLEIFER
09/10/2025
517-22-700
SMPCAH
EHRM INFRASTRUCTURE UPGRADES
FINAL BID DOCUMENTS
BUILDING 1 - BASEMENT PLAN -
MECHANICAL
01-MH100
-2
-7
-M
H
/0
/2
.p d f
BECKLEY VA MEDICAL CENTER
200 VETERANS AVENUE
BECKLEY, WV 25801
1/16" = 1'-0"
BUILDING 1 - OVERALL BASEMENT PLAN - MECHANICAL
A12
MECHANICAL SHEET NOTES:
1. DRIP PANS TO BE PROVIDED UNDER ALL
EXISTING HYDRONIC, PLUMBING, AND FIRE
PROTECTION PIPING OVERHEAD IN TR
SPACES. FOR CLARITY, DRIP PANS ARE ONLY
SHOWN ON PLUMBING DRAWINGS.
MECHANICAL CONTRACTOR SHALL
COORDINATE WITH PLUMBING CONTRACTOR
TO VERIFY ALL EXISTING AND NEW PIPING
OVERHEAD ARE PROVIDED WITH DRIP PAN
COVERAGE.
2. DO NOT SPILL CONDENSATE PIPING INTO DRIP
PANS OVER TR SPACES. COORDINATE
INSTALLATION OF REFRIGERANT AND
CONDENSATE PIPING WITH DRIP PAN
LOCATIONS. AVOID PENETRATIONS OF NEW
DRIP PANS. SEAL ANY NECESSARY
PENETRATIONS WATER TIGHT.
3. TEMPERATURE CONTROLS CONTRACTOR
SHALL COORDINATE LOCATION OF ALL DRIP
PANS FOR LEAK DETECTION MONITORING.
4. TEMPERATURE CONTROLS CONTRACTOR
SHALL BE RESPONSIBLE FOR INTEGRATION OF
MONITORING OF ALL TEMPERATURE AND
HUMIDITY SENSORS INTO EXISTING FACILITY
CONTROLS SYSTEM.
5. ELECTRICAL AND TELECOMMUNICATIONS
EQUIPMENT SHOWN FOR REFERENCE ONLY.
1/4" = 1'-0"
MECH. DEMOLITION - NUT. CART BB-139
G6
NO SCALE
VENTILATION - TR BB-139A
D6
1/4" = 1'-0"
PIPING - TR BB-139A
B6
1/4" = 1'-0"
VENTILATION - TR BA-126A
D3
KEYNOTES:
1. DEMOLISH EXISTING DUCTWORK TO POINT
INDICATED AND CAP. SEAL DUCTWORK AND
REPAIR INSULATION AS REQUIRED.
2. DEMOLISH ABANDONED REFRIGERANT PIPING
COMPLETE.
3. EXISTING LIEBERT CRAC UNIT AND DUCTWORK
TO REMAIN.
4. INSTALL NEW SPLIT SYSTEM ON WALL PER
MANUFACTURER'S INSTRUCTIONS.
COORDINATE EXACT LOCATION WITH
ELECTRICAL AND TELECOMMUNICATIONS
CONTRACTORS. ROUTE REFRIGERANT PIPING
AS INDICATED, SIZED AND INSULATED PER
MANUFACTURER'S RECOMMENDATIONS.
5. FURNISH AND INSTALL WALL-MOUNTED
COMBINATION TEMPERATURE/HUMIDITY
SENSOR. REFER TO SHEET MH700.
6. FURNISH AND INSTALL WALL-MOUNTED
COMBINATION TEMPERATURE/HUMIDITY
SENSOR ADJACENT TO EXISTING LIEBERT
WALL CONTROLLER. SENSOR TO BE USED FOR
MONITORING ONLY. REFER TO A9/MH700.
7. REF PIPING UP THROUGH FLOOR ABOVE.
REFER TO SHEET 01-MH101.
8. ROUTE CONDENSATE PIPING ABOVE CEILING
TO EQUIPMENT ROOM. TURN PIPING DOWN
WALL AND ROUTE TO NEAREST FLOOR DRAIN.
TERMINATE PIPING WITHIN FLOOR DRAIN.
PIPING SHALL NOT BE ROUTED SUCH THAT A
TRIP HAZARD IS CREATED.
24649P R
O
FESSIONAL ENGIN
EE
RSTATE OF
SNI
KSOHAESAC DERETSIGER
W
C O N C R
ET
E
S
ID
E W A L K
C O
NC
R
ETE
SI DE
WA
LK
TLO
F
-2"
+4'-6"
F.E
F.E o
UP
RAMP DN
RAMP DN
CORRIDOR
H T
H T
SITE KEY PLAN
N
SCALE: NOT TO SCALE
N
TRUE
NORTH
N
PLAN
NORTH
CENTRAL
INTAKE
1A-154A
CLERK
1A-154B
LEAD
CLERK
1A-150B
OFFICE
1A-150
OFFICE
1A-149A
OFFICE
1A-149
OFFICE
1A-148
BILLING
OFFICE
1A-147A
CPAC
BILLING
1A-147B
ELEC
CLOSET
1A-146
WAITING
INTAKE
1A-154
OFFICE
1A-153
OFFICE
1A-152
OFFICE
1A-150A
SWITCH
BOARD
1A-155
CLOSET
1A-156A
STOR
1A-156
AUDIOLOGY
ROOM
1A-157A
AUDIOLOGY
ROOM
1A-157B
AUDIOLOGY
ROOM
1A-157C
HIMS
1A-142
OFFICE
1A-144
HIMS
1A-143
OFFICE
1A-145
WAITING
1BF-106
TELE
RETINAL
EXAM
1BF-117
EYE EXAM
1BF-116
EYE EXAM
SURGICAL
PROCEDURE
1BF-115
OPTOMETRY
1BF-114
MINOR
PROCEDURES
1BF-113
SURGY
1BF-112
SURGY
1BF-111
SURGY
1BF-110
SURGY
1BF-109
EYE WORK
UP
1BF-108
EYE WORK
UP EXAM
1BF-107
STERILE
SUPPLY
1BF-101
DIRTY
UTILITY
1BF-103
RECEPTION
1BF-104
ELEC
1BF-102
WORK
STATION
1BF-118
EXAM /
VISUAL
FIELD
1BF-110
PATIENT
TOILET
1BF-105
OFFICE
1B-115
OFFICE
1B-114
OFFICE
1B-113
OFFICE
1B-112C
CONFERENCE
1B-112B
EXAM
1B-112A
OFFICE
1B-112
OFFICE
1B-100
OFFICE
1B-103
STORAGE
1B-104
OFFICE
1B-105
OFFICE
1B-108
EXAM
1B-115A
EXAM
1B-116
EXAM
1B-116A
EXAM
1B-117
PATIENT
TOILET
1B-117A
EXAM
1B-118
EXAM
1B-119
PROSTHETICS
1B-119A
CONFERENCE
1B-122
ARMORY
1B-124L
GUN CLEAN
1B-124F
TOILET
1B-124E
BREAK
1B-124D
LOCKER
1B-124G
EVIDENCE
1B-124J
OFFICE
1B-122A
OFFICE
1B-123
OFFICE
1B-123A
POLICE
OPERATIONS
OFFICE
1B-124H
HOLDING
CELL
1B-124I
CORRIDOR
1B-124
STOR
1B-124J
ELEC
1B-124C
DISPATCH
1B-124K
OFFICE
1B-124B
OFFICE
1B-124A
OFFICE
1B-109
OFFICE
1B-110
VOLUNTEER
INFO
1B-111
OFFICE
1B-102
STOR
1B-102A
INFO
1B-121
WAITING
1B-121A
OFFICE
1B-120D
OFFICE
1B-120A
CHAPEL
1B-120
AH-3
1B-120B
STOR
1B-120C
NICHE
1B-120E
SACRISTY
1B-126A
WAITING
1B-127
WAITING
1B-130
CHECK-IN /
RECEPTION
1B-131
CHECK-IN /
RECEPTION
1B-126
STAFF
TOILET
1B-143G
STOR
1B-143H
TOILET
1A-155A
SUPPLY
1A-159
TREAT
1A-158
TREAT
1A-161
CLINICAL
ROOM
1A-162
EXAM
1A-163A
PHYSICIAN
OFFICE
1A-163
STAFF
TOILET
1A-164D
ONCOLOGY
WAITING
1A-164A
WAITING
1A-164
CLERK
OFFICE
1A-164B
BREAK
1A-164C
TREATMENT
AREA
1A-164E
RECEPTION
1A-164F
PATIENT
TOILET
1A-160
EXAM
1B-132
EXAM
1B-132A
CONF
1B-132B
EXAM
1B-132C
PATIENT
TOILET
1B-133
OFFICE
1B-134
OFFICE
1B-134A
EXAM
1B-134B
EXAM
1B-135
CLINIC
1B-136
CLINIC
NURSE
1B-137
CLINIC
NURSE
1B-137A
WOMEN
TOILET
1B-139
MEN TOILET
1B-140
STAIR 2
ST-2
OFFICE
1B-141
OFFICE
1B-142
OFFICE
1B-143
OFFICE
1B-144
OFFICE
1B-145
HAC
1B-145A
TELECOM
1A-124 & 124A
FIRE
CONTROL
1A-139
STAFF
BREAK
1A-135
STAFF
TOILET
1A-135A
OFFICE
1A-136
STOR
1A-137
TRAUMA
1A-134
WOMEN'S
EXAM
1A-127
TOILET
1A-127A
RECEPTION
1A-140
REGISTRATION
WORKROOM
1A-141
CHECK-IN
1A-141A
CHECK-IN
1A-141B
CHECK-IN
1A-141C
TRIAGE
1A-126
ELEC
1A-120B
NOURISH
1A-120A
TRIAGE /
EXAM
1A-120
MEDICATION
1A-131C
ISOLATION
1A-132
TOILET
1A-132A
TOILET
1A-138
NURSES
STATION
1A-133A
NURSES
STATION
1A-133
OBSERV /
TREAT
1A-133
TOILET
1A-133A
OB/Y TREAT
1A-131F
OB/Y TREAT
1A-131E
OB/Y TREAT
1A-131D
OB/Y TREAT
1A-131C
OB/Y TREAT
1A-131B
OB/Y TREAT
1A-131A
TOILET
1AB-118
EXAM
1AB-119
PHYSICIANS
OFFICE
1AB-117
EXAM
1AB-116
NURSE
OFFICE
1AB-115
CHIEF OF
PHARMACY
1AB-114
OFFICE
1AB-111
STOR
1AB-133
HOUSE
KEEPING
1AB-108
NURSE
OFFICE
1AB-120
EXAM
1AB-123
NURSE
OFFICE
1AB-121
EXAM
1AB-122
EXAM
1AB-124
BREAK
1AB-125
TOILET
1AB-125A
STAIR 4
ST-4
PHYSICIANS
OFFICE
1AB-129
CLINIC
1AB-128
EXAM
1AB-126
OFFICE
1AB-127
ELEC
1AB-127A
OFFICE
1AB-131
EXAM
1AB-130
TOILET
1AB-143B
SATELLITE
BROADCASTING
/ STORAGE
1AB-143C
LIBRARIAN
1AB-143E
SATELLITE
BROADCASTING
/ STORAGE
1AB-143F
TOILET
1AB-143H
LIBRARY
1AB-143A
MECH
1AB-143I
AUDITORIUM
1AB-143
KITCHEN
1AB-135
BREAK
1AB-109
MEN'S
ROOM
1AB-109A
WOMEN'S
ROOM
1AB-109B
ASSIST
CHIEF
1AB-110
ANTI CLINIC
1AB-112
ANTI CLINIC
1AB-113
STOR
1AB-134A
TR
1AB-134
PHARMACY
STORAGE
1AB-100
PHARMACY
1AB-102
VAULT
1AB-105
CONFERENCE
1A-101
ELEC
1AB-101
PHARMACY
WAITING
1A-103
WAITING
1A-143
OFFICE
1A-100A
PHARMACY
PHONE
OFFICE
1A-102A
PHARMACY
RECEIVING /
STORAGE
1A-103
MAIL COPY
1A-165 VACCINE
COORDIATOR
1A-166
OFFICE
1A-168
CASHIER
1A-169
CLERKS
1A-117A
CHECK-IN
1A-117
CLERKS
1A-119
X-RAY
1A-121
CLEAN
UTILITY
1A-129
SOILED
UTILITY
1A-128
TOILET
1A-125
STOR
1A-125
STAIR 6
ST-6
EXAM
1A-122
OFFICE
1A-116A
OFFICE
1A-115
CONF
1A-116
OFFICE
1A-114B
OFFICE
1A-114A
OFFICE
1A-114
STORAGE
1A-105
SOILED
UTILITY
1A-106
HKC
1A-107
OFFICE
1A-108
OFFICE
1A-109
EXAM
1A-110
RECEPTION
1A-111
EXAM
1A-111B
EXAM
1A-111A
STAIR 5
ST-5
LOCKER
1A-100
NUTRITION
CLINIC
1A-100B
CLOSET
1A-167
TOILET
1AB-104
AMBULANCE
ENTRANCE
1A-E1
MECHANICAL
1A-113
OFFICE
1A-175
OFFICE
1A-176
MEN'S
TOILET
1A-173
WOMEN'S
TOILET
1A-172
STAIR 3
ST-3
STAIR 1
ST-1
STAIR 7
ST-7
TR
1B-146
01-MH101
D6
01-MH101
G6
01-MH101
D3
CU-1-BB139A
CU-1-4AB116
CU-1-6B116
CU-1-1B146
CU-1-2B144D
CU-1-5AB112
CU-1-3AB127
REF
HAC
1B-145A x9
E A
24x42 EA
24x60 EA
1"MPS
1"MPS
x6
S A
13x6 OA
HAC
1B-145A
TR
1B-146
SS-1-1B146
SG-1
8x6/50
EG-1
6/75 x9
E A60x24 EA
42x24 EA x6
S A
13x6 OA
HAC
1B-145A
TR
1B-146
SS-1-1B146
3/4"CD
REF
3/4"CD
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
Revisions: Date:
/8
/4
/8
/2
/4
-1
/2
2345678910111213141516
B
C
D
E
F
G
H
J
K
1234561516
ARCHITECT / ENGINEER OF RECORD:CONSULTANTS:
CIVIL
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV 25401
(304) 266-3115
LIFE SAFETY
DAVID McCOY
8734 GALLOWAY TRAIL
NOVELTY, OH 44072
(619) 925-1647
ARCHITECT:
KEN JONES
421 KING ST. SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
891011121314
MEP / FP / STRUCTURAL
JIM KAPPELER
15 SUNNEN DRIVE, SUITE 104
ST. LOUIS, MO 63143
(314) 390-6398
ENVIRONMENTAL
MICHAEL SMITH
1340-B CHARWOOD RD SUITE B
HANOVER, MD 21076
(410) 859-4300
GEOTECH
DUSTIN SCHLEIFER
09/10/2025
517-22-700
SMPCAH
EHRM INFRASTRUCTURE UPGRADES
FINAL BID DOCUMENTS
BUILDING 1 - FIRST FLOOR PLAN -
MECHANICAL
01-MH101
-2
-7
-M
H
/0
/2
.p d f
BECKLEY VA MEDICAL CENTER
200 VETERANS AVENUE
BECKLEY, WV 25801
KEYNOTES:
1. DEMOLISH EXISTING DUCTWORK TO POINT
INDICATED AND CAP. SEAL DUCTWORK AND
REPAIR INSULATION AS REQUIRED.
2. DEMOLISH EXISTING STEAM RADIATOR
COMPLETE. DEMOLISH STEAM AND
CONDENSATE PIPING TO POINT INDICATED
AND CAP. PROVIDE NEW STEAM TRAP AS
REQUIRED.
3. TURN CONDENSATE PIPING DOWN WALL AND
SPILL INTO NEW MOP BASIN. TERMINATE
PIPING 3" ABOVE FLOOR OF MOP BASIN.
4. ROUTE PIPING UP FACE OF EXTERIOR WALL.
INSULATE AND JACKET ALL EXTERIOR PIPING.
PAINT JACKET OF VERTICAL PIPING TO MATCH
EXTERIOR WALL COLOR.
5. INSTALL NEW CONDENSING UNIT ON WALL
WITH MANUFACTURER'S WALL HANGING KIT.
6. INSTALL UNITS STACKED ON WALL.
7. ROUTE CONDENSATE PIPING FROM ABOVE AS
INDICATED. CONNECT CONDENSATE FROM
THIS LEVEL TO TOP OF MAIN.
8. INSTALL NEW SPLIT SYSTEM ON WALL PER
MANUFACTURER'S INSTRUCTIONS.
COORDINATE EXACT LOCATION WITH
ELECTRICAL AND TELECOMMUNICATIONS
CONTRACTORS. ROUTE REFRIGERANT PIPING
AS INDICATED, SIZED AND INSULATED PER
MANUFACTURER'S RECOMMENDATIONS.
9. FURNISH AND INSTALL WALL-MOUNTED
COMBINATION TEMPERATURE/HUMIDITY
SENSOR. REFER TO SHEET MH700.
10. ROUTE PIPING THROUGH EXTERIOR WALL.
SEAL ALL OPENINGS WEATHER TIGHT.
INSULATE AND JACKET ALL EXTERIOR PIPING.
11. ROUTE PIPING DOWN IN EXISTING PIPE CHASE
TO LEVEL BELOW.
1/16" = 1'-0"
BUILDING 1 - OVERALL FIRST FLOOR PLAN - MECHANICAL
A12
MECHANICAL SHEET NOTES:
1. DRIP PANS TO BE PROVIDED UNDER ALL
EXISTING HYDRONIC, PLUMBING, AND FIRE
PROTECTION PIPING OVERHEAD IN TR
SPACES. FOR CLARITY, DRIP PANS ARE ONLY
SHOWN ON PLUMBING DRAWINGS.
MECHANICAL CONTRACTOR SHALL
COORDINATE WITH PLUMBING CONTRACTOR
TO VERIFY ALL EXISTING AND NEW PIPING
OVERHEAD ARE PROVIDED WITH DRIP PAN
COVERAGE.
2. DO NOT SPILL CONDENSATE PIPING INTO DRIP
PANS OVER TR SPACES. COORDINATE
INSTALLATION OF REFRIGERANT AND
CONDENSATE PIPING WITH DRIP PAN
LOCATIONS. AVOID PENETRATIONS OF NEW
DRIP PANS. SEAL ANY NECESSARY
PENETRATIONS WATER TIGHT.
3. TEMPERATURE CONTROLS CONTRACTOR
SHALL COORDINATE LOCATION OF ALL DRIP
PANS FOR LEAK DETECTION MONITORING.
4. TEMPERATURE CONTROLS CONTRACTOR
SHALL BE RESPONSIBLE FOR INTEGRATION OF
MONITORING OF ALL TEMPERATURE AND
HUMIDITY SENSORS INTO EXISTING FACILITY
CONTROLS SYSTEM.
5. ELECTRICAL AND TELECOMMUNICATIONS
EQUIPMENT SHOWN FOR REFERENCE ONLY.
1/4" = 1'-0"
MECH. DEMOLITION - ROOMS
1B-145A & 146
G6
1/4" = 1'-0"
VENTILATION - TR 1B-146
D6 1/4" = 1'-0"
PIPING - TR 1B-146
D3
24649P R
O
FESSIONAL ENGIN
EE
RSTATE OF
SNI
KSOHAESAC DERETSIGER
W
C O N C R
ET
E
S
ID
E W A L K
C O
NC
R
ETE
SI DE
WA
LK
TLO
F
-2"
+4'-6"
F.E
F.E o
ROOF
3 '- 8"
T
T
H T
T
H T
T
SITE KEY PLAN
N
SCALE: NOT TO SCALE
N
TRUE
NORTH
N
PLAN
NORTH
MECH
2B-124 OFFICE
2B-123
OFFICE
2B-122
LAB
2B-120
LAB
2B-118
EXAM
2A-121A EXAM
2A-121
EXAM
2A-119
ELEC
2A-120
EXAM
2A-118
HOT LAB
2A-117
STOR
2A-116
OFFICE
2A-114
PATIENT
TOILET
2A-115
CT SCAN
2A-112
MRI EXAM
2A-110E
MRI EQUIP
2A-110F
MR
CONTROL
2A-110
EQUIP STOR
2A-110C
HOLDING
2A-110B
TOILET
2A-110A
PROCESS /
STOR
2A-113
ELEC
2A-111B
CONTROL
RM
2A-111C
ULTRA
SOUND
2A-111
ULTRASOUND
2A-108B
ULTRASOUND
2A-108AULTRA
SOUND
SUITE
2A-108
ULTRA
SOUND
2A-108E
STAFF
TOILET
2A-109
STAIR 6
ST-6
EXAM
2A-141A
STAIR 5
ST-5
HOUSE
KEEPING
2A-174
PATIENT
TOILET
2A-141C
EXAM
2A-141B
UROLOGY
CLERK
2A-140
UROLOGY
SUPPLY
2A-139
PATIENT
TREAT
2A-141
OFFICE
2A-142
LAB
2A-143
OFFICE
2A-144
EXAM
2A-106
STOR
2A-138
S. TOILET
2A-138A
HOUSE
KEEPING
2A-137
WAITING
2A-136
LOCKER
2A-135
LOCKER
2A-134
LOCKER
2A-131
LOUNGE
2A-132SUPPLY
2A-130B
PATIENT
TOILET
2A-130C
X-RAY
2A-130A
PATIENT
TOILET
2A-104
DRESSING
2A-103A
PATIENT
TOILET
2A-105
PATIENT
TOILET
2A-103B
X-RAY
2A-103
CONTROL
ROOM
2A-102
X-RAY
2A-101
DRESS
2A-100
STOR
2A-100A
PATIENT
TOILET
2A-100B
MECH
2A-123A
MECH
2A-123
READING
ROOM
2A-130
OFFICE
2A-128
SCAN EXAM
2A-127
LAB / EXAM
2A-125
HRS
2A-124
EXAM
2A-122
STOR
2B-111
LAB
2B-112
OFFICE
2B-113
BLOOD
BANK
2B-114
FREEZER
2B-115
COMPRESSOR
2B-116
DRY
STORAGE
2B-117 LAB
2AB-111
LAB
2AB-112
WAITING
2AB-106
PHLEBOTOMY
ROOM
2AB-110
SUPPLY
2AB-109
LOCKER
2AB-105
LOCKER
2AB-104
PATIENT
TOILET
2AB-107
WAITING
2AB-108
RECEPTION
2AB-109
ELEC
2B-124A
HOUSE
KEEPING
2B-124B
OFFICE
2B-125
CHEM STOR
2B-126
BREAK
2B-108
WOMEN'S
ROOM
2B-109
MEN'S
ROOM
2B-110
CLINIC
CO-ORDER
2B-107
EXAM
2B-106
EXAM
2B-105
STAIR 1
ST-1
EXAM /
OFFICE
2B-130
PATIENT
TOILET
2B-127
STAFF
TOILET
2B-129
EXAM /
OFFICE
2B-128A
EXAM /
OFFICE
2B-131
EXAM /
OFFICE
2B-133A
EXAM /
OFFICE
2B-133
STORAGE
2B-134
REHAB /
PHYSICAL
THERAPY
2B-135
PHYSICAL
THERAPY
OFFICE
2B-136
STAIR 2
ST-2
WAITING
2B-128
CHECK-IN
2B-132
OFFICE
2B-139
STAFF
TOILET
2B-139A
SUPPLY
2B-140
EXAM
2B-141
EXAM
2B-142
EXAM
2B-143
PATIENT
SCREENING
2B-144
EXAM
2B-144C
EXAM
2B-104
EXAM
2B-104A
STAFF
LOUNGE
2B-103
CLERK
OFFICE
2B-102
CLINIC
CHECK-IN
2B-101
STOR
2B-105B
EXAM
2B-150
EXAM
2B-151
EXAM
2B-152
EXAM
2B-153
WAITING
2B-101A
OFFICE
2B-145
EXAM
2B-146
EXAM
2B-147
STOR
2B-148
OFFICE
2B-149
CORRIDOR
2B4
LOUNGE
2AB-102
STOR
2AB-100
TOILET
2AB-103
WOMEN'S
LOCKER
2AB-101
CLOSET
2AB-104A
MECH
2AB-113
VACANT
2AB-117
VACANT
2AB-113
STOR
2AB-116
TR
2AB-115
COMM
CLOSET
2AB-114
STAIR 3
ST-3
RADIOLOGY
2A-147
RADIOLOGY
2A-148
DENTAL
EXAM
2A-149
STOR
2A-150
EXAM
2A-151
SUPPLY
2A-152
EXAM
2A-154
DENTAL LAB
2A-156
HYGIENE
EXAM
2A-159
HYGIENE
EXAM
2A-160 OFFICE
2A-161
STAFF
LOUNGE
2A-163
OFFICE
2A-164
STAFF
TOILET
2A-162
TOILET
2A-158
HOUSE
KEEPING
2A-157
SUPPLY
2A-155
SUPPLY
2A-153
DENTAL
EXAM
2A-172
EXAM
2A-171
EXAM
2A-170
SECY
2A-168
DENTAL
EXAM
2A-173
ELEC
CLOSET
2A-146
HEAD OF
RADIOLOGY
2A-167
WAITING
2A-166
OFFICE
2A-165
STAIR 4
ST-4
STOR
2A-145A
STAIR 7
ST-7
MECH
2A-145
CONTROL
2A-175
CONTROL
2A-176
TR
2B-144D
CORRIDOR
C2-22
01-MH102
D6
01-MH102
G6
01-MH102
D3
EXAM
2B-144C
13x6 OA
35x12 EA
48x24 EA
60x24 EA x1
E
A x6
S A
EXAM
2B-144C
TR
2B-144D
SS-1-2B144D
SG-1
8x6/50
60x24 EA
48x24 EA
35x12 EA
13x6 OA x6
S A x1
E
A
8x6 EA
EXAM
2B-144C
TR
2B-144D
SS-1-2B144D
REF1"MPS
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
Revisions: Date:
/8
/4
/8
/2
/4
-1
/2
2345678910111213141516
B
C
D
E
F
G
H
J
K
1234561516
ARCHITECT / ENGINEER OF RECORD:CONSULTANTS:
CIVIL
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV 25401
(304) 266-3115
LIFE SAFETY
DAVID McCOY
8734 GALLOWAY TRAIL
NOVELTY, OH 44072
(619) 925-1647
ARCHITECT:
KEN JONES
421 KING ST. SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
891011121314
MEP / FP / STRUCTURAL
JIM KAPPELER
15 SUNNEN DRIVE, SUITE 104
ST. LOUIS, MO 63143
(314) 390-6398
ENVIRONMENTAL
MICHAEL SMITH
1340-B CHARWOOD RD SUITE B
HANOVER, MD 21076
(410) 859-4300
GEOTECH
DUSTIN SCHLEIFER
09/10/2025
517-22-700
SMPCAH
EHRM INFRASTRUCTURE UPGRADES
FINAL BID DOCUMENTS
BUILDING 1 - SECOND FLOOR PLAN -
MECHANICAL
01-MH102
-2
-7
-M
H
/0
/2
.p d f
BECKLEY VA MEDICAL CENTER
200 VETERANS AVENUE
BECKLEY, WV 25801
KEYNOTES:
1. DEMOLISH EXISTING DUCTWORK TO POINT
INDICATED AND CAP. SEAL DUCTWORK AND
REPAIR INSULATION AS REQUIRED.
2. DEMOLISH EXISTING STEAM RADIATOR
COMPLETE. DEMOLISH STEAM AND
CONDENSATE PIPING TO POINT INDICATED
AND CAP. PROVIDE NEW STEAM TRAP AS
REQUIRED.
3. INSTALL NEW SPLIT SYSTEM ON WALL PER
MANUFACTURER'S INSTRUCTIONS.
COORDINATE EXACT LOCATION WITH
ELECTRICAL AND TELECOMMUNICATIONS
CONTRACTORS. ROUTE REFRIGERANT PIPING
AS INDICATED, SIZED AND INSULATED PER
MANUFACTURER'S RECOMMENDATIONS.
4. FURNISH AND INSTALL WALL-MOUNTED
COMBINATION TEMPERATURE/HUMIDITY
SENSOR. REFER TO SHEET MH700.
5. 3/4" CD FROM ABOVE. CONNECT TO RISER ON
THIS LEVEL. ROUTE PIPING DOWN THROUGH
FLOOR BELOW.
# MECHANICAL SHEET NOTES:
1. DRIP PANS TO BE PROVIDED UNDER ALL
EXISTING HYDRONIC, PLUMBING, AND FIRE
PROTECTION PIPING OVERHEAD IN TR
SPACES. FOR CLARITY, DRIP PANS ARE ONLY
SHOWN ON PLUMBING DRAWINGS.
MECHANICAL CONTRACTOR SHALL
COORDINATE WITH PLUMBING CONTRACTOR
TO VERIFY ALL EXISTING AND NEW PIPING
OVERHEAD ARE PROVIDED WITH DRIP PAN
COVERAGE.
2. DO NOT SPILL CONDENSATE PIPING INTO DRIP
PANS OVER TR SPACES. COORDINATE
INSTALLATION OF REFRIGERANT AND
CONDENSATE PIPING WITH DRIP PAN
LOCATIONS. AVOID PENETRATIONS OF NEW
DRIP PANS. SEAL ANY NECESSARY
PENETRATIONS WATER TIGHT.
3. TEMPERATURE CONTROLS CONTRACTOR
SHALL COORDINATE LOCATION OF ALL DRIP
PANS FOR LEAK DETECTION MONITORING.
4. TEMPERATURE CONTROLS CONTRACTOR
SHALL BE RESPONSIBLE FOR INTEGRATION OF
MONITORING OF ALL TEMPERATURE AND
HUMIDITY SENSORS INTO EXISTING FACILITY
CONTROLS SYSTEM.
5. ELECTRICAL AND TELECOMMUNICATIONS
EQUIPMENT SHOWN FOR REFERENCE ONLY.
1/16" = 1'-0"
BUILDING 1 - OVERALL SECOND FLOOR PLAN - MECHANICAL
A12
1/4" = 1'-0"
MECH. DEMOLITION - ROOMS
2B-144C & 144D
G6
1/4" = 1'-0"
VENTILATION - TR 2B-144D
D6 1/4" = 1'-0"
PIPING - TR 2B-144D
D3
24649P R
O
FESSIONAL ENGIN
EE
RSTATE OF
SNI
KSOHAESAC DERETSIGER
W
C O N C R
ET
E
S
ID
E W A L K
C O
NC
R
ETE
SI DE
WA
LK
TLO
F
-2"
+4'-6"
F.E
F.E o
T T
T H
T
T H
SITE KEY PLAN
N
SCALE: NOT TO SCALE
N
TRUE
NORTH
N
PLAN
NORTH
OBSERVATION
3B-134 DISCHARGE
CO-ORDR
3B-135
EQUIP
ROOM
3B-136
OBSERVATION
3B-133
PATIENT
ROOM
3B-137
PATIENT
ROOM
3B-138
STAIR 2
ST-2
PATIENT
ROOM
3B-132
PATIENT
BATH
3B-132A
PATIENT
BATH
3B-131
PATIENT
ROOM
3B-139
HOPPER RM
3B-140
LINEN STOR
3B-141B
PATIENT
KITCHEN
3B-141
PATIENT
ROOM
3AB-113
NURSING
STATION
3AB-112
CLEAN
UTILITY
3AB-111
NUTRITION
3AB-110
TR
3AB-109
TELECOM
3AB-124
WAITING
3AB-100
PATIENT
ROOM
3AB-120
PATIENT
ROOM
3AB-121
PATIENT
ROOM
3AB-122
PATIENT
ROOM
3AB-123
DIRTY
UTILITY
3AB-119A
STAIR 7
ST-7
GAS
STORAGE
3AB-119
CRITICAL
CARE
CO-ORDR
3AB-114
CONFERENCE
3AB-115
LOCKER /
LOUNGE
3AB-116
MECH
3AB-117
STAFF
TOILET
3AB-118
DIRTY
EQUIP
3AB-118A
DIALYSIS
3A-136
DIALYSIS
3A-137
WOUND
3A-138
ECHO
SUPPLY
3A-139
ECHO
3A-140
ECHO
SUPPLY
3A-123
WOUND
3A-132
CARDIO /
PULMONARY
3A-133
CARDIO /
PULMONARY
3A-134
NURSES
OFFICE
3A-135
PATIENT
BATH
3A-131
CRASH
CART
3A-130
PATIENT
TOILET
3A-129
ENT
3A-128
NEPH
3A-127
NEPH
3A-125
PATIENT
TOILET
3A-126
OFFICE
3A-124
OFFICE
3A-123
STAIR 5
ST-5
ENT
3A-122
ENT
3A-120
ENT
3A-119
DIRTY
UTILITY
3A-117
P. TOILET
3A-118
P. TOILET
3A-121
CLEAN
SUPPLY
3A-116
STORAGE
3A-115A
HOUSE
KEEPING
3A-115
PODIATRY
3A-114
PODIATRY
3A-112
PODIATRY
3A-111
PODIATRY
3A-109
ENGG
MAINT
3A-108
SCHEDULING
3A-105
STAIR 6
ST-6
MECHANICAL
3A-111A
A/C
3C-111B
STORAGE
3C-114B
OFFICE
3C-114A
OFFICE
3C-115B
ELEC
3C-111C
OFFICE
3C-115A
OFFICE
3C-117
OFFICE
3C-118
OFFICE
3C-119
OFFICE
3C-120
CONFERENCE
3C-122OFFICE
3C-126
OFFICE
3C-126A
OFFICE
3C-126B
MECH
3C-127
MECH
3B-113A KITCHEN
3C-125
OPEN AREA
3C-124
COPY
ROOM
3C-123
CONFERENCE
3C-121
STOR
3C-116A
OPEN
OFFICE
3C-116B
STOR
3C-116B
STOR
3C-115A
SECRETARY
OFFICE
3C-115
PATIENT
ROOM
3B-114
PATIENT
TOILET
3B-115
PATIENT
ROOM
3B-116
STORAGE
3B-117A HOUSE
KEEPING
3B-117
HEAD
NURSE
3B-111
STAFF
TOILET
3B-112
ENGG
MAINT
3B-110
KITCHEN
3B-108
PIV
3C-128
EDUCATION
3C-134ENTRY
3C-129
STOR
3C-130
OFFICE
3C-131
OFFICE
3C-132
CONTROL
3C-133
FISCAL
3C-100
FISCAL
3C-101
FISCAL
3C-102
FISCAL
3C-104
LRER
3C-105
FISCAL
3C-103
OFFICE
3C-107
OFFICE
3C-106
OFFICE
3C-108
OFFICE
3C-109
OFFICE
3C-110
OFFICE
3C-114 JANITOR
3C-113
MEN'S
TOILET
3C-112
WOMEN'S
TOILET
3C-111
OFFICE
3A-107
OFFICE
3A-106
MEN'S
TOILET
3AB-108
STAFF
TOILET
3AB-103A
DOCTOR'S
ROOM
3AB-103
OFFICE
3AB-101C
TOILET
3AB-102
OFFICE
3B-100
OFFICE
3B-101MED RM
3B-102
STAFF
TOILET
3B-104
OFFICE
3B-103
STAFF
TOILET
3B-105
NURSES
STATION
3B-107
LOUNGE
3B-142
DOCUMENT
ROOM
3B-142A
PATIENT
ROOM
3B-143
PATIENT
ROOM
3B-145
PATIENT
ROOM
3B-146
PATIENT
TOILET
3B-147
PATIENT
TOILET
3B-144
STAIR 3
ST-3
CVT ROOM
3AB-108
PULMONARY
3A-147
PULMONARY
3A-145
WAITING
ROOM
3A-144
PATIENT
TOILET
3A-146
CLEAN
LINEN
3A-143A
HOPPER
ROOM
3A-142
NUTRITION
3A-143
STAIR 4
ST-4
BREAK
ROOM
3A-103
TOILET
3A-104
OFFICE
3A-102
STAFF
TOILET
3A-102A
PATIENT
ROOM
3B-125
PATIENT
ROOM
3B-127
PATIENT
ROOM
3B-128
PATIENT
TOILET
3B-126
PATIENT
TOILET
3B-129
CRASH
CART
3B-130
SOILED
UTILITY
3B-119
SUPPLY
ROOM
3B-118
PATIENT
ROOM
3B-124
PATIENT
ROOM
3B-122
PATIENT
ROOM
3B-120
TOILET
3B-123
TOILET
3B-121
STAIR 1
ST-1
TR
3AB-127
CORRIDOR
C3-22
01-MH103
D301-MH103
D6
01-MH103
G6
PATIENT
ROOM
3B-146
PATIENT
TOILET
3B-147
48x24 EA
60x24 EA ø
S A
1"MPS
EG-E
48x24
PATIENT
ROOM
3B-146
PATIENT
TOILET
3B-147
TR
3AB-127
SS-1-3AB127
6ø SA
EG-E
48x24
60x24 EA
48x24 EA
PATIENT
ROOM
3B-146
PATIENT
TOILET
3B-147
TR
3AB-127
SS-1-3AB127
REF
3/4"CD
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
Revisions: Date:
/8
/4
/8
/2
/4
-1
/2
2345678910111213141516
B
C
D
E
F
G
H
J
K
1234561516
ARCHITECT / ENGINEER OF RECORD:CONSULTANTS:
CIVIL
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV 25401
(304) 266-3115
LIFE SAFETY
DAVID McCOY
8734 GALLOWAY TRAIL
NOVELTY, OH 44072
(619) 925-1647
ARCHITECT:
KEN JONES
421 KING ST. SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
891011121314
MEP / FP / STRUCTURAL
JIM KAPPELER
15 SUNNEN DRIVE, SUITE 104
ST. LOUIS, MO 63143
(314) 390-6398
ENVIRONMENTAL
MICHAEL SMITH
1340-B CHARWOOD RD SUITE B
HANOVER, MD 21076
(410) 859-4300
GEOTECH
DUSTIN SCHLEIFER
09/10/2025
517-22-700
SMPCAH
EHRM INFRASTRUCTURE UPGRADES
FINAL BID DOCUMENTS
BUILDING 1 - THIRD FLOOR PLAN -
MECHANICAL
01-MH103
-2
-7
-M
H
/0
/2
.p d f
BECKLEY VA MEDICAL CENTER
200 VETERANS AVENUE
BECKLEY, WV 25801
KEYNOTES:
1.