S02 - Att 4 - 517-22-700 Beckley VAMC EHRM - Drawings VOL 2_09-10-2025.pdf

PDF 42 MB Posted

Attached to
EHRM | Beckley VAMC 517-22-700 | Construct Infrastructure Upgrade
Solicitation number
36C77626R0006
Issued by

About this file

This file is a set of architectural and engineering drawings for mechanical, plumbing, fire protection, and electrical systems for an infrastructure upgrade project at Beckley VA Medical Center in Beckley, West Virginia.

The document represents final bid drawings (Volume 2) for the EHRM (Electronic Health Records Management) Infrastructure Upgrades project, VA Project Number 517-22-700, issued September 10, 2025. The project is located at Beckley VA Medical Center, 200 Veterans Avenue, Beckley, WV 25801. The federal agency is the U.S. Department of Veterans Affairs (VA), Office of Construction and Facilities Management. The project involves comprehensive infrastructure upgrades across multiple buildings at the medical center campus. The drawing set includes mechanical, plumbing, fire protection, and electrical systems covering 15 buildings plus a parking garage, with a total of 359 individual drawing sheets across multiple volumes. Key consultant team members include architect Ken Jones (CB Design Group, Inc., Alexandria, VA), MEP/FP/Structural Engineer Jim Kappeler (IMEG Corp., Louisville, KY), Civil Engineer Mark Dyck (Martinsburg, WV), Life Safety Consultant David McCoy (Novelty, OH), Environmental Consultant Michael Smith (Hanover, MD), and Geotech Consultant Dustin Schleifer. The project COR is Seth Buckland, and the contracting officer is Christopher Yong with the VHA Program Contracting Activity Central. The drawings establish design conditions for Beckley's altitude of 2,418 feet above sea level and include specifications for fully sprinklered systems, HVAC equipment replacements, condensate piping systems, and temperature/humidity monitoring throughout the facility.

View the file

Other files

File Type Posted
S06 - Amendment 0004 - ATT 4 - Response to RFI 123 - PreBid RFI Control Point memo.pdf PDF
S06 - Amendment 0004 - ATT 3 - Response to RFI 123 - Beckley Control Points.pdf PDF
S06 - Amendment 0004 - ATT 1 - Tech Questions - Beckley EHRM IU.pdf PDF
S06 - 36C77626R0006 0004.pdf PDF
S06 - Amendment 0004 - ATT 5 - Response to RFI 123 - T40-11072 AERIAL CONTROL1-26-23.pdf PDF
S06 - Amendment 0004 - ATT 2 - Addendum 1.pdf PDF
S06 - Amendment 0003 - ATT 3 - VAAR 852 204-72 PERSONNEL VETTING AND CREDENTIALING MAR 2026.pdf PDF
S06 - 36C77626R0006 0003.pdf PDF
S06 - Amendment 0003 - ATT 1 - 517-22-700 Beckley EHRM - Final Bid Documents SPECS VOL 1 Rev 03-02-2026.pdf PDF
S06 - Amendment 0003 - ATT 2 - VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL-DEV MAR2026.pdf PDF
S06 - 36C77626R0006 0002.pdf PDF
S06 - 36C77626R0006 0001.pdf PDF
S06 - Amendment 0001 - ATT 1 - Site Visit Sign- In - Beckley EHRM IU.pdf PDF
S02 - 36C77626R0006.pdf PDF
S02 - Att 8 - Site Visit Information - Beckley VA Campus.pdf PDF
S02 - Att 5 - Limitations on Subcontracting - Beckley.pdf PDF
S02 - Att 7 - HEFP SEP Design Alerts 1-9 and 11-16.pdf PDF
S02 - Att 6 - WD - WV20260023 - 1.2.2026.pdf PDF
S02 - Att 1 - 517-22-700 Beckley EHRM - Final Bid Documents SPECS VOL 2 09-10-2025 Rev.pdf PDF
S02 - Att 8 - Site Visit Information - Beckley VA Campus.pdf PDF
S02 - 36C77626R0006.pdf PDF
S02 - Att 2 - 517-22-700 Beckley EHRM - Final Bid Documents SPECS VOL 1 09-10-2025_Rev.pdf PDF
S02 - Att 3 - 517-22-700 Beckley VAMC EHRM - Drawings VOL 1_09-10-2025.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

Revisions: Date:

/8

/4

/8

/2

/4

-1

/2

2345678910111213141516

B

C

D

E

F

G

H

J

K

1234561516

ARCHITECT / ENGINEER OF RECORD:CONSULTANTS:

CIVIL

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV 25401

(304) 266-3115

LIFE SAFETY

DAVID McCOY

8734 GALLOWAY TRAIL

NOVELTY, OH 44072

(619) 925-1647

ARCHITECT:

KEN JONES

421 KING ST. SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

891011121314

MEP / FP / STRUCTURAL

MICHAEL LONG

672 E. ROYALTON RD

BROADVIEW HEIGHTS, OH 44147

(440) 262-3070

ENVIRONMENTAL

MICHAEL SMITH

1340-B CHARWOOD RD SUITE B

HANOVER, MD 21076

(410) 859-4300

GEOTECH

DUSTIN SCHLEIFER

09/10/2025

517-22-700

CSKJ

EHRM INFRASTRUCTURE UPGRADES

FINAL BID DOCUMENTS

COVERSHEET VOL 2

GI200

-2

-7

G I2

/1

/2

.p d f

DEPARTMENT OF

VERTERANS AFFAIRS

EHRM INFRASTRUCTURE UPGRADES

BECKLEY VA MEDICAL CENTER

200 VETERANS AVENUE

BECKLEY, WV 25801

BECKLEY VA MEDICAL CENTER

200 VETERANS AVENUE

BECKLEY, WV 25801

FINAL BID DOCUMENTS

LOCATION MAP PROJECT DIRECTORY

Medical Center Director

Director of Facility Management Service

Medical Director

Project COR

Project CO

Infection Control

Safety Officer

APPROVALS

N

VOLUME 2

CONTRACTING OFFICER REPRESENTATIVE (COR)

Seth Buckland

Beckley VA Medical Center 200 Veterans Ave Beckley, WV 25801

(304) 255-2121 Ext. 4193 Seth.Buckland@va.gov

ARCHITECT

CB Design Group, INC 421 King St. Suite 301 Alexandria, VA 22314

(443) 388-7351 kjones@cbdg-ae.com

MEP/FP/STRUCTURAL ENGINEER

IMEG Corp.

101 S. Fifth Street, Suite 1640 Louisville, KY 40202

(502) 415-7814

(502) 321-3031 (mobile) case.a.hoskins@imegcorp.com

CONTRACTING SPECIALIST (CS)

Jessica Nehrenz

VHA Program Contracting Activity Central 6100 Oak Tree Blvd., Suite 490 Independence, OH 44131 Jessica.Nehrenz@va.gov

CONTRACTING OFFICER (CO)

Christopher Yong

VHA Program Contracting Activity Central 6100 Oak Tree Blvd., Suite 490 Independence, OH 44131 Christopher.yong@va.gov

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

Revisions: Date:

/8

/4

/8

/2

/4

-1

/2

2345678910111213141516

B

C

D

E

F

G

H

J

K

1234561516

ARCHITECT / ENGINEER OF RECORD:CONSULTANTS:

CIVIL

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV 25401

(304) 266-3115

LIFE SAFETY

DAVID McCOY

8734 GALLOWAY TRAIL

NOVELTY, OH 44072

(619) 925-1647

ARCHITECT:

KEN JONES

421 KING ST. SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

891011121314

MEP / FP / STRUCTURAL

MICHAEL LONG

672 E. ROYALTON RD

BROADVIEW HEIGHTS, OH 44147

(440) 262-3070

ENVIRONMENTAL

MICHAEL SMITH

1340-B CHARWOOD RD SUITE B

HANOVER, MD 21076

(410) 859-4300

GEOTECH

DUSTIN SCHLEIFER

09/10/2025

517-22-700

CSKJ

EHRM INFRASTRUCTURE UPGRADES

FINAL BID DOCUMENTS

LIST OF DRAWINGS - VOL 2

GI201

-2

-7

G I2

/0

/2

.p d f

BECKLEY VA MEDICAL CENTER

200 VETERANS AVENUE

BECKLEY, WV 25801

SHEET NO SHEET NAME

9.5 - GENERAL

GI200 COVERSHEET VOL 2

GI201 LIST OF DRAWINGS - VOL 2

10 - MECHANICAL

MH000 MECHANICAL COVERSHEET

01-MH100 BUILDING 1 - BASEMENT PLAN - MECHANICAL

01-MH101 BUILDING 1 - FIRST FLOOR PLAN - MECHANICAL

01-MH102 BUILDING 1 - SECOND FLOOR PLAN - MECHANICAL

01-MH103 BUILDING 1 - THIRD FLOOR PLAN - MECHANICAL

01-MH104 BUILDING 1 - FOURTH FLOOR PLAN - MECHANICAL

01-MH105 BUILDING 1 - FIFTH FLOOR PLAN - MECHANICAL

01-MH106 BUILDING 1 - SIXTH FLOOR PLAN - MECHANICAL

02-MH101 BUILDING 2 - BASEMENT, FIRST AND SECOND FLOOR PLANS - MECHANICAL

03-MH101 BUILDING 3 - FIRST AND SECOND FLOOR PLANS - MECHANICAL

04-MH101 BUILDING 4 - FIRST AND SECOND FLOOR PLANS - MECHANICAL

05-MH101 BUILDING 5 - FRST FLOOR PLAN - MECHANICAL

06-MH101 BUILDING 6 - BASEMENT AND FIRST FLOOR PLANS - MECHANICAL

07-MH100 BUILDING 7 - LOWER LEVEL 1 & 2 PLANS - MECHANICAL

07-MH101 BUILDING 7 - FIRST FLOOR PLAN - MECHANICAL

08-MH101 BUILDING 8 - GROUND AND FIRST FLOOR PLANS - MECHANICAL

14/15-MH101 BUILDING 14/15 - FIRST FLOOR PLAN - MECHANICAL

17-MH101 BUILDING 17 - FIRST FLOOR PLAN - MECHANICAL

29-MH101 BUILDING 29 - FIRST FLOOR PLAN - MECHANICAL

35-MH101 BUILDING 35 - GROUND AND FIRST FLOOR PLANS - MECHANICAL

PG-MH101 PARKING GARAGE - LOWER LEVEL AND FIRST FLOOR PLANS - MECHANICAL

PG-MH102 PARKING GARAGE - SECOND AND THIRD FLOOR PLANS - MECHANICAL

PG-MH103 PARKING GARAGE - FOURTH FLOOR PLAN - MECHANICAL

MH400 MECHANICAL DETAILS

MH600 MECHANICAL SCHEDULES

MH700 TEMPERATURE CONTROLS DIAGRAMS AND SEQUENCES

11 - PLUMBING

PL000 PLUMBING COVERSHEET

01-PL100 BUILDING 1 - BASEMENT PLAN - PLUMBING

01-PL101 BUILDING 1 - FIRST FLOOR PLAN - PLUMBING

01-PL102 BUILDING 1 - SECOND FLOOR PLAN - PLUMBING

01-PL103 BUILDING 1 - THIRD FLOOR PLAN - PLUMBING

01-PL104 BUILDING 1 - FOURTH FLOOR PLAN - PLUMBING

01-PL105 BUILDING 1 - FIFTH FLOOR PLAN - PLUMBING

01-PL106 BUILDING 1 - SIXTH FLOOR PLAN - PLUMBING

02-PL101 BUILDING 2 - BASEMENT, FIRST AND SECOND FLOOR PLANS - PLUMBING

03-PL101 BUILDING 3 - FIRST AND SECOND FLOOR PLANS - PLUMBING

04-PL101 BUILDING 4 - FIRST AND SECOND FLOOR PLANS - PLUMBING

05-PL101 BUILDING 5 - FIRST FLOOR PLAN - PLUMBING

06-PL101 BUILDING 6 - BASEMENT AND FIRST FLOOR PLANS - PLUMBING

07-PL100 BUILDING 7 - LOWER LEVEL 1 & 2 PLANS - PLUMBING

07-PL101 BUILDING 7 - FIRST FLOOR PLAN - PLUMBING

08-PL101 BUILDING 8 - GROUND AND FIRST FLOOR PLANS - PLUMBING

14/15-PL101 BUILDING 14/15 - FIRST FLOOR PLAN - PLUMBING

17-PL101 BUILDING 17 - FIRST FLOOR PLAN - PLUMBING

29-PL101 BUILDING 29 - FIRST FLOOR PLAN - PLUMBING

35-PL101 BUILDING 35 - GROUND AND FIRST FLOOR PLANS - PLUMBING

PG-PL101 PARKING GARAGE - LOWER LEVEL AND FIRST FLOOR PLAN - PLUMBING

PG-PL102 PARKING GARAGE - SECOND AND THIRD FLOOR PLAN - PLUMBING

PG-PL103 PARKING GARAGE - FOURTH FLOOR PLAN - PLUMBING

PL400 PLUMBING DETAILS

12 - FIRE PROTECTION

FX000 FIRE PROTECTION COVERSHEET

01-FX100 BUILDING 1 - BASEMENT PLAN - FIRE PROTECTION

01-FX101 BUILDING 1 - FIRST FLOOR PLAN - FIRE PROTECTION

01-FX102 BUILDING 1 - SECOND FLOOR PLAN - FIRE PROTECTION

01-FX103 BUILDING 1 - THIRD FLOOR PLAN - FIRE PROTECTION

01-FX104 BUILDING 1 - FOURTH FLOOR PLAN - FIRE PROTECTION

01-FX105 BUILDING 1 - FIFTH FLOOR PLAN - FIRE PROTECTION

01-FX106 BUILDING 1 - SIXTH FLOOR PLAN - FIRE PROTECTION

02-FX101 BUILDING 2 - BASEMENT, FIRST AND SECOND FLOOR PLANS - FIRE PROTECTION

03-FX101 BUILDING 3 - FIRST AND SECOND FLOOR PLANS - FIRE PROTECTION

04-FX101 BUILDING 4 - FIRST AND SECOND FLOOR PLANS - FIRE PROTECTION

05-FX101 BUILDING 5 - FIRST FLOOR PLAN - FIRE PROTECTION

06-FX101 BUILDING 6 - BASEMENT AND FIRST FLOOR PLANS - FIRE PROTECTION

07-FX100 BUILDING 7 - LOWER LEVEL 1 & 2 PLANS - FIRE PROTECTION

07-FX101 BUILDING 7 - FIRST FLOOR PLAN - FIRE PROTECTION

08-FX101 BUILDING 8 - GROUND AND FIRST FLOOR PLANS - FIRE PROTECTION

14/15-FX101 BUILDING 14/15 - FIRST FLOOR PLAN - FIRE PROTECTION

17-FX101 BUILDING 17 - FIRST FLOOR PLAN - FIRE PROTECTION

29-FX101 BUILDING 29 - FIRST FLOOR PLAN - FIRE PROTECTION

35-FX101 BUILDING 35 - GROUND AND FIRST FLOOR PLANS - FIRE PROTECTION

PG-FX101 PARKING GARAGE - LOWER LEVEL AND FIRST FLOOR PLANS - FIRE PROTECTION

PG-FX102 PARKING GARAGE - SECOND AND THIRD FLOOR PLANS - FIRE PROTECTION

PG-FX103 PARKING GARAGE - FOURTH FLOOR PLAN - FIRE PROTECTION

FX400 FIRE PROTECTION DETAILS

SHEET NO SHEET NAME

30 - ELECTRICAL

EP000 ELECTRICAL COVERSHEET AND SHEET INDEX

EP201 ELECTRICAL SITE PLAN

EP401 ELECTRICAL DETAILS

EP402 ELECTRICAL DETAILS

EP601 ELECTRICAL SCHEDULES

01-ED201 BUILDING 1 - OVERALL BASEMENT DEMO PLAN - ELECTRICAL

01-ED202 BUILDING 1 - FIRST FLOOR DEMO PLAN - ELECTRICAL

01-ED203 BUILDING 1 - SECOND FLOOR DEMO PLAN - ELECTRICAL

01-ED204 BUILDING 1 - THIRD FLOOR DEMO PLAN - ELECTRICAL

01-ED205 BUILDING 1 - FOURTH FLOOR DEMO PLAN - ELECTRICAL

01-ED206 BUILDING 1 - FIFTH FLOOR DEMO PLAN - ELECTRICAL

01-ED207 BUILDING 1 - SIXTH FLOOR DEMO PLAN - ELECTRICAL

01-EP201 BUILDING 1 - OVERALL BASEMENT PLAN - ELECTRICAL

01-EP202 BUILDING 1 - OVERALL FIRST FLOOR PLAN - ELECTRICAL

01-EP203 BUILDING 1 - OVERALL SECOND FLOOR PLAN - ELECTRICAL

01-EP204 BUILDING 1 - OVERALL THIRD FLOOR PLAN - ELECTRICAL

01-EP205 BUILDING 1 - OVERALL FOURTH FLOOR PLAN - ELECTRICAL

01-EP206 BUILDING 1 - OVERALL FIFTH FLOOR PLAN - ELECTRICAL

01-EP207 BUILDING 1 - OVERALL SIXTH FLOOR PLAN - ELECTRICAL

01-EP401 BUILDING 1 - ELECTRICAL ENLARGED PLANS

01-EP402 BUILDING 1 - ELECTRICAL ENLARGED PLANS

01-EP403 BUILDING 1 - ELECTRICAL ENLARGED PLANS

01-EP404 BUILDING 1 - ELECTRICAL ENLARGED PLANS

01-EP405 BUILDING 1 - ELECTRICAL ENLARGED PLANS

01-EP601 BUILDING 1 - ELECTRICAL ONE-LINE DIAGRAMS

01-EP602 BUILDING 1 - ELECTRICAL SCHEDULES

01-EP603 BUILDING 1 - ELECTRICAL SCHEDULES

01-EP604 BUILDING 1 - ELECTRICAL SCHEDULES

03-ED201 BUILDING 3 - FIRST FLOOR DEMO PLAN - ELECTRICAL

03-EP201 BUILDING 3 - FIRST FLOOR PLAN - ELECTRICAL

03-ED401 BUILDING 3 - ELECTRICAL ENLARGED PLANS

03-EP601 BUILDING 3 - ELECTRICAL SCHEDULES

04-ED201 BUILDING 4 - FIRST FLOOR DEMO PLAN - ELECTRICAL

04-EP201 BUILDING 4 - FIRST FLOOR PLAN - ELECTRICAL

04-EP401 BUILDING 4 - ELECTRICAL ENLARGED PLANS

04-EP601 BUILDING 4 - ELECTRICAL SCHEDULES

05-ED201 BUILDING 5 - FIRST FLOOR DEMO PLAN - ELECTRICAL

05-EP201 BUILDING 5 - FIRST FLOOR PLAN - ELECTRICAL

05-EP401 BUILDING 5 - ELECTRICAL ENLARGED PLANS

05-EP601 BUILDING 5 - ELECTRICAL SCHEDULES

06-ED201 BUILDING 6 - BASEMENT DEMO PLAN - ELECTRICAL

06-EP201 BUILDING 6 - BASEMENT PLAN - ELECTRICAL

06-EP202 BUILDING 6 - FIRST FLOOR PLAN - ELECTRICAL

06-EP401 BUILDING 6 - ELECTRICAL ENLARGED PLANS

06-EP601 BUILDING 6 - ELECTRICAL SCHEDULES

07-ED201 BUILDING 7 - FIRST FLOOR DEMO PLAN - ELECTRICAL

07-EP201 BUILDING 7 - FIRST FLOOR PLAN - ELECTRICAL

07-EP401 BUILDING 7 - ELECTRICAL ENLARGED PLANS

07-EP601 BUILDING 7 - ELECTRICAL SCHEDULES

08-ED201 BUILDING 8 - GROUND FLOOR DEMO PLAN - ELECTRICAL

08-ED202 BUILDING 8 - FIRST FLOOR DEMO PLAN - ELECTRICAL

08-EP201 BUILDING 8 - GROUND FLOOR PLAN - ELECTRICAL

08-EP202 BUILDING 8 - FIRST FLOOR PLAN - ELECTRICAL

08-EP401 BUILDING 8 - ELECTRICAL ENLARGED PLANS

08-EP601 BUILDING 8 - ELECTRICAL ONE LINE DIAGRAMS

08-EP602 BUILDING 8 - ELECTRICAL SCHEDULES

14/15-ED201 BUILDING 14/15 - FIRST FLOOR DEMO PLAN - ELECTRICAL

14/15-EP201 BUILDING 14/15 - FIRST FLOOR PLAN - ELECTRICAL

14/15-EP401 BUILDING 14/15 - ELECTRICAL ENLARGED PLANS

14/15-EP601 BUILDING 14/15 - ELECTRICAL ONE LINE DIAGRAMS

14/15-EP602 BUILDING 14/15 - ELECTRICAL SCHEDULES

29-EP201 BUILDING 29 - FIRST FLOOR PLAN - ELECTRICAL

29-EP401 BUILDING 29 - ELECTRICAL ENLARGED PLANS

29-EP601 BUILDING 29 - ELECTRICAL SCHEDULES

35-ED201 BUILDING 35 - GROUND DEMO PLAN - ELECTRICAL

35-ED202 BUILDING 35 - FIRST FLOOR DEMO PLAN - ELECTRICAL

35-EP201 BUILDING 35 - FIRST FLOOR PLAN - ELECTRICAL

35-EP202 BUILDING 35 - FIRST FLOOR PLAN - ELECTRICAL

35-EP401 BUILDING 35 - ELECTRICAL ENLARGED PLANS

35-EP601 BUILDING 35 - ELECTRICAL ONE LINE DIAGRAMS

35-EP602 BUILDING 35 - ELECTRICAL SCHEDULES

Grand total: 359

VOLUME 2

H

C

C

MECHANICAL GENERAL NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.

1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.

2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.

3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO

VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE

REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER

ACCESS.

5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO

COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR

EXPENSE TO OTHERS.

6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL

CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF

DESIGN.

7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY

AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING

MOUNTED DEVICES, OTHER THAN SPRINKLERS.

8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,

FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS

RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND

FINISH.

9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE

GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE

PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS

PANELS PRIOR TO BIDDING.

10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,

AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE

SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER

FOR OUTDOOR USE.

11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,

PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE

TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS

WITHIN ROOMS.

12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED

OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL

RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.

13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT

MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND

REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,

PIPING, DUCTWORK, ETC.

14. DO NOT BLOCK EQUIPMENT SERVICE CLEARANCES.

15. MAINTAIN A MINIMUM WORKING CLEARANCE OF 3’-6” IN FRONT OF ALL ELECTRICAL

EQUIPMENT REQUIRING MAINTENANCE, INSPECTION, AND TESTING INCLUDING BUT NOT

LIMITED TO PANELS, DISTRIBUTION PANELS, SWITCHBOARDS, MOTOR CONTROL CENTERS,

TRANSFORMERS, EQUIPMENT DISCONNECTS AND STARTERS.

16. MAINTAIN THE DEDICATED ELECTRICAL EQUIPMENT SPACE DEFINED BY THE WIDTH / DEPTH

OF ELECTRICAL EQUIPMENT MEASURED FROM THE FLOOR TO A HEIGHT 6’-0” ABOVE THE

EQUIPMENT OR THE STRUCTURAL CEILING, WHICHEVER IS LOWER. SYSTEMS FOREIGN TO

THE ELECTRICAL DISTRIBUTION SYSTEM ARE NOT ALLOWED IN THE DEDICATED

ELECTRICAL SPACE INCLUDING; DUCTWORK, PIPING, ETC.

17. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER

NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE

CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.

MECHANICAL RENOVATION NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.

1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD

SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND

REPORT ANY CONFLICTS BEFORE PROCEEDING.

2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS

BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.

3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE

FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD

CONDITIONS.

4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF THEIR WORK AND

SHALL NOTIFY THE ARCHITECT/ENGINEER PRIOR TO BIDDING IF OTHER UTILITIES ARE

REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO THEIR AREA OF WORK.

5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF

ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.

CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING.

6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF

CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL

CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO

BIDDING.

7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH

NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL

EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT

DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL

SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.

8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING

CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT

REMAIN ACTIVE.

9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY

REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW

SYSTEMS ARE INSTALLED.

10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR

TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND

CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY

DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.

11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT

THAT HAS BEEN REMOVED.

MECHANICAL PHASING NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.

1. REFER TO ARCHITECTURAL DRAWINGS FOR GENERAL DESCRIPTION OF PHASES. REFER TO

ARCHITECT'S INSTRUCTIONS FOR MORE DETAILS AND PHASING SCHEDULES AND FOR

CONCURRENT WORK. MECHANICAL, ELECTRICAL AND TECHNOLOGY DRAWINGS DEPICT

THE INTENT OF THE FINAL DESIGN. THE MECHANICAL, ELECTRICAL, AND TECHNOLOGY

DRAWINGS DO NOT DEPICT THE MEANS AND METHODS TO MEET THE REQUIREMENTS OF

THE PHASING CRITERIA.

2. REVIEW PROJECT PHASING PLANS TO COORDINATE DEMOLITION WORK, OUTAGES, ETC.

WITH AFFECTED ADJACENT AREAS.

3. PROVIDE TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ZONE VALVES, ZONE

ALARMS, ETC. AS NEEDED TO MAINTAIN SERVICE TO ALL AREAS DURING ALL PHASES OF

PROJECT.

4. INSTALL TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ETC. AS NECESSARY TO KEEP

ALL OCCUPIED SPACES OPERATIONAL THROUGHOUT ALL PHASES OF THE PROJECT

5. PHASE DEMOLITION WORK TO MINIMIZE DOWNTIME.

FIRE AND SMOKE SEPARATIONS MAY NOT ALL BE SHOWN ON THESE DOCUMENTS.

CONTRACTOR SHALL REVIEW THE ARCHITECTURAL PLANS AND DETERINE THE LOCATIONS OF

ALL FIRE AND SMOKE PARTITIONS, BARRIERS, AND WALLS. THIS INCLUDES FLOOR RATINGS.

PRICING SHALL INCLUDE ALL MATERIALS AND LABOR REQUIRED TO MAINTAIN THE RATINGS OF

ALL RATED SEPARATIONS, WHETHER SHOWN ON THE ENGINEERING PLANS OR NOT.

FIRE / SMOKE BARRIER DESIGNATIONS

MECHANICAL ABBREVIATION KEY

ABBR: DESCRIPTION:

DIFFERENTIAL PRESSURE GAUGE (RANGE)DPG (0-2")

DIFFERENTIAL PRESSURE SWITCHDPS

AD ACCESS DOOR

ABOVE FINISHED FLOORAFF

NOT IN CONTRACTNIC

CFSD CONTROL/FIRE/SMOKE DAMPER

EA EXHAUST/RELIEF AIR

FD FIRE DAMPER

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

FSD FIRE/SMOKE DAMPER

MA MIXED AIR

OA OUTSIDE AIR

RA RETURN AIR

SA SUPPLY AIR

SD SMOKE DAMPER

TRANSFER DUCTTD

UC-1 DOOR UNDERCUT BY OTHERS (1" TYPICAL)

ECFSD EXISTING CONTROL FIRE SMOKE DAMPER

EFD EXISTING FIRE DAMPER

EFSD EXISTING FIRE SMOKE DAMPER

ESD EXISTING SMOKE DAMPER

TERMINAL AIR BOXTAB

TYPICALTYP

UON UNLESS OTHERWISE NOTES

NORMALLY CLOSEDN.C.

NORMALLY OPENN.O.

PRESSURE SWITCHPS

MIXING VALVEMV

ELECTRICAL TO PNEUMATIC VALVEEP

CO CLEANOUT

C COMMON

SCCR SHORT CIRCUIT CURRENT RATING

PROJECT ALTITUDE: 2,418 FT. ABOVE SEA LEVEL

MECHANICAL DESIGN CONDITIONS:

SUMMER:

WINTER:

DESIGN CONDITIONS:

INDOOR DESIGN CONDITIONS:

BASED ON WEATHER DATA FOR: BECKLEY, WEST VIRGINIA

IT EQUIPMENT INLET: 41-95°F DRY BULB, 8-80% RELATIVE HUMIDITY

TR SPACES: 64-81°F DRY BULB, 6-60% RELATIVE HUMIDITY

TE ENVIRONMENT: 41-95°F DRY BULB, 8-80% RELATIVE HUMIDITY, <82.4°F DEW POINT

REFER TO CONTROL DIAGRAMS FOR ROOM SPECIFICS.

84.8°F DRY BULB, 69.7°F WET BULB

7.5°F DRY BULB

OCCUPANCY SENSORO

HUMIDISTAT SENSOR

CARBON MONOXIDE SENSOR

CARBON DIOXIDE SENSOR

H HUMIDISTAT / SENSOR

TEMPERATURE SENSOR WITH WELL

T

THERMOMETER WITH WELL (DIAL TYPE)T

THERMOMETER WITH WELL (FILLED TYPE)

DIRECTION OF AIR FLOW

FLEXIBLE DUCT

MANUAL VOLUME DAMPER

RISE IN DIRECTION OF AIR FLOWR

DUCT CAP

DROP IN DIRECTION OF AIR FLOWD

DUCT DOWN

DUCT UP

SUPPLY/OUTSIDE AIR DUCT SECTION

RETURN AIR DUCT SECTION

EXHAUST/RELIEF AIR DUCT SECTION

4-WAY DIFFUSER WITH BLANKOFF IN ONE DIRECTION

SD-1

6/115

AIR TERMINAL PROPERTIES SYMBOL

NECK SIZE/CFM

TERMINAL AIR BOX (REFER TO SCHEDULE)###

### TERMINAL AIR BOX w/REHEAT COIL (REFER TO SCHEDULE)

HUMIDIFIERH

OPPOSED BLADE DAMPER (REFER TO SCHEDULE)

PARALLEL BLADE DAMPER (REFER TO SCHEDULE)

DIFFERENTIAL PRESSURE SENSOR

PRESSURE SENSOR/MONITORP

PRESSURE SENSOR (DUCT MOUNTED)P

THERMOSTAT/SENSORT

TEMPERATURE SENSORT

THERMOSTAT/SENSOR WITH HEAVY DUTY ENCLOSURET

MECHANICAL SYMBOL LIST

SYMBOL: DESCRIPTION:

AIRFLOW MEASUREMENT SYMBOL

XX - AHU SYMBOL

Y - SEQUENTIAL NUMBER

XX-Y

NOT ALL SYMBOLS MAY APPLY.

FAN POWERED TERMINAL AIR BOX w/REHEAT COIL

(REFER TO SCHEDULE)

CONTROL VALVE (TWO-WAY)

PITCH PIPE IN DIRECTION

DIELECTRIC CONNECTION

UNION/FLANGE

BALANCING VALVE (NUMBER INDICATES GPM)

PIPE CAP

PIPE DOWN

PIPE UP OR UP/DOWN

DIRECTION OF FLOW IN PIPE

SHUTOFF VALVE NORMALLY OPEN

SHUTOFF VALVE NORMALLY CLOSED

THROTTLING VALVE

AUTOMATIC BALANCING VALVE

MIXING VALVE

CONTROL VALVE (THREE-WAY)

SOLENOID VALVE

CHECK VALVE

SAFETY/RELIEF VALVE

PRESSURE REDUCING VALVE (LIQUID/GAS)

PRESSURE REDUCING VALVE (STEAM)

TRIPLE DUTY VALVE (ANGLE TYPE)

TRIPLE DUTY VALVE (IN-LINE TYPE)

VACUUM BREAKER

"WYE" - STRAINER

"WYE" - STRAINER W/SHUTOFF VALVE AND HOSE CONNECTION WITH CAP

BASKET STRAINER

FLEXIBLE CONNECTION

PRESSURE/TEMPERATURE TEST PLUG

REDUCER - REFERENCE SPECIFICATION

FOR CONCENTRIC/ECCENTRIC AND FOT/FOB

SUCTION DIFFUSER WITH SUPPORT FOOT

AUTOMATIC AIR VENT

MANUAL AIR VENT

DRAIN VALVE WITH HOSE CONNECTION AND CAP

T T-*

STEAM TRAP (REFER TO SCHEDULE)

T-*

F&T STEAM TRAP (REFER TO SCHEDULE)

T-*

INVERTED BUCKET STEAM TRAP (REFER TO SCHEDULE)

ALIGNMENT GUIDE

PIPE ANCHOR

EXPANSION JOINT

#.#" IS THE EXPANSION TRAVEL INCHES

COMPRESSED AIRCA

HEATING/CHILLED WATER RETURNHCR

CONDENSER WATER RETURNCR

CONDENSER WATER SUPPLYCS

CHILLED WATER RETURNCWR

CHILLED WATER SUPPLYCWS

NATURAL GASG

GLYCOL WATER RETURNGWR

GLYCOL WATER SUPPLYGWS

HIGH PRESSURE CONDENSATE (>125 TO 250 PSIG)HPC

HEATING WATER RETURNHWR

HEATING WATER SUPPLYHWS

REFRIGERANT LIQUIDLIQ

LOW PRESSURE CONDENSATE (0 TO 15 PSIG)LPC

FUEL OIL RETURNFOR

FUEL OIL SUPPLYFOS

PUMPED CONDENSATEPC

PUMPED DISCHARGEPD

REHEAT WATER RETURNRWR

REHEAT WATER SUPPLYRWS

REFRIGERANT SUCTIONSUC

SAFETY RELIEF VENTSV

HIGH PRESSURE STEAM (>125 TO 250 PSIG)HPS

LOW PRESSURE STEAM (0 TO 15 PSIG)LPS

DRAINDPP

GAS REGULATOR VENTGV

LAB VACUUMVAC

MEDICAL VACUUMMV

METERM

PUMP

STATIC SWITCH

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P

DIFFERENTIAL PRESSURE SENSOR

PRESSURE SENSOR (FURNISHED WITH BALL VALVE)P

MECHANICAL SYMBOL LIST

SYMBOL: DESCRIPTION:

NOT ALL SYMBOLS MAY APPLY.

SP

BACKFLOW PREVENTER

EJ-#

MEDIUM PRESSURE CONDENSATE (>15 TO 125 PSIG)MPC

MEDIUM PRESSURE STEAM (>15 TO 125 PSIG)MPS

REFRIGERANTREF

PLAN OR DETAIL NUMBER

(INDICATES LOCATION IN SHEET GRID)

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

A1

VIEW NAME

1/8" = 1'-0"

M101

SIMSIM

INDICATES SIMILAR DETAIL REFERENCED

IN MULTIPLE LOCATIONS

LEVEL NAME

10'-0" HEIGHT ABOVE

PROJECT 0'-0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

VIEW KEY

LINE TYPE AND TAG KEY:

NEW WORK BY THIS CONTRACTOR (WIDE LINE)

NEW

EXISTING TO BE REMOVED (SHORT DASHED PATTERN)

NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)

EXISTING

EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)

EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

HALFTONING DOES NOT MODIFY SCOPE.

'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING

TAG UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL

INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST

INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL

T101

APPLICABLE CODES

CONTRACTOR SHALL COMPLY WITH APPLICABLE CODES AND LOCAL AMENDMENTS.

REFER TO ARCHITECTURAL GENERAL AND LIFE SAFETY DRAWINGS FOR LIST OF APPLICABLE

CODES.

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

Revisions: Date:

/8

/4

/8

/2

/4

-1

/2

2345678910111213141516

B

C

D

E

F

G

H

J

K

1234561516

ARCHITECT / ENGINEER OF RECORD:CONSULTANTS:

CIVIL

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV 25401

(304) 266-3115

LIFE SAFETY

DAVID McCOY

8734 GALLOWAY TRAIL

NOVELTY, OH 44072

(619) 925-1647

ARCHITECT:

KEN JONES

421 KING ST. SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

891011121314

MEP / FP / STRUCTURAL

JIM KAPPELER

15 SUNNEN DRIVE, SUITE 104

ST. LOUIS, MO 63143

(314) 390-6398

ENVIRONMENTAL

MICHAEL SMITH

1340-B CHARWOOD RD SUITE B

HANOVER, MD 21076

(410) 859-4300

GEOTECH

DUSTIN SCHLEIFER

09/10/2025

517-22-700

SMPCAH

EHRM INFRASTRUCTURE UPGRADES

FINAL BID DOCUMENTS

MECHANICAL COVERSHEET

MH000

-2

-7

M H

/0

/1

.p d f

BECKLEY VA MEDICAL CENTER

200 VETERANS AVENUE

BECKLEY, WV 25801

MECHANICAL SHEET INDEX

MH000 MECHANICAL COVERSHEET

01-MH100 BUILDING 1 - BASEMENT PLAN - MECHANICAL

01-MH101 BUILDING 1 - FIRST FLOOR PLAN - MECHANICAL

01-MH102 BUILDING 1 - SECOND FLOOR PLAN - MECHANICAL

01-MH103 BUILDING 1 - THIRD FLOOR PLAN - MECHANICAL

01-MH104 BUILDING 1 - FOURTH FLOOR PLAN - MECHANICAL

01-MH105 BUILDING 1 - FIFTH FLOOR PLAN - MECHANICAL

01-MH106 BUILDING 1 - SIXTH FLOOR PLAN - MECHANICAL

02-MH101 BUILDING 2 - BASEMENT, FIRST, AND SECOND FLOOR PLANS - MECHANICAL

03-MH101 BUILDING 3 - FIRST AND SECOND FLOOR PLANS - MECHANICAL

04-MH101 BUILDING 4 - FIRST AND SECOND FLOOR PLANS - MECHANICAL

05-MH101 BUILDING 5 - FIRST FLOOR PLAN - MECHANICAL

06-MH101 BUILDING 6 - BASEMENT AND FIRST FLOOR PLANS - MECHANICAL

07-MH100 BUILDING 7 - LOWER LEVEL 1 & 2 PLANS - MECHANICAL

07-MH101 BUILDING 7 - FIRST FLOOR PLAN - MECHANICAL

08-MH101 BUILDING 8 - GROUND AND FIRST FLOOR PLANS - MECHANICAL

14/15-MH101 BUILDING 14/15 - FIRST FLOOR PLAN - MECHANICAL

17-MH101 BUILDING 17 - FIRST FLOOR PLAN - MECHANICAL

29-MH101 BUILDING 29 - FIRST FLOOR PLAN - MECHANICAL

35-MH101 BUILDING 35 - GROUND AND FIRST FLOOR PLANS - MECHANICAL

PG-MH101 PARKING GARAGE - LOWER LEVEL AND FIRST FLOOR PLANS - MECHANICAL

PG-MH102 PARKING GARAGE - SECOND AND THIRD FLOOR PLANS - MECHANICAL

PG-MH103 PARKING GARAGE - FOURTH FLOOR PLAN - MECHANICAL

MH400 MECHANICAL DETAILS

MH600 MECHANICAL SCHEDULES

MH700 TEMPERATURE CONTROLS DIAGRAMS AND SEQUENCES

GRAND TOTAL: 26

24649P R

O

FESSIONAL ENGIN

EE

RSTATE OF

SNI

KSOHAESAC DERETSIGER

W

EST V IRGIN

IA

x

CONCR ETE SIDEWALK

C O N C R

ET

E

S

ID

E W A L K

C O

NC

R

ETE

SI DE

WA

LK

TL

O

F

-2"

+4'-6"

F.E

F.E o

H T

H T

T T

H

SITE KEY PLAN

N

SCALE: NOT TO SCALE

N

TRUE

NORTH

N

PLAN

NORTH

MCR

BB-125EMERGENCY

GENERATOR

BB-114

EMERGENCY

GENERATOR

BB-113

MEDICAL

GAS

BB-112

MECH

BB-109

ANATOMICAL

PATHOLOGY

TEACHING

FACILITY

BB-110

HSK

BB-111

ENGG

MAINT RM

BB-115

STAFF

TOILET

BB-110

STAIR 2

ST-2

HSK

BB-123B

SUPERVISOR

OFFICE

BB-123A

FOOD SERV

CHIEF

BB-124A

DIETICIAN

OFFICE

BB-124

LOCKER

BB-116

MECH

BB-123D

FREEZER

BB-134B

FREEZER

BB-134

SALAD

PREP

BB-133

NOURISHMENT

STORAGE

BB-132

TELEPHONE

SWITCH

ROOM

BB-130OFFICE

BB-131

KITCHEN

BB-123

FREEZER

BB-108

AUTOPSY

BB-107

STOR

BB-106

LAUNDRY

CHUTE

BB-105

STORAGE

BB-104

STAIR 1

BB-142

MECH

BB-103

MECH

BB-102

EQUIP

STORAGE

BB-101

EQUIP

CLEANING

BB-100

MECH

BB-123C

PUMP

BB-135

DRY

STORAGE

BB-135A

STORAGE

BB-136

FREEZER

BB-137

FREEZER

BB-137A

FREEZER

BB-138

STORAGE

BB-139

OFFICE

BB-123D

SPD STOR

BC-105B

SPD OR

SUPPLY

BC-105

OFFICE

BC-105A

HAZ WASTE

STOR

BC-104A

CHEM STOR

BC-104B

STORAGE

BC-104C

OFFICE

BC-104G

WAREHOUSE

BC-104

LOCKER

BC-104D CHEM SPILL

KIT

BC-104E

ELEC

BC-104F

SEWING

BC-103

LINEN STOR

BC-102B

LINEN STOR

BC-102

HOUSEKEEPING

OFFICE

BC-101A

HOUSEKEEPING

MEETING

RM

BC-101

PUMP

ROOM

BC-100

STORAGE

BA-123

MECH

BA-122

SPD STOR

BA-121

STORAGE

BA-124

LOBBY

BA-120

TELLER

BA-120A

MANAGER

OFFICE

BA-120C

OFFICE

BA-120F

STORAGE

BA-120E

BREAK

BA-120I

STOR

BA-120D

VAULT

BA-120B

PRINTER

ROOM

BA-117

MECH

BA-118

MECH

BA-119

PHARM

STOR

BC-107D

LOCKER

BC-107C

OFFICE

BC-107F

OFFICE

BC-107E

STORAGE

BC-107

OFFICE

BC-107G

WAREHOUSE

BC-107H

WAREHOUSE

BC-107I

STAIR 7

BB-144

OFFICE

BC-110

OFFICE

BC-108E

OFFICE

BC-108B

HKC

BC-108A

BREAK

ROOM

BC-109

SPD

STORAGE

BC-108

STEAM

ROOM

BC-108H

HSK

BA-108C

DECONT

BA-103

PREP RM

BC-108I

MECH

BB-158

ETO

STERILIZATION

BC-108K

RETAIL

BC-114

STOCK

ROOM

BC-114B

ELEC

BC-115

FREEZER

BC-111D KITCHEN

BC-111

STORAGE

BC-111A

CANTEEN

BC-112

STORAGE

BC-112A

HSK

BC-111C

RETAIL

OFFICE

BC-114A

SERVING

BC-111B

CAFE

BC-113

STAIR 5

BB-145

RETAIL

STOR

BA-105

STAIR 3

BB-146

MAIL ROOM

BA-100A

POST

OFFICE

BA-100

MAIL

SORTING

BA-101

STOR

BA-101A

COMM

CLOSET

BA-101B

ABATOR

BA-103A

STORAGE

BA-117A WOMEN'S

LOCKER

BA-115C

HSK

BA-116

MEN'S

LOCKER

BA-114

STAIR 6

BB-147

SPRINKLER

BA-112

HSK / ELEC

BA-111

OFFICE

BA-110

WAITING

BA-109

OPTICAL

BA-109B

CANTEEN

STOR

BA-109A

CANTEEN

STOR

BA-109C

MECH

BA-126

TR

BA-126A

WOMEN'S

SHOWER

BB-148

WOMEN'S

SHOWER

BB-149

WOMEN'S

TOILET

BB-150

MEN'S

TOILET

BB-151

MEN'S

SHOWER

BB-152

WOMEN'S

TOILET

BB-153

MEN'S

TOILET

BB-154

MEN'S

LOCKER

BB-155

WOMEN'S

LOCKER

BB-156

STAFF

LOCKER

BB-157

TR

BC-101B

OFFICE

BB-119

OFFICE

BB-120

OFFICE

BB-120A

OFFICE

BB-121

OFFICE

BB-122

OFFICE

BB-117

OFFICE

BB-118

STOR

BB-122A

OFFICE

BB-128

OFFICE

BB-127

ENTRANCE

BB-125

OFFICE

BB-125A

OFFICE

BB-126

OFFICE

BB-126A

FREEZER

BB-134A

OXYGEN

VALVE

BB-119A

MECH

CHASE

BB-117A

TR

BB-139A

NUTRITION

CARTS

BB-123E

01-MH100

D3

01-MH100

B6

01-MH100

G601-MH100

D6

R E

F

/4

"C D

STORAGE

BB-139

8x6 SA

6x6 EA

STORAGE

BB-139

TR

BB-139A

SS-1-BB139A

SG-1

8x6/50

8x6 SA

6x6 EA

STORAGE

BB-139

TR

BB-139A

SS-1-BB139A

REF

3/4"CD

TR

BA-126A

CRU-1-AC-27

16x10 EA

16x10 OA

RG-E

12x12/600 x1

S

A

SG-E

24x12/600

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

Revisions: Date:

/8

/4

/8

/2

/4

-1

/2

2345678910111213141516

B

C

D

E

F

G

H

J

K

1234561516

ARCHITECT / ENGINEER OF RECORD:CONSULTANTS:

CIVIL

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV 25401

(304) 266-3115

LIFE SAFETY

DAVID McCOY

8734 GALLOWAY TRAIL

NOVELTY, OH 44072

(619) 925-1647

ARCHITECT:

KEN JONES

421 KING ST. SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

891011121314

MEP / FP / STRUCTURAL

JIM KAPPELER

15 SUNNEN DRIVE, SUITE 104

ST. LOUIS, MO 63143

(314) 390-6398

ENVIRONMENTAL

MICHAEL SMITH

1340-B CHARWOOD RD SUITE B

HANOVER, MD 21076

(410) 859-4300

GEOTECH

DUSTIN SCHLEIFER

09/10/2025

517-22-700

SMPCAH

EHRM INFRASTRUCTURE UPGRADES

FINAL BID DOCUMENTS

BUILDING 1 - BASEMENT PLAN -

MECHANICAL

01-MH100

-2

-7

-M

H

/0

/2

.p d f

BECKLEY VA MEDICAL CENTER

200 VETERANS AVENUE

BECKLEY, WV 25801

1/16" = 1'-0"

BUILDING 1 - OVERALL BASEMENT PLAN - MECHANICAL

A12

MECHANICAL SHEET NOTES:

1. DRIP PANS TO BE PROVIDED UNDER ALL

EXISTING HYDRONIC, PLUMBING, AND FIRE

PROTECTION PIPING OVERHEAD IN TR

SPACES. FOR CLARITY, DRIP PANS ARE ONLY

SHOWN ON PLUMBING DRAWINGS.

MECHANICAL CONTRACTOR SHALL

COORDINATE WITH PLUMBING CONTRACTOR

TO VERIFY ALL EXISTING AND NEW PIPING

OVERHEAD ARE PROVIDED WITH DRIP PAN

COVERAGE.

2. DO NOT SPILL CONDENSATE PIPING INTO DRIP

PANS OVER TR SPACES. COORDINATE

INSTALLATION OF REFRIGERANT AND

CONDENSATE PIPING WITH DRIP PAN

LOCATIONS. AVOID PENETRATIONS OF NEW

DRIP PANS. SEAL ANY NECESSARY

PENETRATIONS WATER TIGHT.

3. TEMPERATURE CONTROLS CONTRACTOR

SHALL COORDINATE LOCATION OF ALL DRIP

PANS FOR LEAK DETECTION MONITORING.

4. TEMPERATURE CONTROLS CONTRACTOR

SHALL BE RESPONSIBLE FOR INTEGRATION OF

MONITORING OF ALL TEMPERATURE AND

HUMIDITY SENSORS INTO EXISTING FACILITY

CONTROLS SYSTEM.

5. ELECTRICAL AND TELECOMMUNICATIONS

EQUIPMENT SHOWN FOR REFERENCE ONLY.

1/4" = 1'-0"

MECH. DEMOLITION - NUT. CART BB-139

G6

NO SCALE

VENTILATION - TR BB-139A

D6

1/4" = 1'-0"

PIPING - TR BB-139A

B6

1/4" = 1'-0"

VENTILATION - TR BA-126A

D3

KEYNOTES:

1. DEMOLISH EXISTING DUCTWORK TO POINT

INDICATED AND CAP. SEAL DUCTWORK AND

REPAIR INSULATION AS REQUIRED.

2. DEMOLISH ABANDONED REFRIGERANT PIPING

COMPLETE.

3. EXISTING LIEBERT CRAC UNIT AND DUCTWORK

TO REMAIN.

4. INSTALL NEW SPLIT SYSTEM ON WALL PER

MANUFACTURER'S INSTRUCTIONS.

COORDINATE EXACT LOCATION WITH

ELECTRICAL AND TELECOMMUNICATIONS

CONTRACTORS. ROUTE REFRIGERANT PIPING

AS INDICATED, SIZED AND INSULATED PER

MANUFACTURER'S RECOMMENDATIONS.

5. FURNISH AND INSTALL WALL-MOUNTED

COMBINATION TEMPERATURE/HUMIDITY

SENSOR. REFER TO SHEET MH700.

6. FURNISH AND INSTALL WALL-MOUNTED

COMBINATION TEMPERATURE/HUMIDITY

SENSOR ADJACENT TO EXISTING LIEBERT

WALL CONTROLLER. SENSOR TO BE USED FOR

MONITORING ONLY. REFER TO A9/MH700.

7. REF PIPING UP THROUGH FLOOR ABOVE.

REFER TO SHEET 01-MH101.

8. ROUTE CONDENSATE PIPING ABOVE CEILING

TO EQUIPMENT ROOM. TURN PIPING DOWN

WALL AND ROUTE TO NEAREST FLOOR DRAIN.

TERMINATE PIPING WITHIN FLOOR DRAIN.

PIPING SHALL NOT BE ROUTED SUCH THAT A

TRIP HAZARD IS CREATED.

24649P R

O

FESSIONAL ENGIN

EE

RSTATE OF

SNI

KSOHAESAC DERETSIGER

W

C O N C R

ET

E

S

ID

E W A L K

C O

NC

R

ETE

SI DE

WA

LK

TLO

F

-2"

+4'-6"

F.E

F.E o

UP

RAMP DN

RAMP DN

CORRIDOR

H T

H T

SITE KEY PLAN

N

SCALE: NOT TO SCALE

N

TRUE

NORTH

N

PLAN

NORTH

CENTRAL

INTAKE

1A-154A

CLERK

1A-154B

LEAD

CLERK

1A-150B

OFFICE

1A-150

OFFICE

1A-149A

OFFICE

1A-149

OFFICE

1A-148

BILLING

OFFICE

1A-147A

CPAC

BILLING

1A-147B

ELEC

CLOSET

1A-146

WAITING

INTAKE

1A-154

OFFICE

1A-153

OFFICE

1A-152

OFFICE

1A-150A

SWITCH

BOARD

1A-155

CLOSET

1A-156A

STOR

1A-156

AUDIOLOGY

ROOM

1A-157A

AUDIOLOGY

ROOM

1A-157B

AUDIOLOGY

ROOM

1A-157C

HIMS

1A-142

OFFICE

1A-144

HIMS

1A-143

OFFICE

1A-145

WAITING

1BF-106

TELE

RETINAL

EXAM

1BF-117

EYE EXAM

1BF-116

EYE EXAM

SURGICAL

PROCEDURE

1BF-115

OPTOMETRY

1BF-114

MINOR

PROCEDURES

1BF-113

SURGY

1BF-112

SURGY

1BF-111

SURGY

1BF-110

SURGY

1BF-109

EYE WORK

UP

1BF-108

EYE WORK

UP EXAM

1BF-107

STERILE

SUPPLY

1BF-101

DIRTY

UTILITY

1BF-103

RECEPTION

1BF-104

ELEC

1BF-102

WORK

STATION

1BF-118

EXAM /

VISUAL

FIELD

1BF-110

PATIENT

TOILET

1BF-105

OFFICE

1B-115

OFFICE

1B-114

OFFICE

1B-113

OFFICE

1B-112C

CONFERENCE

1B-112B

EXAM

1B-112A

OFFICE

1B-112

OFFICE

1B-100

OFFICE

1B-103

STORAGE

1B-104

OFFICE

1B-105

OFFICE

1B-108

EXAM

1B-115A

EXAM

1B-116

EXAM

1B-116A

EXAM

1B-117

PATIENT

TOILET

1B-117A

EXAM

1B-118

EXAM

1B-119

PROSTHETICS

1B-119A

CONFERENCE

1B-122

ARMORY

1B-124L

GUN CLEAN

1B-124F

TOILET

1B-124E

BREAK

1B-124D

LOCKER

1B-124G

EVIDENCE

1B-124J

OFFICE

1B-122A

OFFICE

1B-123

OFFICE

1B-123A

POLICE

OPERATIONS

OFFICE

1B-124H

HOLDING

CELL

1B-124I

CORRIDOR

1B-124

STOR

1B-124J

ELEC

1B-124C

DISPATCH

1B-124K

OFFICE

1B-124B

OFFICE

1B-124A

OFFICE

1B-109

OFFICE

1B-110

VOLUNTEER

INFO

1B-111

OFFICE

1B-102

STOR

1B-102A

INFO

1B-121

WAITING

1B-121A

OFFICE

1B-120D

OFFICE

1B-120A

CHAPEL

1B-120

AH-3

1B-120B

STOR

1B-120C

NICHE

1B-120E

SACRISTY

1B-126A

WAITING

1B-127

WAITING

1B-130

CHECK-IN /

RECEPTION

1B-131

CHECK-IN /

RECEPTION

1B-126

STAFF

TOILET

1B-143G

STOR

1B-143H

TOILET

1A-155A

SUPPLY

1A-159

TREAT

1A-158

TREAT

1A-161

CLINICAL

ROOM

1A-162

EXAM

1A-163A

PHYSICIAN

OFFICE

1A-163

STAFF

TOILET

1A-164D

ONCOLOGY

WAITING

1A-164A

WAITING

1A-164

CLERK

OFFICE

1A-164B

BREAK

1A-164C

TREATMENT

AREA

1A-164E

RECEPTION

1A-164F

PATIENT

TOILET

1A-160

EXAM

1B-132

EXAM

1B-132A

CONF

1B-132B

EXAM

1B-132C

PATIENT

TOILET

1B-133

OFFICE

1B-134

OFFICE

1B-134A

EXAM

1B-134B

EXAM

1B-135

CLINIC

1B-136

CLINIC

NURSE

1B-137

CLINIC

NURSE

1B-137A

WOMEN

TOILET

1B-139

MEN TOILET

1B-140

STAIR 2

ST-2

OFFICE

1B-141

OFFICE

1B-142

OFFICE

1B-143

OFFICE

1B-144

OFFICE

1B-145

HAC

1B-145A

TELECOM

1A-124 & 124A

FIRE

CONTROL

1A-139

STAFF

BREAK

1A-135

STAFF

TOILET

1A-135A

OFFICE

1A-136

STOR

1A-137

TRAUMA

1A-134

WOMEN'S

EXAM

1A-127

TOILET

1A-127A

RECEPTION

1A-140

REGISTRATION

WORKROOM

1A-141

CHECK-IN

1A-141A

CHECK-IN

1A-141B

CHECK-IN

1A-141C

TRIAGE

1A-126

ELEC

1A-120B

NOURISH

1A-120A

TRIAGE /

EXAM

1A-120

MEDICATION

1A-131C

ISOLATION

1A-132

TOILET

1A-132A

TOILET

1A-138

NURSES

STATION

1A-133A

NURSES

STATION

1A-133

OBSERV /

TREAT

1A-133

TOILET

1A-133A

OB/Y TREAT

1A-131F

OB/Y TREAT

1A-131E

OB/Y TREAT

1A-131D

OB/Y TREAT

1A-131C

OB/Y TREAT

1A-131B

OB/Y TREAT

1A-131A

TOILET

1AB-118

EXAM

1AB-119

PHYSICIANS

OFFICE

1AB-117

EXAM

1AB-116

NURSE

OFFICE

1AB-115

CHIEF OF

PHARMACY

1AB-114

OFFICE

1AB-111

STOR

1AB-133

HOUSE

KEEPING

1AB-108

NURSE

OFFICE

1AB-120

EXAM

1AB-123

NURSE

OFFICE

1AB-121

EXAM

1AB-122

EXAM

1AB-124

BREAK

1AB-125

TOILET

1AB-125A

STAIR 4

ST-4

PHYSICIANS

OFFICE

1AB-129

CLINIC

1AB-128

EXAM

1AB-126

OFFICE

1AB-127

ELEC

1AB-127A

OFFICE

1AB-131

EXAM

1AB-130

TOILET

1AB-143B

SATELLITE

BROADCASTING

/ STORAGE

1AB-143C

LIBRARIAN

1AB-143E

SATELLITE

BROADCASTING

/ STORAGE

1AB-143F

TOILET

1AB-143H

LIBRARY

1AB-143A

MECH

1AB-143I

AUDITORIUM

1AB-143

KITCHEN

1AB-135

BREAK

1AB-109

MEN'S

ROOM

1AB-109A

WOMEN'S

ROOM

1AB-109B

ASSIST

CHIEF

1AB-110

ANTI CLINIC

1AB-112

ANTI CLINIC

1AB-113

STOR

1AB-134A

TR

1AB-134

PHARMACY

STORAGE

1AB-100

PHARMACY

1AB-102

VAULT

1AB-105

CONFERENCE

1A-101

ELEC

1AB-101

PHARMACY

WAITING

1A-103

WAITING

1A-143

OFFICE

1A-100A

PHARMACY

PHONE

OFFICE

1A-102A

PHARMACY

RECEIVING /

STORAGE

1A-103

MAIL COPY

1A-165 VACCINE

COORDIATOR

1A-166

OFFICE

1A-168

CASHIER

1A-169

CLERKS

1A-117A

CHECK-IN

1A-117

CLERKS

1A-119

X-RAY

1A-121

CLEAN

UTILITY

1A-129

SOILED

UTILITY

1A-128

TOILET

1A-125

STOR

1A-125

STAIR 6

ST-6

EXAM

1A-122

OFFICE

1A-116A

OFFICE

1A-115

CONF

1A-116

OFFICE

1A-114B

OFFICE

1A-114A

OFFICE

1A-114

STORAGE

1A-105

SOILED

UTILITY

1A-106

HKC

1A-107

OFFICE

1A-108

OFFICE

1A-109

EXAM

1A-110

RECEPTION

1A-111

EXAM

1A-111B

EXAM

1A-111A

STAIR 5

ST-5

LOCKER

1A-100

NUTRITION

CLINIC

1A-100B

CLOSET

1A-167

TOILET

1AB-104

AMBULANCE

ENTRANCE

1A-E1

MECHANICAL

1A-113

OFFICE

1A-175

OFFICE

1A-176

MEN'S

TOILET

1A-173

WOMEN'S

TOILET

1A-172

STAIR 3

ST-3

STAIR 1

ST-1

STAIR 7

ST-7

TR

1B-146

01-MH101

D6

01-MH101

G6

01-MH101

D3

CU-1-BB139A

CU-1-4AB116

CU-1-6B116

CU-1-1B146

CU-1-2B144D

CU-1-5AB112

CU-1-3AB127

REF

HAC

1B-145A x9

E A

24x42 EA

24x60 EA

1"MPS

1"MPS

x6

S A

13x6 OA

HAC

1B-145A

TR

1B-146

SS-1-1B146

SG-1

8x6/50

EG-1

6/75 x9

E A60x24 EA

42x24 EA x6

S A

13x6 OA

HAC

1B-145A

TR

1B-146

SS-1-1B146

3/4"CD

REF

3/4"CD

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

Revisions: Date:

/8

/4

/8

/2

/4

-1

/2

2345678910111213141516

B

C

D

E

F

G

H

J

K

1234561516

ARCHITECT / ENGINEER OF RECORD:CONSULTANTS:

CIVIL

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV 25401

(304) 266-3115

LIFE SAFETY

DAVID McCOY

8734 GALLOWAY TRAIL

NOVELTY, OH 44072

(619) 925-1647

ARCHITECT:

KEN JONES

421 KING ST. SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

891011121314

MEP / FP / STRUCTURAL

JIM KAPPELER

15 SUNNEN DRIVE, SUITE 104

ST. LOUIS, MO 63143

(314) 390-6398

ENVIRONMENTAL

MICHAEL SMITH

1340-B CHARWOOD RD SUITE B

HANOVER, MD 21076

(410) 859-4300

GEOTECH

DUSTIN SCHLEIFER

09/10/2025

517-22-700

SMPCAH

EHRM INFRASTRUCTURE UPGRADES

FINAL BID DOCUMENTS

BUILDING 1 - FIRST FLOOR PLAN -

MECHANICAL

01-MH101

-2

-7

-M

H

/0

/2

.p d f

BECKLEY VA MEDICAL CENTER

200 VETERANS AVENUE

BECKLEY, WV 25801

KEYNOTES:

1. DEMOLISH EXISTING DUCTWORK TO POINT

INDICATED AND CAP. SEAL DUCTWORK AND

REPAIR INSULATION AS REQUIRED.

2. DEMOLISH EXISTING STEAM RADIATOR

COMPLETE. DEMOLISH STEAM AND

CONDENSATE PIPING TO POINT INDICATED

AND CAP. PROVIDE NEW STEAM TRAP AS

REQUIRED.

3. TURN CONDENSATE PIPING DOWN WALL AND

SPILL INTO NEW MOP BASIN. TERMINATE

PIPING 3" ABOVE FLOOR OF MOP BASIN.

4. ROUTE PIPING UP FACE OF EXTERIOR WALL.

INSULATE AND JACKET ALL EXTERIOR PIPING.

PAINT JACKET OF VERTICAL PIPING TO MATCH

EXTERIOR WALL COLOR.

5. INSTALL NEW CONDENSING UNIT ON WALL

WITH MANUFACTURER'S WALL HANGING KIT.

6. INSTALL UNITS STACKED ON WALL.

7. ROUTE CONDENSATE PIPING FROM ABOVE AS

INDICATED. CONNECT CONDENSATE FROM

THIS LEVEL TO TOP OF MAIN.

8. INSTALL NEW SPLIT SYSTEM ON WALL PER

MANUFACTURER'S INSTRUCTIONS.

COORDINATE EXACT LOCATION WITH

ELECTRICAL AND TELECOMMUNICATIONS

CONTRACTORS. ROUTE REFRIGERANT PIPING

AS INDICATED, SIZED AND INSULATED PER

MANUFACTURER'S RECOMMENDATIONS.

9. FURNISH AND INSTALL WALL-MOUNTED

COMBINATION TEMPERATURE/HUMIDITY

SENSOR. REFER TO SHEET MH700.

10. ROUTE PIPING THROUGH EXTERIOR WALL.

SEAL ALL OPENINGS WEATHER TIGHT.

INSULATE AND JACKET ALL EXTERIOR PIPING.

11. ROUTE PIPING DOWN IN EXISTING PIPE CHASE

TO LEVEL BELOW.

1/16" = 1'-0"

BUILDING 1 - OVERALL FIRST FLOOR PLAN - MECHANICAL

A12

MECHANICAL SHEET NOTES:

1. DRIP PANS TO BE PROVIDED UNDER ALL

EXISTING HYDRONIC, PLUMBING, AND FIRE

PROTECTION PIPING OVERHEAD IN TR

SPACES. FOR CLARITY, DRIP PANS ARE ONLY

SHOWN ON PLUMBING DRAWINGS.

MECHANICAL CONTRACTOR SHALL

COORDINATE WITH PLUMBING CONTRACTOR

TO VERIFY ALL EXISTING AND NEW PIPING

OVERHEAD ARE PROVIDED WITH DRIP PAN

COVERAGE.

2. DO NOT SPILL CONDENSATE PIPING INTO DRIP

PANS OVER TR SPACES. COORDINATE

INSTALLATION OF REFRIGERANT AND

CONDENSATE PIPING WITH DRIP PAN

LOCATIONS. AVOID PENETRATIONS OF NEW

DRIP PANS. SEAL ANY NECESSARY

PENETRATIONS WATER TIGHT.

3. TEMPERATURE CONTROLS CONTRACTOR

SHALL COORDINATE LOCATION OF ALL DRIP

PANS FOR LEAK DETECTION MONITORING.

4. TEMPERATURE CONTROLS CONTRACTOR

SHALL BE RESPONSIBLE FOR INTEGRATION OF

MONITORING OF ALL TEMPERATURE AND

HUMIDITY SENSORS INTO EXISTING FACILITY

CONTROLS SYSTEM.

5. ELECTRICAL AND TELECOMMUNICATIONS

EQUIPMENT SHOWN FOR REFERENCE ONLY.

1/4" = 1'-0"

MECH. DEMOLITION - ROOMS

1B-145A & 146

G6

1/4" = 1'-0"

VENTILATION - TR 1B-146

D6 1/4" = 1'-0"

PIPING - TR 1B-146

D3

24649P R

O

FESSIONAL ENGIN

EE

RSTATE OF

SNI

KSOHAESAC DERETSIGER

W

C O N C R

ET

E

S

ID

E W A L K

C O

NC

R

ETE

SI DE

WA

LK

TLO

F

-2"

+4'-6"

F.E

F.E o

ROOF

3 '- 8"

T

T

H T

T

H T

T

SITE KEY PLAN

N

SCALE: NOT TO SCALE

N

TRUE

NORTH

N

PLAN

NORTH

MECH

2B-124 OFFICE

2B-123

OFFICE

2B-122

LAB

2B-120

LAB

2B-118

EXAM

2A-121A EXAM

2A-121

EXAM

2A-119

ELEC

2A-120

EXAM

2A-118

HOT LAB

2A-117

STOR

2A-116

OFFICE

2A-114

PATIENT

TOILET

2A-115

CT SCAN

2A-112

MRI EXAM

2A-110E

MRI EQUIP

2A-110F

MR

CONTROL

2A-110

EQUIP STOR

2A-110C

HOLDING

2A-110B

TOILET

2A-110A

PROCESS /

STOR

2A-113

ELEC

2A-111B

CONTROL

RM

2A-111C

ULTRA

SOUND

2A-111

ULTRASOUND

2A-108B

ULTRASOUND

2A-108AULTRA

SOUND

SUITE

2A-108

ULTRA

SOUND

2A-108E

STAFF

TOILET

2A-109

STAIR 6

ST-6

EXAM

2A-141A

STAIR 5

ST-5

HOUSE

KEEPING

2A-174

PATIENT

TOILET

2A-141C

EXAM

2A-141B

UROLOGY

CLERK

2A-140

UROLOGY

SUPPLY

2A-139

PATIENT

TREAT

2A-141

OFFICE

2A-142

LAB

2A-143

OFFICE

2A-144

EXAM

2A-106

STOR

2A-138

S. TOILET

2A-138A

HOUSE

KEEPING

2A-137

WAITING

2A-136

LOCKER

2A-135

LOCKER

2A-134

LOCKER

2A-131

LOUNGE

2A-132SUPPLY

2A-130B

PATIENT

TOILET

2A-130C

X-RAY

2A-130A

PATIENT

TOILET

2A-104

DRESSING

2A-103A

PATIENT

TOILET

2A-105

PATIENT

TOILET

2A-103B

X-RAY

2A-103

CONTROL

ROOM

2A-102

X-RAY

2A-101

DRESS

2A-100

STOR

2A-100A

PATIENT

TOILET

2A-100B

MECH

2A-123A

MECH

2A-123

READING

ROOM

2A-130

OFFICE

2A-128

SCAN EXAM

2A-127

LAB / EXAM

2A-125

HRS

2A-124

EXAM

2A-122

STOR

2B-111

LAB

2B-112

OFFICE

2B-113

BLOOD

BANK

2B-114

FREEZER

2B-115

COMPRESSOR

2B-116

DRY

STORAGE

2B-117 LAB

2AB-111

LAB

2AB-112

WAITING

2AB-106

PHLEBOTOMY

ROOM

2AB-110

SUPPLY

2AB-109

LOCKER

2AB-105

LOCKER

2AB-104

PATIENT

TOILET

2AB-107

WAITING

2AB-108

RECEPTION

2AB-109

ELEC

2B-124A

HOUSE

KEEPING

2B-124B

OFFICE

2B-125

CHEM STOR

2B-126

BREAK

2B-108

WOMEN'S

ROOM

2B-109

MEN'S

ROOM

2B-110

CLINIC

CO-ORDER

2B-107

EXAM

2B-106

EXAM

2B-105

STAIR 1

ST-1

EXAM /

OFFICE

2B-130

PATIENT

TOILET

2B-127

STAFF

TOILET

2B-129

EXAM /

OFFICE

2B-128A

EXAM /

OFFICE

2B-131

EXAM /

OFFICE

2B-133A

EXAM /

OFFICE

2B-133

STORAGE

2B-134

REHAB /

PHYSICAL

THERAPY

2B-135

PHYSICAL

THERAPY

OFFICE

2B-136

STAIR 2

ST-2

WAITING

2B-128

CHECK-IN

2B-132

OFFICE

2B-139

STAFF

TOILET

2B-139A

SUPPLY

2B-140

EXAM

2B-141

EXAM

2B-142

EXAM

2B-143

PATIENT

SCREENING

2B-144

EXAM

2B-144C

EXAM

2B-104

EXAM

2B-104A

STAFF

LOUNGE

2B-103

CLERK

OFFICE

2B-102

CLINIC

CHECK-IN

2B-101

STOR

2B-105B

EXAM

2B-150

EXAM

2B-151

EXAM

2B-152

EXAM

2B-153

WAITING

2B-101A

OFFICE

2B-145

EXAM

2B-146

EXAM

2B-147

STOR

2B-148

OFFICE

2B-149

CORRIDOR

2B4

LOUNGE

2AB-102

STOR

2AB-100

TOILET

2AB-103

WOMEN'S

LOCKER

2AB-101

CLOSET

2AB-104A

MECH

2AB-113

VACANT

2AB-117

VACANT

2AB-113

STOR

2AB-116

TR

2AB-115

COMM

CLOSET

2AB-114

STAIR 3

ST-3

RADIOLOGY

2A-147

RADIOLOGY

2A-148

DENTAL

EXAM

2A-149

STOR

2A-150

EXAM

2A-151

SUPPLY

2A-152

EXAM

2A-154

DENTAL LAB

2A-156

HYGIENE

EXAM

2A-159

HYGIENE

EXAM

2A-160 OFFICE

2A-161

STAFF

LOUNGE

2A-163

OFFICE

2A-164

STAFF

TOILET

2A-162

TOILET

2A-158

HOUSE

KEEPING

2A-157

SUPPLY

2A-155

SUPPLY

2A-153

DENTAL

EXAM

2A-172

EXAM

2A-171

EXAM

2A-170

SECY

2A-168

DENTAL

EXAM

2A-173

ELEC

CLOSET

2A-146

HEAD OF

RADIOLOGY

2A-167

WAITING

2A-166

OFFICE

2A-165

STAIR 4

ST-4

STOR

2A-145A

STAIR 7

ST-7

MECH

2A-145

CONTROL

2A-175

CONTROL

2A-176

TR

2B-144D

CORRIDOR

C2-22

01-MH102

D6

01-MH102

G6

01-MH102

D3

EXAM

2B-144C

13x6 OA

35x12 EA

48x24 EA

60x24 EA x1

E

A x6

S A

EXAM

2B-144C

TR

2B-144D

SS-1-2B144D

SG-1

8x6/50

60x24 EA

48x24 EA

35x12 EA

13x6 OA x6

S A x1

E

A

8x6 EA

EXAM

2B-144C

TR

2B-144D

SS-1-2B144D

REF1"MPS

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

Revisions: Date:

/8

/4

/8

/2

/4

-1

/2

2345678910111213141516

B

C

D

E

F

G

H

J

K

1234561516

ARCHITECT / ENGINEER OF RECORD:CONSULTANTS:

CIVIL

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV 25401

(304) 266-3115

LIFE SAFETY

DAVID McCOY

8734 GALLOWAY TRAIL

NOVELTY, OH 44072

(619) 925-1647

ARCHITECT:

KEN JONES

421 KING ST. SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

891011121314

MEP / FP / STRUCTURAL

JIM KAPPELER

15 SUNNEN DRIVE, SUITE 104

ST. LOUIS, MO 63143

(314) 390-6398

ENVIRONMENTAL

MICHAEL SMITH

1340-B CHARWOOD RD SUITE B

HANOVER, MD 21076

(410) 859-4300

GEOTECH

DUSTIN SCHLEIFER

09/10/2025

517-22-700

SMPCAH

EHRM INFRASTRUCTURE UPGRADES

FINAL BID DOCUMENTS

BUILDING 1 - SECOND FLOOR PLAN -

MECHANICAL

01-MH102

-2

-7

-M

H

/0

/2

.p d f

BECKLEY VA MEDICAL CENTER

200 VETERANS AVENUE

BECKLEY, WV 25801

KEYNOTES:

1. DEMOLISH EXISTING DUCTWORK TO POINT

INDICATED AND CAP. SEAL DUCTWORK AND

REPAIR INSULATION AS REQUIRED.

2. DEMOLISH EXISTING STEAM RADIATOR

COMPLETE. DEMOLISH STEAM AND

CONDENSATE PIPING TO POINT INDICATED

AND CAP. PROVIDE NEW STEAM TRAP AS

REQUIRED.

3. INSTALL NEW SPLIT SYSTEM ON WALL PER

MANUFACTURER'S INSTRUCTIONS.

COORDINATE EXACT LOCATION WITH

ELECTRICAL AND TELECOMMUNICATIONS

CONTRACTORS. ROUTE REFRIGERANT PIPING

AS INDICATED, SIZED AND INSULATED PER

MANUFACTURER'S RECOMMENDATIONS.

4. FURNISH AND INSTALL WALL-MOUNTED

COMBINATION TEMPERATURE/HUMIDITY

SENSOR. REFER TO SHEET MH700.

5. 3/4" CD FROM ABOVE. CONNECT TO RISER ON

THIS LEVEL. ROUTE PIPING DOWN THROUGH

FLOOR BELOW.

# MECHANICAL SHEET NOTES:

1. DRIP PANS TO BE PROVIDED UNDER ALL

EXISTING HYDRONIC, PLUMBING, AND FIRE

PROTECTION PIPING OVERHEAD IN TR

SPACES. FOR CLARITY, DRIP PANS ARE ONLY

SHOWN ON PLUMBING DRAWINGS.

MECHANICAL CONTRACTOR SHALL

COORDINATE WITH PLUMBING CONTRACTOR

TO VERIFY ALL EXISTING AND NEW PIPING

OVERHEAD ARE PROVIDED WITH DRIP PAN

COVERAGE.

2. DO NOT SPILL CONDENSATE PIPING INTO DRIP

PANS OVER TR SPACES. COORDINATE

INSTALLATION OF REFRIGERANT AND

CONDENSATE PIPING WITH DRIP PAN

LOCATIONS. AVOID PENETRATIONS OF NEW

DRIP PANS. SEAL ANY NECESSARY

PENETRATIONS WATER TIGHT.

3. TEMPERATURE CONTROLS CONTRACTOR

SHALL COORDINATE LOCATION OF ALL DRIP

PANS FOR LEAK DETECTION MONITORING.

4. TEMPERATURE CONTROLS CONTRACTOR

SHALL BE RESPONSIBLE FOR INTEGRATION OF

MONITORING OF ALL TEMPERATURE AND

HUMIDITY SENSORS INTO EXISTING FACILITY

CONTROLS SYSTEM.

5. ELECTRICAL AND TELECOMMUNICATIONS

EQUIPMENT SHOWN FOR REFERENCE ONLY.

1/16" = 1'-0"

BUILDING 1 - OVERALL SECOND FLOOR PLAN - MECHANICAL

A12

1/4" = 1'-0"

MECH. DEMOLITION - ROOMS

2B-144C & 144D

G6

1/4" = 1'-0"

VENTILATION - TR 2B-144D

D6 1/4" = 1'-0"

PIPING - TR 2B-144D

D3

24649P R

O

FESSIONAL ENGIN

EE

RSTATE OF

SNI

KSOHAESAC DERETSIGER

W

C O N C R

ET

E

S

ID

E W A L K

C O

NC

R

ETE

SI DE

WA

LK

TLO

F

-2"

+4'-6"

F.E

F.E o

T T

T H

T

T H

SITE KEY PLAN

N

SCALE: NOT TO SCALE

N

TRUE

NORTH

N

PLAN

NORTH

OBSERVATION

3B-134 DISCHARGE

CO-ORDR

3B-135

EQUIP

ROOM

3B-136

OBSERVATION

3B-133

PATIENT

ROOM

3B-137

PATIENT

ROOM

3B-138

STAIR 2

ST-2

PATIENT

ROOM

3B-132

PATIENT

BATH

3B-132A

PATIENT

BATH

3B-131

PATIENT

ROOM

3B-139

HOPPER RM

3B-140

LINEN STOR

3B-141B

PATIENT

KITCHEN

3B-141

PATIENT

ROOM

3AB-113

NURSING

STATION

3AB-112

CLEAN

UTILITY

3AB-111

NUTRITION

3AB-110

TR

3AB-109

TELECOM

3AB-124

WAITING

3AB-100

PATIENT

ROOM

3AB-120

PATIENT

ROOM

3AB-121

PATIENT

ROOM

3AB-122

PATIENT

ROOM

3AB-123

DIRTY

UTILITY

3AB-119A

STAIR 7

ST-7

GAS

STORAGE

3AB-119

CRITICAL

CARE

CO-ORDR

3AB-114

CONFERENCE

3AB-115

LOCKER /

LOUNGE

3AB-116

MECH

3AB-117

STAFF

TOILET

3AB-118

DIRTY

EQUIP

3AB-118A

DIALYSIS

3A-136

DIALYSIS

3A-137

WOUND

3A-138

ECHO

SUPPLY

3A-139

ECHO

3A-140

ECHO

SUPPLY

3A-123

WOUND

3A-132

CARDIO /

PULMONARY

3A-133

CARDIO /

PULMONARY

3A-134

NURSES

OFFICE

3A-135

PATIENT

BATH

3A-131

CRASH

CART

3A-130

PATIENT

TOILET

3A-129

ENT

3A-128

NEPH

3A-127

NEPH

3A-125

PATIENT

TOILET

3A-126

OFFICE

3A-124

OFFICE

3A-123

STAIR 5

ST-5

ENT

3A-122

ENT

3A-120

ENT

3A-119

DIRTY

UTILITY

3A-117

P. TOILET

3A-118

P. TOILET

3A-121

CLEAN

SUPPLY

3A-116

STORAGE

3A-115A

HOUSE

KEEPING

3A-115

PODIATRY

3A-114

PODIATRY

3A-112

PODIATRY

3A-111

PODIATRY

3A-109

ENGG

MAINT

3A-108

SCHEDULING

3A-105

STAIR 6

ST-6

MECHANICAL

3A-111A

A/C

3C-111B

STORAGE

3C-114B

OFFICE

3C-114A

OFFICE

3C-115B

ELEC

3C-111C

OFFICE

3C-115A

OFFICE

3C-117

OFFICE

3C-118

OFFICE

3C-119

OFFICE

3C-120

CONFERENCE

3C-122OFFICE

3C-126

OFFICE

3C-126A

OFFICE

3C-126B

MECH

3C-127

MECH

3B-113A KITCHEN

3C-125

OPEN AREA

3C-124

COPY

ROOM

3C-123

CONFERENCE

3C-121

STOR

3C-116A

OPEN

OFFICE

3C-116B

STOR

3C-116B

STOR

3C-115A

SECRETARY

OFFICE

3C-115

PATIENT

ROOM

3B-114

PATIENT

TOILET

3B-115

PATIENT

ROOM

3B-116

STORAGE

3B-117A HOUSE

KEEPING

3B-117

HEAD

NURSE

3B-111

STAFF

TOILET

3B-112

ENGG

MAINT

3B-110

KITCHEN

3B-108

PIV

3C-128

EDUCATION

3C-134ENTRY

3C-129

STOR

3C-130

OFFICE

3C-131

OFFICE

3C-132

CONTROL

3C-133

FISCAL

3C-100

FISCAL

3C-101

FISCAL

3C-102

FISCAL

3C-104

LRER

3C-105

FISCAL

3C-103

OFFICE

3C-107

OFFICE

3C-106

OFFICE

3C-108

OFFICE

3C-109

OFFICE

3C-110

OFFICE

3C-114 JANITOR

3C-113

MEN'S

TOILET

3C-112

WOMEN'S

TOILET

3C-111

OFFICE

3A-107

OFFICE

3A-106

MEN'S

TOILET

3AB-108

STAFF

TOILET

3AB-103A

DOCTOR'S

ROOM

3AB-103

OFFICE

3AB-101C

TOILET

3AB-102

OFFICE

3B-100

OFFICE

3B-101MED RM

3B-102

STAFF

TOILET

3B-104

OFFICE

3B-103

STAFF

TOILET

3B-105

NURSES

STATION

3B-107

LOUNGE

3B-142

DOCUMENT

ROOM

3B-142A

PATIENT

ROOM

3B-143

PATIENT

ROOM

3B-145

PATIENT

ROOM

3B-146

PATIENT

TOILET

3B-147

PATIENT

TOILET

3B-144

STAIR 3

ST-3

CVT ROOM

3AB-108

PULMONARY

3A-147

PULMONARY

3A-145

WAITING

ROOM

3A-144

PATIENT

TOILET

3A-146

CLEAN

LINEN

3A-143A

HOPPER

ROOM

3A-142

NUTRITION

3A-143

STAIR 4

ST-4

BREAK

ROOM

3A-103

TOILET

3A-104

OFFICE

3A-102

STAFF

TOILET

3A-102A

PATIENT

ROOM

3B-125

PATIENT

ROOM

3B-127

PATIENT

ROOM

3B-128

PATIENT

TOILET

3B-126

PATIENT

TOILET

3B-129

CRASH

CART

3B-130

SOILED

UTILITY

3B-119

SUPPLY

ROOM

3B-118

PATIENT

ROOM

3B-124

PATIENT

ROOM

3B-122

PATIENT

ROOM

3B-120

TOILET

3B-123

TOILET

3B-121

STAIR 1

ST-1

TR

3AB-127

CORRIDOR

C3-22

01-MH103

D301-MH103

D6

01-MH103

G6

PATIENT

ROOM

3B-146

PATIENT

TOILET

3B-147

48x24 EA

60x24 EA ø

S A

1"MPS

EG-E

48x24

PATIENT

ROOM

3B-146

PATIENT

TOILET

3B-147

TR

3AB-127

SS-1-3AB127

6ø SA

EG-E

48x24

60x24 EA

48x24 EA

PATIENT

ROOM

3B-146

PATIENT

TOILET

3B-147

TR

3AB-127

SS-1-3AB127

REF

3/4"CD

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

Revisions: Date:

/8

/4

/8

/2

/4

-1

/2

2345678910111213141516

B

C

D

E

F

G

H

J

K

1234561516

ARCHITECT / ENGINEER OF RECORD:CONSULTANTS:

CIVIL

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV 25401

(304) 266-3115

LIFE SAFETY

DAVID McCOY

8734 GALLOWAY TRAIL

NOVELTY, OH 44072

(619) 925-1647

ARCHITECT:

KEN JONES

421 KING ST. SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

891011121314

MEP / FP / STRUCTURAL

JIM KAPPELER

15 SUNNEN DRIVE, SUITE 104

ST. LOUIS, MO 63143

(314) 390-6398

ENVIRONMENTAL

MICHAEL SMITH

1340-B CHARWOOD RD SUITE B

HANOVER, MD 21076

(410) 859-4300

GEOTECH

DUSTIN SCHLEIFER

09/10/2025

517-22-700

SMPCAH

EHRM INFRASTRUCTURE UPGRADES

FINAL BID DOCUMENTS

BUILDING 1 - THIRD FLOOR PLAN -

MECHANICAL

01-MH103

-2

-7

-M

H

/0

/2

.p d f

BECKLEY VA MEDICAL CENTER

200 VETERANS AVENUE

BECKLEY, WV 25801

KEYNOTES:

1.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .