This is a site infrastructure plan showing the utility and underground systems for a multi-building facility expansion project. The plan depicts three primary buildings (Building #7, Building #1, and Building #23) with existing and planned utility infrastructure overlaid across the site.

The document illustrates existing underground utilities including 8-inch and 12-inch storm drain lines, 8-inch sanitary sewer lines, 8-inch water lines with associated fire hydrants and water valves, underground diesel fuel lines, gas lines with meters, and electrical infrastructure including a 6-4" conduit bank. The plan identifies benchmark monuments (BM 1 and BM 2) and shows construction extents marked in red, indicating areas where contractor work is required during construction. Key site elements include inspection points (IP), pull boxes (RP), and transmission points (TP) throughout the utility network. The note "CONTRACTOR SHALL LOCATE DURING CONSTRUCTION" appears on the plan regarding the gas line and meter H517-19-309 expansion, indicating that precise utility locations must be verified before work begins. The plan serves as a reference document for construction coordination and utility avoidance during the facility expansion project.

View the file

Other files for this federal contract opportunity

Other files attached to EHRM | Beckley VAMC 517-22-700 | Construct Infrastructure Upgrade, newest first.
File Type Posted
S06 - Amendment 0004 - ATT 5 - Response to RFI 123 - T40-11072 AERIAL CONTROL1-26-23.pdf PDF
S06 - Amendment 0004 - ATT 4 - Response to RFI 123 - PreBid RFI Control Point memo.pdf PDF
S06 - 36C77626R0006 0004.pdf PDF
S06 - Amendment 0004 - ATT 1 - Tech Questions - Beckley EHRM IU.pdf PDF
S06 - Amendment 0004 - ATT 2 - Addendum 1.pdf PDF
S06 - Amendment 0003 - ATT 1 - 517-22-700 Beckley EHRM - Final Bid Documents SPECS VOL 1 Rev 03-02-2026.pdf PDF
S06 - Amendment 0003 - ATT 2 - VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL-DEV MAR2026.pdf PDF
S06 - Amendment 0003 - ATT 3 - VAAR 852 204-72 PERSONNEL VETTING AND CREDENTIALING MAR 2026.pdf PDF
S06 - 36C77626R0006 0003.pdf PDF
S06 - 36C77626R0006 0002.pdf PDF
S06 - 36C77626R0006 0001.pdf PDF
S06 - Amendment 0001 - ATT 1 - Site Visit Sign- In - Beckley EHRM IU.pdf PDF
S02 - 36C77626R0006.pdf PDF
S02 - Att 8 - Site Visit Information - Beckley VA Campus.pdf PDF
S02 - Att 1 - 517-22-700 Beckley EHRM - Final Bid Documents SPECS VOL 2 09-10-2025 Rev.pdf PDF
S02 - Att 4 - 517-22-700 Beckley VAMC EHRM - Drawings VOL 2_09-10-2025.pdf PDF
S02 - Att 8 - Site Visit Information - Beckley VA Campus.pdf PDF
S02 - 36C77626R0006.pdf PDF
S02 - Att 2 - 517-22-700 Beckley EHRM - Final Bid Documents SPECS VOL 1 09-10-2025_Rev.pdf PDF
S02 - Att 5 - Limitations on Subcontracting - Beckley.pdf PDF
S02 - Att 3 - 517-22-700 Beckley VAMC EHRM - Drawings VOL 1_09-10-2025.pdf PDF
S02 - Att 6 - WD - WV20260023 - 1.2.2026.pdf PDF
S02 - Att 7 - HEFP SEP Design Alerts 1-9 and 11-16.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

BUILDING #7

BUILDING #1BLDG #23

W

W

W

W

W

W

W

W W

EX. FIRE

HYDRANT

(TYP.)

EX. WATER

VALVE (TYP.)

EX. 8" WATER

LINE (TYP.)

EX. 8" WATER

LINE (TYP.)

UGE

UGE

UGE

UGEUGE

UGE

UGE

UGE

UGEUGE

EX. 12" STORM DRAIN

EX. 8" STORM

DRAIN

EX. 8" STORM DRAIN

EX.

D4

EX.

D5

G

G

G

G

G

G

G

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

G

G

G

EX. UNDERGROUND

DIESEL FUEL LINE

EX.

D2

EX. 8" SAN. SEW

EX. 8" SAN. SEW.

EX.

EX.

G

G

G

G

G

G

G

G

UGE

UGE

UGE

UGE

UGE

UGE

OH

E

OH

E

OH

E

OH

E

OH

E

APPROXIMATE EXTENTS OF VA PROJECTS 517-16-129

"GAS LINE & METER HOUSE REPLACEMENT" &

517-19-309 "EXPAND ELECTRICAL VAULT". THE

CONTRACTOR SHALL REFERENCE THESE PLANS

DURING CONSTRUCTION TO DETERMINE FINAL

EXTENTS OF CONSTRUCTION.

#23

SS

SS

SS

SS

SS

SS

SS

UGF

UGF

UGF

UGF

UGF

UGF

TP

TP

TP

TP

TP

TP

TP

TP

TP

IP

IP

CI501

HH

JB

CI501

RP

RP

6 - 4"

CONDUIT

BA

NK

40'R

BM 1

BM 2

Sheets and Views
Model

File details come from the government source that posted it. Updated .