This is a site infrastructure plan showing the utility and underground systems for a multi-building facility expansion project. The plan depicts three primary buildings (Building #7, Building #1, and Building #23) with existing and planned utility infrastructure overlaid across the site.
The document illustrates existing underground utilities including 8-inch and 12-inch storm drain lines, 8-inch sanitary sewer lines, 8-inch water lines with associated fire hydrants and water valves, underground diesel fuel lines, gas lines with meters, and electrical infrastructure including a 6-4" conduit bank. The plan identifies benchmark monuments (BM 1 and BM 2) and shows construction extents marked in red, indicating areas where contractor work is required during construction. Key site elements include inspection points (IP), pull boxes (RP), and transmission points (TP) throughout the utility network. The note "CONTRACTOR SHALL LOCATE DURING CONSTRUCTION" appears on the plan regarding the gas line and meter H517-19-309 expansion, indicating that precise utility locations must be verified before work begins. The plan serves as a reference document for construction coordination and utility avoidance during the facility expansion project.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
BUILDING #7
BUILDING #1BLDG #23
W
W
W
W
W
W
W
W W
EX. FIRE
HYDRANT
(TYP.)
EX. WATER
VALVE (TYP.)
EX. 8" WATER
LINE (TYP.)
EX. 8" WATER
LINE (TYP.)
UGE
UGE
UGE
UGEUGE
UGE
UGE
UGE
UGEUGE
EX. 12" STORM DRAIN
EX. 8" STORM
DRAIN
EX. 8" STORM DRAIN
EX.
D4
EX.
D5
G
G
G
G
G
G
G
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
G
G
G
EX. UNDERGROUND
DIESEL FUEL LINE
EX.
D2
EX. 8" SAN. SEW
EX. 8" SAN. SEW.
EX.
EX.
G
G
G
G
G
G
G
G
UGE
UGE
UGE
UGE
UGE
UGE
OH
E
OH
E
OH
E
OH
E
OH
E
APPROXIMATE EXTENTS OF VA PROJECTS 517-16-129
"GAS LINE & METER HOUSE REPLACEMENT" &
517-19-309 "EXPAND ELECTRICAL VAULT". THE
CONTRACTOR SHALL REFERENCE THESE PLANS
DURING CONSTRUCTION TO DETERMINE FINAL
EXTENTS OF CONSTRUCTION.
#23
SS
SS
SS
SS
SS
SS
SS
UGF
UGF
UGF
UGF
UGF
UGF
TP
TP
TP
TP
TP
TP
TP
TP
TP
IP
IP
CI501
HH
JB
CI501
RP
RP
6 - 4"
CONDUIT
BA
NK
40'R
BM 1
BM 2
| Sheets and Views |
| Model |
File details come from the government source that posted it. Updated .