S02 ATF-50 LIMITATIONS ON SUBCONTRACTING UNDER SMALL BUSINESS SETASIDES (MAY 2019).docx
DOCX document 16 KB Posted
- Attached to
- Office Space Renovation Federal contract opportunity
- Solicitation number
- 15A00024R00000031
About this file
This document outlines limitations on subcontracting for a small business set-aside solicitation for office space renovation services. The solicitation issued by the Department of Justice Bureau of Alcohol Tobacco Firearms and Explosives seeks proposals for an office space renovation project located at ATF headquarters in Washington DC. Offerors must indicate their proposed level of contract performance for personnel, manufacturing supplies, general construction using their own employees, and construction by special trade contractors, with minimum requirements of 50%, 50%, 15%, and 25% respectively.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S06 15A00024R00000031 A0001.pdf | ||
| 15A00024R00000031 - A0001.pdf | ||
| S02 15A00024R00000031.pdf | ||
| S02 DOL WD DC20240002.pdf | ||
| S02 Past Performance Questionnaire.docx | DOCX document | |
| S02 Office Design Concept Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
15A00024R00000031
ATF-50 LIMITATIONS ON SUBCONTRACTING UNDER SMALL BUSINESS SET-ASIDES (May 24, 2019)
In conjunction with the requirements of FAR 52.219-14, Limitations on Subcontracting, contractors shall certify the level of subcontracting proposed, prior to award of any portion of the contract set-aside or partially set-aside for a small business or 8(a) participant. Contractors shall also certify the level of subcontracting actually achieved prior to exercising any option period.
(Offerors shall indicate “N/A” for lines that are Not Applicable.)
1) Services (except construction). Offeror's/Contractor's proposed contract performance for its personnel shall be: _________ (must be at least 50%).
2) Supplies (other than procurement from a non-manufacturer of such supplies). Offeror's/Contractor's proposed contract performance for its cost of manufacturing the supplies, excluding the cost of materials shall be: _________ (must be at least 50%).
3) General construction. Offeror's/Contractor's proposed contract performance, excluding the cost of materials, with its own employees shall be: _________ (must be at least 15%).
4) Construction by special trade contractors. Offeror's/Contractor's proposed contract performance, excluding the cost of materials, with its own employees shall be: _________ (must be at least 25%).
(End of Clause)