This document is a set of 100% Bid Documents (architectural drawings and specifications) for the Building 111 Facade Repair project at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The project involves façade repair work on Drops (sections) 1, 3, 21, 23, 25, and 26 located on Floors 9 and 11 of the building. The documents include location maps, vicinity maps, and elevation drawings (North, South, and West) depicting the project scope and repair areas.

Critical to the project scope is the identification and abatement of asbestos-containing materials (ACM) found during surveys performed in December 2023 and June-July 2025 by ARC Environmental. Asbestos-containing caulk has been confirmed along vertical joints between pre-cast window panels and brick masonry, and asbestos-containing flashing tar has been identified on metal copper flashing. The contractor is responsible for coordinating with other trades, ensuring worker safety, properly handling and disposing of ACM, and performing daily recaulking/sealing of abated areas to maintain building envelope integrity. All abated areas must receive passing visual clearance inspection approval from an industrial hygienist before recaulking or concealment. The contractor must also assess and sample any newly discovered suspect ACM prior to disturbance. Work specifications are detailed in Section 02 82 11, and references are provided to the Limited Asbestos-Containing Materials Survey (June 28, 2024) and Supplemental Asbestos-Containing Materials Survey (August 28, 2025) reports.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

7 8 9 10321 4 5 6

NORTH

VICINITY MAP

PROJECT TEAM DRAWING SHEET INDEX

600 E. Michigan Avenue, Suite B Kalamazoo, MI 49007 P: 269.927.0144 www.bodwegroup.com

1635 Prince Street Alexandria, VA 22314 P: 202.617.8485 www.alliance.us.com

NORTH

LOCATION MAP

VA MILWAUKEE CAMPUS

Au to de sk

D oc s:

//2

VA

M ilw au ke e Bl dg

F ac ad e W or k/

V

A M ilw au ke e

Bl dg

F ac ad e

W or k-

AR

C H

_R

.rv t

3/

/2

:2 0:

P

M

CLEMENT J. ZABLOCKI VA MEDICAL CENTER

ALLIANCE | SEVEN GENERATIONS A+E JV

600 E. MICHIGAN AVENUE, Ste B

KALAMAZOO, MI 49007

PHONE: 269.927.0144

BODWEGROUP.COM

5000 W NATIONAL AVE

MILWAUKEE, WI, 53295

WISS, JANNEY, ELSTNER ASSOCIATES, INC.

330 PFINGSTEN ROAD

NORTHBROOK, IL 60062

847.272.7400

WJE.COM

HAZARDOUS MATERIAL SPECIALIST

ARC ENVIRONMENTAL

FAÇADE REPAIR CONSULTANT

1635 PRINCE STREET

ALEXANDRIA, VA 22314

PHONE: 202.617.8485

ALLIANCE.US.COM

CLEMENT J. ZABLOCKI VA MEDICAL CENTER

BUILDING 111 FACADE REPAIR

MILWAUKEE, WISCONSIN

MILWAUKEE, WISCONSIN

ARCHITECTURE/COST ESTIMATING:

TITLE SHEET BUILDING 111 FACADE REPAIR

5000 W NATIONAL AVE, MILWAUKEE,

WI, 53295

695-22-121

PROJECT DIRECTOR

MARCH 16, 2026 JD NL

100% BID DOCUMENTS

G001

1311 HAUBERT STREET

BALTIMORE, MD 21230

443.864.7464

ARCENVIRONMENTAL.COM

SHEET DESCRIPTION

GENERAL

G001 TITLE SHEET

G002 GENERAL INFO & SYMBOL LEGEND

G003 ROOF PLANS AND ISOMETRICS

G004 ROOF AND ELEVATOR ACCESS FLOORS 1 AND 3

G005 ROOF PLAN ACCESS INFORMATION FLOORS 9 AND 11

ARCHITECTURAL

A200 EXTERIOR ELEVATIONS - 3 AND 1 (NORTH)

A201 EXTERIOR ELEVATIONS - 21 (SOUTH)

A202 EXTERIOR ELEVATIONS - 23 (SOUTH)

A203 EXTERIOR ELEVATIONS - 25 (SOUTH)

A204 EXTERIOR ELEVATIONS - 26 (WEST)

A300 ENLARGED ELEVATIONS

A301 WALL SECTIONS AND DETAILS

A302 REPAIR DETAILS

A303 REPAIR DETAILS

HAZARDOUS MATERIAL

HA200 HAZARDOUS MATERIALS LOCATION PLAN ELEVATIONS 3 AND 1 (NORTH)

HA201 HAZARDOUS MATERIALS LOCATION PLAN ELEVATIONS 21 (SOUTH)

HA202 HAZARDOUS MATERIALS LOCATION PLAN ELEVATIONS 23 (SOUTH)

HA203 HAZARDOUS MATERIALS LOCATION PLAN ELEVATIONS 25 (SOUTH)

HA204 HAZARDOUS MATERIALS LOCATION PLAN ELEVATIONS 26 (WEST)

PROJECT LOCATION

100% BID DOCUMENTS

BUILDING 111

Revisions: Date:

VHAMIWGeorgK Rectangle

GENERAL HAZARDOUS

MATERIAL NOTES APPLICABLE

TO THE PROJECT AREA

1. AN ASBESTOS-CONTAINING MATERIALS (ACMS) SURVEY

WAS PERFORMED IN DECEMBER 2023 BY ARC

ENVIRONMENTAL AND IDENTIFIED MATERIALS ON THE

EXTERIOR FAÇADE. A SUPPLEMENTAL ASBESTOS SURVEY WAS

PERFORMED IN JUNE-JULY 2025 TO FURTHER DELINEATE

SUSPECT ACMS OBSERVED AT ACCESSIBLE PORTIONS OF

DROPS 1, 3, 21, 23, 25, & 26 WHICH ARE INCLUDED IN THE

PROJECT SCOPE. ASBESTOS-CONTAINING CAULK IS

CONFIRMED TO BE PRESENT ALONG THE VERTICAL JOINTS

BETWEEN PRE-CAST WINDOW PANELS AND BRICK MASONRY

AND ASBESTOS-CONTAINING FLASHING TAR HAS BEEN

IDENTIFIED ON METAL COPPER FLASHING. BOTH OF THESE

REQUIRE ABATEMENT TO FACILITATE THE FAÇADE REPAIRS. THE

CONTRACTOR SHALL REFER TO THE ASSOCIATED 'LIMITED

ASBESTOS-CONTAINING MATERIALS SURVEY - REPAIR

BUILDING 111 CONCRETE FAÇADE STUDY'' REPORT DATED

JUNE 28, 2024, AND 'SUPPLEMENTAL ASBESTOS-CONTAINING

MATERIALS SURVEY - BUILDING 111 CONCRETE FAÇADE

PROJECT' DATED AUGUST 28, 2025, FOR DETAILS RELATED TO

THE ASSESSMENTS AND ASSOCIATED ANALYTICAL DATA. THE

PROVIDED DRAWINGS AND SPECIFICATIONS DETAILING THE

SCOPE OF WORK FOR REMEDIATION AND ABATEMENT ARE

BASED ON THE COMPLETED SURVEYS AND THE PROJECT

SCOPE OF WORK.

2. ASBESTOS-CONTAINING MATERIALS HAVE BEEN IDENTIFIED

WITHIN THE PROJECT AREA. CONTRACTOR SHALL

COORDINATE WITH OTHER TRADES AS REQUIRED TO ENSURE

WORKER SAFETY, PHASING, AND PROPER HANDING,

REMOVAL, AND DISPOSAL OF ACMS. REFER TO

SPECIFICATION SECTION 02 82 11. IT IS ANTICIPATED THAT

ABATEMENT OF EXTERIOR CAULK WILL BE COMPLETED IN A

MANNER THAT MAINTAINS THE MATERIAL IN NON-FRIABLE

CONDITION. BRICK WORK IMPACTED BY ACM CAULK IS

SCOPED FOR REPLACEMENT; THEREFORE, IF MINIMAL

DAMAGE TO THE BRICK IS PERMITTED IF REQUIRED TO

PROPERLY ABATE THE IDENTIFIED ASBESTOS-CONTAINING

CAULK.

3. THE CONTRACTOR IS RESPONSIBLE FOR DAILY RE-

CAULKING/SEALING AREAS WHERE ASBESTOS-CONTAINING

CAULK IS ABATED TO ENSURE THAT THE INTEGRITY OF THE

BUILDING ENVELOPE IS MAINTAINED DURING CONSTRUCTION

ACTIVITIES. THE APPLIED CAULK/SEALANT SHALL BE APPROVED

THROUGH THE PRE-CONSTRUCTION SUBMITTAL PROCESS

PRIOR TO USE. ABATED AREAS SHALL NOT BE RE-

CAULKED/SEALED OR OTHERWISE CONCEALED UNTIL A

PASSING VISUAL CLEARANCE INSPECTION IS OBTAINED FOR

EACH AFFECTED WORK AREA AND APPROVED BY THE

INDUSTRIAL HYGIENIST.

4. IF IMPACTED, THE CONTRACTOR IS RESPONSIBLE FOR

ASSESSING AND SAMPLING ADDITIONAL SUSPECT ASBESTOS-

CONTAINING MATERIALS WITHIN THE PROJECT AREA PRIOR

TO DISTURBANCE OF THE MATERIAL(S) IF NEWLY DISCOVERED,

SUSPECT ACMS ARE IDENTIFIED DURING THE COURSE OF

CONSTRUCTION.

ASBESTOS LOCATION LEGEND

ASBESTOS-CONTAINING MASONRY CAULK

ASBESTOS-CONTAINING FLASHING TAR

Project Number:

Building Number:

Drawing Number:

Project Title:

Location:

Issue Date: Checked: Drawn:

Drawing Title:

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase:DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Sprinkler:

600 E. Michigan Avenue, Suite B Kalamazoo, MI 49007 P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310 Alexandria, VA 22314 P: 202.617.8485 www.alliance.us.com

HAZARDOUS MATERIALS LOCATION PLAN

ELEVATIONS 3 AND 1 (NORTH)

BUILDING 111 FACADE REPAIR

5000 W NATIONAL AVE, MILWAUKEE, WI, 53295

695-22-121

MARCH 16, 2026 SK DL

100% BID DOCUMENTS

HA200

KEY PLAN

N

Revisions: Date:

(975.67)

LEVEL 01

ELEV. 83'-8"

LEVEL 02

ELEV. 97'-5 3/8"

LEVEL 03

ELEV. 111'-2 3/4"

LEVEL 04

ELEV. 122'-9 3/8"

LEVEL 05

ELEV. 134'-4"

LEVEL 06

ELEV. 145'-10 5/8"

LEVEL 07

ELEV. 157'-5 1/4"

LEVEL 08

ELEV. 168'-11 7/8"

LEVEL 09

ELEV. 180'-6 1/2"

LEVEL 10

ELEV. 192'-1 1/8"

P.H. FL. & TOP OF ROOF SLAB

ELEV. 203'-7 3/4"

AA CC FF GG HH JJ KK NNLL MM

3A3 3B3

3B4

3B5

3B6

3B7

3B8

3B9

3B10

3A4

3A5

3A6

3A7

3A8

3A9

3A10

1D3

1D4

1D5

1D6

1D7

1D8

1D9

1D10

1C3

1C4

1C5

1C6

1C7

1C8

1C9

1C10

1B3

1B4

1B5

1B6

1B7

1B8

1B9

1B10

1A3

1A4

1A5

1A6

1A7

1A8

1A9

1A10

ELEVATION 3 (NORTH) ELEVATION 1 (NORTH)

LOWER BUILDING ROOF

ELEV. 112'-0 3/4"

EJ EJ EJEJEJ

GLASS STRUCTURE

N O

T

IN

S C

O

PE

NOT IN SCOPE.

PROTECT DURING THE WORK.

ASBESTOS

CONTAINING

MASONRY

CAULK

LINE OF SOLARIUM

23 2122

GLASS STRUCTURE

NOT IN SCOPE

NOT IN SCOPE.

PROTECT DURING THE WORK.

ASBESTOS

CONTAINING

MASONRY

CAULK

SCALE: 1/8" = 1'-0"2 ELEVATIONS - 3 AND 1 (NORTH)

SCALE: 1/8" = 1'-0"1 ELEVATION - 2 (WEST)

ASBESTOS LOCATION LEGEND

ASBESTOS-CONTAINING MASONRY CAULK

ASBESTOS-CONTAINING FLASHING TAR

GENERAL HAZARDOUS

MATERIAL NOTES APPLICABLE

TO THE PROJECT AREA

1. AN ASBESTOS-CONTAINING MATERIALS (ACMS) SURVEY

WAS PERFORMED IN DECEMBER 2023 BY ARC

ENVIRONMENTAL AND IDENTIFIED MATERIALS ON THE

EXTERIOR FAÇADE. A SUPPLEMENTAL ASBESTOS SURVEY WAS

PERFORMED IN JUNE-JULY 2025 TO FURTHER DELINEATE

SUSPECT ACMS OBSERVED AT ACCESSIBLE PORTIONS OF

DROPS 1, 3, 21, 23, 25, & 26 WHICH ARE INCLUDED IN THE

PROJECT SCOPE. ASBESTOS-CONTAINING CAULK IS

CONFIRMED TO BE PRESENT ALONG THE VERTICAL JOINTS

BETWEEN PRE-CAST WINDOW PANELS AND BRICK MASONRY

AND ASBESTOS-CONTAINING FLASHING TAR HAS BEEN

IDENTIFIED ON METAL COPPER FLASHING. BOTH OF THESE

REQUIRE ABATEMENT TO FACILITATE THE FAÇADE REPAIRS. THE

CONTRACTOR SHALL REFER TO THE ASSOCIATED 'LIMITED

ASBESTOS-CONTAINING MATERIALS SURVEY - REPAIR

BUILDING 111 CONCRETE FAÇADE STUDY'' REPORT DATED

JUNE 28, 2024, AND 'SUPPLEMENTAL ASBESTOS-CONTAINING

MATERIALS SURVEY - BUILDING 111 CONCRETE FAÇADE

PROJECT' DATED AUGUST 28, 2025, FOR DETAILS RELATED TO

THE ASSESSMENTS AND ASSOCIATED ANALYTICAL DATA. THE

PROVIDED DRAWINGS AND SPECIFICATIONS DETAILING THE

SCOPE OF WORK FOR REMEDIATION AND ABATEMENT ARE

BASED ON THE COMPLETED SURVEYS AND THE PROJECT

SCOPE OF WORK.

2. ASBESTOS-CONTAINING MATERIALS HAVE BEEN IDENTIFIED

WITHIN THE PROJECT AREA. CONTRACTOR SHALL

COORDINATE WITH OTHER TRADES AS REQUIRED TO ENSURE

WORKER SAFETY, PHASING, AND PROPER HANDING,

REMOVAL, AND DISPOSAL OF ACMS. REFER TO

SPECIFICATION SECTION 02 82 11. IT IS ANTICIPATED THAT

ABATEMENT OF EXTERIOR CAULK WILL BE COMPLETED IN A

MANNER THAT MAINTAINS THE MATERIAL IN NON-FRIABLE

CONDITION. BRICK WORK IMPACTED BY ACM CAULK IS

SCOPED FOR REPLACEMENT; THEREFORE, IF MINIMAL

DAMAGE TO THE BRICK IS PERMITTED IF REQUIRED TO

PROPERLY ABATE THE IDENTIFIED ASBESTOS-CONTAINING

CAULK.

3. THE CONTRACTOR IS RESPONSIBLE FOR DAILY RE-

CAULKING/SEALING AREAS WHERE ASBESTOS-CONTAINING

CAULK IS ABATED TO ENSURE THAT THE INTEGRITY OF THE

BUILDING ENVELOPE IS MAINTAINED DURING CONSTRUCTION

ACTIVITIES. THE APPLIED CAULK/SEALANT SHALL BE APPROVED

THROUGH THE PRE-CONSTRUCTION SUBMITTAL PROCESS

PRIOR TO USE. ABATED AREAS SHALL NOT BE RE-

CAULKED/SEALED OR OTHERWISE CONCEALED UNTIL A

PASSING VISUAL CLEARANCE INSPECTION IS OBTAINED FOR

EACH AFFECTED WORK AREA AND APPROVED BY THE

INDUSTRIAL HYGIENIST.

4. IF IMPACTED, THE CONTRACTOR IS RESPONSIBLE FOR

ASSESSING AND SAMPLING ADDITIONAL SUSPECT ASBESTOS-

CONTAINING MATERIALS WITHIN THE PROJECT AREA PRIOR

TO DISTURBANCE OF THE MATERIAL(S) IF NEWLY DISCOVERED,

SUSPECT ACMS ARE IDENTIFIED DURING THE COURSE OF

CONSTRUCTION.

Project Number:

Building Number:

Drawing Number:

Project Title:

Location:

Issue Date: Checked: Drawn:

Drawing Title:

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase:DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Sprinkler:

600 E. Michigan Avenue, Suite B Kalamazoo, MI 49007 P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310 Alexandria, VA 22314 P: 202.617.8485 www.alliance.us.com

HAZARDOUS MATERIALS LOCATION PLAN

ELEVATIONS 21 (SOUTH)

BUILDING 111 FACADE REPAIR

5000 W NATIONAL AVE, MILWAUKEE, WI, 53295

695-22-121

MARCH 16, 2026 SK DL

100% BID DOCUMENTS

HA201

KEY PLAN

N 21

Revisions: Date:

(975.67)

LEVEL 01

ELEV. 83'-8"

LEVEL 02

ELEV. 97'-5 3/8"

A

LEVEL 03

ELEV. 111'-2 3/4"

LEVEL 04

ELEV. 122'-9 3/8"

LEVEL 05

ELEV. 134'-4"

LEVEL 06

ELEV. 145'-10 5/8"

LEVEL 07

ELEV. 157'-5 1/4"

LEVEL 08

ELEV. 168'-11 7/8"

LEVEL 09

ELEV. 180'-6 1/2"

LEVEL 10

ELEV. 192'-1 1/8"

P.H. FL. & TOP OF ROOF SLAB

ELEV. 203'-7 3/4"

BCEHK DJ

A

A

EJEJ EJ EJ

21C1

21A2 21B2

21A3 21B3

21A4 21B4

21A5 21B5

21A6 21B6

21A7 21B7

21A8 21B8

21A9 21B9

21A10 21B10

21D1

ASBESTOS

CONTAINING

MASONRY

CAULK

ELEVATION 21 ELEVATION 19

NOT IN SCOPE

EMERGENCY AMBULANCE ENTRY GARAGE AND SHED

SCALE: 1/8" = 1'-0"1 ELEVATION - 21 (SOUTH)

TO THE PROJECT AREA

1. AN ASBESTOS-CONTAINING MATERIALS (ACMS) SURVEY

WAS PERFORMED IN DECEMBER 2023 BY ARC

ENVIRONMENTAL AND IDENTIFIED MATERIALS ON THE

EXTERIOR FAÇADE. A SUPPLEMENTAL ASBESTOS SURVEY WAS

PERFORMED IN JUNE-JULY 2025 TO FURTHER DELINEATE

SUSPECT ACMS OBSERVED AT ACCESSIBLE PORTIONS OF

DROPS 1, 3, 21, 23, 25, & 26 WHICH ARE INCLUDED IN THE

PROJECT SCOPE. ASBESTOS-CONTAINING CAULK IS

CONFIRMED TO BE PRESENT ALONG THE VERTICAL JOINTS

BETWEEN PRE-CAST WINDOW PANELS AND BRICK MASONRY

AND ASBESTOS-CONTAINING FLASHING TAR HAS BEEN

IDENTIFIED ON METAL COPPER FLASHING. BOTH OF THESE

REQUIRE ABATEMENT TO FACILITATE THE FAÇADE REPAIRS. THE

CONTRACTOR SHALL REFER TO THE ASSOCIATED 'LIMITED

ASBESTOS-CONTAINING MATERIALS SURVEY - REPAIR

BUILDING 111 CONCRETE FAÇADE STUDY'' REPORT DATED

JUNE 28, 2024, AND 'SUPPLEMENTAL ASBESTOS-CONTAINING

MATERIALS SURVEY - BUILDING 111 CONCRETE FAÇADE

PROJECT' DATED AUGUST 28, 2025, FOR DETAILS RELATED TO

THE ASSESSMENTS AND ASSOCIATED ANALYTICAL DATA. THE

PROVIDED DRAWINGS AND SPECIFICATIONS DETAILING THE

SCOPE OF WORK FOR REMEDIATION AND ABATEMENT ARE

BASED ON THE COMPLETED SURVEYS AND THE PROJECT

SCOPE OF WORK.

2. ASBESTOS-CONTAINING MATERIALS HAVE BEEN IDENTIFIED

WITHIN THE PROJECT AREA. CONTRACTOR SHALL

COORDINATE WITH OTHER TRADES AS REQUIRED TO ENSURE

WORKER SAFETY, PHASING, AND PROPER HANDING,

REMOVAL, AND DISPOSAL OF ACMS. REFER TO

SPECIFICATION SECTION 02 82 11. IT IS ANTICIPATED THAT

ABATEMENT OF EXTERIOR CAULK WILL BE COMPLETED IN A

MANNER THAT MAINTAINS THE MATERIAL IN NON-FRIABLE

CONDITION. BRICK WORK IMPACTED BY ACM CAULK IS

SCOPED FOR REPLACEMENT; THEREFORE, IF MINIMAL

DAMAGE TO THE BRICK IS PERMITTED IF REQUIRED TO

PROPERLY ABATE THE IDENTIFIED ASBESTOS-CONTAINING

CAULK.

3. THE CONTRACTOR IS RESPONSIBLE FOR DAILY RE-

CAULKING/SEALING AREAS WHERE ASBESTOS-CONTAINING

CAULK IS ABATED TO ENSURE THAT THE INTEGRITY OF THE

BUILDING ENVELOPE IS MAINTAINED DURING CONSTRUCTION

ACTIVITIES. THE APPLIED CAULK/SEALANT SHALL BE APPROVED

THROUGH THE PRE-CONSTRUCTION SUBMITTAL PROCESS

PRIOR TO USE. ABATED AREAS SHALL NOT BE RE-

CAULKED/SEALED OR OTHERWISE CONCEALED UNTIL A

PASSING VISUAL CLEARANCE INSPECTION IS OBTAINED FOR

EACH AFFECTED WORK AREA AND APPROVED BY THE

INDUSTRIAL HYGIENIST.

4. IF IMPACTED, THE CONTRACTOR IS RESPONSIBLE FOR

ASSESSING AND SAMPLING ADDITIONAL SUSPECT ASBESTOS-

CONTAINING MATERIALS WITHIN THE PROJECT AREA PRIOR

TO DISTURBANCE OF THE MATERIAL(S) IF NEWLY DISCOVERED,

SUSPECT ACMS ARE IDENTIFIED DURING THE COURSE OF

CONSTRUCTION.

ASBESTOS LOCATION LEGEND

ASBESTOS-CONTAINING MASONRY CAULK

ASBESTOS-CONTAINING FLASHING TAR

Project Number:

Building Number:

Drawing Number:

Project Title:

Location:

Issue Date: Checked: Drawn:

Drawing Title:

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase:DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Sprinkler:

600 E. Michigan Avenue, Suite B Kalamazoo, MI 49007 P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310 Alexandria, VA 22314 P: 202.617.8485 www.alliance.us.com

HAZARDOUS MATERIALS LOCATION PLAN

ELEVATIONS 23 (SOUTH)

BUILDING 111 FACADE REPAIR

5000 W NATIONAL AVE, MILWAUKEE, WI, 53295

695-22-121

MARCH 16, 2026 SK DL

100% BID DOCUMENTS

HA202

KEY PLAN

N

Revisions: Date:

(975.67)

LEVEL 01

ELEV. 83'-8"

LEVEL 02

ELEV. 97'-5 3/8"

LEVEL 03

ELEV. 111'-2 3/4"

LEVEL 04

ELEV. 122'-9 3/8"

LEVEL 05

ELEV. 134'-4"

LEVEL 06

ELEV. 145'-10 5/8"

LEVEL 07

ELEV. 157'-5 1/4"

LEVEL 08

ELEV. 168'-11 7/8"

LEVEL 09

ELEV. 180'-6 1/2"

LEVEL 10

ELEV. 192'-1 1/8"

P.H. FL. & TOP OF ROOF SLAB

ELEV. 203'-7 3/4"

KLN

MACHINE ROOM

ELEV. 217'-2 3/8"

TANK RM. FL./TOP OF P.H. ROOF

ELEV. 227'-2 3/8"

QSTUXZAA RV

T.O. ROOF SLAB

ELEV. 243'-5"

A

A

A

23A9 23B9 23C9 23D10 23E9 23F9 23G9 23H9 23I9 23J9 23K9 23L9 23M9

23N1023M1023L1023K1023J1023I1023H1023G1023E10 23F1023C10 23D1023A10 23B10

N O

T

IN

S C

O

PE

ASBESTOS

CONTAINING

MASONRY

CAULK

LINE OF SOLARIUM

109 10a

EJ

24K10

24K924J9

24J10

ASBESTOS

CONTAINING

MASONRY

CAULK

LEVEL 09

ELEV. 180'-6 1/2"

LEVEL 10

ELEV. 192'-1 1/8"

P.H. FL. & TOP OF ROOF SLAB

ELEV. 203'-7 3/4"

10 910a

EJ22B1022A10

ASBESTOS

CONTAINING

MASONRY

CAULK

SCALE: 1/8" = 1'-0"3 ELEVATION - 23 (SOUTH)

SCALE: 1/8" = 1'-0"1 ELEVATION - 24 (EAST)

SCALE: 1/8" = 1'-0"2 ELEVATION - 22 (WEST)

ASBESTOS LOCATION LEGEND

ASBESTOS-CONTAINING MASONRY CAULK

ASBESTOS-CONTAINING FLASHING TAR

GENERAL HAZARDOUS

MATERIAL NOTES APPLICABLE

TO THE PROJECT AREA

1. AN ASBESTOS-CONTAINING MATERIALS (ACMS) SURVEY

WAS PERFORMED IN DECEMBER 2023 BY ARC

ENVIRONMENTAL AND IDENTIFIED MATERIALS ON THE

EXTERIOR FAÇADE. A SUPPLEMENTAL ASBESTOS SURVEY WAS

PERFORMED IN JUNE-JULY 2025 TO FURTHER DELINEATE

SUSPECT ACMS OBSERVED AT ACCESSIBLE PORTIONS OF

DROPS 1, 3, 21, 23, 25, & 26 WHICH ARE INCLUDED IN THE

PROJECT SCOPE. ASBESTOS-CONTAINING CAULK IS

CONFIRMED TO BE PRESENT ALONG THE VERTICAL JOINTS

BETWEEN PRE-CAST WINDOW PANELS AND BRICK MASONRY

AND ASBESTOS-CONTAINING FLASHING TAR HAS BEEN

IDENTIFIED ON METAL COPPER FLASHING. BOTH OF THESE

REQUIRE ABATEMENT TO FACILITATE THE FAÇADE REPAIRS. THE

CONTRACTOR SHALL REFER TO THE ASSOCIATED 'LIMITED

ASBESTOS-CONTAINING MATERIALS SURVEY - REPAIR

BUILDING 111 CONCRETE FAÇADE STUDY'' REPORT DATED

JUNE 28, 2024, AND 'SUPPLEMENTAL ASBESTOS-CONTAINING

MATERIALS SURVEY - BUILDING 111 CONCRETE FAÇADE

PROJECT' DATED AUGUST 28, 2025, FOR DETAILS RELATED TO

THE ASSESSMENTS AND ASSOCIATED ANALYTICAL DATA. THE

PROVIDED DRAWINGS AND SPECIFICATIONS DETAILING THE

SCOPE OF WORK FOR REMEDIATION AND ABATEMENT ARE

BASED ON THE COMPLETED SURVEYS AND THE PROJECT

SCOPE OF WORK.

2. ASBESTOS-CONTAINING MATERIALS HAVE BEEN IDENTIFIED

WITHIN THE PROJECT AREA. CONTRACTOR SHALL

COORDINATE WITH OTHER TRADES AS REQUIRED TO ENSURE

WORKER SAFETY, PHASING, AND PROPER HANDING,

REMOVAL, AND DISPOSAL OF ACMS. REFER TO

SPECIFICATION SECTION 02 82 11. IT IS ANTICIPATED THAT

ABATEMENT OF EXTERIOR CAULK WILL BE COMPLETED IN A

MANNER THAT MAINTAINS THE MATERIAL IN NON-FRIABLE

CONDITION. BRICK WORK IMPACTED BY ACM CAULK IS

SCOPED FOR REPLACEMENT; THEREFORE, IF MINIMAL

DAMAGE TO THE BRICK IS PERMITTED IF REQUIRED TO

PROPERLY ABATE THE IDENTIFIED ASBESTOS-CONTAINING

CAULK.

3. THE CONTRACTOR IS RESPONSIBLE FOR DAILY RE-

CAULKING/SEALING AREAS WHERE ASBESTOS-CONTAINING

CAULK IS ABATED TO ENSURE THAT THE INTEGRITY OF THE

BUILDING ENVELOPE IS MAINTAINED DURING CONSTRUCTION

ACTIVITIES. THE APPLIED CAULK/SEALANT SHALL BE APPROVED

THROUGH THE PRE-CONSTRUCTION SUBMITTAL PROCESS

PRIOR TO USE. ABATED AREAS SHALL NOT BE RE-

CAULKED/SEALED OR OTHERWISE CONCEALED UNTIL A

PASSING VISUAL CLEARANCE INSPECTION IS OBTAINED FOR

EACH AFFECTED WORK AREA AND APPROVED BY THE

INDUSTRIAL HYGIENIST.

4. IF IMPACTED, THE CONTRACTOR IS RESPONSIBLE FOR

ASSESSING AND SAMPLING ADDITIONAL SUSPECT ASBESTOS-

CONTAINING MATERIALS WITHIN THE PROJECT AREA PRIOR

TO DISTURBANCE OF THE MATERIAL(S) IF NEWLY DISCOVERED,

SUSPECT ACMS ARE IDENTIFIED DURING THE COURSE OF

CONSTRUCTION.

Project Number:

Building Number:

Drawing Number:

Project Title:

Location:

Issue Date: Checked: Drawn:

Drawing Title:

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase:DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Sprinkler:

600 E. Michigan Avenue, Suite B Kalamazoo, MI 49007 P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310 Alexandria, VA 22314 P: 202.617.8485 www.alliance.us.com

HAZARDOUS MATERIALS LOCATION PLAN

ELEVATIONS 25 (SOUTH)

BUILDING 111 FACADE REPAIR

5000 W NATIONAL AVE, MILWAUKEE, WI, 53295

695-22-121

MARCH 16, 2026 SK DL

100% BID DOCUMENTS

HA203

KEY PLAN

N

Revisions: Date:

(975.67)

LEVEL 01

ELEV. 83'-8"

LEVEL 02

ELEV. 97'-5 3/8"

LEVEL 03

ELEV. 111'-2 3/4"

LEVEL 04

ELEV. 122'-9 3/8"

LEVEL 05

ELEV. 134'-4"

LEVEL 06

ELEV. 145'-10 5/8"

LEVEL 07

ELEV. 157'-5 1/4"

LEVEL 08

ELEV. 168'-11 7/8"

LEVEL 09

ELEV. 180'-6 1/2"

LEVEL 10

ELEV. 192'-1 1/8"

P.H. FL. & TOP OF ROOF SLAB

ELEV. 203'-7 3/4"

AACCFFGGHHJJKKLL

A

25C2

25C3

25C4

25C5

25C6

25C7

25C8

25C9

25C10

25D2

25D3

25D4

25D5

25D6

25D7

25D8

25D9

25D10

25C1 25D125A1 25B1 25E1 25F1

ELEVATION 25ELEVATION 27

EJEJEJEJ

NOT IN SCOPE

ASBESTOS

CONTAINING

MASONRY

CAULK

SCALE: 1/8" = 1'-0"1 ELEVATION - 25 (SOUTH)

TO THE PROJECT AREA

1. AN ASBESTOS-CONTAINING MATERIALS (ACMS) SURVEY

WAS PERFORMED IN DECEMBER 2023 BY ARC

ENVIRONMENTAL AND IDENTIFIED MATERIALS ON THE

EXTERIOR FAÇADE. A SUPPLEMENTAL ASBESTOS SURVEY WAS

PERFORMED IN JUNE-JULY 2025 TO FURTHER DELINEATE

SUSPECT ACMS OBSERVED AT ACCESSIBLE PORTIONS OF

DROPS 1, 3, 21, 23, 25, & 26 WHICH ARE INCLUDED IN THE

PROJECT SCOPE. ASBESTOS-CONTAINING CAULK IS

CONFIRMED TO BE PRESENT ALONG THE VERTICAL JOINTS

BETWEEN PRE-CAST WINDOW PANELS AND BRICK MASONRY

AND ASBESTOS-CONTAINING FLASHING TAR HAS BEEN

IDENTIFIED ON METAL COPPER FLASHING. BOTH OF THESE

REQUIRE ABATEMENT TO FACILITATE THE FAÇADE REPAIRS. THE

CONTRACTOR SHALL REFER TO THE ASSOCIATED 'LIMITED

ASBESTOS-CONTAINING MATERIALS SURVEY - REPAIR

BUILDING 111 CONCRETE FAÇADE STUDY'' REPORT DATED

JUNE 28, 2024, AND 'SUPPLEMENTAL ASBESTOS-CONTAINING

MATERIALS SURVEY - BUILDING 111 CONCRETE FAÇADE

PROJECT' DATED AUGUST 28, 2025, FOR DETAILS RELATED TO

THE ASSESSMENTS AND ASSOCIATED ANALYTICAL DATA. THE

PROVIDED DRAWINGS AND SPECIFICATIONS DETAILING THE

SCOPE OF WORK FOR REMEDIATION AND ABATEMENT ARE

BASED ON THE COMPLETED SURVEYS AND THE PROJECT

SCOPE OF WORK.

2. ASBESTOS-CONTAINING MATERIALS HAVE BEEN IDENTIFIED

WITHIN THE PROJECT AREA. CONTRACTOR SHALL

COORDINATE WITH OTHER TRADES AS REQUIRED TO ENSURE

WORKER SAFETY, PHASING, AND PROPER HANDING,

REMOVAL, AND DISPOSAL OF ACMS. REFER TO

SPECIFICATION SECTION 02 82 11. IT IS ANTICIPATED THAT

ABATEMENT OF EXTERIOR CAULK WILL BE COMPLETED IN A

MANNER THAT MAINTAINS THE MATERIAL IN NON-FRIABLE

CONDITION. BRICK WORK IMPACTED BY ACM CAULK IS

SCOPED FOR REPLACEMENT; THEREFORE, IF MINIMAL

DAMAGE TO THE BRICK IS PERMITTED IF REQUIRED TO

PROPERLY ABATE THE IDENTIFIED ASBESTOS-CONTAINING

CAULK.

3. THE CONTRACTOR IS RESPONSIBLE FOR DAILY RE-

CAULKING/SEALING AREAS WHERE ASBESTOS-CONTAINING

CAULK IS ABATED TO ENSURE THAT THE INTEGRITY OF THE

BUILDING ENVELOPE IS MAINTAINED DURING CONSTRUCTION

ACTIVITIES. THE APPLIED CAULK/SEALANT SHALL BE APPROVED

THROUGH THE PRE-CONSTRUCTION SUBMITTAL PROCESS

PRIOR TO USE. ABATED AREAS SHALL NOT BE RE-

CAULKED/SEALED OR OTHERWISE CONCEALED UNTIL A

PASSING VISUAL CLEARANCE INSPECTION IS OBTAINED FOR

EACH AFFECTED WORK AREA AND APPROVED BY THE

INDUSTRIAL HYGIENIST.

4. IF IMPACTED, THE CONTRACTOR IS RESPONSIBLE FOR

ASSESSING AND SAMPLING ADDITIONAL SUSPECT ASBESTOS-

CONTAINING MATERIALS WITHIN THE PROJECT AREA PRIOR

TO DISTURBANCE OF THE MATERIAL(S) IF NEWLY DISCOVERED,

SUSPECT ACMS ARE IDENTIFIED DURING THE COURSE OF

CONSTRUCTION.

ASBESTOS LOCATION LEGEND

ASBESTOS-CONTAINING MASONRY CAULK

ASBESTOS-CONTAINING FLASHING TAR

Project Number:

Building Number:

Drawing Number:

Project Title:

Location:

Issue Date: Checked: Drawn:

Drawing Title:

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase:DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Sprinkler:

600 E. Michigan Avenue, Suite B Kalamazoo, MI 49007 P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310 Alexandria, VA 22314 P: 202.617.8485 www.alliance.us.com

HAZARDOUS MATERIALS LOCATION PLAN

ELEVATIONS 26 (WEST)

BUILDING 111 FACADE REPAIR

5000 W NATIONAL AVE, MILWAUKEE, WI, 53295

695-22-121

MARCH 16, 2026 SK DL

100% BID DOCUMENTS

HA204

KEY PLAN

N

�26

Revisions: Date:

(975.67)

LEVEL 01

ELEV. 83'-8"

LEVEL 02

ELEV. 97'-5 3/8"

LEVEL 03

ELEV. 111'-2 3/4"

LEVEL 04

ELEV. 122'-9 3/8"

LEVEL 05

ELEV. 134'-4"

LEVEL 06

ELEV. 145'-10 5/8"

LEVEL 07

ELEV. 157'-5 1/4"

LEVEL 08

ELEV. 168'-11 7/8"

LEVEL 09

ELEV. 180'-6 1/2"

LEVEL 10

ELEV. 192'-1 1/8"

P.H. FL. & TOP OF ROOF SLAB

ELEV. 203'-7 3/4"

8 7 6 5 4 2 13

26F2

26F3

26F4

26F5

26F6

26F7

26F8

26F9

26F10

26E2

26E3

26E4

26E5

26E6

26E7

26E8

26E9

26E10

26B2

26B3

26B4

26B5

26B6

26B7

26B8

26B9

26B10

26A2

26A3

26A4

26A5

26A6

26A7

26A8

26A9

26A10

26C126B1 26D1 26E1 26F1

NOT IN SCOPENOT IN SCOPE

BASE BID

EMERGENCY EXIT

2ND FLOOR ROOF

ACCESS DOOR

JJKK

NOT IN SCOPE

ASBESTOS

CONTAINING

MASONRY

CAULK

ASBESTOS

CONTAINING

MASONRY

CAULK

EJ

SCALE: 1/8" = 1'-0"2 ELEVATION - 26 (WEST)

SCALE: 1/8" = 1'-0"1 ELEVATION - 27 (SOUTH)

G001 - TITLE SHEET
G002 - GENERAL INFO & SYMBOL LEGEND
G003 - ROOF PLANS AND ISOMETRICS
G004 - ROOF AND ELEVATOR ACCESS FLOORS 1 AND 3
G005 - ROOF PLAN ACCESS INFORMATION FLOORS 9 AND 11
A200 - EXTERIOR ELEVATIONS - 3 AND 1 (NORTH)
A201 - EXTERIOR ELEVATIONS - 21 (SOUTH)
A202 - EXTERIOR ELEVATIONS - 23 (SOUTH)
A203 - EXTERIOR ELEVATIONS - 25 (SOUTH)
A204 - EXTERIOR ELEVATIONS - 26 (WEST)
A300 - ENLARGED ELEVATIONS
A301 - WALL SECTIONS AND DETAILS
A302 - REPAIR DETAILS
A303 - REPAIR DETAILS
HA200 - HAZARDOUS MATERIALS LOCATION PLAN ELEVATIONS 3 AND 1 (NORTH)
HA201 - HAZARDOUS MATERIALS LOCATION PLAN ELEVATIONS 21 (SOUTH)
HA202 - HAZARDOUS MATERIALS LOCATION PLAN ELEVATIONS 23 (SOUTH)
HA203 - HAZARDOUS MATERIALS LOCATION PLAN ELEVATIONS 25 (SOUTH)
HA204 - HAZARDOUS MATERIALS LOCATION PLAN ELEVATIONS 26 (WEST)