This is a set of final bid documents for a federal construction project at the Veterans Affairs Medical Center in Tomah, Wisconsin. The project (No. 676-23-009) involves the replacement of cast iron fittings throughout the facility's mechanical systems. The project is managed by the Office of Facilities Management and was issued for final bid on November 3, 2023.
The bid documents include comprehensive mechanical drawings and demolition plans across 22 phases of work affecting multiple buildings (B023, B025, B032, B036, B040, B400-B408, B415, B416, B423-B425, and B452) plus tramway connections and exterior trenches/manholes. Work involves removal and replacement of steam and chilled water piping systems, condensate service lines, pressure reducing stations, steam traps, and associated mechanical components. The plans specify detailed sequencing for each phase to manage ongoing facility operations, establish infection control risk assessments with multiple hazard rating levels, and include mechanical site demolition plans for both western and eastern portions of the campus. General notes specify that in case of conflicts between drawings, the government shall determine which requirements provide better quality, more stringent specifications, or greater quantity of work to be performed. The project includes phased construction requiring coordination with multiple building systems and infrastructure connections throughout the medical center campus.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25226B0037 0003.docx | DOCX document | |
| S02 - 676-23-009 Replace Cast Iron Fittings - 100 Bid Specifications.pdf | ||
| 36C25226B0037_1.docx | DOCX document | |
| S02 - Wage Det 07242026.txt | TXT text file | |
| S02 - 676-23-009 Replace Cast Iron Fittings - 100 Bid Drawings P2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION MAP
PROJECT TEAM
PROJECT LEADER/ARCHITECT
PENN CONSTRUCTION GROOP
VETERANS AFFAIRS MEDICAL CENTER
500 E VETERANS ST
TOMAH, WI 54660
CAMPUS MAP SHEET INDEX
IN THE CASE OF CONFLICTS OR DISCREPANCIES
WITHIN OR AMONG THE CONTRACT DRAWINGS, THE
BETTER QUALITY, MORE STRINGENT REQUIREMENTS
OR GREATER QUANTITY OF WORK, AS DETERMINED
BY THE GOVERNMENT, SHALL BE PROVIDED.
MECHANICAL
PENN CONSTRUCTION GROUP
MECHANICAL
M001 MECHANICAL LEGEND AND ABBREVIATIONS
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
NOV 3, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
GI001
KAB
TITLE SHEET
HFB
MD011 MECHANICAL SITE DEMOLITION PLAN - WEST
ST. FRANCIS LOCATION
3770 S. PENNSYLVANIA AVE., UNIT 8
ST. FRANCIS,WI 53235
PHONE: (414) 391-2797
PENN CONSTRUCTION GROUP
ST. FRANCIS LOCATION
3770 S. PENNSYLVANIA AVE., UNIT 8
ST. FRANCIS,WI 53235
PHONE: (414) 391-2797
MD012 MECHANICAL SITE DEMOLITION PLAN - EAST
MD101 B400 MECHANICAL CRAWL SPACE DEMOLITION PLAN
MD104
B401 MECHANICAL CRAWL SPACE DEMOLITION PLAN
MD110
MD118
MD120
MD114
SHEET NUMBER SHEET NAME
GENERAL INFORMATION
GI001 TITLE SHEET
ISSUED FOR
35% BD
7/7/2023
ISSUED FOR
65% DD
8/3/2023
GC101 GENERAL PHASING PLANS
GC102 GENERAL PHASING PLANS
ISSUED FOR
85% CD
9/20/2023
ISSUED FOR
95% CD
10/10/2023
B415 MECHANICAL FIRST FLOOR AND BASEMENT DEMOLITION PLANS
B416 MECHANICAL BASEMENT DEMOLITION PLAN
B452 MECHANICAL FIRST FLOOR DEMOLITION PLAN
B023, B025, B032, B260, B425 MECHANICAL DEMOLITION FLOOR PLANS
B424 MECHANICAL CRAWL SPACE DEMOLITION PLAN
MP105
MP106
MP107
MP108
MP109
MP110
MP113
MP117
MP118
MP114
MD102
MD103
B400 MECHANICAL 2ND FLOOR, 4TH FLOOR, ATTIC PARTIAL DEMOLITION PLANS
MD105
MD106
B402 MECHANICAL CRAWL SPACE DEMOLITION PLAN
MD107
MD108
B403 MECHANICAL CRAWL SPACE DEMOLITION PLAN
MD109
B403 MECHANICAL ATTIC DEMOLITION PLAN
B404 MECHANICAL CRAWL SPACE DEMOLITION PLAN
B404 MECHANICAL ATTIC DEMOLITION PLAN
MD111
MD112
B406 MECHANICAL CRAWL SPACE DEMOLITION PLAN
B406 MECHANICAL FIRST FLOOR DEMOLITION PLAN
MD113
B407 MECHANICAL CRAWL SPACE DEMOLITION PLAN
B408 MECHANICAL CRAWL SPACE AND FIRST FLOOR PARTIAL DEMOLITION PLANS
B408 MECHANICAL ATTIC DEMOLITION PLANMD115
MD116
MD117
B406 MECHANICAL ATTIC DEMOLITION PLAN
B415 MECHANICAL MEZZANINE AND UPPER MEZZANINE DEMOLITION PLANS
MD119
MD122
MD124
MD125
MECHANICAL SITE PLAN - WEST
MECHANICAL SITE PLAN - EAST
B400 MECHANICAL CRAWL SPACE PLAN - NEW WORK
B401 MECHANICAL CRAWL SPACE PLAN - NEW WORK
B415 MECHANICAL FIRST FLOOR AND BASEMENT PLANS - NEW WORK
B416 MECHANICAL BASEMENT PLAN - NEW WORK
B400 MECHANICAL 2ND FLOOR, 4TH FLOOR, ATTIC PARTIAL PLANS - NEW WORK
B402 MECHANICAL CRAWL SPACE PLAN - NEW WORK
B403 MECHANICAL CRAWL SPACE PLAN - NEW WORK
B403 MECHANICAL ATTIC PLAN - NEW WORK
B404 MECHANICAL CRAWL SPACE PLAN - NEW WORK
B404 MECHANICAL ATTIC PLAN - NEW WORK
B406 MECHANICAL CRAWL SPACE PLAN - NEW WORK
B406 MECHANICAL FIRST FLOOR PLAN - NEW WORK
B407 MECHANICAL CRAWL SPACE PLAN - NEW WORK
B408 MECHANICAL CRAWL SPACE AND FIRST FLOOR PARTIAL PLANS - NEW WORK
B408 MECHANICAL ATTIC PLAN - NEW WORK
B406 MECHANICAL ATTIC PLAN - NEW WORK
B415 MECHANICAL MEZZANINE AND UPPER MEZZANINE PLANS - NEW WORK
MP011
MP012
MP101
MP104
MP102
MP103
MP111
MP112
MP115
MP116
MP119
MP122
MP124
MP125
MP120
M501
M601
M602
MECHANICAL DETAILS
MECHANICAL SCHEDULES
MECHANICAL SCHEDULES
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
TRAMWAY MECHANICAL PLANS - NEW WORK
M301
MECHANICAL SECTIONS
M302
MECHANICAL SECTIONS
M603
M604
MECHANICAL SCHEDULES
MECHANICAL SCHEDULES
M605
MECHANICAL SCHEDULES
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
PROJECT NO.: 676-23-009
REPLACE CAST IRON FITTINGS DESIGN
B407 MECHANICAL FIRST FLOOR DEMOLITION PLAN
TRAMWAY MECHANICAL DEMOLITION PLANS
B040 AND B036 MECHANICAL DEMOLITION FLOOR PLANS
MD301
MD302
MECHANICAL ENLARGED DEMOLITION PLANS
MECHANICAL ENLARGED DEMOLITION PLANS
B407 MECHANICAL FIRST FLOOR PLAN - NEW WORK
B023, B025, B032, B260, B425 MECHANICAL NEW WORK FLOOR PLANS
B424 MECHANICAL CRAWL SPACE PLAN - NEW WORK
B452 MECHANICAL FIRST FLOOR PLAN - NEW WORK
B040 AND B036 MECHANICAL NEW WORK FLOOR PLANS
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
MD126
MECHANICAL EXTERIOR TRENCH AND MANHOLE ENLARGED DEMOLITION PLANS X
MP126 MECHANICAL EXTERIOR TRENCH AND MANHOLE ENLARGED NEW WORK PLANS X
MP301
MP302
MECHANICAL ENLARGED NEW WORK PLANS
MECHANICAL ENLARGED NEW WORK PLANS
X
X
HAZARDOUS MATERIALS
HA101 SITE PLAN - WEST
HA102 SITE PLAN - EAST
HA103 TRAMWAY PLANS
MD121
MD123
B423 MECHANICAL FIRST FLOOR DEMOLITION PLAN
B424 MECHANICAL PARTIAL FIRST FLOOR AND ATTIC DEMOLITION PLANS
MP121
MP123
B423 MECHANICAL FIRST FLOOR PLAN - NEW WORK
B424 MECHANICAL PARTIAL FIRST FLOOR AND ATTIC PLANS - NEW WORK
ISSUED FOR
FINAL BID
11/3/2023
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
GC103 GENERAL NOTES AND DETAILS
X
8.5
6.6
6.5
D O
W N
U P
AIR COMP
FLASH TANK
MCCMCC
PRV STATION
WH
ROOF ROOF
1615B
F L A S H
T A N K
AS SHOWN
GENERAL
PHASING AND CRITICAL
BARRIER PLANS
GC101
N.T.S.
PHASE 1- B415
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
NOV 3, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
N.T.S.
PHASE 1- B415
N.T.S.
PHASE 1 - B415
N.T.S.
PHASE 2 - B400
N.T.S.
PHASE 2 - B400
N.T.S.
PHASE 2 - B400
N.T.S.
PHASE 2 - B400
N.T.S.
PHASE 3 - B401
N.T.S.
PHASE 4 - B402
NT.S.
PHASE 5 - B403
N.T.S.
PHASE 5 - B403
N.T.S.
PHASE 6 - B404
N.T.S.
PHASE 6 - B404
N.T.S.
PHASE 7 - B406
N.T.S.
PHASE 7 - B406
AutoCAD SHX Text
PHASE 1 - B415
AutoCAD SHX Text
1A - GROUND FLOOR BOILER ROOM 1B - BASEMENT
AutoCAD SHX Text
UP
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
DN
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
SUMP PUMP
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
AutoCAD SHX Text
SANDBLASTER
AutoCAD SHX Text
WORK TABLE W/ VISE
AutoCAD SHX Text
WORK TABLE W/ DRILL
AutoCAD SHX Text
WORK TABLE
AutoCAD SHX Text
GRINDER
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
FD
AutoCAD SHX Text
WH
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
REF
AutoCAD SHX Text
LOCKERS
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
FD
AutoCAD SHX Text
PHASE 1 - B415
AutoCAD SHX Text
1C - MEZZANINE LEVEL
AutoCAD SHX Text
PHASE 1A - B415
AutoCAD SHX Text
1C - UPPER MEZZANINE LEVEL
AutoCAD SHX Text
OPEN
AutoCAD SHX Text
OPEN
AutoCAD SHX Text
OPEN
AutoCAD SHX Text W14X34
AutoCAD SHX Text
28LH08
AutoCAD SHX Text W8X17
AutoCAD SHX Text
28LH08
AutoCAD SHX Text
28LH08
AutoCAD SHX Text
28LH08
AutoCAD SHX Text
28LH08
AutoCAD SHX Text
28LH08
AutoCAD SHX Text W8X17
AutoCAD SHX Text W8X17
AutoCAD SHX Text
10" STL BEAM
AutoCAD SHX Text L8X11.5
AutoCAD SHX Text L3X3X5/16
AutoCAD SHX Text L3X3X5/16
AutoCAD SHX Text W8X17
AutoCAD SHX Text
STANDARD X BRIDGING
AutoCAD SHX Text
ADDITIONAL BRIDGING @HANGERS TYP
AutoCAD SHX Text L3X3X5/16
AutoCAD SHX Text
L4'X4'X5/16" TYP
AutoCAD SHX Text L3X3X5/16
AutoCAD SHX Text L3X3X5/16
AutoCAD SHX Text L3X3X5/16
AutoCAD SHX Text 2- L6X8.2
AutoCAD SHX Text 2- L6X8.2
AutoCAD SHX Text
10" STL BEAM
AutoCAD SHX Text
10" STL BEAM
AutoCAD SHX Text
10" STL BEAM
AutoCAD SHX Text
10" STL BEAM
AutoCAD SHX Text
L4'X4'X5/16" TYP
AutoCAD SHX Text
COLUMN LINE TRUSS
AutoCAD SHX Text
COLUMN LINE TRUSS
AutoCAD SHX Text
COLUMN LINE TRUSS
AutoCAD SHX Text
COLUMN LINE TRUSS
AutoCAD SHX Text
COLUMN LINE TRUSS
AutoCAD SHX Text
CHILLER
AutoCAD SHX Text
WATER HEATER
AutoCAD SHX Text
SUMP
AutoCAD SHX Text
BLADDER TANK
AutoCAD SHX Text
HEAT EXCH
AutoCAD SHX Text
TELE PANEL
AutoCAD SHX Text
SERVER
AutoCAD SHX Text
AC
AutoCAD SHX Text
HEAT EXCHANGERS
AutoCAD SHX Text
PHASE 2 - B400
AutoCAD SHX Text
2A - CRAWL SPACE 2B - BASEMENT MECHANICAL ROOM
AutoCAD SHX Text PROVIDE ICB-2 TYPE CRITICAL POLY BARRIER AT TOP OF BASEMENT STAIR ON FIRST FLOOR. SEE DRAWING GC103.
AutoCAD SHX Text
PHASE 2 - B400
AutoCAD SHX Text
2C - SECOND FLOOR
AutoCAD SHX Text PROVIDE ICB-2 TYPE CRITICAL POLY BARRIER AT MECHANICAL ROOM DOORS. SEE DRAWING GC103.
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
PHASE 2 - B400
AutoCAD SHX Text
2D - FOURTH FLOOR
AutoCAD SHX Text PROVIDE ICB-2 TYPE CRITICAL POLY BARRIER AT MECHANICAL ROOM DOORS. SEE DRAWING GC103.
AutoCAD SHX Text PROVIDE ICB-2 TYPE CRITICAL POLY BARRIER AT STAIR DOOR TO ATTIC MECHANICAL ROOM ON FOURTH FLOOR. SEE DRAWING GC103.
AutoCAD SHX Text
PHASE 2 - B400
AutoCAD SHX Text
2E - PENTHOUSE/ATTIC
AutoCAD SHX Text PROVIDE ICB-2 TYPE CRITICAL POLY BARRIER AT STAIR DOOR TO ATTIC MECHANICAL ROOM ON FOURTH FLOOR. SEE DRAWING GC103.
AutoCAD SHX Text
PHASE 3 - B401
AutoCAD SHX Text
3A - CRAWL SPACE 3B - BASEMENT MECHANICAL ROOM
AutoCAD SHX Text PROVIDE ICB-2 TYPE CRITICAL POLY BARRIER AT MECHANICAL ROOM DOOR ON FIRST FLOOR. SEE DRAWING GC103.
AutoCAD SHX Text
UP
AutoCAD SHX Text
PHASE 4 - B402
AutoCAD SHX Text
4A - CRAWL SPACE 4B - BASEMENT MECHANICAL ROOM
AutoCAD SHX Text PROVIDE ICB-2 TYPE CRITICAL POLY BARRIER AT MECHANICAL ROOM DOOR ON FIRST FLOOR. SEE DRAWING GC103.
AutoCAD SHX Text
UP
AutoCAD SHX Text F.D.
AutoCAD SHX Text
HEAT EXCH
AutoCAD SHX Text
WH
AutoCAD SHX Text
MED AIR COMPRESSOR
AutoCAD SHX Text
MED VAC COMPRESS
AutoCAD SHX Text
WH
AutoCAD SHX Text
EXP
AutoCAD SHX Text
PHASE 5 - B403
AutoCAD SHX Text
5A - CRAWL SPACE 5B - BASEMENT MECHANICAL ROOM
AutoCAD SHX Text PROVIDE ICB-2 TYPE CRITICAL POLY BARRIER AT MECHANICAL ROOM DOOR ON FIRST FLOOR. SEE DRAWING GC103.
AutoCAD SHX Text
DN
AutoCAD SHX Text
PHASE 5 - B403
AutoCAD SHX Text
5C - ATTIC
AutoCAD SHX Text PROVIDE ICB-2 TYPE CRITICAL POLY BARRIER AT ATTIC MECHANICAL ROOM DOOR ON THIRD FLOOR. SEE DRAWING GC103.
AutoCAD SHX Text
SUMP
AutoCAD SHX Text
UP
AutoCAD SHX Text
HEAT EXCHANGERS
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text
BA100
AutoCAD SHX Text
PHASE 6 - B404
AutoCAD SHX Text
6A - CRAWL SPACE 6B - BASEMENT MECHANICAL ROOM
AutoCAD SHX Text PROVIDE ICB-2 TYPE CRITICAL POLY BARRIER AT MECHANICAL ROOM DOOR ON FIRST FLOOR. SEE DRAWING GC103.
AutoCAD SHX Text
PHASE 6 - B404
AutoCAD SHX Text
6C - ATTIC
AutoCAD SHX Text PROVIDE ICB-2 TYPE CRITICAL POLY BARRIER AT ATTIC MECHANICAL ROOM DOOR ON THIRD FLOOR. SEE DRAWING GC103.
AutoCAD SHX Text
PHASE 7 - B406
AutoCAD SHX Text
7C - FIRST FLOOR
AutoCAD SHX Text PROVIDE ICB-2 TYPE CRITICAL POLY BARRIER AT MECHANICAL ROOM DOOR ON FIRST FLOOR. SEE DRAWING GC103.
AutoCAD SHX Text FOR WORK IN THIS ROOM AS SHOWN ON DRAWINGS MD-110 AND MP-110 PROVIDE AND USE HEPA CART(S), SEE DETAIL 2 ON DRAWING GC103 FOR ADDITIONAL INFORMATION.
AutoCAD SHX Text
UP
AutoCAD SHX Text F.D.
AutoCAD SHX Text
PHASE 7 - B406
AutoCAD SHX Text
7A - CRAWL SPACE 7B - BASEMENT MECHANICAL ROOM
AutoCAD SHX Text PROVIDE ICB-2 TYPE CRITICAL POLY BARRIER AT MECHANICAL ROOM DOOR ON FIRST FLOOR. SEE DRAWING GC103.
AutoCAD SHX Text N
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231, OCT 1978
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text THE CONTRACTOR SHALL DO THE FOLLOWING FOR SEQUENCING OF ALL INSTALLATIONS AND PROPOSED SHUT-DOWNS OF STEAM OR CONDENSATE SERVICE: PRE-MEASURE, PRE-FABRICATE AND HAVE ON-SITE BEFORE ANY DEMOLITION MAY HAPPEN FOR EVERY STEAM TRAP ASSEMBLY, PRESSURE REDUCING STATION ASSEMBLY AND STEAM PRESSURE SAFELY RELIEF VALVE ASSEMBLY. VERIFY EACH ASSEMBLY IS ON-SITE WITH THE COR AND CCR BEFORE BEGINNING THE DEMOLITION WORK. THIS IS IN ADDITION TO 10 DAYS WRITTEN AND APPROVED NOTICE OF ALL SHUT-DOWNS. ADDITIONALLY, THE CONTRACTOR SHALL SUBMIT FOR APPROVAL TO THE VA A DETAILED PLAN OF THE SHUT-DOWN THAT INCLUDES THE LOCATION(S) OF THE WORK, BUILDING OR BUILDINGS AFFECTED, PLANNED TIME OF DAY FOR THE SHUT-DOWN, EXPECTED DURATION OF SHUT-DOWN, AND WHAT SERVICES THE VA MAY NEED TO PROVIDE TO AID THE WORK.
DN
GC102
N.T.S.
PHASE 9 - B408
N.T.S.
PHASE 10 - B32
N.T.S.
PHASE 11 - B23
N.T.S.
PHASE 12 - B25
N.T.S.
PHASE 13 - B36
N.T.S.
PHASE 15 - B423
N.T.S.
PHASE 16 - B424
N.T.S.
PHASE 17 - B425
N.T.S.
PHASE 18 - B452
N.T.S.
PHASE 7 - B406
N.T.S.
PHASE 8 - B407
N.T.S.
PHASE 8 - B407
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
NOV 3, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
N.T.S.
PHASE 14 - B40
N.T.S.
PHASE 9 - B408
N.T.S.
PHASE 9 - B408
N.T.S.
PHASE 19 - B260
N.T.S.
PHASE 20 - B416
SEE SHEETS MD122 AND MP122
PHASE 21 - TRAMWAYS
SEE SHEETS MD124 AND MP124
PHASE 22 - EXTERIOR WORK
AS SHOWN
GENERAL
PHASING AND CRITICAL
BARRIER PLANS
AutoCAD SHX Text
PHASE 9 - B408
AutoCAD SHX Text
9D - ATTIC
AutoCAD SHX Text PROVIDE ICB-2 TYPE CRITICAL POLY BARRIER AT ATTIC MECHANICAL ROOM DOOR ON THIRD FLOOR. SEE DRAWING GC103.
AutoCAD SHX Text
PHASE 10 - B32
AutoCAD SHX Text
10 - BASEMENT
AutoCAD SHX Text PROVIDE ICB-2 TYPE CRITICAL POLY BARRIER AT MECHANICAL ROOM DOOR ON BASEMENT FLOOR. SEE DRAWING GC103.
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
WH
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
PHASE 11 - B23
AutoCAD SHX Text
11A - BASEMENT
AutoCAD SHX Text
PHASE 11 - B23
AutoCAD SHX Text
11B - FIRST FLOOR
AutoCAD SHX Text PROVIDE ICB-2 TYPE CRITICAL POLY BARRIER AT FIRST FLOOR TRAMWAY AND B23 ENTRY DOOR. SEE DRAWING GC103.
AutoCAD SHX Text PROVIDE ICB-2 TYPE CRITICAL POLY BARRIER AT BOTTOM OF STAIRS AT BASEMENT OF B23. SEE DRAWING GC103.
AutoCAD SHX Text
PHASE 12 - B25
AutoCAD SHX Text
12A - BASEMENT MECHANICAL ROOM
AutoCAD SHX Text
PHASE 13 - B36
AutoCAD SHX Text
PROVIDE ICB-2 TYPE CRITICAL POLY BARRIER AS SHOWN ON PLAN. SEE DRAWING GC103.
AutoCAD SHX Text FOR WORK IN THESE ROOMS AS SHOWN ON DRAWINGS MD-120 AND MP-120 PROVIDE AND USE HEPA CART(S), SEE DETAIL 2 ON DRAWING GC103 FOR ADDITIONAL INFORMATION, TYPICAL OF 9 LOCATIONS.
AutoCAD SHX Text
PHASE 16 - B424
AutoCAD SHX Text
16A - FIRST FLOOR 16B - BASEMENT 16C - ATTIC
AutoCAD SHX Text
UP
AutoCAD SHX Text FOR WORK IN THIS ROOM AS SHOWN ON DRAWINGS MD-124 AND MP-124 PROVIDE AND USE HEPA CART(S), SEE DETAIL 2 ON DRAWING GC103 FOR ADDITIONAL INFORMATION.
AutoCAD SHX Text
PROVIDE ICB-2 TYPE CRITICAL POLY BARRIER AS SHOWN ON PLAN. SEE DRAWING GC103.
AutoCAD SHX Text
PHASE 7 - B406
AutoCAD SHX Text
7D - ATTIC
AutoCAD SHX Text PROVIDE ICB-2 TYPE CRITICAL POLY BARRIER AT ATTIC MECHANICAL ROOM DOOR ON THIRD FLOOR. SEE DRAWING GC103.
AutoCAD SHX Text
PHASE 8 - B407
AutoCAD SHX Text
8A - CRAWL SPACE 8B - BASEMENT MECHANICAL ROOM
AutoCAD SHX Text
UP
AutoCAD SHX Text PROVIDE ICB-2 TYPE CRITICAL POLY BARRIER AT MECHANICAL ROOM DOOR ON FIRST FLOOR. SEE DRAWING GC103.
AutoCAD SHX Text
PHASE 8 - B407
AutoCAD SHX Text
8C - FIRST FLOOR
AutoCAD SHX Text PROVIDE ICB-2 TYPE CRITICAL POLY BARRIER AT MECHANICAL ROOM DOOR ON FIRST FLOOR. SEE DRAWING GC103.
AutoCAD SHX Text
PHASE 9 - B408
AutoCAD SHX Text
9A - CRAWL SPACE 9B - BASEMENT MECHANICAL ROOM
AutoCAD SHX Text F.D.
AutoCAD SHX Text F.D.
AutoCAD SHX Text F.D.
AutoCAD SHX Text
UP
AutoCAD SHX Text PROVIDE ICB-2 TYPE CRITICAL POLY BARRIER AT MECHANICAL ROOM DOOR ON FIRST FLOOR. SEE DRAWING GC103.
AutoCAD SHX Text
PHASE 9 - B408
AutoCAD SHX Text
9C - FIRST FLOOR
AutoCAD SHX Text PROVIDE ICB-2 TYPE CRITICAL POLY BARRIER AT PHARMACY STORAGE ROOM ON FIRST FLOOR. SEE DRAWING GC103. ACCESS IS LIMITED AND AND ESCORT IS REQUIRED ANYTIME WORK IS PERFORMED IN THIS ROOM.
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231, OCT 1978
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text THE CONTRACTOR SHALL DO THE FOLLOWING FOR SEQUENCING OF ALL INSTALLATIONS AND PROPOSED SHUT-DOWNS OF STEAM OR CONDENSATE SERVICE: PRE-MEASURE, PRE-FABRICATE AND HAVE ON-SITE BEFORE ANY DEMOLITION MAY HAPPEN FOR EVERY STEAM TRAP ASSEMBLY, PRESSURE REDUCING STATION ASSEMBLY AND STEAM PRESSURE SAFELY RELIEF VALVE ASSEMBLY. VERIFY EACH ASSEMBLY IS ON-SITE WITH THE COR AND CCR BEFORE BEGINNING THE DEMOLITION WORK. THIS IS IN ADDITION TO 10 DAYS WRITTEN AND APPROVED NOTICE OF ALL SHUT-DOWNS. ADDITIONALLY, THE CONTRACTOR SHALL SUBMIT FOR APPROVAL TO THE VA A DETAILED PLAN OF THE SHUT-DOWN THAT INCLUDES THE LOCATION(S) OF THE WORK, BUILDING OR BUILDINGS AFFECTED, PLANNED TIME OF DAY FOR THE SHUT-DOWN, EXPECTED DURATION OF SHUT-DOWN, AND WHAT SERVICES THE VA MAY NEED TO PROVIDE TO AID THE WORK.
GC103
KAB
GENERAL
INFECTION CONTROL
GENERAL NOTES AND DETAILS
HFB
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
NOV 3, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
INFECTION CONTROL RISK ASSESSMENT:
1/2" = 1'-0"
ICB-2
6 MIL. POLY CRITICAL BARRIER
NTS
HEPACART USAGE DETAIL - READ O&M MANUAL BEFORE USE
INFECTION CONTROL GENERAL NOTES:
P
U
E
P
U
E
P
U
E
P
U
E
B U
I L D
I N
G
N
O
BUILDING NO. 404
B U
I L D
I N
G
N
O
B U
I L D
I N
G
N
O
BUILDING
NO. 425
BUILDING NO. 401
BUILDING NO. 424
BUILDING NO. 23
BUILDING NO. 25
BUILDING NO. 423
B U
I L D
I N
G
N
O
B U
I L D
I N
G
N
O
TEPS
B U
I L D
I N
G
N
O
BUILDING NO. 36
BUILDING NO. 40
BUILDING NO. T270
GAZEBO
GAZEBO
GAZEBO
HORSESHOE
W
A
L
L
W
A
L
L
W A
L L
B B Q A R E A
PAVERS
PAVERS
GAZEBO
S T
E P
S
P-UE
P-UE
P-UE
P-UE
P-UE
P-UE
P-U E
P-UE
P
U
E
P
U
E
P
U
E
P
U
E
P
U
E
P
U
E
W
A
L
L
D
E
C
K
GAZEBO
PLANTERS
B
R
I
C
K
W
A
L
L
B R
I C
K
W
A L
L
W A
L L
R A
M P
RAMP
DOCK
WITH
OVER
HANG
STEPS
STEPS
STEPS
STEPS
P O
S S
IB
L E
A B
A N
D O
N E
D G
A S
L
IN
E S
GAZEBO
BUILDING NO. 32
BUILDING NO. 405
STEPS
B U
I L D
I N
G
N
O
PLANTERS
STEPS
STEPS
STEPS
STEPS
W
ALL
W
A
L
L
W A
L L
W A
L L
W
A
L
L
WALL
BUILDING NO. T290
SHED
40A
W
O
O
D
R
M
P
R A
M P
GAZEBO
C O
N C
R E
T E
U R
B
C
O
N
C
R
E
T
E
LANDSCAPING
STEPS
F E
N C
E
WOOD FENCE
WOOD FENCE
CELLAR DOORS
C H
I L
L E
D
W
A T
E R
S U
P P
L Y
R
E T
U R
N
PITS
P U
E
P U
E
P U
E P
U
E
LANDSCAPE
TIMBERS
BUILDING
NO. 452
WELL HOUSE
GENERATOR
BUILDING
G E
N E
R A
T O
R
B U
I L D
I N
G
BUILDING NO. 455
B
B
B
O X
Y G
E N
O X
Y G
E N
O
X
Y
G
E
N
O
X
Y
G
E
N
O
X
Y
G
E
N
O
X
Y
G
E
N
O
X
Y
G
E
N
O
X
Y
G
E
N
O
X
Y
G
E
N
O
X
Y
G
E
N
D E C K
R A
M P
S U N S H A D E
A
M P
RUBBER MAT
S A
N
I T
T U
R F
L A
N D
S C
A P
I N
G
G R
A V
E L
P A
V E
R S
RUBBER MAT
STEPS
OVERHANG
STEPS
FOUNTAIN
UNDERGROUND
FUEL STORAGE
ABANDONED
CATCH BASIN
DRINKING
FOUNTAIN
LIFT STATION
VAPORIZER
FUEL
TANK
CONCRETE SLAB
STEPS
WALL
CELLAR DOOR
R A
M P
U N
D E
R G
R O
U N
D
F U
L
S
O
R A
G E
SUN SHADE
STEPS
UNDERGROUND
FUEL STORAGE
CONCRETE
CONCRETE
30,000 GALLON
PROPANE TANK
30,000 GALLON
PROPANE TANK
30,000 GALLON
PROPANE TANK
CHAIN LINK FENCE
C O
N C
R E
R
B
POST
CONCRETE SLAB
CONCRETE
G
V
H
VERHANG
STEPS
W
ALL
W A
LL
W A
L L
W A
L L
CONCRETE
SLABS
STEPS
CHAIN LINK
FENCE
L A
N D
S C
A P
I N
G
LANDSCAPED AREA
S T
E P
S
C H
A
N
K
F
E N
C E
C H
A
N
K
F
E N
C E
POST
OVERHANG
OVERHANG
O V
E R
H A
N G
OVERHANG
OVERHANG
OVERHANG
O
V
E
R
H
A
N
G
O
V
E
R
H
A
N
G
O
V
E
R
H
A
N
G
C O
N C
R E
T E
WATER
VAULT
W
A
L
L
STEPS
OVERHANG
D E C K
OVERHANG
W O
F
N
C E
STEAM MANHOLE
STEAM MANHOLE
STEAM
VAULT
AIR SCRUBBER
ELECTRICAL
ENCLOSURE
V
I
N
Y
N
C
E
V
I
N
N
C
E
CHILLED WATER
SUPPLY/RETURN
CHILLED WATER
SUPPLY/RETURN
CHILLED WATER
SUPPLY/RETURN
C H
A
N
K
F
E N
C E
CELLAR
DOOR
CELLAR DOOR
GAS CONNECTION
ICE TANKS
OVER-
HANG
STEPS
GENERATOR
BUILDING
CONCRETE
CONCRETE
C O
N C
R E
R
B
CONCRETE
DOCK
WITH
OVER-
HANG
P
U
E
P
U
E
P
U
E
P
U
E
P
U
E
GENERATOR
BUILDING
G
A
T
E
LANDSCAPED AREA
WALL
WELL HOUSE
CONCRETE
S I G
N
S I G
N
X
X
X
X
X
X
X
C H
A
N
K
F
E N
C E
X
X
X
C H
A
N
K
F
E N
C E
UNDERGROUND
FUEL STORAGE
HA101
JMD
HAZARDOUS MATERIALS
SITE PLAN - WEST
HFB
1'-0" = 50'-0"
PARTIAL SITE PLAN - WEST
NORTH
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
SITE
Date
NOV 3, 2023
X
AC
AC
AC
AC
AC
AC
BUILDING NO. 400
BUILDING NO. 407
GAZEBO
BASKETBALL COURT
W A L L
W A L L
X
STEPS
WALL
WALL
RAMP
WINDOW
WELL
GENERATOR
BUILDING
GENERATOR
BUILDING
UILDING NO. 455
WALL
W A
L L
X
B I T
U M
I N
O U
S
P
A T
H
B
B
B
B
B
O X
Y G
E N
O X
Y G
E N
O
X
Y
G
E
N
O
X
Y
G
E
N
O
X
Y
G
E
N
O
X
Y
G
E
N
O
X
Y
G
E
N
O
X
Y
G
E
N
O
X
Y
G
E
N
O
X
Y
G
E
N
X
X
X
X
X
X
X
SIREN
UNDERGROUND
FUEL STORAGE
CELLAR DOOR
R A
M P
RAMP
R A
M P
DRINKING
FOUNTAIN
C
A
N
V
N
I N
G
CELLAR DOOR
RETRACTABLE
AWNING
RAMP
RAMP
CELLAR DOOR
R A
M P
C
O
N
C
R
E
R
B
L
A
N
D
S
C
A
P
E
D
A
R
E
A
L A
N D
S C
A P
E
A
LANDSCAPED AREA
OVERHANG
C O
N C
C U
R B
WALL
OVERHANG
OVERHANG
D E C K
OVERHANG
FENCE
RETRACTABLE
AWNING
OVERHANG
C
O
N
C
R
E
R
B
DISK GOLF BASKET
DISK GOLF BASKET
DISK GOLF BASKET
CONCRETE
LANDSCAPED AREA
LANDSCAPED
AREA
X
XX
X
XXXX
BUILDING NO. 408
HA102
JMD
HAZARDOUS MATERIALS
SITE PLAN - EAST
HFB
1'-0" = 50'-0"
PARTIAL SITE PLAN - EAST
NORTH
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
SITE
HA103
JMD
HAZARDOUS MATERIALS
TRAMWAY PLANS
HFB
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
1/16" = 1'-0"
TRAMWAY B407 TO B408
NORTH
1/16" = 1'-0"
TRAMWAY B425 TO B400
1/16" = 1'-0"
TRAMWAY B400 TO B407
1/16" = 1'-0"
TRAMWAY B401 TO B406
1/16" = 1'-0"
TRAMWAY B403 TO B404
1/16" = 1'-0"
TRAMWAY B402 TO B401
NORTH
NORTH
NORTH NORTH
NORTH
M001
JMD
MECHANICAL
LEGEND AND ABBREVIATIONS
HFB
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
U
E
P
U
E
P
U
E
P
U
E
B U
I L D
I N
G
N
O
BUILDING NO. 404
B U
I L D
I N
G
N
O
B U
I L D
I N
G
N
O
BUILDING
NO. 425
BUILDING NO. 401
BUILDING NO. 424
BUILDING NO. 23
BUILDING NO. 25
BUILDING NO. 423
B U
I L D
I N
G
N
O
B U
I L D
I N
G
N
O
TEPS
B U
I L D
I N
G
N
O
BUILDING NO. 36
BUILDING NO. 40
BUILDING NO. T270
GAZEBO
GAZEBO
GAZEBO
HORSESHOE
W
A
L
L
W
A
L
L
W A
L L
B B Q A R E A
PAVERS
PAVERS
GAZEBO
S T
E P
S
P-UE
P-UE
P-UE
P-UE
P-U E
P-UE
P-U E
P-UE
P
U
E
P
U
E
P
U
E
P
U
E
P
U
E
P
U
E
W
A
L
L
D
E
C
K
GAZEBO
PLANTERS
B
R
I
L
L
B R
I C
K
W
A L
L
W A
L L
R A
M P
RAMP
DOCK
WITH
OVER
HANG
STEPS
STEPS
STEPS
STEPS
P O
S S
IB
L E
A B
A N
D O
N E
D G
A S
L
IN
E S
GAZEBO
BUILDING NO. 32
BUILDING NO. 405
STEPS
B U
I L D
I N
G
N
O
PLANTERS
STEPS
STEPS
STEPS
STEPS
W
ALL
W
A
L
L
W A
L L
W A
L L
W
A
L
L
WALL
BUILDING NO. T290
SHED
40A
W
O
M
P
R A
M P
GAZEBO
C O
N C
R E
R
B
C
O
N
C
R
E
T
E
LANDSCAPING
STEPS
F E
N C
E
WOOD FENCE
WOOD FENCE
CELLAR DOORS
C H
I L L
T
E R
S U
P P
L Y
R
E T
U R
N
PITS
P U
E
P U
E
P U
E P
U
E
LANDSCAPE
TIMBERS
BUILDING
NO. 452
WELL HOUSE
GENERATOR
BUILDING
G E
N E
R A
T O
R
B U
I L
D I N
G
BUILDING NO. 455
B
B
B
O X
Y G
E N
O X
Y G
E N
O
X
Y
G
E
N
O
X
Y
G
E
N
O
X
Y
G
E
N
O
X
Y
G
E
N
O
X
Y
G
E
N
O
X
Y
G
E
N
O
X
Y
G
E
N
O
X
Y
G
E
N
D E C K
R A
M P
S U N S H A D E
A
M P
RUBBER MAT
S A
T
T U
R F
L A
N D
S C
A P
I N
G
G R
A V
E L
P A
V E
R S
RUBBER MAT
STEPS
OVERHANG
STEPS
FOUNTAIN
UNDERGROUND
FUEL STORAGE
ABANDONED
CATCH BASIN
DRINKING
FOUNTAIN
LIFT STATION
VAPORIZER
FUEL
TAN
K
CONCRETE SLAB
STEPS
WALL
CELLAR DOOR
R A
M P
U N
D E
R G
R O
U N
D
F U
O
R A
G E
SUN SHADE
STEPS
UNDERGROUND
FUEL STORAGE
CONCRETE
CONCRETE
30,000 GALLON
PROPANE TANK
30,000 GALLON
PROPANE TANK
30,000 GALLON
PROPANE TANK
CHAIN LINK FENCE
C O
N C
R E
R
B
POST
CONCRETE SLAB
CONCRETE
H
VERHANG
STEPS
W
ALL
W A
LL
W A
L L
W A
L L
CONCRETE
SLABS
STEPS
CHAIN LINK
FENCE
L A
N D
S C
A P
I N
G
LANDSCAPED AREA
S T
E P
S
C H
A
N
K
F
E N
C E
C H
A
N
K
F
E N
C E
POST
OVERHANG
OVERHANG
O V
E R
H A
N G
OVERHANG
OVERHANG
OVERHANG
O
V
E
R
H
A
N
G
O
V
E
R
H
A
N
G
O
V
E
R
H
A
N
G
C O
N C
R E
T E
WATER
VAULT
W
A
L
L
STEPS
OVERHANG
D E C K
OVERHANG
W O
N
C E
STEAM MANHOLE
STEAM MANHOLE
STEAM
VAULT
AIR SCRUBBER
ELECTRICAL
ENCLOSURE
V
I
N
N
C
E
V
I
N
N
C
E
CHILLED WATER
SUPPLY/RETURN
CHILLED WATER
SUPPLY/RETURN
CHILLED WATER
SUPPLY/RETURN
C H
A
N
K
F
E N
C E
CELLAR
DOOR
CELLAR DOOR
GAS CONNECTION
ICE TANKS
OVER-
HANG
STEPS
GENERATOR
BUILDING
CONCRETE
CONCRETE
C O
N C
R E
R
B
CONCRETE
DOCK
WITH
OVER-
HANG
P
U
E
P
U
E
P
U
E
P
U
E
P
U
E
GENERATOR
BUILDING
G
A
T
E
LANDSCAPED AREA
WALL
WELL HOUSE
CONCRETE
S I G
N
S I G
N
X
X
X
X
X
X
X
C H
A
N
K
F
E N
C E
X
X
X
C H
A
N
K
F
E N
C E
UNDERGROUND
FUEL STORAGE
MD011
JMD
MECHANICAL
SITE DEMOLITION PLAN - WEST
HFB
1'-0" = 50'-0"
PARTIAL SITE PLAN - WEST
NORTH
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
SITE
X
AC
AC
AC
AC
AC
AC
BUILDING NO. 400
BUILDING NO. 407
GAZEBO
BASKETBALL COURT
W A L L
W A L L
X
STEPS
WALL
WALL
RAMP
WINDOW
WELL
GENERATOR
BUILDING
GENERATOR
BUILDING
UILDING NO. 455
WALL
W A
L L
X
B I T
U M
I N
O U
S
P
A T
H
B
B
B
B
B
O X
Y G
E N
O X
Y G
E N
O
X
Y
G
E
N
O
X
Y
G
E
N
O
X
Y
G
E
N
O
X
Y
G
E
N
O
X
Y
G
E
N
O
X
Y
G
E
N
O
X
Y
G
E
N
O
X
Y
G
E
N
X
X
X
X
X
X
X
SIREN
UNDERGROUND
FUEL STORAGE
CELLAR DOOR
R A
M P
RAMP
R A
M P
DRINKING
FOUNTAIN
C
A
N
V
N
I N
G
CELLAR DOOR
RETRACTABLE
AWNING
RAMP
RAMP
CELLAR DOOR
R A
M P
C
O
N
C
R
E
R
B
L
A
N
D
S
C
A
P
E
D
A
R
E
A
L A
N D
S C
A P
E
A
LANDSCAPED AREA
OVERHANG
C O
N C
C U
R B
WALL
OVERHANG
OVERHANG
D E C K
OVERHANG
FENCE
RETRACTABLE
AWNING
OVERHANG
C
O
N
C
R
E
R
B
DISK GOLF BASKET
DISK GOLF BASKET
DISK GOLF BASKET
CONCRETE
LANDSCAPED AREA
LANDSCAPED
AREA
X
XX
X
XXXX
BUILDING NO. 408
MD012
JMD
MECHANICAL
SITE DEMOLITION PLAN - EAST
HFB
1'-0" = 50'-0"
PARTIAL SITE PLAN - EAST
NORTH
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
SITE
A B C D E F G H J K L M N P Q R S UT
K.2 K.9
M
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
MECHANICAL
CRAWL SPACE
DEMOLITION PLAN
MD101
JMDHFB
B400
1/8" = 1'-0"
CRAWL SPACE PLAN
NORTH
MECH. RM.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
MECHANICAL
2ND FLOOR, 4TH FLOOR, ATTIC
PARTIAL DEMOLITION PLANS
MD102
JMDHFB
1/4" = 1'-0"
ATTIC PARTIAL PLAN
NORTH
B400
1/4" = 1'-0"
FOURTH FLOOR PARTIAL PLAN
NORTH
1/4" = 1'-0"
SECOND FLOOR PARTIAL PLAN
NORTH
KEY PLAN
8.6
3.6
2.6
1.6
G.3 G.9 L.7L.2
J.9 K.1
9.9
9.5
A B C D E F G H J K L M N
P
Q R S T
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
MECHANICAL
CRAWL SPACE DEMOLITION
PLAN
MD103
JMDHFB
1/8" = 1'-0"
CRAWL SPACE PLAN
NORTH
B401
8.6
3.6
2.6
1.6
G.3 G.9 L.7L.2
J.9 K.1
9.9
9.5
A B C D E F G H J K L M N
P
Q R S T
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
MECHANICAL
CRAWL SPACE DEMOLITION
PLAN
MD104
JMDHFB
1/8" = 1'-0"
CRAWL SPACE PLAN
NORTH
B402
A B C D E F G H I J K L M N P Q R S
H.4 H.9
L.1 L.8
8.6
8.9
J K
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
MECHANICAL
CRAWL SPACE DEMOLITION
PLAN
MD105
JMDHFB
1/8" = 1'-0"
CRAWL SPACE PLAN
NORTH
B403
A B C D E
F
G
H I J
K L
M
N
P Q R
S
T
4.8
MECHANICAL
ATTIC DEMOLITION PLAN
MD106
JMDHFB
1/8" = 1'-0"
ATTIC FLOOR PLAN
NORTH
B403
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
AIR COMP
FLASH TANK
MCCMCC
PRV STATION
WH
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
MECHANICAL
CRAWL SPACE DEMOLITION
PLAN
MD107
JMDHFB
1/8" = 1'-0"
CRAWL SPACE PLAN
NORTH
B404
ROOF ROOF
B C D E F G H J K L M N P Q R S T U V W
A
MECHANICAL
ATTIC DEMOLITION PLAN
MD108
JMDHFB
1/8" = 1'-0"
ATTIC FLOOR PLAN
NORTH
B404
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
A S H
T A N K
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
MECHANICAL
CRAWL SPACE DEMOLITION
PLAN
MD109
JMDHFB
1/8" = 1'-0"
CRAWL SPACE PLAN NORTH
B406
1615B
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
MECHANICAL
FIRST FLOOR DEMOLITION
PLAN
MD110
JMDHFB
1/8" = 1'-0"
FIRST FLOOR PLAN NORTH
B406
1/4" = 1'-0"
ENLARGED PLAN NORTH
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
MECHANICAL
ATTIC DEMOLITION PLAN
MD111
JMDHFB
1/8" = 1'-0"
ATTIC FLOOR PLAN NORTH
B406
MECHANICAL
CRAWL SPACE DEMOLITION
PLAN
MD112
JMDHFB
1/8" = 1'-0"
CRAWL SPACE PLAN
NORTH
B407
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
A B C D E F G H J K L M N P Q R S T
1.5
1.6
3.5
3.6
6.8
7.5
E.1
E.5 F.5 G.5 G.9 J K L.2 M.5 N.3L.6
S.8
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
MECHANICAL
FIRST FLOOR DEMOLITION
PLAN
MD113
JMDHFB
1/8" = 1'-0"
FIRST FLOOR PLAN
NORTH
B407
1/4" = 1'-0"
ENLARGED PLAN
NORTH
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
MECHANICAL
CRAWL SPACE & FIRST FLOOR
PARTIAL DEMOLITION PLANS
MD114
JMDHFB
1/8" = 1'-0"
CRAWL SPACE PLAN NORTH
B408
1/8" = 1'-0"
FIRST FLOOR PARTIAL PLAN NORTH
G H J K L M N P Q R S TA B C D E F
7.9
10.9
U
7.8
E.5 F.2 F.8 H.8 K.1 L.2 M.6M.2 N.5 N.8 P.3
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
MECHANICAL
ATTIC DEMOLITION
PLAN
MD115
JMDHFB
1/8" = 1'-0"
ATTIC FLOOR PLAN NORTH
B408
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
MD116
JMD
MECHANICAL
FIRST FLOOR AND BASEMENT
DEMOLITION PLAN
HFB
1/4" = 1'-0"
FIRST FLOOR PLAN NORTH
B415
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
MD117
JMD
MECHANICAL
MEZZANINE AND UPPER
MEZZANINE DEMOLITION PLANS
HFB
1/4" = 1'-0"
MEZZANINE PLAN NORTH
1/4" = 1'-0"
UPPER MEZZANINE PLAN NORTH
B415
A B C D E F G H
BASEMENT DEMOLITION PLAN
MD118
JMDHFB
B416
1/4" = 1'-0"
BASEMENT FLOOR PLAN
NORTH
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
DEMOLITION FLOOR PLANS -
B023, B025, B032, B260, B425
MD119
JMDHFB
1/8" = 1'-0"
B032 BASEMENT FLOOR PLAN
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
NORTH
1/8" = 1'-0"
B025 BASEMENT FLOOR PLAN
NORTH
1/8" = 1'-0"
B425 FIRST FLOOR PLAN
NORTH
1/8" = 1'-0"
B260 FIRST FLOOR PLAN
NORTH
1/8" = 1'-0"
B023 BASEMENT FLOOR PLAN
NORTH
1/8" = 1'-0"
B023 FIRST FLOOR PLAN
NORTH
MECHANICAL DEMOLITION
FLOOR PLANS - B040 AND B036
MD120
JMDHFB
1/8" = 1'-0"
B36 FIRST FLOOR PLAN
B036/B040
1/8" = 1'-0"
B40 FIRST FLOOR PLAN
NORTH
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
NORTH
MD121
JMD
MECHANICAL
FIRST FLOOR DEMOLITION
PLAN
HFB
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
1/8" = 1'-0"
FIRST FLOOR PLAN
NORTH
B423
1" = 1'-0"
ENLARGED PLAN
NORTH
MD122
MECHANICAL
CRAWL SPACE DEMOLITION
PLAN
HFB
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
1/8" = 1'-0"
B424 CRAWL SPACE PLAN
NORTH
B424
MD123
MECHANICAL
PARTIAL FIRST FLOOR AND
ATTIC DEMOLITION PLANS
HFB
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
1/8" = 1'-0"
B424 PARTIAL FIRST FLOOR PLAN
NORTH
B424
1/4" = 1'-0"
B424 PARTIAL ATTIC PLAN
NORTH
DN
A A
B B
C C
D D
E E
3/4"ø
MD124
JMD
MECHANICAL
FIRST FLOOR DEMOLITION
PLAN
HFB
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
NOV 3, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
B452
1/8" = 1'-0"
FIRST FLOOR PLAN
NORTH
MD125
MECHANICAL
TRAMWAY DEMOLITION PLANS
HFB
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
1/16" = 1'-0"
TRAMWAY B407 TO B408
NORTH
1/16" = 1'-0"
TRAMWAY B425 TO B400
1/16" = 1'-0"
TRAMWAY B400 TO B407
1/16" = 1'-0"
TRAMWAY B401 TO B406
1/16" = 1'-0"
TRAMWAY B403 TO B404
1/16" = 1'-0"
TRAMWAY B023 TO INTERSECTION
1/16" = 1'-0"
TRAMWAY B402 TO B401
NORTH
NORTH
NORTH NORTH
NORTH
NORTH
MECHANICAL EXTERIOR
TRENCH AND MANHOLE
ENLARGED DEMOLITION PLANS
MD126
JMDHFB
1/8" = 1'-0"
MANHOLE NORTH OF B423
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
NORTH
1/8" = 1'-0"
STEAM VAULT EAST OF B416
NORTH
1/8" = 1'-0"
MANHOLE WEST OF B036
NORTH
MD301
MECHANICAL
ENLARGED DEMOLITION
PLANS
HFB
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
1/4" = 1'-0"
B400 BASEMENT PLAN - DEMOLITION
NORTH
1/4" = 1'-0"
B401 BASEMENT PLAN - DEMOLITION
NORTH
1/4" = 1'-0"
B402 BASEMENT PLAN - DEMOLITION
NORTH
1/4" = 1'-0"
B403 BASEMENT PLAN - DEMOLITION
NORTH
A S H
T A N K
MD302
JMD
MECHANICAL
ENLARGED DEMOLITION
PLANS
HFB
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-23-009
Office of
Facilities
Management
FINAL BID DOCUMENTS
OCT. 23, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE CAST IRON FITTINGS
DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
1/4" = 1'-0"
B404 BASEMENT PLAN - DEMOLITION
NORTH
1/4" = 1'-0"
B406 BASEMENT PLAN - DEMOLITION
NORTH
1/4" = 1'-0"
B407 BASEMENT PLAN - DEMOLITION
NORTH
1/4" = 1'-0"
B408 BASEMENT PLAN - DEMOLITION
NORTH
1/4" = 1'-0"
B424 BASEMENT PLAN - DEMOLITION
NORTH
| Cover |
| GC101 |
| GC102 |
| GC103 |
| HA101 |
| HA102 |
| HA103 |
| M001 |
| MD011 |
| MD012 |
| MD101-400 |
| MD102-400 |
| MD103-401 |
| MD104-402 |
| MD105-403 |
| MD106-403 |
| MD107-404 |
| MD108-404 |
| MD109-406 |
| MD110-406 |
| MD111-406 |
| MD112-407 |
| MD113-407 |
| MD114-408 |
| MD115-408 |
| MD116-415 |
| MD117-415 |
| MD118-416 |
| MD119-B23-B25-B32-B260-B425 |
| MD120-036-040 |
| MD121-423 |
| MD122-424 |
| MD123-424 |
| MD124-452 |
| MD125-Tramways |
| MD126 Exterior Enlarged Plans |
| MD301 Enlarged Plans |
| MD302 Enlarged Plans |
| MP011 |
| MP012 |
| MP101-400 |
| MP102-400 |
| MP103-401 |
| MP104-402 |
| MP105-403 |
| MP106-403 |
| MP107-404 |
| MP108-404 |
| MP109-406 |
| MP110-406 |
| MP111-406 |
| MP112-407 |
| MP113-407 |
| MP114-408 |
| MP115-408 |
| MP116-415 |
| MP117-415 |
| MP118-416 |
| MP119-B23-B25-B32-B260-B425 |
| MP120-036-040 |
| MP121-423 |
| MP122-424 |
| MP123-424 |
| MP124-452 |
| MP125-Tramways |
| MP126 Exterior Enlarged Plans |
| MP301 Enlarged Plans |
| MP302 Enlarged Plans |
| M301 |
| M302 |
| M501 |
| M601 |
| M602 |
| M603 |
| M604 |
| M605 |
File details come from the government source that posted it. Updated .