S02 - 436-22-104 Building 154 First Floor Patient Safety Upgrades_DWG.pdf

PDF 6 MB Posted

Attached to
Z2DA-- Building 154 First Floor Patient Safety Upgrades
Solicitation number
36C25924R0006
Issued by

About this file

This document appears to be a set of architectural drawings for the Building 154 First Floor Patient Safety Upgrades project at the Fort Harrison VA Medical Center. The drawings cover the scope of work for selective demolition, new floor finishes, wall protection upgrades, and infection control measures across multiple phased construction areas on the first floor. Key details include:

The project will be completed in 5 phased areas to minimize disruption to patient care services. The scope includes removing and replacing vinyl composite tile (VCT) flooring with luxury vinyl tile (LVT), installing new wall protection like corner guards and handrails, and upgrading the ceiling system. Infection control procedures are specified, such as installing temporary poly barriers, providing HEPA filtration, and cleaning work areas daily. Detailed finish schedules, reflected ceiling plans, and transition details are provided.

This appears to be supporting documentation for the federal contract opportunity "Z2DA-- Building 154 First Floor Patient Safety Upgrades" (Solicitation #36C25924R0006) issued by the Department of Veterans Affairs.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 View Name 1/8" = 1'-0"

SECTION, DETAIL, OR ELEVATION TITLE EXAMPLE

ELEVATION CALLOUT EXAMPLE

DETAIL CALLOUT EXAMPLE

SECTION CALLOUT EXAMPLE

SECTION, DETAIL, OR ELEVATION

SYMBOL IDENTIFIERS

DETAIL NAME

LETTER OR NUMBER DESIGNATOR

DRAWING SEQUENCE NUMBER

INDICATES WHERE TITLE IS

LOCATED

ONE OR TWO CHARACTER

DISCIPLINE DESIGNATOR

(MAY NOT BE PRESENT IF

CALLOUT AND TITLE ARE ON

DRAWINGS WITHIN THE SAME

DISCIPLINE)

A A101

AE101

AE101

MATCH LINE

DETAIL NUMBER

ON SHEET

SHEET NUMBER

DETAIL NUMBER

ON SHEET

SHEET NUMBER

02 \ A-1.04

154 A

SADIE

PHARMACY

MED LAB

N N

PLAN NORTHTRUE NORTH

FORT HARRISON VA MEDICAL SYSTEM

VAMC PROJECT # 436-22-104

BUILDING 154 PATIENT SAFETY UPGRADES

SHEET LIST

G-0.00 COVER SHEET

G-1.00 LEVEL 01 - PROPOSED PHASING PLAN, AREA OF WORK

D-1.01 LEVEL 01 SELECTIVE DEMOLITION PLAN - PHASES 1 AND 2

IA-1.01

IA-1.02

IA-6.01

IA-8.01

GENERAL NOTES

ABBREVIATIONSA

& AND

@ AT

AB ANCHOR BOLT

ACFL ACCESS FLOOR

ACOUS ACOUSTICAL

AD AREA DRAIN

ADJ ADJUSTABLE

ADJ ADJACENT

ADMIN ADMINISTRATION

AFF ABOVE FINISH FLOOR

AHU AIR HANDLING UNIT

ALT ALTERNATE

ALUM ALUMINUM

AP ACCESS PANEL

APROX APPROXIMATE

ARCH ARCHITECTURAL

AT ACOUSTICAL CEILING TILE

AUTO AUTOMATIC

AWT ACOUSTICAL WALL TREATMENT

B

BD BOARD

BFE BOTTOM FOOTING ELEVATION

BG BUMPER GUARD

BKT BRACKET

BLDG BUILDING

BM BEAM

BOT BOTTOM

BP BRICK PAVING

BR BRICK

BRG BEARING

BSMT BASEMENT

C

C CHANNEL

CAB CABINET

CANTL CANTILEVER

CAP CAPACITY

CAT CATEGORY

CCTV CLOSED CIRCUIT TELEVISION

CD COILING DOOR

CG COILING GRILLE

CG COILING GUARD

CH COAT HOOK

CJT CONTROL JOINT

CL CENTER LINE

CL CLASS

CLG CEILING

CLR CLEAR

CM CONSTRUCTION MANAGER

CMU CONCRETE MASONRY UNIT

CO CASED OPENING

COL COLUMN

CONC CONCRETE

CONF CONFERENCE

CONN CONNECT/-ED/-ION

CONST CONSTRUCTION

CONT CONTINUE/CONTINUOUS

CONTR CONTRACTOR

COORD COORDINATE

CORR CORRIDOR

CP CARPET

CPT CARPET MODULE TILE

CR-1 CHAIR RAIL

CR-2 CRASH RAIL

CT CERAMIC TILE

CTR CENTER

CW CURTAIN WALL

CW COLD WATER

CYL CYLINDER

D

D DEPTH OR DEEP

DEMO DEMOLITION

DEPR DEPRESSIONDBL DOUBLE

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL

DIFF DIFFUSER

DIM DIMENSION

DISP DISPENSER

DIST DISTRIBUTION

DIV DIVISION

DN DOWN

DP DATA PROCESSING

DR DOOR

DS DOWNSPOUT

DWG DRAWING

E

EC ELECTRICAL CABINET

EC EPOXY COATING

EF EXHAUST FAN

EFTR EXISTING FINISH TO REMAIN

EJT EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

EMERG EMERGENCY

EO ELECTRICAL OUTLET

EPDM ETHYLENE PROPYLENE

DIENE MONOMER

EQ EQUAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EXH EXHAUST HOOD

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

EXT-P EXTERIOR PAINT

EXT-ST EXTERIOR STAIN

F

FA FIRE ALARM

FAP FIRE ALARM PANEL

FB FIRE BLANKET

FD FLOOR DRAIN

FDN FOUNDATION

FDV FIRE DEPARTMENT VALVE

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FGS FOAM GASKET SEAL

FH FIRE HOSE

FHV FIRE HOSE VALVE

FIN FINISH

FIXT FIXTURE

FL FLOOR

FL FLOW LINE

FP FIRE PROOFING

H

H HIGH

HB HOSE BIB

HD HAND DRYER

HDCP HANDICAP

HDR HEADER

HDW HARDWARE

HM HOLLOW METAL

HORIZ HORIZONTAL

HPT HIGH POINT

HR HANDRAIL

HT HEIGHT

HTR HEATER

HVAC HEATING, VENTILATING,

AIR CONDITIONING

HW HOT WATER

HWD HARDWOOD

I

IC INTERCOM

ID INSIDE DIAMETER

IN INCH

INSUL INSULATION

INT INTERIOR

ISO ISOLATION

J

JAN JANITOR

JB JUNCTION BOX

JST JOIST

JT JOINT

K

KO KNOCK OUT

L

L LAVATORY

LB POUND

LCD LINEAR CEILING DIFFUSER

LF LINE FIGURED

LIN LINEAR

LKR LOCKER

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LMC LINEAR METAL CEILING

LOC LOCATION OR LOCATE

LPT LOW POINT

LS LAWN SPRINKLING

LT LIGHT

LTG LIGHTING

LVR LOUVER

LWC LINEAR WOOD CEILINGM

MAT MATERIAL

MAX MAXIMUM

MBD MARKER BOARD

MC MEDICINE CABINET

MCU MODULAR COOLING UNIT

MECH MECHANICAL

MEMB MEMBRANE

MET METAL

MRF MANUFACTURER

MH MANHOLE

MIL MILLIMETER

MN MINIMUM

MR MIRROR

MISC MISCELLANEOUS

MO MASONRY OPENING

MONO MONOLITHIC

MPU MULTI- PURPOSE UNIT

MTD MOUNTED

MTL METAL

MTR MOTOR

MULL MULLION

P

PNL PANEL

PR PAIR

PRELIM PRELIMINARY

PRES PLASTIC RESIN

PRESS PRESSURE

PRIM PRIMARY

PROJ PROJECTION

PRV POWER ROOF VENTILATOR

PTC PAPER TOWEL CABINET

PTR PRINTER

PVC POLYVINYL CHLORIDE

R

R RADIUS

R RISER

RA RETURN AIR

RB RESILIENT BASE/RUBBER BASE

RD ROOF DRAIN

REC RECESSED

REF REFERENCE

REFR REFRIGERATOR

REG REGISTER

REIN REINFORCE/-ED/-ING

REM REMOVE

REQD REQUIRED

RET RETAINING

REV REVERSE

REV REVISE

RF RESILIENT FLOOR

RFI REQUEST FOR INFORMATION

RH ROOF HATCH

RM ROOM

RO ROUGH OPENING

RS ROUGH SLAB

RSF RESILIENT SHEET FLOOR

RWC RAIN WATER CONDUCTOR

S

S SINK

S STAIN

SCHED SCHEDULE

SD SHOWER DRAIN

SD SMOKE DAMPER

SDISP SOAP DISPENSER

SF STORE FRONT

SF SQUARE FOOT

SH SHOWER

SHT SHEET

SHTG SHEATHING

SIM SIMILAR

SM SURFACE MOUNTED

SNC SANITARY NAPKIN CABINET

SND SANITARY NAPKIN DISPOSER

SP STANDPIPE

SPEC SPECIFICATIONS

SPR SINGLE PLY ROOF

SQ SQUARE

SQ YD SQUARE YARD

SR SERVICE RECEPTOR

SS SERVICE SINK

SST STAINLESS STEEL

ST STREET

ST STONE TILE

STC SOUND TRANSMISSION

STD STANDARD

STL STEEL

STOR STORAGE

STRUC STRUCTURAL

T

T TOP

TAN TANGENT

TCAB TOWEL CABINET

TDR TRENCH DRAIN

TEL TELEPHONE

TEMP TEMPERATURE

TER TERRAZZO

TG TONGUE & GROVE

THRES THRESHOLD

TPH TOILET PAPER HOLDER

TR TREAD

TRANSF TRANSFORMER

TS TUBE SECTION

TV TELEVISION

TYP TYPICAL

U

U URINAL

UC UNDERCUT

UC UNDERCOUNTER

UFD UNDER FLOOR DUCT

UG UNDERGROUND

UH UNIT HEATER

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

US UTILITY SHELF

UTIL UTILITY

V

VC VALVE CABINET

VCT VINYL COMPOSITION TILE

VENT VENTILATION

VERT VERTICAL

VEST VESTIBULE

VR VAPOR RETARDER

VTR VENT THROUGH ROOF

W

W WALL COVERING

W WIDTH/WIDE

W WIDE FLANGE

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WD WOOD

WDW WINDOW

WG WALL GUARD

WH WALL HYDRANT

WHCH WHEELCHAIR

WHTR WATER HEATER

WP WALL PANEL

WP WATERPROOF

WR WASTE RECEPTACLE

WS WEATHERSTRIP

WSCT WAINSCOT

WSF WELDED SEAM-RESILIENT

SHEET FLOORING

WT WINDOW TREATMENT

WT WEIGHT

N

NA NOT APPLICABLE

NC NURSE CALL

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NRC NOISE REDUCTION COEFFICIENT

NT NOTE

NTS NOT TO SCALE

O

OC ON CENTER

OD OUTSIDE DIAMETER

OFF OFFICE

OH OVERHEAD

OP OPERABLE PARTITION

OPER OPERATOR

OPNG OPENING

OPP OPPOSITE

OFD OVERFLOW ROOF DRAIN

P

P PAINT

PART PARTITION

PB PUSH BUTTON

F

FRMG FRAMING

FSTOP FIRE STOPPING

FT FOOT/FEET

FTG FOOTING

FURR FURRING

G

GA GAUGE

GAL GALLONS

GALV GALVANIZED

GB GRAB BAR

GB GRADE BEAM

GC GENERAL CONTRACTOR

GEN GENERAL

GEN GENERATOR

GL GLASS

GR GRADE

GRT GROUT

GWB GYPSUM WALLBOARD

GYP GYPSUM

PC PRECAST CONCRETE

PCD PAPER CUP DISPENSER

PED PEDESTAL

PL PLATE

PL PROPERTY LINE

PLAM PLASTIC LAMINATE

PLBG PLUMBING

PLS PLASTER

1. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY. VERIFY ALL

DIMENSIONS PRIOR TO START OF WORK. IN THE EVENT OF

DISCREPANCY, NOTIFY THE ARCHITECT AND OBTAIN RESOLUTION

BEFORE PROCEEDING.

2. PROVIDE ALL BLOCKING AND ANCHORAGE AS NECESSARY FOR PROPER

INSTALLATION OF WALL HUNG OR WALL MOUNTED EQUIPMENT

FIXTURES.

3. ADDITIONAL PLAN INFORMATION IS SHOWN ON LARGER SCALE PLANS

WHERE INDICATED BY KEYED REFERENCE. LARGE SCALE DRAWINGS

TAKE PRECEDENCE OVER SMALLER SCALE DRAWINGS.

4. THE LIST OF ABBREVIATIONS IS SHOWN AS A GUIDE ONLY AND DOES

NOT NECESSARILY INCLUDE ALL ABBREVIATIONS USED. OTHER

ABBREVIATIONS MAY BE FOUND AMONG THE DRAWINGS.

5. ALL CONSTRUCTION SHALL MEET OR EXCEED LOCAL INDUSTRY

STANDARDS. DETAILS ARE PROVIDED TO INDICATE MINIMUM QUALITY

AND TO GIVE STANDARDS OF CONSTRUCTION. IF A CONDITION IS NOT

SPECIFICALLY DETAILED, SUBMIT A SIMILAR DETAIL FOR GUIDE AND

APPROVAL. UFC 3-600-01, NFPA 101 AND 5000.

D-1.02 LEVEL 01 SELECTIVE DEMOLITION PLAN - PHASES 3,4 AND 5

LEVEL 01 FLOOR FINISH PLAN - PHASES 1 AND 2

LEVEL 01 FLOOR FINISH PLAN - PHASES 3,4 AND 5

INTERIOR ARCHITECTURE TYPICAL DETAILS

SCHEDULES

WP-1.01 LEVEL 01 WALL PROTECTION PLAN - PHASES 1 AND 2

WP-1.02 LEVEL 01 WALL PROTECTION PLAN - PHASES 3, 4 AND 5

G-2.00 LEVEL 01 - ICRA, INFECTION CONTROL PLAN

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Construction and Facilities Management

AutoCAD SHX Text

COVER SHEET

AutoCAD SHX Text G0.00

AutoCAD SHX Text

AutoCAD SHX Text

FORT HARRISON, MONTANA

AutoCAD SHX Text

BUILDING 154 FINISH UPGRADES

AutoCAD SHX Text 436-22-104

AutoCAD SHX Text 01/27/2023

AutoCAD SHX Text

DJA

AutoCAD SHX Text

JOSE RIVERA-HERNANDEZ, PROJECT ENGINEER

AutoCAD SHX Text

VAMC FORT HARRISON

AutoCAD SHX Text

SYMBOL LEGEND

AutoCAD SHX Text

OVERALL BUILDING SITE PLAN

AutoCAD SHX Text

DJA

PH

AS

E

PHASE 2

PHASE 3

PH

AS

E

PH

AS

E

1. PHASE WORK AS TO MINIMIZE INTERRUPTION TO PATIENT CARE

SERVICES.

2. ALL PROPOSED AREAS OF PHASING ARE OF MEDIUM TO HIGH

RISK INFECTION CONTROL. FOLLOW INFECTION CONTROL

PROCEDURES OUTLINED IN THE DRAWINGS AND IN THE

INFECTION CONTROL RISK ASSESSMENT PERMIT.

3. COORDINATE ALL PROJECT PHASING WITH COR.

4. PHASED AREAS OUTLINED ON PLAN INDICATE THE AREA OF

WORK. NOTIFY COR OF ANY DISCREPANCIES.

1. SEE SHEET G1.00 FOR PROPOSED PHASING.

2. SEE SHEETS D1.01 AND D1.02 FOR DEMOLITION SCOPE OF

WORK.

3. SEE SHEETS IA1.01 AND IA1.02 FOR NEW FLOOR FINISH SCOPE

OF WORK.

4. SEE SHEETS WP1.01 AND WP1.02 FOR NEW WALL PROTECTION

SCOPE OF WORK.

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

NO. 1

AutoCAD SHX Text

FIRE

AutoCAD SHX Text

MATCHLINE: SOUTH

AutoCAD SHX Text

MATCHLINE: NORTH

AutoCAD SHX Text

AutoCAD SHX Text

PROSTHETICS

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 139A

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text B

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

AutoCAD SHX Text

TBD

AutoCAD SHX Text

AutoCAD SHX Text

UTILITY

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

AutoCAD SHX Text

HAC

AutoCAD SHX Text

AutoCAD SHX Text

MEDICINE LAB

AutoCAD SHX Text

AutoCAD SHX Text

MEDICINE

AutoCAD SHX Text

AutoCAD SHX Text

UTILITY

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text 115-11

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

LOADING DOCK

AutoCAD SHX Text 133A

AutoCAD SHX Text

O2 STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text 115-07

AutoCAD SHX Text

(WAITING)

AutoCAD SHX Text

COMMON AREA

AutoCAD SHX Text 131B

AutoCAD SHX Text

HSKP

AutoCAD SHX Text 115-10

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 115-09

AutoCAD SHX Text

RESTROOM

AutoCAD SHX Text 115-08

AutoCAD SHX Text

RESTROOM

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 115-05

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 115-03

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 115-01

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 115-06

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 115-02

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

COMMON AREA

AutoCAD SHX Text 128A

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PATIENT ROOM

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text A

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

AutoCAD SHX Text

NURSE MANAGER

AutoCAD SHX Text

AutoCAD SHX Text

UTIL.

AutoCAD SHX Text 111B

AutoCAD SHX Text

KITCHEN

AutoCAD SHX Text

REC. HALL

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 115-03A

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 114A

AutoCAD SHX Text

SUPERVISOR

AutoCAD SHX Text

RESTROOM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

RESTROOM

AutoCAD SHX Text

AutoCAD SHX Text

HAC

AutoCAD SHX Text

SERVICES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

X-RAY LAB

AutoCAD SHX Text 147A

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text 148A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AREA

AutoCAD SHX Text

COMMON

AutoCAD SHX Text

WAITING

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

RADIOLOGY

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

POLICE

AutoCAD SHX Text

OFF.

AutoCAD SHX Text

AutoCAD SHX Text 125A

AutoCAD SHX Text

CT LAB

AutoCAD SHX Text

AutoCAD SHX Text

CR ROOM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

COMMON

AutoCAD SHX Text

AREA

AutoCAD SHX Text

AutoCAD SHX Text

TLT RM.

AutoCAD SHX Text

UTILITY

AutoCAD SHX Text 117A

AutoCAD SHX Text 116A

AutoCAD SHX Text 117B

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

X-RAY LAB

AutoCAD SHX Text C-104

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C-107

AutoCAD SHX Text

LOBBY

AutoCAD SHX Text C

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text 127B

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 127C

AutoCAD SHX Text

UTILITY

AutoCAD SHX Text

MECH.

AutoCAD SHX Text

AutoCAD SHX Text

PATIENT ROOM

AutoCAD SHX Text 104A

AutoCAD SHX Text

PATIENT ROOM

AutoCAD SHX Text

AutoCAD SHX Text

MOTHER'S ROOM

AutoCAD SHX Text 127A

AutoCAD SHX Text

TECHNOLOGIST

AutoCAD SHX Text 120A

AutoCAD SHX Text

ULTRASOUND

AutoCAD SHX Text

HAC

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text C-107

AutoCAD SHX Text

LOBBY

AutoCAD SHX Text 101B

AutoCAD SHX Text

TOILET

AutoCAD SHX Text 101C

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

AutoCAD SHX Text

WAITING

AutoCAD SHX Text 102D

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 102E

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 102F

AutoCAD SHX Text 102G

AutoCAD SHX Text

TREATMENT

AutoCAD SHX Text

GENERAL

AutoCAD SHX Text 102H

AutoCAD SHX Text I.T.

AutoCAD SHX Text

LOCKER

AutoCAD SHX Text

DIRTY

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

ROOM

AutoCAD SHX Text 102K

AutoCAD SHX Text

OPERATING

AutoCAD SHX Text 102L

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

OPERATING

AutoCAD SHX Text 102Y

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text 102P

AutoCAD SHX Text

X-RAY LAB

AutoCAD SHX Text 102Q

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 102R

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

INSTRUMENT

AutoCAD SHX Text 102S

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text 102U

AutoCAD SHX Text

LAB

AutoCAD SHX Text 102U

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 102V

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 102W

AutoCAD SHX Text

-GRAPHY

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C-102A

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 102T

AutoCAD SHX Text

DENTIST

AutoCAD SHX Text

AutoCAD SHX Text

HYGIENE

AutoCAD SHX Text N/A

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

NO. 2

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

NO. 3

AutoCAD SHX Text N/A

AutoCAD SHX Text

HAC

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

ELEC.

AutoCAD SHX Text

FIRE CL.

AutoCAD SHX Text

DENTAL

AutoCAD SHX Text

TREATMENT

AutoCAD SHX Text

GENERAL

AutoCAD SHX Text

STAFF

AutoCAD SHX Text

LEAD

AutoCAD SHX Text

ECHOCARDIO

AutoCAD SHX Text

CHIEF

AutoCAD SHX Text

SECRETARY

AutoCAD SHX Text

ELEC.

AutoCAD SHX Text

RADIOLOGY

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

WATER

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

LANDING

AutoCAD SHX Text

TELE-HEALTH

AutoCAD SHX Text

FIRE

AutoCAD SHX Text

ELEC.

AutoCAD SHX Text

MEN'S

AutoCAD SHX Text

WOMEN'S

AutoCAD SHX Text

TELE-HEALTH

AutoCAD SHX Text

TELE-HEALTH

AutoCAD SHX Text 115-04

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

MEN'S

AutoCAD SHX Text

WOMEN'S

AutoCAD SHX Text

ELEC.

AutoCAD SHX Text

NUCLEAR

AutoCAD SHX Text

NUCLEAR

AutoCAD SHX Text

ATS

AutoCAD SHX Text

154-TSES

AutoCAD SHX Text

PANEL

AutoCAD SHX Text

154-DP2

AutoCAD SHX Text

PANEL

AutoCAD SHX Text

154-GSBD

AutoCAD SHX Text

ASCO POWER

AutoCAD SHX Text

TRANSFORMER

AutoCAD SHX Text

& BYPASS

AutoCAD SHX Text

SWITCHES

AutoCAD SHX Text

QED-6

AutoCAD SHX Text

SWITCHBOARD

AutoCAD SHX Text

AST TSEC2

AutoCAD SHX Text

PANEL

AutoCAD SHX Text

154-NDEC2

AutoCAD SHX Text

ATS 154-TSEC

AutoCAD SHX Text

X-RAY

AutoCAD SHX Text

TRANSFORMER

AutoCAD SHX Text

X-RAY

AutoCAD SHX Text

TRANSFORMER

AutoCAD SHX Text

STERILIZER

AutoCAD SHX Text

LIFT EQUIPMENT

AutoCAD SHX Text

GE MEDICAL

AutoCAD SHX Text

SYSTEMS:

AutoCAD SHX Text

RADIOGRAPHIC

AutoCAD SHX Text

UNIT

AutoCAD SHX Text C-106

AutoCAD SHX Text C-105

AutoCAD SHX Text C-102

AutoCAD SHX Text C-101

AutoCAD SHX Text C-104

AutoCAD SHX Text C-106

AutoCAD SHX Text C-103

AutoCAD SHX Text

PAT. CORR.

AutoCAD SHX Text C-103A

AutoCAD SHX Text C-101

AutoCAD SHX Text C-102A

AutoCAD SHX Text

PAT. CORR.

AutoCAD SHX Text

PAT. CORR.

AutoCAD SHX Text

PAT. CORR.

AutoCAD SHX Text

PAT. CORR.

AutoCAD SHX Text

PAT. CORR.

AutoCAD SHX Text

PAT. CORR.

AutoCAD SHX Text

PAT. CORR.

AutoCAD SHX Text

PAT. CORR.

AutoCAD SHX Text

PAT. CORR.

AutoCAD SHX Text

MATCHLINE: SOUTH

AutoCAD SHX Text

MATCHLINE: NORTH

AutoCAD SHX Text

AutoCAD SHX Text

LAUNDRY

AutoCAD SHX Text 141C

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text 141D

AutoCAD SHX Text

COMMON AREA

AutoCAD SHX Text 141E

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

SERVICE

AutoCAD SHX Text

CLEAN LINEN

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 139B

AutoCAD SHX Text

COMMON AREA

AutoCAD SHX Text

FLOOR

AutoCAD SHX Text

SCALE

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Construction and Facilities Management

AutoCAD SHX Text

LEVEL 01 ICRA, INFECTION CONTROL PLAN

AutoCAD SHX Text G-2.00

AutoCAD SHX Text

AutoCAD SHX Text

FORT HARRISON, MONTANA

AutoCAD SHX Text

BUILDING 154 PATIENT SAFETY UPGRADES

AutoCAD SHX Text 436-22-104

AutoCAD SHX Text 01/27/2023

AutoCAD SHX Text

DJA

AutoCAD SHX Text

JOSE RIVERA-HERNANDEZ

AutoCAD SHX Text

VAMC FORT HARRISON

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

PLAN

AutoCAD SHX Text 1/16" = 1'-0"

AutoCAD SHX Text

LEVEL 01 ICRA PLAN

AutoCAD SHX Text

AutoCAD SHX Text 1/16" = 1'-0"

AutoCAD SHX Text

LEVEL 01 ICRA PLAN - NORTH

AutoCAD SHX Text

AutoCAD SHX Text

ICRA PLAN GENERAL NOTES:

AutoCAD SHX Text

DJA

VHAFHMArmstD White

VHAFHMArmstD Line

VHAFHMArmstD Line

VHAFHMArmstD Line

VHAFHMArmstD Line

VHAFHMArmstD Line

VHAFHMArmstD Line

VHAFHMArmstD Line

VHAFHMArmstD PolyLine

VHAFHMArmstD PolyLine

VHAFHMArmstD PolyLine

VHAFHMArmstD PolyLine

VHAFHMArmstD PolyLine

VHAFHMArmstD PolyLine

VHAFHMArmstD PolyLine

VHAFHMArmstD PolyLine

VHAFHMArmstD PolyLine

VHAFHMArmstD PolyLine

VHAFHMArmstD PolyLine

VHAFHMArmstD PolyLine

VHAFHMArmstD Line

VHAFHMArmstD Line

VHAFHMArmstD Line

VHAFHMArmstD White

VHAFHMArmstD Line

VHAFHMArmstD Line

VHAFHMArmstD PolyLine

VHAFHMArmstD Callout DOOR TO BE SECURED DURING THE CEILING REPLACEMENT PHASE IN CORRIDORS C-102 AND C-102A

VHAFHMArmstD Callout PROVIDE FULL HEIGHT GWB BARRIER WITH ACCESS DURING THE CEILING REPLACEMENT PHASE IN CORRIDORS C-102 AND C-102A

VHAFHMArmstD Text Box

HARD WALL BARRIER TO UNDERSIDE OF EXISTING CEILING

COMPOSITION:

5/8" TYPE X GWB, 3 5/8" MS, 5/8" TYPE X GWB

VHAFHMArmstD Text Box

TEMPORARY BARRIERS TO SET AND REMOVED AT THE END OF EACH DAILY WORK PERIOD

VHAFHMArmstD Text Box TEMPORARY DOOR ENCLOSURE BARRIERS TO SET FOR WORK REQUIRED AT DOOR TRANSITION. COORDINATE ACCESS WITH COR.

VHAFHMArmstD Text Box

ICRA BARRIER SYMBOL LEGEND

VHAFHMArmstD White

REMOVE EXISTING VINYL WALL PANEL WALL PROTECTION IN ITS ENTIRETY. PATCH AND REPAIR

WALL AS NEEDED TO MATCH ADJACENT WALL FOR A SMOOTH MONOLITHIC FINISH. PREP AS

REQUIRED FOR NEW SCHEDULED WALL FINISHES AND WALL PROTECTION.

REMOVE EXISTING 36" H. HAND GEL DISPENSER. PATCH AND REPAIR WALL AS NEEDED TO ACHIEVE A SMOOTH MONOLITHIC FINISH IN ORDER TO ACCEPT NEW SCHEDULED WALL FINISH. RE-MOUNT

DISPENSER SO BOTTOM OF DISPENSER (NOT THE DRIP SHELF) IS 48" AFF.

LINE REPRESENTS EXTENT OF SELECTIVE DEMOLITION AREA. SEE SHEET G1.00 FOR AREA OF WORK

EXISTING THRESHOLD PLATE ASSEMBLY TO BE RE-USED TO MAINTAIN DOOR STC RATING.

DEMO EXISTING THRESHOLD PLATE. PREP TRANSITION AS NEEDED FOR NEW SCHEDULED FLOORING

TRANSITION.

1. INFECTION CONTROL WILL CONSIST OF TEMPORARY “POLY” BARRIERS. REPLACE TEMPORARY

BARRIER IN ITS ENTIRETY AS NEEDED IF BARRIER IS TORN OR DAMAGED DURING THE WORK.

2. SEE SHEET G1.00 FOR THE PROJECT PHASING PLAN.

3. CONTRACTOR, EXERCISING CARE, WILL REMOVE TEMPORARY “POLY” BARRIER MATERIALS TO

MINIMIZE SPREADING OF DIRT AND DEBRIS THIRTY MINUTES PRIOR TO THE COMMENCEMENT OF

REGULAR HOSPITAL HOURS

4. CONTRACTOR TO PROVIDE “WALK OFF” OR “STICKY” MATS AT THE ENTRY AND EXITS TO THE AREA

OF WORK. REPLACE AS NEEDED. CONSTRUCTION PERSONNEL ARE REQUIRED TO ENSURE SHOES

ARE NOT TRACKING WHEN LEAVING THE WORK SITE

5. CONTRACTOR TO PROVIDE HEPA FILTRATION “NEGATIVE AIR” MACHINES AND OTHER ACTIVE

MEANS (TOOL VACUUM SYSTEMS) WHEN DEEMED NECESSARY TO PREVENT AIR-BONE DUST FROM

DISPERSING INTO THE ATMOSPHERE WITHIN THE WORKSITE.

6. CONTRACTOR IS TO ISOLATE ALL AIR VENTS WITHIN THE AREA OF WORK. ISOLATION OF AIR VENTS

AS REQUIRED TO PREVENT AIRBORNE DUST FROM ENTERING THE VENT/DUCT. CONTRACTOR TO

REMOVE VENT/DUCT ISOLATION BARRIERS AT THE END OF THE WORK PERIOD AND 30 MINUTES

BEFORE REGULAR HOSPITAL HOURS ARE TO COMMENCE.

7. TEMPORARY BARRIERS WILL BE ERECTED SO AS TO NOT IMPEDE ACCESS TO REMAINING AREAS

OF THE FACILITY FOR PATIENTS, VISITORS AND HOSPITAL STAFF.

8. ALL DEBRIS MUST BE REMOVED BY CART/CONTAINER WITH A TIGHTLY COVERED LID, NO

EXCEPTIONS WILL BE ALLOWED.

9. CONTRACTOR TO MAINTAIN A CLEAN AND ORDERLY, DUST, DEBRIS, TRIP HAZARD FREE WORK

AREA ON A DAILY BASIS DURING REGULAR HOSPITAL HOURS. CONTRACTOR TO WIPE WORK

SURFACES WITH DISINFECTANT, WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM

BEFORE LEAVING THE WORK AREA THIRTY MINUTES BEFORE REGULAR HOSPITAL HOURS ARE TO

COMMENCE.

10. IN THE EVENT THAT AN EXISTING FIRE EXTINGUISHER IS NOT READILY ACCESSIBLE DUE TO THE

ERECTION OF TEMPORARY BARRIERS, THE CONTRACTOR WILL PROVIDE A FIRE EXTINGUISHER

OUTSIDE OF THE AREA OF WORK.

11. CONTRACTOR TO FIELD VERIFY ALL SITE CONDITIONS PRIOR TO COMMENCING WITH THE WORK.

CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) OF ANY

DISCREPANCIES NOT SHOWN ON THE PLAN(S) PRIOR TO COMMENCING WITH THE WORK.

12. AREA OF WORK DENOTES EXISTING VINYL COMPOSITE TILE (VCT) FLOORING TO BE REMOVED IN ITS ENTIRETY. PREP AND REPAIR FLOOR AS REQUIRED FOR NEW SCHEDULED LUXURY VINYL TILE

(LVT). SEE SHEETS G1.00, IA8.01 FOR ADDITIONAL INFORMATION.

13. AREA OF WORK DENOTES EXISTING VINYL/RUBBER WALL BASE TO BE REMOVED IN ITS ENTIRETY.

PATCH AND REPAIR EXISTING WALLS AS REQUIRED TO ACHIEVE A SMOOTH, MONOLITHIC WALL

FINISH IN ORDER TO ACCEPT NEW SCHEDULED WALL BASE. SEE SHEETS G1.00, IA8.01 FOR

ADDITIONAL INFORMATION.

14. ALL EXISTING WALL EMBEDDED STAINLESS-STEEL CORNER GUARDS ARE TO REMAIN AS IS. CLEAN

AS NEEDED TO REMOVE MARKS, PAINT STAINS ETC. TO AN ACCEPTABLE APPEARANCE. NOTIFY

COR OF ANY EXISTING CORNER GUARDS THAT MAY REQUIRE ADDITIONAL MEANS AND METHODS

BESIDES BASIC CLEANING PRIOR TO ACCEPTANCE FROM THE COR.

15. MISCELLANEOUS SIGNAGE, ARTWORK, ACRYLIC SIGN HOLDERS TO BE REMOVED BY THE GOV/COR.

COORDINATE REMOVAL PRIOR TO COMMENCING WORK AND EACH PHASE OF WORK.

16. EXISTING ROOM SIGNAGE TO REMAIN IN PLACE UNLESS OTHERWISE REMOVED BY THE GOV/COR.

17. MISCELLANEOUS WALL MOUNTED EQUIPMENT/APPURTENCES (AED CABINETS, PPE CABINETS, HAND GEL DISPENSERS, DOME SAFETY MIRRORS ETC.) SHOULD BE REMOVED WHENEVER

POSSIBLE PRIOR TO APPLYING NEW SCHEDULED WALL FINISH. REMOUNT ANY REMOVED

EQUIPMENT BACK TO ITS ORIGINAL PLACEMENT ONCE APPLICATION OF NEW FINISHES ARE

COMPLETE.

18. EXISTING DOOR FRAME LOCATION LABEL WITH UPC IDENTIFIER TO BE REMOVED IN ITS ENTIRETY.

PATCH AND REPAIR DOOR FRAME FINISH AS REQUIRED FOR A "LIKE NEW" APPEARANCE PRIOR TO

APPLICATION OF NEW SCHEDULED FRAME FINISH.

1. INFECTION CONTROL WILL CONSIST OF TEMPORARY “POLY” BARRIERS. REPLACE TEMPORARY

BARRIER IN ITS ENTIRETY AS NEEDED IF BARRIER IS TORN OR DAMAGED DURING THE WORK.

2. SEE SHEET G1.00 FOR THE PROJECT PHASING PLAN.

3. CONTRACTOR, EXERCISING CARE, WILL REMOVE TEMPORARY “POLY” BARRIER MATERIALS TO

MINIMIZE SPREADING OF DIRT AND DEBRIS THIRTY MINUTES PRIOR TO THE COMMENCEMENT OF

REGULAR HOSPITAL HOURS

4. CONTRACTOR TO PROVIDE “WALK OFF” OR “STICKY” MATS AT THE ENTRY AND EXITS TO THE AREA

OF WORK. REPLACE AS NEEDED. CONSTRUCTION PERSONNEL ARE REQUIRED TO ENSURE SHOES

ARE NOT TRACKING WHEN LEAVING THE WORK SITE

5. CONTRACTOR TO PROVIDE HEPA FILTRATION “NEGATIVE AIR” MACHINES AND OTHER ACTIVE

MEANS (TOOL VACUUM SYSTEMS) WHEN DEEMED NECESSARY TO PREVENT AIR-BONE DUST FROM

DISPERSING INTO THE ATMOSPHERE WITHIN THE WORKSITE.

6. CONTRACTOR IS TO ISOLATE ALL AIR VENTS WITHIN THE AREA OF WORK. ISOLATION OF AIR VENTS

AS REQUIRED TO PREVENT AIRBORNE DUST FROM ENTERING THE VENT/DUCT. CONTRACTOR TO

REMOVE VENT/DUCT ISOLATION BARRIERS AT THE END OF THE WORK PERIOD AND 30 MINUTES

BEFORE REGULAR HOSPITAL HOURS ARE TO COMMENCE.

7. TEMPORARY BARRIERS WILL BE ERECTED SO AS TO NOT IMPEDE ACCESS TO REMAINING AREAS

OF THE FACILITY FOR PATIENTS, VISITORS AND HOSPITAL STAFF.

8. ALL DEBRIS MUST BE REMOVED BY CART/CONTAINER WITH A TIGHTLY COVERED LID, NO

EXCEPTIONS WILL BE ALLOWED.

9. CONTRACTOR TO MAINTAIN A CLEAN AND ORDERLY, DUST, DEBRIS, TRIP HAZARD FREE WORK

AREA ON A DAILY BASIS DURING REGULAR HOSPITAL HOURS. CONTRACTOR TO WIPE WORK

SURFACES WITH DISINFECTANT, WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM

BEFORE LEAVING THE WORK AREA THIRTY MINUTES BEFORE REGULAR HOSPITAL HOURS ARE TO

COMMENCE.

10. IN THE EVENT THAT AN EXISTING FIRE EXTINGUISHER IS NOT READILY ACCESSIBLE DUE TO THE

ERECTION OF TEMPORARY BARRIERS, THE CONTRACTOR WILL PROVIDE A FIRE EXTINGUISHER

OUTSIDE OF THE AREA OF WORK.

11. CONTRACTOR TO FIELD VERIFY ALL SITE CONDITIONS PRIOR TO COMMENCING WITH THE WORK.

CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) OF ANY

DISCREPANCIES NOT SHOWN ON THE PLAN(S) PRIOR TO COMMENCING WITH THE WORK.

12. AREA OF WORK DENOTES EXISTING VINYL COMPOSITE TILE (VCT) FLOORING TO BE REMOVED IN ITS ENTIRETY. PREP AND REPAIR FLOOR AS REQUIRED FOR NEW SCHEDULED LUXURY VINYL TILE

(LVT). SEE SHEETS G1.00, IA8.01 FOR ADDITIONAL INFORMATION.

13. AREA OF WORK DENOTES EXISTING VINYL/RUBBER WALL BASE TO BE REMOVED IN ITS ENTIRETY.

PATCH AND REPAIR EXISTING WALLS AS REQUIRED TO ACHIEVE A SMOOTH, MONOLITHIC WALL

FINISH IN ORDER TO ACCEPT NEW SCHEDULED WALL BASE. SEE SHEETS G1.00, IA8.01 FOR

ADDITIONAL INFORMATION.

14. ALL EXISTING WALL EMBEDDED STAINLESS-STEEL CORNER GUARDS ARE TO REMAIN AS IS. CLEAN

AS NEEDED TO REMOVE MARKS, PAINT STAINS ETC. TO AN ACCEPTABLE APPEARANCE. NOTIFY

COR OF ANY EXISTING CORNER GUARDS THAT MAY REQUIRE ADDITIONAL MEANS AND METHODS

BESIDES BASIC CLEANING PRIOR TO ACCEPTANCE FROM THE COR.

15. MISCELLANEOUS SIGNAGE, ARTWORK, ACRYLIC SIGN HOLDERS TO BE REMOVED BY THE GOV/COR.

COORDINATE REMOVAL PRIOR TO COMMENCING WORK AND EACH PHASE OF WORK.

16. EXISTING ROOM SIGNAGE TO REMAIN IN PLACE UNLESS OTHERWISE REMOVED BY THE GOV/COR.

17. MISCELLANEOUS WALL MOUNTED EQUIPMENT/APPURTENCES (AED CABINETS, PPE CABINETS, HAND GEL DISPENSERS, DOME SAFETY MIRRORS ETC.) SHOULD BE REMOVED WHENEVER

POSSIBLE PRIOR TO APPLYING NEW SCHEDULED WALL FINISH. REMOUNT ANY REMOVED

EQUIPMENT BACK TO ITS ORIGINAL PLACEMENT ONCE APPLICATION OF NEW FINISHES ARE

COMPLETE.

18. EXISTING DOOR FRAME LOCATION LABEL WITH UPC IDENTIFIER TO BE REMOVED IN ITS ENTIRETY.

PATCH AND REPAIR DOOR FRAME FINISH AS REQUIRED FOR A "LIKE NEW" APPEARANCE PRIOR TO

APPLICATION OF NEW SCHEDULED FRAME FINISH.

REMOVE EXISTING CORNER DOME MIRROR FOR NEW CEILING GRID INSTALLATION. MIRROR TO BE

RETAINED FOR RE-USE.

EXISTING SURFACE MOUNTED "CURVED" CORNER GUARD TO BE REMOVED

DASHED LINE REPRESENTS EXISTING GUARD/HANDRAIL TO BE REMOVED IN ITS ENTRETY. TYPICAL.

EXISTING SURFACE MOUNTED CORNERGUARD TO BE REMOVED IN ITS ENTIRETY.

EXISTING REAL TIME LOCATION SYSTEM (RTLS) BATTERY OPERATED CEILING DEVICE TO BE

REMOVED BY GOV. COORDINATE REMOVAL WITH COR.

DASHED LINES REPRESENT EXTENT OF ACP CEILING SYSTEM TO BE REMOVED IN ITS ENTIRETY.

EXISTING RETURN AIR DIFFUSER TO BE REUSED AND RELOCATED INTO THE NEW CEILING GRID IN SIMILAR LOCATION. SUSPEND DIFFUSER IN PLACE DURING RENOVATION FOR INSTALLATION INTO

NEW CEILING GRID. SEE RCP FOR ADDITIONAL INFORMATION.

EXISTING WIRELESS ACCESS POINT, POE DEVICE TO BE REUSED AND RELOCATED INTO THE NEW CEILING GRID IN THE SAME LOCATION. SUSPEND FIXTURE IN PLACE DURING RENOVATION FOR INSTALLATION INTO NEW CEILING GRID. DEVICE CAN BE TEMPORARILY DISCONNECTED AS NEED

FOR CEILING DEMOLITION. SEE RCP FOR ADDITIONAL INFORMATION.

EXISTING AIR SUPPLY/RETURN DIFFUSER TO BE DEMO'D IN ITS ENTIRETY. PREP DUCTWORK AS

NEEDED FOR NEW SCHEDULED AIR DIFFUSER.

REMOVE EXISTING ALUMINUM DIAMOND PLATING WALL PROTECTION. PATCH AND REPAIR WALL AS

REQUIRED FOR NEW SCHEDULED WALL FINISHES AND WALL PROTECTION.

REMOVE EXISTING VINYL WALL PANEL WALL PROTECTION IN ITS ENTIRETY. PATCH AND REPAIR

WALL AS NEEDED TO MATCH ADJACENT WALL FOR A SMOOTH MONOLITHIC FINISH. PREP AS

REQUIRED FOR NEW SCHEDULED WALL FINISHES AND WALL PROTECTION.

REMOVE EXISTING 36" H. HAND GEL DISPENSER. PATCH AND REPAIR WALL AS NEEDED TO ACHIEVE A SMOOTH MONOLITHIC FINISH IN ORDER TO ACCEPT NEW SCHEDULED WALL FINISH. RE-MOUNT

DISPENSER SO BOTTOM OF DISPENSER (NOT THE DRIP SHELF) IS 48" AFF.

EXISTING OVERHEAD SIGN TO BE REMOVED BY GOV/COR. COORDINATE REMOVAL PRIOR TO

COMMENCING WORK AND AT EACH PHASE OF WORK.

REMOVE EXISTING OVER DOOR SIGN. PATCH AND REPAIR WALLS AS NEEDED FOR NEW SCHEDULED

WALL FINISH.

REMOVE EXISTING DOOR IDENTIFICATION SIGNS IN THEIR ENTIRETY IN CORRIDOR C-103A. PATCH

AND REPAIR WALLS AS NEEDED FOR NEW SCHEDULED WALL FINISH.

REMOVE EXISTING FIRE EXTINGUISHER SIGN. PATCH AND REPAIR WALLS AS NEEDED FOR NEW

SCHEDULED WALL FINISH.

EXISTING THRESHOLD PLATE ASSEMBLY TO BE RE-USED TO MAINTAIN DOOR STC RATING.

4'- 0"

4'- 0"

3 PLANKS

3 P

LA

NK

S

3 P

LA

NK

S

1. CONTRACTOR TO FIELD VERIFY ALL SITE CONDITIONS PRIOR TO COMMENCING WITH THE WORK.

CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) OF ANY

DISCREPANCIES NOT SHOWN ON THE PLAN(S) PRIOR TO COMMENCING WITH THE WORK.

2. ALL WALLS SHALL HAVE PT-1 PAINT FINISH WITH RB-1 BASE, UNLESS OTHERWISE NOTED.

3. ALL DOOR METAL DOOR FRAMES SHALL HAVE PT-2 PAINT FINISH UNLESS NOTED OTHERWISE.

DOOR FRAMES ARE TO BE PAINTED TO THE INSIDE CORNER OF THE JAMB FACING THE DOOR.

CONTRACTOR TO COORDINATE DOOR/ROOM ACCESS AS NEEDED WITH THE COR.

4. SEE SHEET AS601 FOR SCHEDULED FINISHES.

5. SEE SHEET AS601/AS602 FOR FLOOR TRANSITION DETAILS AND FLOOR FINISH INFORMATION.

6. SEE SHEET-102 FOR THE PROJECT PHASING.

7. CONTRACTOR TO SUBMIT SAMPLES OF ALL SCHEDULED FINISHES FOR APPROVAL PRIOR TO

ORDERING. NOTIFY COR OF ANY DISCREPANCIES OR OMISSIONS.

8. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE ACCURACY OF THE TOTAL

YARDAGE/SQUARE FOOT MATERIAL REQUIREMENTS TO BE FURNISHED. NO REQUESTS FOR

MATERIALS OR INSTALLATION EXTRAS WILL BE CONSIDERED DUE TO MEASUREMENT OR TAKEOFF

ERRORS BY THE CONTRACTOR

9. ALL INTERIOR FINISHES SHALL HAVE A CLASS A FLAME SPREAD RATING.

10. INSTALL NEW SCHEDULED FINISHES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S

INSTRUCTIONS AND RECOMMENDATIONS FOR THE SPECIFIC SUBSTRATE.

11. RESILIENT BASE MATERIAL SHALL BE INSTALLED FLUSH ON FINISHED FLOOR SURFACE UNLESS

NOTED OTHERWISE.

12. PROVIDE FLOOR FINISH TRANSITIONS AS REQUIRED AT ALL CHANGE OF MATERIAL LOCATIONS.

13. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A SMOOTH LEVEL SURFACE THAT

MEETS/EXCEEDS THE MANUFACTURERS INSTALLATION SPECIFICATIONS PRIOR TO THE

INSTALLATION OF ALL FLOORING MATERIALS. SELF-DRYING CEMENT-BASE FINISH UNDERLAYMENT UNDER NEW FLOOR FINISH AREAS PER SPECIFICATIONS. PATCH/FLASH ALL AREAS AS NECESSARY SO THAT NEW FLOOR MEETS LEVEL WITH ALL OTHER FLOORING SURFACES. VARIATIONS IN FLOOR LEVEL IN EXCESS OF 1” FOR EVERY 10'-0” SHALL BE LEVELED BY THE CONTRACTOR. LEVELING SHALL BE COMPLETED AND ADEQUATELY CURED PRIOR TO RECEIVING OF NEW FLOOR FINISHES AS

SCHEDULED.

14. ALL FLOORING TRANSITIONS TO OCCUR BENEATH AND AT CENTER OF DOOR, OR CENTERLINE OF

AN OPENING WHERE NO DOOR OCCURS WHENEVER EXISTING ADJACENT FLOOR CONDITIONS WILL

ALLOW UNLESS OTHERWISE NOTED.

15. ALL FLOORING TRANSITIONS TO OCCUR AT CENTERLINE OF AN OPENING WHERE NO DOOR OCCURS

ALLOW UNLESS OTHERWISE NOTED.

16. ONCE FLOORING INSTALLATION IS COMPLETE, CONTRACTOR TO CLEAN FLOOR AS RECOMMENDED

BY THE FLOORING MANUFACTURER PRIOR TO ACCEPTANCE BY THE COR.

17. ALL NEW AND EXISTING FINISHES SCHEDULED TO REMAIN SHALL BE PROTECTED DURING

CONSTRUCTION. ANY DAMAGE SHALL BE REPAIRED BY CONTRACTOR/SUB-CONTRACTORS AT

THEIR TIME AND EXPENSE.

18. PATCH AND REPAIR ALL EXISTING WALLS TO A “LIKE NEW” FINISH WHERE THERE IS EXISTING WALL DAMAGE OR ITEMS HAVE BEEN REMOVED PRIOR TO PAINTING. CONTRACTOR IS RESPONSIBLE FOR

RETURNING REMOVED ITEMS TO THEIR ORIGINAL LOCATION UNLESS NOTED OTHERWISE OR

DIRECTED BY THE COR.

19. EXISTING FIRE ALARM DEVICES, THERMOSTATS, MAGNETIC HOLD OPENS OR SIMILAR ELECTRICAL DEVICES ARE TO REMAIN IN PLACE DURING PAINTING. CONTRACTOR IS TO COVER AND PROTECT

AS REQUIRED WHILE MAINTAINING THE FUNCTION AND OPERATION OF THE DEVICE DURING

PAINTING.

20. PAINT FOR EXISTING PARTITIONS SHALL BE INTERIOR, WATERBASED ACRYLIC LATEX, FINISH:

EGGSHELL UNLESS NOTED OTHERWISE.

21. PAINT FOR EXISTING DOOR FRAMES TO BE INTERIOR, WATERBASED, ACRYLIC ALKYD ENAMEL, FINISH: SEMI-GLOSS UNLESS OTHERWISE NOTED

STEP/RISER ON ROOM SIDE, INSTALL WALL BASE AT RISER.

REPLACE EXISTING TRANSITION WITH NEW ALUMINUM TRANSITION TR-1

EXISTING BUILDING EXPANSION JOINT COVER TO REMAIN. PROVIDE TRANSITION(S) ON EACH SIDE

OF EXPANSION JOINT AS NEEDED. CONTRACTOR TO PROVIDE, VA/COR TO APPROVE.

ROOM ACCESS IS RESTRICTED. MINIMUM 5 WORKING DAYS NOTICE IS REQUIRED PRIOR ANY

PAINTING OR FLOORING TO BE COMPLETED. COORDINATE ACCESS WITH COR.

EXISTING THRESHOLD PLATE ASSEMBLY TO BE RE-USED.

3 PLANKS

3 P

LA

NK

S

3 P

LA

NK

S

3 PLANKS

3 P

LA

NK

S

3 PLANKS

3 P

LA

NK

S

3 PLANKS

1'-

6" DIA. LED RECESSED DOWNLIGHT

SYMBOL

REFLECTED CEILING PLAN SYMBOL LEGEND

DESCRIPTION

2X4 LED DIRECT INDIRECT LIGHT FIXTURE

2X2 LED DIRECT INDIRECT LIGHT FIXTURE

CEILING MOUNTED EXIT SIGN

CEILING MOUNTED EXIT SIGN, DIRECTIONAL

WAP, WIRELESS ACCESS POINT

OC

RTLS, STAR DEVICE, POE

RTLS, MONITOR DEVICE, BATTERY POWER

OCCUPANCY SENSOR SWITCH, CEILING MOUNTED

RTLS, VIRTUAL WALL DEVICE, BATTERY POWER

J JUNCTION BOX, POWER

CAMERA, SECURITY

DIFFUSER, SUPPLY AIR, LAY-IN

DIFFUSER, RETURN AIR, LAY-IN

LED, RECESSED LINEAR LIGHT FIXTURE

WAP, WIRELESS ACCESS POINT, FULL PANEL

FIRE ALARM, SMOKE DETECTOR

1. CONTRACTOR TO FIELD VERIFY ALL SITE CONDITIONS PRIOR TO COMMENCING WITH THE WORK.

CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) OF ANY

DISCREPANCIES NOT SHOWN ON THE PLAN(S) PRIOR TO COMMENCING WITH THE WORK.

2. ALL WALLS SHALL HAVE PT-1 PAINT FINISH WITH RB-1 BASE, UNLESS OTHERWISE NOTED.

3. ALL DOOR METAL DOOR FRAMES SHALL HAVE PT-2 PAINT FINISH UNLESS NOTED OTHERWISE.

DOOR FRAMES ARE TO BE PAINTED TO THE INSIDE CORNER OF THE JAMB FACING THE DOOR.

CONTRACTOR TO COORDINATE DOOR/ROOM ACCESS AS NEEDED WITH THE COR.

4. SEE SHEET IA-8.01 FOR SCHEDULED FINISHES.

5. SEE SHEET IA-6.01 FOR FLOOR TRANSITION DETAILS AND FLOOR FINISH INFORMATION.

6. SEE SHEET G-1.00 FOR PROJECT PHASING.

7. CONTRACTOR TO SUBMIT SAMPLES OF ALL SCHEDULED FINISHES FOR APPROVAL PRIOR TO

ORDERING. NOTIFY COR OF ANY DISCREPANCIES OR OMISSIONS.

8. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE ACCURACY OF THE TOTAL

YARDAGE/SQUARE FOOT MATERIAL REQUIREMENTS TO BE FURNISHED. NO REQUESTS FOR

MATERIALS OR INSTALLATION EXTRAS WILL BE CONSIDERED DUE TO MEASUREMENT OR TAKEOFF

ERRORS BY THE CONTRACTOR

9. ALL INTERIOR FINISHES SHALL HAVE A CLASS A FLAME SPREAD RATING.

10. INSTALL NEW SCHEDULED FINISHES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S

INSTRUCTIONS AND RECOMMENDATIONS FOR THE SPECIFIC SUBSTRATE.

11. RESILIENT BASE MATERIAL SHALL BE INSTALLED FLUSH ON FINISHED FLOOR SURFACE UNLESS

NOTED OTHERWISE.

12. PROVIDE FLOOR FINISH TRANSITIONS AS REQUIRED AT ALL CHANGE OF MATERIAL LOCATIONS.

13. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A SMOOTH LEVEL SURFACE THAT

MEETS/EXCEEDS THE MANUFACTURERS INSTALLATION SPECIFICATIONS PRIOR TO THE

INSTALLATION OF ALL FLOORING MATERIALS. SELF-DRYING CEMENT-BASE FINISH UNDERLAYMENT UNDER NEW FLOOR FINISH AREAS PER SPECIFICATIONS. PATCH/FLASH ALL AREAS AS NECESSARY SO THAT NEW FLOOR MEETS LEVEL WITH ALL OTHER FLOORING SURFACES. VARIATIONS IN FLOOR LEVEL IN EXCESS OF 1” FOR EVERY 10'-0” SHALL BE LEVELED BY THE CONTRACTOR. LEVELING SHALL BE COMPLETED AND ADEQUATELY CURED PRIOR TO RECEIVING OF NEW FLOOR FINISHES AS

SCHEDULED.

14. ALL FLOORING TRANSITIONS TO OCCUR BENEATH AND AT CENTER OF DOOR, OR CENTERLINE OF

AN OPENING WHERE NO DOOR OCCURS WHENEVER EXISTING ADJACENT FLOOR CONDITIONS WILL

ALLOW UNLESS OTHERWISE NOTED.

15. ONCE FLOORING INSTALLATION IS COMPLETE, CONTRACTOR TO CLEAN FLOOR AS RECOMMENDED

BY THE FLOORING MANUFACTURER PRIOR TO ACCEPTANCE BY THE COR.

16. ALL NEW AND EXISTING FINISHES SCHEDULED TO REMAIN SHALL BE PROTECTED DURING

CONSTRUCTION. ANY DAMAGE SHALL BE REPAIRED BY CONTRACTOR/SUB-CONTRACTORS AT

THEIR TIME AND EXPENSE.

17. PATCH AND REPAIR ALL EXISTING WALLS TO A “LIKE NEW” FINISH WHERE THERE IS EXISTING WALL DAMAGE OR ITEMS HAVE BEEN REMOVED PRIOR TO PAINTING. CONTRACTOR IS RESPONSIBLE FOR

RETURNING REMOVED ITEMS TO THEIR ORIGINAL LOCATION UNLESS NOTED OTHERWISE OR

DIRECTED BY THE COR.

18. EXISTING FIRE ALARM DEVICES, THERMOSTATS, MAGNETIC HOLD OPENS OR SIMILAR ELECTRICAL DEVICES ARE TO REMAIN IN PLACE DURING PAINTING. CONTRACTOR IS TO COVER AND PROTECT

AS REQUIRED WHILE MAINTAINING THE FUNCTION AND OPERATION OF THE DEVICE DURING

PAINTING.

DOOR STOP, HALF-DOME. CONTRACTOR TO PROVIDE, GOV/COR TO

APPROVE.

ROOM ACCESS IS RESTRICTED. MINIMUM 5 WORKING DAYS NOTICE IS

REQUIRED PRIOR TO ANY NEW FINISH INSTALLATION. COORDINATE

ACCESS WITH COR.

EXISTING THRESHOLD PLATE ASSEMBLY TO BE RE-USED.

DOOR MAY REQUIRE TRIMMING FOR NEW SCHEDULED FLOOR FINISH.

CONTRACTOR TO VERIFY AND NOTIFY COR IF DOOR IS TO BE REPLACED IN

ORDER TO MAINTAIN THE REQUIRED FIRE RATING..

EXISTING LIGHT FIXTURE TO BE RE-USED.

RE-INSTALL EXISTING CORNER DOME MIRROR REMOVED DURING SELECTIVE DEMOLITION

RTLS DEVICE TO BE REINSTALLED BY GOV. COORDINATE WITH COR

EXISTING EXIT SIGN TO BE RE-USED.

NEW EXIT SIGN TO MATCH BUILDING STANDARD.

1. INFECTION CONTROL WILL CONSIST OF TEMPORARY “POLY” BARRIERS. REPLACE

TEMPORARY BARRIER IN ITS ENTIRETY AS NEEDED IF BARRIER IS TORN OR DAMAGED

DURING THE WORK.

2. FOR WORK OCCURING AFTER HOURS, CONTRACTOR, EXERCISING CARE, WILL REMOVE

TEMPORARY “POLY” BARRIER MATERIALS TO MINIMIZE SPREADING OF DIRT AND

DEBRIS THIRTY MINUTES PRIOR TO THE COMMENCEMENT OF REGULAR HOSPITAL

HOURS

3. CONTRACTOR TO PROVIDE “WALK OFF” OR “STICKY” MATS AT THE ENTRY AND EXITS TO

THE AREA OF WORK. REPLACE AS NEEDED. CONSTRUCTION PERSONNEL ARE

REQUIRED TO ENSURE SHOES ARE NOT TRACKING WHEN LEAVING THE WORK SITE

4. CONTRACTOR TO PROVIDE HEPA FILTRATION “NEGATIVE AIR” MACHINES AND OTHER

ACTIVE MEANS (TOOL VACUUM SYSTEMS) WHEN DEEMED NECESSARY TO PREVENT

AIR-BONE DUST FROM DISPERSING INTO THE ATMOSPHERE WITHIN THE WORKSITE.

5. CONTRACTOR IS TO ISOLATE ALL AIR VENTS WITHIN THE AREA OF WORK. ISOLATION

OF AIR VENTS AS REQUIRED TO PREVENT AIRBORNE DUST FROM ENTERING THE

VENT/DUCT. CONTRACTOR TO REMOVE VENT/DUCT ISOLATION BARRIERS AT THE END

OF THE WORK PERIOD AND 30 MINUTES BEFORE REGULAR HOSPITAL HOURS ARE TO

COMMENCE.

6. TEMPORARY BARRIERS WILL BE ERECTED SO AS TO NOT IMPEDE ACCESS TO

REMAINING AREAS OF THE FACILITY FOR PATIENTS, VISITORS AND HOSPITAL STAFF.

7. ALL DEBRIS MUST BE REMOVED BY CART/CONTAINER WITH A TIGHTLY COVERED LID,

NO EXCEPTIONS WILL BE ALLOWED.

8. CONTRACTOR TO MAINTAIN A CLEAN AND ORDERLY, DUST, DEBRIS, TRIP HAZARD FREE

WORK AREA ON A DAILY BASIS DURING REGULAR HOSPITAL HOURS. CONTRACTOR TO

WIPE WORK SURFACES WITH DISINFECTANT, WET MOP AND/OR VACUUM WITH HEPA

FILTERED VACUUM BEFORE LEAVING THE WORK AREA AT THE END OF EACH WORK DAY

OR THIRTY MINUTES BEFORE REGULAR HOSPITAL HOURS ARE TO COMMENCE.

9. IN THE EVENT THAT AN EXISTING FIRE EXTINGUISHER IS NOT READILY ACCESSIBLE DUE

TO THE ERECTION OF TEMPORARY BARRIERS, THE CONTRACTOR WILL PROVIDE A FIRE

EXTINGUISHER OUTSIDE OF THE AREA OF WORK.

10. CONTRACTOR TO FIELD VERIFY ALL SITE CONDITIONS PRIOR TO COMMENCING WITH

THE WORK. CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S

REPRESENTATIVE (COR) OF ANY DISCREPANCIES NOT SHOWN ON THE PLAN(S) PRIOR

TO COMMENCING WITH THE WORK.

11. SEE INFECTION CONTROL PLAN (IC SERIES) AND PHASING PLAN (PH SERIES) FOR

ADDITIONAL INFORMATION FOR PROPOSED INFECTION CONTROL BARRIERS AND

PHASING FOR EACH AREA OF WORK REQUIRED. CONTRACTOR WILL BE RESPONSIBLE

FOR COORDINATING THE WORK AND THE APPROPRIATE INFECTION CONTROL BARRIER

AS NEEDED TO ACCOMPLISH THE WORK. COORDINATE ALL PROPOSED BARRIERS WITH

THE COR THAT MAY NEED TO BE CREATED TO ACCOMODATE VARIOUS TRADES AS

NEEDED.

12. THE ARCHITECTURAL REFLECTED CEILING PLAN SHALL GOVERN THE LAYOUT OF ALL

CEILING ELEMENTS, HEIGHTS AND/OR PENETRATIONS. COORDINATION OF

ARCHITECTURAL ELEMENTS, ENGINEERING COMPETES AND FIELD CONDITIOINS IS THE

RESPONSIBILITY OF THE CONTRACTOR. REFER ANY DISCREPANCIES TO THE COR.

13. FIXTURES, ELEMENTS SIZES OF MECHANICAL, ELECTRICAL AND PLUMBING EQUIPMENT

ON THIS SHEET ARE FOR REFERENCE ONLY. REFER TO MEP PLANS FOR ADDITIONAL

INFORMATION.

14. ACOUSTIC PANEL CEILING SHALL BE CENTERED IN THE ROOM AND INSTALLED TO

ELIMINATE NARROW CUT STRIPS OF PANELS ALONG THE EDGES OF WALLS AND

BULKHEADS. COORDINATE WITH THE LIGHTING LAYOUT. THE LIGHTING SHALL BE

CENTERED IN ROOMS UNLESS SHOWN OTHERWISE.

15. CEILING MOUNTED ITEMS (SPRINKLER HEADS, MOUNTING DEVICES, ETC.) SHALL BE

CENTERED IN THE CEILING PANELS UNLESS NOTED OTHERWISE.

16. ABOVE CELING WORK REQUIRED BEYOND THE SCOPE OF THE WORK SHALL BE

COORDINATED WITH PATIENT SAFETY, INFECTION CONTROL AND THE COR.

17. CELING TILE REMOVED IN ORDER TO COMPLETE ABOVE CELING WORK SHALL BE

STORED IN A SAFE DRY LOCATION. DAMAGED OR BROKEN CEILING TILES SHALL BE

REPLACED. DRYWALL CELINGS SHALL BE PATCHED, PREPPED AND NEW FINISH

APPLIED TO MATCH EXISTING.

18. SEE SHEE IA8.01 FOR ELECTRICAL FIXTURE SCHEDULE AND CEILING DIFFUSER

SCHEDULE.

1. SPRINKLERS ARE TO BE LOCATED IN CENTER OF CEILING TILE.

2. THE SPACIING OF SPRINKLERS: THE SPACING AND SIZES OF PIPES SHALL CONFORM TO

THE REQUIREMENTS OF NFPA PAMPHLET NO. 13. SPRINKLERS SHALL BE INSTALLED BY

PERSONNEL WHO HAVE ENGINEERING FACILITIES AND EXPERIENCE IN SUCH WORK

AND WHO ARE REGULARLY EMPLOLYED TO DO SUCH WORK.

3. IN LOCATING SPRINKLERS AND PIPING, CONTRACTOR SHALL COORDINATE THE

SPRINKLER LAYOUT WITH THE LIGHTING AND HVAC LAYOUT.

4. ALL MATERIAL SHALL BE OF APPROVED QUALITY AND THE WORK SHALL BE DONE IN A

THOROUGH AND WORKMANLIKE MANNER. THE WORK, MATERIALS AND TEST SHALL BE

IN ACCORDANCE WITH THE CURRENT REQUIREMENTS OF NFPA 13, LATEST EDITION.

5. PIPING: SPRINKLER PIPING SHALL BE SCHEDULE 40 BLACK STEEL PIPE AND FITTINGS

CONFORMAING TO ASTM A-53. MINIMUM SIZE IS ONE (1") INCH. SCHEDULE 10

GALVANIZED MAY BE USED FOR 2 12" AND LARGER. DO NOT THREAD THINWALL PIPE.

6. PIPE SUPPORTS: HANGERS, CLAMPS, RODS AND OTHER ACCESSORIES OF AN

APPROVED TYPE AND IN SUFFICIENT NUMBER TO PROPERLY SUPPORT ALL PIPING

SHALL BE FURNISHED AND INSTALLED. PIPING SHALL BE SUPPORTED BY ROND

WROUGHT U-TYPE APPROVED ADJUSTABLE HANGERS.

7. SPRINKLERS SHALL BE 12" ORIFICE TYPE OF ORDINARY DEGREE RATING EXCEPT WHERE

EXCESSIVE TEMPERATURES ARE ANTICIPATED. IN THESE LOCATIONS HIGH

TEMPERATURE SPRINKLERS SHALL BE INSTALLED IN ACCORDANCE WITH NFPA NO. 13.

8. PROVIDE AND MAINTAIN A MINIMUM OF 18 INCHES CLEARANCE BETWEEN THE BOTTOM

OF THE SPRINKLER DEFLECTOR AND THE TOP OF STORAGE, FILES, ETC.

9. REFER TO ARCHITECTURAL DOCUMENTS FOR LOCATIONS OF ALL SMOKE AND/OR FIRE

WALLS WHICH FIRE PROTECTION IPING PENETRATES AND PENETRATION DETAILS

SHOWING THE MAINTENANCE OF THE INTEGRITY OF THE SMOKE/FIRE WALLS IN AN

APPROVED MANNER WHEN PENETRATING WALLS AND FLOORS.

10. THE SUBMISSION OF A PROPOSAL SHALL BE CONSTRUED AS EVIDENCE THAT THE

CONTRACTOR HAS FAMILIARIZED HIMSELF/HERSELF WITH THE PLANS AND BUILDING

SITE. CLAIMS MADE SUBSEQUENT TO THE PROPOSAL FOR MATERIALS AND LABOR

BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT BE RECOGNIZED. IF THEY COULD

HAVE BEEN FORESEEN HAD PROPER EXAMINATION BEEN MADE.

11. ESCUTCHEON PLATE FOR SPRINKLERS HEADS MUST HOLD TIGHT TO THE CEILING AND

CANNOT HAVE 18" GAP. INSTALLER SHALL INSTALL SO THAT THERE IS STILL THREADING

TO TIGHTEN THE PLATE TIGHT TO CEILING IN THE FURTURE TO ACCOUNT FOR SAG OF

FIRE LINES OVER TIME.

12. BUILDING IS LOCATED IN SEISMIC ZONE D AND SEISMIC BRACING IS REQUIRED.

13. FIRE SPRINKLER CONTRACTOR SHALL HAVE A FLOW TEST PERFORMED IF PROVIDED

FLOW TEST DATA IS OLDER THAN 12 MONTHS.

14. NEW SPRINKLERS SHALL BE FM APPROVED QUICK RESPONSE SPRINKLERS.

15. CONTRACTOR SHALL MODIFY THE EXISTING SPRINKLER SYSTEM AS NECESSARY TO

PROVIDE CODE COMPLIANT COVERAGE IN THE NEW LAYOUT.

IBC - INTERNATIONAL BUILDING CODE 2018 EDITION.

NFPA 13 - STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS 2016 EDITION.

NFPA 101 - LIFE SAFETY CODE 2015 EDITION

VA FIRE PROTECTION DESIGN MANUAL

CORNER GUARD

HANDRAIL

DOOR FRAME

METAL EDGE STRIP WITH

ADJUSTABLE TRANSITION

LVT FLOORING

SCHEDULED CARPET

FLASH AS REQUIRED FOR A

SMOOTH TRANSITION

METAL EDGE

TRANSITION STRIP

LVT

VCT

SEALANT EACH SIDE

CONCRETE SUBFLOORCONCRETE SUBFLOOR

METAL EDGE TRANSITION

REDUCING STRIP

LVT

SEALANT

CONCRETE SUBFLOOR

METAL EDGE TRANSITION

REDUCING STRIP

LVT

SEALANT

CONCRETE SUBFLOOR

THINSET MORTAR BED

SCHEDULED TILE

METAL EDGE

TRANSITION STRIP

LVT

VCT

SEALANT EACH SIDE

CONCRETE SUBFLOOR

SEALANT

METAL EDGE TRANSITION

REDUCING STRIP

LVT

SEALANT

CONCRETE SUBFLOOR

SHEET VINYL

3"

3'- 0"

51 4"

3'- 0"

3'- 0"

SCHEDULED

RESILIENT BASE

EXISTING PARTITION

SINGLE LINE, VINYL

HANDRAIL, SECURED TO

EXISTING PARTITION

FRAMING, HR-1

WP-3

EXISTING PARTITION

WP-4 WP-6

EXISTING PARTITION

BUMPER RAIL, BR-1

CRASH RAIL, CR-1

8"

BUMPER RAIL WITH

INTEGRATED HANDRAIL

SECURED TO EXISTING

PARTITION FRAMING, HR-2

4"

CRASH RAIL, CR-1

SCHEDULED

RESILIENT BASE

8" 4"

4'- 0"

EDGE TRIM AND SEALANT

SCHEDULED

RESILIENT BASE

INSTALLED OVER

RIGID WALLCOVERING

3'- 0"

WP-5

EXISTING PARTITION

CRASH RAIL, CR-1

8"

4"

4'- 0"

EDGE TRIM AND SEALANT

SCHEDULED

RESILIENT BASE

INSTALLED OVER

RIGID WALLCOVERING

BUMPER RAIL WITH

INTEGRATED HANDRAIL

SECURED TO EXISTING

PARTITION FRAMING, HR-2

FULL HEIGHT VINYL

CORNER GUARD, MOUNT

JUST ABOVE SCHEDULED

FLOOR BASE

CONTINUOUS ALUMINUM

RETAINER

SECURE TO PARTITION

PER MANUFACTURERS

SPECIFICATIONS PER

PARTITION TYPE

ROOM FINISH SCHEDULE

ROOM # ROOOM NAME FLOOR BASE WALLS CEILING REMARKS

LVT-1, LVT-2 RB-1 P- 1 EXISTING

RB-1

C-102A

PATIENT CORRIDOR

C-102 C-101

P- 1 ACP-1

ACP-1

FINISH SCHEDULE

FINISH MARK FINISH MANUFACTURER PATTERN/STYLE COLOR FORMAT COMMENTS

CEILING

ACP-1 ACOUSTICAL CEILING PANEL CERTAIN TEED BAROQUE, TRIM, BET-157 WHITE 24" X 24" X 5/8"

FLOOR

LVT-1 LUXURY VINYL TILE SHAW CONTRACT ABIDE, 4107V 2.5mm, 7" X 48"

WALL BASE

RB-1 RESILIENT BASE JOHNSONITE 49 BEIGE 4" COVE BASE

WALLS

P-1 PAINT SHERWIN WILLIAMS SW7638 JOGGING PATH

P-2 PAINT SHERWIN WILLIAMS SW6107 NOMADIC DESERT

FIELD WALL PAINT, ACRYLIC LATEX

HM DOOR TRIM PAINT

TS-1 TRANSITION STRIP SCHLUTER SYSTEMS SCHLUTER SCHIENE STAINLESS STEEL LVT FLOORING TO VCT FLOORING

WALL PROTECTION

RR-1 RIGID VINYL INPRO 8" RIGID VINYL, RUB RAIL 0250 BISCOTTI

HR-2 HAND RAIL/BUMPER

-8" HIGH

1200 SERIES 6 14" HIGH

INPRO 0250 BISCOTTI

RWC-1 RIGID VINYL INPRO 48" RIGID VINYL WALLCOVERING 0250 BISCOTTI -8" HIGH

LVT-2 LUXURY VINYL TILE

C-103 C-104 C-104A C-105 C-106

PATIENT CORRIDOR

PATIENT CORRIDOR

PATIENT CORRIDOR

PATIENT CORRIDOR

PATIENT CORRIDOR

PATIENT CORRIDOR

PATIENT CORRIDOR

LVT-1, LVT-2

LVT-1, LVT-2

LVT-1, LVT-2

LVT-1, LVT-2

LVT-1

LVT-1, LVT-2

LVT-1, LVT-2

RB-1

RB-1

RB-1

RB-1

RB-1

RB-1

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

TS-2 SCHLUTER RENO-V STAINLESS STEEL LVT FLOORING TO CARPET

TS-3 SCHLUTER RENO-U STAINLESS STEEL LVT FLOORING TO SEALED CONCRETE

TS-4 SCHLUTER RENO-U STAINLESS STEEL LVT FLOORING TO PORCELAIN/CERAMIC TILE

TS-5 SCHLUTER SCHIENE STAINLESS STEEL LVT FLOORING TO LVT FLOORING

TRANSITION STRIP SCHLUTER SYSTEMS

TRANSITION STRIP SCHLUTER SYSTEMS

TRANSITION STRIP SCHLUTER SYSTEMS

TRANSITION STRIP SCHLUTER SYSTEMS

HR-1 HAND RAIL INPRO 940 SMOOTH HANDRAIL 0250 BISCOTTI 40mm DIA.

CR-1 CRASH RAIL 700 WALL GUARD 8" HIGHINPRO 0250 BISCOTTI

BR-1 1600 WALL GUARDINPRO 0250 BISCOTTIBUMPER RAIL 6" HIGH

CG-1 CORNER GUARD 150 HIGH IMPACT CORNER GUARD 3" EACH LEGINPRO 0250 BISCOTTI

TAHINI OAK, 07240

SEMI-GLOSS, ACRYLIC LATEX

SEMI-GLOSS, ACRYLIC LATEX

INSTALLATION METHOD: STAGGER

INSTALLATION METHOD: STAGGER

MARK TYPE AIRFLOW MOUNTINGLOCATION MAX APD PANEL SIZE ROUND RECTANGULAR

PANEL SIZE

MAX NC DAMPER AT DEVICE FINISH MATERIAL REMARKS

REMARKS:

1. DIFFUSER TO MATCH BUILDING STANDARD.

2. REMOVE EXISTING HARD DUCTWORK CONNECTION AND REPLACE WITH NEW TAKE OFF AND

FLEX DUCT. PATCH AND REPAIR DUCTWORK AS NEEDED FOR A COMPLETE INSTALLATION.

3. DESIGN INTENT IS TO RE-USE EXISTING FLEX DUCT. CONTRACTOR TO FIELD VERIFY. NOTIFY

COR IF THERE ARE DISCREPANCIES.

DIFFUSER SCHEDULE

C-102SD-1 SQUARE/CONE 200 0.04 in-wg CEILING 24" X 24" 8" - - NO WHITE STEEL 1, 2

C-102RD-2 PERFORATED 200 0.04 in-wg CEILING 24" X 24" 8" - - NO WHITE STEEL 1

NOT USEDEG-1 LOUVERED/ 45 DEG 90 0.07 in-wg CEILING 6" X 6" - 6" X 6" 19 NO WHITE STEEL 1

C-102SD-2 SQUARE/CONE 200 0.04 in-wg CEILING 24" X 24" 8" - - NO WHITE STEEL 1, 2 C-102ASD-3 SQUARE/CONE 200 0.04 in-wg CEILING 24" X 24" 8" - - NO WHITE STEEL 1, 3

C-102RD-1 PERFORATED 200 0.04 in-wg CEILING 24" X 24" 8" - - NO WHITE STEEL 1

C-102RD-3 PERFORATED 200 CEILING 24" X 24" 8" - - NO WHITE STEEL 10.04 in-wg

SHAW CONTRACT ABIDE, 4107V SPICED OAK, 07630…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .