S02 - 436-22-104 Building 154 First Floor Patient Safety Upgrades_DWG.pdf
PDF 6 MB Posted
- Solicitation number
- 36C25924R0006
About this file
This document appears to be a set of architectural drawings for the Building 154 First Floor Patient Safety Upgrades project at the Fort Harrison VA Medical Center. The drawings cover the scope of work for selective demolition, new floor finishes, wall protection upgrades, and infection control measures across multiple phased construction areas on the first floor. Key details include:
The project will be completed in 5 phased areas to minimize disruption to patient care services. The scope includes removing and replacing vinyl composite tile (VCT) flooring with luxury vinyl tile (LVT), installing new wall protection like corner guards and handrails, and upgrading the ceiling system. Infection control procedures are specified, such as installing temporary poly barriers, providing HEPA filtration, and cleaning work areas daily. Detailed finish schedules, reflected ceiling plans, and transition details are provided.
This appears to be supporting documentation for the federal contract opportunity "Z2DA-- Building 154 First Floor Patient Safety Upgrades" (Solicitation #36C25924R0006) issued by the Department of Veterans Affairs.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 View Name 1/8" = 1'-0"
SECTION, DETAIL, OR ELEVATION TITLE EXAMPLE
ELEVATION CALLOUT EXAMPLE
DETAIL CALLOUT EXAMPLE
SECTION CALLOUT EXAMPLE
SECTION, DETAIL, OR ELEVATION
SYMBOL IDENTIFIERS
DETAIL NAME
LETTER OR NUMBER DESIGNATOR
DRAWING SEQUENCE NUMBER
INDICATES WHERE TITLE IS
LOCATED
ONE OR TWO CHARACTER
DISCIPLINE DESIGNATOR
(MAY NOT BE PRESENT IF
CALLOUT AND TITLE ARE ON
DRAWINGS WITHIN THE SAME
DISCIPLINE)
A A101
AE101
AE101
MATCH LINE
DETAIL NUMBER
ON SHEET
SHEET NUMBER
DETAIL NUMBER
ON SHEET
SHEET NUMBER
02 \ A-1.04
154 A
SADIE
PHARMACY
MED LAB
N N
PLAN NORTHTRUE NORTH
FORT HARRISON VA MEDICAL SYSTEM
VAMC PROJECT # 436-22-104
BUILDING 154 PATIENT SAFETY UPGRADES
SHEET LIST
G-0.00 COVER SHEET
G-1.00 LEVEL 01 - PROPOSED PHASING PLAN, AREA OF WORK
D-1.01 LEVEL 01 SELECTIVE DEMOLITION PLAN - PHASES 1 AND 2
IA-1.01
IA-1.02
IA-6.01
IA-8.01
GENERAL NOTES
ABBREVIATIONSA
& AND
@ AT
AB ANCHOR BOLT
ACFL ACCESS FLOOR
ACOUS ACOUSTICAL
AD AREA DRAIN
ADJ ADJUSTABLE
ADJ ADJACENT
ADMIN ADMINISTRATION
AFF ABOVE FINISH FLOOR
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
AP ACCESS PANEL
APROX APPROXIMATE
ARCH ARCHITECTURAL
AT ACOUSTICAL CEILING TILE
AUTO AUTOMATIC
AWT ACOUSTICAL WALL TREATMENT
B
BD BOARD
BFE BOTTOM FOOTING ELEVATION
BG BUMPER GUARD
BKT BRACKET
BLDG BUILDING
BM BEAM
BOT BOTTOM
BP BRICK PAVING
BR BRICK
BRG BEARING
BSMT BASEMENT
C
C CHANNEL
CAB CABINET
CANTL CANTILEVER
CAP CAPACITY
CAT CATEGORY
CCTV CLOSED CIRCUIT TELEVISION
CD COILING DOOR
CG COILING GRILLE
CG COILING GUARD
CH COAT HOOK
CJT CONTROL JOINT
CL CENTER LINE
CL CLASS
CLG CEILING
CLR CLEAR
CM CONSTRUCTION MANAGER
CMU CONCRETE MASONRY UNIT
CO CASED OPENING
COL COLUMN
CONC CONCRETE
CONF CONFERENCE
CONN CONNECT/-ED/-ION
CONST CONSTRUCTION
CONT CONTINUE/CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CP CARPET
CPT CARPET MODULE TILE
CR-1 CHAIR RAIL
CR-2 CRASH RAIL
CT CERAMIC TILE
CTR CENTER
CW CURTAIN WALL
CW COLD WATER
CYL CYLINDER
D
D DEPTH OR DEEP
DEMO DEMOLITION
DEPR DEPRESSIONDBL DOUBLE
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIFF DIFFUSER
DIM DIMENSION
DISP DISPENSER
DIST DISTRIBUTION
DIV DIVISION
DN DOWN
DP DATA PROCESSING
DR DOOR
DS DOWNSPOUT
DWG DRAWING
E
EC ELECTRICAL CABINET
EC EPOXY COATING
EF EXHAUST FAN
EFTR EXISTING FINISH TO REMAIN
EJT EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
EMERG EMERGENCY
EO ELECTRICAL OUTLET
EPDM ETHYLENE PROPYLENE
DIENE MONOMER
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EXH EXHAUST HOOD
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
EXT-P EXTERIOR PAINT
EXT-ST EXTERIOR STAIN
F
FA FIRE ALARM
FAP FIRE ALARM PANEL
FB FIRE BLANKET
FD FLOOR DRAIN
FDN FOUNDATION
FDV FIRE DEPARTMENT VALVE
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FGS FOAM GASKET SEAL
FH FIRE HOSE
FHV FIRE HOSE VALVE
FIN FINISH
FIXT FIXTURE
FL FLOOR
FL FLOW LINE
FP FIRE PROOFING
H
H HIGH
HB HOSE BIB
HD HAND DRYER
HDCP HANDICAP
HDR HEADER
HDW HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HPT HIGH POINT
HR HANDRAIL
HT HEIGHT
HTR HEATER
HVAC HEATING, VENTILATING,
AIR CONDITIONING
HW HOT WATER
HWD HARDWOOD
I
IC INTERCOM
ID INSIDE DIAMETER
IN INCH
INSUL INSULATION
INT INTERIOR
ISO ISOLATION
J
JAN JANITOR
JB JUNCTION BOX
JST JOIST
JT JOINT
K
KO KNOCK OUT
L
L LAVATORY
LB POUND
LCD LINEAR CEILING DIFFUSER
LF LINE FIGURED
LIN LINEAR
LKR LOCKER
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LMC LINEAR METAL CEILING
LOC LOCATION OR LOCATE
LPT LOW POINT
LS LAWN SPRINKLING
LT LIGHT
LTG LIGHTING
LVR LOUVER
LWC LINEAR WOOD CEILINGM
MAT MATERIAL
MAX MAXIMUM
MBD MARKER BOARD
MC MEDICINE CABINET
MCU MODULAR COOLING UNIT
MECH MECHANICAL
MEMB MEMBRANE
MET METAL
MRF MANUFACTURER
MH MANHOLE
MIL MILLIMETER
MN MINIMUM
MR MIRROR
MISC MISCELLANEOUS
MO MASONRY OPENING
MONO MONOLITHIC
MPU MULTI- PURPOSE UNIT
MTD MOUNTED
MTL METAL
MTR MOTOR
MULL MULLION
P
PNL PANEL
PR PAIR
PRELIM PRELIMINARY
PRES PLASTIC RESIN
PRESS PRESSURE
PRIM PRIMARY
PROJ PROJECTION
PRV POWER ROOF VENTILATOR
PTC PAPER TOWEL CABINET
PTR PRINTER
PVC POLYVINYL CHLORIDE
R
R RADIUS
R RISER
RA RETURN AIR
RB RESILIENT BASE/RUBBER BASE
RD ROOF DRAIN
REC RECESSED
REF REFERENCE
REFR REFRIGERATOR
REG REGISTER
REIN REINFORCE/-ED/-ING
REM REMOVE
REQD REQUIRED
RET RETAINING
REV REVERSE
REV REVISE
RF RESILIENT FLOOR
RFI REQUEST FOR INFORMATION
RH ROOF HATCH
RM ROOM
RO ROUGH OPENING
RS ROUGH SLAB
RSF RESILIENT SHEET FLOOR
RWC RAIN WATER CONDUCTOR
S
S SINK
S STAIN
SCHED SCHEDULE
SD SHOWER DRAIN
SD SMOKE DAMPER
SDISP SOAP DISPENSER
SF STORE FRONT
SF SQUARE FOOT
SH SHOWER
SHT SHEET
SHTG SHEATHING
SIM SIMILAR
SM SURFACE MOUNTED
SNC SANITARY NAPKIN CABINET
SND SANITARY NAPKIN DISPOSER
SP STANDPIPE
SPEC SPECIFICATIONS
SPR SINGLE PLY ROOF
SQ SQUARE
SQ YD SQUARE YARD
SR SERVICE RECEPTOR
SS SERVICE SINK
SST STAINLESS STEEL
ST STREET
ST STONE TILE
STC SOUND TRANSMISSION
STD STANDARD
STL STEEL
STOR STORAGE
STRUC STRUCTURAL
T
T TOP
TAN TANGENT
TCAB TOWEL CABINET
TDR TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPERATURE
TER TERRAZZO
TG TONGUE & GROVE
THRES THRESHOLD
TPH TOILET PAPER HOLDER
TR TREAD
TRANSF TRANSFORMER
TS TUBE SECTION
TV TELEVISION
TYP TYPICAL
U
U URINAL
UC UNDERCUT
UC UNDERCOUNTER
UFD UNDER FLOOR DUCT
UG UNDERGROUND
UH UNIT HEATER
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
US UTILITY SHELF
UTIL UTILITY
V
VC VALVE CABINET
VCT VINYL COMPOSITION TILE
VENT VENTILATION
VERT VERTICAL
VEST VESTIBULE
VR VAPOR RETARDER
VTR VENT THROUGH ROOF
W
W WALL COVERING
W WIDTH/WIDE
W WIDE FLANGE
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WDW WINDOW
WG WALL GUARD
WH WALL HYDRANT
WHCH WHEELCHAIR
WHTR WATER HEATER
WP WALL PANEL
WP WATERPROOF
WR WASTE RECEPTACLE
WS WEATHERSTRIP
WSCT WAINSCOT
WSF WELDED SEAM-RESILIENT
SHEET FLOORING
WT WINDOW TREATMENT
WT WEIGHT
N
NA NOT APPLICABLE
NC NURSE CALL
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NRC NOISE REDUCTION COEFFICIENT
NT NOTE
NTS NOT TO SCALE
O
OC ON CENTER
OD OUTSIDE DIAMETER
OFF OFFICE
OH OVERHEAD
OP OPERABLE PARTITION
OPER OPERATOR
OPNG OPENING
OPP OPPOSITE
OFD OVERFLOW ROOF DRAIN
P
P PAINT
PART PARTITION
PB PUSH BUTTON
F
FRMG FRAMING
FSTOP FIRE STOPPING
FT FOOT/FEET
FTG FOOTING
FURR FURRING
G
GA GAUGE
GAL GALLONS
GALV GALVANIZED
GB GRAB BAR
GB GRADE BEAM
GC GENERAL CONTRACTOR
GEN GENERAL
GEN GENERATOR
GL GLASS
GR GRADE
GRT GROUT
GWB GYPSUM WALLBOARD
GYP GYPSUM
PC PRECAST CONCRETE
PCD PAPER CUP DISPENSER
PED PEDESTAL
PL PLATE
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLS PLASTER
1. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY. VERIFY ALL
DIMENSIONS PRIOR TO START OF WORK. IN THE EVENT OF
DISCREPANCY, NOTIFY THE ARCHITECT AND OBTAIN RESOLUTION
BEFORE PROCEEDING.
2. PROVIDE ALL BLOCKING AND ANCHORAGE AS NECESSARY FOR PROPER
INSTALLATION OF WALL HUNG OR WALL MOUNTED EQUIPMENT
FIXTURES.
3. ADDITIONAL PLAN INFORMATION IS SHOWN ON LARGER SCALE PLANS
WHERE INDICATED BY KEYED REFERENCE. LARGE SCALE DRAWINGS
TAKE PRECEDENCE OVER SMALLER SCALE DRAWINGS.
4. THE LIST OF ABBREVIATIONS IS SHOWN AS A GUIDE ONLY AND DOES
NOT NECESSARILY INCLUDE ALL ABBREVIATIONS USED. OTHER
ABBREVIATIONS MAY BE FOUND AMONG THE DRAWINGS.
5. ALL CONSTRUCTION SHALL MEET OR EXCEED LOCAL INDUSTRY
STANDARDS. DETAILS ARE PROVIDED TO INDICATE MINIMUM QUALITY
AND TO GIVE STANDARDS OF CONSTRUCTION. IF A CONDITION IS NOT
SPECIFICALLY DETAILED, SUBMIT A SIMILAR DETAIL FOR GUIDE AND
APPROVAL. UFC 3-600-01, NFPA 101 AND 5000.
D-1.02 LEVEL 01 SELECTIVE DEMOLITION PLAN - PHASES 3,4 AND 5
LEVEL 01 FLOOR FINISH PLAN - PHASES 1 AND 2
LEVEL 01 FLOOR FINISH PLAN - PHASES 3,4 AND 5
INTERIOR ARCHITECTURE TYPICAL DETAILS
SCHEDULES
WP-1.01 LEVEL 01 WALL PROTECTION PLAN - PHASES 1 AND 2
WP-1.02 LEVEL 01 WALL PROTECTION PLAN - PHASES 3, 4 AND 5
G-2.00 LEVEL 01 - ICRA, INFECTION CONTROL PLAN
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Construction and Facilities Management
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text G0.00
AutoCAD SHX Text
AutoCAD SHX Text
FORT HARRISON, MONTANA
AutoCAD SHX Text
BUILDING 154 FINISH UPGRADES
AutoCAD SHX Text 436-22-104
AutoCAD SHX Text 01/27/2023
AutoCAD SHX Text
DJA
AutoCAD SHX Text
JOSE RIVERA-HERNANDEZ, PROJECT ENGINEER
AutoCAD SHX Text
VAMC FORT HARRISON
AutoCAD SHX Text
SYMBOL LEGEND
AutoCAD SHX Text
OVERALL BUILDING SITE PLAN
AutoCAD SHX Text
DJA
PH
AS
E
PHASE 2
PHASE 3
PH
AS
E
PH
AS
E
1. PHASE WORK AS TO MINIMIZE INTERRUPTION TO PATIENT CARE
SERVICES.
2. ALL PROPOSED AREAS OF PHASING ARE OF MEDIUM TO HIGH
RISK INFECTION CONTROL. FOLLOW INFECTION CONTROL
PROCEDURES OUTLINED IN THE DRAWINGS AND IN THE
INFECTION CONTROL RISK ASSESSMENT PERMIT.
3. COORDINATE ALL PROJECT PHASING WITH COR.
4. PHASED AREAS OUTLINED ON PLAN INDICATE THE AREA OF
WORK. NOTIFY COR OF ANY DISCREPANCIES.
1. SEE SHEET G1.00 FOR PROPOSED PHASING.
2. SEE SHEETS D1.01 AND D1.02 FOR DEMOLITION SCOPE OF
WORK.
3. SEE SHEETS IA1.01 AND IA1.02 FOR NEW FLOOR FINISH SCOPE
OF WORK.
4. SEE SHEETS WP1.01 AND WP1.02 FOR NEW WALL PROTECTION
SCOPE OF WORK.
AutoCAD SHX Text
ELEV
AutoCAD SHX Text
NO. 1
AutoCAD SHX Text
FIRE
AutoCAD SHX Text
MATCHLINE: SOUTH
AutoCAD SHX Text
MATCHLINE: NORTH
AutoCAD SHX Text
AutoCAD SHX Text
PROSTHETICS
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 139A
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text B
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
AutoCAD SHX Text
TBD
AutoCAD SHX Text
AutoCAD SHX Text
UTILITY
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
AutoCAD SHX Text
HAC
AutoCAD SHX Text
AutoCAD SHX Text
MEDICINE LAB
AutoCAD SHX Text
AutoCAD SHX Text
MEDICINE
AutoCAD SHX Text
AutoCAD SHX Text
UTILITY
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text 115-11
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
LOADING DOCK
AutoCAD SHX Text 133A
AutoCAD SHX Text
O2 STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text 115-07
AutoCAD SHX Text
(WAITING)
AutoCAD SHX Text
COMMON AREA
AutoCAD SHX Text 131B
AutoCAD SHX Text
HSKP
AutoCAD SHX Text 115-10
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 115-09
AutoCAD SHX Text
RESTROOM
AutoCAD SHX Text 115-08
AutoCAD SHX Text
RESTROOM
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 115-05
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 115-03
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 115-01
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 115-06
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 115-02
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
COMMON AREA
AutoCAD SHX Text 128A
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PATIENT ROOM
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text A
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
AutoCAD SHX Text
NURSE MANAGER
AutoCAD SHX Text
AutoCAD SHX Text
UTIL.
AutoCAD SHX Text 111B
AutoCAD SHX Text
KITCHEN
AutoCAD SHX Text
REC. HALL
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 115-03A
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 114A
AutoCAD SHX Text
SUPERVISOR
AutoCAD SHX Text
RESTROOM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RESTROOM
AutoCAD SHX Text
AutoCAD SHX Text
HAC
AutoCAD SHX Text
SERVICES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
X-RAY LAB
AutoCAD SHX Text 147A
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text 148A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AREA
AutoCAD SHX Text
COMMON
AutoCAD SHX Text
WAITING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RADIOLOGY
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
POLICE
AutoCAD SHX Text
OFF.
AutoCAD SHX Text
AutoCAD SHX Text 125A
AutoCAD SHX Text
CT LAB
AutoCAD SHX Text
AutoCAD SHX Text
CR ROOM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
COMMON
AutoCAD SHX Text
AREA
AutoCAD SHX Text
AutoCAD SHX Text
TLT RM.
AutoCAD SHX Text
UTILITY
AutoCAD SHX Text 117A
AutoCAD SHX Text 116A
AutoCAD SHX Text 117B
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
X-RAY LAB
AutoCAD SHX Text C-104
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C-107
AutoCAD SHX Text
LOBBY
AutoCAD SHX Text C
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text 127B
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 127C
AutoCAD SHX Text
UTILITY
AutoCAD SHX Text
MECH.
AutoCAD SHX Text
AutoCAD SHX Text
PATIENT ROOM
AutoCAD SHX Text 104A
AutoCAD SHX Text
PATIENT ROOM
AutoCAD SHX Text
AutoCAD SHX Text
MOTHER'S ROOM
AutoCAD SHX Text 127A
AutoCAD SHX Text
TECHNOLOGIST
AutoCAD SHX Text 120A
AutoCAD SHX Text
ULTRASOUND
AutoCAD SHX Text
HAC
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text C-107
AutoCAD SHX Text
LOBBY
AutoCAD SHX Text 101B
AutoCAD SHX Text
TOILET
AutoCAD SHX Text 101C
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
AutoCAD SHX Text
WAITING
AutoCAD SHX Text 102D
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 102E
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 102F
AutoCAD SHX Text 102G
AutoCAD SHX Text
TREATMENT
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text 102H
AutoCAD SHX Text I.T.
AutoCAD SHX Text
LOCKER
AutoCAD SHX Text
DIRTY
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
ROOM
AutoCAD SHX Text 102K
AutoCAD SHX Text
OPERATING
AutoCAD SHX Text 102L
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
OPERATING
AutoCAD SHX Text 102Y
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text 102P
AutoCAD SHX Text
X-RAY LAB
AutoCAD SHX Text 102Q
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 102R
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
INSTRUMENT
AutoCAD SHX Text 102S
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text 102U
AutoCAD SHX Text
LAB
AutoCAD SHX Text 102U
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 102V
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 102W
AutoCAD SHX Text
-GRAPHY
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C-102A
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 102T
AutoCAD SHX Text
DENTIST
AutoCAD SHX Text
AutoCAD SHX Text
HYGIENE
AutoCAD SHX Text N/A
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
ELEV
AutoCAD SHX Text
NO. 2
AutoCAD SHX Text
ELEV
AutoCAD SHX Text
NO. 3
AutoCAD SHX Text N/A
AutoCAD SHX Text
HAC
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
ELEC.
AutoCAD SHX Text
FIRE CL.
AutoCAD SHX Text
DENTAL
AutoCAD SHX Text
TREATMENT
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text
STAFF
AutoCAD SHX Text
LEAD
AutoCAD SHX Text
ECHOCARDIO
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
SECRETARY
AutoCAD SHX Text
ELEC.
AutoCAD SHX Text
RADIOLOGY
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
WATER
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
LANDING
AutoCAD SHX Text
TELE-HEALTH
AutoCAD SHX Text
FIRE
AutoCAD SHX Text
ELEC.
AutoCAD SHX Text
MEN'S
AutoCAD SHX Text
WOMEN'S
AutoCAD SHX Text
TELE-HEALTH
AutoCAD SHX Text
TELE-HEALTH
AutoCAD SHX Text 115-04
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
MEN'S
AutoCAD SHX Text
WOMEN'S
AutoCAD SHX Text
ELEC.
AutoCAD SHX Text
NUCLEAR
AutoCAD SHX Text
NUCLEAR
AutoCAD SHX Text
ATS
AutoCAD SHX Text
154-TSES
AutoCAD SHX Text
PANEL
AutoCAD SHX Text
154-DP2
AutoCAD SHX Text
PANEL
AutoCAD SHX Text
154-GSBD
AutoCAD SHX Text
ASCO POWER
AutoCAD SHX Text
TRANSFORMER
AutoCAD SHX Text
& BYPASS
AutoCAD SHX Text
SWITCHES
AutoCAD SHX Text
QED-6
AutoCAD SHX Text
SWITCHBOARD
AutoCAD SHX Text
AST TSEC2
AutoCAD SHX Text
PANEL
AutoCAD SHX Text
154-NDEC2
AutoCAD SHX Text
ATS 154-TSEC
AutoCAD SHX Text
X-RAY
AutoCAD SHX Text
TRANSFORMER
AutoCAD SHX Text
X-RAY
AutoCAD SHX Text
TRANSFORMER
AutoCAD SHX Text
STERILIZER
AutoCAD SHX Text
LIFT EQUIPMENT
AutoCAD SHX Text
GE MEDICAL
AutoCAD SHX Text
SYSTEMS:
AutoCAD SHX Text
RADIOGRAPHIC
AutoCAD SHX Text
UNIT
AutoCAD SHX Text C-106
AutoCAD SHX Text C-105
AutoCAD SHX Text C-102
AutoCAD SHX Text C-101
AutoCAD SHX Text C-104
AutoCAD SHX Text C-106
AutoCAD SHX Text C-103
AutoCAD SHX Text
PAT. CORR.
AutoCAD SHX Text C-103A
AutoCAD SHX Text C-101
AutoCAD SHX Text C-102A
AutoCAD SHX Text
PAT. CORR.
AutoCAD SHX Text
PAT. CORR.
AutoCAD SHX Text
PAT. CORR.
AutoCAD SHX Text
PAT. CORR.
AutoCAD SHX Text
PAT. CORR.
AutoCAD SHX Text
PAT. CORR.
AutoCAD SHX Text
PAT. CORR.
AutoCAD SHX Text
PAT. CORR.
AutoCAD SHX Text
PAT. CORR.
AutoCAD SHX Text
MATCHLINE: SOUTH
AutoCAD SHX Text
MATCHLINE: NORTH
AutoCAD SHX Text
AutoCAD SHX Text
LAUNDRY
AutoCAD SHX Text 141C
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text 141D
AutoCAD SHX Text
COMMON AREA
AutoCAD SHX Text 141E
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
SERVICE
AutoCAD SHX Text
CLEAN LINEN
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 139B
AutoCAD SHX Text
COMMON AREA
AutoCAD SHX Text
FLOOR
AutoCAD SHX Text
SCALE
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Construction and Facilities Management
AutoCAD SHX Text
LEVEL 01 ICRA, INFECTION CONTROL PLAN
AutoCAD SHX Text G-2.00
AutoCAD SHX Text
AutoCAD SHX Text
FORT HARRISON, MONTANA
AutoCAD SHX Text
BUILDING 154 PATIENT SAFETY UPGRADES
AutoCAD SHX Text 436-22-104
AutoCAD SHX Text 01/27/2023
AutoCAD SHX Text
DJA
AutoCAD SHX Text
JOSE RIVERA-HERNANDEZ
AutoCAD SHX Text
VAMC FORT HARRISON
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
PLAN
AutoCAD SHX Text 1/16" = 1'-0"
AutoCAD SHX Text
LEVEL 01 ICRA PLAN
AutoCAD SHX Text
AutoCAD SHX Text 1/16" = 1'-0"
AutoCAD SHX Text
LEVEL 01 ICRA PLAN - NORTH
AutoCAD SHX Text
AutoCAD SHX Text
ICRA PLAN GENERAL NOTES:
AutoCAD SHX Text
DJA
VHAFHMArmstD White
VHAFHMArmstD Line
VHAFHMArmstD Line
VHAFHMArmstD Line
VHAFHMArmstD Line
VHAFHMArmstD Line
VHAFHMArmstD Line
VHAFHMArmstD Line
VHAFHMArmstD PolyLine
VHAFHMArmstD PolyLine
VHAFHMArmstD PolyLine
VHAFHMArmstD PolyLine
VHAFHMArmstD PolyLine
VHAFHMArmstD PolyLine
VHAFHMArmstD PolyLine
VHAFHMArmstD PolyLine
VHAFHMArmstD PolyLine
VHAFHMArmstD PolyLine
VHAFHMArmstD PolyLine
VHAFHMArmstD PolyLine
VHAFHMArmstD Line
VHAFHMArmstD Line
VHAFHMArmstD Line
VHAFHMArmstD White
VHAFHMArmstD Line
VHAFHMArmstD Line
VHAFHMArmstD PolyLine
VHAFHMArmstD Callout DOOR TO BE SECURED DURING THE CEILING REPLACEMENT PHASE IN CORRIDORS C-102 AND C-102A
VHAFHMArmstD Callout PROVIDE FULL HEIGHT GWB BARRIER WITH ACCESS DURING THE CEILING REPLACEMENT PHASE IN CORRIDORS C-102 AND C-102A
VHAFHMArmstD Text Box
HARD WALL BARRIER TO UNDERSIDE OF EXISTING CEILING
COMPOSITION:
5/8" TYPE X GWB, 3 5/8" MS, 5/8" TYPE X GWB
VHAFHMArmstD Text Box
TEMPORARY BARRIERS TO SET AND REMOVED AT THE END OF EACH DAILY WORK PERIOD
VHAFHMArmstD Text Box TEMPORARY DOOR ENCLOSURE BARRIERS TO SET FOR WORK REQUIRED AT DOOR TRANSITION. COORDINATE ACCESS WITH COR.
VHAFHMArmstD Text Box
ICRA BARRIER SYMBOL LEGEND
VHAFHMArmstD White
REMOVE EXISTING VINYL WALL PANEL WALL PROTECTION IN ITS ENTIRETY. PATCH AND REPAIR
WALL AS NEEDED TO MATCH ADJACENT WALL FOR A SMOOTH MONOLITHIC FINISH. PREP AS
REQUIRED FOR NEW SCHEDULED WALL FINISHES AND WALL PROTECTION.
REMOVE EXISTING 36" H. HAND GEL DISPENSER. PATCH AND REPAIR WALL AS NEEDED TO ACHIEVE A SMOOTH MONOLITHIC FINISH IN ORDER TO ACCEPT NEW SCHEDULED WALL FINISH. RE-MOUNT
DISPENSER SO BOTTOM OF DISPENSER (NOT THE DRIP SHELF) IS 48" AFF.
LINE REPRESENTS EXTENT OF SELECTIVE DEMOLITION AREA. SEE SHEET G1.00 FOR AREA OF WORK
EXISTING THRESHOLD PLATE ASSEMBLY TO BE RE-USED TO MAINTAIN DOOR STC RATING.
DEMO EXISTING THRESHOLD PLATE. PREP TRANSITION AS NEEDED FOR NEW SCHEDULED FLOORING
TRANSITION.
1. INFECTION CONTROL WILL CONSIST OF TEMPORARY “POLY” BARRIERS. REPLACE TEMPORARY
BARRIER IN ITS ENTIRETY AS NEEDED IF BARRIER IS TORN OR DAMAGED DURING THE WORK.
2. SEE SHEET G1.00 FOR THE PROJECT PHASING PLAN.
3. CONTRACTOR, EXERCISING CARE, WILL REMOVE TEMPORARY “POLY” BARRIER MATERIALS TO
MINIMIZE SPREADING OF DIRT AND DEBRIS THIRTY MINUTES PRIOR TO THE COMMENCEMENT OF
REGULAR HOSPITAL HOURS
4. CONTRACTOR TO PROVIDE “WALK OFF” OR “STICKY” MATS AT THE ENTRY AND EXITS TO THE AREA
OF WORK. REPLACE AS NEEDED. CONSTRUCTION PERSONNEL ARE REQUIRED TO ENSURE SHOES
ARE NOT TRACKING WHEN LEAVING THE WORK SITE
5. CONTRACTOR TO PROVIDE HEPA FILTRATION “NEGATIVE AIR” MACHINES AND OTHER ACTIVE
MEANS (TOOL VACUUM SYSTEMS) WHEN DEEMED NECESSARY TO PREVENT AIR-BONE DUST FROM
DISPERSING INTO THE ATMOSPHERE WITHIN THE WORKSITE.
6. CONTRACTOR IS TO ISOLATE ALL AIR VENTS WITHIN THE AREA OF WORK. ISOLATION OF AIR VENTS
AS REQUIRED TO PREVENT AIRBORNE DUST FROM ENTERING THE VENT/DUCT. CONTRACTOR TO
REMOVE VENT/DUCT ISOLATION BARRIERS AT THE END OF THE WORK PERIOD AND 30 MINUTES
BEFORE REGULAR HOSPITAL HOURS ARE TO COMMENCE.
7. TEMPORARY BARRIERS WILL BE ERECTED SO AS TO NOT IMPEDE ACCESS TO REMAINING AREAS
OF THE FACILITY FOR PATIENTS, VISITORS AND HOSPITAL STAFF.
8. ALL DEBRIS MUST BE REMOVED BY CART/CONTAINER WITH A TIGHTLY COVERED LID, NO
EXCEPTIONS WILL BE ALLOWED.
9. CONTRACTOR TO MAINTAIN A CLEAN AND ORDERLY, DUST, DEBRIS, TRIP HAZARD FREE WORK
AREA ON A DAILY BASIS DURING REGULAR HOSPITAL HOURS. CONTRACTOR TO WIPE WORK
SURFACES WITH DISINFECTANT, WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM
BEFORE LEAVING THE WORK AREA THIRTY MINUTES BEFORE REGULAR HOSPITAL HOURS ARE TO
COMMENCE.
10. IN THE EVENT THAT AN EXISTING FIRE EXTINGUISHER IS NOT READILY ACCESSIBLE DUE TO THE
ERECTION OF TEMPORARY BARRIERS, THE CONTRACTOR WILL PROVIDE A FIRE EXTINGUISHER
OUTSIDE OF THE AREA OF WORK.
11. CONTRACTOR TO FIELD VERIFY ALL SITE CONDITIONS PRIOR TO COMMENCING WITH THE WORK.
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) OF ANY
DISCREPANCIES NOT SHOWN ON THE PLAN(S) PRIOR TO COMMENCING WITH THE WORK.
12. AREA OF WORK DENOTES EXISTING VINYL COMPOSITE TILE (VCT) FLOORING TO BE REMOVED IN ITS ENTIRETY. PREP AND REPAIR FLOOR AS REQUIRED FOR NEW SCHEDULED LUXURY VINYL TILE
(LVT). SEE SHEETS G1.00, IA8.01 FOR ADDITIONAL INFORMATION.
13. AREA OF WORK DENOTES EXISTING VINYL/RUBBER WALL BASE TO BE REMOVED IN ITS ENTIRETY.
PATCH AND REPAIR EXISTING WALLS AS REQUIRED TO ACHIEVE A SMOOTH, MONOLITHIC WALL
FINISH IN ORDER TO ACCEPT NEW SCHEDULED WALL BASE. SEE SHEETS G1.00, IA8.01 FOR
ADDITIONAL INFORMATION.
14. ALL EXISTING WALL EMBEDDED STAINLESS-STEEL CORNER GUARDS ARE TO REMAIN AS IS. CLEAN
AS NEEDED TO REMOVE MARKS, PAINT STAINS ETC. TO AN ACCEPTABLE APPEARANCE. NOTIFY
COR OF ANY EXISTING CORNER GUARDS THAT MAY REQUIRE ADDITIONAL MEANS AND METHODS
BESIDES BASIC CLEANING PRIOR TO ACCEPTANCE FROM THE COR.
15. MISCELLANEOUS SIGNAGE, ARTWORK, ACRYLIC SIGN HOLDERS TO BE REMOVED BY THE GOV/COR.
COORDINATE REMOVAL PRIOR TO COMMENCING WORK AND EACH PHASE OF WORK.
16. EXISTING ROOM SIGNAGE TO REMAIN IN PLACE UNLESS OTHERWISE REMOVED BY THE GOV/COR.
17. MISCELLANEOUS WALL MOUNTED EQUIPMENT/APPURTENCES (AED CABINETS, PPE CABINETS, HAND GEL DISPENSERS, DOME SAFETY MIRRORS ETC.) SHOULD BE REMOVED WHENEVER
POSSIBLE PRIOR TO APPLYING NEW SCHEDULED WALL FINISH. REMOUNT ANY REMOVED
EQUIPMENT BACK TO ITS ORIGINAL PLACEMENT ONCE APPLICATION OF NEW FINISHES ARE
COMPLETE.
18. EXISTING DOOR FRAME LOCATION LABEL WITH UPC IDENTIFIER TO BE REMOVED IN ITS ENTIRETY.
PATCH AND REPAIR DOOR FRAME FINISH AS REQUIRED FOR A "LIKE NEW" APPEARANCE PRIOR TO
APPLICATION OF NEW SCHEDULED FRAME FINISH.
1. INFECTION CONTROL WILL CONSIST OF TEMPORARY “POLY” BARRIERS. REPLACE TEMPORARY
BARRIER IN ITS ENTIRETY AS NEEDED IF BARRIER IS TORN OR DAMAGED DURING THE WORK.
2. SEE SHEET G1.00 FOR THE PROJECT PHASING PLAN.
3. CONTRACTOR, EXERCISING CARE, WILL REMOVE TEMPORARY “POLY” BARRIER MATERIALS TO
MINIMIZE SPREADING OF DIRT AND DEBRIS THIRTY MINUTES PRIOR TO THE COMMENCEMENT OF
REGULAR HOSPITAL HOURS
4. CONTRACTOR TO PROVIDE “WALK OFF” OR “STICKY” MATS AT THE ENTRY AND EXITS TO THE AREA
OF WORK. REPLACE AS NEEDED. CONSTRUCTION PERSONNEL ARE REQUIRED TO ENSURE SHOES
ARE NOT TRACKING WHEN LEAVING THE WORK SITE
5. CONTRACTOR TO PROVIDE HEPA FILTRATION “NEGATIVE AIR” MACHINES AND OTHER ACTIVE
MEANS (TOOL VACUUM SYSTEMS) WHEN DEEMED NECESSARY TO PREVENT AIR-BONE DUST FROM
DISPERSING INTO THE ATMOSPHERE WITHIN THE WORKSITE.
6. CONTRACTOR IS TO ISOLATE ALL AIR VENTS WITHIN THE AREA OF WORK. ISOLATION OF AIR VENTS
AS REQUIRED TO PREVENT AIRBORNE DUST FROM ENTERING THE VENT/DUCT. CONTRACTOR TO
REMOVE VENT/DUCT ISOLATION BARRIERS AT THE END OF THE WORK PERIOD AND 30 MINUTES
BEFORE REGULAR HOSPITAL HOURS ARE TO COMMENCE.
7. TEMPORARY BARRIERS WILL BE ERECTED SO AS TO NOT IMPEDE ACCESS TO REMAINING AREAS
OF THE FACILITY FOR PATIENTS, VISITORS AND HOSPITAL STAFF.
8. ALL DEBRIS MUST BE REMOVED BY CART/CONTAINER WITH A TIGHTLY COVERED LID, NO
EXCEPTIONS WILL BE ALLOWED.
9. CONTRACTOR TO MAINTAIN A CLEAN AND ORDERLY, DUST, DEBRIS, TRIP HAZARD FREE WORK
AREA ON A DAILY BASIS DURING REGULAR HOSPITAL HOURS. CONTRACTOR TO WIPE WORK
SURFACES WITH DISINFECTANT, WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM
BEFORE LEAVING THE WORK AREA THIRTY MINUTES BEFORE REGULAR HOSPITAL HOURS ARE TO
COMMENCE.
10. IN THE EVENT THAT AN EXISTING FIRE EXTINGUISHER IS NOT READILY ACCESSIBLE DUE TO THE
ERECTION OF TEMPORARY BARRIERS, THE CONTRACTOR WILL PROVIDE A FIRE EXTINGUISHER
OUTSIDE OF THE AREA OF WORK.
11. CONTRACTOR TO FIELD VERIFY ALL SITE CONDITIONS PRIOR TO COMMENCING WITH THE WORK.
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) OF ANY
DISCREPANCIES NOT SHOWN ON THE PLAN(S) PRIOR TO COMMENCING WITH THE WORK.
12. AREA OF WORK DENOTES EXISTING VINYL COMPOSITE TILE (VCT) FLOORING TO BE REMOVED IN ITS ENTIRETY. PREP AND REPAIR FLOOR AS REQUIRED FOR NEW SCHEDULED LUXURY VINYL TILE
(LVT). SEE SHEETS G1.00, IA8.01 FOR ADDITIONAL INFORMATION.
13. AREA OF WORK DENOTES EXISTING VINYL/RUBBER WALL BASE TO BE REMOVED IN ITS ENTIRETY.
PATCH AND REPAIR EXISTING WALLS AS REQUIRED TO ACHIEVE A SMOOTH, MONOLITHIC WALL
FINISH IN ORDER TO ACCEPT NEW SCHEDULED WALL BASE. SEE SHEETS G1.00, IA8.01 FOR
ADDITIONAL INFORMATION.
14. ALL EXISTING WALL EMBEDDED STAINLESS-STEEL CORNER GUARDS ARE TO REMAIN AS IS. CLEAN
AS NEEDED TO REMOVE MARKS, PAINT STAINS ETC. TO AN ACCEPTABLE APPEARANCE. NOTIFY
COR OF ANY EXISTING CORNER GUARDS THAT MAY REQUIRE ADDITIONAL MEANS AND METHODS
BESIDES BASIC CLEANING PRIOR TO ACCEPTANCE FROM THE COR.
15. MISCELLANEOUS SIGNAGE, ARTWORK, ACRYLIC SIGN HOLDERS TO BE REMOVED BY THE GOV/COR.
COORDINATE REMOVAL PRIOR TO COMMENCING WORK AND EACH PHASE OF WORK.
16. EXISTING ROOM SIGNAGE TO REMAIN IN PLACE UNLESS OTHERWISE REMOVED BY THE GOV/COR.
17. MISCELLANEOUS WALL MOUNTED EQUIPMENT/APPURTENCES (AED CABINETS, PPE CABINETS, HAND GEL DISPENSERS, DOME SAFETY MIRRORS ETC.) SHOULD BE REMOVED WHENEVER
POSSIBLE PRIOR TO APPLYING NEW SCHEDULED WALL FINISH. REMOUNT ANY REMOVED
EQUIPMENT BACK TO ITS ORIGINAL PLACEMENT ONCE APPLICATION OF NEW FINISHES ARE
COMPLETE.
18. EXISTING DOOR FRAME LOCATION LABEL WITH UPC IDENTIFIER TO BE REMOVED IN ITS ENTIRETY.
PATCH AND REPAIR DOOR FRAME FINISH AS REQUIRED FOR A "LIKE NEW" APPEARANCE PRIOR TO
APPLICATION OF NEW SCHEDULED FRAME FINISH.
REMOVE EXISTING CORNER DOME MIRROR FOR NEW CEILING GRID INSTALLATION. MIRROR TO BE
RETAINED FOR RE-USE.
EXISTING SURFACE MOUNTED "CURVED" CORNER GUARD TO BE REMOVED
DASHED LINE REPRESENTS EXISTING GUARD/HANDRAIL TO BE REMOVED IN ITS ENTRETY. TYPICAL.
EXISTING SURFACE MOUNTED CORNERGUARD TO BE REMOVED IN ITS ENTIRETY.
EXISTING REAL TIME LOCATION SYSTEM (RTLS) BATTERY OPERATED CEILING DEVICE TO BE
REMOVED BY GOV. COORDINATE REMOVAL WITH COR.
DASHED LINES REPRESENT EXTENT OF ACP CEILING SYSTEM TO BE REMOVED IN ITS ENTIRETY.
EXISTING RETURN AIR DIFFUSER TO BE REUSED AND RELOCATED INTO THE NEW CEILING GRID IN SIMILAR LOCATION. SUSPEND DIFFUSER IN PLACE DURING RENOVATION FOR INSTALLATION INTO
NEW CEILING GRID. SEE RCP FOR ADDITIONAL INFORMATION.
EXISTING WIRELESS ACCESS POINT, POE DEVICE TO BE REUSED AND RELOCATED INTO THE NEW CEILING GRID IN THE SAME LOCATION. SUSPEND FIXTURE IN PLACE DURING RENOVATION FOR INSTALLATION INTO NEW CEILING GRID. DEVICE CAN BE TEMPORARILY DISCONNECTED AS NEED
FOR CEILING DEMOLITION. SEE RCP FOR ADDITIONAL INFORMATION.
EXISTING AIR SUPPLY/RETURN DIFFUSER TO BE DEMO'D IN ITS ENTIRETY. PREP DUCTWORK AS
NEEDED FOR NEW SCHEDULED AIR DIFFUSER.
REMOVE EXISTING ALUMINUM DIAMOND PLATING WALL PROTECTION. PATCH AND REPAIR WALL AS
REQUIRED FOR NEW SCHEDULED WALL FINISHES AND WALL PROTECTION.
REMOVE EXISTING VINYL WALL PANEL WALL PROTECTION IN ITS ENTIRETY. PATCH AND REPAIR
WALL AS NEEDED TO MATCH ADJACENT WALL FOR A SMOOTH MONOLITHIC FINISH. PREP AS
REQUIRED FOR NEW SCHEDULED WALL FINISHES AND WALL PROTECTION.
REMOVE EXISTING 36" H. HAND GEL DISPENSER. PATCH AND REPAIR WALL AS NEEDED TO ACHIEVE A SMOOTH MONOLITHIC FINISH IN ORDER TO ACCEPT NEW SCHEDULED WALL FINISH. RE-MOUNT
DISPENSER SO BOTTOM OF DISPENSER (NOT THE DRIP SHELF) IS 48" AFF.
EXISTING OVERHEAD SIGN TO BE REMOVED BY GOV/COR. COORDINATE REMOVAL PRIOR TO
COMMENCING WORK AND AT EACH PHASE OF WORK.
REMOVE EXISTING OVER DOOR SIGN. PATCH AND REPAIR WALLS AS NEEDED FOR NEW SCHEDULED
WALL FINISH.
REMOVE EXISTING DOOR IDENTIFICATION SIGNS IN THEIR ENTIRETY IN CORRIDOR C-103A. PATCH
AND REPAIR WALLS AS NEEDED FOR NEW SCHEDULED WALL FINISH.
REMOVE EXISTING FIRE EXTINGUISHER SIGN. PATCH AND REPAIR WALLS AS NEEDED FOR NEW
SCHEDULED WALL FINISH.
EXISTING THRESHOLD PLATE ASSEMBLY TO BE RE-USED TO MAINTAIN DOOR STC RATING.
4'- 0"
4'- 0"
3 PLANKS
3 P
LA
NK
S
3 P
LA
NK
S
1. CONTRACTOR TO FIELD VERIFY ALL SITE CONDITIONS PRIOR TO COMMENCING WITH THE WORK.
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) OF ANY
DISCREPANCIES NOT SHOWN ON THE PLAN(S) PRIOR TO COMMENCING WITH THE WORK.
2. ALL WALLS SHALL HAVE PT-1 PAINT FINISH WITH RB-1 BASE, UNLESS OTHERWISE NOTED.
3. ALL DOOR METAL DOOR FRAMES SHALL HAVE PT-2 PAINT FINISH UNLESS NOTED OTHERWISE.
DOOR FRAMES ARE TO BE PAINTED TO THE INSIDE CORNER OF THE JAMB FACING THE DOOR.
CONTRACTOR TO COORDINATE DOOR/ROOM ACCESS AS NEEDED WITH THE COR.
4. SEE SHEET AS601 FOR SCHEDULED FINISHES.
5. SEE SHEET AS601/AS602 FOR FLOOR TRANSITION DETAILS AND FLOOR FINISH INFORMATION.
6. SEE SHEET-102 FOR THE PROJECT PHASING.
7. CONTRACTOR TO SUBMIT SAMPLES OF ALL SCHEDULED FINISHES FOR APPROVAL PRIOR TO
ORDERING. NOTIFY COR OF ANY DISCREPANCIES OR OMISSIONS.
8. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE ACCURACY OF THE TOTAL
YARDAGE/SQUARE FOOT MATERIAL REQUIREMENTS TO BE FURNISHED. NO REQUESTS FOR
MATERIALS OR INSTALLATION EXTRAS WILL BE CONSIDERED DUE TO MEASUREMENT OR TAKEOFF
ERRORS BY THE CONTRACTOR
9. ALL INTERIOR FINISHES SHALL HAVE A CLASS A FLAME SPREAD RATING.
10. INSTALL NEW SCHEDULED FINISHES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S
INSTRUCTIONS AND RECOMMENDATIONS FOR THE SPECIFIC SUBSTRATE.
11. RESILIENT BASE MATERIAL SHALL BE INSTALLED FLUSH ON FINISHED FLOOR SURFACE UNLESS
NOTED OTHERWISE.
12. PROVIDE FLOOR FINISH TRANSITIONS AS REQUIRED AT ALL CHANGE OF MATERIAL LOCATIONS.
13. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A SMOOTH LEVEL SURFACE THAT
MEETS/EXCEEDS THE MANUFACTURERS INSTALLATION SPECIFICATIONS PRIOR TO THE
INSTALLATION OF ALL FLOORING MATERIALS. SELF-DRYING CEMENT-BASE FINISH UNDERLAYMENT UNDER NEW FLOOR FINISH AREAS PER SPECIFICATIONS. PATCH/FLASH ALL AREAS AS NECESSARY SO THAT NEW FLOOR MEETS LEVEL WITH ALL OTHER FLOORING SURFACES. VARIATIONS IN FLOOR LEVEL IN EXCESS OF 1” FOR EVERY 10'-0” SHALL BE LEVELED BY THE CONTRACTOR. LEVELING SHALL BE COMPLETED AND ADEQUATELY CURED PRIOR TO RECEIVING OF NEW FLOOR FINISHES AS
SCHEDULED.
14. ALL FLOORING TRANSITIONS TO OCCUR BENEATH AND AT CENTER OF DOOR, OR CENTERLINE OF
AN OPENING WHERE NO DOOR OCCURS WHENEVER EXISTING ADJACENT FLOOR CONDITIONS WILL
ALLOW UNLESS OTHERWISE NOTED.
15. ALL FLOORING TRANSITIONS TO OCCUR AT CENTERLINE OF AN OPENING WHERE NO DOOR OCCURS
ALLOW UNLESS OTHERWISE NOTED.
16. ONCE FLOORING INSTALLATION IS COMPLETE, CONTRACTOR TO CLEAN FLOOR AS RECOMMENDED
BY THE FLOORING MANUFACTURER PRIOR TO ACCEPTANCE BY THE COR.
17. ALL NEW AND EXISTING FINISHES SCHEDULED TO REMAIN SHALL BE PROTECTED DURING
CONSTRUCTION. ANY DAMAGE SHALL BE REPAIRED BY CONTRACTOR/SUB-CONTRACTORS AT
THEIR TIME AND EXPENSE.
18. PATCH AND REPAIR ALL EXISTING WALLS TO A “LIKE NEW” FINISH WHERE THERE IS EXISTING WALL DAMAGE OR ITEMS HAVE BEEN REMOVED PRIOR TO PAINTING. CONTRACTOR IS RESPONSIBLE FOR
RETURNING REMOVED ITEMS TO THEIR ORIGINAL LOCATION UNLESS NOTED OTHERWISE OR
DIRECTED BY THE COR.
19. EXISTING FIRE ALARM DEVICES, THERMOSTATS, MAGNETIC HOLD OPENS OR SIMILAR ELECTRICAL DEVICES ARE TO REMAIN IN PLACE DURING PAINTING. CONTRACTOR IS TO COVER AND PROTECT
AS REQUIRED WHILE MAINTAINING THE FUNCTION AND OPERATION OF THE DEVICE DURING
PAINTING.
20. PAINT FOR EXISTING PARTITIONS SHALL BE INTERIOR, WATERBASED ACRYLIC LATEX, FINISH:
EGGSHELL UNLESS NOTED OTHERWISE.
21. PAINT FOR EXISTING DOOR FRAMES TO BE INTERIOR, WATERBASED, ACRYLIC ALKYD ENAMEL, FINISH: SEMI-GLOSS UNLESS OTHERWISE NOTED
STEP/RISER ON ROOM SIDE, INSTALL WALL BASE AT RISER.
REPLACE EXISTING TRANSITION WITH NEW ALUMINUM TRANSITION TR-1
EXISTING BUILDING EXPANSION JOINT COVER TO REMAIN. PROVIDE TRANSITION(S) ON EACH SIDE
OF EXPANSION JOINT AS NEEDED. CONTRACTOR TO PROVIDE, VA/COR TO APPROVE.
ROOM ACCESS IS RESTRICTED. MINIMUM 5 WORKING DAYS NOTICE IS REQUIRED PRIOR ANY
PAINTING OR FLOORING TO BE COMPLETED. COORDINATE ACCESS WITH COR.
EXISTING THRESHOLD PLATE ASSEMBLY TO BE RE-USED.
3 PLANKS
3 P
LA
NK
S
3 P
LA
NK
S
3 PLANKS
3 P
LA
NK
S
3 PLANKS
3 P
LA
NK
S
3 PLANKS
1'-
6" DIA. LED RECESSED DOWNLIGHT
SYMBOL
REFLECTED CEILING PLAN SYMBOL LEGEND
DESCRIPTION
2X4 LED DIRECT INDIRECT LIGHT FIXTURE
2X2 LED DIRECT INDIRECT LIGHT FIXTURE
CEILING MOUNTED EXIT SIGN
CEILING MOUNTED EXIT SIGN, DIRECTIONAL
WAP, WIRELESS ACCESS POINT
OC
RTLS, STAR DEVICE, POE
RTLS, MONITOR DEVICE, BATTERY POWER
OCCUPANCY SENSOR SWITCH, CEILING MOUNTED
RTLS, VIRTUAL WALL DEVICE, BATTERY POWER
J JUNCTION BOX, POWER
CAMERA, SECURITY
DIFFUSER, SUPPLY AIR, LAY-IN
DIFFUSER, RETURN AIR, LAY-IN
LED, RECESSED LINEAR LIGHT FIXTURE
WAP, WIRELESS ACCESS POINT, FULL PANEL
FIRE ALARM, SMOKE DETECTOR
1. CONTRACTOR TO FIELD VERIFY ALL SITE CONDITIONS PRIOR TO COMMENCING WITH THE WORK.
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) OF ANY
DISCREPANCIES NOT SHOWN ON THE PLAN(S) PRIOR TO COMMENCING WITH THE WORK.
2. ALL WALLS SHALL HAVE PT-1 PAINT FINISH WITH RB-1 BASE, UNLESS OTHERWISE NOTED.
3. ALL DOOR METAL DOOR FRAMES SHALL HAVE PT-2 PAINT FINISH UNLESS NOTED OTHERWISE.
DOOR FRAMES ARE TO BE PAINTED TO THE INSIDE CORNER OF THE JAMB FACING THE DOOR.
CONTRACTOR TO COORDINATE DOOR/ROOM ACCESS AS NEEDED WITH THE COR.
4. SEE SHEET IA-8.01 FOR SCHEDULED FINISHES.
5. SEE SHEET IA-6.01 FOR FLOOR TRANSITION DETAILS AND FLOOR FINISH INFORMATION.
6. SEE SHEET G-1.00 FOR PROJECT PHASING.
7. CONTRACTOR TO SUBMIT SAMPLES OF ALL SCHEDULED FINISHES FOR APPROVAL PRIOR TO
ORDERING. NOTIFY COR OF ANY DISCREPANCIES OR OMISSIONS.
8. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE ACCURACY OF THE TOTAL
YARDAGE/SQUARE FOOT MATERIAL REQUIREMENTS TO BE FURNISHED. NO REQUESTS FOR
MATERIALS OR INSTALLATION EXTRAS WILL BE CONSIDERED DUE TO MEASUREMENT OR TAKEOFF
ERRORS BY THE CONTRACTOR
9. ALL INTERIOR FINISHES SHALL HAVE A CLASS A FLAME SPREAD RATING.
10. INSTALL NEW SCHEDULED FINISHES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S
INSTRUCTIONS AND RECOMMENDATIONS FOR THE SPECIFIC SUBSTRATE.
11. RESILIENT BASE MATERIAL SHALL BE INSTALLED FLUSH ON FINISHED FLOOR SURFACE UNLESS
NOTED OTHERWISE.
12. PROVIDE FLOOR FINISH TRANSITIONS AS REQUIRED AT ALL CHANGE OF MATERIAL LOCATIONS.
13. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A SMOOTH LEVEL SURFACE THAT
MEETS/EXCEEDS THE MANUFACTURERS INSTALLATION SPECIFICATIONS PRIOR TO THE
INSTALLATION OF ALL FLOORING MATERIALS. SELF-DRYING CEMENT-BASE FINISH UNDERLAYMENT UNDER NEW FLOOR FINISH AREAS PER SPECIFICATIONS. PATCH/FLASH ALL AREAS AS NECESSARY SO THAT NEW FLOOR MEETS LEVEL WITH ALL OTHER FLOORING SURFACES. VARIATIONS IN FLOOR LEVEL IN EXCESS OF 1” FOR EVERY 10'-0” SHALL BE LEVELED BY THE CONTRACTOR. LEVELING SHALL BE COMPLETED AND ADEQUATELY CURED PRIOR TO RECEIVING OF NEW FLOOR FINISHES AS
SCHEDULED.
14. ALL FLOORING TRANSITIONS TO OCCUR BENEATH AND AT CENTER OF DOOR, OR CENTERLINE OF
AN OPENING WHERE NO DOOR OCCURS WHENEVER EXISTING ADJACENT FLOOR CONDITIONS WILL
ALLOW UNLESS OTHERWISE NOTED.
15. ONCE FLOORING INSTALLATION IS COMPLETE, CONTRACTOR TO CLEAN FLOOR AS RECOMMENDED
BY THE FLOORING MANUFACTURER PRIOR TO ACCEPTANCE BY THE COR.
16. ALL NEW AND EXISTING FINISHES SCHEDULED TO REMAIN SHALL BE PROTECTED DURING
CONSTRUCTION. ANY DAMAGE SHALL BE REPAIRED BY CONTRACTOR/SUB-CONTRACTORS AT
THEIR TIME AND EXPENSE.
17. PATCH AND REPAIR ALL EXISTING WALLS TO A “LIKE NEW” FINISH WHERE THERE IS EXISTING WALL DAMAGE OR ITEMS HAVE BEEN REMOVED PRIOR TO PAINTING. CONTRACTOR IS RESPONSIBLE FOR
RETURNING REMOVED ITEMS TO THEIR ORIGINAL LOCATION UNLESS NOTED OTHERWISE OR
DIRECTED BY THE COR.
18. EXISTING FIRE ALARM DEVICES, THERMOSTATS, MAGNETIC HOLD OPENS OR SIMILAR ELECTRICAL DEVICES ARE TO REMAIN IN PLACE DURING PAINTING. CONTRACTOR IS TO COVER AND PROTECT
AS REQUIRED WHILE MAINTAINING THE FUNCTION AND OPERATION OF THE DEVICE DURING
PAINTING.
DOOR STOP, HALF-DOME. CONTRACTOR TO PROVIDE, GOV/COR TO
APPROVE.
ROOM ACCESS IS RESTRICTED. MINIMUM 5 WORKING DAYS NOTICE IS
REQUIRED PRIOR TO ANY NEW FINISH INSTALLATION. COORDINATE
ACCESS WITH COR.
EXISTING THRESHOLD PLATE ASSEMBLY TO BE RE-USED.
DOOR MAY REQUIRE TRIMMING FOR NEW SCHEDULED FLOOR FINISH.
CONTRACTOR TO VERIFY AND NOTIFY COR IF DOOR IS TO BE REPLACED IN
ORDER TO MAINTAIN THE REQUIRED FIRE RATING..
EXISTING LIGHT FIXTURE TO BE RE-USED.
RE-INSTALL EXISTING CORNER DOME MIRROR REMOVED DURING SELECTIVE DEMOLITION
RTLS DEVICE TO BE REINSTALLED BY GOV. COORDINATE WITH COR
EXISTING EXIT SIGN TO BE RE-USED.
NEW EXIT SIGN TO MATCH BUILDING STANDARD.
1. INFECTION CONTROL WILL CONSIST OF TEMPORARY “POLY” BARRIERS. REPLACE
TEMPORARY BARRIER IN ITS ENTIRETY AS NEEDED IF BARRIER IS TORN OR DAMAGED
DURING THE WORK.
2. FOR WORK OCCURING AFTER HOURS, CONTRACTOR, EXERCISING CARE, WILL REMOVE
TEMPORARY “POLY” BARRIER MATERIALS TO MINIMIZE SPREADING OF DIRT AND
DEBRIS THIRTY MINUTES PRIOR TO THE COMMENCEMENT OF REGULAR HOSPITAL
HOURS
3. CONTRACTOR TO PROVIDE “WALK OFF” OR “STICKY” MATS AT THE ENTRY AND EXITS TO
THE AREA OF WORK. REPLACE AS NEEDED. CONSTRUCTION PERSONNEL ARE
REQUIRED TO ENSURE SHOES ARE NOT TRACKING WHEN LEAVING THE WORK SITE
4. CONTRACTOR TO PROVIDE HEPA FILTRATION “NEGATIVE AIR” MACHINES AND OTHER
ACTIVE MEANS (TOOL VACUUM SYSTEMS) WHEN DEEMED NECESSARY TO PREVENT
AIR-BONE DUST FROM DISPERSING INTO THE ATMOSPHERE WITHIN THE WORKSITE.
5. CONTRACTOR IS TO ISOLATE ALL AIR VENTS WITHIN THE AREA OF WORK. ISOLATION
OF AIR VENTS AS REQUIRED TO PREVENT AIRBORNE DUST FROM ENTERING THE
VENT/DUCT. CONTRACTOR TO REMOVE VENT/DUCT ISOLATION BARRIERS AT THE END
OF THE WORK PERIOD AND 30 MINUTES BEFORE REGULAR HOSPITAL HOURS ARE TO
COMMENCE.
6. TEMPORARY BARRIERS WILL BE ERECTED SO AS TO NOT IMPEDE ACCESS TO
REMAINING AREAS OF THE FACILITY FOR PATIENTS, VISITORS AND HOSPITAL STAFF.
7. ALL DEBRIS MUST BE REMOVED BY CART/CONTAINER WITH A TIGHTLY COVERED LID,
NO EXCEPTIONS WILL BE ALLOWED.
8. CONTRACTOR TO MAINTAIN A CLEAN AND ORDERLY, DUST, DEBRIS, TRIP HAZARD FREE
WORK AREA ON A DAILY BASIS DURING REGULAR HOSPITAL HOURS. CONTRACTOR TO
WIPE WORK SURFACES WITH DISINFECTANT, WET MOP AND/OR VACUUM WITH HEPA
FILTERED VACUUM BEFORE LEAVING THE WORK AREA AT THE END OF EACH WORK DAY
OR THIRTY MINUTES BEFORE REGULAR HOSPITAL HOURS ARE TO COMMENCE.
9. IN THE EVENT THAT AN EXISTING FIRE EXTINGUISHER IS NOT READILY ACCESSIBLE DUE
TO THE ERECTION OF TEMPORARY BARRIERS, THE CONTRACTOR WILL PROVIDE A FIRE
EXTINGUISHER OUTSIDE OF THE AREA OF WORK.
10. CONTRACTOR TO FIELD VERIFY ALL SITE CONDITIONS PRIOR TO COMMENCING WITH
THE WORK. CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S
REPRESENTATIVE (COR) OF ANY DISCREPANCIES NOT SHOWN ON THE PLAN(S) PRIOR
TO COMMENCING WITH THE WORK.
11. SEE INFECTION CONTROL PLAN (IC SERIES) AND PHASING PLAN (PH SERIES) FOR
ADDITIONAL INFORMATION FOR PROPOSED INFECTION CONTROL BARRIERS AND
PHASING FOR EACH AREA OF WORK REQUIRED. CONTRACTOR WILL BE RESPONSIBLE
FOR COORDINATING THE WORK AND THE APPROPRIATE INFECTION CONTROL BARRIER
AS NEEDED TO ACCOMPLISH THE WORK. COORDINATE ALL PROPOSED BARRIERS WITH
THE COR THAT MAY NEED TO BE CREATED TO ACCOMODATE VARIOUS TRADES AS
NEEDED.
12. THE ARCHITECTURAL REFLECTED CEILING PLAN SHALL GOVERN THE LAYOUT OF ALL
CEILING ELEMENTS, HEIGHTS AND/OR PENETRATIONS. COORDINATION OF
ARCHITECTURAL ELEMENTS, ENGINEERING COMPETES AND FIELD CONDITIOINS IS THE
RESPONSIBILITY OF THE CONTRACTOR. REFER ANY DISCREPANCIES TO THE COR.
13. FIXTURES, ELEMENTS SIZES OF MECHANICAL, ELECTRICAL AND PLUMBING EQUIPMENT
ON THIS SHEET ARE FOR REFERENCE ONLY. REFER TO MEP PLANS FOR ADDITIONAL
INFORMATION.
14. ACOUSTIC PANEL CEILING SHALL BE CENTERED IN THE ROOM AND INSTALLED TO
ELIMINATE NARROW CUT STRIPS OF PANELS ALONG THE EDGES OF WALLS AND
BULKHEADS. COORDINATE WITH THE LIGHTING LAYOUT. THE LIGHTING SHALL BE
CENTERED IN ROOMS UNLESS SHOWN OTHERWISE.
15. CEILING MOUNTED ITEMS (SPRINKLER HEADS, MOUNTING DEVICES, ETC.) SHALL BE
CENTERED IN THE CEILING PANELS UNLESS NOTED OTHERWISE.
16. ABOVE CELING WORK REQUIRED BEYOND THE SCOPE OF THE WORK SHALL BE
COORDINATED WITH PATIENT SAFETY, INFECTION CONTROL AND THE COR.
17. CELING TILE REMOVED IN ORDER TO COMPLETE ABOVE CELING WORK SHALL BE
STORED IN A SAFE DRY LOCATION. DAMAGED OR BROKEN CEILING TILES SHALL BE
REPLACED. DRYWALL CELINGS SHALL BE PATCHED, PREPPED AND NEW FINISH
APPLIED TO MATCH EXISTING.
18. SEE SHEE IA8.01 FOR ELECTRICAL FIXTURE SCHEDULE AND CEILING DIFFUSER
SCHEDULE.
1. SPRINKLERS ARE TO BE LOCATED IN CENTER OF CEILING TILE.
2. THE SPACIING OF SPRINKLERS: THE SPACING AND SIZES OF PIPES SHALL CONFORM TO
THE REQUIREMENTS OF NFPA PAMPHLET NO. 13. SPRINKLERS SHALL BE INSTALLED BY
PERSONNEL WHO HAVE ENGINEERING FACILITIES AND EXPERIENCE IN SUCH WORK
AND WHO ARE REGULARLY EMPLOLYED TO DO SUCH WORK.
3. IN LOCATING SPRINKLERS AND PIPING, CONTRACTOR SHALL COORDINATE THE
SPRINKLER LAYOUT WITH THE LIGHTING AND HVAC LAYOUT.
4. ALL MATERIAL SHALL BE OF APPROVED QUALITY AND THE WORK SHALL BE DONE IN A
THOROUGH AND WORKMANLIKE MANNER. THE WORK, MATERIALS AND TEST SHALL BE
IN ACCORDANCE WITH THE CURRENT REQUIREMENTS OF NFPA 13, LATEST EDITION.
5. PIPING: SPRINKLER PIPING SHALL BE SCHEDULE 40 BLACK STEEL PIPE AND FITTINGS
CONFORMAING TO ASTM A-53. MINIMUM SIZE IS ONE (1") INCH. SCHEDULE 10
GALVANIZED MAY BE USED FOR 2 12" AND LARGER. DO NOT THREAD THINWALL PIPE.
6. PIPE SUPPORTS: HANGERS, CLAMPS, RODS AND OTHER ACCESSORIES OF AN
APPROVED TYPE AND IN SUFFICIENT NUMBER TO PROPERLY SUPPORT ALL PIPING
SHALL BE FURNISHED AND INSTALLED. PIPING SHALL BE SUPPORTED BY ROND
WROUGHT U-TYPE APPROVED ADJUSTABLE HANGERS.
7. SPRINKLERS SHALL BE 12" ORIFICE TYPE OF ORDINARY DEGREE RATING EXCEPT WHERE
EXCESSIVE TEMPERATURES ARE ANTICIPATED. IN THESE LOCATIONS HIGH
TEMPERATURE SPRINKLERS SHALL BE INSTALLED IN ACCORDANCE WITH NFPA NO. 13.
8. PROVIDE AND MAINTAIN A MINIMUM OF 18 INCHES CLEARANCE BETWEEN THE BOTTOM
OF THE SPRINKLER DEFLECTOR AND THE TOP OF STORAGE, FILES, ETC.
9. REFER TO ARCHITECTURAL DOCUMENTS FOR LOCATIONS OF ALL SMOKE AND/OR FIRE
WALLS WHICH FIRE PROTECTION IPING PENETRATES AND PENETRATION DETAILS
SHOWING THE MAINTENANCE OF THE INTEGRITY OF THE SMOKE/FIRE WALLS IN AN
APPROVED MANNER WHEN PENETRATING WALLS AND FLOORS.
10. THE SUBMISSION OF A PROPOSAL SHALL BE CONSTRUED AS EVIDENCE THAT THE
CONTRACTOR HAS FAMILIARIZED HIMSELF/HERSELF WITH THE PLANS AND BUILDING
SITE. CLAIMS MADE SUBSEQUENT TO THE PROPOSAL FOR MATERIALS AND LABOR
BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT BE RECOGNIZED. IF THEY COULD
HAVE BEEN FORESEEN HAD PROPER EXAMINATION BEEN MADE.
11. ESCUTCHEON PLATE FOR SPRINKLERS HEADS MUST HOLD TIGHT TO THE CEILING AND
CANNOT HAVE 18" GAP. INSTALLER SHALL INSTALL SO THAT THERE IS STILL THREADING
TO TIGHTEN THE PLATE TIGHT TO CEILING IN THE FURTURE TO ACCOUNT FOR SAG OF
FIRE LINES OVER TIME.
12. BUILDING IS LOCATED IN SEISMIC ZONE D AND SEISMIC BRACING IS REQUIRED.
13. FIRE SPRINKLER CONTRACTOR SHALL HAVE A FLOW TEST PERFORMED IF PROVIDED
FLOW TEST DATA IS OLDER THAN 12 MONTHS.
14. NEW SPRINKLERS SHALL BE FM APPROVED QUICK RESPONSE SPRINKLERS.
15. CONTRACTOR SHALL MODIFY THE EXISTING SPRINKLER SYSTEM AS NECESSARY TO
PROVIDE CODE COMPLIANT COVERAGE IN THE NEW LAYOUT.
IBC - INTERNATIONAL BUILDING CODE 2018 EDITION.
NFPA 13 - STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS 2016 EDITION.
NFPA 101 - LIFE SAFETY CODE 2015 EDITION
VA FIRE PROTECTION DESIGN MANUAL
CORNER GUARD
HANDRAIL
DOOR FRAME
METAL EDGE STRIP WITH
ADJUSTABLE TRANSITION
LVT FLOORING
SCHEDULED CARPET
FLASH AS REQUIRED FOR A
SMOOTH TRANSITION
METAL EDGE
TRANSITION STRIP
LVT
VCT
SEALANT EACH SIDE
CONCRETE SUBFLOORCONCRETE SUBFLOOR
METAL EDGE TRANSITION
REDUCING STRIP
LVT
SEALANT
CONCRETE SUBFLOOR
METAL EDGE TRANSITION
REDUCING STRIP
LVT
SEALANT
CONCRETE SUBFLOOR
THINSET MORTAR BED
SCHEDULED TILE
METAL EDGE
TRANSITION STRIP
LVT
VCT
SEALANT EACH SIDE
CONCRETE SUBFLOOR
SEALANT
METAL EDGE TRANSITION
REDUCING STRIP
LVT
SEALANT
CONCRETE SUBFLOOR
SHEET VINYL
3"
3'- 0"
51 4"
3'- 0"
3'- 0"
SCHEDULED
RESILIENT BASE
EXISTING PARTITION
SINGLE LINE, VINYL
HANDRAIL, SECURED TO
EXISTING PARTITION
FRAMING, HR-1
WP-3
EXISTING PARTITION
WP-4 WP-6
EXISTING PARTITION
BUMPER RAIL, BR-1
CRASH RAIL, CR-1
8"
BUMPER RAIL WITH
INTEGRATED HANDRAIL
SECURED TO EXISTING
PARTITION FRAMING, HR-2
4"
CRASH RAIL, CR-1
SCHEDULED
RESILIENT BASE
8" 4"
4'- 0"
EDGE TRIM AND SEALANT
SCHEDULED
RESILIENT BASE
INSTALLED OVER
RIGID WALLCOVERING
3'- 0"
WP-5
EXISTING PARTITION
CRASH RAIL, CR-1
8"
4"
4'- 0"
EDGE TRIM AND SEALANT
SCHEDULED
RESILIENT BASE
INSTALLED OVER
RIGID WALLCOVERING
BUMPER RAIL WITH
INTEGRATED HANDRAIL
SECURED TO EXISTING
PARTITION FRAMING, HR-2
FULL HEIGHT VINYL
CORNER GUARD, MOUNT
JUST ABOVE SCHEDULED
FLOOR BASE
CONTINUOUS ALUMINUM
RETAINER
SECURE TO PARTITION
PER MANUFACTURERS
SPECIFICATIONS PER
PARTITION TYPE
ROOM FINISH SCHEDULE
ROOM # ROOOM NAME FLOOR BASE WALLS CEILING REMARKS
LVT-1, LVT-2 RB-1 P- 1 EXISTING
RB-1
C-102A
PATIENT CORRIDOR
C-102 C-101
P- 1 ACP-1
ACP-1
FINISH SCHEDULE
FINISH MARK FINISH MANUFACTURER PATTERN/STYLE COLOR FORMAT COMMENTS
CEILING
ACP-1 ACOUSTICAL CEILING PANEL CERTAIN TEED BAROQUE, TRIM, BET-157 WHITE 24" X 24" X 5/8"
FLOOR
LVT-1 LUXURY VINYL TILE SHAW CONTRACT ABIDE, 4107V 2.5mm, 7" X 48"
WALL BASE
RB-1 RESILIENT BASE JOHNSONITE 49 BEIGE 4" COVE BASE
WALLS
P-1 PAINT SHERWIN WILLIAMS SW7638 JOGGING PATH
P-2 PAINT SHERWIN WILLIAMS SW6107 NOMADIC DESERT
FIELD WALL PAINT, ACRYLIC LATEX
HM DOOR TRIM PAINT
TS-1 TRANSITION STRIP SCHLUTER SYSTEMS SCHLUTER SCHIENE STAINLESS STEEL LVT FLOORING TO VCT FLOORING
WALL PROTECTION
RR-1 RIGID VINYL INPRO 8" RIGID VINYL, RUB RAIL 0250 BISCOTTI
HR-2 HAND RAIL/BUMPER
-8" HIGH
1200 SERIES 6 14" HIGH
INPRO 0250 BISCOTTI
RWC-1 RIGID VINYL INPRO 48" RIGID VINYL WALLCOVERING 0250 BISCOTTI -8" HIGH
LVT-2 LUXURY VINYL TILE
C-103 C-104 C-104A C-105 C-106
PATIENT CORRIDOR
PATIENT CORRIDOR
PATIENT CORRIDOR
PATIENT CORRIDOR
PATIENT CORRIDOR
PATIENT CORRIDOR
PATIENT CORRIDOR
LVT-1, LVT-2
LVT-1, LVT-2
LVT-1, LVT-2
LVT-1, LVT-2
LVT-1
LVT-1, LVT-2
LVT-1, LVT-2
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
TS-2 SCHLUTER RENO-V STAINLESS STEEL LVT FLOORING TO CARPET
TS-3 SCHLUTER RENO-U STAINLESS STEEL LVT FLOORING TO SEALED CONCRETE
TS-4 SCHLUTER RENO-U STAINLESS STEEL LVT FLOORING TO PORCELAIN/CERAMIC TILE
TS-5 SCHLUTER SCHIENE STAINLESS STEEL LVT FLOORING TO LVT FLOORING
TRANSITION STRIP SCHLUTER SYSTEMS
TRANSITION STRIP SCHLUTER SYSTEMS
TRANSITION STRIP SCHLUTER SYSTEMS
TRANSITION STRIP SCHLUTER SYSTEMS
HR-1 HAND RAIL INPRO 940 SMOOTH HANDRAIL 0250 BISCOTTI 40mm DIA.
CR-1 CRASH RAIL 700 WALL GUARD 8" HIGHINPRO 0250 BISCOTTI
BR-1 1600 WALL GUARDINPRO 0250 BISCOTTIBUMPER RAIL 6" HIGH
CG-1 CORNER GUARD 150 HIGH IMPACT CORNER GUARD 3" EACH LEGINPRO 0250 BISCOTTI
TAHINI OAK, 07240
SEMI-GLOSS, ACRYLIC LATEX
SEMI-GLOSS, ACRYLIC LATEX
INSTALLATION METHOD: STAGGER
INSTALLATION METHOD: STAGGER
MARK TYPE AIRFLOW MOUNTINGLOCATION MAX APD PANEL SIZE ROUND RECTANGULAR
PANEL SIZE
MAX NC DAMPER AT DEVICE FINISH MATERIAL REMARKS
REMARKS:
1. DIFFUSER TO MATCH BUILDING STANDARD.
2. REMOVE EXISTING HARD DUCTWORK CONNECTION AND REPLACE WITH NEW TAKE OFF AND
FLEX DUCT. PATCH AND REPAIR DUCTWORK AS NEEDED FOR A COMPLETE INSTALLATION.
3. DESIGN INTENT IS TO RE-USE EXISTING FLEX DUCT. CONTRACTOR TO FIELD VERIFY. NOTIFY
COR IF THERE ARE DISCREPANCIES.
DIFFUSER SCHEDULE
C-102SD-1 SQUARE/CONE 200 0.04 in-wg CEILING 24" X 24" 8" - - NO WHITE STEEL 1, 2
C-102RD-2 PERFORATED 200 0.04 in-wg CEILING 24" X 24" 8" - - NO WHITE STEEL 1
NOT USEDEG-1 LOUVERED/ 45 DEG 90 0.07 in-wg CEILING 6" X 6" - 6" X 6" 19 NO WHITE STEEL 1
C-102SD-2 SQUARE/CONE 200 0.04 in-wg CEILING 24" X 24" 8" - - NO WHITE STEEL 1, 2 C-102ASD-3 SQUARE/CONE 200 0.04 in-wg CEILING 24" X 24" 8" - - NO WHITE STEEL 1, 3
C-102RD-1 PERFORATED 200 0.04 in-wg CEILING 24" X 24" 8" - - NO WHITE STEEL 1
C-102RD-3 PERFORATED 200 CEILING 24" X 24" 8" - - NO WHITE STEEL 10.04 in-wg
SHAW CONTRACT ABIDE, 4107V SPICED OAK, 07630…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .