S02_-_36C10F26R0085_1.pdf

PDF 736 KB Posted

Attached to
RFP Correct Seismic Deficiencies for Building 14, Marion VAMC, Illinois Construction of New Boiler Plant and Demolition of Existing
Solicitation number
36C10F26R0085, Proj 657-50
Issued by
Washington County, Illinois

About this file

This is a Design-Bid-Build solicitation document issued by the Department of Veterans Affairs, Office of Construction and Facilities Management, for Project 657-507, Correct Seismic Deficiencies B14 at the VA Medical Center (VAMC) in Marion, Illinois. The solicitation requests construction services for a new boiler plant (Building 14) including demolition of the existing plant, site preparation covering approximately 0.7 acres, utility modifications, a new approximately 10,310 square-foot building over three floors with structural steel and reinforced masonry construction, installation of three 250 HP gas-fired firetube boilers with fuel oil backup systems, HVAC systems, electrical infrastructure including a diesel generator, plumbing and fire protection systems, and startup/commissioning of all new systems. The site visit is scheduled for October 20, 2026 at 10:00 AM local time; the Request for Information due date is October 30, 2026 at 1:00 PM Eastern; and the proposal due date is November 6, 2026 at 1:00 PM Eastern. The contract duration shall not exceed 24 months (730 calendar days) from Notice to Proceed, with work performed during normal business hours (7:00 AM to 4:30 PM, Monday-Friday) unless approved by Marion VAMC Engineering Service.

This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside acquisition under NAICS code 236220 with a size standard of $45 million, with an estimated construction magnitude between $20 million and $50 million. The contract will be awarded as a single Firm-Fixed-Price (FFP) award. A bid bond of 20 percent of the bid price or $3 million, whichever is less, is required. The contractor must perform work equivalent to at least 20 percent of the total contract value with its own organization per FAR 52.236-1. Evaluation criteria include three equally-weighted technical factors: Organizational/Technical Approach & Schedule, Past Performance, and Key Personnel (each limited to 30 pages), with all technical factors combined being approximately equal in importance to price. Key personnel requirements include a Project Superintendent with minimum ten years' on-site construction experience, a Project Manager with minimum five years' experience, a Contractor Quality Control System Manager with bachelor's degree in engineering/architecture/construction management or PE license plus four years' experience, and a Site Safety and Health Officer with minimum ten years' safety-related work and five years' construction project experience plus OSHA 30-hour certification.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATIONSOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES NO

a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

1 117

36C10F26R0085 X

10-07-2026

TBD 657-507

003C4

Department of Veterans Affairs Office of Construction and Facilities Management (00CFM3B) 1800 G St NW Washington DC 20226

See Block 7

Charles Boswell 202-431-6522

Design-Bid-Build Construction for Project Number 657-507, FCA Correct Seismic Deficiencies B14 located on the grounds of the VA Medical Center (VAMC) in Marion, IL.

This solicitation is being issued as a Design-Bid-Build procurement (Reference Revolutionary FAR Overhaul Subparts 36.1 and 36.2). One Firm-Fixed-Price (FFP) contract will be awarded.

This is a 100% Service-Disabled Veteran-Owned (SDVOSB) set-aside acquisition utilizing NAICS code 236220 with a size standard of $45M. In accordance with VAAR 836.204, the estimated magnitude of construction for this project (2) Between $20,000,000 and $50,000,000.

SEE PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS, BASIS OF AWARD, AND EVALUATION CRITERIA

A Site Visit will be held at 10am local time on 20 OCT 2026 for Building 14.

Request for Information Due Date: 1 pm Eastern on 30 OCT 2026.

Proposal Due Date: 1 pm Eastern on 06 NOV 2026.

10 730

X X 52.211-10

X 10

1 13:00 EST

11-06-2026

X

14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

PHONE: FAX:

28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code)

(Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

(Type or print)

(4 copies unless otherwise specified)

(Type or print) (Type or print)

(Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror)

(To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

101F

Department of Veterans Affairs Office of Construction and Facilities Management 1800 G St., NW Washington DC 20006

Department of Veterans Affairs

FMS-VA-2(101)

Financial Services Center PO Box 149971 Austin TX 78714-9971

36C10F26R0085

Table of Contents

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)

A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,

ALTERATION, OR REPAIR)– BACK

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

A.4 DELIVERY SCHEDULE

STATEMENT OF WORK

INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)

2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE

OF THE WORK (NOV 2025) (DEVIATION)

2.3 52.228-1 BID GUARANTEE (SEP 1996)

2.4 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE)

(FEB 2021)

2.5 52.233-2 SERVICE OF PROTEST (SEP 2006)

2.6 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS

AND CERTIFICATIONS (NOV 2025) (DEVIATION)

2.7 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB

1998)

2.8 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND

VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)

2.9 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)

REPRESENTATIONS AND CERTIFICATIONS

3.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)

3.2 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—

CERTIFICATION (NOV 2021)

GENERAL CONDITIONS

4.1 52.203-14 DISPLAY OF HOTLINE POSTER(S) (NOV 2021)

4.2 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND

CERTIFICATIONS (DEC 2014)

4.3 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000)

4.4 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION

(NOV 2025) (DEVIATION)

4.5 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL

LABOR RELATIONS ACT (NOV 2025) (DEVIATION)

4.6 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS

(DEVIATION APR 2026)

4.7 SUPPLEMENTAL INSURANCE REQUIREMENTS

4.8 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025)

(DEVIATION)

4.9 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

4.10 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (NOV

2025) (DEVIATION)

4.11 VAAR 852.204-72 PERSONNEL VETTING AND CREDENTIALING (DEVIATION)

(MAR 2026)

4.12 VAAR 852.219-74 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED

VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION)

4.13 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—

CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023)

(DEVIATION)

4.14 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION

(APR 2019)

4.15 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)

4.16 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)

4.17 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT

ADMINISTRATION (OCT 2020)

4.18 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT

(SEP 2019)

4.19 MANDATORY WRITTEN DISCLOSURES

4.20 IT CONTRACT SECURITY

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBER

DESCRIPTION OF

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1.00 JB __________________ __________________

BASE: New Boiler Plant and maintenance spaces; and steam tunnel system that will connect to the existing site distribution. Work includes general construction, alterations, roads, walks, grading, drainage, steam plant and equipment, walkable steam tunnel and connection to existing steam distribution, startup and commissioning necessary removal of existing structures and construction and certain other items.

Deductive Design Alternatives per SOW:

1. Deletion of asphalt replacement on East Periphery Drive

2. Removal of maintenance garage and shop space addition to new plant. $_______________

GRAND TOTAL __________________

A.4 DELIVERY SCHEDULE

ITEM

NUMBER SHIPPING INFORMATION QUANTITY

DELIVERY

DATE

0001 1.00

657-507, FCA Correct Seismic Deficiencies B14

STATEMENT OF WORK

Project Title: 657-507, FCA Correct Seismic Deficiencies B14

Statement of Work

The contractor shall provide all planning, labor, materials, equipment, supervision and expertise required for the complete construction of the new boiler plant (Building 14) as well as the demolition and removal of the existing plant, both of which reside on the grounds of the VA Medical Center (VAMC) in Marion, IL. The contractor shall refer to the Project #657-507, Correct Seismic Deficiencies B14 plans and specifications for details on all requirements of construction. All work will be performed in accordance with this SOW, the project documents as well as all applicable local, State, Federal and VA codes and standards.

Design Alternates

The project documents contain accommodations for (2) deductive plan alternates. These include;

1. Deletion of asphalt replacement on East Periphery Drive

2. Removal of maintenance garage and shop space addition to new plant.

Performance Period and Operational Constraints

The contractor shall complete the work required under this Statement of Work (SOW) within 24 months (730 calendar days) from the Notice to Proceed (NTP). All work is to be performed during normal working hours (7:00 am to 4:30 pm, Monday-Friday) unless approved in writing by the Marion VAMC Engineering Service. Work at the government site shall not take place on Federal holidays unless directed by the Contracting Officer. This contract requires phasing of the work in accordance with the project plans and specifications.

The General Contractor’s employees shall not enter the project site without appropriate authorization from the VAMC Engineering Service (up to and including the issuing of security badging via the Marion VAMC Police Department). The contractors and all their staff shall sign-in/out at a location to be determined by VA Engineering staff each day upon arrival/departure from the VA campus. Contractor shall refer to the section below titled Deliverable(s) as well as the project plans and specifications for additional constraints and requirements.

Task(s)

This project shall include the following construction items (this list is generalized and shall not be considered all-inclusive nor perfectly sequenced):

1. The establishment of the new building’s site. The new site is approximately 0.7 acres in size. It includes cut and fill earthwork operations as well as the construction of a parking lot, security fencing and vehicle gates, an exterior fuel oil tank yard, site utility modifications (including water, electrical, telecommunications, sanitary sewer, storm sewer, natural gas and steam), roadway realignment and steam tunnel modification/construction.

2. The construction of the new plant building itself. The new plant building is approximately 10,310 sf over three floors (including a basement level) and is supported on an augercast pile and grade beam foundation system. The building structure consists of a combined structural steel, buckling-restrained, braced building frame system with independent reinforced masonry walls, concrete slab-on-grade floors and concrete slab on metal deck roof.

3. The installation of all of the new building’s systems (mechanical, HVAC, electrical, telecommunications/data, plumbing, fire protection). The new plant will house (3) new 250 HP gas-fired, firetube boilers with fuel oil backup and storage system. The scope of work will also include the installation of various climate control systems, fuel oil polishing systems, electrical systems (including a diesel generator and both medium and low voltage power distribution), new plumbing systems (including a pumping and monitoring system for the campus water tower), new control and IT systems as well as new fire protection systems (including both sprinklers and fire alarms).

4. The startup and commissioning of all new plant systems.

5. The cutover of all utility services from the existing plant to the new.

6. The demolition of the existing plant building. The project will conclude with the teardown and haulaway of the existing boiler plant as well as the re-establishment of the existing plant’s footprint to green space. The existing plant is approximately 6,200 sf divided over several levels (including a basement) and was constructed in 1940. It’s original structure consisted of unreinforced, clay masonry walls with structural steel truss and beam roof supports and cast concrete roof and floor decks. The original structure was retrofitted in the late 1980’s to add seismic resilience to the building. This retrofit added a reinforced concrete shell over the outside of the exterior walls and provided new connections from this shell to the various floor and roof decks. Naturally, the existing plant also contains the current plant boiler system as well as mechanical, electrical, telecommunications/data, plumbing and fire protection systems which will also be demolished by the project. The demolition work will also require mitigation of hazardous construction materials.

Deliverable(s)

The Contractor shall:

1. Prior to the commencement of any construction activity, submit a construction schedule to the CO/COR. The schedule shall be approved in writing by the CO/COR before to the start of work.

2. Prior to the ordering of any equipment or materials, submit shop drawings to both the AE and the CO/COR in accordance with the specifications and submittal register. All shop drawings shall be approved by the AE and the CO/COR before any procurement begins. Anything ordered ahead of an approved submittal will be at the contractor’s own liability and not subject to guaranteed payment/reimbursement by the Government.

3. Prior to the commencement of any construction activity, submit a Contractor Accident Prevention (APP) Plan in accordance with the specifications. This shall include Activity Hazard Analyses (AHA’s) in advance of any work which may pose a particularly significant hazard to Contractor or subcontractor employees, VA staff or facilities or patient care operations.

4. Prior to the commencement of any construction activity, submit a Contractor Quality Control (CQC) Plan in accordance with the specifications.

5. After the start of construction, attend a daily meeting with the COR to discuss progress, upcoming work/needs and issues faced on the project. An email covering the items discussed at each daily shall be provided to the CO and COR after the conclusion of the meeting.

6. After the start of construction, provide a daily report of construction-related details to the COR. The report shall be in the form of VA 6131 / OMB No. 2900-0208 or an equivalent approved by the COR.

7. After the start of construction, submit written requests for shutdowns, interruptions and outages to the COR at least (21) days in advance of need. These requests shall apply to any required shutdown, interruption or outage of any campus utility, surface feature, building/space or campus amenity to facilitate the project work. No shutdown shall ever proceed without prior written approval from the COR.

Contractor shall refer to the project specifications for more information.

8. After the start of construction, submit permit requests (as needed) to the COR for all required “hot work”. Examples of “hot work” are; welding, soldering, brazing, grinding, torch-cutting or any other work which is capable of producing sparks or flame. The hot work permit request template will be provided to the Contractor by the COR prior to the start of work. Hot work without an approved permit is prohibited.

9. After the start of construction, submit “lift plans” (as needed) to the COR for all required crane or hoisting work at least (21) days in advance of need. The “lift plan” template will be provided to the Contractor by the COR prior to the start of work.

Working with elevated loads without an approved lift plan is prohibited.

10. After the start of construction, submit confined space entry permit requests (as needed) to the COR for all required confined space entry work at least (21) days in advance of need. The entry permit template will be provided to the Contractor by the COR prior to the start of work. Working in confined spaces without an approved permit is prohibited.

11. Submit a written request to conduct a final project walkthrough at least (14) days before the proposed inspection date.

12. Submit final “redlines” and plan markups for all field-administered changes to the AE for the purpose of as-built/record drawing generation in accordance with the specifications.

13. Submit all maintenance and operations information (model numbers, serial numbers, owner’s manuals, wiring diagrams, etc.) for all equipment installed prior to project closeout in accordance with the specifications. Information shall include all warranty details.

14. Submit all deliverables which are required by the contract, plans or specifications, but not specifically identified within this list.

Requirements of the Project:

Replacement of Existing Boiler Plant (Building 14) In Accordance With

Drawings: GI001 – VA Cover Sheet

GI002 – General Notes and Phasing

G100 – Code Data

CS100 – Demolition Plan

CS101 – Overall Site Plan

CS102 – Dimensioned Control and Fire Lane Plan

CS200 – Grading Plan

CS201 – Drainage Plan

CS202 – Drainage Area Map

CS203 – Detailed Site Drainage Plan

CS300 – Utility Plan

CS301 – Steam Tunnel Plan and Profile

CS400 – SWPPP Plan

CS500 – Details (1 of 4)

CS501 – Details (2 of 4)

CS502 – Details (3 of 4)

CS503 – Details (4 of 4)

AS101 – Architectural Site Plan

AD101 – Demolition Plan

A001 – Wall Types

A100 – Basement Plan

A101-D – First Floor – Dimension Plan

A101-N – First Floor – Note Plan

A102 – Mezzanine Plan

A103 – Roof Plan

A104 – Deduct Alternate Plan

A121 – Reflected Ceiling Plan

A201 – Exterior Elevations

A202 – Exterior Elevations – Fuel Yard

A301 – Building Sections

A311 – Wall Sections

A312 – Wall Sections

A321 – Stair Plans and Details

A601 – Door Schedule and Details

A602 – Window Details

AF101-F – Floor Finish Plans

AF101-W – Wall Finish Plans

AF601 – Finish Schedule and Finish Details

AI101 – Equipment and Signage Plan

AI401 – Interior Elevations and Casework Details

S-000 – General Notes, Abbreviations and Legend

SA011 – Special Inspections

SS101 – Structural Site Plan and Details

SS102 – Enlarged Structural Site Plan and Details

SS103 – Enlarged Structural Site Details

SB101 – Basement Foundation Plan

SB102 – First Floor Foundation and Framing Plan

SB103 – Stair Plans

SB301 – Foundation Sections and Details

SB302 – Foundation Sections and Details

SB303 – Foundation Sections and Details

SB304 – Foundation Sections and Details

SB305 – Foundation Sections and Details

SF101 – Mezzanine and Low Roof Framing Plan

SF102 – High Roof and Stair Tower Roof Framing Plan

SF201 – Brace Frame Elevations

SF202 – Brace Frame Elevations

SF203 – Brace Frame Elevations

SF204 – Wall Elevations

SF205 – Wall Elevations

SF206 – Wall Elevations

SF207 – Wall Elevations

SF208 – Wall Elevations

SF501 – Framing Sections and Details

SF502 – Framing Sections and Details

SF503 – Framing Sections and Details

SF504 – Framing Sections and Details

SF601 – Steel Column, Base Plate and Anchor Bolt Schedule

FA001 – Fire Alarm Abbreviations, Legend, and General Notes

FA101 – Floor Plan – Fire Alarm – New Work

FA501 – Fire Alarm Details

FX001 – Fire Supression Abbreviations, Legend, and General Notes

FX101 – Fire Supression Floor Plans

FX301 – Fire Supression Sections

FP501 – Fire Supression Details

P-001 – Plumbing Notes, Legends & Symbols

PD101 – Floor Plan – Plumbing – Demolition

PS-101 – Basement and First Floor Plan – Plumbing Gravity – New Work

PS-102 – Roof Plan – Plumbing Gravity – New Work

PP-101 – Basement and First Floor Plan – Plumbing Pressure – New Work

PP-102 – Roof Plan – Plumbing Pressure – New Work

P-401 – Plumbing Enlarged Plans

P-501 – Plumbing Details I

P-502 – Plumbing Details II

P-503 – Plumbing Details III

P-601 – Plumbing Isometrics

P-801 – Plumbing Schedules

M-001 – Mechanical Notes, Legends & Symbols

MS101 – Site Plan – Mechanical – New Work

MS102 – Site Section – Mechanical – New Work

MD001 – B14 – Pump Room/Boiler Rm Plan – Mechanical – Demolition

MD002 – B14 – DA Mezzanine/Upper Boiler Rm Plan – Mechanical - Demolition

MD003 – B14 – Steam Header Platform Plan – Mechanical – Demolition

MD004 – B14 – Roof Plan – Mechanical – Demolition

MD005 – B14 – Site Plan – Mechanical – Demolition

MD601 – B14 – Steam Generation Flow Diagram – Boiler Room – Demolition

MD602 – B14 – Steam Generation Flow Diagram – Pump Room – Demolition

MD603 – B14 – Natural Gas and No. 2 Fuel Oil – Modifications – Demolition

MP100 – Basement Plan – Mechanical Piping – New Work

MP101 – Floor Plan – Mechanical Piping – New Work

MP102 – Mezzanine – Mechanica Piping – New Work

MH100 – Boiler Floor Plan – Mechanical HVAC – New Work

MH101 – First Floor Plan – Mechanical HVAC – New Work

MH102 – Mezzanine and Support Roof Plan – Mechanical HVAC – New Work

MH103 – Roof Plan – Mechanical HVAC – New Work

M-301 – Mechanical Sections

M-302 – Mechanical Sections

M-303 – Mechanical Sections

M-401 – Mechanical Enlarged Plans

M-402 – Fuel Yard Part Plans – New Work

M-403 – Utility Tunnel Part Plans – New Work

M-404 – Utility Tunnel Part Plans and Sections – New Work

M-405 – Deaerator Part Plans and Sections – New Work

M-501 – Mechanical Details

M-502 – Mechanical Details

M-503 – Mechanical Details

M-504 – Mechanical Details

M-505 – Mechanical Details

M-506 – Mechanical Details

MI601 – Mechanical Instrumentation – System Diagram

MI602 – Mechanical Instrumentation – Control System Architecture

MI603 – Mechanical Instrumentation – Gas Detection System

MI604 – Mechanical Instrumentation – Boiler Plant Ventilation

MI605 – Mechanical Instrumentation – Steam To HHW

MI606 – Mechanical Instrumentation – AHU-01

MI607 – Mechanical Instrumentation – Generator Room Ventilation

MI608 – Mechanical Instrumentation – Water Tower Pumps

MI609 – Mechanical Instrumentation – Steam System

MI610 – Mechanical Instrumentation – Condensate System

MI611 – Mechanical Instrumentation – Deaerator

MI612 – Mechanical Instrumentation – Feedwater Pump System

MI613 – Mechanical Instrumentation – Boiler Blowdown System

MI614 – Mechanical Instrumentation – Water Treatment System

MI615 – Mechanical Instrumentation – Softened Water System

MI616A – Mechanical Instrumentation – Fuel Oil System

MI616B – Mechanical Instrumentation – Fuel Oil System Logic & I/O Summary

MI617A – Mechanical Instrumentation – Boiler Trim and Train

MI617B – Mechanical Instrumentation – Boiler Logic & I/O Summary

MI618 – Mechanical Instrumentation – Natural Gas System

MI619 – Mechanical Instrumentation – Sampling Sink

MI620 – Mechanical Instrumentation – Miscellaneous Instrumentation Systems

M-801 – Mechanical Schedules – Steam

M-802 – Mechanical Schedules – HVAC

E-001 – Electrical Legends & Symbols

E-002 – Electrical General Notes

E-100 – Electrical Site Plans

E-101 – Electrical Site Plans

ED101 – Floor Plan – Electrical Equipment – Demolition

EL100 – Basement Floor Plan – Lighting – New Work

EL101 – Floor Plan – Lighting – New Work

EL102 – Mezzanine Floor Plan – Lighting – New Work

EP100 – Basement Floor Plan – Electrical Equipment – New Work

EP101 – First Floor Plan – Electrical Equipment – New Work

EP102 – Mezzanine Floor Plan – Electrical Equipment – New Work

EP103 – Roof Plan – Electrical Equipment – New Work

E-401 – Electrical Enlarged Plans

E-402 – Utility Tunnel Parts Plan – New Work

E-501 – Electrical Details

E-502 – Electrical Details

E-601 – Electrical Diagrams

E-602 – Electrical Diagrams

E-603 – Electrical Diagrams

E-801 – Electrical Schedules

E-802 – Electrical Panel Schedules

E-803 – Electrical Panel Schedules

T-001 – Technology Legend, Abbreviations, & General Notes

TD101 – B14 Boiler Room – Telecommunications – Demolition

T-100 – Overall Technology Site Plan

T-101 – Site Section – Technology – New Work

T-102 – Site Plan – Perimeter Fence – Technology

TA101 – Floor Plan – AV/PA – New Work

TN100 – Basement Floor Plan – Data/Access Control/SSTV – New Work

TN101 – Floor Plan – Data/Access Control/SSTV – New Work

T-401 – Technology Enlarged Plans

T-501 – Technology – Details

T-502 – Technology – Details

T-601 – Technology Diagrams

(178) Sheets in total

Specifications:01 00 00 – General Requirements

01 32 16.15 – Project Schedules

01 33 23 – Shop Drawings, Product Data and Samples

01 35 26 – Safety Requirements for Major Projects

01 42 19 – Reference Standards

01 45 00 – Quality Control

01 45 29 – Testing Laboratory Services

01 45 35 – Special Inspections

01 57 19 – Temporary Environmental Controls

01 74 19 – Construction Waste Management

01 81 13 – Sustainable Construction Requirements

01 91 00 – General Commissioning Requirements

02 21 13 – Site Surveys

02 41 00 – Demolition

02 82 11 – Traditional Asbestos Abatement

02 82 13.41 – Asbestos Abatement for Total Demolition Project

02 83 33.13 – Lead-Based Paint Removal and Disposal

03 30 00 – Cast-In-Place Concrete

04 05 13 – Masonry Mortaring

04 05 16 – Masonry Grouting

04 20 00 – Unit Masonry

05 12 00 – Structural Steel Framing

05 12 50 – Buckling Restrained Braces

05 31 00 – Steel Decking

05 36 00 – Composite Metal Decking

05 40 00 – Cold-Formed Metal Framing

05 51 00 – Metal Stairs

06 10 00 – Rough Carpentry

06 41 16 – Plastic Laminate Clad Architectural Cabinets

07 11 13 – Bituminous Dampproofing

07 12 00 – Built-Up Bituminous Waterproofing

07 13 00 – Sheet Waterproofing

07 13 52 – Modified Bituminous Sheet Waterproofing

07 21 13 – Thermal Insulation

07 22 00 – Roof and Deck Insulation

07 24 00 – Exterior Insulation and Finish Systems

07 27 26 – Fluid-Applied Membrane Air Barrier, Vapor Permeable

07 54 23 – Thermoplastic Polyolefin (TPO) Roofing

07 60 00 – Flashing and Sheet Metal

07 71 00 – Roof Specialties

07 72 00 – Roof Accessories

07 81 00 – Applied Fireproofing

07 84 00 - Firestopping

07 92 00 – Joint Sealants

07 95 13 – Expansion Joint Cover Assemblies

08 11 13 – Hollow Metal Doors and Frames

08 31 13 – Access Doors and Frames

08 33 00 – Coiling Doors and Grilles

08 41 13 – Aluminum-Framed Entrances and Storefronts

08 44 13 – Glazed Aluminum Curtain Walls

08 56 53 – Blast Resistant Windows

08 71 00 – Door Hardware

08 80 00 – Glazing

08 90 00 – Louvers and Vents

09 05 16 – Subsurface Preparation for Floor Finishes

09 22 16 – Non Structural Metal Framing

09 29 00 – Gypsum Board

09 51 00 – Acoustical Ceiling

09 65 13 – Resilient Base and Accessories

09 67 23.60 – Resinous Urethane and Epoxy Mortar Flooring

09 91 00 – Painting

10 14 00 – Signage

10 21 16 – Shower and Dressing Compartments

10 26 00 – Wall and Door Protection

10 28 00 – Toilet, Bath and Laundry Accessories

10 44 13 – Fire Extinguisher Cabinets

10 51 13 – Metal Lockers

11 05 01 – Owner Furnished / Contractor Installed Equipment

12 31 00 – Manufactured Metal Casework

12 36 00 – Countertops

13 05 41 – Seismic Restraint Requirements for Non-Structural Components

14 45 00 – Vehicle Lifts

21 13 13 – Wet-Pipe Sprinkler Systems

22 05 11 – Common Work Results for Plumbing

22 05 12 – General Motor Requirements for Plumbing Equipment

22 05 19 – Meters and Gages for Plumbing Piping

22 05 23 – General-Duty Valves Plumbing Piping

22 07 11 – Plumbing Insulation

22 08 00 – Commissioning of Plumbing Systems

22 11 00 – Facility Water Distribution

22 11 23 – Domestic Water Pumps

22 13 00 – Facility Sanitary and Vent Piping

22 13 23 – Sanitary Waste Interceptors

22 13 29.13 – Wet-Pit Mounted, Vertical Sewerage Pumps

22 14 00 – Facility Storm Drainage

22 14 29 – Sump Pumps

22 15 00 – General Service Compressed-Air Systems

22 31 11 – Water Softeners

22 34 00 – Fuel-Fired Domestic Water Heaters

22 40 00 – Plumbing Fixtures

23 05 10 – Common Work Results for Boiler Plant and Steam Generation

23 05 11 – Common Work Results for HVAC

23 05 12 – General Motor Requirements for HVAC and Steam Generation

23 05 41 – Noise and Vibration Control for HVAC Piping and Equipment

23 05 51 – Noise and Vibration Control for Boiler Plant

23 05 93 – Testing, Adjusting and Balancing for HVAC

23 07 11 – HVAC and Boiler Plant Insulation

23 08 00 – Commissioning of HVAC Systems

23 08 11 – Demonstration and Tests for Boiler Plant

23 09 11 – Instrumentation and Control for Boiler Plant

23 09 23 – Direct-Digital Control System for HVAC

23 10 00 – Facility Fuel Systems

23 11 23 – Facility Natural-Gas Piping

23 21 11 – Boiler Plant Piping Systems

23 21 13 – Hydronic Piping

23 21 23 – Hydronic Pumps

23 22 13 – Steam and Condensate Heating Piping

23 22 23 – Steam Condensate Pumps

23 23 00 – Refrigerant Piping

23 25 00 – HVAC Water Treatment

23 31 00 – HVAC Duct and Casings

23 34 00 – HVAC Fans

23 36 00 – Air Terminal Units

23 37 00 – Air Outlets and Inlets

23 40 00 – HVAC Air Cleaning Devices

23 50 11 – Boiler Plant Mechanical Equipment

23 51 00 – Breechings, Chimneys and Stacks

23 52 39 – Fire Tube Boilers

23 73 00 – Indoor Central-Station Air-Handling Units

23 81 00 – Decentralized Unitary HVAC Equipment

23 82 16 – Air Coils

26 05 11 – Requirements for Electrical Installations

26 05 13 – Medium-Voltage Cables

26 05 19 – Low Voltage Electrical Power Conductors and Cables

26 05 26 – Grounding and Bonding for Electrical Systems

26 05 33 – Raceway and Boxes for Electrical Systems

26 05 41 – Underground Electrical Construction

26 05 73 – Overcurrent Protective Device Coordination Study

26 08 00 – Commissioning of Electrical Systems

26 09 23 – Lighting Controls

26 11 16 – Secondary Unit Substations

26 13 16 – Medium-Voltage Fusible Interrupter Switches

26 22 00 – Low-Voltage Transformers

26 24 13 – Distribution Switchboards

26 24 16 – Panelboards

26 27 26 – Wiring Devices

26 29 11 – Motor Controllers

26 29 21 – Enclosed Switches and Circuit Breakers

26 32 13 – Engine Generators

26 36 23 – Automatic Transfer Switches

26 41 00 – Facility Lightning Protection

26 43 13 – Surge Protective Devices

26 51 00 – Interior Lighting

26 56 00 – Exterior Lighting

27 05 11 – Requirements for Communications Installations

27 05 26 – Grounding and Bonding for Communications Systems

27 05 33 – Raceways and Boxes for Communications Systems

27 08 00 – Commissioning of Communications Systems

27 10 00 – Control, Communication and Signal Wiring

27 11 00 – Telecommunications Room Fittings

27 15 00 – Communications Structured Cabling

27 51 16 – Public Address and Mass Notification Systems

28 05 13 – Conductors and Cables for Electronic Safety and Security

28 05 26 – Grounding and Bonding for Electronic Safety and Security

28 05 28.33 – Conduits and Backboxes for Electronic Safety and Security

28 08 00 – Commissioning of Electronic Safety and Security Systems

28 13 00 – Physical Access Control System

28 23 00 – Video Surveillance

28 31 00 – Fire Detection and Alarm

31 20 00 – Earthwork

31 63 16 – Auger Cast Grout Piles

32 05 23 – Cement and Concrete for Exterior Improvements

32 12 16 – Asphalt Paving

32 17 23 – Pavement Markings

32 31 00 – Cantilever Slide Gate

33 10 00 – Water Utilities

33 30 00 – Sanitary Sewer Utilities

33 40 00 – Storm Sewer Utilities

33 63 00 – Steam Energy Distribution

Schedule for Deliverable

If, for any reason, any deliverable cannot be provided within the scheduled time frame the contractor is required to notify the contracting Officer and the COR in writing immediately. This should include a firm commitment of when the work shall be completed. This notice to the Contracting Officer shall cite the reasons for the delay, and the impact on the overall project. The Contracting Officer will then review the facts and issue a response in accordance with applicable regulations.

References

All contractor work, methods, materials, installation and testing shall conform to the latest approved editions of these documents and standards as well as any other applicable VA regulations not specifically listed here. In cases where the standards may differ from one another, the more stringent shall apply.

Design documentation for Project 657-507, Correct Seismic Deficiencies B14, including both plans and specifications

The Infection Control Risk Assessment (ICRA) completed for this project

The Pre-Construction Risk Assessment (PCRA) completed for this project

VA’s Design and Construction Procedures (PG-18-3)

29 CFR 1926 – Occupational Safety and Health Administration (OSHA) Code

NFPA 70 – National Electric Code (NEC)

NFPA 101 – Life Safety Code

VA Barrier Free Architectural Accessibility Standard (PG-18-13)

VA Environmental Compliance Manual (PG-18-17)

VA H-18-8 Seismic Design Handbook

VA PG-18-10 Design Manuals (including but not necessarily limited to) o Architectural o Electrical o Fire Protection o HVAC o Physical Security and Resiliency o Plumbing o Site o Steam, Heating Hot Water and Oustide Distribution Systems Design Manual, Volume 1 – Steam Boilers o Steam, Heating Hot Water and Oustide Distribution Systems Design Manual, Volume 2 – Water Boilers o Steam, Heating Hot Water and Oustide Distribution Systems Design Manual, Volume 3 – Distribution Systems o Structural o Sustainable Design o Telecom and Special Telecom Systems

VA PG-18-12 Office of Information and Technology Design Guide

VA Infrastructure Standard for Telecommunications Spaces (ISTS)

VHA Boiler and Associated Plant Safety Device Testing Manual, 8th Edition

The International Building Code (IBC)

The International Mechanical Code (IMC)

The International Plumbing Code (IPC)

INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE

AND BONDS

PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS, BASIS OF AWARD, AND

EVALUATION CRITERIA

A. DESCRIPTION OF WORK

a. This Request for Proposal (RFP) solicits for a single Firm-Fixed-Price (FFP) Contract to complete construction of the new boiler plant at the VA Medical Center (VAMC) in Marion, IL.

b. The contractor shall provide all planning, labor, materials, equipment, supervision and expertise required for the complete construction of the new boiler plant (Building 14) as well as the demolition and removal of the existing plant, both of which reside on the grounds of the VA Medical Center (VAMC) in Marion, IL. The contractor shall refer to the Project #657-507, Correct Seismic Deficiencies B14 plans and specifications for details on all requirements of construction. All work will be performed in accordance with this SOW, the project documents as well as all applicable local, State, Federal and VA codes and standards.

B. GENERAL INSTRUCTIONS

a. This requirement will be advertised for 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) competition; any legally organized firm may submit a proposal.

Offerors submitting as a joint venture must provide the agreement forming the joint venture.

b. All proposals shall be submitted electronically, except for the Bid Bond.

c. All submissions shall be in Adobe PDF format. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

d. Title the file(s) in the following format:

i. 36C10F26R0085_COMPANY NAME_ VOLUME I

ii. 36C10F26R0085_COMPANY NAME_ VOLUME II

iii. Submit proposals electronically via email to the following:

003C4C.acquisitions@va.gov

e. SUBMITTAL OF OFFERS:

i. Offerors submitting proposals for this project should limit submissions to data essential for evaluation of proposals in preparing information required herein.

However, in order to be effectively and equitably evaluated, the proposals must include information sufficiently detailed to clearly describe the Offeror's experience and capability, past performance, and use of small business necessary for successful completion of the project. Requirements stated in this RFP are minimums.

ii. The Offeror’s conformance with the specified format, submission requirements, and the Offeror’s attention to detail will be considered during the technical evaluation and trade-off. Material omission(s) may result in a deficiency, which may cause the technical proposal to be rejected as unacceptable.

iii. Technical proposals that do not provide the specified information in the specified location in accordance with the submission instructions may be found to have weaknesses or significant weaknesses. The Government is under no obligation to search for information that is not in the specified location.

iv. Responses that are essentially blanket offers of compliance are not adequate substitutes for the detailed and complete technical information necessary to establish that an Offeror can meet Government needs. The proposal submission instructions are written to give prospective contractors, where feasible, an indication of the level of detail desired by the Government. The Offeror’s failure to include information that the Government has indicated should be included may result in the proposal being assigned a (significant) weakness and/or being found deficient if inadequate detail is provided.

v. Any prescribed page and formatting limitations will be strictly adhered to and enforced by the Government. The Government will not evaluate any excess information resulting from the Offeror’s failure to comply with the submission instructions.

vi. Exceptions. Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal volumes. Inclusion of any standard company terms and conditions that conflict with the terms and conditions of the solicitation may result in a determination that the offer is unacceptable and thus ineligible for award. Resolve questions about the terms and conditions or technical requirements of the solicitation prior to submission of the offer.

vii. Restrictions on Offeror-Provided Information. “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can nonetheless be provided to the Government as part of the Offeror’s technical proposal. Confidential Project is defined as projects containing confidential information of which reasonably could be expected to cause damage to the national security with the unauthorized disclosure. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must clearly mark the information in accordance with FAR 52.215-1, “Instructions to Offeror – Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data.” Files shall not contain classified data.

C. PROPOSAL FORMAT

a. General Proposal Format:

i. ALL Volumes shall contain:

1. Title Page. Include the title of the solicitation, solicitation number, Offeror name, and date of the submittal.

2. Table of Contents. Each volume of the proposal shall contain a detailed table of contents. Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.

3. Tabs. Proposals shall be organized and tabbed in accordance with the tabbing per Phase and Volume.

ii. All Volumes shall be formatted as follows:

1. Electronic Matter Submissions. Written material shall be on single sided 8 ½ x 11 size pages in no less than a 10 pitch or 10 font. Page limitations, where specified in the RFP, shall be considered a maximum. Pages in excess of any specified limitation shall not be evaluated.

2. Number of Copies. Offerors SHALL submit an electronic version (PDF Format) of the original Volume I and Volume II. Offerors SHALL submit only two files in PDF format (i.e. Volume I and Volume II). These two files should be named in a specific format: Solicitation Number, Offerors Company and the volume (i.e.

36C10F26R0085_Company_VolumeI.pdf). Given the limited time and resources of the evaluation board, failure to provide proposal in the correct format may hinder the board's ability to evaluate the Offeror's proposal.

b. Proposal Formatting:

i. VOLUME I (Contract Requirements):

1. TAB A – Standard Form 1442, completed and signed by authorized individual(s) of the Offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.

2. TAB B – Proposal Pricing Schedule.

3. TAB C – Representations and Certifications.

4. TAB D – Proposal Data Sheet – See Attachment 3 provided in the solicitation.

Offerors should ensure that telephone number, fax number, e-mail address and Unique Entity ID are all included. The Unique Entity ID provided will be used to access Contractor Performance Assessment Reporting System (CPARS) data. If a separate ID has been created for a joint venture it must also be submitted. The Offeror shall also submit its Tax ID number on the proposal data sheet.

5. TAB E - Bid Bond –The Offeror is required to submit a bid bond for this project.

This is to be submitted in original form and sent to the Contracting Office with an electronic copy included here in Tab D. Submit originals; photocopied or scanned copies are not acceptable. FAR clause 52.228-1, “Bid Guarantee” will be included in the contract.

6. TAB F – Joint Venture Agreement, if applicable.

ii. VOLUME II (Technical- Requirements):

1. TAB G – FACTOR 1 Organization/Technical Approach & Schedule

2. TAB H – FACTOR 2 Past Performance of the Offeror’s Team

3. TAB I – FACTOR 3 Key Personnel

D. SUBMISSION REQUIREMENTS AND EVALUATION CRITERIA

1. Volume II, Tab G – Factor 1 – Organizational/Technical Approach & Schedule:

1.1 Provide information that describes the Offeror's organization and intended technical approach to executing the contract per the detailed requirements of the solicitation. Offerors are limited to 30 pages total for this factor. Any pages submitted beyond this limit will be removed and will not be read or given any consideration. Offerors should clearly but concisely describe the organizational and technical approach to project management and execution.

1.2 Organizational Approach: Describe what firms (Offeror/Prime and subcontractors), their resources and how their resources will be utilized, their roles and responsibilities and any contractual arrangements that will be established. Present a matrix of responsibilities for each firm in executing the key work breakdown structure activities of the project, including construction activities for each major feature. The Offeror should identify any specific firms chosen as subcontractors for electrical, structural, mechanical, etc; or indicate self-performance.

If the Offeror intends to subcontract out any separate work types, identify the subcontractor. In order for a firm other than the Offeror to contribute to the Offeror’s organizational approach, document unequivocal teaming arrangements with subcontractors. Describe the proposed management structure for the team, how the construction process will be managed and the authorities and the delegations of authority within the team. Include a chart illustrating the organization including the proposed quality control group(s). Include a key personnel organization chart that clearly depicts the key positions and the names of the personnel, their firm affiliations and their job locations, and their job/position title within the organization. The key personnel organization chart shall be consistent with the corporate organization chart and with the matrix of responsibilities assigned to the team firms.

1.3 Technical Approach for Construction: Describe the approach for the full scope of work in the contract. Describe the role and interaction of the construction team during construction, addressing elements such as schedule management, material/equipment delivery and management, labor management, cost management, site security and personnel assurance system management, progress meetings, documentation and quality control.

1.3.1 Describe quality control procedures during construction. Include description of quality control inspection and submittal register control.

1.3.2 As per FAR 52.236-1, the contractor shall perform on the site, and with its own organization, work equivalent to at least 20% of the total amount of work to be performed under the contract.

1.3.3 Proposed Contract Duration and Summary Schedule: The Offeror shall submit a summary level schedule for construction with details for all major activities. The number of calendar days should be included for each activity. The Offeror shall also include their proposed contract duration in this summary level schedule, which shall not exceed the maximum contract duration specified in the solicitation. It is the Offeror’s responsibility to schedule the work considering all constraints of the project. This summary schedule will, after contract award, be replaced with a project schedule as required by the specifications. The schedules should be task oriented, indicating the number of calendar days, after notice to proceed, by which milestones are to be achieved. The proposed project schedule shall reflect the proposed contract duration and phasing requirements as indicated within the Scope of Work

(SOW).

1.4 Source Selection Evaluation Criteria for Factor 1 – Organizational/Technical Approach & Schedule:

1.4.1 The Government will evaluate the firm’s understanding and capability to execute the project, as well as compliance w/ the percentage of work to be performed by the contractor as per FAR 52.236-1. Some additional specific evaluation considerations are listed below.

1.4.2 Organizational Approach: The Government will evaluate the clarity and strength of the overall organization and how well it is organized, structured and staffed to execute the entire scope of work. Joint venture participant’s contribution to the organization should be commensurate with their skills and background.

1.4.3 Technical Approach for Construction: The Government will evaluate the clarity and strength for technical approach. The Government places a higher value on an Offeror that provides proposed methods to streamline construction, manage labor and other resource constraints in an effort to reduce costs and support an aggressive schedule. The Government will also consider whether the approach reduces on-site fabrication and susceptibility to inclement weather delays. The Government will also evaluate the Offeror’s capabilities and understanding of the contractually required quality control processes for construction.

1.4.4 Schedule:

1.4.4.1 Summary Schedule: The Government will evaluate the summary schedule for construction. The length of the schedule must match the contract duration. The Government will evaluate the schedule to assess the strength of understanding of the project scope, restrictions which must be considered in the schedule e.g. permitting, long lead items, etc. The Government will evaluate the Offeror's capability to schedule the complete project within the contract duration and the realism of the schedule. A schedule that offers advantage(s) to the Government over one that merely indicates an adequate understanding of the scope, restrictions, major milestones and general understanding of the various events that can affect start and completion of construction will receive additional consideration.

2. Volume II, Tab H – Factor 2 – Past Performance:

2.1 The Past Performance Questionnaire (PPQ) included in the Government’s RFP as Attachment 2 is provided for the Offeror or its team members to submit to the client for each project the Offeror includes in its RFP response for “Past Performance.” Ensure correct phone numbers and email addresses are provided for the client point of contact. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before the response closing dates, the Offeror should complete and submit with the response the first page of the PPQ, which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires.

2.2 Offerors may also include performance recognition documents, not necessarily related to those projects submitted for Factor 2, received within the last seven (7) years such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.

2.3 In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through Contractor Performance Assessment Reporting System (CPARS), using all UEI/CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, etc.) identified in the Offeror’s response, inquiries of owner representative(s).

2.4 While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance…

This is the start of the file's text. The full file is on GovTribe.