S02 - 03_550-25-108 VISN12 CAM Approved Project Application.pdf

PDF 136 KB Posted

Attached to
Z1DA--550-25-108 Renovate Bathrooms B103 PRRTP & B 64/72 (CON)
Solicitation number
36C25226B0025
Issued by

About this file

VHA NRM Project Application Summary

This is a Veterans Health Administration (VHA) National Real Estate Management (NRM) project application for capital asset renovation at the Danville VA Medical Center (VISN 12, Station 550). Project 550-25-108 involves renovating bathrooms in Building 103 (rooms 107B, 107C, 136C, 159C) and restrooms 6/7 in Building 72, totaling approximately 2,177 square feet of renovated space. The project is categorized as addressing Architectural Barriers and corrects Facility Condition Assessment (FCA) deficiencies (primary deficiency #306162 with a condition grade of D), with 40 percent of total project costs dedicated to correcting FCA issues. The project has received VISN-level funding approval and is scheduled with a design obligation date of December 15, 2024 (FY2025) and a construction obligation date of December 15, 2025 (FY2026).

The total project cost is $584,146, comprising design costs of $92,868 (18.90 percent) and construction costs of $491,278. Design will be completed by an Architect/Engineer under the FY2025 Operating Plan, and construction will be executed by contract under the FY2026 Operating Plan. Scope improvements include installation of grab bars, mounted mirrors, accessible lockers, roll-in showers, updated bathroom signage, required turning clearances, door swing modifications, pipe sleeve insulation, accessible locker identification, benches, and replacement of toilet exhaust fans, all per VA accessibility guidelines and standards. An independent fire code review is required for this project. No documentation was submitted with the application.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHA NRM Project Applications Capital Assets

Print Close

NRM Project Application for VISN 12 - 550 Danville

Project Update History

Original Entry Date/Time: 6/21/2024 8:29:38 AM

Last Modified Date/Time: 9/6/2024 9:50:36 AM

Modified By: VHA12\VHAMIWKormaD

General Data Section

Project Number: 550-25-108 SCIP Project Number:

Project Title: Renovate Bathrooms B103 PRRTP & B64/72 Approval Level: VISN Funding Approved

Mental Health Project? No

Station-Level Funded Project? No

Project in Leased Space? No

Budget Category: FY2025 Operating Plan

Project Category: Architectural Barriers

Design Method: Architect/Engineer - FY2025 Operating Plan

Construction Method: Contract - FY2026 Operating Plan Army Corps of Engineers Contracting or Project Management?

(Additional Army Corps of Engineers fields will only be shown if Yes.) No

Is an independent fire code review required? Yes

Planned Obligation Data Section

Design Obligation Date: 12/15/2024 (FY 2025)

Construction Obligation Date: 12/15/2025 (FY 2026)

Special Categories Data Section

Special categories may appear here based on the Fiscal Year of Design/Construction Obligation Date.

FCA Data Section

Does this Project Correct FCA Deficiency?

(Additional FCA fields will be shown only if Yes.) Yes

FCA Condition Grade: D

% Total Project Cost Related to Correcting FCA Deficiencies: 40 %

FCA Primary System: Access

Primary FCA Deficiency Individual Rec #: 306162

Construction Cost Data Section

Construction $: $491,278

Design $: $92,868 Design %: [Calculated] 18.90 % Total Project Cost: [Calculated] $584,146

Other New Building GSF Project Costs: $0

Other New Building GSF: 0

New Utility Building GSF Project Costs: $0

New Utility Building GSF: 0

Renovated GSF Project Costs: $584,146

Total Renovated GSF: 2,177 Total Building Demolition Project Costs:

Total Building Demolition GSF:

Energy Data Section

Does Project Result in Energy or Water Savings?

(Additional Energy fields will be shown only if Yes.) No

Scope Justification Section

Description (Scope of Work):

This project includes renovating Building 103 bathrooms 107B, 107c, 136c, 159c, and restrooms 6/7 in building 72. The total amount of renovated space is approximately 2,177 sq. ft.

Justification:

This project will correct the following FCA deficiencies, 306162, 42239, and 27984. In building 103, grab bars, mounted mirrors, accessories, required turning clearances, door swing, and pipe sleeve insulation will be renovated per accessibility guidelines/ standards. Bathroom signage will be updated as well. In building 72, this project will provide accessible lockers and turning clearances, in addition to, benches and accessible locker identification for administration areas. Roll in showers will be installed per VA accessibility guidelines. Toilet exhaust fans will be removed and replaced.

Documentation Section

No documentation was returned.

Print Close

File details come from the government source that posted it. Updated .