S01 Attachment A - Specifications.pdf

PDF 397 KB Posted

Attached to
ACEP-WRE Emergent Wetland Seeding for NRCS Illinois State Office (Clark County)
Solicitation number
12FPC125Q0056
Issued by

About this file

This document is a specification for a wetland seeding project in Clark County, Illinois, focusing on native grass, forbs, and shrub planting. The specification details the process for site preparation, seeding, and stabilization of a wetland area. The seeding mix includes 31 species, categorized as forbs (F), grasses (G), and shrubs (S), selected for wet to moist soil conditions and varying sunlight exposures. The recommended planting density is 1 lb of grass species, 40 oz of forb species, and 10 oz of shrub species per acre, totaling 4.125 lbs/acre. Species include Swamp Milkweed, Blue Joint Grass, Common Rush, and Buttonbush, among others, chosen to thrive in wet environmental conditions. The specification provides detailed guidelines for seedbed preparation, seeding methods, fertilization, mulching, and maintenance to ensure successful establishment of the native wetland vegetation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clark County

ACEP-WRE Emergent Wetland Seeding

Illinois State Office

INDEX OF SPECIFICATIONS

8 Mobilization 327 Native Grass and Forbs Planting 490 Site Preparation

INDEX OF MATERIAL SPECIFICATIONS

NONE

Specification 8—Mobilization and Demobilization

1. Scope

The work consists of the mobilization and demobilization of the contractor's forces and equipment necessary for performing the work required under the contract. It does not include mobilization and demobilization for specific items of work for which payment is provided elsewhere in the contract. Mobilization will not be considered as work in fulfilling the contract requirements for commencement of work.

2. Equipment and Material Mobilization shall include all activities and associated costs for transportation of contractor's personnel, equipment, and operating supplies to the site; establishment of offices, buildings, and other necessary general facilities for the contractor's operations at the site; premiums paid for performance and payment bonds including coinsurance and reinsurance agreements as applicable; and other items specified in Section 4 of this specification.

Demobilization shall include all activities and costs for transportation of personnel, equipment, and supplies not required or included in the contract from the site; including the disassembly, removal, and site cleanup of offices, buildings, and other facilities assembled on the site specifically for this contract.

This work includes mobilization and demobilization required by the contract at the time of award. If additional mobilization and demobilization activities and costs are required during the performance of the contract as a result of changed, deleted, or added items of work for which the contractor is entitled to an adjustment in contract price, compensation for such costs will be included in the price adjustment for the item or items of work changed or added.

3. Payment Payment will be made as the work proceeds, after presentation of paid invoices or documentation of direct costs by the contractor showing specific mobilization and demobilization costs and supporting evidence of the charges of suppliers, subcontractors, and others. When the total of such payments is less than the lump sum contract price, the balance remaining will be included in the final contract payment. Payment of the lump sum contract price for mobilization and demobilization will constitute full compensation for completion of the work.

Payment will not be made under this item for the purchase costs of materials having a residual value, the purchase costs of materials to be incorporated in the project, or the purchase costs of operating supplies.

4. Items of Work Details Items of work to be performed in conformance with this specification and the details therefore are:

A.) Task 1 - Mobilization

(1) This item shall consist of the following:

a. Mobilization and demobilization of the contractor's work force and equipment.

b. Purchase of bonds if required by the terms of the contract.

c. Purchase of liability insurance coverage for accidental injury to personnel on the work site and accidental damage to property located within the work sites and damaged during the performance period of the contract.

d. Costs of moving equipment to the work sites and removal of equipment after completion of the work.

(2) The contractor shall assume responsibility for protection of existing roads, overhead and/or buried utilities and fences that may be affected by the work.

(3) All invoices submitted by the contractor shall be subject to approval of the Technical

Point of Contact.

(4) Ingress and egress to the sites shall be provided by the project sponsors with specific instructions provided by the site landowner. Access roads shall be restored to original condition and grade after the work is completed.

(5) Measurement and Payment: Payment will be made by the method in Section 3:

Payment.

8-2

Specification 6—Seeding, Sprigging, and Mulching

1. Scope

The work consists of preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inocu- lant, lime, and other soil amendments; and anchoring mulch in designated areas as specified.

The following BioPreferred® product categories are applicable to this specification:

— mulch and compost materials

— erosion control materials

— fertilizers

— agricultural spray adjuvants

2. Material

Seed—All seed shall conform to the current rules and regulations of the state where it is being used and shall be from the latest crop available. It shall meet or exceed the standard for purity and germination listed in Section 7.

Seed shall be labeled in accordance with the state laws and the U.S. Department of Agriculture rules and regulations under the Federal Seed Act in effect on the date of Request for Quote (RFQ). Bag tag figures are evidence of purity and germination. No seed will be accepted with a test date of more than 9 months before the delivery date to the site.

Seed that has become wet, moldy, or otherwise damaged in transit or storage will not be accepted. The percent of noxious weed seed allowable shall be as defined in the current State laws relating to agricultural seeds. Each type of seed shall be delivered in separate sealed containers and fully tagged unless exception is granted in writing by the Technical

Point of Contact.

Fertilizer—Unless otherwise specified, the fertilizer shall be a commercial grade fertilizer. It shall meet the standard for grade and quality specified by State law. Where fertilizer is furnished from bulk storage, the contrac- tor shall furnish a supplier's certification of analysis and weight. When required by the contract, a representative sample of the fertilizer shall be furnished to the Technical Point of Contact for chemical analysis.

Inoculants—The inoculant for treating legume seeds shall be a pure culture of nitrogen-fixing bacteria prepared specifically for the species and shall not be used later than the date indicated on the container or as otherwise specified.

A mixing medium, as recommended by the manufacturer, shall be used to bond the inoculant to the seed. Two times the amount of the inoculant recommended by the manufacturer shall be used except four times the amount shall be used when seed is applied using a hydraulic seeder. Seed shall be sown within 24 hours of treat- ment and shall not remain in the hydraulic seeder longer than 4 hours.

Lime and other soil amendments—Lime shall consist of standard ground agriculture limestone, or approved equiv- alent.

Standard ground agriculture limestone is defined as ground limestone meeting current requirements of the State

Department of Agriculture. Other soil amendments shall meet quality criteria and application requirements specified in

Section 7.

Mulch tackifiers—Asphalt emulsion tackifiers shall conform to the requirements of ASTM D 977, Specification for

Emulsified Asphalt. The emulsified asphalt may be rapid setting, medium setting, or slow setting. Nonasphaltic tackifiers required because of environmental considerations shall be as specified in Section 7.

Straw mulch material—Straw mulch shall consist of wheat, barley, oat or rye straw, hay, grass cut from native grasses, or other plants as specified in Section 7. The mulch material shall be air-dry, reasonably light in color, and shall not be musty, moldy, caked, or otherwise of low quality. The use of mulch that contains noxious weeds is not permitted. The contractor shall provide a method satisfactory to the Technical Point of Contact for determining weight of mulch furnished.

(210–VI–NEH, January 2014) 6–1

Other mulch materials—Mulching materials, such as wood cellulose fiber mulch, mulch tackifiers, synthetic fiber mulch, netting, and mesh, are other mulching materials that may be required for specialized locations and conditions. These materials, when specified, must be accompanied by the manufacturer's recommendations for methods of application.

3. Seeding Mixtures, Sod, Sprigs, and Dates of Planting The application rate per acre for seed mixtures, sprigs, or sod and date of seeding or planting shall be as shown on the plans or as specified in Section 7.

4. Seedbed Preparation and Treatment

Areas to be treated shall be dressed to a smooth, firm surface. On sites where equipment can operate on slopes safely, the seedbed shall be adequately loosened (4 to 6 inches deep) and smoothed. Depending on soil and mois-ture conditions, disking or cultipacking, or both, may be necessary to properly prepare a seedbed. Where equip-ment cannot operate safely, the seedbed shall be prepared by hand methods by scarifying to provide a roughened soil surface so that broadcast seed will remain in place.

If seeding is to be accomplished immediately following operations, seedbed preparation may not be required except on a compacted, polished, or freshly cut soil surface.

Rocks larger than 6 inches in diameter, trash, weeds, and other debris that will interfere with seeding or mainte-nance operations shall be removed or disposed of as specified in Section 7.

Seedbed preparation shall be discontinued when soil moisture conditions are not suitable for the preparation of a satisfactory seedbed as determined by the Technical Point of Contact.

5. Seeding, Sprigging, Fertilizing, Mulching, and Stabilizing

All seeding or sprigging operations shall be performed in such a manner that the seed or sprigs are applied in the specified quantities uniformly in the designated areas. The method and rate of seed application shall be as specified in Section 7. Unless otherwise specified, seeding or sprigging shall be accomplished within 2 days after final grading is completed and approved.

Fertilizer, lime, and other soil amendments shall be applied as specified in Section 7. When specified, the fertilizer and soil amendments shall be thoroughly incorporated into the soil immediately following surface application.

The rate, amount, and kind of mulching or mesh shall be as specified in Section 7. Mulches shall be applied uni-formly to the designated areas. They shall be applied to areas seeded not later than 2 working days after seeding has been performed. Straw mulch material shall be stabilized within 24 hours of application using a mulch crimper or equivalent anchoring tool or by a suitable tackifier. When the mulch crimper or equivalent anchoring tool is used, it shall have straight blades and be the type manufactured expressly for and capable of firmly punching the mulch into the soil. Where the equipment can be safely operated, it shall be operated on the contour. Hand methods shall be used where equipment cannot safely operate to perform the work required.

The tackifier shall be applied uniformly over the mulch material at the specified rate, or it shall be injected into the mulch material as it is being applied. Mesh or netting stabilizing materials shall be applied smoothly, but loosely on the designated areas. The edges of these materials shall be buried or securely anchored using spikes or staples as specified in Section 7.

The contractor shall maintain the mesh or netting areas until all work under the contract has been completed and accepted. Maintenance shall consist of the repair of areas damaged by water erosion, wind, fire, or other causes.

Such areas shall be repaired to reestablish the intended condition and to the design lines and grades required by the contract. The areas shall be refertilized, reseeded, and remulched before the new application of the mesh or netting.

(210–VI–NEH, January 2014) 6–3

6. Measurement and Payment

Method 1—For items of work for which specific unit prices are established in the contract, each area treated is measured as specified in Section 7 and the area calculated to the nearest 0.1 acre. Payment for treatment is made at the contract unit price for the designated treatment, which will constitute full compensation for completion of the work.

When specified as an item of work, mesh or netting is measured to the nearest square yard of surface area covered and accepted. Payment is made at the contract unit price and will constitute full compensation for completion of the work.

Method 2—For items of work for which specific lump sum prices are established in the contract, the quantity of work will not be measured for payment. Payment for this item is made at the contract lump sum price for the item and will constitute full compensation for the completion of the work.

Method 3—For items of work for which lump sum prices are established in the contract, payment is made as the work proceeds. Progress payments will be determined as specified in Section 7. Payment of the lump sum contract price will constitute full compensation for completion of the work.

All Methods—The following provisions apply to all methods of measurement and payment. Compensation for any item of work described in the contract is included in the payment for the item of work to which it is made subsidiary. Such items and the item(s) to which they are made subsidiary are identified in Section 7.

7. Items of Work

See recommended seeding sheet.

Clark Co Wetland Mix

Grass/Forb/Shrub Common Name Scientific Name Sunlight (FS, PS,SH,PSH) Soil Moisture Lbs/Sq-FT Notes F Ammannia coccinea Scarlet Toothcup Partial MW-W 40 OZ/AC.

F Asclepias incarnata Swamp Milkweed Full sun-partial shade Wet-Moist F Boltonia asteroides False Aster Full sun-partial shade Wet-Moist F Eupatorium perfoliatum Boneset Full/Partial Sun Wet-Moist F Helenium autumnale Sneezeweed Full/Partial Sun Wet-Moist F Hibiscus moscheutos Swamp Rose Mallow Full/Partial Sun Wet-Consistently Moist F Lobelia siphilitica Great Blue Lobelia Partial Sun Wet-Moist F Lycopus americanus Water Horehound Partial-Full Sun Wet-Moist F Mimulus ringens Monkey Flower Partial-Full Sun Wet F Persicaria punctata Dotted Smartweed Full-Partial Sun Moist-Wet F Physostegea virginiana Obedient Plant Full-Partial Sun Moist-Average F Pyncanthemum virginianum Mountain Mint Full-Partial Sun Moist-Average F Sagittaria latifolia Common Arrowhead Full sun-partial shade Shallow Water (1')-Wet Conditions F Sparganium eurycarpum Great Bur Reed Full-Partial Sun Wet Conditions (including 1-2' water) F Verbena hastata Blue Vervain Full-Partial Sun Moist

G Bromus ciliatus Fringed Brome G Calamagrostis canadensis Blue Joint Grass Full-Partial Sun Wet-Moist 1 LB/AC.

G Carex frankii Bristly Cattail Sedge (Franks Sedge) Partial-Full Sun Wet-Moist

Carex stipata Awl-fruited Sedge (Prickly Sedge) Light Shade-Full Sun Moist-Slightly Wet G Carex vulpinoidea Brown Fox Sedge Full-Partial Sun Wet-Moist G Elymus virginicus Virginia Wild Rye Full Sun-Light Shade Moist G Glyceria striata Fowl Manna Grass Full Sun-Light Shade Wet-Mesic G Juncus effusus Common Rush Full Sun Wet G Scirpus atrovirens Dark-green Bulrush Full Sun-Partial Shade Wet-Moist G Scirpus cyperinus Wool Grass Full-Partial Sun Wet-Moist G Schoenoplectus tabernaemontani Great Bulrush Full-Partial Sun Wet G Spartina pectinata Prairie Cord Grass Full Sun-Partial Shade Wet-Mesic G Sparganium eurycarpum Great Bur Reed Full-Partial Sun Wet (including 1-2' of water) G Carex crinita Fringed Sedge Light Shade-Full Sun Wet-Moist G Scirpus pendulus Red/Nodding Bulrush Full Sun-Light Shade Wet-Mesic G Scirpus fluviatulus River Bulrush Full Sun-Light Shade Wet-Mesic

(210–VI–NEH, January 2014) 6–5

S Cephalunthus occidentalis Buttonbush Full Sun Wet-Medium

10 OZ/AC.

Total of all species above to get an amount per acre of 1 lb of all grass species, 40 OZ of all forb species and 10 oz of shrub species. This gives a total of 4.125 LB/AC.

File details come from the government source that posted it. Updated .