S000000522 HVAC Repair and Maintenance Official Solicitation Price Sheet~1.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
HVAC Repair and Maintenance
Solicitation number
S000000522
Issued by
Pulaski County, Norfork City, Arkansas

About this file

This is an Official Solicitation Price Sheet for solicitation S000000522, an HVAC Repair and Maintenance contract issued by the Arkansas Department of Veteran Affairs. The solicitation requests pricing for comprehensive heating, ventilation, and air conditioning services including spring pre-cooling maintenance, fall pre-heating maintenance, summer maintenance, and winter maintenance as detailed in Section 2.3 of the invitation for bids. Prospective contractors must submit pricing through three separate cost tables, with instructions to enter data only in designated blue-shaded cells and notify the OSP Procurement Specialist at least 72 hours before the bid opening if the price sheet does not accommodate accurate pricing.

The price sheet establishes a weighted cost evaluation structure allocating 20 percent of total cost points to maintenance costs, 60 percent to hourly labor costs, and 20 percent to equipment markup costs. Contractors must provide annual pricing for spring pre-cooling, fall pre-heating, summer maintenance, and winter maintenance services in Table 1; hourly labor rates for both standard hours (estimated at 50 annual hours) and after-hours labor (estimated at 20 annual hours) in Table 2; and a percentage markup for equipment costs against an estimated annual equipment cost of $80,000 in Table 3. All estimated quantities are identified as comparison purposes only and are not guaranteed amounts. Contractors are prohibited from altering the Official Solicitation Price Sheet, and all pricing must be inclusive of materials, staffing, and services necessary to meet or exceed the requirements outlined in the invitation for bids.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Sheet

Official Solicitation Price Sheet
S000000522 HVAC Repair and Maintenance
Arkansas Department of Veteran Affairs
Prospective Contractor Name
1.Prospective Contractors shall enter data in all of the blue-shaded cells and only the blue-shaded cells, including the Prospective Contractor's name.
2.Prospective Contractors shall enter pricing in Table 1 that is inclusive of all materials, staffing, and services needed to meet or exceed the requirements of the IFB. The Total Annual Maintenance Cost will automatically calculate.
3.Prospective Contractors shall enter pricing in Table 2 for the estimated hours listed. The Annual Cost and Total Annual Labor Cost will automatically calculate.
4.Prospective Contractors shall enter the additional percentage markup for equipment, excluding maintenance parts and equipment listed in Section 2.3, in Table 3. The Annual Cost will automatically calculate.
5.All estimated quantities are used for comparison purposes only and are not guaranteed amounts.
6.Total Weighted Cost Points will automatically calculate.
7.Prospective Contractors shall not alter this Official Solicitation Price Sheet.
8.If this price sheet does not allow for accurate pricing, Prospective Contractors should notify the OSP Procurement Specialist at least seventy-two (72) hours before the bid opening time, but preferably during the clarification of solicitation period.
TABLE 1: MAINTENANCE COSTS (to be weighted at 20% total cost points)
ItemDescriptionAnnual Cost
1Spring Pre-Cooling as listed in Sections 2.3, A$ - 0
2Fall Pre-Heating as listed in Sections 2.3, B$ - 0
3Summer Maintenance as listed in Section 2.3, C$ - 0
4Winter Maintenance as listed in Section 2.3, C$ - 0
Total Annual Maintenance Cost$ - 0
TABLE 2: HOURLY LABOR COSTS (to be weighted at 60% total cost points)
ItemDescriptionEstimated Annual HoursCost Per HourAnnual Cost
1Hourly Labor Rate50$ - 0$ - 0
2After Hours Labor Rate20$ - 0$ - 0
Total Annual Labor Cost$ - 0
TABLE 3: EQUIPMENT MARK UP COSTS (to be weighted at 20% total cost points)
ItemDescriptionEstimated Equipment CostPercentage MarkupAnnual Cost
1Percentage Equipment Markup$ 80,000.000.0000%$ 80,000.00

Total Weighted Cost Points 16000

File details come from the government source that posted it. Updated .