S000000263 Bidders Conference PPT.pdf
PDF 158 KB Posted
- Attached to
- K-3 Literacy Screener System
- Solicitation number
- S000000263
- Issued by
- Pulaski County, Arkansas
About this file
This document is a Bidders Conference PowerPoint presentation issued by the Arkansas Department of Transformation and Shared Services Office of State Procurement (TSS OSP) for a Request for Proposal (RFP) to establish a K-3 Literacy Screener System that can be used in every public K-3 classroom across the state. The goal of the RFP is to partner with a contractor to provide integrated and aligned diagnostic assessments for students, a reporting system to identify areas of reading risk, and a single report to inform each student's independent reading plan. The RFP solicitation schedule outlines key dates, including a Bidders Conference on September 19, 2023, a proposal due date of October 3, 2023, and a target award date of December 1, 2023.
The presentation details the criteria for the "Most Advantageous Proposal" (MAP), which will be evaluated based on the Prospective Contractor's experience, proposed solution, and risk mitigation. Interviews will be conducted, and final proposals will be scored using a weighted evaluation process. Discussions will then be held with the top-ranked Prospective Contractor to finalize the scope of work, payment schedule, and project management. The presentation does not provide any information on pricing terms, set asides, incumbents, funding sources, or other salient details about the contract opportunity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S000000263 Contract and Grant Disclosure.pdf | ||
| S000000263 K-3 Literacy Screener Questions and Answers.xlsx | XLSX spreadsheet | |
| S000000263 Official Solicitation Price Sheet.xlsx | XLSX spreadsheet | |
| S000000263 K-3 Literacy Screener REVISED RFP~2.pdf | ||
| Services-Contract-SRV-1-Fillable-Form-V.3.6.27.22~1.pdf | ||
| S000000263 Technical Proposal Packet.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S000000263
RFP FOR K-3 LITERACY SCREENER SYSTEM
BIDDERS CONFERENCE
DEPARTMENT OF TRANSFORMATION AND SHARED SERVICES OFFICE OF STATE PROCUREMENT
TSS OSP CONTACT INFORMATION
Julie Robnolt
Statewide Procurement Specialist
Email: julie.robnolt@arkansas.gov
Office: 501-371-6070 arbuy.arkansas.gov
RFP GOALS AND OBJECTIVES
Partnering with a Contractor to launch a single, universal K-3 Literacy Screener System that can be used in every public K-3 classroom across the State
Providing integrated and aligned diagnostic assessments for students
Providing a reporting system that identifies areas of risk for reading deficit after each administration
Providing a single report to inform each student’s independent reading plan based on screener data for use by educators and families
Streamlining data collection and reporting to drive student supports
Providing initial and ongoing training for administrators and educators on administering and interpreting screener results
RFP SOLICITATION SCHEDULE
Activity Date
RFQ Release to Prospective Contractors September 14, 2023
Bidders Conference September 19, 2023, 10:00 am CST
Deadline for Questions September 24, 2023 midnight
Answers to Questions September 26, 2023
Proposal Due Date October 3, 2023 @ 10:00 am CST
Initial Proposal Evaluation* October 6, 2023
Interviews* October 12-13, 2023
Final Proposal Evaluation* October 13, 2023
Discussions Kick Off Meeting* October 16, 2023
Finalize Discussions* October 23, 2023
Post Anticipation to Award* October 27, 2023
Award Contract* December 1, 2023
MOST ADVANTAGEOUS PROPOSAL OVERVIEW
The State seeks the most advantageous proposal (the “MAP”) to reach its objectives. The State is relying on the expertise of the Prospective Contractors to put together the MAP, which needs to:
Clearly outline the best way to achieve the State’s objectives, considering the evaluation factors identified in the RFQ
Use demonstrable and observable metrics to make its business case
Identify known and anticipated risks, along with how to manage, mitigate, or avoid those risks
The proposal should be easy for a non-technical person to read and understand.
The State expects to discuss the finer details and technical points of the project or service delivery with the Prospective Contractor who provides the MAP.
PHASES OF THE RFP PROCESS
Preparation
• Develop and release RFP
• Bidders conference
Selection
• Initial evaluation
• Interviews
• Final evaluation
Discussions
• Kick off meeting
• Final meeting
Execution
• Award
• Implementation
• Progress reporting
PHASE II OF THE RFP PROCESS - SELECTION
The TSS OSP will conduct the following task:
Review proposal response packets for submission requirements
Evaluators will conduct the following tasks:
Review and score proposal response packets and interview Prospective Contractors who meet RFP submission requirements
Recommend Prospective Contractor submitting the MAP to move into the discussion phase with the
State
PHASE II OF THE RFP PROCESS – SELECTION
Prospective Contractors provide the following information in their proposal response packets:
Experience
Solution
Risk
Each evaluation criteria submittal must be no more than 2 pages (6 pages total).
Technical Response Packets should focus on the merits of the proposed approach and not the identity or reputation of the Prospective Contractor.
The Prospective Contractor must not be identified in the proposal.
Proposals should be simple, non-technical, project specific, and supported by metrics.
Metrics should objectively demonstrate the soundness of the approach (high likelihood of success and little to no risk of failure).
Metrics should show the capability of the Prospective Contractor and minimize the room for uncertainty and subjectivity in the evaluation process.
Examples of demonstrable and verifiable experience metrics:
Claim of Expertise We provide an experienced implementation team to deliver the services requested in the RFP.
Documented performance
• Implemented successfully in 5 states
• Average implementation time of 6 months
• Average customer satisfaction rating 9.8 out of 10
Claim of Expertise Our proposed project manager is very experienced and capable.
Documented performance
• Implemented 6 projects in the last 5 years
• Average cost per project is $4 million
• Average project duration is 5 months
• Average cost deviation is 0.1%
• Average time deviation is 1.0%
Solution
High-level overview of the Prospective Contractor’s proposed solution
Should be non-technical and should include the Prospective Contractor’s best solution for meeting the requirements of the RFP
Additional service options and recommendations above and beyond the required scope of services should be included in the Recommended Options Form
Examples of demonstrable and verifiable risk mitigation metrics:
Risk Description State personnel do not attend training sessions regarding the use of the solution
Solution
Contractor will assign full-time personnel to continually reach out to State personnel regarding training sessions. Contractor will also have a 24/7 toll free number to assist personnel.
Documented performance
Contractor has implemented this strategy on the last 4 projects, and client complaints and issues have decreased by 30%. Client satisfaction on this mitigation strategy is 10/10
Interviews
Prospective Contractors meeting the RFP submission requirements will be invited to attend an interview.
The primary project manager or key person for the project will generally be the only individual attending the interview.
If the prospective contractor thinks additional personnel are needed during the interview, the Prospective
Contractor can submit the reason and request approval from the State to bring additional personnel.
Each Prospective Contractor will be provided a list of questions that will be asked during the interview.
Follow up questions may be asked during the interview.
Evaluators will follow the rating system below:
Score Description
10 The response provides metrics clearly establishing that the Prospective Contractor is reliable and capable of fully performing the required services.
5 The response provides some information suggesting that the Prospective Contractor’s level of performance may be acceptable, but it does not clearly establish that the Prospective Contractor is reliable and capable of fully performing the required services.
0 The response provides performance metrics clearly establishing that the Prospective Contractor is unreliable and incapable of fully performing the required services.
Scoring criteria and corresponding weighted percentages
Criteria Weighted Percentage
Experience 20%
Solution 35%
Risk 5%
Interview 40%
Consensus
Raw scores will be added together to determine the Total Score for each proposal to determine the top ranked proposal.
Proposals that do not receive a minimum Total Score of 430 will not be subject to further consideration in the solicitation process.
Evaluators will determine if the top ranked proposal is the MAP for the State and submit their recommendation to TSS OSP.
PHASE III OF THE RFP PROCESS – DISCUSSIONS
TSS OSP will begin the discussions phase with the responsive and responsible Prospective
Contractor submitting the MAP recommended by the Evaluators.
Prospective Contractor will be invited to participate in the discussion phase.
No work should be done during this phase, but all planning should be completed.
Discussions check points
Kickoff meeting
Refinement
Finalization
Kickoff meeting
Prospective Contractor prepares the following documents:
Detailed scope of work, including milestone schedule and performance standards
Risk management plan
Financial summary including a proposed payment schedule and recommended options
Proposed project management and reporting templates
Prospective Contractor presents the documents during to all applicable State personnel
Refinement
Prospective Contractor adjusts proposed scope, schedule, and plan (where needed) based on State feedback
Prospective Contractor collaborates with the State to finalize documents
Finalization
Prospective Contractor prepares final documents for State review during final meeting with stakeholders
S000000263
RFP FOR K-3 LITERACY SCREENER
SYSTEM
BIDDERS CONFERENCE
DEPARTMENT OF TRANSFORMATION AND SHARED SERVICES OFFICE OF
STATE PROCUREMENT
| Slide 1: S000000263 RFP FOR K-3 LITERACY SCREENER SYSTEM Bidders conference |
| Slide 2: TSS OSP contact information |
| Slide 3: RFP goals and objectives |
| Slide 4: RFP SOLICITATION schedule |
| Slide 5: most advantageous Proposal overview |
| Slide 6: Phases of the rfP process |
| Slide 7: Phase II of the RFP Process - selection |
| Slide 8: Phase II of the RFP Process – selection |
| Slide 9: Phase II of the RFP Process – selection |
| Slide 10: Phase II of the RFP Process – selection |
| Slide 11: Phase II of the RFP Process – selection |
| Slide 12: Phase II of the RFP Process – selection |
| Slide 13: Phase II of the RFP Process – selection |
| Slide 14: Phase II of the RFP Process – selection |
| Slide 15: Phase II of the RFP Process – selection |
| Slide 16: Phase II of the RFP Process – selection |
| Slide 17: Phase III of the RFP Process – discussions |
| Slide 18: Phase III of the RFP Process – discussions |
| Slide 19: Phase III of the RFP Process – discussions |
| Slide 20: Phase III of the RFP Process – discussions |
| Slide 21: S000000263 RFP for K-3 LITERACY SCREENER SYSTEM Bidders conference |
File details come from the government source that posted it. Updated .