About this file
Summary of Christensen Road Detention Erosion Mitigation Plans
This document is an approved construction plan set prepared by CivilWorx for the City of Cheyenne, Wyoming, detailing the Christensen Road Detention Erosion Mitigation project. The project encompasses restoration of a detention pond and installation of a new storm sewer system connecting to an existing culvert beneath the Union Pacific Railroad right-of-way. Major work items include installation of one new 60-inch storm manhole, 375 linear feet of 42-inch HDPE storm sewer pipe, one 42-inch flared end section, approximately 1,100 cubic yards of unclassified excavation, 1,500 cubic yards of imported fill, 150 cubic yards of topsoil, reseedable restoration across approximately 3 acres, and relocation of 171 square yards of riprap to be salvaged and reused on-site. The project is located on a portion of the S1/2 of Section 30 and N1/2 of Section 31, T.13N., R.66W. in Laramie County, within the City of Cheyenne. The plans were submitted on September 25, 2025, and received Engineering Plan Review approval on October 3, 2025, approved in scope only. Wyoming Registered Professional Engineer Kelly W. Hafner (PE No. 10514) of CivilWorx is the engineer of record, with Cotton Jones, PLS of Jones Land Surveying serving as surveyor of record.
Construction specifications shall comply with the City of Cheyenne and Board of Public Utilities Construction Specifications and Standard Drawings (2022 and all amendments through the date of construction plan approval). The contractor must coordinate construction access with the project manager and obtain written railroad approval before commencing any work affecting the Union Pacific Railroad right-of-way. Critical contractor responsibilities include backfill of eroded areas, removal and restoration of riprap, storm sewer installation, temporary erosion control and reseeding, and completion of as-constructed survey documentation. The contractor is solely responsible for locating all underground utilities by contacting One Call of Wyoming at least three working days prior to excavation, protecting all existing facilities not designated for removal, and managing all aspects of jobsite safety including excavation, shoring, and traffic control. Strict Union Pacific Railroad safety requirements apply to work within the railroad right-of-way, including mandatory flagmen within 25 feet of track centerline, guardrail installation around unattended excavations, compaction of backfill to minimum 95 percent of maximum dry density per ASTM D1557 (or 100 percent within 100 feet of bridge ends), and immediate reporting of any track movement or railroad property damage.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
October 3, 2025
CivilWorx
Attn: Kelly Hafner
1807 Capitol Avenue
Suite 108
Cheyenne, WY 82001
RE: EPR Approval Letter for Christensen Road Detention Erosion Mitigation Plan
ENPR-25-40
Dear Mr. Hafner, The Engineering Plan Review, for plans dated September 25, 2025, is complete for the above referenced project.
The plans are approved in scope only. The City Engineering Department’s approval and review shall be understood to be a cursory review of the plans only. The character, sufficiency, and completeness of the design and plans are the sole responsibility of the Wyoming Registered
Engineer(s) who have sealed and signed them. This review does not constitute verification of plan accuracy or completeness, and the City holds no responsibility regarding the design and detail of the information contained therein.
Please contact the City Engineer’s Office at 307-637-6268 if you have any questions.
Respectfully, Thomas D. Cobb, P.E.
City Engineer
A COMMUNITY OF CHOICE
ENGINEERING
2101 O’Neil Avenue Room 206 Cheyenne, Wyoming 82001 Phone (307)637-6268 Fax (307)637-6256
APPROVED
Oct. 03 2025
1:46:32 PM
Docusign Envelope ID: 4DC64629-C25C-486F-928B-FAD0BFDE5047
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 TMAP MOBILITY Earthstar Geographics SIO © 2025 TomTom © 2025 Zenrin
CHRISTENSEN ROAD DETENTION EROSION
MITIGATION PLANS
CHRISTENSEN ROAD
A PORTION OF THE S1
2, SECTION 30,
AND THE N1
2, SECTION 31, T.13N., R.66W., OF THE 6TH P.M.,
CITY OF CHEYENNE,
LARAMIE COUNTY, WYOMING
Lowes Detention Restoration
C O
VE
R
S H
EE
T
N/A N/A
CV01
CERTIFICATE OF ENGINEER
I, KELLY W. HAFTER , HEREBY CERTIFY THAT THE DESIGN OF THESE
PLANS WAS PERFORMED BY ME OR UNDER MY DIRECT SUPERVISION
AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER IN
THE STATE OF WYOMING.
REGISTERED PROFESSIONAL ENGINEER
STATE OF WYOMING NO. 10514
VICINITY MAP
OWNER/PROJECT MANAGER
WESLEY D. BAY, P.E.
STORMWATER DIVISION MANAGER
CITY DRAINAGE ENGINEER
CITY OF CHEYENNE
2101 O'NEIL AVENUE
CHEYENNE, WY 82001
OFFICE: (307)638-4315
WBAY@CHEYENNECITY.ORG
1. THIS PLAN SET IS PREPARED FOR THE CHRISTENSEN ROAD DETENTION POND RESTORATION.
2. THE GENERAL CIVIL SCOPE OF THE CIVIL PLANS IS INSTALLATION OF A NEW STORM SYSTEM CONNECTING TO AN EXISTING CULVERT UNDER THE UPRR TO THE EXISTING CHRISTENSEN ROAD DETENTION POND AND
RESTORING A LARGE AREA OF ERODED SOILS IN THE UPRR AND DETENTION POND.
PROJECT TEAM
PROJECT COORDINATES
PROJECT VERTICAL DATUM:
NAVD 88
PROJECT HORIZONTAL DATUM:
NAD 83 WYOMING STATE PLANE EAST USFT
CIVIL ENGINEER
CIVILWORX, LLC
ENGINEER OF RECORD:
KELLY HAFNER, PE
1807 CAPITOL AVENUE STE 108
CHEYENNE, WY 82001
OFFICE: (307) 514-1012
MOBILE: (307) 760-1776
KELLY.HAFNER@CIVILWORXENG.COM
SURVEYOR
JONES LAND SURVEYING, Inc.
SURVEYOR OF RECORD:
COTTON JONES, PLS
6750 SAY KALLY RD.
CHEYENNE, WY 82009
OFFICE: (307) 637-7107
WEBSITE: JONESLANDSURVEY.COM
PROJECT & PLAN SCOPE OF WORK
SPECIFICATIONS
THE CITY OF CHEYENNE AND BOARD OF PUBLIC UTILITIES CONSTRUCTION SPECIFICATIONS AND STANDARD DRAWINGS 2022 AND ALL AMENDMENTS THROUGH THE DATE OF CONSTRUCTION PLAN APPROVAL SHALL BE THE STANDARD SPECIFICATIONS FOR ALL CIVIL SITE & UTILITY WORK ON THIS PROJECT. ALL WORK SHALL BE IN CONFORMANCE WITH THESE STANDARDS AND SPECIFICATIONS AS AMENDED BY THESE PLANS
AND THE SPECIAL PROVISIONS.
THE STANDARD SPECIFICATIONS CAN BE DOWNLOADED IN PDF FORMAT WWW.CHEYENNECITY.ORG FOLLOWING LINKS TO THE PLANNING AND DEVELOPMENT DEPARTMENT, ENGINEERING SERVICES, CONSTRUCTION ENGINEERING - CONSTRUCTION SPECIFICATIONS. NO STANDARD DRAWINGS WILL BE PROVIDED WITH THIS PLAN SET. THE CONTRACTOR SHALL HAVE A COPY OF THE CITY OF CHEYENNE SPECIFICATIONS AND
STANDARD DETAILS AT THE JOBSITE WITH THE CONTRACT DESIGN PLANS.
ADDITIONAL SPECIFICATIONS FOR WORK WITHIN THE UPRR RIGHT OF WAY IS INCLUDED WITH THESE PLANS AND PROVIDED AS SUPPLEMENTAL
PDFS FOR REVIEW BY THE CONTRACTOR.
PR
EP
AR
ED
F O
R
JOB NUMBER
SHEET NUMBER
SHEETSOF
D
AT
E
SU
BM
IT
TE
D
Th e en gi ne er p re pa rin g th es e pl an s w ill no t b e re sp on si bl e fo r, or li ab le fo r, un au th or iz ed c ha ng es to o r u se s of th es e pl an s.
A ll ch an ge s to th e pl an s m us t b e in w rit in g an d m us t b e ap pr ov ed b y th e pr ep ar er o f t he se p la ns
NO
BY
DA
TE
CAUTION
RE
VI
SI
O
NS
VERTICAL:
HORIZONTAL:
SCALE
1807 Capitol Avenue Suite 108
Cheyenne, WY 82001
(307) 514-1012
CivilWorxeng.com
C H
R
IS
TE
N
SE
N
R O
AD
D
ET
EN
TI
O
N E
R O
SI
O
N M
IT
IG
AT
IO
N P
LA
N
S
C25016
C
IT
Y O
F C
H
EY
EN
N
E 9/
/2
CONSTRUCTION
DOCUMENTS
CW
X 8/
/2
CI
TY
C O
M M
EN
TS
D
ES
IG
N
RE
FI
NE
M
EN
TS
CW
X 9/
/2
CI
TY
C O
M M
EN
TS
FI
NA
L
RE
FI
NE
M
EN
TS
N
S
EW
DATE
APPROVED
APPROVAL
CHEYENNE FIRE DEPARTMENT DATE
APPROVED
CHEYENNE BOARD OF PUBLIC UTILITIES ENGINEER DATE
APPROVED
THESE PLANS ARE APPROVED IN SCOPE ONLY, NOT IN DETAIL.
DETAIL OF THESE PLANS IS THE SOLE RESPONSIBILITY OF THE
WYOMING REGISTERED CIVIL ENGINEER WHO HAS SEALED AND
SIGNED THEM. THE CITY HOLDS NO RESPONSIBILITY REGARDING THE
DESIGN AND DETAIL OF THESE PLANS.
CITY ENGINEER
Sheet List Table Sheet
Number Sheet Title Sheet Description
1 CV01 COVER SHEET
2 NT01 NOTES AND SUMMARY
3 DM01 EXISTING CONDITIONS & DEMO PLAN
4 SD01 STORM PLAN & PROFILE
5 GR01 RESTORATION GRADING PLAN
6 DT01 CONSTRUCTION DETAILS
7 DT02 CONSTRUCTION DETAILS
N/A
N/AAPPROVED
Oct. 03 2025
1:46:25 PM
Docusign Envelope ID: 4DC64629-C25C-486F-928B-FAD0BFDE5047
October 3, 2025
AutoCAD SHX Text R
AutoCAD SHX Text
CALL BEFORE YOU DIG UTILITY NOTIFICATION CENTER OF WYOMING
AutoCAD SHX Text
ONE-CALL OF WYOMING
AutoCAD SHX Text 1-800-849-2476
AutoCAD SHX Text
OR
AutoCAD SHX Text
AutoCAD SHX Text n
AutoCAD SHX Text I
AutoCAD SHX Text Date
AutoCAD SHX Text W
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text Y
AutoCAD SHX Text L
AutoCAD SHX Text a
AutoCAD SHX Text o
AutoCAD SHX Text L
AutoCAD SHX Text n
AutoCAD SHX Text s
AutoCAD SHX Text i
AutoCAD SHX Text s
AutoCAD SHX Text K
AutoCAD SHX Text P
AutoCAD SHX Text o
AutoCAD SHX Text r
AutoCAD SHX Text f
AutoCAD SHX Text e
AutoCAD SHX Text E
AutoCAD SHX Text H
AutoCAD SHX Text A
AutoCAD SHX Text g
AutoCAD SHX Text i
AutoCAD SHX Text W.
AutoCAD SHX Text Y
AutoCAD SHX Text l
AutoCAD SHX Text E
AutoCAD SHX Text 10514
AutoCAD SHX Text n
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text i
AutoCAD SHX Text l
AutoCAD SHX Text i
AutoCAD SHX Text C
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text e
AutoCAD SHX Text e
AutoCAD SHX Text r
AutoCAD SHX Text
AutoCAD SHX Text v
AutoCAD SHX Text R
KellyHafner Snapshot
N O
TE
S
AN
D
S U
M M
AR
Y
N/A N/A
NT01
PR
EP
AR
ED
F O
R
JOB NUMBER
SHEET NUMBER
SHEETSOF
D
AT
E
SU
BM
IT
TE
D
Th e en gi ne er p re pa rin g th es e pl an s w ill no t b e re sp on si bl e fo r, or li ab le fo r, un au th or iz ed c ha ng es to o r u se s of th es e pl an s.
A ll ch an ge s to th e pl an s m us t b e in w rit in g an d m us t b e ap pr ov ed b y th e pr ep ar er o f t he se p la ns
NO
BY
DA
TE
CAUTION
RE
VI
SI
O
NS
VERTICAL:
HORIZONTAL:
SCALE
1807 Capitol Avenue Suite 108
Cheyenne, WY 82001
(307) 514-1012
CivilWorxeng.com
C H
R
IS
TE
N
SE
N
R O
AD
D
ET
EN
TI
O
N E
R O
SI
O
N M
IT
IG
AT
IO
N P
LA
N
S
C25016
C
IT
Y O
F C
H
EY
EN
N
E 9/
/2
CONSTRUCTION
DOCUMENTS
CW
X 8/
/2
CI
TY
C O
M M
EN
TS
D
ES
IG
N
RE
FI
NE
M
EN
TS
CW
X 9/
/2
CI
TY
C O
M M
EN
TS
FI
NA
L
RE
FI
NE
M
EN
TS
PROJECT MAJOR QUANTITIES:
ITEM MEASUREMENT UNIT EST. QUANTITIES
NEW STORM MH (60") EACH 1
NEW 42-INCH STEEL- HDPE COUPLER EACH 1
NEW STORM SEWER (42-INCH) LINEAR FOOT 375
NEW 42-INCH FLARED END SECTION EACH 1
UNCLASSIFIED EXCAVATION (ON-SITE) CUBIC YARD 1,100
IMPORTED FILL ESTIMATE CUBIC YARD 1,500
TOPSOIL (IMPORT) CUBIC YARD 150
RESEEDED AREA (ESTIMATE) ACRE 3.0
RIPRAP TO BE RELOCATED SQUARE YARD 171
RESTORATION AREA OF WORK
RIPRAP TO BE SALVAGED
AND RE-USED FOR SITE WORK
RESTORE ERODED AREA.
BACKFILL WITH DEPOSITED MATERIAL.
GENERAL NOTES
1. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION ACCESS WITH THE PROJECT MANAGER.
2. OWNER PROVIDED ITEMS:
2.1. ACCESS TO UPRR, COORDINATE WITH PROJECT MANAGER
2.2. ACCESS TO CITY PROPERTY (I.E. DETENTION FACILITY)
2.3. GRADING PERMIT (WAIVED FEES)
2.4. ON-SITE SOIL FOR USE WITH BACKFILL
3. CONTRACTOR SCOPE OF WORK (PRIMARY ITEMS):
3.2. BACKFILL OF ERODED AREAS
3.3. REMOVAL AND RESTORATION OF RIPRAP
3.4. STORM SEWER INSTALLATION
3.5. TEMPORARY SITE EROSION CONTROL AND RESEEDING
3.6. AS-CONSTRUCTED SURVEY OF STORM SEWER AND RESTORED DETENTION FACILITY
4. THE CONTRACTOR SHALL COORDINATE AND COOPERATE WITH THE OWNER REGARDING RELOCATIONS, ADJUSTMENTS, EXTENSIONS, AND REARRANGEMENTS OF EXISTING UTILITIES
(IF REQURIED) DURING CONSTRUCTION.
5. NO STOCKPILING OR MATERIALS NOT FOR IMMEDIATE PLACEMENT SHALL BE ALLOWED IN THE UPRR.
THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL UTILITIES DURING CONSTRUCTION AND FOR COORDINATING WITH THE APPROPRIATE UTILITY COMPANY FOR ANY UTILITY CROSSING REQUIRED THE TYPE, SIZE, LOCATION AND NUMBER OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THE PLANS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE AND LOCATION OF ALL UNDERGROUND UTILITIES ALONG THE ROUTE OF THE WORK BEFORE COMMENCING CONSTRUCTION. THE CONTRACTOR SHALL CONTACT THE ONE CALL OF WYOMING AT 1-800-849-2476 AT LEAST THREE (3) WORKING DAYS PRIOR TO BEGINNING EXCAVATION OR GRADING TO HAVE ALL REGISTERED UTILITY LOCATION MARKED. OTHER UNREGISTERED UTILITIES ARE TO BE LOCATED BY CONTACTING THE RESPECTIVE REPRESENTATIVE.
SHOULD CONDITIONS ARISE WHICH ARE DIFFERENT THAN THOSE SHOWN ON THE DRAWINGS.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY, INCLUDING, BUT NOT LIMITED TO, EXCAVATION, TRENCHING, SHORING, PEDESTRIAN / VEHICULAR TRAFFIC CONTROL AND JOBSITE SECURITY. NOTE THE SITE IS SUBJECT TO INUNDATION DURING RAINFALL EVENTS.
7. THE CONTRACTOR SHALL PROVIDE, AT THE COMPLETION OF THE PROJECT, A COMPLETE SET OF REPRODUCIBLE “AS-BUILT” DRAWINGS TO THE OWNER'S REPRESENTATIVE. THE
AS-BUILT DRAWING WILL CONSIST OF:
1. MARKED-UP SET OF “ISSUED FOR CONSTRUCTION” DRAWING VERIFYING THE FOLLOWING.
2. ALL LENGTHS AND SIZES AND MATERIAL OF INSTALLED PIPE, MANHOLES, AND ANY OTHER IMPROVEMENTS.
3. ELEVATIONS AT FLOWLINE/INVERT OF PIPES AT DESIGN LOCATIONS AND RIM ELEVATIONS OF ANY CONNECTED MANHOLE(s) / INLET(s) / JUNCTION(s).
4. ENCOUNTERED UTILITIES AND ELEVATIONS,
5. RESTORED DETENTION POND STAGE-AREA-VOLUME TABLE.
6. ANY OTHER VARIATIONS FROM THE CONSTRUCTION DOCUMENTS MUST BE CLEARLY NOTED AND DETAILED ON THE PLANS.
SURVEYING AND LAYOUT GENERAL NOTES:
1. THE CONTRACTOR SHALL PROVIDE CONSTRUCTION STAKING. COORDINATE KNOWN CONTROL POINTS WITH PROJECT SURVEYOR.
2. THE ORIGINAL SITE GRADING PLAN AND LAYOUT INFORMATION ARE AVAILABLE FOR FOR REFERENCE TO ASSIST WITH RECONSTRUCTION OF THE DETENTION FACILITY TO VERIFY THE
CONFORMITY TO THE ORIGINAL DESIGN INTENT.
UPRR GENERAL SAFETY REQUIREMENTS (REFER TO TO UPRR CONTRACTOR MINIMUM SAFETY REQUIREMENTS SUPPLEMENTAL):
THE CONTRACTOR MUST NOT BEGIN CONSTRUCTION OF ANY COMPONENT OF THE SHORING SYSTEM AFFECTING THE RAILROAD RIGHT-OF-WAY UNTIL WRITTEN RAILROAD APPROVAL HAS
BEEN RECEIVED.
1. ALL EXCAVATIONS SHALL BE IN COMPLIANCE WITH APPLICABLE OSHA REGULATIONS AND SHALL BE SHORED WHERE THERE IS ANY DANGER TO TRACKS, STRUCTURES OR PERSONNEL REGARDLESS OF DEPTH.2. THE CONTRACTOR IS RESPONSIBLE FOR PLANNING AND EXECUTING ALL PROCEDURES NECESSARY TO CONSTRUCT, MAINTAIN AND REMOVE
THE TEMPORARY SHORING SYSTEM IN A SAFE AND CONTROLLED MANNER.
3. EMERGENCY RAILROAD PHONE NUMBERS ARE TO BE OBTAINED FROM THE RAILROAD REPRESENTATIVE IN CHARGE OF THE PROJECT PRIOR TO THE START OF ANY WORK AND SHALL
BE POSTED AT THE JOB SITE.
4. THE CONTRACTOR MUST OBTAIN A VALID RIGHT OF ENTRY PERMIT FROM THE RAILROAD AND COMPLY WITH ALL RAILROAD REQUIREMENTS WHEN WORKING ON RAILROAD
PROPERTY.
5. THE CONTRACTOR IS REQUIRED TO MEET MINIMUM SAFETY STANDARDS AS DEFINED BY THE RAILROAD.
6. ALL TEMPORARY SHORING SYSTEMS THAT SUPPORT OR IMPACT THE RAILROAD’S TRACKS OR OPERATIONS SHALL BE DESIGNED AND CONSTRUCTED TO PROVIDE SAFE AND
ADEQUATE RIGIDITY.
7. THE RAILROAD REQUIREMENTS, CONSTRUCTION SUBMITTAL REVIEW TIMES AND REVIEW CRITERIA SHOULD BE DISCUSSED AT THE PRE-CONSTRUCTION MEETING WITH THE
CONTRACTOR.
8. A FLAGMAN IS REQUIRED WHEN ANY WORK IS PERFORMED WITHIN 25 FEET OF TRACK CENTERLINE. IF THE RAILROAD PROVIDES FLAGGING OR OTHER SERVICES, THE CONTRACTOR
SHALL NOT BE RELIEVED OF ANY RESPONSIBILITIES OR LIABILITIES AS SET FORTH IN ANY DOCUMENT AUTHORIZING THE WORK. NO WORK IS ALLOWED WITHIN 50 FEET OF TRACK CENTERLINE WHEN A TRAIN PASSES THE WORK SITE AND ALL PERSONNEL MUST CLEAR THE AREA WITHIN 25 FEET OF TRACK CENTERLINE AND SECURE ALL EQUIPMENT WHEN
TRAINS ARE PRESENT.
9. APPROPRIATE MEASURES FOR THE INSTALLATION AND PROTECTION OF FIBER OPTIC CABLES SHALL BE ADDRESSED IN THE PLANS AND CONTRACT DOCUMENTS. FOR SPECIFIC
RAILROAD REQUIREMENTS AND ADDITIONAL INFORMATION
REFER TO:
WWW.BNSF.COM OR CALL 1-800-533-2891.
WWW.UPRR.COM, CALL 1-800-336-9193 OR REFER TO UPRR FIBER OPTIC ENGINEERING, CONSTRUCTION AND MAINTENANCE STANDARDS (UPRR)
10. RELOCATION OF UTILITIES OR COMMUNICATION LINES NOT OWNED BY THE RAILROAD SHALL BE COORDINATED WITH THE UTILITY OWNERS. THE UTILITY RELOCATION PLANS MUST THEN BE SUBMITTED TO THE RAILROAD UTILITY REPRESENTATIVE FOR APPROVAL. THE SHORING PLANS MUST INCLUDE THE CORRECT CONTACT FOR THE RAILROAD, STATE OR LOCAL UTILITY LOCATING SERVICE PROVIDER. THE RAILROAD WILL NOT BE RESPONSIBLE FOR COST ASSOCIATED WITH ANY UTILITY, SIGNAL, OR COMMUNICATION LINE RELOCATION
OR ADJUSTMENTS.
CONTRACTOR RESPONSIBILITIES (UPRR)
THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE DESIGN, CONSTRUCTION AND PERFORMANCE OF THE TEMPORARY STRUCTURE. (AREMA 8.28.1.3)
11. THE CONTRACTOR’S WORK SHALL IN NO WAY IMPEDE THE TRAIN OPERATIONS OF THE RAILROAD AND MUST BE COORDINATED WITH THE LOCAL RAILROAD OPERATING DEPARTMENT.
12. THE CONTRACTOR SHALL DEVELOP A WORK PLAN THAT ENABLES THE TRACK(S) TO REMAIN OPEN TO TRAIN TRAFFIC AT ALL TIMES.
13. THE CONTRACTOR SHALL COMPLY WITH ALL STATE AND FEDERAL LAWS, COUNTY OR MUNICIPAL ORDINANCES AND REGULATIONS WHICH IN ANY MANNER AFFECT THE WORK.
14. ALL REMOVED SOILS WILL BECOME THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE DISPOSED OF OUTSIDE THE RAILROAD RIGHT-OF-WAY ACCORDING TO THE APPLICABLE
FEDERAL, STATE AND LOCAL REGULATIONS.
15. THE PROJECT ENGINEER AND THE CONTRACTOR SHALL EVALUATE THE QUALITY OF MATERIALS FURNISHED AND WORK PERFORMED.
16. 6. THE CONTRACTOR IS RESPONSIBLE TO PROTECT THE RAILROAD BALLAST AND SUBBALLAST FROM CONTAMINATION.
17. THE CONTRACTOR MUST MONITOR AND RECORD TOP OF RAIL ELEVATIONS AND TRACK ALIGNMENT FOR THE DURATION OF THE PROJECT. THE MOVEMENT SHALL BE WITHIN THE
LIMITS DEFINED IN TABLE 1, DEFLECTION CRITERIA ON PAGE 10. DISPLACEMENTS EXCEEDING THE LIMITS DEFINED IN TABLE 1 MUST BE IMMEDIATELY REPORTED TO THE RAILROAD.
ALL WORK ON THE PROJECT MUST STOP AND THE RAILROAD MAY TAKE ANY ACTION NECESSARY TO ENSURE SAFE PASSAGE OF TRAINS. THE CONTRACTOR MUST IMMEDIATELY SUBMIT A CORRECTIVE ACTION PLAN TO THE RAILROAD FOR REVIEW AND APPROVAL. THE RAILROAD MUST REVIEW AND APPROVE THE PROPOSED REPAIR PROCEDURE. THE REPAIR MUST BE INSPECTED BY THE RAILROAD BEFORE THE TRACK CAN BE PLACED BACK IN SERVICE.
18. ANY DAMAGE TO RAILROAD PROPERTY SUCH AS TRACK, SIGNAL EQUIPMENT OR STRUCTURE COULD RESULT IN A TRAIN DERAILMENT. ALL DAMAGE MUST BE REPORTED
IMMEDIATELY TO THE RAILROAD REPRESENTATIVE IN CHARGE OF
19. THE PROJECT AND TO THE RAILROAD MANAGER OF TRACK MAINTENANCE (MTM).
20. 1.1 UNION PACIFIC REQUIRES ITS CONTRACTORS TO FOLLOW THE SAME SAFETY RULES THAT GOVERN UNION PACIFIC EMPLOYEES. THESE INCLUDE, BUT ARE NOT LIMITED TO, REQUIREMENTS RELATED TO WORK GEAR, EQUIPMENT, AND SAFETY CONDUCT, REPORTING, PROHIBITIONS AGAINST WEAPONS, DRUGS & ALCOHOL, AND FIRES.
21. 1.2 RAILROAD MANAGEMENT IS AUTHORIZED TO TAKE ANY ACTIONS NECESSARY TO PREVENT INJURIES TO ANY PERSON, DAMAGE TO RAILROAD PROPERTY, DISRUPTION OF
RAILROAD OPERATION, AND THE SAFETY OF THE PUBLIC.
22. 1.3 THE CONTRACTOR IS RESPONSIBLE FOR THE SAFETY OF ITS PERSONNEL, SUBCONTRACTORS, AND ANY VENDORS OR MATERIAL/DELIVERY DRIVERS WORKING ON BEHALF OF THE
CONTRACTOR.
23. 1.4 CONTRACTOR PERSONNEL MUST BE FAMILIAR WITH AND OBEY ALL RULES, REGULATIONS, AND INSTRUCTIONS APPLICABLE TO THEIR DUTIES AND WORK LOCATION PRIOR TO PERFORMING WORK. THE CONTRACTOR IS RESPONSIBLE FOR TRAINING CONTRACTOR PERSONNEL TO BE PREPARED TO WORK IN COMPLIANCE WITH ALL APPLICABLE STANDARDS
AND REQUIREMENTS.
24. 1.5 ANY QUESTIONS REGARDING THIS INFORMATION SHOULD BE DIRECTED TO THE UNION PACIFIC MANAGER IN CHARGE OF THE WORK LOCATION.
SHORING SAFETY REQUIREMENTS FOR CONTRACTOR WORKING IN UPRR RIGHT-OF-WAY:
1. GUARDRAILS
i. GUARDRAILS SHALL BE PROVIDED TO SURROUND UNATTENDED EXCAVATIONS ON RAILROAD RIGHT-OF-WAY PER OSHA STANDARD NUMBER 1926.502 AS FOLLOWS:
a. THE GUARDRAIL HEIGHT SHALL BE AT LEAST 42 INCHES ABOVE THE WALKING SURFACE.
b. THE SMALLEST DIMENSION FOR OPENINGS IN THE GUARDRAIL SHALL BE NO GREATER THAN 19 INCHES.
c. GUARDRAIL SYSTEMS SHALL BE CAPABLE OF WITHSTANDING, WITHOUT FAILURE, A FORCE OF AT LEAST 200 POUNDS APPLIED WITHIN 2 INCHES OF THE TOP EDGE, IN ANY OUTWARD
OR DOWNWARD DIRECTION, AT ANY POINT ALONG THE TOP EDGE OF THE GUARDRAIL.
COMPACTION REQUIREMENTS FOR EXCAVATION WORK WITHIN UPRR RIGHT-OF-WAY:
a. THE BACKFILL SHALL PREFERABLY BE PLACED IN LOOSE LAYERS NOT TO EXCEED 8 INCHES IN THICKNESS. EACH LAYER SHALL BE COMPACTED BEFORE PLACING THE NEXT, BUT
OVER COMPACTION SHALL BE AVOIDED.
b. IT IS REQUIRED THAT BACKFILL BE COMPACTED TO NO LESS THAN 95% OF MAXIMUM DRY DENSITY AT A MOISTURE CONTENT WITHIN 2% OF OPTIMUM AND TESTED USING MODIFIED
PROCTOR ASTM D1557.
c. FILL WITHIN 100 FEET OF BRIDGE ENDS OR 20 FEET OUTSIDE CULVERTS SHALL BE PLACED AND COMPACTED TO NOT LESS THAN 100% OF MAXIMUM.
d. NO DUMPING OF BACKFILL MATERIAL SHALL BE PERMITTED IN SUCH A WAY THAT THE SUCCESSIVE LAYERS SLOPE DOWNWARD TOWARD THE WALL. THE LAYERS SHALL BE
HORIZONTAL OR SHALL SLOPE DOWNWARD AWAY FROM THE WALL.
CONNECT TO
EX. PIPELINE
AND BACKFILL
MATERIAL IN BASE OF
POND TO BE REMOVED
AND USED AS BACKILL
IN ERODED AREAS.
EXPOSED UTILITIES
APPROVED
Oct. 03 2025
1:46:32 PM
Docusign Envelope ID: 4DC64629-C25C-486F-928B-FAD0BFDE5047
AutoCAD SHX Text | KellyHafner | D:\Civilworx\CivilWorx Dropbox\CivilWorx\Projects\2025\C25016 - Lowes Detention Restoration\04_Drawings\AutoCAD\Construction Sheets\NT_Notes And Special Provisions C25016.dwg | KellyHafner | D:\Civilworx\CivilWorx Dropbox\CivilWorx\Projects\2025\C25016 - Lowes Detention Restoration\04_Drawings\AutoCAD\Construction Sheets\NT_Notes And Special Provisions C25016.dwg | | D:\Civilworx\CivilWorx Dropbox\CivilWorx\Projects\2025\C25016 - Lowes Detention Restoration\04_Drawings\AutoCAD\Construction Sheets\NT_Notes And Special Provisions C25016.dwg | D:\Civilworx\CivilWorx Dropbox\CivilWorx\Projects\2025\C25016 - Lowes Detention Restoration\04_Drawings\AutoCAD\Construction Sheets\NT_Notes And Special Provisions C25016.dwg | | 9/25/2025 2:33 PM | |
ST
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
D
EM
O P
LA
N
1" = 80' N/A
DM01
0 80' 160'
SCALE: 1" = 80'
40'00
LEGEND
UTILITIES
EX. CULVERT (CMP)
UG ELECTRICAL LINE
UG FIBER OPTIC LINE
UG TELECOM LINE
EX. UPRR ROW
NOTES
1. EXISTING UNDERGROUND AND OVERHEAD
PUBLIC AND PRIVATE UTILITIES AS SHOWN
ARE INDICATED ACCORDING TO THE BEST
INFORMATION AVAILABLE TO THE ENGINEER.
2. THE CONTRACTOR SHALL PROTECT ALL
EXISTING FEATURES THAT ARE NOT TO BE
REMOVED ADJACENT TO THE CONSTRUCTION
AREA INCLUDING, BUT NOT LIMITED TO,
PAVEMENT, PRIVATE FENCES, ABOVE GROUND
OR UNDERGROUND UTILITIES, STRUCTURES,
AND UNDERGROUND FOUNDATIONS. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR
ANY DAMAGE THAT SHOULD OCCUR TO ANY
ON-SITE, OFF-SITE, PUBLIC OR PRIVATE
FACILITY OR FEATURE AS A RESULT OF THE
CONSTRUCTION PROCESS FOR THIS PROJECT.
3. SEE NOTES SHEET FOR SURVEYING AND
RESTORATION REQUIREMENTS.
DEMOLITION
LIMITS OF DISTURBANCE
EX. LANDSCAPED AREA
FOR RESTORATION
PR
EP
AR
ED
F O
R
JOB NUMBER
SHEET NUMBER
SHEETSOF
D
AT
E
SU
BM
IT
TE
D
Th e en gi ne er p re pa rin g th es e pl an s w ill no t b e re sp on si bl e fo r, or li ab le fo r, un au th or iz ed c ha ng es to o r u se s of th es e pl an s.
A ll ch an ge s to th e pl an s m us t b e in w rit in g an d m us t b e ap pr ov ed b y th e pr ep ar er o f t he se p la ns
NO
BY
DA
TE
CAUTION
RE
VI
SI
O
NS
VERTICAL:
HORIZONTAL:
SCALE
1807 Capitol Avenue Suite 108
Cheyenne, WY 82001
(307) 514-1012
CivilWorxeng.com
C H
R
IS
TE
N
SE
N
R O
AD
D
ET
EN
TI
O
N E
R O
SI
O
N M
IT
IG
AT
IO
N P
LA
N
S
C25016
C
IT
Y O
F C
H
EY
EN
N
E 9/
/2
CONSTRUCTION
DOCUMENTS
CW
X 8/
/2
CI
TY
C O
M M
EN
TS
D
ES
IG
N
RE
FI
NE
M
EN
TS
CW
X 9/
/2
CI
TY
C O
M M
EN
TS
FI
NA
L
RE
FI
NE
M
EN
TS
EX-CONC
EX-LS
X-LS
EX-STM
UGT
FO
BE
EXISTING CONDITIONS AND REMOVAL PLAN KEY NOTES
(PROTECT IN PLACE)
EXISTING CONCRETE PVMTS
EXISTING LANDSCAPED AREAS TO REMAIN, INCLUDE
GRAVEL AND WEED BARRIER, SOD, AND SPRINKLER
DEMOLITION - LIMITED DISTURBANCE OF EX. LANDSCAPED
AREA FOR NEW UTILITY INSTALLATION (SEE HYDRONIC
PLANS), RESTORE PRE-PROJECT LANDSCAPE COVERING
OR AS DIRECTED BY IMAGE NOTES THIS SHEET
SALVAGE EXISTING RIPRAP AND RE-USE ONSITE.
EXISTING CULVERT (CMP)
EXISTING ELECTRICAL
EXISTING FIBER OPTIC
EXISTING TELECOM
EX-LS
X-LS
EX-CONC
EX-BE
EX-FO
EX-UGT
EX-STM
EX-RR
EX-RR
AREA FOR
CLEANUP
APPROVED
Oct. 03 2025
2025 M icrosoft Corporation © 2025 M axar © CNES (2025) Distribution Airbus DS ©
2025 TM
AP M
OBILITY Earthstar Geographics SIO © 2025 Tom
Tom
2025 Zenrin
2025 M icrosoft Corporation © 2025 M axar © CNES (2025) Distribution Airbus DS ©
2025 TM
AP M
OBILITY Earthstar Geographics SIO © 2025 Tom
Tom
2025 Zenrin
STM D
STA 13+26.52
N: 235782.91 E: 781905.36
STM C
STA 12+88.26
N: 235750.91 E: 781884.57
38.16 LF 42" HDPE @ 4.62%
136.99 LF 42" HDPE @ 4.50%
20.00 LF 42" HDPE @ 2.05%
20.00 LF 42" HDPE @ 6.52%
R400'
ST
P1-5
STA 14+26.60
N: 235880.62 E: 781925.72
STA: 14+61.90
N: 235915.87 E: 781927.14
UTILITY XING - UGT
STA: 15+26.61
N: 235980.27 E: 781921.48
CONNECT TO EX. CMP
STA: 13+91.99
N: 235846.28 E: 781921.52
UTILITY XING - FO
STA: 12+70.57
N: 235736.32 E: 781874.59
UTILITY XING - BE
STA: 12+64.34
N: 235731.14 E: 781871.11
UTILITY XING - BE
9+50 10+00 11+00 12+00 13+00
14+00
15+00
+76
STM B
STA 11+51.28
N: 235637.25 E: 781808.11
PR_Storm PROFILE
SCALE: (H) 1" = 50' (V) 1" = 5'
START STA: 9+50.00, END STA: 16+00.00
9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00
ST
M
E
ST
A
+2 6.
R
IM
2.
7±
IN
V.
O
U T
.9
(S
ST
M
D
ST
A
+2 6.
R
IM
8.
9±
IN
V.
IN
0.
(N
IN
V.
O U
T
.5
(S
W
ST
M
C
ST
A
+8 8.
R
IM
8.
6±
IN
V.
IN
4.
(N E)
IN
V.
O U
T
.8
(S
W
ST
M
B
ST
A
+5 1.
R
IM
2.
4±
IN
V.
IN
8.
(N E)
38.16 LF 42" HDPE @ 4.62%
136.99 LF 42" HDPE @ 4.50%
P1 -5
ST
A
+2
6.
R
IM
0.
3±
IN
V.
IN
6.
(N
IN
V.
O
U T
.4
(S
100 LF 42" HDPE @ 2.05% (20' SEGMENTS)
100 LF 42" HDPE @ 6.52% (20' SEGMENTS)
ST
A:
4+
.7
T.
O
.P
7.
4"
T
EL
EC
O
M
ST
A:
3+
.1
T.
O
.P
2.
4"
F
IB
ER
O
PT
IC
ST
A:
2+
.5
T.
O
.P
0.
4"
E
LE
C
TR
IC
AL
ST
A:
2+
.8
T.
O
.P
0.
4"
E
LE
C
TR
IC
AL
PROPOSED GROUND
EXISTING GROUND
42" STEEL-HDPE COUPLER
SEE ENERGY
DISSIPATER DETAIL
SHEET DT01
UPRR ROW
DAYLIGHT
TO POND
ST
O
R M
P
LA
N
P R
O
FI
LE
1" = 10' N/A
SD01
0 80' 160'
SCALE: 1" = 80'
40'00
NOTE:
- STORM PIPE MATERIAL SHALL BE ADS HP STORM DUAL
WALL, ADS SANITITE HP DUAL WALL OR AN
ALTERNATIVE OF ADS SANITITE HP TRIPLE WALL PIPE.
- ALL JOINTS REQUIRE A SPLIT COUPLER.
- STATION 14+00 TO CONNECTION USE E-80 TRENCHING
AND INSTALL DETAIL, USE EMBANKMENT BACKFILL
MATERIAL TO TOP OF FINISHED GRADE.
- SEE DT01 FOR ADDITIONAL NOTES AND DETAILS.
PR
EP
AR
ED
F O
R
JOB NUMBER
SHEET NUMBER
SHEETSOF
D
AT
E
SU
BM
IT
TE
D
Th e en gi ne er p re pa rin g th es e pl an s w ill no t b e re sp on si bl e fo r, or li ab le fo r, un au th or iz ed c ha ng es to o r u se s of th es e pl an s.
A ll ch an ge s to th e pl an s m us t b e in w rit in g an d m us t b e ap pr ov ed b y th e pr ep ar er o f t he se p la ns
NO
BY
DA
TE
CAUTION
RE
VI
SI
O
NS
VERTICAL:
HORIZONTAL:
SCALE
1807 Capitol Avenue Suite 108
Cheyenne, WY 82001
(307) 514-1012
CivilWorxeng.com
C H
R
IS
TE
N
SE
N
R O
AD
D
ET
EN
TI
O
N E
R O
SI
O
N M
IT
IG
AT
IO
N P
LA
N
S
C25016
C
IT
Y O
F C
H
EY
EN
N
E 9/
/2
CONSTRUCTION
DOCUMENTS
CW
X 8/
/2
CI
TY
C O
M M
EN
TS
D
ES
IG
N
RE
FI
NE
M
EN
TS
CW
X 9/
/2
CI
TY
C O
M M
EN
TS
FI
NA
L
RE
FI
NE
M
EN
TS
UTILITIES
EX. CULVERT (CMP)
UG ELECTRICAL LINE
UG FIBER OPTIC LINE
UG TELECOM LINE
PROPOSED STORM (HDPE)
EX. UPRR ROW
100-YR HGL
10-YR HGL
NOTES
1. EXISTING UNDERGROUND AND OVERHEAD
PUBLIC AND PRIVATE UTILITIES AS SHOWN
ARE INDICATED ACCORDING TO THE BEST
INFORMATION AVAILABLE TO THE ENGINEER.
2. THE CONTRACTOR SHALL PROTECT ALL
EXISTING FEATURES THAT ARE NOT TO BE
REMOVED ADJACENT TO THE CONSTRUCTION
AREA INCLUDING, BUT NOT LIMITED TO,
PAVEMENT, PRIVATE FENCES, ABOVE GROUND
OR UNDERGROUND UTILITIES, STRUCTURES,
AND UNDERGROUND FOUNDATIONS. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR
ANY DAMAGE THAT SHOULD OCCUR TO ANY
ON-SITE, OFF-SITE, PUBLIC OR PRIVATE
FACILITY OR FEATURE AS A RESULT OF THE
CONSTRUCTION PROCESS FOR THIS PROJECT.
APPROVED
Oct. 03 2025
BEBE
ST
17+50
18+00
18+50
19+00
19+50
20+00
20+50
21+00
44.78FG
46.44FG
46.00FG
44.63FG
44.50FG
43.35FG
44.64FG
46.25FG
47.79FG
47.31FG
45.94FG
45.27FG
17+50
0 200-20
18+00
0 20 400-20
18+50
0 200-20
19+00
0 200-20
19+50
0 200-20
20+00
0 200-20
20+50
0 200-20
21+00
0 200-20
R
ES
TO
R
AT
IO
N G
R
AD
IN
G
P
LA
N
1" = 80' N/A
GR01
00 60' 120'
SCALE: 1" = 60'
30'
PERMANENT SLOPE EROSION CONTROL:
PR
EP
AR
ED
F O
R
JOB NUMBER
SHEET NUMBER
SHEETSOF
D
AT
E
SU
BM
IT
TE
D
Th e en gi ne er p re pa rin g th es e pl an s w ill no t b e re sp on si bl e fo r, or li ab le fo r, un au th or iz ed c ha ng es to o r u se s of th es e pl an s.
A ll ch an ge s to th e pl an s m us t b e in w rit in g an d m us t b e ap pr ov ed b y th e pr ep ar er o f t he se p la ns
NO
BY
DA
TE
CAUTION
RE
VI
SI
O
NS
VERTICAL:
HORIZONTAL:
SCALE
1807 Capitol Avenue Suite 108
Cheyenne, WY 82001
(307) 514-1012
CivilWorxeng.com
C H
R
IS
TE
N
SE
N
R O
AD
D
ET
EN
TI
O
N E
R O
SI
O
N M
IT
IG
AT
IO
N P
LA
N
S
C25016
C
IT
Y O
F C
H
EY
EN
N
E 9/
/2
CONSTRUCTION
DOCUMENTS
CW
X 8/
/2
CI
TY
C O
M M
EN
TS
D
ES
IG
N
RE
FI
NE
M
EN
TS
CW
X 9/
/2
CI
TY
C O
M M
EN
TS
FI
NA
L
RE
FI
NE
M
EN
TS
GEOTEXTILE TURF REINFORCEMENT MAT (TRM):
MIRAFI (SOLOREX) PROPEX LANDLOK 435 OR APPROVED EQUAL
COVERAGE AREA: 8,700 SF (966 SY)
x10% (OVERLAP ESTIMATE)
9,570 SF MIN. COVERAGE
CONTRACTOR TO VERIFY BASED ON FIELD CONDITIONS AND
FEEDBACK FROM THE ENGINEER AND OWNER PRIOR TO ORDERING
MATERIALS. TRM TO BE COVERED WITH 6" TOPSOIL AND RESEEDED.
TRM LOCATION
(ON FLATTER DOWNSLOPE)
LEGEND
UTILITIES
EX. CULVERT (CMP)
UG ELECTRICAL LINE
UG FIBER OPTIC LINE
UG TELECOM LINE
NOTES
1. EXISTING UNDERGROUND AND OVERHEAD
PUBLIC AND PRIVATE UTILITIES AS SHOWN
ARE INDICATED ACCORDING TO THE BEST
INFORMATION AVAILABLE TO THE ENGINEER.
2. THE CONTRACTOR SHALL PROTECT ALL
EXISTING FEATURES THAT ARE NOT TO BE
REMOVED ADJACENT TO THE CONSTRUCTION
AREA INCLUDING, BUT NOT LIMITED TO,
PAVEMENT, PRIVATE FENCES, ABOVE GROUND
OR UNDERGROUND UTILITIES, STRUCTURES,
AND UNDERGROUND FOUNDATIONS. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR
ANY DAMAGE THAT SHOULD OCCUR TO ANY
ON-SITE, OFF-SITE, PUBLIC OR PRIVATE
FACILITY OR FEATURE AS A RESULT OF THE
CONSTRUCTION PROCESS FOR THIS PROJECT.
3. EXISTING SIDEWALKS AND DRIVEWAY SLABS
SHALL BE REMOVED TO THE NEAREST FULL
JOINT.
4. CONTRACTOR SHALL COORDINATE ALL
CONSTRUCTION NEEDS IMPACTING ACCESS
TO EXISTING BUILDINGS PRIOR TO CLOSING.
FENCING AND SIGNAGE DIRECTING
PEDESTRIAN TRAFFIC TO DESIGNATED SHALL
BE REQUIRED DURING CONSTRUCTION.
5. NEW HYDRONIC PIPING AND INSULATION
UNDER EX. PAVERS CANNOT BE REMOVED.
USE CAUTION AND PROVIDE SUPPORT WHEN
POTHOLING UNDER AND EXCAVATING NEAR.
SEE SD01 FOR POTHOLING OF EXISTING
UTILITIES FOR BID ALTERNATIVE STORM
SEWER FOR ADDITIONAL INFORMATION.
6. SEE NOTES SHEET FOR SURVEYING AND
RESTORATION REQUIREMENTS.
7. DIGITAL SURVEY INFORMATION FOR TARGET
RESTORATION GRADING CAN BE PROVIDED AT
THE REQUEST OF THE CONTRACTOR.
FINISH GRADE SURFACE
WASHOUT SURFACE
EX. UPRR ROW
EXTEND TRM UNDER
ENERGY DISSIPATER
PROPOSED
GRADE
EXISTING
GRADE
PROPOSED
STORM SEWER
RESTORE AREA
(APPROX 5,500 SY)
TO CONTOUR
ELEVATIONS SHOWN
APPROVED
Oct. 03 2025
D D
' (V
AR
IE
S)
2-L
AY
ER
S
D (M
IN
RE: GRADING
PLAN
8'
PRECAST
FLARED
END SECTION
TRM MAT UNDER
RIPRAP
(TYP.)
CULVERT OUTFALL ENERGY DISSIPATER DETAIL
RIPRAP (TYP.)
SEE TABLE R.1
FOR d-50 CLASS
SEE PROFILE
FOR INVERT
5' 6' 5' 8'
1'
MI
N.
3-LAYERS
EXTEND (ALL SIDES)
TRM MAT 4' MIN. PAST
EDGE OR RIPRAP
(TYP.)
C O
N
ST
R U
C
TI
O N
D
ET
AI
LS
N/A N/A
DT01
PR
EP
AR
ED
F O
R
JOB NUMBER
SHEET NUMBER
SHEETSOF
D
AT
E
SU
BM
IT
TE
D
Th e en gi ne er p re pa rin g th es e pl an s w ill no t b e re sp on si bl e fo r, or li ab le fo r, un au th or iz ed c ha ng es to o r u se s of th es e pl an s.
A ll ch an ge s to th e pl an s m us t b e in w rit in g an d m us t b e ap pr ov ed b y th e pr ep ar er o f t he se p la ns
NO
BY
DA
TE
CAUTION
RE
VI
SI
O
NS
VERTICAL:
HORIZONTAL:
SCALE
1807 Capitol Avenue Suite 108
Cheyenne, WY 82001
(307) 514-1012
CivilWorxeng.com
C H
R
IS
TE
N
SE
N
R O
AD
D
ET
EN
TI
O
N E
R O
SI
O
N M
IT
IG
AT
IO
N P
LA
N
S
C25016
C
IT
Y O
F C
H
EY
EN
N
E 9/
/2
CONSTRUCTION
DOCUMENTS
CW
X 8/
/2
CI
TY
C O
M M
EN
TS
D
ES
IG
N
RE
FI
NE
M
EN
TS
CW
X 9/
/2
CI
TY
C O
M M
EN
TS
FI
NA
L
RE
FI
NE
M
EN
TS
APPROVED
Oct. 03 2025
1:46:32 PM
Docusign Envelope ID: 4DC64629-C25C-486F-928B-FAD0BFDE5047
AutoCAD SHX Text
NOT TO SCALE
| KellyHafner | D:\Civilworx\CivilWorx Dropbox\CivilWorx\Projects\2025\C25016 - Lowes Detention Restoration\04_Drawings\AutoCAD\Construction Sheets\DT_Details Sheet 25016.dwg | 9/25/2025 2:39 PM |KellyHafner | D:\Civilworx\CivilWorx Dropbox\CivilWorx\Projects\2025\C25016 - Lowes Detention Restoration\04_Drawings\AutoCAD\Construction Sheets\DT_Details Sheet 25016.dwg | 9/25/2025 2:39 PM | | D:\Civilworx\CivilWorx Dropbox\CivilWorx\Projects\2025\C25016 - Lowes Detention Restoration\04_Drawings\AutoCAD\Construction Sheets\DT_Details Sheet 25016.dwg | 9/25/2025 2:39 PM |D:\Civilworx\CivilWorx Dropbox\CivilWorx\Projects\2025\C25016 - Lowes Detention Restoration\04_Drawings\AutoCAD\Construction Sheets\DT_Details Sheet 25016.dwg | 9/25/2025 2:39 PM | | 9/25/2025 2:39 PM |9/25/2025 2:39 PM | |
C O
N
ST
R U
C
TI
O N
D
ET
AI
LS
N/A N/A
DT02
PR
EP
AR
ED
F O
R
JOB NUMBER
SHEET NUMBER
SHEETSOF
D
AT
E
SU
BM
IT
TE
D
Th e en gi ne er p re pa rin g th es e pl an s w ill no t b e re sp on si bl e fo r, or li ab le fo r, un au th or iz ed c ha ng es to o r u se s of th es e pl an s.
A ll ch an ge s to th e pl an s m us t b e in w rit in g an d m us t b e ap pr ov ed b y th e pr ep ar er o f t he se p la ns
NO
BY
DA
TE
CAUTION
RE
VI
SI
O
NS
VERTICAL:
HORIZONTAL:
SCALE
1807 Capitol Avenue Suite 108
Cheyenne, WY 82001
(307) 514-1012
CivilWorxeng.com
C H
R
IS
TE
N
SE
N
R O
AD
D
ET
EN
TI
O
N E
R O
SI
O
N M
IT
IG
AT
IO
N P
LA
N
S
C25016
C
IT
Y O
F C
H
EY
EN
N
E 9/
/2
CONSTRUCTION
DOCUMENTS
CW
X 8/
/2
CI
TY
C O
M M
EN
TS
D
ES
IG
N
RE
FI
NE
M
EN
TS
CW
X 9/
/2
CI
TY
C O
M M
EN
TS
FI
NA
L
RE
FI
NE
M
EN
TS
APPROVED
Oct. 03 2025
1:46:33 PM
Docusign Envelope ID: 4DC64629-C25C-486F-928B-FAD0BFDE5047
| KellyHafner | D:\Civilworx\CivilWorx Dropbox\CivilWorx\Projects\2025\C25016 - Lowes Detention Restoration\04_Drawings\AutoCAD\Construction Sheets\DT_Details Sheet 25016.dwg | 9/16/2025 3:17 PM |KellyHafner | D:\Civilworx\CivilWorx Dropbox\CivilWorx\Projects\2025\C25016 - Lowes Detention Restoration\04_Drawings\AutoCAD\Construction Sheets\DT_Details Sheet 25016.dwg | 9/16/2025 3:17 PM | | D:\Civilworx\CivilWorx Dropbox\CivilWorx\Projects\2025\C25016 - Lowes Detention Restoration\04_Drawings\AutoCAD\Construction Sheets\DT_Details Sheet 25016.dwg | 9/16/2025 3:17 PM |D:\Civilworx\CivilWorx Dropbox\CivilWorx\Projects\2025\C25016 - Lowes Detention Restoration\04_Drawings\AutoCAD\Construction Sheets\DT_Details Sheet 25016.dwg | 9/16/2025 3:17 PM | | 9/16/2025 3:17 PM |9/16/2025 3:17 PM | |
| 2025-11-03T13:04:07-0800 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .