S-2-26_PLANS.pdf
PDF 37 MB Posted
- Attached to
- Cheyenne Depot Renovation
- Solicitation number
- S-2-26
- Issued by
- Natrona County, Wyoming
About this file
This file contains comprehensive construction plans and specifications for the Cheyenne Depot Renovation project at 121 West 15th Street in Cheyenne, Wyoming, involving multiple agencies including the City of Cheyenne Community Recreation & Events and the Cheyenne Depot Museum. The project encompasses renovation of portions of the Second and Third Levels and exterior improvements to the Historic Union Pacific Depot building, with work including selective demolition, site work, historic stone masonry repairs and treatment, historic wood window restoration, new shade structure installation, interior renovations, electrical and mechanical updates, and related construction activities. The plans are dated July 31, 2025, and include detailed architectural, civil, structural, mechanical, electrical, and fire protection drawings prepared by The Design Studio Inc. and various engineering consultants.
The project involves extensive exterior masonry restoration with specific treatments for red sandstone including consolidant application, micro injection grout, repointing, and patching compound application, along with window restoration including new copper sill and transom coverings. Interior work includes office space reconfigurations, new flooring, lighting upgrades to LED fixtures, HVAC modifications, and fire protection system updates. A new steel shade structure with aluminum panels will be constructed in the depot plaza area, along with new brick paver installation in a railroad track pattern and concrete repairs. The plans specify compliance with various building codes including the 2021 International Building Code and 2023 National Electrical Code, and include detailed specifications for materials, installation methods, and quality control requirements for this historic preservation project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Cheyenne_Depot_Renovation.pdf | ||
| S-2-26_SPECS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
A
B
C
D
E
F
G
H
I
J
K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
NOTE:
THE ORIGINAL DRAWINGS FOR THIS PROJECT ARE 36" X 24". IF YOU HAVE A
SMALLER SET, IT HAS BEEN REDUCED AND DRAWING SCALES ARE NOT VALID.
Set Number:Project Number:
Date:
T h e D e si g n
S tu d io in c
A rc h it e ct u re
In te ri o r
D e si g n P io n e e r
A v e n u e C h e y e n n e W y o m in g
T
.7
.9
W t d s i.
s
25.2.468
2025.07.31
C H
E Y
E N
N E
D E
P O
T R
E N
O V
A T
IO
N
S
W
E S
T
T
H S
T R
E E
T
G-001 GENERAL INFORMATION SHEET
G-002 GENERAL COORDINATION DETAILS
GENERAL
SHEET INDEX:
CIVIL
A-110 ARCHITECTURAL SITE PLAN - DEMOLITION
A-111 ARCHITECTURAL SITE PLAN - NEW
A-113 SHADE STRUCTURE PLANS
A-142 SECOND LEVEL FLOOR PLANS
A-143 THIRD LEVEL FLOOR PLANS
A-191 ROOM FINISH PLANS
A-192 SECOND LEVEL REFLECTED CEILING PLANS
A-193 THIRD LEVEL REFLECTED CEILING PLANS
A-201 INTERIOR ELEVATIONS, DOORS, AND WINDOWS
A-211 EXTERIOR ELEVATIONS - WINDOWS NORTH & EAST
A-212 EXTERIOR ELEVATIONS - NORTH WINDOW NOTES
A-213 EXTERIOR ELEVATIONS - EAST WINDOW NOTES
A-214 EXTERIOR ELEVATIONS - WINDOWS SOUTH & WEST
A-215 EXTERIOR ELEVATIONS - SOUTH WINDOW NOTES
A-216 EXTERIOR ELEVATIONS - WEST WINDOW NOTES
A-230 EXTERIOR ELEVATIONS - MASONRY
A-231 EXTERIOR ELEVATIONS - EAST MASONRY
A-232 EXTERIOR ELEVATIONS - EAST MASONRY
A-233 EXTERIOR ELEVATIONS - NORTH MASONRY
A-234 EXTERIOR ELEVATIONS - NORTH MASONRY
A-235 EXTERIOR ELEVATIONS - NORTH MASONRY
ARCHITECTURAL
ELECTRICALSTRUCTURAL
C-101 CIVIL SITE PLAN
C-200 CIVIL CONCRETE REPAIR
C-201 CIVIL CONCRETE REPAIR
E-100 SITE LIGHTING, LEGEND AND SHEET INDEX
E-200 2ND FLOOR LIGHTING DEMO AND REMODEL PLANS
E-201 3RD FLOOR DEMOLITION AND REMODEL POWER PLANS
E-202 LIGHTING DETAILS AND SCHEDULES
E-300 2ND FLOOR POWER DEMOLITION AND REMODEL
E-301 3RD FLOOR DEMOLITION AND REMODEL POWER PLANS
S-001 STRUCTURAL NOTES
S-002 STRUCTURAL NOTES & QA/QC
S-100 FOUNDATION AND FRAMING PLANS
S-200 STRUCTURAL DETAILS
MECHANICAL
F-131 FIRE PROTECTION PLAN
M-001 MECHANICAL NOTES, LEGEND, & SCHEDULES
M-132 2ND LEVEL MECHANICAL PLAN
M-133 3RD LEVEL MECHANICAL PLAN
M-501 MECHANICAL DETAILS
A-236 EXTERIOR ELEVATIONS - NORTH MASONRY
A-237 EXTERIOR ELEVATIONS - NORTH MASONRY
A-238 EXTERIOR ELEVATIONS - NORTH MASONRY
A-239 EXTERIOR ELEVATIONS - NORTH MASONRY
A-240 EXTERIOR ELEVATIONS - NORTH MASONRY
A-241 EXTERIOR ELEVATIONS - NORTH MASONRY
A-242 EXTERIOR ELEVATIONS - SOUTH MASONRY
A-243 EXTERIOR ELEVATIONS - SOUTH MASONRY
A-244 EXTERIOR ELEVATIONS - SOUTH MASONRY
A-245 EXTERIOR ELEVATIONS - SOUTH MASONRY
A-246 EXTERIOR ELEVATIONS - SOUTH MASONRY
A-247 EXTERIOR ELEVATIONS - SOUTH MASONRY
A-248 EXTERIOR ELEVATIONS - SOUTH MASONRY
A-249 EXTERIOR ELEVATIONS - SOUTH MASONRY
A-250 EXTERIOR ELEVATIONS - WEST MASONRY
A-251 EXTERIOR ELEVATIONS - EAST MASONRY TOWER
A-252 EXTERIOR ELEVATIONS - NORTH MASONRY TOWER
A-253 EXTERIOR ELEVATIONS - SOUTH MASONRY TOWER
A-254 EXTERIOR ELEVATIONS - WEST MASONRY TOWER
A-441 LADDER ENLARGED PLANS & SECTIONS
ONE CALL OF
WYOMING
1.800.849.2476
R O
A D
DELL RANGE
C A
R
EY
AVEN
U
E
COLLEGE DRIVE
LINCOLNWAY
MISSILE
NATIONWAY
RANDALL
STOREY BLVD
E. CARLSON
C
EN
TR
AL
Y E
L L O
W S
T O
N E
WESTERN HILLS
BOULEVARD
E D
U C
A T
IO
N
D R
P O
W D
E R
H O
U S
E R
D
PERSHING BOULEVARD
W I N
D M
IL
L
C O
N V
E R
S E
A V
E N
U E
FOUR MILE ROAD
C O
L L E
G E
S
D R
IV
E
R
ID
G E
R O
A D
N C
O L L E
G E
D R
IV
E
PIO
N
EER
AV
E.
R O
A D
BOULEVARD
AVENUE
AV
EN
U E
DRIVE
CAMPSTOOL
P A
R S
L E
Y B
L V
D
W A
L T
E R
S C
H E
ID
B
O U
L E
V A
R D
W A
R R
E N
A V
E N
U E
M A
X W
E L L A
V E
N U
E
EV
EN
S
AV
EN
U E
CHEYENNE, WYOMING
NOT TO SCALE
GENERAL NOTES:
1. THE ARCHITECT AND ENGINEERS HAVE ENDEAVORED TO LOCATE AND SHOW
ALL SIGNIFICANT FEATURES WITHIN THE GENERAL PROJECT LIMITS. IT SHALL
BE THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY EXISTING
CONDITIONS. NO ADDITIONAL COMPENSATION OR TIME WILL BE ALLOWED FOR
CLAIMS OF ADDITIONAL WORK DUE TO ITEMS NOT SHOWN ON THE DRAWINGS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL LABOR,
MATERIALS AND EQUIPMENT FOR A COMPLETE PROJECT FOR ALL WORK
REASONABLY INFERRED, FROM THE CONTRACT DOCUMENTS, WHETHER
SHOWN OR SPECIFIED OR NOT.
2. DIMENSIONS ARE GIVEN TO:
a. COLUMN LINES;
b. STRUCTURAL LINES;
c. FACE OF CONCRETE OR MASONRY WALLS;
d. FACE OF STUDS:
• NORTH FACE;
• WEST FACE.
3. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF CITY OF CHEYENNE
AMENDMENTS TO SOME OR ALL OF THE FOLLOWING:
a. CHEYENNE CITY CODE.
b. ZONING CODE: CHEYENNE UNIFIED DEVELOPMENT CODE.
c. THE CITY OF CHEYENNE & BOARD OF PUBLIC UTILITIES SPECIFICATIONS
AND STANDARD DRAWINGS, MOST RECENT EDITION.
d. NFPA 101 - LIFE SAFETY CODE, 2021
e. ICC (IFC) - INTERNATIONAL FIRE CODE, 2021; INCLUDING APPENDIX D, APPENDIX E, APPENDIX F, AND APPENDIX G.
f. ICC (IBC) - INTERNATIONAL BUILDING CODE, 2021.
g. ICC (IEBC) - INTERNATIONAL EXISTING BUILDING CODE, 2021.
h. ICC (IRC) - INTERNATIONAL RESIDENTIAL CODE, 2021.
i. ICC (IPC) - INTERNATIONAL PLUMBING CODE, 2021.
j. ICC (IMC) - INTERNATIONAL MECHANICAL CODE, 2021.
k. ICC (IFGC) - INTERNATIONAL FUEL GAS CODE, 2021.
l. ICC (IPMC) - INTERNATIONAL PROPERTY MAINTENANCE CODE, 2021.
m. ICC (IECC) - INTERNATIONAL ENERGY CONSERVATION CODE, 2021.
n. NFPA 70 - NATIONAL ELECTRICAL CODE, 2023.
o. ICC A117.1-2009 - ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES.
4. BUILDING DESIGN INFORMATION:
a. ULTIMATE DESIGN WIND SPEED: THERE ARE FOUR LEVELS OF WIND SPEED
DEPENDING ON THE RISK CATEGORY OF THE BUILDING. THE MAJORITY OF
BUILDINGS WILL BE IN RISK CATEGORY II WITH A WIND SPEED OF 115 MPH;
WIND EXPOSURE CATEGORY C
b. SEISMIC DESIGN CATEGORY: B
c. ANNUAL RAINFALL: 15 INCHES/YEAR
d. HAIL: MODERATE
e. SNOW LOAD: 30 PSF - GROUND; INCLUDES NO SNOWDRIFT
f. FROST LINE DEPTH: 36" - MINIMUM FOR FOUNDATIONS
g. CLIMATE ZONE: 6B
h. TERMITE: SLIGHT TO MODERATE
i. WINTER DESIGN TEMP: -1 DEGREE F; 7381 HEATING DEGREE DAYS
j. WEATHERING: SEVERE
k. DECAY: NONE TO SLIGHT
l. AND OTHER REQUIREMENTS OF THE AUTHORITIES HAVING JURISDICTION
OVER THE PROJECT.
5. GENERALLY, TYPICAL NOTES, DIMENSIONS, ELEVATIONS, ETC. ARE SHOWN OR
NOTED ON THE FIRST DRAWING ON WHICH THEY APPEAR.
6. DO NOT SCALE DRAWINGS.
NORTH ARROW
A101
SIM
A101
A101
Ref
1R e f
1 R e f
Ref
BUILDING SECTION
SECTION
NUMBER
SHEET
WHERE
DRAWN
SECTION NUMBER
SHEET WHERE
DRAWN
WALL SECTION
SECTION NUMBER
SHEET WHERE DRAWN
DETAIL
SHEET WHERE DRAWN
INTERIOR ELEVATION
SHEET WHERE DRAWN
EXTERIOR ELEVATION
VERTICAL ELEVATION
EXISTING STRUCTURAL GRIDA
NEW STRUCTURAL GRIDAA
WALL TYPE
ROOM DESIGNATION
WINDOW NUMBER
DOOR NUMBER
KEYNOTE (LEADER OPTIONAL)
REVISION
REVISION NUMBER
REVISION AREA
DRAWING IDENTIFICATION
PLAN, SECTION, ELEVATION,
OR DETAIL NUMBER
SCALE
SHEET LOCATION
K1 VIEW NAME
1/8" = 1'-0" A-101
A
TYPICAL SYMBOLS
1 Ref
R e f
R e f
1 Ref
1t
Name
150 SF
Name
Elevation
A101
SIM
A101
A101 x MATERIAL FINISH TAG
EARTH
SAND/MORTAR/PLASTER
PLYWOOD
GRAVEL/AGGREGATE WOOD
CONCRETE
BATT INSULATION
BRICK
RIGID INSULATION
CONCRETE MASONRY UNITS
(CMU'S) SMALL SCALE
GYPSUM BOARD
STEEL
WOOD FRAMING
(THROUGH MEMBER)
WOOD FRAMING
(INTERRUPTED MEMBER)
ASPHALTIC CONCRETE PAVING
STONE
FOAMED-IN-PLACE INSULATION
MATERIAL INDICATIONS
C -1
LIC
E
N S
E D
A R
C H
IT
E
C T
RAN
D
Y L
B
Y E
R S
S T
A T
E O
F W
Y O
M
IN
G
D a te
APN: Date Issued:
Drawn By: Checked By:
Sheet Title:
Sheet Number:
T D S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A
B
C
D
E
F
G
H
I
J
K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
T h e D e si g n
S tu d io in c
A rc h it e c tu
I n te ri o r D e si g n
P io n e e r
A v e n u e
C h e y e n n e
W y o m in g
T
.7
.9 t d s i.
NOTE: THE ORIGINAL DRAWINGS FOR THIS PROJECT ARE 36" X 24". IF YOU HAVE A SMALLER SET, IT HAS BEEN
REDUCED AND DRAWING SCALES ARE NOT VALID.
i
/3
/2
:2 :5
P
M
G-001
GENERAL
INFORMATION
SHEET
WZB RLB
25.2.468 2025.07.31
.0
.3
C D
C H
E Y
E N
N E
D E
P O
T R
E N
O V
A T
IO
N
S
W
E S
T
T
H S
T R
E E
T
DESIGN TEAM
DRAWING NUMBERING
DISCIPLINE DESIGNATORS
G - General E - Electrical C - Civil T - Technology S - Structural FS - Foodservice A - Architectural AV - Audio Visual P - Plumbing PE - Performance Equipment M - Mechanical
SHEET TYPE DESIGNATORS
0 General (symbols legend, notes, etc.)
1 Plans (horizontal views) 2 Elevations (vertical views) 3 Sections (sectional views) 4 Large Scale Views (plans, elevations, or sections that are not details) 5 Details 6 Schedules and Diagrams 7 User Defined 8 User Defined 9 3D Representations (isometrics, perspectives, photographs)
WORK DESIGNATORS
Plans Elevations Sections 0 Default 1 Site Exterior Building 2 Demolition Interior Wall 3 Floor Plans 4 Reflected Ceiling Plans 5 ?
6 ?
7 Roof Plans 8 ?
9 Finish Plans
LEVEL DESIGNATORS / SHEET NUMBERS IN SEQUENCE
Plans Elevations Sections 0 Basement 0 0 1 First Floor 1 1 2 Second Floor 2 2 3 Third Floor 3 3 etc. etc. etc. etc.
OWNER:
City of Cheyenne Community Recreation & Events 2101 O'Neil Avenue Cheyenne, Wyoming 82001
t) 307.638.4375 Director:
Jason Sanchez
e) jsanchez@cheyennecity.org
Cheyenne Depot Musem 121 West 15th Street Cheyenne, Wyoming 82001
Director:
Christy McCarthy
e) christy@cheyennedepotmuseum.org
ARCHITECT:
TDSi - The Design Studio, inc.
Architecture + Interior Design 1610 Pioneer Avenue Cheyenne, Wyoming 82001
t) 307.775.9970
Principal in Charge:
Randy Byers, AIA, LEED AP
e) randy@tdsi.us Project Manager:
Will Byers, Associate AIA
e) will@tdsi.us
CIVIL ENGINEER:
Theena Engineering PO Box 20083 Cheyenne, WY 82003
t) 307.274.8929
President, Civil Engineer:
Darci Hendon, PE
e) darci@theenaeng.com
STRUCTURAL ENGINEER:
Martin/Martin Wyoming 6523 Yellowstone Road, Suite 200 Cheyenne, Wyoming 82009
t) 307.637.8422 ext.124
Structural Engineer, Associate:
Jera Likely
e) jlikely@mmwyo.com
MECHANICAL ENGINEER:
Design Point Engineering 1623 Central Avenue #29 Cheyenne, Wyoming 82001-4368
t) 307.222.9375 19 Old Town Square, #238 Ft. Collins, Colorado 80524
t) 970.430.5783
w) www.designpointengineering.com
President Justin Montgomery, PE, LEED AP
e) jmontgomery@designpointengineering.com
ELECTRICAL ENGINEER:
Gust Engineering 3612 Pioneer Avenue Cheyenne, Wyoming 82001
t) 307.638.2511
President, Electrical Engineer Mike Gust, PE
e) mgust@gustengineering.com
VICINITY MAP
PROJECT SITE:
121 WEST 15TH STREET
REVISION SCHEDULE
Revision Number Revision Description Revision Date
EQUAL EQUAL EQUAL
E Q
U A
L E
Q U
A L
CEILING PANEL,
TYPICAL
SUSPENDED
GRID, TYPICAL
EQUALEQUAL
E Q
U A
L E
Q U
A L
E Q
U A
L E
Q U
A L
EQUALEQUAL
E Q
U A
L E
Q U
A L
EQUALEQUAL
E Q
U A
L E
Q U
A L
EQEQ
CEILING DETAILS LEGEND
SPEAKER OR
OTHER DEVICE
DIFFUSERS, GRILLES,
AND/OR LIGHT FIXTURES
SPRINKLER
HEAD
LOUVER, VENT
OR REGISTER
CL CL
LIGHT
FIXTURE
3" 3"
D7
G-002
Sim D10
G-002
Sim
METAL DOOR FRAME
DOUBLE STUDS
METAL
BORROW
LITE FRAME
ELECTRICAL LIGHT
SWITCH
3"
METAL DOOR FRAME
DOUBLE STUDS
ELECTRICAL LIGHT
SWITCH
3"
PLUMBING CLEANOUT
LOCATE SO ALL OF CLEANOUT AND
ESCUTCHEON WILL BE ABOVE BASE
CMU WALLS = 8" (NOMINAL)
OTHER WALLS = 6"
F
IN
IS
H
FLOOR DRAIN
LOCATION
1" EXPANSION JOINT
1" EXPANSION JOINT
TOP TRACK
HEADER
DOUBLE KING STUDS
CRIPPLE STUDS
NOTE:
TYPICAL AT ALL INTERIOR DOORS
AND BORROW LIGHT LOCATIONS
CEILING AS SCHEDULED.
EXPANSION JOINT CONTINUES
ABOVE CEILING. REFER TO
GYPSUM BOARD SYSTEMS
SPECIFICATION FOR LEVELS OF
FINISH ABOVE AND BELOW CEILING
SILL
1" EXPANSION JOINT
1" EXPANSION JOINT
CRIPPLE STUDS
R
IM
WALL HUNG URINAL
ADULT INSTALLATION
C L E
A R
SIDE FRONTADULT TOILET - ACCESSIBLE
FLOOR MOUNT - FLUSH VALVE TYPE
G R
A B
B A
R
40"
7" - 9"
/2
TWO-WALL GRAB BAR
42" MINIMUM
TOILET PAPER
DISPENSER
TYPICAL
S E
A T
TWO-WALL GRAB BAR
54" MINIMUM
M
A X
A N
Y O
P E
R A
B L E
P A
R T
S
M A
X
IM
U M
SOAP
DISPENSER
MIRROR
INSULATED
TRAP & WASTE
TOWEL
DISPENSER
WALL HUNG LAVATORY
WITH ACCESSORIES
A N
Y O
P E
R A
B L E
P A
R T
S
M A
X
IM
U M
FLUSH HANDLE
TO OPEN SIDE OF
COMPARTMENT
O P
E R
A B
L E
P A
R T
S
M A
X
ADULT
ACCESSIBLE LAVATORY
M
IN
SOAP DISPENSER
MIRROR
ACCESSIBLE LAVATORY,
REFER TO PLUMBING
TOWEL
DISPENSER
24" 16" to 18"
M A
X
IM
U M
SIDE FRONTADULT TOILET - ACCESSIBLE
WALL MOUNT - FLUSH VALVE TYPE
40"
" 4
42"
7" - 9"
/2
C -1
LIC
E
N S
E D
A R
C H
IT
E
C T
RAN
D
Y L
B
Y E
R S
S T
A T
E O
F W
Y O
M
IN
G
D a te
APN: Date Issued:
Drawn By: Checked By:
Sheet Title:
Sheet Number:
T D S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A
B
C
D
E
F
G
H
I
J
K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
T h e D e si g n
S tu d io in c
A rc h it e c te ri o r D e si g n
P io n e e r
A v e n u e
C h e y e n n e
W y o m in g
T
.7
.9 t d s i.
NOTE: THE ORIGINAL DRAWINGS FOR THIS PROJECT ARE 36" X 24". IF YOU HAVE A SMALLER SET, IT HAS BEEN
REDUCED AND DRAWING SCALES ARE NOT VALID.
i
/3
/2
:2 :5
P
M
G-002
GENERAL
COORDINATION
DETAILS
25.2.468 2025.07.31
.0
.3
C D
C H
E Y
E N
N E
D E
P O
T R
E N
O V
A T
IO
N
S
W
E S
T
T
H S
T R
E E
T
1/2" = 1'-0" G-002
B1 CEILING DETAILS
1/4" = 1'-0" G-002
D1 DOOR EQUIPMENT DETAILS
1/4" = 1'-0" G-002
D4 DOOR SWITCH DETAILS
1 1/2" = 1'-0" G-002
D7 ENLARGED DOOR SWITCH DETAIL 1
1 1/2" = 1'-0" G-002
D10 ENLARGED DOOR SWITCH DETAIL 2
1/2" = 1'-0" G-002
F9 RESTROOM CLEANOUT LOCATION
GENERAL NOTES:
1. DETAILS ON THIS PAGE INDICATE CERTAIN COORDINATION ITEMS THAT ARE
THE RESPONSIBILITY OF MULTIPLE CONTRACTORS.
2. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT
THE WORK OF THE VARIOUS TRADES COMPLY WITH THESE DETAILS.
1/2" = 1'-0" G-002
F10 RESTROOM FLOOR DRAIN LOCATION
1 1/2" = 1'-0" G-002
K9 INTERIOR EXPANSION JOINT DETAIL 2D
1/2" = 1'-0" G-002
K1 TYPICAL - RESTROOM ELEVATIONS
1/2" = 1'-0" G-002
F1 TYPICAL MOUNTING HEIGHTS
1/2" = 1'-0" G-002
I4 ADULT, ACCESSIBLE, WALL MOUNT, FLUSH VALVE TYPE
N
0 20 40
APN: Date Issued:
Drawn By: Checked By:
Sheet Title:
Sheet Number:
TD
S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A
B
C
D
E
F
G
H
I
J
K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Th e
D es ig n
St ud io , i nc
$U ch ite ct uU e nt eU io
U D es ig n
P io ne er
A ve nu e, C he ye nn e, W yo m in g
T
| 3
.7
.9 td si
.u
NOTE: THE ORIGINAL DRAWINGS FOR THIS PROJECT ARE 36" X 24". IF YOU HAVE A SMALLER SET, IT HAS BEEN
REDUCED AND DRAWING SCALES ARE NOT VALID.
i
C-101
CIVIL
SITE PLAN
DMH .
25.2.468 2025.07.31
PO
B
OX
C
HE
YE
NN
E, W
Y
7.2
.89
C
AP
IT
AL
A
VE
N U
E
PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES, THE CONTRACTOR SHALL SUBMIT TO THE WYOMING DEPARTMENT OF ENVIRONMENTAL QUALITY (WDEQ) A "NOTICE OF INTENT" (NOI) FOR COVERAGE UNDER THE STATE'S GENERAL NPDES PERMIT FOR STORM WATER DISCHARGE FROM CONSTRUCTION SITES. IN ACCORDANCE WITH THIS PERMIT, THE CONTRACTOR SHALL DEVELOP A POLLUTION PREVENTION PLAN UTILIZING BEST MANAGEMENT PRACTICES (BMP) BEFORE SUBMITTING THE NOI TO THE WDEQ. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING STORM WATER CONTROL PERMITS, AND FOR PREPARING AND MAINTAINING A STORM WATER MANAGEMENT PLAN. THE CONTRACTOR SHALL CONTROL STORM WATER RUNOFF AND DUST, AND PREVENT TRACKING OF MUD DURING ALL CONSTRUCTION ACTIVITIES PER STATE AND FEDERAL REQUIREMENTS THROUGHOUT THE CONSTRUCTION SITE AND UNTIL RE-VEGETATION HAS BEEN RE-ESTABLISHED. THE CONTRACTOR IS RESPONSIBLE FOR CONTINUOUS SEDIMENT AND EROSION CONTROL MAINTENANCE AND FULL REHABILITATION OF ALL DAMAGED IMPROVEMENTS, INCLUDING CULVERTS, TO ORIGINAL OR
BETTER CONDITIONS.
THE CONTRACTOR SHALL NOTIFY THE CITY OF CHEYENNE AT LEAST TWO (2) WORKING DAYS PRIOR TO START OF ANY EARTH DISTURBING ACTIVITY, OR CONSTRUCTION ACTIVITY ON ANY AND ALL PUBLIC IMPROVEMENTS. ALL SUBSEQUENT INSPECTIONS REQUIRE THE SAME 24 HOUR ADVANCE NOTICE. THERE SHALL BE NO WORK WITHIN THE PUBLIC RIGHT-OF-WAY ON SATURDAYS, SUNDAYS, OR HOLIDAYS UNLESS SPECIFICALLY APPROVED IN WRITING BY THE CITY OF CHEYENNE CONSTRUCTION SERVICES.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY, INCLUDING. BUT NOT LIMITED TO, EXCAVATION, TRENCHING, SHORING, TRAFFIC CONTROL AND SECURITY. THE CITY OF CHEYENNE AND THE ENGINEER EXERCISE NO CONTROL OF THE SAFETY OR ADEQUACY OF ANY EQUIPMENT, BUILDING COMPONENTS, SCAFFOLDING, FORMS, OR OTHER WORK AIDS USED IN OR ABOUT THE
PROJECT, OR IN SUPERVISION OF THE SAME
THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL UTILITIES DURING CONSTRUCTION AND FOR COORDINATING WITH THE
APPROPRIATE UTILITY CROSSING REQUIRED.
UPON COMPLETION OF CONSTRUCTION, THE SITE SHALL BE CLEANED AND RESTORED TO A CONDITION EQUAL TO, OR BETTER, THAN THAT WHICH EXISTED BEFORE CONSTRUCTION, OR TO THE GRADES AND CONDITION AS REQUIRED BY THESE PLANS.
EXISTING FENCES, TREES, STREETS, SIDEWALKS, CURBS AND GUTTER, LANDSCAPING, STRUCTURES, AND IMPROVEMENTS DESTROYED, DAMAGED, OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT SHALL BE REPLACED OR RESTORED IN LIKE KIND AT
THE CONTRACTOR'S EXPENSE, UNLESS OTHERWISE INDICATED ON THESE PLANS.
AFTER FINAL ACCEPTANCE BY THE CITY OF CHEYENNE, PUBLIC IMPROVEMENTS DEPICTED IN THESE PLANS SHALL BE FREE FROM MATERIAL AND WORKMANSHIP DEFECTS FOR A PERIOD OF TWO YEARS FROM THE DATE OF ACCEPTANCE.
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF CHEYENNE AND BOARD OF PUBLIC UTILITIES CONSTRUCTION
SPECIFICATIONS AND STANDARD DETAILS, MOST CURRENT EDITION.
GENERAL CONSTRUCTION NOTES:
WEST 15th STREET
REMOVE EXISTING CONCRETE AT
JOINTS, REPLACE WITH PAVERS.
REFER TO SHEET A-111 FOR
PATTERN (3,350 SF±)
REMOVE EXISTING CONCRETE AT
JOINTS, REPLACE WITH PAVERS.
REFER TO SHEET A-111 FOR
PATTERN (1,860 SF±)
REMOVE EXISTING CONCRETE AT
JOINTS, REPLACE WITH PAVERS.
REFER TO SHEET A-111 FOR
PATTERN (6,080 SF±)
EXISTING BOLLARDS TO REMAIN (x3)
REMOVE AND REPLACE EXISTING STAIRS
REMOVE AND REPLACE EXISTING STAIRS
1. FOR ALL AREAS WITHIN THE PLAZA THAT WILL NOT HAVE CONCRETE REMOVED AND REPLACED: CONTRACTOR SHALL REMOVE
ALL EXISTING PAINT AND SEALANT BY POWER WASHING.
2. THERE ARE SEVERAL CONCRETE PLANTERS WITHIN THE PLAZA. CONTRACTOR SHALL MOVE ANY PLANTERS WHICH WILL IMPACT THEIR WORK, AND RESET THOSE PLANTERS FOLLOWING CONSTRUCTION. THERE ARE 22 TOTAL PLANTERS, SOME 6' DIAMETER
AND SOME 4' DIAMETER.
3. CONTRACTOR SHALL CLEAN AND RESEAL ALL CONCRETE JOINTS WITHIN THE PLAZA AREA DEFINED BY THESE CONSTRUCTION DOCUMENTS. THIS INCLUDES ALL JOINTS ALONG THE PERIMETER OF THE PLAZA, ADJACENT TO WALLS, CURBS AND/OR STEPS.
4. CONTRACTOR SHALL CLEAN OUT ALL 3 STORM SEWER TRENCH DRAINS WITHIN DEPOT PLAZA BY REMOVING THE GRATE, CLEANING OUT ALL DEBRIS WITHIN THE TRENCH DRAIN, JETTING THE OUTLET, AND REPLACING THE GRATE.
5. COMPETE CONCRETE AND BRICK REPAIRS AS SHOWN ON SHEET C-201.
SCOPE OF WORK
EXISTING SLOTTED DRAIN SHALL BE TAPED
OFF DURING CONSTRUCTION TO PREVENT
DEBRIS FROM GETTING IN DRAIN.
CONTRACTOR TO CLEAN OUT SLOTTED
DRAIN AFTER NEW CONCRETE IS PLACED.
EXISTING SLOTTED DRAIN SHALL BE TAPED
OFF DURING CONSTRUCTION TO PREVENT
DEBRIS FROM GETTING IN DRAIN.
CONTRACTOR TO CLEAN OUT SLOTTED
DRAIN AFTER NEW CONCRETE IS PLACED.
EXISTING SLOTTED DRAIN SHALL BE TAPED
OFF DURING CONSTRUCTION TO PREVENT
DEBRIS FROM GETTING IN DRAIN.
CONTRACTOR TO CLEAN OUT SLOTTED
DRAIN AFTER NEW CONCRETE IS PLACED.
SHADE STRUCTURE SUPPORT, SEE STRUCTURAL DRAWINGS (TYP x 5)
SAWCUT ON DIAGONAL
(NOT ON JOINT) TO R&R
DAMAGED CONCRETE AT
END OF TRENCH DRAIN
LEGEND
EXISTING BOLLARD COVERTS TO REMAIN (x3)
CONCRETE JOINTS (TYP)
REMOVE AND REPLACE STONE, CROSS SLOPE EXCEEDS 2%
TYPICAL ALL CONCRETE THAT IS TO
REMAIN: REMOVE ALL EXISTING PAINT
TYPICAL ALL CONCRETE THAT
IS TO REMAIN: REMOVE ALL
EXISTING PAINT
STAGE AREA AND STEP TO BE REMOVED AND REPLACED
TO ACCOMMODATE SHADE STRUCTURE FOUNDATION.
REPLACE WITH 4" CONCRETE ON 4" CRUSHED BASE.
COMPACTION TEST REQUIRED ON CRUSHED BASE.
.80
REMOVE AND REPLACE CONCRETE TO
NEAREST JOINT. SEE SHEET C-201. (TYP)
REMOVE AND REPLACE CONCRETE TO
NEAREST JOINT. SEE SHEET C-201. (TYP)
STAIRS: 2 RISERS, EACH 5.5"
SEE SHEET C-200
7-23-2025
ALL CONCRETE SHALL BE 4500 PSI, FIBER REINFORCED.
CONCRETE NOTE:
REMOVE AND REPLACE CONCRETE TO
NEAREST JOINT. SEE SHEET C-201. (TYP)
REMOVE AND REPLACE CONCRETE
GUTTER. REPLACE WITH PAVERS (122 SF±)
C H
EY
EN
N E
D
EP
O T
R
EN
O
VA
TI
O
N S:
W
ES
T
TH
S
TR
EE
T
6066.25 NOSE
6066.27
6066.62 NOSE
6066.63
6066.99 NOSE
.00
6065.90
6065.85 1.5%
.83 N
OSE60
.31 N
OSE
6066.83 NOSE
6066.31 NOSE
.31 N
OSE
.83
N
OSE
1.9%
1.9%
1.5%
1.1%
1.1%
.94
TOC
6066.37 TOC
6065.85±(EXISTING)
6066.37 TOC
6065.85±(EXISTING)
6066.37 TOC
6065.85±
(EXISTING)
NOTES:
1. STAIR FINISH SHALL BE HORIZONTAL BROOM FINISH.
2. HANDRAIL SHALL BE POWDERCOATED AND PAINTED GLOSS BLACK.
3. ALL STEEL POSTS AND HANDRAILS SHALL BE FREE FROM DENTS, SPURS,
AND SHARP EDGES AND SHALL BE INSTALLED LEVEL, PLUMB AND SQUARE.
4. CONTRACTOR MAY ALTER RAILING DESIGN AND/OR POST LOCATIONS
PROVIDED THAT ALL APPLICABLE CODES ARE MET.
5. ENSURE A MINIMUM CLEARANCE OF 1.5" BETWEEN HANDRAIL AND
ADJACENT WALL OR SURFACE.
4.
12" MIN.
24" MIN.
1-1/2" O.D. STEEL HANDRAIL
ON BOTH SIDE OF STAIRS
#4 BAR, 12" O.C. EACH WAY
#4 NOSE BAR AT
EACH TREAD FOR
WIDTH OF STAIR
4" CRUSHED BASE
3' -0
2" FULL DEPTH EXPANSION
JOINT, SEALED (TYP TOP
AND BOTTOM OF STAIRS)
POSTS TO BE SLEEVED
AND GROUTED
8"
1.0'
1.0'
1.0'
5"
STAGE CONCRETE:
4" CONCRETE ON 4"
CRUSHED BASE
PROTECT EXISTING
BRICK PAVERS
SIDEWALK:
4" CONCRETE ON
4" CRUSHED BASE
5" CONCRETE
IMPORTANT: NORTH STAIR
HAS AN ELECTRIC BOX ON
SOUTH SIDE. POST TO BE
PLACED IN THIS LOCATION
TO ENSURE ACCESS TO
ELECTRIC BOX
3"
1.5%
1.5%
1.5%
1' -9
M
IN
IMPORTANT: NORTH STAIR
HAS AN ELECTRIC BOX ON
SOUTH SIDE. MAINTAIN
1'-9" MIN. CLEARANCE TO
ALLOW DOOR TO OPEN
IMPORTANT: NORTH STAIR HAS AN ELECTRIC
BOX ON NORTH SIDE. CONSTRUCTING THIS
RAILING EXTENSION LONGER THAN 24" MAY
RESULT IN BOX DOOR BEING OBSTRUCTED
N
APN: Date Issued:
Drawn By: Checked By:
Sheet Title:
Sheet Number:
TD
S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Th e
D es ig n
St ud io , i nc
$U ch ite ct nt eU io
U D es ig n
P io ne er
A ve nu e, C he ye nn e, W yo m in g
T
| 3
.7
.9 td si
NOTE: THE ORIGINAL DRAWINGS FOR THIS PROJECT ARE 36" X 24". IF YOU HAVE A SMALLER SET, IT HAS BEEN
REDUCED AND DRAWING SCALES ARE NOT VALID.
i
CIVIL
CONCRETE
REPAIR
DMH .
2025.07.31
SECTION A-A
PO
B
OX
C
HE
YE
NN
E, W
Y
7.2
.89
25.2.468
5 0 5 10
C-200
A
B
C
D
E
F
G
H
I
J
K
A
A
STAIR
TR
EAD
= 3'-0"
8" C O
N C
R
ETE R
ESTR
AIN
IN
G
BAN
D
R
EM
AIN
D
ER
O
F STAIR
TR
EAD
TO
BE BR
IC
K
A A
6.26'±
EXISTING ELECTRICAL PANEL,
ENSURE THAT RAILING IS
CONSTRUCTED TO ALLOW ACCESS
PANEL TO SWING OPEN FREELY
SHADE STRUCTURE SUPPORT, SEE STRUCTURAL DRAWINGS (TYP x 5)
34.1'±
.0
EXISTING ELECTRICAL PANEL, ENSURE
THAT RAILING IS CONSTRUCTED PER
DETAIL TO ALLOW ACCESS PANEL TO
SWING OPEN FREELY
ELEVATIONS AND DIMENSIONS SHOWN APPLY TO BOTH STAIR LOCATIONS (SECTION A-A)
BACK OF STAGE: MATCH EXISTING TOP OF STAGE CONCRETE ~6067.0,
WHICH IS LOWER THAN TOP OF RETAINING WALL
7-23-2025
4.
4'-2" MINIMUM FROM
COLUMN TO STAIR RISER
4.25'
4'-2" MINIMUM FROM
COLUMN TO STAIR RISER
C H
EY
EN
N E
D
EP
O T
R
EN
O
VA
TI
O
N S:
W
ES
T
TH
S
TR
EE
T
B
B
SECTION B-B
1.9%
8"
BRICK PAVERS
3/4" SETTING SAND
5" SLURRY BED
2" RIGID INSULATION SPACER (TYP)
(REMOVED PRIOR TO SANDING)
2' - 4"
4" CONCRETE
4" CRUSHED BASE
1.9%
9" EXISTING
PLAZA
CONCRETE5.
5" S
TE
P
3' - 0"
5.
5"
S
TE
P
4"
NOTE:
COMPACT EXISTING SUBGRADE PRIOR TO
PLACING SLURRY BED OR CRUSHED BASE
APN: Date Issued:
Drawn By: Checked By:
Sheet Title:
Sheet Number:
TD
S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Th e
D es ig n
St ud io , i nc
$U ch ite ct nt eU io
U D es ig n
P io ne er
A ve nu e, C he ye nn e, W yo m in g
T
| 3
.7
.9 td si
NOTE: THE ORIGINAL DRAWINGS FOR THIS PROJECT ARE 36" X 24". IF YOU HAVE A SMALLER SET, IT HAS BEEN
REDUCED AND DRAWING SCALES ARE NOT VALID.
i
CIVIL
CONCRETE
REPAIR
DMH .
2025.07.31
KEY NOTES
CONCRETE SPALL REPAIR
REMOVE CONCRETE AT STAMPED "JOINT LINE"
AND REPLACE TO ADDRESS SUNKEN STONE
REMOVE AND RESET SUNKEN BRICKS AS
NEEDED. MATCH TOP OF CONCRETE ELEVATION.
REMOVE CONCRETE AT NEAREST JOINT AND
REPLACE IN ITS ENTIRETY, 4" CONCRETE ON 4"
CRUSHED BASE. EXISTING BASE MAY BE
REUSED/RECOMPACTED.
REMOVE CONCRETE THAT EXCEEDS 2% CROSS
SLOPE BY SAWCUTTING STONE WHERE
INDICATED. REPLACE WITH 4" CONCRETE ON
4" CRUSHED BASE. EXISTING BASE MAY BE
REUSED/RECOMPACTED.
REMOVE CONCRETE. REPLACE WITH PAVERS.
PO
B
OX
C
HE
YE
NN
E, W
Y
7.2
.89
25.2.468
10 0 10 20
W EST 15th STREET
STAGE AREA AND STEP TO BE REMOVED AND REPLACED
TO ACCOMMODATE SHADE STRUCTURE FOUNDATION.
REPLACE WITH 4" CONCRETE ON 4" CRUSHED BASE.
COMPACTION TEST REQUIRED ON CRUSHED BASE.
CONCRETE SPALL REPAIR
SPALL REPAIR SHALL BE DONE WITH DAYTON SUPERIOR HD 50 REPAIR MORTAR, OR
PREVIOUSLY APPROVED EQUAL.
DO NOT PROCEED WITH INSTALLATION OF SPALL REPAIR MORTAR UNDER
UNFAVORABLE WEATHER CONDITIONS, INCLUDING MOISTURE AND EXCESSIVE WIND.
INSTALL SPALL REPAIR MORTAR WHEN TEMPERATURE IS STABLE IN TEMPERATURE
RANGE RECOMMENDED BY MANUFACTURER FOR INSTALLATION.
PREPARE SURFACE BY REMOVING DETERIORATED OR CONTAMINATED CONCRETE AND
ROUGHEN AND CLEAN A SUBSTRATE TO ENHANCE BOND OF THE REPAIR MATERIAL.
CLEAN DUST AND DEBRIS FROM THE AREA TO BE REPAIRED. ENSURE AREA IS DRY
PRIOR TO INSTALLING MORTAR.
C-201
REMOVE CONCRETE, REPLACE WITH
BRICK. SEE ARCHITECTURAL DRAWINGS
FOR BRICK PATTERN/SPECIFICATIONS
EXIST. TRENCH DRAIN
EXIST. TRENCH DRAIN
EXIST. TRENCH DRAIN
7-23-2025
5 EXIST. STATUE TO REMAIN
5REMOVE AND REPLACE STAIRS (TYP). SEE SHEET C-200.
C H
EY
EN
N E
D
EP
O T
R
EN
O
VA
TI
O
N S:
W
ES
T
TH
S
TR
EE
T
6 6
REMOVE CONCRETE,
REPLACE WITH BRICK.
SEE ARCHITECTURAL
DRAWINGS FOR BRICK
PATTERN/SPECIFICATIONS
REMOVE CONCRETE,
REPLACE WITH BRICK.
SEE ARCHITECTURAL
DRAWINGS FOR BRICK
PATTERN/SPECIFICATIONS
SYMBOL DESCRIPTION
ELEVATION CALLOUT
XXX'-XX"
STEP
SLOPE
KEY NOTE
SUBGRADE
FORM SAVER
DRAWING REVISION NUMBER
CURRENT REVISION CLOUD
X
SERVICE LOAD PROVIDED
FOR SPECIALTY DESIGNER
SECTION OR
DETAIL CUT
SHEET NUMBER
GRID LINES
X
XX
ROUGHENED SURFACE,
INTENTIONALLY ROUGHEN
TO 1/4" AMPLITUDE, UNO
NOTES:
1. ITEMS NOT DESIGNED BY MARTIN/MARTIN WYOMING,INC
ARE SHOWN HALFTONED
A. ITEMS INCLUDE:
a. EXISTING CONSTRUCTION
b. PERFORMANCE SPECIFIED AND DEFERRED
SUBMITTAL ITEMS (RAILINGS, ARCHITECTURAL
METAL PANELING, ETC.)
SYMBOLS LEGEND
X'-XX" DIMENSIONS TO EXISTING
STRUCTURE, FIELD VERIFY
(ITALICS)
X'-XX"
DIMENSIONS TO NEW
STRUCTURE
1. GENERAL:
A. THE FOLLOWING PORTIONS OF THE STRUCTURAL DESIGN WILL NOT BE SUBMITTED AT THE TIME OF
PERMIT APPLICATION. WHEN RECEIVED AND REVIEWED, THESE DEFERRED SUBMITTAL ITEMS SHALL
BE SUBMITTED TO THE BUILDING OFFICIAL BY THE CONTRACTOR:
• EXCAVATION SHORING
• ARCHITECTURAL METAL SHADE PANELING
• METAL RAILINGS
• ANCHORAGE, BRACING AND ATTACHMENT OF REQUIRED ARCHITECTURAL, ELECTRICAL, AND
OTHER SYSTEMS NOT SPECIFICALLY DETAILED IN THESE DRAWINGS.
B. ALL DEFERRED SUBMITTALS TO BE ATTACHED TO PRIMARY STRUCTURE WITH A PINNED
CONNECTION. MOMENT CONNECTIONS TO PRIMARY STRUCTURE NOT PERMITTED UNLESS NOTED ON
DRAWINGS OR APPROVED BY ENGINEER IN WRITING PRIOR TO SUBMITTAL OF DRAWINGS OR
CALCULATIONS.
C. LOADING AND LOCATION FOR ATTACHMENT OF DEFERRED SUBMITTAL ITEMS ARE NOTED ON
DRAWINGS AND ARE NOT TO BE RELOCATED OR INCREASED WITHOUT WRITTEN APPROVAL.
D. SUBMIT STAMPED STRUCTURAL CALCULATIONS FOR ALL DEFERRED SUBMITTAL ITEMS PRIOR TO OR
CONCURRENTLY WITH DRAWINGS OR PRODUCT DATA. INCLUDE ANALYSIS OF ATTACHMENT TO
PRIMARY STRUCTURE. INCLUDE CURRENT ICC REPORT WITH ALL PROPRIETARY STRUCTURAL
ELEMENTS AND ANCHORS/FASTENERS.
DEFERRED SUBMITTALS
1. DESIGN CRITERIA:
A. THE GEOTECHNICAL REPORT PREPARED BY INBERG-MILLER ENGINEERS, NUMBER 24725-HX, DATED
MAY 8, 2025 PROVIDED CRITERIA FOR THE FOUNDATION DESIGN FOR THE PROJECT.
2. FOOTINGS:
A. FOOTING DESIGN CRITERIA:
• MAXIMUM TOTAL LOAD BEARING PRESSURE = 1500 PSF
• FROST DEPTH TO BOTTOM OF FOUNDATION = 36 IN
3. THE OWNER SHALL ENGAGE A QUALIFIED INSPECTION AND TESTING AGENCY TO PERFORM SPECIAL INSPECTIONS AND TESTING TO VERIFY SOIL CONDITIONS, SITE PREPARATION, SUBGRADE, AND DESIGN CRITERIA USED FOR THE DESIGN OF THE FOUNDATIONS. EOR SHALL BE NOTIFIED IF THE GEOTECHNICAL ENGINEER/ SPECIAL INSPECTOR DETERMINES THAT IN-PLACE SOILS AND/OR FILLS LESS THAN THE
ALLOWABLE BEARING PRESSURE ARE PRESENT AT THE SITE.
4. SEE GEOTECHNICAL REPORT FOR SITE PREPARATION AND EARTHWORK RECOMMENDATIONS.
5. SUBGRADES SHALL BE FREE OF ORGANIC MATERIALS, ROCKS, MOUNDS, DEBRIS, OLD FILL, AND SOFT, COMPRESSIBLE SOIL OR MATERIAL. WEAK OR YIELDING SUBGRADES SHALL BE REPAIRED AS
RECOMMENDED BY THE GEOTECHNICAL REPORT.
FOUNDATION NOTES
1. GENERAL:
A. ENGINEER: REFERENCES ON THE STRUCTURAL DRAWINGS TO ‘ENGINEER’ MEAN THE STRUCTURAL
ENGINEER OF RECORD. OTHER ENTITIES ARE SPECIFICALLY NOTED AS “CONTRACTOR’S ENGINEER”, “MECHANICAL ENGINEER”, ETC.
B. THESE NOTES SUPPLEMENT THE SPECIFICATIONS, WHICH SHALL BE REFERENCED FOR ADDITIONAL
REQUIREMENTS.
C. UNDERGROUND UTILITIES: LOCATE EXISTING UTILITIES AND NOTIFY ARCHITECT OF EXISTING
UTILITIES OR SUBGRADE CONDITIONS WHICH INTERFERE WITH WORK.
D. STRUCTURAL ELEMENTS ARE CENTERED ON GRID LINES AND GRID LINE INTERSECTIONS UNLESS
DIMENSIONED OTHERWISE.
2. USE OF DRAWINGS:
A. DO NOT SCALE DRAWINGS.
B. DETAILS ON DRAWINGS TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS.
C. DETAILS NOTED TYPICAL APPLY TO ALL SIMILAR CONDITIONS. WHERE NO SPECIFIC DETAILS ARE
SHOWN, CONSTRUCTION SHALL CONFORM TO SIMILAR WORK ELSEWHERE ON THE PROJECT.
D. WHERE DISCREPANCIES OCCUR BETWEEN PLANS, DETAILS, GENERAL NOTES AND SPECIFICATIONS:
• CONTACT THE ARCHITECT PRIOR TO PROCEEDING WITH CONSTRUCTION
• THE MORE STRINGENT REQUIREMENTS SHALL GOVERN FOR BIDDING / PRICING
3. EXISTING STRUCTURES:
A. CONTRACT DOCUMENTS HAVE BEEN PREPARED USING AVAILABLE DRAWINGS AND SITE
OBSERVATION AS PERMITTED BY ACCESS RESTRICTIONS DURING DESIGN.
B. DURING CONSTRUCTION, THE CONTRACTOR MAY ENCOUNTER EXISTING CONDITIONS WHICH ARE
NOT KNOWN OR ARE AT VARIANCE WITH PROJECT DOCUMENTATION. CONTRACTOR SHALL NOTIFY
THE ARCHITECT OF ALL CONDITIONS NOT PER THE CONTRACT DOCUMENTS. EXAMPLES INCLUDE:
• SIZES OR DIMENSIONS OTHER THAN THOSE SHOWN
• DAMAGE OR DETERIORATION TO MATERIALS AND COMPONENTS
• CONDITIONS OF INSTABILITY OR LACK OF SUPPORT
• ITEMS NOTED AS EXISTING ON THE DRAWINGS BUT NOT FOUND IN THE FIELD
C. PREPARE DIMENSIONAL DRAWINGS OF ALL DISCOVERED ITEMS.
D. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING STRUCTURAL CONDITIONS PRIOR TO SUBMITTING
SHOP DRAWINGS.
E. CONTRACTOR SHALL MAKE ALLOWANCE FOR THE RESOLUTION OF SUCH DISCOVERIES IN THE
CONSTRUCTION SCHEDULE.
F. SUBMIT A DIMENSIONED DRAWING OF ALL NEW OPENINGS THROUGH EXISTING FOUNDATIONS AND
SECURE APPROVAL PRIOR TO CUTTING. NEW OPENING MAY BE EITHER SHOWN ON THE CONTRACT
DOCUMENTS OR PROPOSED BY THE CONTRACTOR. DRAWING SHALL SHOW:
• VERTICAL & HORIZONTAL LOCATION AND SIZE OF NEW OPENING(S)
• ALL EXISTING OPENINGS IN THE VICINITY OF THE NEW OPENING(S)
• ALL EXISTING STRUCTURE (FOUNDATIONS, SLABS, WALLS, ETC) IN THE VICINITY OF THE NEW
OPENING(S)
• ALL REINFORCING BAR SIZES AND POSITIONS (LAYOUT LOCATION AND DEPTH) CONFLICTING WITH
OR IN THE VICINITY OF THE NEW OPENING(S).
4. COORDINATION:
A. STRUCTURAL DRAWINGS ARE NOT STAND-ALONE DOCUMENTS AND ARE INTENDED TO BE USED IN CONJUNCTION WITH CIVIL, ARCHITECTURAL, ELECTRICAL, AND DRAWINGS FROM OTHER DISCIPLINES.
THE CONTRACTOR SHALL COORDINATE ALL REQUIREMENTS OF THE CONTRACT DOCUMENTS INTO
SHOP DRAWINGS AND WORK.
5. SUBMITTALS AND SUBSTITUTIONS:
A. SUBMITTALS: REFER TO SPECIFICATIONS FOR DETAILED REQUIREMENTS.
• IF THE CONTRACTOR REQUESTS A CHANGE FROM THE STRUCTURAL DRAWINGS, IT SHALL BE
APPROVED BY THE ARCHITECT AND DESIGNED BY MARTIN/MARTIN WYOMING, INC. PRIOR TO
SUBMITTING SHOP DRAWINGS. VARIATION SHALL BE INDICATED ON THE SHOP DRAWINGS.
CONTRACTOR SHALL COMPENSATE MARTIN/MARTIN WYOMING, INC. FOR MAKING THE CHANGE.
• CONSTRUCTION DOCUMENTS SHALL NOT BE REPRODUCED FOR USE IN SUBMITTALS
• ALL SHOP DRAWINGS SHALL REFERENCE THE STRUCTURAL DRAWING NUMBER AND DETAIL USED
TO PREPARE THE SUBMITTAL
• SUBMIT A STATEMENT OF RESPONSIBILITY FOR CONSTRUCTION OF THE LATERAL LOAD
RESISTING SYSTEM IDENTIFIED IN THE DESIGN CRITERIA IN ACCORDANCE WITH IBC 2024 SECTION
B. SUBSTITUTIONS: ARCHITECT’S APPROVAL SHALL BE SECURED FOR ALL SUBSTITUTIONS
C. NONCONFORMANCE: NOTIFY ARCHITECT OF CONDITIONS NOT CONSTRUCTED PER THE CONTRACT
DOCUMENTS PRIOR TO PROCEEDING WITH CORRECTIVE WORK. SUBMIT PROPOSED REPAIR TO THE
ARCHITECT FOR ACCEPTANCE. CONTRACTOR SHALL COMPENSATE MARTIN/MARTIN, INC. FOR
DESIGNING THE REPAIR.
D. ALL SHOP DRAWINGS SHALL BE SUBMITTED IN ELECTRONIC FORMAT ONLY.
6. TEMPORARY CONDITIONS, CONSTRUCTION ENGINEERING, AND OSHA STANDARDS:
A. THE STRUCTURE IS DESIGNED TO FUNCTION AS A UNIT UPON COMPLETION AND ONLY FOR LOADS
ANTICIPATED DURING THE STRUCTURE’S SERVICE LIFE.
B. THE CONTRACTOR IS RESPONSIBLE FOR FURNISHING ALL TEMPORARY BRACING AND/OR SUPPORT THAT MAY BE REQUIRED AS THE RESULT OF THE CONTRACTOR’S CONSTRUCTION METHODS AND/OR SEQUENCES. CONTRACTOR SHALL PROVIDE ALL REQUIRED ENGINEERING AND OTHER MEASURES TO
ACHIEVE THE MEANS, METHODS, AND SEQUENCES OF WORK WHICH MAY INCLUDE, BUT IS NOT
LIMITED TO:
a. LAYOUT
b. DESIGN FOR FORMWORK, SHORING, AND RESHORING
c. DESIGN OF CONCRETE MIXES
d. ERECTION PROCEDURES WHICH ADDRESS STABILITY OF THE FRAME DURING CONSTRUCTION
e. WELD PROCEDURES
f. DESIGN OF TEMPORARY BRACING OF WALLS FOR WIND, SEISMIC, OR SOIL LOADS
g. SURVEYING TO VERIFY CONSTRUCTION TOLERANCES
h. EVALUATION OF TEMPORARY CONSTRUCTION LOADS ON STRUCTURE DUE TO EQUIPMENT AND
MATERIALS
i. STRUCTURAL ENGINEERING TO RESIST ANY OTHER LOADS NOT IDENTIFIED ON DESIGN DRAWINGS
C. NOTHING SHOWN ON THE STRUCTURAL DRAWINGS SHALL BE CONSTRUED AS ELIMINATING THE NEED
FOR THE CONTRACTOR TO COMPLY WITH ALL OSHA REQUIREMENTS. WHERE THE STRUCTURAL
DRAWINGS APPEAR TO CONFLICT WITH OSHA REQUIREMENTS, THE STRUCTURAL DRAWINGS
REPRESENT FINAL CONDITIONS ONLY.
• THE CONTRACTOR SHALL ADD ALL ERECTION FRAMING NECESSARY TO COMPLY WITH OSHA.
• THE CONTRACTOR SHALL ADD ALL NECESSARY BOLTS, ANCHOR BOLTS, PLATES, STIFFENER
PLATES, STABILIZER PLATES, BRIDGING, BRACING, BEARING SEATS, COLUMN SPLICES, ETC.
• WASHERS OR RINGS MAY BE WELDED TO COLUMNS TO PROVIDE FOR SAFETY CABLES. HOLES IN
COLUMNS FOR SAFETY CABLES SHALL BE SHOP INSTALLED AND SHALL BE INDICATED ON SHOP
DRAWINGS.
GENERAL NOTES
1. CODES AND STANDARDS:
A. GENERAL DESIGN
• INTERNATIONAL BUILDING CODE 2024 AND CITY OF CHEYENNE AMENDMENTS
B. LOADS
• ASCE/SEI 7-16 "MINIMUM DESIGN LOAD FOR BUILDINGS AND OTHER STRUCTURES" WHERE
INDICATED ON DRAWINGS INDIVIDUAL UNFACTORED LOAD COMPONENTS (D, DI, L, LR, R, S, H, F, FA, E, W, WI, T) ARE AS DEFINED AND DETERMINED BY THE BUILDING CODES AND STANDARDS
INDICATED. LOAD COMPONENTS SHALL BE COMBINED USING THE LOAD COMBINATIONS OF THE
BUILDING CODE FOR SPECIALTY DESIGN BY OTHERS.
C. CONCRETE
• ACI 301-LATEST EDITION "SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS"
• ACI 318-19 "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE"
D. STEEL
• ANSI/AISC 341-22 "SEISMIC PROVISIONS FOR STRUCTURAL STEEL BUILDINGS"
• ANSI/AISC 360-22 "SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS" LOAD AND RESISTANCE
FACTOR DESIGN.
2. SEISMIC LOADS
• SEISMIC DESIGN CATEGORY = A
• RISK CATEGORY = II
• EARTHQUAKE IMPORTANCE FACTOR, Ie = 1.00
• MAPPED SPECTRAL RESPONSE ACCELERATION, SS = 0.17 g
• MAPPED SPECTRAL RESPONSE ACCELERATION, S1 = 0.039 g
• DESIGN SPECTRAL RESPONSE COEFFICIENT, SDS = 0.15
• DESIGN SPECTRAL RESPONSE COEFFICIENT, SD1 = 0.056
• SOIL SITE CLASS = D
3. GRAVITY LOADS
A. SUPERIMPOSED DEAD LOAD (INCLUDES W6 OR S6 BEAM AND ARCHITECTURAL METAL PANELS) = 9 psf B. DRIFTING, SLIDING AND UNBALANCED SNOW. LOADS ARE ULTIMATE (1.0S) TO BE COMBINED USING
2024 IBC LOAD COMBINATIONS.
• GROUND SNOW LOAD = Pg,ULT = 46.0 psf, Pg,ASD = 32.2 psf
• SNOW EXPOSURE FACTOR, Ce = 1.0
• THERMAL FACTOR, Ct = 1.2
• FLAT ROOF SNOW LOAD = Pf,ULT = 38.6 psf
4. WIND LOADS
• RISK CATEGORY = II
• BASIC WIND SPEED, VULT = 108 mph, VASD = 84 mph
• EXPOSURE CATEGORY = C
• INTERNAL PRESSURE COEFFICIENT, GCPI = 0.00
• TOPOGRAPHIC FACTOR, KZT = 1.00
• GROUND ELEVATION FACTOR, KE = 0.80
5. DESIGN WIND PRESSURES FOR COMPONENTS AND CLADDING AND ELEMENTS DESIGNED BY THE
CONTRACTOR
• LISTED COMPONENTS AND CLADDING WIND PRESSURES ARE INCLUDED FOR REFERENCE ONLY.
FINAL CALCULATIONS SHALL BE COMPLETED BY THE CONTRACTOR.
• PRESSURES LISTED BELOW ARE ULTIMATE (1.0W) TO BE COMBINED USING 2024 IBC LOAD
COMBINATIONS.
• PRESSURES INCLUDE GROUND ELEVATION FACTOR, KE.
• ROOF PRESSURES: < 9 SF > 9 SF, < 36 SF > 36 SF
ZONE 3, POSITIVE 46.7 35.0 23.3
ZONE 3, NEGATIVE -61.4 -30.7 -20.5
ZONE 2, POSITIVE 35.0 35.0 23.3
ZONE 2, NEGATIVE -30.7 -30.7 -20.5
ZONE 1, POSITIVE, 23.3 23.3 23.3
ZONE 1, NEGATIVE -20.5 -20.5 -20.5
DESIGN CRITERIACONCRETE NOTES
1. GENERAL:
A. ALL WORK SHALL CONFORM WITH ACI 301-20, UNLESS NOTED OTHERWISE IN DRAWINGS OR PROJECT
SPECIFICATIONS.
B. DETAIL BARS IN ACCORDANCE WITH THE DRAWINGS, PROJECT SPECIFICATIONS, AND ACI
PUBLICATION SP-66 (2004): “ACI DETAILING MANUAL”
2. REINFORCING MATERIALS:
A. SEE ‘REINFORCING MATERIAL TABLE’
3. REINFORCING FABRICATION:
A. SPLICES:
• NO SPLICING OF REINFORCEMENT PERMITTED EXCEPT AS NOTED ON DRAWINGS. WHERE
PERMITTED, SPLICES MAY BE MADE BY CONTACT LAPS OR MECHANICAL CONNECTORS.
• SEE DETAILS FOR LAP LENGTHS.
B. MISCELLANEOUS REINFORCING REQUIREMENTS:
• PROVIDE ADDITIONAL BARS OR STIRRUPS REQUIRED TO SECURE REINFORCING IN PLACE DURING
CONCRETE PLACEMENT.
• MAKE ALL REINFORCING BAR BENDS IN THE FABRICATOR’S SHOP UNLESS NOTED.
• NO WELDING OF REINFORCING PERMITTED UNLESS NOTED ON DRAWINGS. WHERE PERMITTED,
PERFORM WELDING IN ACCORDANCE WITH AWS D1.4-2011.
• PROVIDE ADDED REINFORCING TO TRIM ALL OPENINGS, NOTCHES, AND REENTRANT CORNERS AS
NOTED IN TYPICAL DETAILS.
4. STRUCTURAL CONCRETE MIX REQUIREMENTS: SEE ‘CONCRETE MIX TABLE’
5. NON-SHRINK GROUT:
A. CONFORM TO ASTM C1107
B. ACHIEVE 7000 PSI COMPRESSIVE STRENGTH AT 28 DAYS.
6. PLACING REINFORCEMENT:
A. REINFORCEMENT PROTECTION:
• SEE ACI 117-10 FOR REINFORCEMENT PLACING TOLERANCES
• CONCRETE CLEAR COVER:
1. 3" FOR CONCRETE PLACED AGAINST EARTH
2. 2" CONCRETE PLACED IN FORMS, EXPOSED TO WEATHER OR EARTH
B. PROVIDE ACCESSORIES NECESSARY TO PROPERLY SUPPORT REINFORCING AND WELDED WIRE
REINFORCEMENT AT POSITIONS SHOWN ON PLANS. ALL REINFORCING, DOWELS, BOLTS, AND
EMBEDDED PLATES SHALL BE SET AND TIED IN PLACE BEFORE THE CONCRETE IS POURED.
“STABBING” INTO PREVIOUSLY PLACED CONCRETE IS NOT PERMITTED.
7. MODIFICATIONS TO HARDENED OR EXISTING CONCRETE:
A. UNLESS NOTED ON THE STRUCTURAL DOCUMENTS MODIFICATIONS (I.E. SAW CUTTING, CORING, CHIPPING, ETC.) SHALL NOT BE MADE TO HARDENED OR EXISTING CONCRETE WITHOUT APPROVAL
OF THE ARCHITECT.
B. DO NOT CUT OR DAMAGE ANY REINFORCING WITHOUT APPROVAL OF THE ARCHITECT
8. SLEEVES, OPENINGS, AND EMBEDDED PIPE/CONDUITS:
A. GENERAL: REFER TO TYPICAL DETAILS FOR SPACING AND LAYOUT LIMITATIONS FOR SLEEVES AND
OPENINGS. FORM OPENINGS AND PROVIDE SLEEVES BEFORE PLACING CONCRETE, CORING OF
CONCRETE IS NOT PERMITTED.
B. REINFORCING: REFER TO TYPICAL DETAILS FOR REINFORCEMENT REQUIREMENTS AT SLEEVES, OPENINGS OR CONDUIT. DO NOT CUT REINFORCING WHICH MAY CONFLICT.
STEEL NOTES
1. GENERAL:
A. SEE PROJECT SPECIFICATIONS FOR ADDITIONAL STEEL FRAMING REQUIREMENTS.
B. STEEL SHALL BE FABRICATED, CONSTRUCTED, AND PREPARED PER AISC AESS 2.
C. SURFACES SHALL BE PREPPED TO SSPC-SP6.
2. CONNECTIONS:
A. PROVIDE CONNECTIONS AS SHOWN IN DETAILS HEREIN.
3. STEEL MATERIALS:
A. SEE ‘STEEL MATERIAL TABLE’
4. WELDING REQUIREMENTS:
A. WELDERS: HAVE IN POSSESSION CURRENT EVIDENCE OF PASSING THE APPROPRIATE AWS.
QUALIFICATION TESTS.
B. MINIMUM WELDS: AISC SPECIFICATION, NOT LESS THAN 3/16” FILLET, CONTINUOUS UNLESS
OTHERWISE NOTED.
C. WELD SIZES AND LENGTHS CALLED FOR ON THE DRAWINGS ARE THE NET EFFECTIVE REQUIRED.
INCREASE WELD SIZE IF GAPS EXIST AT THE FAYING SURFACE.
D. ALL EXPOSED WELDS SHALL MEET THE REQUIREMENTS OF AESS 2:
a. ALL WELDS EXPOSED TO VIEW SHALL BE SMOOTH AND GROUND SMOOTH. PROVIDE A
CONTINUOUS WELD APPEARANCE.
b. WELD SPATTERS SHALL BE REMOVED.
E. WELD SIZES SHALL BE AS SHOWN UNLESS A GREATER SIZE IS REQUIRED BY ANSI/AISC 360-22
TABLES J2.3 AND J2.4.
F. ALL GROOVE WELDS SHALL BE COMPLETE PENETRATION UNLESS NOTED.
G. FIELD WELDING SYMBOLS INDICATE SEQUENCE CONSIDERED DURING DESIGN. THE CONTRACTOR
SHALL REQUEST APPROVAL FROM THE ENGINEER TO MODIFY WELD INSTALLATION LOCATION
INDICATED ON THE DOCUMENTS:
• FROM SHOP TO FIELD
• FROM FIELD TO SHOP
5. STRUCTURAL STEEL INSTALLATION:
A. UNLESS INDICATED OTHERWISE, SNUG TIGHTEN ALL JOINTS AS DEFINED BY AISC.
B. SEE SPECIFICATIONS FOR AESS REQUIREMENTS AND TOLERANCES.
COMPONENTS & CLADDING SPECIAL ROOF ZONES
a
ZONE 1
ZONE 2
ZONE 3
TYP
a = 3'-0" nss io
Pr efo
E eing n
LE
erA
R E
KE. IL
al
J
GNW
Date
IO MY
15944 Y
APN: Date Issued:
Drawn By: Checked By:
Sheet Title:
Sheet Number:
T D S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A
B
C
D
E
F
G
H
I
J
K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
T h e D e si g n
S tu d io in c
A rc h it e c te ri o r D e si g n
P io n e e r
A v e n u e
C h e y e n n e
W y o m in g
T
.7
.9 t d s i.
NOTE: THE ORIGINAL DRAWINGS FOR THIS PROJECT ARE 36" X 24". IF YOU HAVE A SMALLER SET, IT HAS BEEN
REDUCED AND DRAWING SCALES ARE NOT VALID.
i
M M
J O
B
P
R
IN
C
IP
A L:
E O
R
P R
O
JE
C T
M A
N A
G E
R
D E
S
IG
N E
R S
LE
A D
R E
V
IT
T E
C H
D
A T
E P
R
IN
T E
D
F
IL
E P
A T
H
07/31/2025
7/
/2
3:
:3
P
M A ut od es k
D oc s:
//A
C C
-M M
S
/2 5-
5_
D ep ot S qu ar e S un S ha de
S tr uc tu re _S
.rv t
S-001
STRUCTURAL
NOTES
EL/JR JL
25.2.468 2025.07.31
C H
E Y
E N
N E
D E
P O
T R
E N
O V
A T
IO
N
S
W
E S
T
T
H S
T R
E E
T
JR
JL
JL
JS25
.2
.4
JL
E
L
SHEET NUMBER SHEET TITLE
S-001 STRUCTURAL NOTES
S-002 STRUCTURAL NOTES & QAQC
S-100 FOUNDATION AND FRAMING PLANS
S-200 STRUCTURAL DETAILS
WELDED A706 60 80 -
TYP REINFORCING A615 60 90 -
REINF ELEMENT ASTM Fy (KSI) Fu (KSI) COMMENTS
REINFORCING MATERIAL TABLE
WF, WT A992 50 65 -
WELDING ELECTRODES E70 - - PER AWS
RECT HSS A500 GR C 50 62 -
PLATES A36 36 58 -
OTHER SHAPES
A36 36 58
A572 WITH Fy=50 KSI AND Fu=65 KSI
ACCEPTABLE AT CONTRACTOR'S OPTION
BOLTS F3125 - TYPE
A325 OR F1852
- 120
BOLTS ARE 3/4"Ø UNO, USE TENSION-
CONTROLLED WHERE POSSIBLE
ANCHOR RODS F1554 GR 55 55 75 WELDABLE, HEAVY HEX HEADED
STEEL ELEMENT ASTM/TYPE Fy (KSI) Fu (KSI) COMMENTS
STEEL MATERIAL TABLE
NWC = NORMAL WEIGHT CONCRETE
b. ABBREVIATIONS FOR OTHER REQUIREMENTS AS FOLLOWS:
a. WHERE AIR CONTENT IS INDICATED IN THE MIX TABLE, PROVIDE AIR ENTRAINING ADMIXTURE. TOTAL AIR CONTENT LIMITS INCLUDE BOTH ENTRAINED AND ENTRAPPED AIR +/- 1 1/2%. ‘NP’ IN COLUMN
INDICATES ADDITION OF ENTRAINED AIR IS NOT PERMITTED EXCEPT WHERE CONTRACTOR CAN
DEMONSTRATE THAT SLABS WITH ENTRAINED AIR WILL HAVE A FINISH ACCEPTABLE TO THE ARCHITECT
WITHOUT BLISTERS. AIR CONTENT NOTED IS BASED ON 3/4" AGGREGATE. IF 3/8” AGGREGATE IS USED, INCREASE AIR CONTENT BY 11/2%.
FOR CONCRETE PLACED BY PUMPING PROVIDE CONCRETE MIX FLOWABILITY TO FACILITATE PUMPING.
ENTRAINED AIR MAY BE USED TO FACILITATE PUMPING SUBJECT TO THE PROVISIONS OF NOTE a BELOW.
ALKALI-AGGREGATE REACTIVITY OF AGGREGATES - SUBMIT REPORTS INDICATING THAT FINE AND COARSE AGGREGATES ARE NOT "POTENTIALLY REACTIVE" BASED ON THE ASTM C295 OR ASTM C1260 (OR ASTMC1293) TESTING LIMITS SET FORTH IN SECTION 5.1 OF "GUIDE SPECIFICATION FOR CONCRETE SUBJECT TO ALKALI-SILICA REACTIONS" (2007 PORTLAND CEMENT ASSOCIATION). ALTERNATIVELY, SUBMIT ASTM C1567 TEST REPORTS INDICATING THAT THE COMBINATION OF MIX INGREDIENTS REDUCES THE EXPANSION DUE TO ALKALI-AGGREGATE REACTIVITY SUCH THAT THE MIX COMPLIES WITH SECTION
5.2 OF "GUIDE SPECIFICATION FOR CONCRETE SUBJECT TO ALKALI-SILICA REACTIONS" (2007 PORTLAND CEMENT ASSOCIATION). ALL TESTS FOR SUBMITTED REPORTS SHALL HAVE BEEN PERFORMED WITHIN
ONE YEAR OF THE SUBMITTAL DATE.
USE TYPE I / II PORTLAND CEMENT OR TYPE IL-HS MODIFIED CEMENT (SULFATE RESISTANT), UNLESS NOTED OTHERWISE. FOR CONCRETE MIXES USED ON FLOORS MINIMUM CEMENTITIOUS CONTENT SHALL
BE 540 POUNDS PER CUBIC YARD
- PROVIDE WORKABILITY AND CONSISTENCY TO PERMIT CONCRETE TO BE WORKED READILY INTO FORMS
AND AROUND REINFORCEMENT UNDER CONDITIONS OF PLACEMENT TO BE EMPLOYED, WITHOUT
SEGREGATION OR EXCESSIVE BLEEDING. CONTRACTOR SHALL SELECT APPROPRIATE SLUMP. USE
ADMIXTURES AS REQUIRED TO OBTAIN DESIRED RESULTS.
- PROVIDE THE MINIMUM COMPRESSIVE STRENGTH AS INDICATED IN THE MIX TABLE. DO NOT EXCEED
THE MAXIMUM WATER-CEMENT RATIO NOTED.
PROPORTIONS OF MATERIALS IN CONCRETE MIX SHALL BE ESTABLISHED TO:
CONCRETE MIX TABLE NOTES:
FOOOTINGS AND
PILASTERS 4.5 NWC 1 1 (#57) - -
CONC
MIX
TYPE
INTENDED USE
28 DAY
STRENGTH
f'c (KSI)
CONC
WEIGHT
MAX W/C
RATIO,
INCLUDING
FLY ASH
MAX
AGGREGATE
SIZE, IN
(ASTM C33)
TOTAL AIR
CONTENT
NOTE a
OTHER
REQTS,
NOTE b
CONCRETE MIX TABLE
SHEET LIST
QUALITY ASSURANCE GENERAL NOTES
STATEMENT OF STRUCTURAL SPECIAL INSPECTIONS AND TESTING
1) GENERAL:
1A) SCOPE OF WORK
- THE OWNER WILL ENGAGE A QUALIFIED INSPECTION AND TESTING AGENCY(S) TO PERFORM SPECIAL INSPECTIONS AND TESTING FOR ALL STRUCTURAL MEMBERS AND ASSEMBLIES AS NOTED HEREIN.
- SUBMIT DOCUMENTATION OF QUALIFICATIONS, INCLUDING COMPETENCE AND RELEVANT WORK
EXPERIENCE OR TRAINING OF SPECIAL INSPECTORS TO THE AUTHORITY HAVING JURISDICTION PRIOR TO
THE START OF WORK.
- SPECIAL INSPECTIONS ARE IN ADDITION TO INSPECTIONS BY THE AUTHORITY HAVING JURISDICTION
REQUIRED BY IBC 2024 SECTION 110.
- REFER TO THE SPECIFICATIONS FOR REPORTING AND PROCEDURAL REQUIREMENTS FOR QUALITY
ASSURANCE AND QUALITY CONTROL.
- REFER TO ARCH/MECH/ELEC/CIVIL SPECIFICATIONS AND DRAWINGS FOR ADDITIONAL SPECIAL
INSPECTION AND TESTING THAT MAY BE REQUIRED.
1B) SPECIAL INSPECTIONS AND TESTING ARE APPLICABLE TO ALL REVISIONS AND/OR FUTURE WORK ADDED
BY AMENDMENTS TO THESE DOCUMENTS.
1C) DEFINITIONS
- SPECIAL INSPECTOR: THE AGENCY ENGAGED BY THE OWNER AND APPROVED BY THE AUTHORITY HAVING JURISDICTION TO ACT AS THE DESIGNATED REPRESENTATIVE TO PERFORM INSPECTIONS.
- SPECIAL INSPECTION: INSPECTION PERFORMED BY THE SPECIAL INSPECTOR ACCORDING TO IBC 2024 SECTION 1704 TO ENSURE COMPLIANCE WITH APPROVED CONSTRUCTION DOCUMENTS AND REFERENCED
STANDARDS.
- (P) PERIODIC INSPECTION: THE PART-TIME OR INTERMITTENT OBSERVATION BY THE SPECIAL INSPECTOR OF WORK BEING PERFORMED. SPECIAL INSPECTOR SHALL BE PRESENT IN THE AREA WHERE THE WORK IS BEING PERFORMED. OBSERVATION OF ALL WORK (100% VISUAL) SHALL BE MADE AT THE
COMPLETION OF THE WORK.
- (C) CONTINUOUS INSPECTION: THE FULL-TIME OBSERVATION BY THE SPECIAL INSPECTOR OF WORK BEING PERFORMED. SPECIAL INSPECTOR SHALL BE PRESENT IN THE AREA WHERE THE WORK IS BEING PERFORMED. OBSERVATION OF ALL WORK (100% VISUAL) SHALL BE MADE AT THE COMPLETION OF THE
WORK.
1D) DEFICIENCIES IN WORK
- CORRECT DEFICIENCIES IN WORK THAT TESTS AND INSPECTIONS INDICATE DO NOT COMPLY WITH THE
CONTRACT DOCUMENTS AND REFERENCED STANDARDS.
- ALL COST OF ADDITIONAL TESTING AND/OR INSPECTIONS FOR CORRECTIVE WORK SHALL BE BORNE BY
THE CONTRACTOR.
2) SHOP FABRICATIONS:
2A) GENERAL
- PERFORM INSPECTIONS AND TESTING FOR ALL SHOP FABRICATED STRUCTURAL MEMBERS AND
ASSEMBLIES AS NOTED HEREIN. SPECIAL INSPECTOR SHALL PERFORM SPECIAL INSPECTIONS AND TESTING UNLESS THE FABRICATOR IS REGISTERED AND APPROVED BY THE AUTHORITY HAVING JURISDICTION TO
PERFORM SUCH WORK WITHOUT SPECIAL INSPECTION OR FABRICATION HAS A CURRENT ICC-ES
EVALUATION REPORT.
- SPECIAL INSPECTOR SHALL VERIFY THE FABRICATOR MAINTAINS AND FOLLOWS DETAILED SHOP FABRICATION AND QUALITY CONTROL PROCEDURES, UNLESS FABRICATOR IS REGISTERED AND APPROVED.
- AT THE COMPLETION OF FABRICATION, THE APPROVED FABRICATOR SHALL SUBMIT A CERTIFICATE OF COMPLIANCE TO THE AUTHORITY HAVING JURISDICTION ACCORDING TO IBC 2024 SECTION 1704.2.5.1.
- APPROVED FABRICATORS MAY PERFORM TESTING NOTED HEREIN EXCEPT THAT NONDESTRUCTIVE TESTING (NDT) SHALL ONLY BE PERFORMED BY PERSONNEL WITH QUALIFICATIONS THAT MEET OR EXCEED THE CRITERIA OF AWS D1.1 SUBCLAUSE 6.14.6 AND AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING
(ASNT) SNT-TC-1A OR ASNT CP-189.
2B) SHOP FABRICATIONS INCLUDED
- SHOP FABRICATED STRUCTURAL STEEL INCLUDING STAIRS AND RAILING ELEMENTS
- SHOP FABRICATED METAL PANELING
nss io
Pr efo
E eing n
LE
erA
R E
KE. IL
al
J
GNW
Date
IO MY
15944 Y
APN: Date Issued:
Drawn By: Checked By:
Sheet Title:
Sheet Number:
T D S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A
B
C
D
E
F
G
H
I
J
K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
T h e D e si g n
S tu d io in c
A rc h it e c te ri o r D e si g n
P io n e e r
A v e n u e
C h e y e n n e
W y o m in g
T
.7
.9 t d s i.
NOTE: THE ORIGINAL DRAWINGS FOR THIS PROJECT ARE 36" X 24". IF YOU HAVE A SMALLER SET, IT HAS BEEN
REDUCED AND DRAWING SCALES ARE NOT VALID.
i
M M
J O
B
P
R
IN
C
IP
A L:
E O
R
P R
O
JE
C T
M A
N A
G E
R
D E
S
IG
N E
R S
LE
A D
R E
V
IT
T E
C H
D
A T
E P
R
IN
T E
D
F
IL
E P
A T
H
07/31/2025
7/
/2
3:
:3
P
M A ut od es k
D oc s:
//A
C C
-M M
S
/2 5-
5_
D ep ot S qu ar e S un S ha de
S tr uc tu re _S
.rv t
S-002
STRUCTURAL
NOTES & QAQC
EL/JR JL
25.2.468 2025.07.31
C H
E Y
E N
N E
D E
P O
T R
E N
O V
A T
IO
N
S
W
E S
T
T
H S
T R
E E
T
JR
JL
JL
JS25
.2
.4
JL
E
L
2. SEE CIVIL DRAWINGS AND/OR SPECIFICATIONS FOR CLASSIFICATION AND TESTING REQUIREMENTS FOR
COMPACTED FILL AND/OR CONTROLLED LOW-STRENGTH MATERIAL.
1. SEE CIVIL DRAWINGS AND/OR SPECIFICATIONS FOR ADDITIONAL EARTHWORK AND UTILITY INSPECTION
REQUIREMENTS.
SOILS SPECIAL INSPECTION NOTES:
- PLACEMENT
C -
VERIFY USE OF PROPER MATERIALS,
DENSITIES, COMPACTION, AND LIFT
THICKNESSES
- PRIOR TO PLACEMENT
P -
VERIFY SUBGRADE HAS BEEN PROPERLY
PREPARED
CONTROLLED FILL
- BEARING MATERIAL
P SOILS REPORT
VERIFY BEARING MATERIAL IS ADEQUATE TO
ACHIEVE THE DESIGN BEARING CAPACITY
- EXCAVATION
P -
VERIFY EXCAVATIONS ARE EXTENDED TO THE
PROPER DEPTH AND HAVE REACHED THE
PROPER BEARING MATERIAL
SUBGRADE
ITEM FREQUENCY STANDARD CRITERIA
SOILS SPECIAL INSPECTIONS
2. REPORTS OF COMPRESSIVE STRENGTH TESTS SHALL CONTAIN THE FOLLOWING INFORMATION: DATE OF CONCRETE PLACEMENT, LOCATION OF CONCRETE BATCH IN WORK, DESIGN 28-DAY COMPRESSIVE STRENGTH, SLUMP, CONCRETE SUPPLIER AND MIXTURE ID NUMBER, TIME OF BATCH AND PLACEMENT, AMBIENT AIR TEMPERATURE, SITE ADDED WATER AND ADMIXTURES, UNIT WEIGHT, AND AS REQUIRED BY
ASTM C39.
1. NONDESTRUCTIVE TESTING MAY BE PERMITTED BY THE ARCHITECT, BUT WILL NOT BE USED AS SOLE BASIS
FOR APPROVAL OR REJECTION OF DEFICIENT CONCRETE.
STRUCTURAL CONCRETE TESTING NOTES:
- COMPRESSIVE
STRENGTH (56-DAY
SPECIFIED STRENGTH)
EACH
COMPOSITE
SAMPLE
ASTM C31ASTM
C39(5) 6X12 OR
(7) 4x8
CYLINDERS
TEST PER SCHEDULE BELOW FOR 56-DAY
STRENGTH:
- 7 DAYS: (1) 6x12 OR (1) 4x8
- 28 DAYS: (2) 6x12 OR (3) 4x8
- 56 DAYS: (2) 6x12 OR (3) 4x8
- COMPRESSIVE
STRENGTH (28-DAY
SPECIFIED STRENGTH)
EACH
COMPOSITE
SAMPLE
ASTM C31ASTM
39(4)6x12 OR (6)
4x8 CYLINDERS
TEST PER SCHEDULE BELOW FOR 28-DAY
STRENGTH:
- 7 DAYS: (1) 6x12 OR (1) 4x8
- 28 DAYS: (2) 6x12 OR (3) 4x8
- 56 DAYS: (1) 6x12 OR (2) 4x8 (IF 28 DAY TESTS
DO NOT ACHIEVE SPECIFIED 28 DAY STRENGTH)
ACCEPTANCE CRITERIA PER ACI 318
- COLD WEATHER CURING
- ASTM C1074
RECORD MAXIMUM AND MINIMUM CONCRETE
TEMPERATURE DURING CURING PERIOD, WHEN
DAILY AVERAGE AIR TEMPERATURE OF 40 °F OR
BELOW IS EXPECTED FOR 3 SUCCESSIVE DAYS
DURING CURING PERIOD
- TEMPERATURE EACH
COMPOSITE
SAMPLE AND 60
MINUTE
INTERVALS
ASTM C1064
REQUIRED WHEN AIR TEMPERATURE IS 40 °F
AND BELOW OR 80°F AND ABOVE
- SLUMP/SLUMP FLOW
EACH
COMPOSITE
SAMPLE
ASTM C143
(SLUMP) OR
ASTM C1611
(SLUMP FLOW)
SPECIFIED SLUMP SHALL BE AS SUBMITTED IN
THE MIX DESIGN ± 1 1/2". PERFORM ADDITIONAL
TESTS WHEN CONCRETE CONSISTENCY
APPEARS TO CHANGE
2. DRILLED PIERS
EACH SHAFT
FOR DRILLED PIERS OBTAIN NEAR BEGINNING
OF LOAD PRIOR TO PLACEMENT IN SHAFT.
- COMPOSITE SAMPLE
ASTM C172
OBTAIN AT POINT OF PLACEMENT. ADJUST
FREQUENCY AS REQUIRED TO PROVIDE...
CONCRETE
- WELDING - - PER STRUCTURAL STEEL TESTING
REINFORCING STEEL, BOLTS AND EMBEDMENTS
ITEM FREQUENCY STANDARD CRITERIA
STRUCTURAL CONCRETE TESTING
- SHORE/FORM REMOVAL P ACI 301-16 2.3.2 FOR BEAMS AND STRUCTURAL SLABS
- CURING P ACI 301-16 5.3.6 -
- PLACEMENT OF
CONCRETE C ACI 301-16 5.3.2 -
- FORMWORK PRIOR TO
PLACEMENT OF
CONCRETE
P ACI 301-16 2.2-2.3 INSPECT FIRST POUR OF EACH TYPE
- MIX DESIGN
EACH TRUCK -
VERIFY USE OF APPROVED DESIGN MIXTURE
FOR EACH TRUCK LOAD
CONCRETE
- WELDING - - INSPECT PER THE STRUCTURAL STEEL TABLE
- PRIOR TO PLACEMENT
OF CONCRETE
100% -
VERIFY TYPE, FINISH, DIAMETER, LENGTH,
QUANTITY, EMBEDMENT LENGTH, SPACING AND
EDGE DISTANCES. VERIFY USE OF PLACING
TEMPLATE WHERE SPECIFIED
BOLTS AND EMBEDMENTS
- MECHANICAL
CONNECTORS C ICC-ES REPORT -
- COATED REINFORCING P ACI 301-16 3.2.1.2 -
- FIELD BENDING P ACI 301-16 3.3.2.8 -
- WELDING C AWS D1.4 VERIFY ASTM A706 REINFORCING STEEL
- PRIOR TO…
This is the start of the file's text. The full file is on GovTribe.