This document is a set of construction plans and drawings for the Oregon Department of Aviation's Mulino State Airport runway, taxilane, and apron surface seal project, prepared by Century West Engineering. The project (A.I.P. No. 3-41-0072-018-2025) involves pavement rehabilitation work including crack sealing, asphalt concrete patching for wide cracks, standard seal coat application, and pavement marking replacement across Runway 14-32, Taxiways A1-A3, and associated taxilanes and apron areas. The work is organized into three phases: Phase 1 covers crack sealing and AC patching (7 days for Work Area #1, 4 days for Work Area #2); Phase 2 addresses surface seal application (2 days for Work Area #1, 2 days for Work Area #2); and Phase 3 covers pavement marking installation (2 days for Work Area #1, 1 day for Work Area #2). All work must be completed within 13 continuous calendar days of the contract notice to proceed, with an anticipated start date of August 2026. The project requires runway closures and coordination with the airport's UNICOM frequency (123.05 MHz). Construction quantities include 21,724 linear feet of crack sealing, 906 linear feet of AC patching, 54,666 square yards of surface seal, and 9,268 square feet of pavement markings (including both first and second coat applications).
The project documents specify detailed safety and phasing requirements, including low-level barricade installation, temporary traffic control measures, and runway closure procedures requiring the disengagement of runway lighting, taxiway lighting, and PAPIS navigation aids during closure periods. Specific weather conditions must be met for surface seal and pavement marking applications, with contractor coordination required a minimum of 12 hours before planned application. The second coat of pavement markings is exempt from the 13-day contract period and will be permitted a minimum of 30 days after pavement rehabilitation completion. The contractor is restricted to designated staging areas and haul routes and must maintain all equipment height at 12 feet unless approved otherwise. Equipment stockpiles are limited to 12 feet in height and must be positioned at least 250 feet from runway centerlines and 65.5 feet from taxiway centerlines. All work areas must be cleared and restored to meet FAA safety area standards prior to reopening, including friction testing of the applied surface seal per FAA AC 150/5320-12C standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DOCUMENTS
FOR
OREGON DEPARTMENT OF AVIATION
MULINO STATE AIRPORT
RUNWAY, TAXILANE, AND APRON SURFACE SEAL
ATTACHMENT D – RUNWAY, TAXILANE, AND APRON SURFACE
SEAL PROJECT PLANS AND DRAWINGS
OWNER:
Oregon Department of Aviation
3040 25th St. SE Salem, OR 97302
ENGINEER:
Century West Engineering
5500 Meadows Rd., Suite 250
Lake Oswego, OR 97035
Phone: 503.419.2130
FEBRUARY 2026
This Page Left Intentionally Blank
OREGON DEPARTMENT OF AVIATION
MULINO STATE AIRPORT (4S9)
RUNWAY, APRON, AND TAXILANE SURFACE SEAL
A.I.P. NO. 3-41-0072-018-2025
FEBRUARY 2026
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
MULINO STATE AIRPORT (4S9)
RUNWAY, APRON, AND TAXILANE SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- M ul in o
St at e R un w ay , T ax ila ne , a nd A pr on
S ur fa ce
S ea l - P ha se
I
- D es ig n\ C
AD
W O
R
KI
N G
\1
C
O
VE
R S
H
EE
T.
dw g
AS NOTED40097.141.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
ARB
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0072-018-2025
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11, 2012
RYAN HA JIME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
BID SET
SITE MAP
SCALE: N.T.S.
VICINITY MAP
SCALE: N.T.S.
PROJECT LOCATION
N
G-01
COVER SHEET
N
S MULINO RD
H W
Y 213
S BUFF RD
PASSMORE RD
SHEET INDEX
SHEET NO DWG NO SHEET TITLE
1 G-01 COVER SHEET
2 G-02 SITE AND SURVEY CONTROL PLAN
3 G-03 CONSTRUCTION SITE AND SAFETY PHASING PLAN
4 G-04 CONSTRUCTION SITE AND SAFETY NOTES AND DETAILS
5 EC-01 EROSION CONTROL PLAN
6 C-01 DEMOLITION PLAN
7 C-02 CRACK SEAL AND PAVEMENT REPAIR PLAN
8 C-03 SURFACE SEAL PLAN
9 C-04 PAVEMENT REPAIR AND SURFACE SEAL DETAILS
10 C-05 PAVEMENT MARKING OVERALL PLAN
11 C-06 PAVEMENT MARKING PLAN
12 C-07 PAVEMENT MARKING PLAN
13 C-08 PAVEMENT MARKING DETAILS
14 C-09 PAVEMENT MARKING DETAILS
MULTICORELINK:14101 SITE AND SURVEY CONTROL-2 G-02
MULTICORELINK:14101 CONSTRUCTION SITE AND SAFETY PHASING PLAN-G-03
MULTICORELINK:14101 CONSTRUCTION SITE AND SAFETY PHASING PLAN-G-03
MULTICORELINK:14101 CONSTRUCTION SITE AND SAFETY PHASING PLAN-G-03
MULTICORELINK:14101 CONSTRUCTION SITE AND SAFETY PHASING PLAN-G-04
MULTICORELINK:14101 CONSTRUCTION SITE AND SAFETY PHASING PLAN-G-04
MULTICORELINK:14101 CONSTRUCTION SITE AND SAFETY PHASING PLAN-G-04
MULTICORELINK:14101 EROSION CONTROL PLAN-EC-01
MULTICORELINK:14101 EROSION CONTROL PLAN-EC-01
MULTICORELINK:14101 EROSION CONTROL PLAN-EC-01
MULTICORELINK:14101 DEMOLITION PLAN-C-01
MULTICORELINK:14101 DEMOLITION PLAN-C-01
MULTICORELINK:14101 DEMOLITION PLAN-C-01
MULTICORELINK:14101 CRACK REPAIR-C-02
MULTICORELINK:14101 CRACK REPAIR-C-02
MULTICORELINK:14101 CRACK REPAIR-C-02
MULTICORELINK:14101 SURFACE SEAL-8 C-03
MULTICORELINK:14101 DETAILS-9 C-04
MULTICORELINK:14101 DETAILS-9 C-04
MULTICORELINK:14101 DETAILS-9 C-04
MULTICORELINK:14101 PAVEMENT MARKING OVERALL PLAN-10 C-05
MULTICORELINK:14101 PAVEMENT MARKING OVERALL PLAN-10 C-05
MULTICORELINK:14101 PAVEMENT MARKING OVERALL PLAN-10 C-05
MULTICORELINK:14101 PAVEMENT MARKING PLAN-11 C-06
MULTICORELINK:14101 PAVEMENT MARKING PLAN-11 C-06
MULTICORELINK:14101 PAVEMENT MARKING PLAN-11 C-06
MULTICORELINK:14101 PAVEMENT MARKING PLAN-12 C-07
MULTICORELINK:14101 PAVEMENT MARKING PLAN-12 C-07
MULTICORELINK:14101 PAVEMENT MARKING PLAN-12 C-07
MULTICORELINK:14101 DETAILS-13 C-08
MULTICORELINK:14101 DETAILS-13 C-08
MULTICORELINK:14101 DETAILS-13 C-08
MULTICORELINK:14101 DETAILS-14 C-09
MULTICORELINK:14101 DETAILS-14 C-09
MULTICORELINK:14101 DETAILS-14 C-09
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
MULINO STATE AIRPORT (4S9)
RUNWAY, APRON, AND TAXILANE SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- M ul in o
St at e R un w ay , T ax ila ne , a nd A pr on
S ur fa ce
S ea l - P ha se
I
- D es ig n\ C
AD
W O
R
KI
N G
\1
S
IT
E
AN
D
S U
R
VE
Y C
O N
TR
O
L.
dw g
AS NOTED40097.141.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
ARB
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0072-018-2025
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA JIME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
BID SET
SITE AND SURVEY CONTROL PLAN
SCALE: 1"=150'
LEGEND:
RUNWAY SAFETY AREA
OBSTACLE-FREE ZONE
OBJECT FREE AREA
TAXIWAY OBJECT FREE AREA
TAXIWAY SAFETY AREA
TAXILANE OBJECT FREE AREA
CONTROL POINT
G-02
EXISTING WINDCONE
TAXIWAY A
RUNWAY 14-32
TWY A2
NORTH TAXILANE
TWY A1 TWY A3
S AIRPORT RD
LA
ND
IN
G
W
AY
S MULINO RD
SECURITY GATE
SURVEY CONTROL TABLE
NAVD 88
POINT # NORTHING EASTING ELEVATION DESCRIPTION
1 573652.21 7664346.41 251.39 CNT IR RPC
2 573659.29 7664043.49 252.48 CNT 5/8IR RPC
3 573138.92 7664016.95 249.60 CNT MAG
4 573165.05 7664404.60 248.80 CNT MAG
5 573092.66 7664241.66 249.02 CNT MAG
6 570409.04 7664319.07 257.60 CAP
7 572566.79 7664424.35 251.50
8 571202.43 7663931.71 255.34 RPC
9 571862.86 7663395.13 256.24 CAP
10 572716.86 7663415.87 249.17 RPC
11 573571.94 7663216.40 247.10 CAP
CP#7
CP#11 CP#10
CP#9
CP#8 CP#6
CP#1 CP#4
CP#5CP#2
CP#3
SURVEY NOTES:
1. COORDINATES SHOWN ARE BASED ON THE OREGON STATE PLANE, NORTH ZONE (2011, INTN'L FOOT).
VERTICAL DATUM: NAVD88
2. TOPOGRAPHIC SURVEY IS PROVIDED FROM CRAWFORD, DRUMMOND & ASSOCIATES, INC, DATED OCTOBER 2025.
3. EXISTING UNDERGROUND UTILITIES THROUGHOUT THIS SET OF DRAWINGS ARE APPROXIMATE ONLY AND HAVE NOT BEEN VERIFIED BY THE OWNER OR IT'S REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK AND IS FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTORS FAILURE TO EXACTLY LOCATE AND PRESERVE
ANY AND ALL UNDERGROUND UTILITIES.
4. FOR ACCESS TO THE SURVEY CONTROL POINTS THAT ARE LOCATED OUTSIDE OF THE CONSTRUCTION AREA, CONTRACTOR/SURVEYOR SHALL
COORDINATE AND RECEIVE APPROVAL FROM THE AIRPORT BEFORE ENTRY INTO THIS AREA.
MAIN APRON
150'
400'
500'
131'
79'
79'
HANGAR APRON
79'
79'
TAXIWAY
G-02
SITE AND SURVEY CONTROL PLAN
150 150 300
SCALE OF FEET
SCALE: 1"=150'
G-03
CONSTRUCTION SAFETY AND PHASING PLAN
SCALE: 1"=150'
G-03
CONSTRUCTION SITE AND SAFETY PHASING PLAN
WORK AREA DURATION RUNWAY CLOSURE
WA#1 4 DAYS 4 DAYS
WA#2 3 DAYS N/A
CRACK SEALING
AC PATCHING - MAJOR WIDE CRACK
WORK SCOPE - CRACK SEALING AND AC
PATCHING - MAJOR WIDE CRACK (PHASE 1):
1. SET UP RUNWAY CLOSURE "X" AND NAVAID (PAPIS)
TURNED OFF (FOR WORK AREA #1 CONSTRUCTION ONLY)
2. INSTALL TEMPORARY TRAFFIC CONTROL (INCLUDING
BARRICADES AND RUNWAY CLOSURE X'S)
3. PAVEMENT MARKING REMOVAL
4. CRACK PREPARATION, WIDE CRACK REPAIR
5. CRACK FILL
6. FOREIGN OBJECT DEBRIS (FOD) REMOVAL
WORK AREA DURATION RUNWAY CLOSURE
2 DAYS 2 DAYS
WA#2 2 DAYS N/A
SURFACE SEAL
WORK SCOPE - SURFACE SEAL (PHASE 2):
1. SET UP RUNWAY CLOSURE "X" AND NAVAID (PAPIS) TURNED
OFF (FOR WORK AREA #1 CONSTRUCTION ONLY)
2. INSTALL TEMPORARY TRAFFIC CONTROL (INCLUDING
BARRICADES AND RUNWAY CLOSURE X'S)
3. PAVEMENT MARKING REMOVAL
4. FOREIGN OBJECT DEBRIS (FOD) REMOVAL
5. SURFACE PREPARATION
6. SURFACE SEAL
WORK SCOPE - PAVEMENT MARKING (PHASE 3):
1. SET UP RUNWAY CLOSURE "X" AND NAVAID (PAPIS) TURNED OFF
(FOR WORK AREA #1 CONSTRUCTION ONLY)
(IN PLACE FROM PHASE 2)
2. INSTALL TEMPORARY TRAFFIC CONTROL (INCLUDING BARRICADES
AND RUNWAY CLOSURE X'S)
(IN PLACE FROM PHASE 2)
3. PAVEMENT MARKING
4. FOREIGN OBJECT DEBRIS (FOD) CHECK/REMOVAL
WORK AREA DURATION RUNWAY CLOSURE
WA#1 1 DAY 1 DAY
WA#2 1 DAY N/A
PAVEMENT MARKING (FIRST COAT)
GENERAL PHASING NOTES:
1. THE CONTRACTOR SHALL REQUEST RUNWAY CLOSURES FOR CONSTRUCTION 14
DAYS IN ADVANCE.
2. WORK AREAS ARE SHOWN AS CONSECUTIVE. CONTRACTOR TO SUBMIT THE
CONSTRUCTION SCHEDULE FOR OWNER REVIEW. COORDINATE CLOSURES WITH
THE ENGINEER AND MAINTAIN AIRPORT OPERATION TO THE GREATEST EXTENT
POSSIBLE.
3. ALL RUNWAY LIGHTING AND TAXIWAY LIGHTING SHALL BE SHUT DOWN/OFFLINE
DURING RUNWAY CLOSURE. ALL GUIDANCE SIGNS SHALL BE SHUT
DOWN/OFFLINE (IF LIGHTED) AND COVERED DURING RUNWAY CLOSURE.
4. TEMPORARY TRAFFIC CONTROL LOW LEVEL BARRICADES TO BE INSTALLED AT
THE NORTH TAXILANE FOR THE DURATION OF THE PROJECT.
5. BARRICADES ARE TO BE INSTALLED AND REMOVED FOR EACH WORK AREA AS
NEEDED TO COMPLETE THE CONSTRUCTION.
6. RUNWAY AND TAXIWAY MARKINGS SHALL BE IN PLACE ANY TIME RUNWAY OR
TAXIWAYS ARE OPEN TO AIR TRAFFIC.
7. REMOVAL OF EXISTING PAVEMENT MARKINGS SHALL PRECEDE CRACK SEAL
WORK AND SEAL COAT WORK.
8. THE TERM "DAY" SHALL BE TAKEN TO MEAN A CALENDAR DAY OF 24 HOURS,
BEGINNING AT 12:00 MIDNIGHT, SATURDAYS, SUNDAYS, AND HOLIDAYS SHALL BE
INCLUDED.
9. SEE CSPP FOR FULL SAFETY AND PHASING REQUIREMENTS.
10. CONTRACTOR SHALL IMPLEMENT SPCD IN ACCORDANCE WITH SECTION 01300
OF THE SPECIFICATIONS.
11. CONTRACTOR TO COORDINATE WITH THE ENGINEER AND OWNER FOR
COMPLETION AND SUBMITTAL OF FAA FORM 7460-1.
TOTAL
WA#1
7 DAYS 4 DAYS
TOTAL 4 DAYS 2 DAYS
TOTAL 2 DAYS 1 DAY
BARRICADE
WA#1 2
G-04
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
MULINO STATE AIRPORT (4S9)
RUNWAY, APRON, AND TAXILANE SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- M ul in o
St at e R un w ay , T ax ila ne , a nd A pr on
S ur fa ce
S ea l - P ha se
I
- D es ig n\ C
AD
W O
R
KI
N G
\1
C
O N
ST
R
U C
TI
O
N S
IT
E
AN
D
S
AF
ET
Y
PH
AS
IN
G
P
LA
N .d w g
AS NOTED40097.141.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
ARB
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0072-018-2025
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA JIME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
EXISTING WINDCONE
TAXIWAY A
S AIRPORT RD
LA
ND
IN
G
W
AY
S MULINO RD
SECURITY GATE
ENTRANCE
MAIN APRON
CONSTRUCTION HAUL
ROUTE TO HWY 213
150 150 300
SCALE OF FEET
SCALE: 1"=150'
LEGEND
WORK AREA #1
WORK AREA #2
CONTRACTOR STAGING AREA
CONTRACTOR HAUL / ACCESS ROUTE
LOW LEVEL BARRICADES
RUNWAY SAFETY AREA
RUNWAY OBJECT FREE AREA
RUNWAY OBSTACLE FREE ZONE
TAXIWAY SAFETY AREA
TAXIWAY OBJECT FREE AREA
TAXILANE OBJECT FREE AREA
G-04
RUNWAY 14-32
RUNWAY CLOSURE
"X"
G-04
RUNWAY CLOSURE
"X"
G-04
G-04
NORTH TAXILANE
BARRICADE
WA#2
G-04
TWY A2TWY A1 TWY A3
131'
79.0'
HANGAR APRON
79'
79'
150'
400'
500'
TAXIWAY
CONTRACTOR
STAGING AREA
LOW LEVEL
BARRICADES
G-04
BARRICADE
WA#12
G-04
79'
BARRICADE
WA#2BARRICADE
WA#2
G-04
BARRICADE
WA#2 2
G-04
CONTRACTOR
HAUL ROUTE TO
RUNWAY 14-32
THE SCOPE OF THIS PROJECT HAS BEEN
COORDINATED WITH THE 2026 ODAV PMP CYCLE TO
AVOID DUPLICATION OF TREATMENTS.
MAIN APRON WILL NOT RECEIVE ANY
SURFACE SEAL APPLICATION.
BID SET
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
MULINO STATE AIRPORT (4S9)
RUNWAY, APRON, AND TAXILANE SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- M ul in o
St at e R un w ay , T ax ila ne , a nd A pr on
S ur fa ce
S ea l - P ha se
I
- D es ig n\ C
AD
W O
R
KI
N G
\1
C
O N
ST
R
U C
TI
O
N S
IT
E
AN
D
S
AF
ET
Y
PH
AS
IN
G
P
LA
N .d w g
AS NOTED40097.141.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
ARB
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0072-018-2025
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA JIME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
BID SET
G-04
CONSTRUCTION SITE AND SAFETY NOTES AND DETAILS
ORANGE / WHITE STRIPE
HIGH REFLECTIVE SHEETING
INSTALL BATTERY OR SOLAR POWERED
RED LENS STANDARD BARRICADE LIGHT
8'-0"
10"
ELEVATION
FILL WITH WATER
OR SAND
ORANGE BODY
SELF-CONNECTING
PINS
NOTES:
1. BARRICADES SHALL MEET THE REQUIREMENTS OF SECTION 2.20.2, FIGURE 2-8, AND FIGURE 2-9 OF
AC 150/5370-2G OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION.
2. PLACE BARRICADE PER THE PLANS OR AS DIRECTED BY THE ENGINEER.
3. BARRICADES SHALL BE PROVIDED BY THE CONTRACTOR. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR PLACING, FILLING, EMPTYING, MOVING, MAINTAINING AND PROTECTING
BARRICADES THROUGHOUT THE DURATION OF THE PROJECT.
4. LIGHTS ARE TO BE NO FARTHER APART THAN 10' WHEN PLACED.
5. BARRICADES SHALL BE NOT FARTHER THAN 10' APART.
6. BARRICADES SHALL BE COVERED WITH REFLECTIVE SHEETING OR OTHER MATERIAL APPROVED BY
THE ENGINEER.
7. BARRICADES SHALL BE APPROPRIATELY WEIGHTED DOWN TO RESTRICT MOVEMENT FROM HIGH
WINDS OR PROP WASH.
SCALE: N.T.S.
G-04
LOW LEVEL BARRICADE DETAIL
VARIES 6'-0"
GENERAL WORK AREA NOTES:
1. THE CONTRACTOR SHALL BE RESTRICTED TO USE THE ENTRANCE AND HAULING ROUTES
SHOWN ON THE DRAWINGS. FOLLOW AIRPORT AND FAA SAFETY PROCEDURES WHEN MOVING
EQUIPMENT OR PERSONNEL. NO PERSONAL VEHICLES SHALL BE ALLOWED OUTSIDE OF THE
STAGING AREA. THE AIRPORT MAY IMMEDIATELY REMOVE ANY PERSONNEL AND EQUIPMENT
FROM THE SITE IN VIOLATION OF AIRPORT SAFETY AND SECURITY PROCEDURES.
2. ALL VEHICLES AND CONSTRUCTION EQUIPMENT SHALL REMAIN ON PAVEMENT TO THE
FURTHEST EXTENT POSSIBLE. ANY DAMAGE TO LIGHTS OR OTHER AIRPORT NAVIGATIONAL AIDS
SHALL BE REPORTED IMMEDIATELY.
3. LIMIT EQUIPMENT HEIGHT TO 12 FEET UNLESS OTHERWISE APPROVED BY THE ENGINEER.
4. LIMIT STOCKPILES TO 12 FEET IN HEIGHT AND AT LEAST 250 FEET FROM THE RUNWAY
CENTERLINE AND 65.5 FEET FROM TAXIWAY CENTERLINE.
5. IN THE EVENT OF AN EMERGENCY, MOVE ALL EQUIPMENT AND PERSONNEL TO THE
CONTRACTOR'S STAGING AREA UNLESS OTHERWISE DIRECTED BY THE ENGINEER.
6. ACCESS TO ANY WORK AREA MUST BE AUTHORIZED BY THE ENGINEER PRIOR TO WORK IN THAT
AREA. NOTIFY THE ENGINEER A MINIMUM OF 72 HOURS PRIOR TO BEGINNING WORK IN ANY
AREA.
7. SEE SECTION 01300 OF THE TECHNICAL SPECIFICATIONS. ANY WORK WITHIN 250 FEET OF THE RUNWAY 14-32 CENTERLINE OR WITHIN 300 FEET OF THE RUNWAY END WILL REQUIRE A RUNWAY
CLOSURE.
8. PLACE LOW LEVEL BARRICADES AS SHOWN AND AS DESCRIBED IN SECTION 01300 OF THE
TECHNICAL SPECIFICATIONS.
9. IN THE EVENT OF NIGHTTIME CONSTRUCTION, LIGHTING EQUIPMENT MUST ADEQUATELY
ILLUMINATE THE WORK AREA PER AC 150/5370-2G OPERATIONAL SAFETY ON AIRPORTS DURING
CONSTRUCTION.
10. FOR ADDITIONAL REQUIREMENTS, REFER TO SECTION 01300, AIRPORT SAFETY, IN THE
TECHNICAL SPECIFICATIONS.
11. WHILE WORKING IN ANY AREA, THE CONTRACTOR SHALL HAVE AN AIRPORT RADIO CAPABLE OF
MONITORING THE AIRPORT UNICOM FREQUENCY:
CTAF/UNICOM: 123.05 MHz
RADIO TRAINING IS REQUIRED FOR STAFF ASSIGNED TO MONITOR THE RADIO.
12. CONTRACTOR SHALL MOVE ALL EQUIPMENT TO THE STAGING AREA AT THE COMPLETION OF
EACH WORK SHIFT.
13. PLACE CLOSURE CROSSES (X's) OFF THE END OF THE RUNWAY DURING RUNWAY CLOSURES AS
DIRECTED BY THE ENGINEER.
14. DISENGAGE LIGHTING CIRCUITS, DARKEN LIGHT FIXTURES, AND COVER GUIDANCE SIGNS AS
DIRECTED BY THE AIRPORT TO PREVENT AIRCRAFT FROM TAXIING TOWARDS CLOSED WORK
AREAS. ALL AIRPORT LIGHTING SHALL BE DISENGAGED DURING A RUNWAY CLOSURE.
15. RUNWAY CLOSURES WILL REQUIRE THE SHUTDOWN OF AIRPORT PAPIS, THRESHOLD LIGHTS, AND MIRLS. AIRPORT SPONSOR TO SUBMIT RUNWAY CLOSURE STRATEGIC EVENT SUBMISSION
(SEC) A MINIMUM OF 45 DAYS PRIOR TO THE ANTICIPATED CONSTRUCTION START DATE.
16. PAPI SHUTDOWN WILL BE MADE PUBLIC TO AIRFIELD USERS VIA NOTAM.
17. ENGINEERING CONSULTANT POINT-OF-CONTACT:
RYAN HALVORSON, PE
503-419-2130
18. CONTRACTOR SHALL PREVENT WILDLIFE ATTRACTANTS PER FAA 150/5200-33C HAZARDOUS
WILDLIFE ATTRACTANTS ON OR NEAR AIRPORTS.
19. SPECIFIC WEATHER CONDITIONS MUST BE MET FOR SURFACE SEAL APPLICATION. CONTRACTOR TO COORDINATE WITH ENGINEER TO DETERMINE IF SURFACE SEAL APPLICATION IS FEASIBLE A
MINIMUM OF 12 HOURS BEFORE PLANNED APPLICATION. IF UNPREDICTED WEATHER OCCURS,
THE ENGINEER MAY POSTPONE APPLICATION. SEE WEATHER LIMITATIONS SECTION P-608-4.2 IN
THE TECHNICAL SPECIFICATIONS.
20. SPECIFIC WEATHER CONDITIONS MUST BE MET FOR THE PAVEMENT MARKING APPLICATION.
CONTRACTOR TO COORDINATE WITH ENGINEER TO DETERMINE IF PAVEMENT MARKING
APPLICATION IS FEASIBLE A MINIMUM OF 12 HOURS BEFORE PLANNED APPLICATION. IF
UNPREDICTED WEATHER OCCURS, THE ENGINEER MAY POSTPONE APPLICATION. SEE WEATHER
LIMITATIONS SECTION P-620-3.1 IN THE TECHNICAL SPECIFICATIONS.
SAFETY AREAS AND OBJECT FREE AREAS:
1. RUNWAY SAFETY AREA (RSA) AND TAXIWAY SAFETY AREA (TSA) AREAS ARE DEFINED AS AREAS
THAT SHALL BE CLEARED AND GRADED AND HAVE NO POTENTIALLY HAZARDOUS RUTS, HUMPS,
DEPRESSIONS, OR OTHER SURFACE VARIATIONS. THE MAXIMUM SLOPE ANYWHERE WITHIN A
RUNWAY OR TAXIWAY SAFETY AREA SHALL BE 5%. IN TRANSITIONS FROM PAVED TO UNPAVED
AREAS, A 3 INCH MAXIMUM VERTICAL DROP IS ALLOWED. THE RUNWAY AND TAXIWAY SAFETY
AREAS SHALL BE MAINTAINED AT ALL TIMES WHEN THE RUNWAY AND TAXIWAY IS OPEN TO AIR TRAFFIC. PERSONNEL, EQUIPMENT, OR MATERIAL WITHIN A RUNWAY SAFETY AREA AT ANY TIME
REQUIRES A CLOSURE. SAFETY AREAS THAT ARE CLOSED FOR CONSTRUCTION MUST MEET
THESE CRITERIA PRIOR TO REOPENING.
2. THE CONTRACTOR SHALL ANTICIPATE THE CONSTRUCTION OF TEMPORARY FILLS, COMPACTION, AND GRADING TO MEET THE REQUIREMENTS OF "WORK IN SAFETY AREAS AND OBJECT FREE
AREAS" PRIOR TO REOPENING. THIS WORK IS CONSIDERED INCIDENTAL TO VARIOUS WORK ITEMS
AND SEPARATE PAYMENT WILL NOT BE MADE.
3. CONTRACTOR SHALL NOT ENTER ANY ACTIVE RSA OR TSA WITHOUT AUTHORIZATION FROM THE AIRPORT. ALL EQUIPMENT, TOOLS, AND MATERIALS SHALL BE MOVED TO STAGING AREAS PRIOR
TO REOPENING A RUNWAY OR TAXIWAY.
4. SAFETY AREA LIMITS:
RUNWAY 14-32 - 75 FEET FROM ; 300 FEET FROM RUNWAY END/THRESHOLD (RSA)
- (60 FEET FROM MIN. STANDARD)
TAXIWAYS - 39.5 FEET FROM
- (24.5 FEET FROM MIN. STANDARD)
5. RUNWAY AND TAXIWAY OBJECT FREE AREAS ARE DEFINED AS AREAS THAT SHALL BE CLEAR OF
FIXED OR MOVABLE OBJECTS. EQUIPMENT NOT IN USE, AND MATERIAL STOCKPILES AND
STORAGE SHALL BE PLACED AT LEAST 250 FEET FROM ANY RUNWAY CENTERLINE. NO WORK MAY OCCUR IN TAXIWAY OBJECT FREE AREAS UNLESS THE TAXIWAY IS CLOSED TO AIRCRAFT TRAFFIC.
NO STORAGE OF EQUIPMENT, MATERIALS OR STOCKPILES IS ALLOWED WITHIN ACTIVE
TAXIWAY/RUNWAY OBJECT FREE AREAS.
6. PERSONNEL, MATERIAL, AND/OR EQUIPMENT MAY NOT PENETRATE THE OBSTACLE FREE ZONE
WHILE THE RUNWAY IS OPEN FOR AIRCRAFT OPERATIONS.
7. OBJECT FREE AREA LIMITS: OBSTACLE FREE ZONE LIMITS:
RUNWAY 14-32 - 250 FEET FROM RUNWAY 14-32 -200 FEET FROM
TAXIWAYS - 65.5 FEET FROM
(44.5 FEET MIN STANDARD)
TAXILANES - 57.5 FEET FROM
8. RUNWAY AND TAXIWAY SAFETY AREA AND RUNWAY AND TAXIWAY OBJECT FREE ZONE CRITERIA
MUST BOTH BE MET PRIOR TO OPENING AN IMPACTED RUNWAY OR TAXIWAY.
WORK SCHEDULE AND PHASING NOTES:
1. ALL WORK SHALL BE COMPLETED WITHIN 13 CONTINUOUS CALENDAR DAYS OF
CONTRACT NOTICE TO PROCEED.
2. NOTICE TO PROCEED FOR CONSTRUCTION IS ANTICIPATED AUGUST 2026 AT
THE EARLIEST.
3. WORK EXEMPT FROM THE 13 CALENDAR DAY CONTRACT PERIOD INCLUDES
THE SECOND APPLICATION OF PAVEMENT MARKINGS. A CONTINUOUS 1
CALENDAR DAY (24 HOUR) CLOSURE FOR THE SECOND APPLICATION OF
PAVEMENT MARKINGS WILL BE PERMITTED, A MINIMUM OF 30 DAYS AFTER
PAVEMENT REHABILITATION HAS BEEN COMPLETED.
YELLOW
RUNWAY
LC
(TYP)
(TYP)
NOTES:
1. RUNWAY CLOSURE CROSSES SHALL BE PROVIDED, INSTALLED,
MAINTAINED, AND REMOVED BY THE CONTRACTOR.
2. PLACE CLOSING "X" DIRECTLY OUTSIDE OF BOTH ENDS OF THE
RUNWAY, AS CLOSE TO THE EDGE OF PAVEMENT AS IS
REASONABLE TO COMPLETE RUNWAY WORK.
3. THE CROSSES SHALL BE SECURED WITH WEIGHTED MATERIALS
LESS THAN 3 INCHES IN HEIGHT. SANDBAGS OR EQUIVALENT
ARE NOT ALLOWED.
4. SEE FIGURE 2-3 OF FAA AC 15-5370-2G OPERATIONAL SAFETY
ON AIRPORTS DURING CONSTRUCTION FOR MARKINGS OF A
TEMPORARY RUNWAY CLOSURE.
SCALE: N.T.S.
G-04
RUNWAY CLOSURE "X" DETAIL
C L C L
C L C L
C L C L
C L
C L
RUNWAY/TAXIWAY/APRON RE-OPENING CHECKLIST:
1. BACKFILL ANY OPEN TRENCHES WITHIN THE RSA AND/OR TSA, OR COVER THE
EXCAVATIONS APPROPRIATELY TO ALLOW FOR THE SAFE OPERATION OF THE
HEAVIEST AIRCRAFT OPERATING ON THE AFFECTED RUNWAY OR TAXIWAY
SUCH THAT THE AIRCRAFT WILL NOT BE DAMAGED.
2. ENSURE THERE ARE NO POTENTIALLY HAZARDOUS RUTS, HUMPS,
DEPRESSIONS, OR OTHER SURFACE VARIATIONS WITHIN THE RSA AND/OR TSA.
THE RSA AND TSA MUST BE CAPABLE OF SUPPORTING OCCASIONAL PASSAGE
OF AIRCRAFT DURING DRY CONDITIONS WITHOUT CAUSING STRUCTURAL
DAMAGE TO THE AIRCRAFT.
3. ENSURE THAT IMPACTED PAVEMENT EDGES DO NOT EXCEED 3 INCHES
VERTICALLY.
4. IF RE-OPENING A RUNWAY AFTER STANDARD SEAL (P-608) APPLICATION,
ENSURE THAT FRICTION TESTING HAS BEEN COMPLETED AND ACCEPTED IN
ACCORDANCE WITH ITEM P-608 IN THE TECHNICAL SPECIFICATIONS. USE
APPROVED CONTINUOUS FRICTION MEASURING EQUIPMENT (CFME) AND
DETERMINE IF RESULTS ARE PASSING OR FAILING BASED ON THE APPLICATION
MAINTENANCE PLANNING FRICTION LEVELS SHOWN IN TABLE 3-2 OF FAA AC
150/5320-12C MEASUREMENT, CONSTRUCTION, AND MAINTENANCE OF
SKID-RESISTANT AIRPORT PAVEMENT SURFACES. THE RPR SHALL BE PRESENT
FOR FRICTION TESTING, AND THE CONTRACTOR SHALL PROVIDE THE RPR WITH
A WRITTEN REPORT OF PASSING TEST RESULTS FOR ACCEPTANCE PRIOR TO
RE-OPENING THE RUNWAY.
5. RETURN ALL EQUIPMENT TO STAGING AREAS AND ENSURE NO CONSTRUCTION
EQUIPMENT, MATERIALS, OR OTHER OBJECTS ARE WITHIN THE OFA AND/OR
TOFA.
6. REMOVE ALL CONSTRUCTION DEBRIS, TRASH, AND ALL FOD FROM THE
PAVEMENT.
7. REMOVE BARRICADES AND CLOSURE MARKERS.
EC-01
EROSION CONTROL PLAN
EC-01
EROSION CONTROL PLAN
SCALE: 1"=150'
LEGEND:
RUNWAY SAFETY AREA
OBSTACLE-FREE ZONE
OBJECT FREE AREA
TAXIWAY OBJECT FREE AREA
TAXIWAY SAFETY AREA
TAXILANE OBJECT FREE AREA
WORK AREA BOUNDARY
INLET BASIN PROTECTION
PER
LOW LEVEL BARRICADE
CONTRACTOR STAGING AREA
HAUL ROUTE
NOTES:
1. HYDROSEED ANY DISTURBED SURFACES, AT NO COST TO THE OWNER. HYDROSEEDING SHALL NOT OCCUR ON
GRAVEL SHOULDERS. THIS WORK IS INCIDENTAL TO OTHER BID ITEMS.
2. CONSTRUCTION STAGING AREA TO CONTAIN STOCKPILE, PORTABLE TOILET, CONSTRUCTION FUEL, AND
MATERIALS.
EC-01
ANTICIPATED PROJECT SCHEDULE:
1. ANTICIPATED START DATE FOR WORK IS AUGUST 2026. WORK INCLUDES PAVEMENT REHABILITATION CONSISTING
OF CRACK SEALING, AC PATCHING - WIDE CRACK REPAIR, PAVEMENT MARKINGS, AND SURFACE SEAL.
2. ANTICIPATED END DATE FOR WORK IS AUGUST 2026; NO TEMPORARY STOP DATES ARE ANTICIPATED.
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
MULINO STATE AIRPORT (4S9)
RUNWAY, APRON, AND TAXILANE SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- M ul in o
St at e R un w ay , T ax ila ne , a nd A pr on
S ur fa ce
S ea l - P ha se
I
- D es ig n\ C
AD
W O
R
KI
N G
\1
E
R O
SI
O
N C
O N
TR
O
L
PL
AN
.d w g
AS NOTED40097.141.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
ARB
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0072-018-2025
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA JIME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
BID SET
EXISTING WINDCONE
TAXIWAY A
RUNWAY 14-32
150 150 300
SCALE OF FEET
SCALE: 1"=150'
S MULINO RD
SECURITY GATE
MAIN APRON
EC-01
PREFABRICATED FILTER
INSERT-TYPE 3 DETAIL
NO SCALE
FLOW
FLOW
GRATE#5 REBAR #5 REBAR
SEWN 6"
OVERLAP
GEOTEXTILE INSERT
SEWN 6"
OVERLAP
FILTERED
WATER
NOTES:
1. INSTALL PREFABRICATED FILTER INSERT -
TYPE 3 PER ODOT STANDARD DRAWING
RD1010.
2. INSTALLATION, MAINTENANCE, AND REMOVAL
OF INLET PROTECTION SHALL BE INCIDENTAL
TO "TEMPORARY EROSION AND POLLUTION
CONTROL." NO SEPARATE MEASUREMENT OR
PAYMENT SHALL BE MADE.
CONSTRUCTION HAUL
ROUTE TO HWY 213
S AIRPORT RD
LA
ND
IN
G
W
AY
INLET BASIN
PROTECTION (TYP.)
INLET BASIN
PROTECTION (TYP.)
150'
400'
500'
TWY A2TWY A1 TWY A3
131'
79'
79'
79'
79'
NORTH TAXILANE
EC-01
TAXIWAY
HANGAR APRON
EC-01
CONTRACTOR
STAGING AREA
LOW LEVEL
BARRICADES
CONTRACTOR
HAUL ROUTE TO
RUNWAY 14-32
G-04
5.
C-01
DEMOLITION PLAN
SCALE: 1"=150'
C-01
DEMOLITION PLAN
LEGEND:
RUNWAY SAFETY AREA
OBSTACLE-FREE ZONE
OBJECT FREE AREA
TAXIWAY OBJECT FREE AREA
TAXIWAY SAFETY AREA
TAXILANE OBJECT FREE AREA
WORK AREA #1
WORK AREA #2
RUNWAY PAVEMENT MARKING
REMOVAL
RUNWAY, TAXIWAY, AND TAXILANE
CENTERLINE MARKING REMOVAL
EXISTING PAVEMENT MARKING
DEMOLITION NOTES:
1. PROTECT EXISTING STRUCTURES, UTILITIES AND
FEATURES TO REMAIN.
2. PROTECT ALL EXISTING PAVEMENT MARKINGS UNLESS
OTHERWISE NOTED.
3. PAVEMENT MARKING REMOVAL AMOUNT SHALL BE:
· 50% REMOVAL FOR PAVEMENT AREAS TO RECEIVE
STANDARD SEAL COAT WHEN MARKINGS ARE NOT
RELOCATED
· 100% REMOVAL FOR AREAS TO RECEIVE STANDARD
SEAL COAT WHEN MARKINGS ARE TO BE RELOCATED,
AS SHOWN ON THE PLAN
SEE ITEM P-620 IN THE TECHNICAL SPECIFICATIONS.
4. PROPOSED PAVEMENT MARKING QUANTITIES ARE
BASED ON FIELD SURVEY AND/OR GIS DATA UTILIZED
AT THE TIME OF DESIGN AND WILL BE FIELD-VERIFIED.
DEVIATIONS ARE EXPECTED DUE TO RELOCATIONS OF
EXISTING MARKINGS AND CONDITION CHANGES.
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
MULINO STATE AIRPORT (4S9)
RUNWAY, APRON, AND TAXILANE SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- M ul in o
St at e R un w ay , T ax ila ne , a nd A pr on
S ur fa ce
S ea l - P ha se
I
- D es ig n\ C
AD
W O
R
KI
N G
\1
D
EM
O
LI
TI
O N
P
LA
N .d w g
AS NOTED40097.141.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
ARB
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0072-018-2025
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA JIME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
BID SET
EXISTING WINDCONE
TAXIWAY A
RUNWAY 14-32
TWY A2
150 150 300
SCALE OF FEET
SCALE: 1"=150'
TWY A1 TWY A3
S AIRPORT RD
LA
ND
IN
G
W
AY
S MULINO RD
SECURITY GATE
MAIN APRON
HOLD BAR TO
REMAIN IN PLACE
HOLD BAR TO
REMAIN IN PLACE
HOLD BAR TO
REMAIN IN PLACE
RUNWAY NUMBER
REMOVAL RUNWAY NUMBER
REMOVAL
RUNWAY CLOSURE
"X"
G-04
RUNWAY CLOSURE
"X"
G-04
RUNWAY CENTERLINE
REMOVAL
TAXIWAY LEAD ON
REMOVAL
RUNWAY MARKING TO
BE 100% REMOVED
TAXILANE CENTERLINE
REMOVAL
TAXILANE CENTERLINE
REMOVAL
NORTH TAXILANE
TAXILANE CENTERLINE
REMOVAL
TAXILANE CENTERLINE
REMOVAL TAXIWAY
HANGAR APRON
150'
400'
500'
EX. TAXIWAY CENTERLINES
TO REMAIN IN PLACE
EX. TIE-DOWN PAVEMENT
MARKINGS TO REMAIN IN PLACE
PAVEMENT MARKINGS REMOVAL
WORK AREA YELLOW MARKINGS (SF) WHITE MARKINGS (SF)
1 1,451 4,810
2 1,391 0
TOTALS 2,871 4,810
PROJECT TOTAL
(YELLOW & WHITE) 7,681
TAXILANE CL TO BE 100%
REMOVED
TAXILANE CL TO BE 100%
REMOVED
RUNWAY MARKING
REMOVAL
C-02
CRACK SEAL AND PAVEMENT REPAIR PLAN
C-02
CRACK SEAL AND PAVEMENT REPAIR PLAN
SCALE: 1"=150'
LEGEND:
RUNWAY SAFETY AREA
OBSTACLE-FREE ZONE
OBJECT FREE AREA
TAXIWAY OBJECT FREE AREA
TAXIWAY SAFETY AREA
TAXILANE OBJECT FREE AREA
CRACK SEAL WORK AREA #1
CRACK SEAL WORK AREA #2
CRACK REPAIR NOTES:
1. SPRAY WEEDS A MINIMUM OF TWO WEEKS PRIOR TO
CRACK SEALING
2. PRIOR TO CRACK REPAIR, CRACK LOCATIONS WILL
BE INDICATED WITH TEMPORARY MARKS BY THE
ENGINEER. CONTRACTOR WILL BE PROVIDED WITH
MEASURED CRACK QUANTITY INFORMATION.
3. PERFORM EXISTING PAVEMENT MARKING REMOVAL
BEFORE CRACK SEALING AND SURFACE SEAL.
REMOVED PAVEMENT MARKINGS SHALL BE
REPLACED PRIOR TO OPENING RUNWAY, TAXIWAYS,
OR TAXILANES TO AIR TRAFFIC.
4. CONTRACTOR SHALL IMMEDIATELY NOTIFY
ENGINEER IF ANY DISCREPANCY IN CRACK LENGTH
IS OBSERVED.
5. CONTRACTOR SHALL NOTIFY ENGINEER 72 HOURS
MINIMUM PRIOR TO CRACK REPAIR WORK.
6. PERFORM CRACK SEALING PRIOR TO SURFACE SEAL
APPLICATION.
7. FOR CRACK SEALING DETAIL, REFER TO
8. FOR AC PATCHING - WIDE CRACK REPAIR DETAIL,
REFER TO
GENERAL NOTES:
1. AIRPORT USES UNICOM RADIO FREQUENCY OF
123.05. PERFORM RADIO CHECK PRIOR TO ENTERING
AIRPORT.
2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO USE
CAUTION AROUND RUNWAY LIGHTS, TAXIWAY
LIGHTS, TAXIWAY REFLECTORS, AND CONNECTOR
SIGNS.
3. CONTRACTOR CHANGES TO PHASING PLAN
REQUIRES APPROVAL FROM THE ENGINEER.
C-04
KEY NOTE # CRACK SEALING (LF) AC PATCHING - WIDE CRACK
REPAIR (LF)
WORK AREA #1
1 16,244 13
2 854 0
3 990 276
SUBTOTAL 18,088 289
WORK AREA #2
4 262 141
5 1,702 96
6 0 52
7 0 90
8 0 36
9 108 78
10 477 37
11 350 60
12 737 27
SUBTOTAL 3,636 617
TOTAL 21,724 906
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
MULINO STATE AIRPORT (4S9)
RUNWAY, APRON, AND TAXILANE SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- M ul in o
St at e R un w ay , T ax ila ne , a nd A pr on
S ur fa ce
S ea l - P ha se
I
- D es ig n\ C
AD
W O
R
KI
N G
\1
C
R
AC
K R
EP
AI
R .d w g
AS NOTED40097.141.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
ARB
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0072-018-2025
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA JIME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
BID SET
6 7
EXISTING WINDCONE
TAXIWAY A
TWY A2TWY A1 TWY A3
S MULINO RD
SECURITY GATE
MAIN APRON
S AIRPORT RD
LA
ND
IN
G
W
AY
NORTH TAXILANE
RUNWAY 14-32
C-04
150 150 300
SCALE OF FEET
SCALE: 1"=150'
TAXIWAY
HANGAR APRON
150'
400'
500'
MULTICORELINK:14101 DETAILS-9 C-04
C-03
SURFACE SEAL PLAN
SCALE: 1"=150'
LEGEND:
RUNWAY SAFETY AREA
OBSTACLE-FREE ZONE
OBJECT FREE AREA
TAXIWAY OBJECT FREE AREA
TAXIWAY SAFETY AREA
TAXILANE OBJECT FREE AREA
STANDARD SEAL COAT LIMITS
NOTES:
1. AIRPORT USES UNICOM RADIO FREQUENCY OF 123.05. PERFORM RADIO CHECK PRIOR TO ENTERING
AIRPORT.
2. REMOVE EXISTING PAVEMENT MARKINGS AS SHOWN ON DEMOLITION PLAN AND AS DESCRIBED IN THE SPECIFICATIONS. PERFORM EXISTING PAVEMENT MARKING REMOVAL, CRACK SEALING, AND AC PATCHING
- WIDE CRACK REPAIR BEFORE SURFACE SEAL.
3. PROVIDE SURFACE PREPARATION FOR ALL AREAS TO RECEIVE STANDARD (P-608) SEAL COAT. SEE DETAIL
FOR PAVEMENT EDGE CLEANING.
4. ALL PAVEMENT MARKINGS WITHIN WORK AREAS TO BE REMARKED AFTER SURFACE SEAL, REFER TO
PAVEMENT MARKING PLANS.
5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO USE CAUTION AROUND RUNWAY LIGHTS, TAXIWAY LIGHTS, TAXIWAY REFLECTORS, AND CONNECTOR SIGNS.
6. COORDINATE SURFACE SEAL LIMITS WITH THE ENGINEER IN THE FIELD PRIOR TO BEGINNING
CONSTRUCTION.
7. OIL AND FUEL RESIDUE MAY BE PRESENT FROM AIRCRAFT OPERATIONS. CONTRACTOR SHALL TAKE ADDED CARE TO PERFORM SURFACE PREPARATION PRIOR TO SURFACE SEAL APPLICATION. SEE ITEM P-101.
8. PRESERVE AND PROTECT ALL PAVEMENT MARKINGS OUTSIDE OF WORK AREAS. DAMAGE TO MARKINGS
OUTSIDE OF WORK AREAS WILL BE REPLACED AT NO ADDITIONAL COST TO THE OWNER.
9. CONTRACTOR CHANGES TO PHASING PLAN REQUIRES APPROVAL FROM THE ENGINEER.
10. THE CONTRACTOR MAY BEGIN TESTING THE SKID RESISTANCE OF THE APPLIED STANDARD SEAL (P-608) AFTER IT HAS FULLY CURED, GENERALLY 8 TO 36 HOURS AFTER APPLICATION. THE RUNWAY MUST HAVE PASSING FRICTION TEST RESULTS PER FAA AC 150/5320-12 PRIOR TO OPENING TO TRAFFIC. SEE ITEM
P-608 IN THE SPECIFICATIONS.
11. CONTRACTOR SHALL IMPLEMENT APPROVED SPCD IN ACCORDANCE WITH SECTION 01300 OF THE
SPECIFICATIONS
C-04
EXISTING WINDCONE
TAXIWAY A
TWY A2
150 150 300
SCALE OF FEET
SCALE: 1"=150'
TWY A1 TWY A3
S MULINO RD
SECURITY GATE
MAIN APRON
S AIRPORT RD
LA
ND
IN
G
W
AY
NORTH TAXILANE
RUNWAY 14-32
C-03
SURFACE SEAL PLAN
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
MULINO STATE AIRPORT (4S9)
RUNWAY, APRON, AND TAXILANE SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- M ul in o
St at e R un w ay , T ax ila ne , a nd A pr on
S ur fa ce
S ea l - P ha se
I
- D es ig n\ C
AD
W O
R
KI
N G
\1
S
U R
FA
C
E
SE
AL
.d w g
AS NOTED40097.141.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
ARB
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0072-018-2025
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA JIME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
BID SET
STANDARD SEAL COAT (P-608)
STANDARD SEAL COAT (P-608)
KEY NOTE # STANDARD SEAL (SY)
WORK AREA #1
1 40,125
2 0
3 1,839
SUBTOTAL 41,964
WORK AREA #2
4 904
5 2,812
6 493
7 737
8 845
9 1,668
10 2,650
11 1,024
12 1,569
SUBTOTAL 12,702
TOTAL 54,666
6 7
RUNWAY 14-32
TAXIWAY
HANGAR APRON
150'
400'
500'
CONCRETE VALLEY
GUTTER
C-04
PAVEMENT REPAIR AND SURFACE SEAL DETAILS
PAVEMENT EDGE CLEANING DETAIL
SCALE: N.T.S.
2'
1.5" EDGE EXPOSURE
REMOVE OVERGROWN
SOD, MOSS, SOIL, VEGETATION
AND THOROUGHLY CLEAN
PRIOR TO SEAL COAT
DISPOSE OFF-SITE
EXISTING
PAVEMENT
SECTION
FINISH GRADE
MATCH EXISTING
GRADE
C-04
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
MULINO STATE AIRPORT (4S9)
RUNWAY, APRON, AND TAXILANE SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- M ul in o
St at e R un w ay , T ax ila ne , a nd A pr on
S ur fa ce
S ea l - P ha se
I
- D es ig n\ C
AD
W O
R
KI
N G
\1
D
ET
AI
LS
.d w g
AS NOTED40097.141.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
ARB
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0072-018-2025
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA JIME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
BID SET
EXISTING
BASE
ROTOMILL OR
SAWCUT
SEAL EDGE OF FINISHED PATCH
WITH CRACK SEAL MATERIAL (TYP.)
HMAC PAVEMENT
NOM. THKN. - 3" MIN OR MATCH EXISTING
THICKNESS, (3" MAX. LIFT), WHICHEVER IS
GREATER. 92% COMPACTION PER ODOT
00744 CONSTRUCTION STANDARDS.
3/4" - 0" DENSE GRADED ODOT
AGGREGATE BASE COURSE, 2" MIN.
THICKNESS. COMPACT TO 100% ASTM
D-698 PER ODOT 00641
CONSTRUCTION STANDARDS.
SCALE: N.T.S.
AC PATCHING - MAJOR WIDE CRACK DETAIL 2
C-04
NOTES:
1. EXACT LENGTH WILL BE IDENTIFIED IN THE FIELD BY THE
ENGINEER PRIOR TO CONSTRUCTION.
2. TACK ASPHALT FACES OF SAWCUTS. TACK COAT AND
RUBBERIZED ASPHALT CRACK SEALANT SHALL BE
INCIDENTAL TO OTHER APPLICABLE BID ITEMS. NO SEPARATE
MEASUREMENT OR PAYMENT WILL BE MADE.
3. RECOMPACT EXISTING BASE ROCK TO 100% OF ASTM D-698
PRIOR TO CONSTRUCTING NEW AGGREGATE BASE.
4. AGGREGATE BASE COMPACTION TO BE TESTED PER ODOT
SPECIFICATION 00641.44; ASPHALT CONCRETE COMPACTION
TO BE TESTED PER ODOT SPECIFICATION 00744.49.
PLAN
SECTION
REPAIR LIMITS
(SAWCUT LINE OR
ROTOMILLED EDGE)
PAVEMENT CRACKS WITH
WIDTH GREATER THAN 1 1/2"
24" WIDE
APPLY TACK (P-603) TO FACE
OF SAWCUT OR MILLED EDGE
(TYP.)
VARIES
18" - 24"
C-04
CRACK SEALING DETAIL
SCALE: NTS
NOTES:
1. VERIFY CRACK LOCATIONS AND QUANTITIES FOR
CLEANING AND FILLING WITH ENGINEER PRIOR TO
WORK.
2. FOR UNSEALED CRACKS, ROUTE AND CLEAN CRACKS OF
ALL DEBRIS AND VEGETATION, THEN FILL WITH
RUBBERIZED ASPHALT CRACK SEALANT. SQUEEGEE USE
IS NOT ALLOWED FOR UNSEALED CRACKS.
3. FOR PREVIOUSLY SEALED CRACKS, CLEAN CRACKS
WITH HEAT LANCE AND FILL WITH RUBBERIZED ASPHALT
CRACK SEALANT. SQUEEGEE USE IS ALLOWED FOR
PREVIOUSLY SEALED CRACKS.
4. MORE THAN ONE LIFT OF SEALANT MAY BE NECESSARY
TO MEET THE REQUIREMENTS OF SPECIFICATION ITEMS
P-101 AND P-605.
FOR UNSEALED CRACKS: ROUTE,
CLEAN, AND SEAL
FOR PREVIOUSLY SEALED
CRACKS: HEAT, CLEAN, AND SEAL
C-05
PAVEMENT MARKING OVERALL PLAN
SCALE: 1"=150'
SEE
SHEET
C-07
SEE SHEET
C-06
C-05
PAVEMENT MARKING OVERALL PLAN
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
MULINO STATE AIRPORT (4S9)
RUNWAY, APRON, AND TAXILANE SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- M ul in o
St at e R un w ay , T ax ila ne , a nd A pr on
S ur fa ce
S ea l - P ha se
I
- D es ig n\ C
AD
W O
R
KI
N G
\1
P
AV
EM
EN
T
M
AR
KI
N
G O
VE
R
AL
L
PL
AN
.d w g
AS NOTED40097.141.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
ARB
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0072-018-2025
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA JIME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
TWY A2TWY A1 TWY A3
TAXIWAY
TAXIWAY A
150 150 300
SCALE OF FEET
SCALE: 1"=150'
RUNWAY 14-32
HANGAR APRON
MAIN APRON
NORTH
TAXILANE
PAVEMENT MARKINGS (FIRST APPLICATION, 30%)
WORK AREA YELLOW MARKINGS (SF) WHITE MARKINGS (SF)
1 1,797 5,238
2 1,358 0
TOTALS 3,184 5,238
PROJECT TOTAL
(YELLOW & WHITE) 8,422
PAVEMENT MARKINGS (SECOND APPLICATION, 100%)
WORK AREA YELLOW MARKINGS (SF) WHITE MARKINGS (SF)
1 2,643 5,238
2 1,358 0
TOTALS 4,030 5,238
PROJECT TOTAL
(YELLOW & WHITE) 9,268
LEGEND:
RUNWAY SAFETY AREA
OBSTACLE-FREE ZONE
OBJECT FREE AREA
TAXIWAY OBJECT FREE AREA
TAXIWAY SAFETY AREA
WORK AREA #1
WORK AREA #2
WHITE PAVEMENT MARKING
YELLOW PAVEMENT MARKING
NOTES:
1. CONTRACTOR TO SURVEY PAVEMENT MARKINGS AND REPLACE IN-PLACE (UNLESS OTHERWISE NOTED) ONCE PAVEMENT REHABILITATION IS
COMPLETE.
2. ALL PAVEMENT MARKINGS REQUIRE TWO APPLICATIONS OF PAINT, UNLESS NOTED OTHERWISE. PAVEMENT MARKINGS WITH TWO PAINT
APPLICATIONS WILL HAVE THE FOLLOWING COVERAGE:
· FIRST COAT: 30% OF SPECIFIED APPLICATION RATE WITHOUT GLASS BEADS
· SECOND/FINAL COAT: 100% OF SPECIFIED APPLICATION RATE WITH GLASS BEADS
SEE ITEM P-620 IN THE TECHNICAL SPECIFICATIONS.
3. ALL PAVEMENT MARKINGS FOR RUNWAY AND TAXIWAYS SHALL BE INSTALLED PRIOR TO OPENING.
4. SECOND COAT OF MARKINGS TO BE APPLIED AFTER 30-DAYS PER SPECIFICATIONS
5. SEE FAA FORM 7460-1 FOR TALL CONSTRUCTION EQUIPMENT
6. CONTRACTOR TO MEET MARKING STANDARDS PER FAA AC 150/5340-1M STANDARDS FOR AIRPORT MARKINGS.
8. PROPOSED PAVEMENT MARKING QUANTITIES ARE BASED ON FIELD SURVEY AND/OR GIS DATA UTILIZED AT THE TIME OF DESIGN AND WILL BE FIELD-VERIFIED. DEVIATIONS ARE EXPECTED DUE TO RELOCATIONS OF EXISTING MARKINGS AND CONDITION CHANGES.
BID SET
N:572188.6355 E: 7663497.7024
N:571668.9378 E: 7663676.7250
M
AT
C H
LI
N
E, S
EE
B
EL
O
W
C-06
PAVEMENT MARKING PLAN
SCALE: 1"=60'
60 60 120
SCALE OF FEET
SCALE: 1"=60'
C-06
PAVEMENT MARKING PLAN
SCALE: 1"=60'
M
AT
C H
LI
N
E, S
EE
A
BO
VE
C-06
PAVEMENT MARKING PLAN
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
MULINO STATE AIRPORT (4S9)
RUNWAY, APRON, AND TAXILANE SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- M ul in o
St at e R un w ay , T ax ila ne , a nd A pr on
S ur fa ce
S ea l - P ha se
I
- D es ig n\ C
AD
W O
R
KI
N G
\1
P
AV
EM
EN
T
M
AR
KI
N
G P
LA
N
.d w g
AS NOTED40097.141.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
ARB
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0072-018-2025
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA JIME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
BID SET
RUNWAY 14 NUMERAL
MARKINGS
C-09
RUNWAY CENTERLINE
MARKING
C-08
RUNWAY CENTERLINE
MARKING
C-08
RUNWAY MARKINGS
C-09
TAXIWAY LEAD ON
MARKING
C-08
TAXIWAY LEAD ON
MARKING
C-08
MATCH INTO EXISTING
R75 'R75'
R75'
MATCH INTO EXISTING
RUNWAY 14-32
RUNWAY 14-32
TW
Y
A1
TW
Y
A2
TW
Y
A3
60 60 120
SCALE OF FEET
SCALE: 1"=60'
40'
120' 80' 120' 80' 120' 80' 120' 80' 120' 80' 120' 80' 120' 80'
120' 51' 91' 51'
TAXIWAY LEAD ON
MARKING
C-08
120' 80' 120' 80' 120' 80' 120' 80' 120' 80' 120' 80' 120' 40'
51.0000' 75.0'
20'
20'
10'
60'
91'
91'
60'
LEGEND:
RUNWAY SAFETY AREA
OBSTACLE-FREE ZONE
OBJECT FREE AREA
TAXIWAY OBJECT FREE AREA
TAXIWAY SAFETY AREA
WORK AREA #1
WORK AREA #2
WHITE PAVEMENT MARKING
YELLOW PAVEMENT MARKING
NOTES:
1. CONTRACTOR TO SURVEY PAVEMENT MARKINGS AND REPLACE IN-PLACE (UNLESS OTHERWISE NOTED) ONCE PAVEMENT REHABILITATION IS
COMPLETE.
2. ALL PAVEMENT MARKINGS REQUIRE TWO APPLICATIONS OF PAINT, UNLESS NOTED OTHERWISE. PAVEMENT MARKINGS WITH TWO PAINT
APPLICATIONS WILL HAVE THE FOLLOWING COVERAGE:
· FIRST COAT: 30% OF SPECIFIED APPLICATION RATE WITHOUT GLASS BEADS
· SECOND/FINAL COAT: 100% OF SPECIFIED APPLICATION RATE WITH GLASS BEADS
SEE ITEM P-620 IN THE TECHNICAL SPECIFICATIONS.
3. ALL PAVEMENT MARKINGS FOR RUNWAY AND TAXIWAYS SHALL BE INSTALLED PRIOR TO OPENING.
4. SECOND COAT OF MARKINGS TO BE APPLIED AFTER 30-DAYS PER SPECIFICATIONS
5. SEE FAA FORM 7460-1 FOR TALL CONSTRUCTION EQUIPMENT
6. CONTRACTOR TO MEET MARKING STANDARDS PER FAA AC 150/5340-1M STANDARDS FOR AIRPORT MARKINGS.
8. PROPOSED PAVEMENT MARKING QUANTITIES ARE BASED ON FIELD SURVEY AND/OR GIS DATA UTILIZED AT THE TIME OF DESIGN AND WILL BE FIELD-VERIFIED. DEVIATIONS ARE EXPECTED DUE TO RELOCATIONS OF EXISTING MARKINGS AND CONDITION CHANGES.
MULTICORELINK:14101 DETAILS-14 C-09
MULTICORELINK:14101 DETAILS-13 C-08
MULTICORELINK:14101 DETAILS-13 C-08
MULTICORELINK:14101 DETAILS-14 C-09
MULTICORELINK:14101 DETAILS-13 C-08
MULTICORELINK:14101 DETAILS-13 C-08
X
X
X
C-07
PAVEMENT MARKING PLAN
C-07
PAVEMENT MARKING PLAN
SCALE: 1"=50'
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
MULINO STATE AIRPORT (4S9)
RUNWAY, APRON, AND TAXILANE SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- M ul in o
St at e R un w ay , T ax ila ne , a nd A pr on
S ur fa ce
S ea l - P ha se
I
- D es ig n\ C
AD
W O
R
KI
N G
\1
P
AV
EM
EN
T
M
AR
KI
N
G P
LA
N
.d w g
AS NOTED40097.141.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
ARB
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0072-018-2025
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA JIME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
BID SET
6" TAXILANE CENTERLINE
MARKING
6" TAXILANE
CENTERLINE MARKING
6" TAXILANE CENTERLINE
MARKING
6" TAXIWAY CENTERLINE
MARKING, MATCH EX. (TYP.)
SINGLE COAT (100%
APPLICATION RATE)
6" TAXILANE CENTERLINE
MARKING
6" TAXILANE
CENTERLINE MARKING
6" TAXILANE
CENTERLINE MARKING,
MATCH EX. (TYP.)
SINGLE COAT (100%
APPLICATION RATE)
6" TAXILANE CENTERLINE
MARKING, MATCH EX. (TYP.)
SINGLE COAT (100%
APPLICATION RATE)
TIE-DOWN MARKING,
MATCH EX. (TYP.)
SINGLE COAT (100%
APPLICATION RATE)
C-08
MATCH INTO EXISTING
TAXIWAY
NORTH TAXILANE
.5
17.5'
.5
' 12 .5
.5
'12 .5
.5
'12 .5
12.5'
13'
13'
.5
R65'
R50'
R25
R25
R30'
20'
6" TAXILANE CENTERLINE
MARKING
12.5'
12.5'
12.5'
12.5'
50 50 100
SCALE OF FEET
SCALE: 1"=50'
MATCH INTO EXISTING
.5
.5
.5
.0
9.
0'
HANGAR APRON
CONCRETE VALLEY
GUTTER
14.2'
MAIN APRON
LEGEND:
RUNWAY SAFETY AREA
OBSTACLE-FREE ZONE
OBJECT FREE AREA
TAXIWAY OBJECT FREE AREA
TAXIWAY SAFETY AREA
WORK AREA #1
WORK AREA #2
YELLOW PAVEMENT MARKING
NOTES:
1. CONTRACTOR TO SURVEY PAVEMENT MARKINGS AND REPLACE IN-PLACE (UNLESS OTHERWISE NOTED) ONCE PAVEMENT REHABILITATION IS COMPLETE.
2. ALL PAVEMENT MARKINGS REQUIRE TWO APPLICATIONS OF PAINT, UNLESS NOTED OTHERWISE. PAVEMENT MARKINGS WITH TWO PAINT APPLICATIONS
WILL HAVE THE FOLLOWING COVERAGE:
· FIRST COAT: 30% OF SPECIFIED APPLICATION RATE WITHOUT GLASS BEADS
· SECOND/FINAL COAT: 100% OF SPECIFIED APPLICATION RATE WITH GLASS BEADS
SEE ITEM P-620 IN THE TECHNICAL SPECIFICATIONS.
3. ALL PAVEMENT MARKINGS FOR RUNWAY AND TAXIWAYS SHALL BE INSTALLED PRIOR TO OPENING.
4. SECOND COAT OF MARKINGS TO BE APPLIED AFTER 30-DAYS PER SPECIFICATIONS
5. SEE FAA FORM 7460-1 FOR TALL CONSTRUCTION EQUIPMENT
6. CONTRACTOR TO MEET MARKING STANDARDS PER FAA AC 150/5340-1M STANDARDS FOR AIRPORT MARKINGS.
8. PROPOSED PAVEMENT MARKING QUANTITIES ARE BASED ON FIELD SURVEY AND/OR GIS DATA UTILIZED AT THE TIME OF DESIGN AND WILL BE FIELD-VERIFIED. DEVIATIONS ARE EXPECTED DUE TO RELOCATIONS OF EXISTING MARKINGS AND CONDITION CHANGES.
C-08
PAVEMENT MARKING DETAILS
RUNWAY CENTERLINE MARKING DETAIL
SCALE: N.T.S.
200' 200'
3' CLEAR GAP
(TYP)
TAXIWAY ℄ MARKING PER
(SEE PLANS FOR CURVE DATA)
RUNWAY ℄
RUNWAY ℄ WHITE MARKING
ON RUNWAY ℄
C-08
TAXIWAY LEAD ON MARKING DETAIL
SCALE: N.T.S.
200'
80' (TYP)120' (TYP)
12" WHITE RUNWAY CENTERLINE
STRIPE CENTERED ON RW CENTERLINE
RUNWAY
CENTERLINE
NOTE: SEE PLAN FOR VARIATION NEAR CENTER OF RUNWAY
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
MULINO STATE AIRPORT (4S9)
RUNWAY, APRON, AND TAXILANE SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- M ul in o
St at e R un w ay , T ax ila ne , a nd A pr on
S ur fa ce
S ea l - P ha se
I
- D es ig n\ C
AD
W O
R
KI
N G
\1
D
ET
AI
LS
.d w g
AS NOTED40097.141.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
ARB
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0072-018-2025
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA JIME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
BID SET
± 24'
± 12'
C-08
TIE-DOWN MARKING DETAIL
SCALE: N.T.S.
C-08
6" WIDE
YELLOW STRIPE
EXISTING
TIE-DOWN
ANCHOR
C-08
RUNWAY ℄ MARKING PER
6" YELLOW MARKING
ON TAXIWAY ℄
C-09
PAVEMENT MARKING DETAILS
C-09
32 RUNWAY NUMERAL AND THRESHOLD MARKINGS
SCALE: N.T.S.
EDGE OF RUNWAY
PAVEMENT
WHITE RUNWAY
NUMERAL
.5
5'
2'
8'
0'
EDGE OF RUNWAY
PAVEMENT
20'
EDGE OF RUNWAY
PAVEMENT
EDGE OF RUNWAY
PAVEMENT
12" WHITE RUNWAY
CENTERLINE STRIPE
12" WHITE RUNWAY
CENTERLINE STRIPE
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
MULINO STATE AIRPORT (4S9)
RUNWAY, APRON, AND TAXILANE SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- M ul in o
St at e R un w ay , T ax ila ne , a nd A pr on
S ur fa ce
S ea l - P ha se
I
- D es ig n\ C
AD
W O
R
KI
N G
\1
D
ET
AI
LS
.d w g
AS NOTED40097.141.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
ARB
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0072-018-2025
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA JIME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
BID SET
C-09
14 RUNWAY NUMERAL MARKINGS
SCALE: N.T.S.
5'
EDGE OF RUNWAY
PAVEMENT
5'
WHITE RUNWAY THRESHOLD
MARKING (10' WIDE X 100' LONG)
YELLOW ARROW
6" YELLOW TAXIWAY
CENTERLINE MARKING
RUNWAY
CENTERLINE
RUNWAY CENTERLINE
C-08
C-08
60'
10'
10' 10'
17' 14' 7'
19'
25' (TYP)
5'
9'20
20'60'40'
60'
1.
5'
10'
19' 18'5'
40'
3'
7'6'
5'
5'
10'
5' (TYP)
45' (TYP)
12.5'(TYP)
TY
P)
0'
13'
10'
7.
5'
3' (TYP)
WHITE RUNWAY
NUMERALS
MULTICORELINK:14101 DETAILS-13 C-08
MULTICORELINK:14101 DETAILS-13 C-08
| 2026-03-11T22:13:15-0700 | |
| Ryan Halvorson |
| 2026-03-11T22:13:45-0700 | |
| Ryan Halvorson |
| 2026-03-11T22:14:06-0700 | |
| Ryan Halvorson |
| 2026-03-11T22:14:24-0700 | |
| Ryan Halvorson |
| 2026-03-11T22:14:44-0700 | |
| Ryan Halvorson |
| 2026-03-11T22:15:15-0700 | |
| Ryan Halvorson |
| 2026-03-11T22:15:36-0700 | |
| Ryan Halvorson |
| 2026-03-11T22:15:59-0700 | |
| Ryan Halvorson |
| 2026-03-11T22:16:20-0700 | |
| Ryan Halvorson |
| 2026-03-11T22:16:40-0700 | |
| Ryan Halvorson |
| 2026-03-11T22:16:59-0700 | |
| Ryan Halvorson |
| 2026-03-11T22:17:16-0700 | |
| Ryan Halvorson |
| 2026-03-11T22:17:34-0700 | |
| Ryan Halvorson |
| 2026-03-11T22:17:49-0700 | |
| Ryan Halvorson |
File details come from the government source that posted it. Updated .