This document is a set of plans and drawings for the Oregon Department of Aviation's Lebanon State Airport Runway and Taxiway B Surface Seal Project, prepared by Century West Engineering. The project involves pavement rehabilitation work on Runway 16-34 and Taxiway B, including crack sealing, asphalt patching, standard seal coat application, slurry seal application, and pavement marking installation and removal. Work scope quantities include 3,013 linear feet of crack sealing, 539 square feet of asphalt patching, 20,329 square yards of standard seal coat, 3,998 square yards of slurry seal, removal of 6,643 square feet of pavement markings, and installation of 7,499 square feet of new pavement markings. The project is organized into three phases: crack sealing and asphalt patching (Phase 1), surface seal application (Phase 2), and pavement marking (Phase 3). All work must be completed within nine continuous calendar days from the notice to proceed, which is anticipated for July 2026. The second application of pavement markings is exempt from the nine-day requirement and may occur a minimum of 30 days after pavement rehabilitation completion.
The contractor must coordinate runway closures with the airport and provide 14 days advance notice for each closure. Work area restrictions are clearly defined with two primary work areas requiring runway closures of one to two days each. The contractor is required to comply with FAA safety standards, including friction testing of the surface seal per AC 150/5320-12C prior to runway reopening, and must maintain airport operations to the greatest extent possible. Equipment stockpiles are limited to 12 feet in height and must be positioned at least 125 feet from runway centerlines and 44.5 feet from taxiway centerlines. Specific weather conditions must be met for surface seal and pavement marking application, with the contractor required to coordinate with the engineer a minimum of 12 hours before planned application. The project is funded through Airport Improvement Program (AIP) No. 3-41-0033-011-2025 and coordinates with the 2026 Oregon Department of Aviation Pavement Management Program cycle to avoid treatment duplication.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DOCUMENTS
FOR
OREGON DEPARTMENT OF AVIATION
LEBANON STATE AIRPORT
RUNWAY AND TAXIWAY B SURFACE SEAL PROJECT
ATTACHMENT D – RUNWAY AND TAXIWAY B SURFACE SEAL
PROJECT PLANS AND DRAWINGS
OWNER:
Oregon Department of Aviation
3040 25th St. SE Salem, OR 97302
ENGINEER:
Century West Engineering
5500 Meadows Rd., Suite 250
Lake Oswego, OR 97035
Phone: 503.419.2130
FEBRUARY 2026
This Page Left Intentionally Blank
OREGON DEPARTMENT OF AVIATION
LEBANON STATE AIRPORT (S30)
RUNWAY AND TAXIWAY B SURFACE SEAL
A.I.P NO. 3-41-0033-011-2025
FEBRUARY 2026
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
LEBANON STATE AIRPORT (S30)
RUNWAY AND TAXIWAY B SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- L eb an on
S ta te R un w ay a nd T ax iw ay S ur fa ce S ea l -
P ha se I
- D es ig n\
C
AD
W
O R
KI
N
G \C
O
VE
R S
H
EE
T.
dw g
AS NOTED40097.140.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
LRR
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0033-011-2025
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA JIME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
BID SET
VICINITY MAP
NO SCALE
SITE MAP
NO SCALE
COVER SHEET
G-01
PROJECT LOCATION
SHEET INDEX
SHEET NO. DWG NO. SHEET TITLE
1 G-01 COVER SHEET
2 G-02 SITE & SURVEY CONTROL
3 G-03 CONSTRUCTION SITE AND SAFETY PHASING PLAN
4 G-04 CONSTRUCTION SITE AND SAFETY NOTES AND DETAILS
5 EC-01 EROSION CONTROL PLAN AND DETAILS
6 C-01 PAVEMENT MARKING REMOVAL PLAN
7 C-02 CRACK SEAL AND PAVEMENT REPAIR PLAN
8 C-03 SURFACE SEAL PLAN
9 C-04 PAVEMENT REPAIR DETAILS
10 C-05 PAVEMENT MARKING OVERALL PLAN
11 C-06 PAVEMENT MARKING PLAN - STA 10+00 TO STA 24+00
12 C-07 PAVEMENT MARKING PLAN - STA 24+00 TO STA 38+71
13 C-08 PAVEMENT MARKING DETAILS
14 C-09 PAVEMENT MARKING DETAILS
H W
Y 20
PAR
K ST
HWY 34
AIRPORT RD
W OAK ST
12TH
ST
AutoCAD SHX Text N
AutoCAD SHX Text N
MULTICORELINK:SITE & SURVEY CONTROL-2 SITE & SURVEY CONTROL
MULTICORELINK:SITE & SURVEY CONTROL-2 SITE & SURVEY CONTROL
MULTICORELINK:SITE & SURVEY CONTROL-2 SITE & SURVEY CONTROL
MULTICORELINK:G-03 - PHASING PLAN-G-03
MULTICORELINK:G-03 - PHASING PLAN-G-03
MULTICORELINK:G-03 - PHASING PLAN-G-03
MULTICORELINK:G-04 - SITE & SAFETY NOTES & DETAILS-G-04
MULTICORELINK:G-04 - SITE & SAFETY NOTES & DETAILS-G-04
MULTICORELINK:G-04 - SITE & SAFETY NOTES & DETAILS-G-04
MULTICORELINK:EC-01 - EROSION CONTROL PLAN-EC-01
MULTICORELINK:EC-01 - EROSION CONTROL PLAN-EC-01
MULTICORELINK:EC-01 - EROSION CONTROL PLAN-EC-01
MULTICORELINK:C-01 - DEMO PLAN-C-01
MULTICORELINK:C-01 - DEMO PLAN-C-01
MULTICORELINK:C-01 - DEMO PLAN-C-01
MULTICORELINK:C-02 - CRACK SEAL AND PAVEMENT REPAIR PLAN-C-02
MULTICORELINK:C-03 - SURFACE SEAL PLAN-C-03
MULTICORELINK:C-03 - SURFACE SEAL PLAN-C-03
MULTICORELINK:C-03 - SURFACE SEAL PLAN-C-03
MULTICORELINK:D-01 - PVMT REPAIR DETAILS-9 PAVEMENT REPAIR DETAILS
MULTICORELINK:D-01 - PVMT REPAIR DETAILS-9 PAVEMENT REPAIR DETAILS
MULTICORELINK:C-04 - PVMT MARKING OVERALL PLAN-10 PAVEMENT MARKING OVERALL PLAN
MULTICORELINK:C-04 - PVMT MARKING OVERALL PLAN-10 PAVEMENT MARKING OVERALL PLAN
MULTICORELINK:C - PVMT MARKING PLANS-11 PAVEMENT MARKING PLAN - STA 10+00 TO STA 24+00 MULTICORELINK:C - PVMT MARKING PLANS-11 PAVEMENT MARKING PLAN - STA 10+00 TO STA 24+00 MULTICORELINK:C - PVMT MARKING PLANS-12 PAVEMENT MARKING PLAN - STA 24+00 TO STA 38+71 MULTICORELINK:C - PVMT MARKING PLANS-12 PAVEMENT MARKING PLAN - STA 24+00 TO STA 38+71 MULTICORELINK:C - PVMT MARKING PLANS-12 PAVEMENT MARKING PLAN - STA 24+00 TO STA 38+71
MULTICORELINK:D-02-03 - PVMT MARKING DETAILS-13 PAVEMENT MARKING DETAILS
MULTICORELINK:D-02-03 - PVMT MARKING DETAILS-14 PAVEMENT MARKING DETAILS
STA: 10+00.00
N:326069.39
E:7568628.55
STA: 38+70.68
N:323199.98 E:7568543.19
10+00 15+00 20+00 25+00 30+00 35+00 38+71
0'
0'
SITE & SURVEY CONTROL
G-02
SITE & SURVEY CONTROL
LEGEND:
RUNWAY SAFETY AREA
OBJECT FREE AREA
TAXIWAY OBJECT FREE AREA
TAXIWAY SAFETY AREA
OBSTACLE FREE ZONE
SURVEY NOTES:
1. THE EXISTING CONDITIONS MAP IS BASED ON A COMBINATION OF SURVEY AND GIS .
2. THE COORDINATES SHOWN ARE BASED ON THE OREGON STATE PLAN NORTH ZONE (2269).
VERTICAL DATUM: NAVD88
3. IF SHOWN, THE LOCATION OF EXISTING UNDERGROUND UTILITIES THROUGHOUT THIS SET OF DRAWINGS ARE APPROXIMATE ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE.
THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY DAMAGES WHICH MAY OCCUR DUE TO THE FAILURE TO
DO SO.
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
LEBANON STATE AIRPORT (S30)
RUNWAY AND TAXIWAY B SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
\\C W
FI
LE
SE
R
VE
R
\P or tla nd
\P ro je ct s\ O re go n D ep ar tm en t o f A vi at io n\
- L eb an on S ta te
R un w ay a nd
T ax iw ay
S ur fa ce
S ea l - P ha se
I
- D es ig n\ C
AD
W O
R
KI
N G
\S
IT
E
SU
R
VE
Y
C O
N
TR
O L.
dw g
AS NOTED40097.140.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
LRR
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0033-011-2025
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA JIME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
BID SET
G-02SCALE: 1"=120'
RUNWAY 16-34
TW
Y
B2
TW
Y
A3
TAXIWAY A
TW
Y
A2
TW
Y
A1
TW
Y B1
TAXIWAY A
TAXIWAY B
W AIRWAY RD
AI
R
PO
R
T D
R
120 120 240
SCALE OF FEET
SCALE: 1"=120'
AutoCAD SHX Text
OFA
AutoCAD SHX Text
OFA
AutoCAD SHX Text
OFA
AutoCAD SHX Text
OFA
AutoCAD SHX Text N
0'
0'
10+00 15+00 20+00 25+00 30+00 35+00 38+71
CONSTRUCTION SITE AND SAFETY PHASING PLAN
G-03
3 OF 14SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
LEBANON STATE AIRPORT (S30)
RUNWAY AND TAXIWAY B SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- L eb an on
S ta te R un w ay a nd T ax iw ay S ur fa ce S ea l -
P ha se I
- D es ig n\
C
AD
W
O R
KI
N
G \G
-0
- P H
AS
IN
G P
LA
N
.d w g
AS NOTED40097.140.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
LRR
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0033-011-2025
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA JIME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
BID SET
G-03
CONSTRUCTION SAFETY AND PHASING PLAN
SCALE: 1"=120'
LEGEND:
RUNWAY SAFETY AREA
OBJECT FREE AREA
TAXIWAY SAFETY AREA
TAXIWAY OBJECT FREE
AREA
OBSTACLE FREE ZONE
WORK AREA #1
WORK AREA #2
CONTRACTOR
HAUL/ACCESS ROADS
CONTRACTOR STAGING
AREA
LOW LEVEL BARRICADES
WORK AREA DURATION RUNWAY CLOSURE
WA#1 1 DAY 1 DAY
WA#2 2 DAYS N/A
CRACK SEALING & AC PATCHING
WORK SCOPE - CRACK SEALING (PHASE 1):
1. SET UP RUNWAY CLOSURE "X" AND NAVAID (PAPIS)
TURNED OFF (FOR WORK AREA #1 CONSTRUCTION ONLY)
2. INSTALL TEMPORARY TRAFFIC CONTROL (INCLUDING
BARRICADES AND TAXIWAY CLOSURE Xs)
3. CRACK PREPARATION, ASPHALT PATCHING
4. CRACK FILL
5. FOREIGN OBJECT DEBRIS (FOD) REMOVAL
WORK AREA DURATION RUNWAY CLOSURE
WA#1 2 DAYS 2 DAYS
WA#2 2 DAYS N/A
SURFACE SEAL
WORK SCOPE - SURFACE SEAL (PHASE 2):
1. SET UP RUNWAY CLOSURE "X" AND NAVAID (PAPIS) TURNED
OFF (FOR WORK AREA #1 CONSTRUCTION ONLY)
2. INSTALL TEMPORARY TRAFFIC CONTROL (INCLUDING
BARRICADES AND TAXIWAY CLOSURE Xs)
3. PAVEMENT MARKING REMOVAL
4. FOREIGN OBJECT DEBRIS (FOD) REMOVAL
5. SURFACE SWEEPING
6. SURFACE SEAL
WORK SCOPE - PAVEMENT MARKING (PHASE 3):
1. SET UP RUNWAY CLOSURE "X" AND NAVAID (PAPIS) TURNED OFF
(FOR WORK AREA #1 CONSTRUCTION ONLY)
(IN PLACE FROM PHASE 2)
2. INSTALL TEMPORARY TRAFFIC CONTROL (INCLUDING
BARRICADES AND TAXIWAY CLOSURE Xs)
(IN PLACE FROM PHASE 2)
3. PAVEMENT MARKING
4. FOREIGN OBJECT DEBRIS (FOD) CHECK/REMOVAL
WORK AREA DURATION RUNWAY CLOSURE
WA#1 1 DAY 1 DAY
WA#2 1 DAY N/A
PAVEMENT MARKING (FIRST COAT)
TOTAL 3 DAYS 1 DAY TOTAL 4 DAYS 2 DAYS
TOTAL 2 DAY 1 DAY
GENERAL PHASING NOTES:
1. THE CONTRACTOR SHALL REQUEST RUNWAY CLOSURES FOR CONSTRUCTION 14 DAYS IN ADVANCE.
2. CONTRACTOR TO VERIFY STAGING AREA LOCATION WITH THE ENGINEER PRIOR TO USE.
3. THE PRIMARY STAGING AREA MUST BE ACCESSED VIA TAXIWAY B1 WHICH WILL REMAIN OPEN FOR SOME DURATION OF THE PROJECT. THE SECONDARY STAGING AREA MUST BE ACCESSED VIA TAXIWAY A WHICH WILL REMAIN OPEN FOR THE FULL DURATION OF THE PROJECT. CONTRACTOR IS TO CALL OUT PRESENCE ON ANY OPEN TAXIWAYS AND
USE CAUTION WHILE DRIVING ON AREAS OPEN TO AIR TRAFFIC.
4. WORK AREAS ARE SHOWN AS CONSECUTIVE. CONTRACTOR TO SUBMIT THE CONSTRUCTION SCHEDULE FOR OWNER REVIEW. COORDINATE CLOSURES WITH THE ENGINEER AND MAINTAIN AIRPORT OPERATION TO THE GREATEST
EXTENT POSSIBLE.
5. ALL RUNWAY AND TAXIWAY LIGHTING SHALL BE SHUT DOWN/OFFLINE DURING RUNWAY CLOSURE. ALL GUIDANCE
SIGNS SHALL BE SHUT DOWN/OFFLINE (IF LIGHTED) AND COVERED DURING RUNWAY CLOSURE.
6. BARRICADES ARE TO BE INSTALLED AND REMOVED FOR EACH WORK AREA AS NEEDED TO COMPLETE THE
CONSTRUCTION.
7. RUNWAY AND TAXIWAY MARKINGS SHALL BE IN PLACE ANY TIME RUNWAY OR TAXIWAYS ARE OPEN TO AIR TRAFFIC.
8. THE TERM "DAY" SHALL BE TAKEN TO MEAN A CALENDAR DAY OF 24 HOURS, BEGINNING AT 12:00 MIDNIGHT, SATURDAYS, SUNDAYS, AND HOLIDAYS SHALL BE INCLUDED.
9. REMOVAL OF EXISTING PAVEMENT MARKINGS SHALL PRECEDE CRACK SEAL WORK AND SEAL COAT WORK.
10. TAXIWAY CLOSURE "X" SHALL BE PLACED AT THE ENTRANCE OF TEMPORARILY CLOSED TAXIWAY FROM THE RUNWAY ON THE TAXIWAY CENTERLINE. CONTRACTOR TO ENSURE THE "X" IS NOT WITHIN THE RUNWAY, AND SECURED WITHIN THE ENTRANCE OF THE TAXIWAY CONNECTOR AND RSA LIMITS. SEE TAXIWAY CLOSURE "X" DETAIL
11. CONTRACTOR SHALL PERFORM FRICTION TESTING PER AC 150/5320-12C MEASUREMENT, CONSTRUCTION, AND MAINTENANCE OF SKID RESISTANT AIRPORT PAVEMENT SURFACES PRIOR TO REOPENING RUNWAY.
12. CONTRACTOR SHALL IMPLEMENT APPROVED SPCD IN ACCORDANCE WITH SECTION 01300 OF THE SPECIFICATIONS.
120 120 240
SCALE OF FEET
SCALE: 1"=120'
RUNWAY 16-34
TAXIWAY A
TAXIWAY A
TAXIWAY B
W AIRWAY RD
BARRICADE WA#1
PER DETAIL
SECURITY GATE ENTRANCE
TAXIWAY B2
TAXIWAY A1TAXIWAY A2TAXIWAY A3
SECONDARY STAGING
AREA WITH BARRICADES
BARRICADE WA#1
PER DETAIL
BARRICADE WA#1
PER DETAIL
BARRICADE WA#1
PER DETAIL
BARRICADE WA#1 & WA#2
PER DETAIL
BARRICADE WA#1 & WA#2
PER DETAIL
RUNWAY CLOSURE "X" WA#1
PER DETAIL
RUNWAY CLOSURE "X" WA#1
PER DETAIL
TAXIWAY CLOSURE "X" WA#2
PER DETAIL
SECURITY GATE
ENTRANCE
TAXIWAY B1
BARRICADE WA#1 & WA#2
PER DETAIL
G-04
G-04
G-04
G-04
G-04
G-04
G-04
G-04
G-04
G-04
PRIMARY STAGING
AREA
TAXIWAY CLOSURE "X" WA#2
PER DETAIL
G-04
AI
R
PO
R
T D
R
HAUL ROUTE
G-04
THE SCOPE OF THIS PROJECT HAS BEEN
COORDINATED WITH THE 2026 ODAV PMP CYCLE TO
AVOID DUPLICATION OF TREATMENTS.
AutoCAD SHX Text
OFA
AutoCAD SHX Text
OFA
AutoCAD SHX Text
OFA
AutoCAD SHX Text
OFA
AutoCAD SHX Text N
MULTICORELINK:G-04 - SITE & SAFETY NOTES & DETAILS-G-04
MULTICORELINK:G-04 - SITE & SAFETY NOTES & DETAILS-G-04
MULTICORELINK:G-04 - SITE & SAFETY NOTES & DETAILS-G-04
MULTICORELINK:G-04 - SITE & SAFETY NOTES & DETAILS-G-04
MULTICORELINK:G-04 - SITE & SAFETY NOTES & DETAILS-G-04
MULTICORELINK:G-04 - SITE & SAFETY NOTES & DETAILS-G-04
MULTICORELINK:G-04 - SITE & SAFETY NOTES & DETAILS-G-04
MULTICORELINK:G-04 - SITE & SAFETY NOTES & DETAILS-G-04
MULTICORELINK:G-04 - SITE & SAFETY NOTES & DETAILS-G-04
MULTICORELINK:G-04 - SITE & SAFETY NOTES & DETAILS-G-04
GENERAL WORK AREA NOTES:
1. THE CONTRACTOR SHALL BE RESTRICTED TO USE THE ENTRANCE AND
HAULING ROUTES SHOWN ON THE DRAWINGS. FOLLOW AIRPORT AND FAA
SAFETY PROCEDURES WHEN MOVING EQUIPMENT OR PERSONNEL. NO
PERSONAL VEHICLES SHALL BE ALLOWED OUTSIDE OF THE STAGING AREA.
THE AIRPORT MAY IMMEDIATELY REMOVE ANY PERSONNEL AND EQUIPMENT
FROM THE SITE IN VIOLATION OF AIRPORT SAFETY AND SECURITY
PROCEDURES.
2. ALL VEHICLES AND CONSTRUCTION EQUIPMENT SHALL REMAIN ON PAVEMENT
TO THE FURTHEST EXTENT POSSIBLE. ANY DAMAGE TO LIGHTS OR OTHER
AIRPORT NAVIGATIONAL AIDS SHALL BE REPORTED IMMEDIATELY.
3. LIMIT EQUIPMENT HEIGHT TO 12 FEET UNLESS OTHERWISE APPROVED BY THE
ENGINEER.
4. LIMITS STOCKPILES TO 12 FEET IN HEIGHT AND AT LEAST 125 FEET FROM THE
RUNWAY CENTERLINE AND 44.5 FEET FROM TAXIWAY CENTERLINE.
5. IN THE EVENT OF AN EMERGENCY, MOVE ALL EQUIPMENT AND PERSONNEL
TO THE CONTRACTOR'S STAGING AREA UNLESS OTHERWISE DIRECTED BY
THE ENGINEER.
6. ACCESS TO ANY WORK AREA MUST BE AUTHORIZED BY THE ENGINEER PRIOR
TO WORK IN THAT AREA. NOTIFY THE ENGINEER A MINIMUM OF 72 HOURS
PRIOR TO BEGINNING WORK IN ANY AREA.
7. SEE SECTION 01300 OF THE TECHNICAL SPECIFICATIONS. ANY WORK WITHIN
60 FEET OF THE RUNWAY 16-34 CENTERLINE OR WITHIN 240 FEET OF THE
RUNWAY END WILL REQUIRE A RUNWAY CLOSURE.
8. PLACE LOW LEVEL BARRICADES AS SHOWN AND AS DESCRIBED IN SECTION
01300 OF THE TECHNICAL SPECIFICATIONS.
9. IN THE EVENT OF NIGHTTIME CONSTRUCTION, LIGHTING EQUIPMENT MUST
ADEQUATELY ILLUMINATE THE WORK AREA PER FAA AC 150/5320-2G
OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION.
10. FOR ADDITIONAL REQUIREMENTS, REFER TO SECTION 01300, AIRPORT
SAFETY, IN THE TECHNICAL SPECIFICATIONS.
11. WHILE WORKING IN ANY AREA, THE CONTRACTOR SHALL HAVE AN AIRPORT
RADIO CAPABLE OF MONITORING THE AIRPORT UNICOM FREQUENCY:
CTAF/UNICOM: 122.80 MHz
RADIO TRAINING IS REQUIRED FOR STAFF ASSIGNED TO MONITOR THE RADIO.
12. CONTRACTOR SHALL MOVE ALL EQUIPMENT TO THE STAGING AREA AT THE
COMPLETION OF EACH WORK SHIFT.
13. PLACE CLOSURE CROSSES (X's) OFF THE ENDS OF THE RUNWAY DURING
RUNWAY CLOSURES AS DIRECTED BY THE ENGINEER.
14. DISENGAGE LIGHTING CIRCUITS, DARKEN LIGHT FIXTURES, AND COVER
GUIDANCE SIGNS AS DIRECTED BY THE AIRPORT TO PREVENT AIRCRAFT
FROM TAXIING TOWARDS CLOSED WORK AREAS. ALL AIRPORT LIGHTING
SHALL BE DISENGAGED DURING A RUNWAY CLOSURE.
15. RUNWAY CLOSURES WILL REQUIRE THE SHUTDOWN OF AIRPORT NAVAIDS.
AIRPORT SPONSOR TO SUBMIT RUNWAY CLOSURE STRATEGIC EVENT
SUBMISSION (SEC) FORM A MINIMUM OF 45 DAYS PRIOR TO THE ANTICIPATED
CONSTRUCTION START DATE.
16. PAPI SHUTDOWN WILL BE MADE PUBLIC TO AIRFIELD USERS VIA NOTAM.
17. ENGINEERING CONSULTANT POINT-OF-CONTACT:
RYAN HALVORSON, PE
503-419-2130
18. CONTRACTOR SHALL PREVENT WILDLIFE ATTRACTANTS PER FAA AC
150/5200-33C HAZARDOUS WILDLIFE ATTRACTANTS ON OR NEAR AIRPORTS.
19. CONTRACTOR TO COORDINATE WITH THE ENGINEER AND OWNER FOR
COMPLETION AND SUBMITTAL OF FAA FORM 7460-1.
20. SPECIFIC WEATHER CONDITIONS MUST BE MET FOR SURFACE SEAL
APPLICATION. CONTRACTOR TO COORDINATE WITH ENGINEER TO DETERMINE
IF SURFACE SEAL APPLICATION IS FEASIBLE A MINIMUM OF 12 HOURS BEFORE
PLANNED APPLICATION. IF UNPREDICTED WEATHER OCCURS, THE ENGINEER
MAY POSTPONE APPLICATION. SEE WEATHER LIMITATIONS SECTIONS
P-608-4.2 AND P-626-4.1 IN THE TECHNICAL SPECIFICATIONS.
2. SPECIFIC WEATHER CONDITIONS MUST BE MET FOR PAVEMENT MARKING
APPLICATION. CONTRACTOR TO COORDINATE WITH ENGINEER TO DETERMINE
IF PAVEMENT MARKING APPLICATION IS FEASIBLE A MINIMUM OF 12 HOURS
BEFORE PLANNED APPLICATION. IF UNPREDICTED WEATHER OCCURS, THE
ENGINEER MAY POSTPONE APPLICATION. SEE WEATHER LIMITATIONS
SECTION P-620-3.1 IN THE TECHNICAL SPECIFICATIONS.
WORK IN SAFETY AREAS AND OBJECT FREE AREAS:
1. RUNWAY SAFETY AREA (RSA) AND TAXIWAY SAFETY AREA (TSA) AREAS ARE DEFINED AS AREAS THAT
SHALL BE CLEARED AND GRADED AND HAVE NO POTENTIALLY HAZARDOUS RUTS, HUMPS,
DEPRESSIONS, OR OTHER SURFACE VARIATIONS. THE MAXIMUM SLOPE ANYWHERE WITHIN A
RUNWAY OR TAXIWAY SAFETY AREA SHALL BE 5%. IN TRANSITIONS FROM PAVED TO UNPAVED
AREAS, A 3 INCH MAXIMUM VERTICAL DROP IS ALLOWED. THE RUNWAY AND TAXIWAY SAFETY AREAS SHALL BE MAINTAINED AT ALL TIMES WHEN THE RUNWAY AND TAXIWAY IS OPEN TO AIR TRAFFIC.
PERSONNEL, EQUIPMENT, OR MATERIAL WITHIN A RUNWAY SAFETY AREA AT ANY TIME REQUIRES A
CLOSURE. SAFETY AREAS THAT ARE CLOSED FOR CONSTRUCTION MUST MEET THESE CRITERIA
PRIOR TO REOPENING.
2. THE CONTRACTOR SHALL ANTICIPATE THE CONSTRUCTION OF TEMPORARY FILLS, COMPACTION, AND
GRADING TO MEET THE REQUIREMENTS OF "WORK IN SAFETY AREAS AND OBJECT FREE AREAS"
PRIOR TO REOPENING RUNWAYS AND TAXIWAYS. THIS WORK IS CONSIDERED INCIDENTAL TO
VARIOUS WORK ITEMS AND SEPARATE PAYMENT WILL NOT BE MADE.
3. CONTRACTOR SHALL NOT ENTER ANY ACTIVE RSA OR TSA WITHOUT AUTHORIZATION FROM THE AIRPORT. ALL EQUIPMENT, TOOLS, AND MATERIALS SHALL BE MOVED TO STAGING AREAS PRIOR TO
REOPENING A RUNWAY OR TAXIWAY.
4. SAFETY AREA LIMITS:
RUNWAY 16-34 (RSA) - 60 FEET FROM ℄; 240 FEET FROM RUNWAY END/THRESHOLD
TAXIWAYS (TSA) - 24.5 FEET FROM ℄
5. RUNWAY AND TAXIWAY OBJECT FREE AREAS ARE DEFINED AS AREAS THAT SHALL BE CLEAR OF FIXED OR MOVABLE OBJECTS. EQUIPMENT NOT IN USE, AND MATERIAL STOCKPILES AND STORAGE SHALL BE PLACED AT LEAST 125 FEET FROM ANY RUNWAY CENTERLINE. NO WORK MAY OCCUR IN TAXIWAY OBJECT FREE ZONES UNLESS THE TAXIWAY IS CLOSED TO AIRCRAFT TRAFFIC. NO STORAGE OF
EQUIPMENT, MATERIALS OR STOCKPILES IS ALLOWED WITHIN TAXIWAY OBJECT FREE ZONES.
6. PERSONNEL, MATERIAL, AND EQUIPMENT MAY NOT OCCUPY THE OBSTACLE FREE ZONE WHILE THE
RUNWAY IS OPEN FOR AIRCRAFT OPERATIONS
7. OBJECT FREE AREA LIMITS
RUNWAY 16-34 (OFA) - 125 FEET FROM ℄
TAXIWAYS (TOFA) - 44.5 FEET FROM ℄
8. OBSTACLE FREE ZONE LIMITS:
RUNWAY 16-34 (OFZ) - 125 FEET FROM ℄; 200 FEET FROM RUNWAY END/THRESHOLD
9. RUNWAY AND TAXIWAY SAFETY AREA, RUNWAY AND TAXIWAY OBJECT FREE AREA, AND OBSTACLE FREE ZONE CRITERIA MUST BOTH BE MET PRIOR TO OPENING AN IMPACTED RUNWAY OR TAXIWAY.
WORK SCHEDULE AND PHASING NOTES:
1. ALL WORK SHALL BE COMPLETED WITHIN 9 CONTINUOUS CALENDAR DAYS OF CONTRACT
NOTICE TO PROCEED.
2. NOTICE TO PROCEED FOR CONSTRUCTION IS ANTICIPATED JULY 2026, AT THE CONVENIENCE
OF THE OWNER.
3. WORK EXEMPT FROM THE 9 CALENDAR DAY CONTRACT PERIOD INCLUDES THE SECOND
APPLICATION OF PAVEMENT MARKINGS. A CONTINUOUS 1 CALENDAR DAY (24 HOUR) CLOSURE
FOR THE SECOND APPLICATION OF PAVEMENT MARKINGS WILL BE PERMITTED, A MINIMUM OF
30 DAYS AFTER PAVEMENT REHABILITATION HAS BEEN COMPLETED.
4. COORDINATE WORK AREA CLOSURES WITH THE AIRPORT TO ENSURE ACCESS AS NEEDED TO
MAINTAIN AIRPORT OPERATIONS TO THE FURTHEST EXTENT POSSIBLE.
YELLOW
RUNWAY
LC
(TYP)
(TYP)
NOTES:
1. RUNWAY CLOSURE CROSSES SHALL BE PROVIDED, INSTALLED,
MAINTAINED, AND REMOVED BY THE CONTRACTOR.
2. PLACE CLOSING "X" DIRECTLY OUTSIDE OF BOTH ENDS OF THE
RUNWAY, AS CLOSE TO THE EDGE OF PAVEMENT AS IS
REASONABLE TO COMPLETE RUNWAY WORK.
3. THE CROSSES SHALL BE SECURED WITH WEIGHTED MATERIALS
LESS THAN 3 INCHES IN HEIGHT. SANDBAGS OR EQUIVALENT
ARE NOT ALLOWED.
4. SEE FIGURE 2-3 OF FAA AC 15-5370-2G OPERATIONAL SAFETY
ON AIRPORTS DURING CONSTRUCTION FOR MARKINGS OF A
TEMPORARY RUNWAY CLOSURE.
SCALE: N.T.S.
G-04
RUNWAY CLOSURE "X" DETAIL
ORANGE / WHITE STRIPE
HIGH REFLECTIVE SHEETING
INSTALL BATTERY OR SOLAR POWERED
RED LENS STANDARD BARRICADE LIGHT
8'-0"
10"
ELEVATION - FRONT
FILL WITH WATER
OR SAND
ORANGE BODY
SELF-CONNECTING
PINS
NOTES:
1. BARRICADES SHALL MEET THE REQUIREMENTS OF AC 150/5370-2G OPERATIONAL SAFETY ON AIRPORT
DURING CONSTRUCTION.
2. PLACE BARRICADE AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER.
3. BARRICADES SHALL BE PROVIDED BY THE CONTRACTOR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PLACING, FILLING, EMPTYING, MOVING, MAINTAINING AND PROTECTING BARRICADES THROUGHOUT
THE DURATION OF THE PROJECT.
4. LIGHTS ARE TO BE NO FARTHER APART THAN 10' WHEN PLACED.
5. BARRICADES SHALL BE COVERED WITH REFLECTIVE SHEETING OR OTHER MATERIAL APPROVED BY THE
ENGINEER.
6. BARRICADES SHALL BE APPROPRIATELY WEIGHTED DOWN TO RESTRICT MOVEMENT FROM HIGH WINDS
OR PROP WASH.
SCALE: N.T.S.
G-04
LOW LEVEL BARRICADE DETAIL
VARIES 6'-0"
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
LEBANON STATE AIRPORT (S30)
RUNWAY AND TAXIWAY B SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- L eb an on
S ta te R un w ay a nd T ax iw ay S ur fa ce S ea l -
P ha se I
- D es ig n\
C
AD
W
O R
KI
N
G \G
-0
- S
IT
E
SA
FE
TY
N
O
TE
S
D
ET
AI
LS
.d w g
AS NOTED40097.140.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
LRR
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0033-011-2025
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA JIME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
BID SET
CONSTRUCTION SITE AND SAFETY NOTES AND DETAILS
G-04
ELEVATION - SIDE
NOTES:
1. THE CROSSES SHALL BE SECURED WITH WEIGHTED MATERIALS
LESS THAN 3 INCHES IN HEIGHT. SANDBAGS OR EQUIVALENT
NOT ALLOWED.
2. TAXIWAY CLOSURE "X" SHALL BE PLACED AT THE ENTRANCE OF
THE TEMPORARILY CLOSED TAXIWAY FROM THE RUNWAY ON
THE TAXIWAY CENTERLINE. CONTRACTOR TO ENSURE THE "X"
IS NOT WITHIN THE RUNWAY, AND SECURED WITHIN THE
ENTRANCE OF THE TAXIWAY CONNECTOR AND RSA LIMITS.$
3. SEE FIGURE 2-4 OF FAA AC 150-5370-2G OPERATIONAL SAFETY
ON AIRPORTS DURING CONSTRUCTION FOR MARKINGS OF A
TEMPORARY TAXIWAY CLOSURE.
SCALE: N.T.S.
G-04
TAXIWAY CLOSURE "X" DETAIL
5'
.5'
RUNWAY/TAXIWAY RE-OPENING CHECKLIST:
1. BACKFILL ANY OPEN TRENCHES WITHIN THE RSA AND/OR TSA, OR COVER THE EXCAVATIONS
APPROPRIATELY TO ALLOW FOR THE SAFE OPERATION OF THE HEAVIEST AIRCRAFT OPERATING
ON THE AFFECTED RUNWAY OR TAXIWAY SUCH THAT THE AIRCRAFT WILL NOT BE DAMAGED.
2. ENSURE THERE ARE NO POTENTIALLY HAZARDOUS RUTS, HUMPS, DEPRESSIONS, OR OTHER
SURFACE VARIATIONS WITHIN THE RSA AND/OR TSA. THE RSA AND TSA MUST BE CAPABLE OF
SUPPORTING OCCASIONAL PASSAGE OF AIRCRAFT DURING DRY CONDITIONS WITHOUT CAUSING
STRUCTURAL DAMAGE TO THE AIRCRAFT.
3. ENSURE THAT IMPACTED PAVEMENT EDGES DO NOT EXCEED 3 INCHES VERTICALLY.
4. IF RE-OPENING A RUNWAY AFTER STANDARD SEAL (P-608) APPLICATION, ENSURE THAT FRICTION
TESTING HAS BEEN COMPLETED AND ACCEPTED IN ACCORDANCE WITH ITEM P-608 IN THE
TECHNICAL SPECIFICATIONS. USE APPROVED CONTINUOUS FRICTION MEASURING EQUIPMENT
(CFME) AND DETERMINE IF RESULTS ARE PASSING OR FAILING BASED ON THE APPLICABLE
MAINTENANCE PLANNING FRICTION LEVELS SHOWN IN TABLE 3-2 OF FAA 150/5320-12C
MEASUREMENT, CONSTRUCTION, AND MAINTENANCE OF SKID-RESISTANT AIRPORT PAVEMENT
SURFACES. THE RPR SHALL BE PRESENT FOR FRICTION TESTING, AND THE CONTRACTOR SHALL
BE PROVIDE THE RPR WITH A WRITTEN REPORT OF PASSING TEST RESULTS FOR ACCEPTANCE
PRIOR TO RE-OPENING THE RUNWAY.
5. REMOVE ALL CONSTRUCTION DEBRIS, TRASH, AND ALL FOD FROM THE PAVEMENT.
6. REMOVE BARRICADES AND CLOSURE MARKERS.
10+00 15+00 20+00 25+00 30+00 35+00 38+71
0'
0'
EROSION CONTROL PLAN AND DETAILS
EC-01
5 OF 14SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
LEBANON STATE AIRPORT (S30)
RUNWAY AND TAXIWAY B SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- L eb an on
S ta te R un w ay a nd T ax iw ay S ur fa ce S ea l -
P ha se I
- D es ig n\
C
AD
W
O R
KI
N
G \E
C -0
- E
R O
SI
O
N C
O N
TR
O
L
PL
AN
.d w g
AS NOTED40097.140.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
LRR
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0033-011-2025
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA JIME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
BID SET
EC-01
EROSION CONTROL PLAN
SCALE: 1"=120'
120 120 240
SCALE OF FEET
SCALE: 1"=120'
EROSION CONTROL NOTES:
1. PLACE SEDIMENT BARRIER AROUND SOIL STOCK PILES AS NEEDED.
2. HYDROSEED ANY DISTURBED SURFACES AT NO COST TO THE OWNER.
HYDROSEEDING SHALL NOT OCCUR ON GRAVEL SHOULDERS. THIS WORK IS
INCIDENTAL TO OTHER BID ITEMS.
3. CONSTRUCTION STAGING AREA TO CONTAIN STOCKPILE, PORTABLE TOILET,
CONSTRUCTION FUEL, AND MATERIALS.
ANTICIPATED PROJECT SCHEDULE:
1. ANTICIPATED START DATE FOR WORK IS JUNE 2026. WORK INCLUDES
PAVEMENT REHABILITATION CONSISTING OF CRACK SEALING, AC PATCHING,
AND SURFACE SEAL.
2. ANTICIPATED END DATE FOR WORK IS JULY 2026; NO TEMPORARY STOP DATES
ARE ANTICIPATED.
EC-01
DITCH PROTECTION BIO-FILTER BAG
SCALE: N.T.S.
NOTES:
1. STACKING OF BAGS REQUIRED USING (2) 1"X2" WOOD STAKES OR
APPROVED EQUAL PER BAG.
2. SURFACE MUST BE SMOOTH BEFORE APPLICATION
3. CHECK DAMS CAN BE CONSTRUCTED USING STRAW WATTLES OR
OTHER MATERIALS AS APPROVED BY THE ENGINEER
DITCH PROTECTION
PER
LEGEND:
RUNWAY SAFETY AREA
OBJECT FREE AREA
TAXIWAY SAFETY AREA
TAXIWAY OBJECT FREE
AREA
OBSTACLE FREE ZONE
WORK AREA #1
WORK AREA #2
DITCH PROTECTION
BIO-FILTER BAG
CONTRACTOR
HAUL/ACCESS ROADS
CONTRACTOR STAGING
AREA
LOW LEVEL BARRICADES
RUNWAY 16-34
TW
Y
B2
TW
Y
A3
TAXIWAY A
TW
Y
A2
TW
Y
A1
TW
Y B1
TAXIWAY A
TAXIWAY B
W AIRWAY RD
EC-01
DITCH PROTECTION
PER2
EC-01
EC-01
AI
R
PO
R
T D
R
DITCH PROTECTION
PER
EC-01
AutoCAD SHX Text
OFA
AutoCAD SHX Text
OFA
AutoCAD SHX Text
OFA
AutoCAD SHX Text
OFA
AutoCAD SHX Text N
0'
PAVEMENT MARKING REMOVAL PLAN
C-01
6 OF 14SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
LEBANON STATE AIRPORT (S30)
RUNWAY AND TAXIWAY B SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- L eb an on
S ta te R un w ay a nd T ax iw ay S ur fa ce S ea l -
P ha se I
- D es ig n\
C
AD
W
O R
KI
N
G \C
-0
- D
EM
O P
LA
N
.d w g
AS NOTED40097.140.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
LRR
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0033-011-2025
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA JIME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
BID SET
C-01
PAVEMENT MARKING REMOVAL PLAN
SCALE: 1"=120'
PAVEMENT MARKING REMOVAL NOTES:
1. PROTECT EXISTING STRUCTURES, UTILITIES, AND FEATURES TO REMAIN.
2. PROTECT ALL EXISTING PAVEMENT MARKINGS UNLESS OTHERWISE NOTED.
3. PAVEMENT MARKING REMOVAL AMOUNT SHALL BE:
· 50% REMOVAL FOR PAVEMENT AREAS TO RECEIVE SLURRY SEAL, TYPE 1
· 50% REMOVAL FOR PAVEMENT AREAS TO RECEIVE STANDARD SEAL COAT WHEN
MARKINGS ARE NOT RELOCATED
· 100% REMOVAL FOR AREAS TO RECEIVE STANDARD SEAL COAT WHEN MARKINGS
ARE TO BE RELOCATED, AS SHOWN ON THE PLAN.
SEE ITEM P-620 IN THE TECHNICAL SPECIFICATIONS.
4. PROPOSED PAVEMENT MARKING QUANTITIES ARE BASED ON FIELD SURVEY AND/OR
GIS DATA UTILIZED AT THE TIME OF DESIGN AND WILL BE FIELD-VERIFIED.
DEVIATIONS ARE EXPECTED DUE TO RELOCATIONS OF EXISTING MARKINGS AND
CONDITION CHANGES.
LEGEND:
RUNWAY SAFETY AREA
OBJECT FREE AREA
TAXIWAY SAFETY AREA
TAXIWAY OBJECT FREE AREA
OBSTACLE FREE ZONE
WORK AREA #1
WORK AREA #2
RUNWAY NUMERAL MARKING REMOVAL
RUNWAY ARROW MARKING REMOVAL
RUNWAY CENTERLINE MARKING REMOVAL
PAVEMENT STRIPING MARKING REMOVAL
HOLD LINE MARKING REMOVAL
RUNWAY 16-34
TW
Y
B2
TW
Y
A3
TAXIWAY A
TW
Y
A2
TW
Y
A1
TW
Y B1
TAXIWAY A
TAXIWAY B
W AIRWAY RD
AI
R
PO
R
T D
R
120 120 240
SCALE OF FEET
SCALE: 1"=120'
HOLD BAR MARKING REMOVAL,
100% OF ALL 3' BARS
HOLD BAR MARKING
REMOVAL
ARROWHEAD MARKING
REMOVAL, 100% (TYP.)
RUNWAY CLOSURE "X" WA#1
PER DETAIL
G-04
RUNWAY CLOSURE "X" WA#1
PER DETAIL
G-04
RUNWAY 16 PAVEMENT
MARKING REMOVAL,
100% (TYP.)
RUNWAY 34 PAVEMENT
MARKING REMOVAL,
100% (TYP.)
ALL PAVEMENT MARKINGS FOR RUNWAY AND
TAXIWAYS SHALL BE INSTALLED PRIOR TO OPENING
PAVEMENT MARKINGS REMOVAL
WORK AREA YELLOW MARKINGS (SF) WHITE MARKINGS (SF)
1 1,547 4,191
2 905 0
TOTALS 2,452 4,191
PROJECT TOTAL
(YELLOW & WHITE) 6,643
THRESHOLD BAR
MARKING REMOVAL
DEMARCATION BAR
MARKING REMOVAL
RUNWAY CENTERLINE
MARKING REMOVAL,
100% (TYP.)
CONTINUOUS TAXIWAY CENTERLINE
MARKING REMOVAL, 100% (TYP.)
AutoCAD SHX Text
OFA
AutoCAD SHX Text
OFA
AutoCAD SHX Text
OFA
AutoCAD SHX Text
OFA
AutoCAD SHX Text N
0'
CRACK SEAL AND PAVEMENT REPAIR PLAN
C-02
7 OF 14SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
LEBANON STATE AIRPORT (S30)
RUNWAY AND TAXIWAY B SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- L eb an on
S ta te R un w ay a nd T ax iw ay S ur fa ce S ea l -
P ha se I
- D es ig n\
C
AD
W
O R
KI
N
G \C
-0
- C R
AC
K
SE
AL
A N
D P
AV
EM
EN
T
R
EP
AI
R
P
LA
N .d w g
AS NOTED40097.140.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
LRR
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0033-011-2025
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA JIME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
BID SET
C-02
CRACK SEAL AND PAVEMENT REPAIR PLAN
SCALE: 1"=120'
RUNWAY 16-34
120 120 240
SCALE OF FEET
SCALE: 1"=120'
LEGEND:
RUNWAY SAFETY AREA
OBJECT FREE AREA
TAXIWAY SAFETY AREA
TAXIWAY OBJECT FREE
AREA
OBSTACLE FREE ZONE
WORK AREA #1
WORK AREA #2
KEYED NOTE # CRACK SEALING (LF) AC PATCHING (SF)
WORK AREA #1
1 1,245 0
2 60 0
3 28 0
4 25 0
SUBTOTAL 1,358 0
WORK AREA #2
5 0 0
6 1,627 539
7 0 0
8 28 0
SUBTOTAL 1,655 539
PROJECT TOTAL 3,013 539
1 4
5 6 3
TW
Y
B2
TW
Y
A3
TAXIWAY A
TW
Y
A2
TW
Y
A1
TW
Y
B1
TAXIWAY A
TAXIWAY B
GENERAL NOTES:
1. AIRPORT USES UNICOM RADIO FREQUENCY OF 122.80.
CONTRACTOR TO PERFORM RADIO CHECK PRIOR TO ENTERING
THE AIRPORT.
2. THE CONTRACTOR SHALL USE CAUTION AROUND ALL EXISTING
AIRPORT GUIDANCE ITEMS INCLUDING RUNWAY LIGHTS, TAXIWAY
REFLECTORS, AND CONNECTOR SIGNS. THE CONTRACTOR WILL
INCUR THE COST OF ANY STRUCTURES DAMAGED DURING
CONSTRUCTION ACTIVITIES.
3. CONTRACTOR CHANGES TO THE PHASING PLAN REQUIRES
APPROVAL FROM THE ENGINEER.
CRACK SEALING NOTES:
1. CONTRACTOR SHALL NOTIFY ENGINEER 72 HOURS MINIMUM
PRIOR TO CRACK REPAIR WORK.
2. PRIOR TO CRACK REPAIR, CRACK LOCATIONS WILL BE INDICATED
WITH TEMPORARY MARKS BY THE ENGINEER. CONTRACTOR WILL
BE PROVIDED WITH MEASURED CRACK QUANTITY INFORMATION.
3. CONTRACTOR SHALL IMMEDIATELY NOTIFY ENGINEER IF ANY
DISCREPANCY IN CRACK LENGTH IS OBSERVED.
4. REMOVE EXISTING PAVEMENT MARKINGS BEFORE CRACK
SEALING. REMOVED PAVEMENT MARKINGS SHALL BE REPLACED
PRIOR TO OPENING RUNWAY OR TAXIWAY TO AIR TRAFFIC.
5. PERFORM CRACK SEALING PRIOR TO SURFACE SEAL
APPLICATION.
6. APPLY A PRE-EMERGENT HERBICIDE TO CRACKS IMMEDIATELY
PRIOR TO SEALING.
7. FOR CRACK SEALING DETAIL REFER TO
AC PATCHING NOTES:
1. FOR AC PATCHING DETAIL, REFER TO
2. THE ASPHALT PATCH LOCATIONS INDICATED ON THE PLANS ARE
APPROXIMATE. ASPHALT DEMOLITION EXTENTS FOR ASPHALT
PATCHES WILL BE INDICATED BY THE ENGINEER. CONTRACTOR
WILL BE PROVIDED WITH MEASURED ASPHALT PATCH QUANTITY
INFORMATION.
3. CONTRACTOR SHALL NOTIFY ENGINEER 72 HOURS MINIMUM
PRIOR TO ASPHALT PATCH WORK.
4. PERFORM AC PATCHING WORK PRIOR TO SURFACE SEAL
APPLICATION.
AC PATCH
4' x 24'
AC PATCH
7' x 20'
AC PATCH
7' x 12'
AC PATCH
5' x 3'
AC PATCH
6' x 15'
W AIRWAY RD
AI
R
PO
R
T D
R
C-04
C-04
RUNWAY CLOSURE "X" WA#1
PER DETAIL
G-04
RUNWAY CLOSURE "X" WA#1
PER DETAIL
G-04
AC PATCH
5.5' x 5'AC PATCH
8' x 5'
AC PATCH
6.5' x 7'
AutoCAD SHX Text
OFA
AutoCAD SHX Text
OFA
AutoCAD SHX Text
OFA
AutoCAD SHX Text
OFA
AutoCAD SHX Text N
MULTICORELINK:D-01 - PVMT REPAIR DETAILS-9 PAVEMENT REPAIR DETAILS
MULTICORELINK:D-01 - PVMT REPAIR DETAILS-9 PAVEMENT REPAIR DETAILS
0'
SURFACE SEAL PLAN
C-03
8 OF 14SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
LEBANON STATE AIRPORT (S30)
RUNWAY AND TAXIWAY B SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- L eb an on
S ta te R un w ay a nd T ax iw ay S ur fa ce S ea l -
P ha se I
- D es ig n\
C
AD
W
O R
KI
N
G \C
-0
- S U
R
FA
C E
SE
AL
P
LA
N .d w g
AS NOTED40097.140.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
LRR
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0033-011-2025
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA JIME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
BID SET
C-03
SURFACE SEAL PLAN
SCALE: 1"=120'
RUNWAY 16-34
120 120 240
SCALE OF FEET
SCALE: 1"=120'
5 6
TW
Y
B2
TW
Y
A3
TAXIWAY A
TW
Y
A2
TW
Y
A1
TW
Y
B1
TAXIWAY A
TAXIWAY B
W AIRWAY RD
AI
R
PO
R
T D
R
SURFACE SEAL NOTES:
1. PERFORM EXISTING PAVEMENT MARKING REMOVAL, CRACK SEALING, AND AC PATCHING WORK AS SHOWN
ON THE PLANS AND AS DESCRIBED IN THE SPECIFICATIONS BEFORE APPLYING ANY SURFACE SEAL. THIS
ALSO APPLIES TO FRICTION TEST STRIPS FOR STANDARD SEAL COATING.
2. PROVIDE SURFACE PREPARATION AND EDGE CLEANING FOR ALL AREAS TO RECEIVE STANDARD SEAL COAT
AND SLURRY SEAL PER
3. ALL PAVEMENT MARKINGS WITHIN WORK AREAS MUST BE REMARKED AFTER SURFACE SEAL APPLICATION AND BEFORE AREAS ARE REOPENED TO AIR TRAFFIC. REFER TO THE PAVEMENT MARKING PLANS.
4. COORDINATE SURFACE SEAL LIMITS WITH THE ENGINEER IN THE FIELD PRIOR TO BEGINNING CONSTRUCTION.
5. PRESERVE AND PROTECT ALL PAVEMENT MARKINGS OUTSIDE OF WORK AREAS. DAMAGE TO MARKINGS OUTSIDE OF WORK AREAS WILL BE REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE
OWNER.
6. OIL AND FUEL RESIDUE MAY BE PRESENT FROM AIRCRAFT OPERATIONS. CONTRACTOR SHALL TAKE ADDED CARE TO PERFORM SURFACE PREPARATION PRIOR TO SURFACE SEAL APPLICATION. SEE ITEM P-101 IN THE
SPECIFICATIONS.
7. THE CONTRACTOR MAY BEGIN TESTING THE SKID RESISTANCE OF THE APPLIED STANDARD SEAL (P-608) AFTER IT HAS FULLY CURED, GENERALLY 8 TO 36 HOURS AFTER APPLICATION. THE RUNWAY MUST HAVE PASSING FRICTION TEST RESULTS PRIOR TO OPENING TO TRAFFIC. SEE ITEM P-608 IN THE SPECIFICATIONS.
8. FRESH SLURRY SEAL (P-626) SHALL BE PROTECTED AND PERMITTED TO DRY FOR 4 TO 24 HOURS, DEPENDING ON WEATHER CONDITIONS. PRIOR TO OPENING TO TRAFFIC, THE CONTRACTOR SHALL ENSURE THAT THE SEAL COAT IS UNIFORM AND SKID RESISTANT IN TEXTURE, HAVE NO HOLES, BARE SPOTS, OR CRACKS, AND HAVE NO POTENTIAL FOR LOOSE MATERIAL, TO THE SATISFACTION OF THE RPR. SEE ITEM P-626 IN THE
SPECIFICATIONS.
STANDARD SEAL COAT (P-608)
KEYED NOTE # SURFACE SEAL (SY)
WORK AREA #1
1 18,689
2 384
3 320
4 361
SUBTOTAL 19,754
WORK AREA #2
7 188
8 387
SUBTOTAL 575
TOTAL 20,329
SLURRY SEAL (P-626)
KEYED NOTE # SURFACE SEAL (SY)
WORK AREA #2
5 1,832
6 2,166
TOTAL 3,998
LEGEND:
RUNWAY SAFETY AREA
OBJECT FREE AREA
TAXIWAY SAFETY AREA
TAXIWAY OBJECT FREE AREA
OBSTACLE FREE ZONE
STANDARD SEAL COAT AREA
SLURRY SEAL AREA
GENERAL NOTES:
1. AIRPORT USES UNICOM RADIO FREQUENCY OF 122.80.
CONTRACTOR TO PERFORM RADIO CHECK PRIOR TO
ENTERING THE AIRPORT.
2. THE CONTRACTOR SHALL USE CAUTION AROUND ALL
EXISTING AIRPORT GUIDANCE ITEMS INCLUDING RUNWAY
LIGHTS, TAXIWAY REFLECTORS, AND CONNECTOR SIGNS.
THE CONTRACTOR WILL INCUR THE COST OF ANY
STRUCTURES DAMAGED DURING CONSTRUCTION
ACTIVITIES.
3. CONTRACTOR CHANGES TO THE PHASING PLAN REQUIRES
APPROVAL FROM THE ENGINEER.
C-04
RUNWAY CLOSURE "X" WA#1
PER DETAIL
G-04
RUNWAY CLOSURE "X" WA#1
PER DETAIL
G-04
AutoCAD SHX Text
OFA
AutoCAD SHX Text
OFA
AutoCAD SHX Text
OFA
AutoCAD SHX Text
OFA
AutoCAD SHX Text N
MULTICORELINK:D-01 - PVMT REPAIR DETAILS-9 PAVEMENT REPAIR DETAILS
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
LEBANON STATE AIRPORT (S30)
RUNWAY AND TAXIWAY B SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- L eb an on
S ta te R un w ay a nd T ax iw ay S ur fa ce S ea l -
P ha se I
- D es ig n\
C
AD
W
O R
KI
N
G \D
-0
- P
VM
T R
EP
AI
R D
ET
AI
LS
.d w g
AS NOTED40097.140.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
LRR
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0033-011-2025
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA JIME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
BID SET
PAVEMENT REPAIR DETAILS
C-04
C-04
CRACK SEALING DETAIL
SCALE: NTS
PAVEMENT EDGE CLEANING DETAIL
SCALE: NTS
2'
REMOVE OVERGROWN
SOD, MOSS, SOIL, VEGETATION
AND THOROUGHLY CLEAN
PRIOR TO SEAL COAT
EXISTING
PAVEMENT
SECTION
FINISH GRADE
MATCH EXISTING
GRADE
1.5" EDGE EXPOSURE
C-04
NOTES:
1. VERIFY CRACK LOCATIONS AND QUANTITIES FOR
CLEANING AND FILLING WITH ENGINEER PRIOR TO
WORK.
2. FOR UNSEALED CRACKS, ROUTE AND CLEAN CRACKS OF
ALL DEBRIS AND VEGETATION, THEN FILL WITH
RUBBERIZED ASPHALT CRACK SEALANT. SQUEEGEE USE
IS NOT ALLOWED FOR UNSEALED CRACKS.
3. FOR PREVIOUSLY SEALED CRACKS, CLEAN CRACKS
WITH HEAT LANCE AND FILL WITH RUBBERIZED ASPHALT
CRACK SEALANT. SQUEEGEE USE IS ALLOWED FOR
PREVIOUSLY SEALED CRACKS.
4. MORE THAN ONE LIFT OF SEALANT MAY BE NECESSARY
TO MEET THE REQUIREMENTS OF SPECIFICATION ITEMS
P-101 AND P-605.
FOR UNSEALED CRACKS: ROUTE,
CLEAN, AND SEAL
FOR PREVIOUSLY SEALED
CRACKS: HEAT, CLEAN, AND SEAL
SCALE: N.T.S.
AC PATCHING DETAIL
EXISTING SUBGRADE
SAWCUT (TYP.) EXISTING PAVEMENT SECTION. DEPTHS OF
EXISTING A.C. AND BASE ROCK
AS NOTED ON THE PLANS.
SEAL EDGE OF FINISHED PATCH
WITH CRACK SEAL MATERIAL (TYP.)
HMAC PAVEMENT NOM. THKN. = 3" MIN OR MATCH
EXISTING (WHICHEVER IS GREATER)
COMPACTION = 92% MIN PER ODOT 00744
CONSTRUCTION STANDARDS.
4"-0 DENSE GRADED ODOT AGG. BASE NOM. THKN. = 4"
MIN OR MATCH EXISTING (WHICHEVER IS GREATER)
COMPACTION = 100% OF ASTM D-698 PER ODOT 00641
CONSTRUCTION STANDARDS.
PLAN
SECTION
REPAIR LIMITS
(SAWCUT LINE)
APPLY TACK (P-603) TO FACE
OF SAWCUT EDGE (TYP.)
DISTANCE VARIES
LO
C
AT
IO
N A
S
SH
O W
N O
N P
LA
N
SPAVEMENT PATCH
LIMITS
LO
C
AT
IO
N A
S
SH
O W
N O
N P
LA
N
S
C-04
REMOVE EXISTING GEOTEXTILE FABRIC OR GEOGRID IF
WITHIN REPAIR LIMITS. PLACE NEW GEOTEXTILE FABRIC
OR GEOGRID ON TOP ON COMPACTED SUBGRADE.
AREA OF CRACKED/
DISTRESSED PAVEMENT
6" BENCH OF EXISTING
AGGREGATE
EXISTING
AGGREGATE BASE
6" BENCH OF EXISTING
AGGREGATE BASE
6" 6"
10+00 15+00 20+00 25+00 30+00 35+00 38+71
PAVEMENT MARKING OVERALL PLAN
C-05
10 OF 14SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
LEBANON STATE AIRPORT (S30)
RUNWAY AND TAXIWAY B SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- L eb an on
S ta te R un w ay a nd T ax iw ay S ur fa ce S ea l -
P ha se I
- D es ig n\
C
AD
W
O R
KI
N
G \C
-0
- P
VM
T M
AR
KI
N G
O
VE
R
AL
L
PL
AN
.d w g
AS NOTED40097.140.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
LRR
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0033-011-2025
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA JIME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
BID SET
C-05
PAVEMENT MARKING OVERALL PLAN
SCALE: 1"=120'
120 120 240
SCALE OF FEET
SCALE: 1"=120'
LEGEND:
RUNWAY SAFETY AREA
OBJECT FREE AREA
TAXIWAY SAFETY AREA
TAXIWAY OBJECT FREE AREA
OBSTACLE FREE ZONE
WORK AREA #1
WORK AREA #2
WHITE PAVEMENT MARKING
YELLOW PAVEMENT MARKING
RUNWAY 16-34
TW
Y
B2
TW
Y
A3 TAXIWAY A
TW
Y
A2
TW
Y
A1
TW
Y
B1
TAXIWAY A
TAXIWAY B
W AIRWAY RD
AI
R
PO
R
T D
R
SEE
SHEET
C-06
SEE
SHEET
C-07
PAVEMENT MARKINGS
WORK AREA YELLOW MARKINGS (SF) WHITE MARKINGS (SF)
1 1,591 5,002
2 906 0
TOTALS 2,497 5,002
PROJECT TOTAL
(YELLOW & WHITE) 7,499
NOTES:
1. THE CONTRACTOR SHALL SURVEY PAVEMENT MARKING
LOCATIONS. ADHESIVE TABS SHALL NOT BE USED FOR
MARKING LAYOUT PRIOR TO SURFACE SEAL APPLICATION.
2. ALL PAVEMENT MARKINGS REQUIRE TWO APPLICATIONS OF
PAINT WITH THE FOLLOWING COVERAGE:
· FIRST COAT: 30% OF SPECIFIED APPLICATION RATE
WITHOUT GLASS BEADS
· SECOND/FINAL COAT: 100% OF SPECIFIED APPLICATION
RATE WITH GLASS BEADS
SEE ITEM P-620 IN THE TECHNICAL SPECIFICATIONS.
3. SECOND COAT OF MARKINGS TO BE APPLIED AFTER 30-DAYS
PER SPECIFICATIONS.
4. ALL PAVEMENT MARKINGS FOR RUNWAY AND TAXIWAYS
SHALL BE APPLIED PRIOR TO OPENING.
5. SEE FAA FORM 7460-1 FOR TALL CONSTRUCTION EQUIPMENT.
6. ALL PAVEMENT MARKINGS SHALL MEET THE STANDARDS OF
FAA AC 150/5340-1M STANDARDS FOR AIRPORT MARKINGS.
7. PROPOSED PAVEMENT MARKING QUANTITIES ARE BASED ON
FIELD SURVEY AND/OR GIS DATA UTILIZED AT THE TIME OF
DESIGN AND WILL BE FIELD-VERIFIED. DEVIATIONS ARE
EXPECTED DUE TO RELOCATIONS OF EXISTING MARKINGS
AND CONDITION CHANGES.
AutoCAD SHX Text
OFA
AutoCAD SHX Text
OFA
AutoCAD SHX Text
OFA
AutoCAD SHX Text
OFA
AutoCAD SHX Text N
MULTICORELINK:C - PVMT MARKING PLANS-11 PAVEMENT MARKING PLAN - STA 10+00 TO STA 24+00 MULTICORELINK:C - PVMT MARKING PLANS-11 PAVEMENT MARKING PLAN - STA 10+00 TO STA 24+00 MULTICORELINK:C - PVMT MARKING PLANS-12 PAVEMENT MARKING PLAN - STA 24+00 TO STA 38+71 MULTICORELINK:C - PVMT MARKING PLANS-12 PAVEMENT MARKING PLAN - STA 24+00 TO STA 38+71
10+00 15+00 20+00
.6
14.0' 12.4'
.0
.5
.0
PAVEMENT MARKING PLAN - STA 10+00 TO STA 24+00
C-06
11 OF 14SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
LEBANON STATE AIRPORT (S30)
RUNWAY AND TAXIWAY B SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- L eb an on
S ta te R un w ay a nd T ax iw ay S ur fa ce S ea l -
P ha se I
- D es ig n\
C
AD
W
O R
KI
N
G \C
PV
M T
M
AR
KI
N
G P
LA
N
S.
dw g
AS NOTED40097.140.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
LRR
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0033-011-2025
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA JIME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
BID SET
LEGEND:
RUNWAY SAFETY AREA
OBJECT FREE AREA
TAXIWAY SAFETY AREA
TAXIWAY OBJECT FREE AREA
OBSTACLE FREE ZONE
WORK AREA #1
WORK AREA #2
WHITE PAVEMENT MARKING
YELLOW PAVEMENT MARKING
RUNWAY 16-34
TW
Y
B2
TW
Y
A3
TAXIWAY A
TW
Y
A2
TAXIWAY B
M
AT
C H
LI
N
E
ST
A
+0 0, S
EE
S H
EE
T
C -0
37.0'
40.0'
20.0'
120.0'
80.0' 80.0' 80.0' 80.0' 63.5' 63.5' 80.0'
120.0' 120.0' 120.0' 120.0' 100.0' 100.0'
RUNWAY 16 MARKINGS
PER
C-08
C-06
PAVEMENT MARKING PLAN - STA 10+00 TO STA 24+00
SCALE: 1"=50'
50 50 100
SCALE OF FEET
SCALE: 1"=50'
ALL PAVEMENT MARKINGS FOR RUNWAY AND
TAXIWAYS SHALL BE INSTALLED PRIOR TO OPENING
RUNWAY CENTERLINE
STRIPES PER
C-09
CONTINUOUS TAXIWAY
CENTERLINE MARKING
PER
C-09 HOLD BAR MARKINGS
PER
C-09
R75.0'
R70.0'
R
.0
R70 .0'
R70.0'
CONTINUOUS TAXIWAY
CENTERLINE MARKING
PER3
C-09
MATCH INTO EXISTING
MARKINGS
N: 324564.76 E: 7568593.54
N: 326564.74 E: 7568601.11
NOTES:
1. THE CONTRACTOR SHALL SURVEY PAVEMENT MARKING
LOCATIONS. ADHESIVE TABS SHALL NOT BE USED FOR
MARKING LAYOUT PRIOR TO SURFACE SEAL APPLICATION.
2. ALL PAVEMENT MARKINGS REQUIRE TWO APPLICATIONS OF
PAINT WITH THE FOLLOWING COVERAGE:
· FIRST COAT: 30% OF SPECIFIED APPLICATION RATE
WITHOUT GLASS BEADS
· SECOND/FINAL COAT: 100% OF SPECIFIED APPLICATION
RATE WITH GLASS BEADS
SEE ITEM P-620 IN THE TECHNICAL SPECIFICATIONS.
3. SECOND COAT OF MARKINGS TO BE APPLIED AFTER 30-DAYS
PER SPECIFICATIONS.
4. ALL PAVEMENT MARKINGS FOR RUNWAY AND TAXIWAYS
SHALL BE APPLIED PRIOR TO OPENING.
5. SEE FAA FORM 7460-1 FOR TALL CONSTRUCTION EQUIPMENT.
6. ALL PAVEMENT MARKINGS SHALL MEET THE STANDARDS OF
FAA AC 150/5340-1M STANDARDS FOR AIRPORT MARKINGS.
7. PROPOSED PAVEMENT MARKING QUANTITIES ARE BASED ON
FIELD SURVEY AND/OR GIS DATA UTILIZED AT THE TIME OF
DESIGN AND WILL BE FIELD-VERIFIED. DEVIATIONS ARE
EXPECTED DUE TO RELOCATIONS OF EXISTING MARKINGS
AND CONDITION CHANGES.
MULTICORELINK:C - PVMT MARKING PLANS-12 PAVEMENT MARKING PLAN - STA 24+00 TO STA 38+71 MULTICORELINK:C - PVMT MARKING PLANS-12 PAVEMENT MARKING PLAN - STA 24+00 TO STA 38+71
MULTICORELINK:D-02-03 - PVMT MARKING DETAILS-13 PAVEMENT MARKING DETAILS
AutoCAD SHX Text N
MULTICORELINK:D-02-03 - PVMT MARKING DETAILS-14 PAVEMENT MARKING DETAILS
MULTICORELINK:D-02-03 - PVMT MARKING DETAILS-14 PAVEMENT MARKING DETAILS
25+00 30+00 35+00 38+71
PAVEMENT MARKING PLAN - STA 24+00 TO STA 38+71
C-07
12 OF 14SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
LEBANON STATE AIRPORT (S30)
RUNWAY AND TAXIWAY B SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- L eb an on
S ta te R un w ay a nd T ax iw ay S ur fa ce S ea l -
P ha se I
- D es ig n\
C
AD
W
O R
KI
N
G \C
PV
M T
M
AR
KI
N
G P
LA
N
S.
dw g
AS NOTED40097.140.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
LRR
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0033-011-2025
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA JIME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
BID SET
RUNWAY 16-34
TW
Y
A1
TW
Y
B1
TAXIWAY A
M
AT
C H
LI
N
E
ST
A
+0 0, S
EE
S H
EE
T
C -0
80.0'
120.0'
80.0'
120.0'
80.0'
120.0'
80.0'
120.0'
40.0'
120.0'
80.0'
10.0' 30.0' 80.0' 60.0'
5.0'
5.0'
50 50 100
SCALE OF FEET
SCALE: 1"=50'
C-07
PAVEMENT MARKING PLAN - STA 24+00 TO STA 38+71
SCALE: 1"=50'
70.7'
ALL PAVEMENT MARKINGS FOR RUNWAY AND
TAXIWAYS SHALL BE INSTALLED PRIOR TO OPENING
.8
.8
9.2' 9.5'
R75 .0'
R75.0'
MATCH INTO
EXISTING
MARKINGS
RUNWAY 34 MARKINGS
PER
C-08
RUNWAY CENTERLINE
STRIPES PER
C-09
HOLD BAR MARKINGS
PER
C-09
CONTINUOUS TAXIWAY
CENTERLINE MARKING
PER3
C-09
ALIGNED TAXIWAY MARKINGS
PER
C-08
RUNWAY ARROWHEADS
PER
C-09
6" TAXIWAY CENTERLINE STRIPE
R30.0'
13.1' 12.7'
CONTINUOUS TAXIWAY
CENTERLINE MARKING
PER
C-09
.0
N: 325114.56 E: 7568593.54
N: 325114.91 E: 7568600.91
NOTES:
1. THE CONTRACTOR SHALL SURVEY PAVEMENT MARKING
LOCATIONS. ADHESIVE TABS SHALL NOT BE USED FOR
MARKING LAYOUT PRIOR TO SURFACE SEAL APPLICATION.
2. ALL PAVEMENT MARKINGS REQUIRE TWO APPLICATIONS OF
PAINT WITH THE FOLLOWING COVERAGE:
· FIRST COAT: 30% OF SPECIFIED APPLICATION RATE
WITHOUT GLASS BEADS
· SECOND/FINAL COAT: 100% OF SPECIFIED APPLICATION
RATE WITH GLASS BEADS
SEE ITEM P-620 IN THE TECHNICAL SPECIFICATIONS.
3. SECOND COAT OF MARKINGS TO BE APPLIED AFTER 30-DAYS
PER SPECIFICATIONS.
4. ALL PAVEMENT MARKINGS FOR RUNWAY AND TAXIWAYS
SHALL BE APPLIED PRIOR TO OPENING.
5. SEE FAA FORM 7460-1 FOR TALL CONSTRUCTION EQUIPMENT.
6. ALL PAVEMENT MARKINGS SHALL MEET THE STANDARDS OF
FAA AC 150/5340-1M STANDARDS FOR AIRPORT MARKINGS.
7. PROPOSED PAVEMENT MARKING QUANTITIES ARE BASED ON
FIELD SURVEY AND/OR GIS DATA UTILIZED AT THE TIME OF
DESIGN AND WILL BE FIELD-VERIFIED. DEVIATIONS ARE
EXPECTED DUE TO RELOCATIONS OF EXISTING MARKINGS
AND CONDITION CHANGES.
LEGEND:
RUNWAY SAFETY AREA
OBJECT FREE AREA
TAXIWAY SAFETY AREA
TAXIWAY OBJECT FREE AREA
OBSTACLE FREE ZONE
WORK AREA #1
WORK AREA #2
WHITE PAVEMENT MARKING
YELLOW PAVEMENT MARKING
AutoCAD SHX Text N
MULTICORELINK:D-02-03 - PVMT MARKING DETAILS-13 PAVEMENT MARKING DETAILS
MULTICORELINK:D-02-03 - PVMT MARKING DETAILS-14 PAVEMENT MARKING DETAILS
MULTICORELINK:D-02-03 - PVMT MARKING DETAILS-14 PAVEMENT MARKING DETAILS
MULTICORELINK:D-02-03 - PVMT MARKING DETAILS-14 PAVEMENT MARKING DETAILS
MULTICORELINK:D-02-03 - PVMT MARKING DETAILS-13 PAVEMENT MARKING DETAILS
PAVEMENT MARKING DETAILS
C-08
13 OF 14SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
LEBANON STATE AIRPORT (S30)
RUNWAY AND TAXIWAY B SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- L eb an on
S ta te R un w ay a nd T ax iw ay S ur fa ce S ea l -
P ha se I
- D es ig n\
C
AD
W
O R
KI
N
G \D
-0 2-
PV
M
T M
AR
KI
N G
D
ET
AI
LS
.d w g
AS NOTED40097.140.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
LRR
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0033-011-2025
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA JIME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
BID SET
C-08
RUNWAY 16 PAVEMENT MARKINGS
SCALE: N.T.S.
63.0'
60.0'
15.0'
10.0' 17.0' 10.0'
13.0'
5.0'
5.0'
5.0'
2.0' 10.0'
1.0'
14.0'
5.0'
40.0'
60.0'
60.0'
29.0'14.0'17.0'
9.0'
10.0'10.0' 20.0'
7.0'5.0' 5.0'
5.0'
10.0' 13.0'19.0'
15.0'
5.0'18.0'
10.0'
2.5'
7.5'40.0'
10.0' 10.0'
5.0'
15.0'
15.0'
45.0' 30.0' 45.0'
3.0'
5.0'
C-08
ALIGNED TAXIWAY PAVEMENT MARKINGS
SCALE: N.T.S.
C-08
RUNWAY 34 PAVEMENT MARKINGS
SCALE: N.T.S.
RUNWAY DEMARCATION
BAR (YELLOW)
ARROWHEAD
PER
C-09
6" TAXIWAY CENTERLINE
MARKING
RUNWAY THRESHOLD
BAR (WHITE)
ARROWHEAD
PER 4
C-09
RUNWAY CENTERLINE
MARKING PER
C-09
RUNWAY CENTERLINE
MARKING PER
C-09
20.0'
15.0'
15.0'
60.0'
EDGE OF RUNWAY
PAVEMENT
EDGE OF RUNWAY
PAVEMENT
EDGE OF RUNWAY
PAVEMENT
EDGE OF RUNWAY
EDGE OF ALIGNED
TAXIWAY PAVEMENT
EDGE OF ALIGNED
TAXIWAY PAVEMENT
EDGE OF ALIGNED
TAXIWAY PAVEMENT
EDGE OF RUNWAY
PAVEMENT
EDGE OF RUNWAY
PAVEMENT
MULTICORELINK:D-02-03 - PVMT MARKING DETAILS-14 PAVEMENT MARKING DETAILS
MULTICORELINK:D-02-03 - PVMT MARKING DETAILS-14 PAVEMENT MARKING DETAILS
PAVEMENT MARKING DETAILS
C-09
14 OF 14SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
LEBANON STATE AIRPORT (S30)
RUNWAY AND TAXIWAY B SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DES…