S-10900-00015899 Attachment C - PLANS AND DRAWINGS_Vectorized Version.pdf
PDF 10 MB Posted
- Solicitation number
- S-10900-00015899
- Issued by
- Lane County, Oregon
About this file
This is an Invitation to Bid (ITB) document from the Oregon Department of Aviation for runway reconstruction and associated improvements at Oakridge State Airport in Lane County, Oregon. The project scope encompasses full-depth reconstruction of Runway 9-27, demolition and removal of existing pavement, Runway Safety Area grading, reconstruction of two apron connector taxiways and existing apron pavement, installation of up to four concrete helipads, storm drainage improvements, installation of three lighted solar-powered wind cones, aircraft tie-down installation, permanent seeding and site stabilization, and new pavement markings. The base bid includes 31 line items with quantities ranging from lump sum mobilization to specific unit prices for materials and labor, while two additive schedules provide options for Apron Reconstruction (13 items) and New Connector Taxiway (15 items). A voluntary pre-bid conference and site walkthrough is scheduled for April 9, 2026, at 11:00 AM; questions and clarifications must be submitted by the same date. Bids are due April 16, 2026, at 2:00 PM Pacific Standard Time through the OregonBuys electronic procurement system, with public bid opening immediately following via Microsoft Teams. The anticipated Notice to Proceed is June 1, 2026, with substantial completion of all work except seeding required by July 31, 2026 (61 calendar days), seeding completion by October 31, 2026, and final project completion by October 31, 2026.
The project is funded entirely with state funds with an estimated budget of $2.0 million to $2.3 million. Bidders must be registered with Oregon's Construction Contractors Board and must submit bid security equal to 10% of the total bid amount, along with performance and payment bonds each in the amount of 100% of the contract price. The contract is subject to prevailing wage requirements as established by the Oregon Bureau of Labor and Industries for Lane County, BOLI Region 5, effective February 18, 2026, with liquidated damages of $1,000 per calendar day for failure to meet the substantial completion date and $250 per calendar day for failure to meet the final completion date. Comprehensive insurance coverage is required, including $1 million in commercial general liability and automobile liability coverage per occurrence and a $5 million excess/umbrella policy. Five percent retainage will be withheld from progress payments, with alternative retainage options available through surety bonds or approved securities. All work must comply with technical standards established by the American Society for Testing and Materials (ASTM), American Association of State Highway and Transportation Officials (AASHTO), and Oregon Department of Aviation requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HARNEY
GRANT
WHEELER
GILLIAM
MORROW
YAMHILL
CLACKAMAS
RIVER
WASCO
SHERMAN
JEFFERSON
LINCOLN
POLK
BENTON
LINN
MARION
LANE
CROOK
DESCHUTES
DOUGLAS
COOS
CURRY JOSEPHINE JACKSON
KLAMATH
LAKE
SD
HIGHWAY 58
AIRPORT
WESTFIR RD
MIDDLE
WILLAMETTE
FORK
RIVER
RD
INDEX TO DRAWINGSVICINITY MAP
RUNWAY 9-27 PAVEMENT RECONSTRUCTION
AND ASSOCIATED IMPROVEMENTS
OAKRIDGE STATE AIRPORT
OREGON DEPARTMENT OF AVIATION
SITE MAP
PROJECT
LOCATION
NORTH
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
3/
/ 2
- 1
1:
am kk im
P
:\O \o da -o ak rid ge
2-rw y re co ns tr\
C
AD
\D
W G
\S he et s\
O
AK
2-
C O
VE
R
.d w g
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
OAKRIDGE STATE AIRPORT
RUNWAY 9-27 PAVEMENT RECONSTRUCTION AND
ASSOCIATED IMPROVEMENTS
COVER SHEET
PRECISION APPROACH ENGINEERING, INC.
MAR 2026
LMT
KWK/JAW
KJK
AS SHOWN
OAK002
OAKRIDGE STATE
AIRPORT
OAKRIDGE
Sheet List TableSheet Number Sheet Title
1 COVER SHEET
2 LEGENDS
3 BID SCHEDULES
4 SITE PLAN
5 CONSTRUCTION SAFETY AND PHASING AND GENERAL NOTES
6 CONSTRUCTION SAFETY AND PHASING PLAN CRITICAL AREAS
7 CONSTRUCTION SAFETY AND PHASING PLAN
8 EROSION AND SEDIMENT CONTROL PLAN
9 EROSION AND SEDIMENT CONTROL NOTES
10 EROSION AND SEDIMENT CONTROL DETAILS
11 DEMOLITION PLAN
12 ADDITIVE A APRON DEMOLITION PLAN
13 GEOTECHNICAL LOGS
14 GEOTECHNICAL LOGS
15 DEMOLITION DETAILS
16 RUNWAY PLAN AND PROFILE - STA 8+00 TO 14+50
17 RUNWAY PLAN AND PROFILE - STA 14+50 TO 23+00
18 RUNWAY PLAN AND PROFILE - STA 23+00 TO 31+50
19 RUNWAY PLAN AND PROFILE - STA 31+50 TO 40+00
20 RUNWAY PLAN AND PROFILE - STA 40+00 TO 48+00
21 TAXIWAY CONNECTOR AND ADDITIVE A APRON LAYOUT PLAN
22 TAXIWAY CONNECTOR PLAN AND PROFILE
23 ADDITIVE B TAXIWAY CONNECTOR PLAN AND PROFILE
24 ADDITIVE A APRON GRADING PLAN
25 RUNWAY CROSS SECTIONS
26 TYPICAL SECTIONS
27 PAVEMENT DETAILS
28 PAVEMENT DETAILS
29 PAVEMENT DETAILS
30 DRAINAGE DETAILS
31 MARKING AND RETROREFLECTIVE MARKER PLAN
32 THRESHOLD MARKING DETAILS
33 TAXIWAY AND APRON MARKING AND RETROREFLECTIVE
MARKER PLAN
34 MARKING DETAILS
35 MARKING DETAILS
36 MARKING DETAILS
37 ELECTRICAL DETAILS
38 WIND CONE DETAILS
39 WIND CONE DETAILS
2202,3BEM
REG
ISTERED PROFESSIONAL
KADEN J. KINS R1
EXPIRES 6/30/2027
TPES
RE E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PACIFIC OCEAN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BANDON
AutoCAD SHX Text
COOS
AutoCAD SHX Text
BAY
AutoCAD SHX Text
REEDSPORT
AutoCAD SHX Text
FLORENCE
AutoCAD SHX Text
NEWPORT
AutoCAD SHX Text
NETARTS
AutoCAD SHX Text
PORTLAND
AutoCAD SHX Text
EUGENE
AutoCAD SHX Text
ROSEBURG
AutoCAD SHX Text
MEDFORD
AutoCAD SHX Text
CORVALLIS
AutoCAD SHX Text
SALEM
AutoCAD SHX Text
AutoCAD SHX Text
OAKRIDGE
AutoCAD SHX Text
GRAVEL ROAD
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
100236PE
ELECTRICAL LEGEND
NEWEXISTING
POH
P
CIVIL SYMBOLS LEGEND
EXISTING NEW
T
G
W W
SS SS
SD SD
SDSD
EDGE OF PAVEMENT
EDGE OF GRAVEL
CONTOUR
DITCH FLOW LINE
FENCE
STORM DRAIN
UNDER DRAIN
CULVERT
SANITARY SEWER
WATER
GAS
TELEPHONE
IRRIGATION
SLOPE SYMBOL
CATCH BASIN WITH METAL GRATE
CATCH BASIN WITH WOOD GRATE
STORM DRAIN MANHOLE-SOLID LID
STORM DRAIN MANHOLE WITH INLET
CLEANOUT
CULVERT END STRUCTURE
CULVERT END STRUCTURE WITH RACK
CONCRETE HEADWALL
SURFACE FLOW DIRECTION
SANITARY MANHOLE
FIRE HYDRANT
WATER METER
WATER VALVE
TIE DOWN
SIGN
SURVEY CONTROL POINT
SURVEY FOUND MONUMENT
BRASS CAP
BENCHMARK
AIRPORT BEACON
SHRUBS
TREES
ABANDONED FEATURE LINE
DEMO FEATURE LINES
DEMO FEATURE LINES
SS
HANDHOLE
POWER VAULT
DUCT MARKER
JUNCTION CAN
JC-PAPI
JC-MIRL
ELECTRICAL RISER
RUNWAY EDGE LIGHT AND THRESHOLD LIGHT
C = CLEAR
R = RED
G = GREEN
Y = YELLOW
O = OPAQUE
RUNWAY LIGHT IN PAVEMENT (FLUSH MOUNT)
REIL (RUNWAY END IDENTIFIER LIGHT)
PAPI (PRECISION APPROACH PATH INDICATOR)
TAXIWAY LIGHT
B = BLUE
TAXIWAY LIGHT IN PAVEMENT (FLUSH MOUNT)
RETROREFLECTIVE MARKER
POWER OVERHEAD CIRCUIT / CONDUIT
POWER UNDERGROUND CIRCUIT/CONDUIT
POWER POLE
GUY WIRE
STREET LIGHT
GUIDANCE SIGN
SS
JJ
IRR
UD
AVIATION LEGEND
FUTUREEXISTING
OBJECT FREE AREA (OFA)
OBJECT FREE ZONE (OFZ)
OFZ-OFA
RUNWAY OBJECT FREE AREA
RUNWAY OBSTACLE FREE ZONE
RUNWAY PROTECTION ZONE
RUNWAY SAFETY AREA
TAXIWAY OBJECT FREE AREA
TAXILANE OBJECT FREE AREA
TAXIWAY SAFETY AREA
SDSD
LEGEND
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
3/
/ 2
- 1
1:
am kk im
P
:\O \o da -o ak rid ge
2-rw y re co ns tr\
C
AD
\D
W G
\S he et s\
O
AK
2-
C O
VE
R
.d w g
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
OAKRIDGE STATE AIRPORT
RUNWAY 9-27 PAVEMENT RECONSTRUCTION AND
ASSOCIATED IMPROVEMENTS
LEGENDS
PRECISION APPROACH ENGINEERING, INC.
MAR 2026
LMT
KWK/JAW
KJK
2202,3BEM
REG
ISTERED PROFESSIONAL
KADEN J. KINS R1
EXPIRES 6/30/2027
TPES
RE E
AutoCAD SHX Text 101.8
AutoCAD SHX Text
HH
AutoCAD SHX Text P
AutoCAD SHX Text
DM
AutoCAD SHX Text E
AutoCAD SHX Text
HH
AutoCAD SHX Text P
AutoCAD SHX Text
DM
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text
WOOD
AutoCAD SHX Text
WOOD
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
100236PE
DIGITALLY SIGNED
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
3/
/ 2
- 1
1:
am kk im
P
:\O \o da -o ak rid ge
2-rw y re co ns tr\
C
AD
\D
W G
\S he et s\
O
AK
2-
C O
VE
R
.d w g
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
OAKRIDGE STATE AIRPORT
RUNWAY 9-27 PAVEMENT RECONSTRUCTION AND
ASSOCIATED IMPROVEMENTS
BID SCHEDULES
PRECISION APPROACH ENGINEERING, INC.
MAR 2026
LMT
KWK/JAW
KJK
RUNWAY RECONSTRUCTION
BASE BID SCHEDULE
APRON RECONSTRUCTION
ADDITIVE BID SCHEDULE A
BID ITEM SPEC. DESCRIPTION UNIT QUANTITY CONSTRUCTION
QUANTITY
1 00210 MOBILIZATION LS 1
2 00280 SEDIMENT BARRIER, TYPE 3 LF 2,560
3 00280 EROSION CONTROL LS 1
4 00280 TEMPORARY MULCHING, STRAW AC 9
5 00305 CONSTRUCTION SURVEY WORK LS 1
6 00310 REMOVAL OF STRUCTURES AND OBSTRUCTIONS LS 1
7 00310 REMOVAL OF PIPES LF 250
8 00315 ASPHALT PAVEMENT GRINDING AND BLENDING SY 16,120
9 00330 GENERAL EXCAVATION CY 10,160
10 00331 SUBGRADE STABILIZATION CY 1,100
11 00336 SHOULDER AND SLOPE GRADING SY 38,000
12 00445 8-INCH RCP PIPE LF 130
13 00445 12-INCH HDPE PIPE LF 170
14 00460 PAVED CULVERT END SLOPE EA 2
15 00470 CATCH BASIN, TYPE G-2 EA 1
16 00620 COLD PLANE PAVEMENT REMOVAL, FULL DEPTH SY 4,830
17 00641 AGGREGATE BASE CY 5,600
18 00641 AGGREGATE SHOULDERS, 6 INCHES THICK SY 10,580
19 00744 LEVEL 2, 1/2 INCH ACP MIXTURE TON 4,250
20 00759 CONCRETE HELIPAD PAVEMENT SF 3,675
21 00759 LONGITUDINAL JOINT SEAL LF 805
22 00860 LONGITUDINAL PAVEMENT MARKINGS SF 6,960
23 01030 PERMANENT SEEDING AC 9
24 L-107 L-806 WIND CONE, FOUNDATION AND POWER SUPPLY EA 2
25 L-107 L-807 WIND CONE, FOUNDATION AND POWER SUPPLY EA 1
26 L-107 SEGMENTED CIRCLE MARKER SYSTEM LS 1
27 L-110 2-INCH PVC CONDUIT LF 120
28 L-110 ELECTRICAL TRENCH LF 60
29 L-125 RETROREFLECTIVE MARKER, ELEVATED EA 64
30 L-125 RETROREFLECTIVE MARKER, ELEVATED, IN-PAVEMENT EA 6
31 L-125 VEGETATIVE BARRIER MAT EA 64
BID ITEM SPEC. DESCRIPTION UNIT QUANTITY CONSTRUCTION
QUANTITY
A-1 00210 MOBILIZATION LS 1
A-2 00305 CONSTRUCTION SURVEY WORK LS 1
A-3 00310 REMOVAL OF STRUCTURES AND OBSTRUCTIONS LS 1
A-4 00330 GENERAL EXCAVATION CY 2,170
A-5 00331 SUBGRADE STABILIZATION CY 600
A-6 00336 SHOULDER AND SLOPE GRADING SY 2,510
A-7 00620 COLD PLANE PAVEMENT REMOVAL, FULL DEPTH SY 6,210
A-8 00641 AGGREGATE BASE CY 1,620
A-9 00744 LEVEL 2, 1/2 INCH ACP MIXTURE TON 1,150
A-10 00759 AIRCRAFT TIE-DOWN ANCHOR EA 12
A-11 00759 CONCRETE HANGAR TRANSITION LF 135
A-12 00759 LONGITUDINAL JOINT SEAL LF 280
A-13 00860 LONGITUDINAL PAVEMENT MARKINGS SF 1,540
NEW TAXIWAY CONNECTOR
ADDITIVE BID SCHEDULE B
BID ITEM SPEC. DESCRIPTION UNIT QUANTITY CONSTRUCTION
QUANTITY
B-1 00330 GENERAL EXCAVATION CY 260
B-2 00331 SUBGRADE STABILIZATION CY 30
B-3 00445 8 INCH RCP PIPE LF 160
B-4 00460 PAVED CULVERT END SLOPE EA 2
B-5 00641 AGGREGATE BASE CY 170
B-6 00641 AGGREGATE SHOULDERS, 6 INCHES THICK SY 180
B-7 00744 LEVEL 2, 1/2 INCH ACP MIXTURE TON 140
B-8 00759 CONCRETE HELIPAD PAVEMENT SF 1,225
B-9 00759 LONGITUDINAL JOINT SEAL LF 280
B-10 00860 LONGITUDINAL PAVEMENT MARKINGS SF 410
B-11 L-110 2-INCH PVC CONDUIT LF 130
B-12 L-110 ELECTRICAL TRENCH LF 70
B-13 L-125 RETROREFLECTIVE MARKER, ELEVATED EA 3
B-14 L-125 RETROREFLECTIVE MARKER, FLUSH MOUNTED EA 1
B-15 L-125 VEGETATIVE BARRIER MAT EA 3
2202,3BEM
REG
ISTERED PROFESSIONAL
KADEN J. KINS R1
EXPIRES 6/30/2027
TPES
RE E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
100236PE
E
EE
SS
SD
SD
100 101105
AIRPORT RD
HANGAR
HANGAR
NEW RUNWAY REFLECTORS
REPLACED PRIMARY WINDCONE AND
SEGMENTED CIRCLE REPLACEMENT
RELOCATE CONNECTOR TAXIWAY
CONTRACTOR'S MATERIAL
STOCKPILE AREA
RUNWAY 9-27 REHABILITATION
NEW WINDCONE
NEW TURN AROUND AND PARKING PAD
NEW AIRCRAFT
TURNAROUND AND
PARKING PAD
NEW DISPLACED THRESHOLD
EXISTING VEGETATION
LINE AS OF FALL 2025
RUNWAY SAFETY AREA
AIRPORT PROPERTY LINE NEW WINDCONE
CONTRACTOR'S
STAGING AREA
APRON PAVEMENT
RECONSTRUCTION,
ADDITIVE A
NEW CONNECTOR
TAXIWAY, ADDITIVE B
SCALE IN FEET
150 300
HORIZONTAL DATUM: NAD83 (2011) OREGON SOUTH ZONE 3602, INTERNATIONAL FEET
VERTICAL DATUM: NAVD 88
NUMBER
NORTHING
766215.51
766133.20
767085.14
766618.26
EASTING
4393258.01
4393551.81
4389907.97
4392849.06
ELEVATION
1377.00
1381.28
1402.50
1407.01
DESCRIPTION
NGS SURVEY DISK IN CONC MONUMENT
5/8" BAR WITH ALUMINUM CAP
5/8" BAR WITH ALUMINUM CAP
3.5" BRASS DISC "US DEPT OF INTERIOR"
SURVEY NOTES
1. HORIZONTAL AND VERTICAL CONTROL SURVEY REFERENCE POINTS ARE PROVIDED BY THE
ENGINEER FOR CONTROL OF THE PROJECT. CONTRACTOR SHALL LAYOUT ALL WORK FROM
REFERENCE POINTS AS SHOWN ON THE DRAWINGS. ALL LAYOUT AND CONSTRUCTION
SURVEY SHALL BE CONDUCTED BY A PROFESSIONAL LAND SURVEYOR REGISTERED IN THE
STATE OF OREGON.
2. PRIOR TO BEGINNING ANY LAYOUT, THE CONTRACTOR'S SURVEYOR SHALL OCCUPY ALL
SURVEY POINTS REFERENCED IN THE TABLE SHOWN ON THIS SHEET AND VERIFY DATA
GIVEN. ANY DISCREPANCY SHALL IMMEDIATELY BE BROUGHT TO THE ENGINEER'S ATTENTION
FOR CLARIFICATION OR CORRECTION. NOTES AND A LETTER APPROVED AND SIGNED BY A
STATE LICENSED PROFESSIONAL LAND SURVEYOR (PLS) SHOWING CONFIRMATION OF THE
HORIZONTAL AND VERTICAL CONTROL SHALL BE PROVIDED TO THE ENGINEER PRIOR TO
STARTING CONSTRUCTION OR CONSTRUCTION LAYOUT.
NORTH
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
3/
/ 2
- 1
1:
am kk im
P
:\O \o da -o ak rid ge
2-rw y re co ns tr\
C
AD
\D
W G
\S he et s\
O
AK
2-
SI
TE
.d w g
THIS DRAWING IS INTENDED
TO BE PRINTED IN COLOR.
PRINTING IN BLACK AND
WHITE MAY REDUCE
READABILITY AND ALTER
ENTITY DEFINITION OR
REPRESENTATION.
PRINT IN COLOR
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
OAKRIDGE STATE AIRPORT
RUNWAY 9-27 PAVEMENT RECONSTRUCTION AND
ASSOCIATED IMPROVEMENTS
SITE PLAN
PRECISION APPROACH ENGINEERING, INC.
MAR 2026
LMT
KWK/JAW
KJK
digsafelyoregon.com
CALL 48 HOURS BEFORE YOU DIG
RUNWAY CLOSURE CROSS, SEE DETAIL
CONSTRUCTION HAUL ROUTE
NO CONSTRUCTION TRAFFIC
LEGENDSURVEY CONTROL POINTS
2202,3BEM
REG
ISTERED PROFESSIONAL
KADEN J. KINS R1
EXPIRES 6/30/2027
TPES
RE E
AutoCAD SHX Text
COUNTY ROAD
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
100236PE
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
3/
/ 2
- 1
1:
am kk im
P
:\O \o da -o ak rid ge
2-rw y re co ns tr\
C
AD
\D
W G
\S he et s\
O
AK
2-
C
SP
P.
dw g
THIS DRAWING IS INTENDED
TO BE PRINTED IN COLOR.
PRINTING IN BLACK AND
WHITE MAY REDUCE
READABILITY AND ALTER
ENTITY DEFINITION OR
REPRESENTATION.
PRINT IN COLOR
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
OAKRIDGE STATE AIRPORT
RUNWAY 9-27 PAVEMENT RECONSTRUCTION AND
ASSOCIATED IMPROVEMENTS
CONSTRUCTION SAFETY AND
PHASING AND GENERAL NOTES
PRECISION APPROACH ENGINEERING, INC.
MAR 2026
LMT
KWK/JAW
KJK
CONSTRUCTION SAFETY AND PHASING PLAN - NOTES
1. THE CONTRACTOR SHALL PROVIDE SUFFICIENT LEAD TIME FOR REQUIRED NOTIFICATIONS WITH PROJECT
STAKEHOLDERS AND THE OWNER. THIS WILL REQUIRE SUBMITTAL OF A PRELIMINARY SCHEDULE TO INCLUDE START DATES WITHIN 15 CALENDAR DAYS AFTER EXECUTION OF THE CONSTRUCTION CONTRACT. A REVISED CONSTRUCTION SCHEDULE WILL BE PREPARED IN CONJUNCTION WITH THE PRE-CONSTRUCTION MEETING. THE CONTRACTOR SHALL NOTIFY THE OWNER WITH REQUESTS FOR NOTICES TO AIRMEN (NOTAMS) 5 DAYS PRIOR TO
IMPLEMENTATION.
2. PRIOR TO REOPENING A CLOSED RUNWAY, THE CONTRACTOR SHALL PROVIDE ADEQUATE TIME FOR THE ENGINEER OR OWNER TO INSPECT FOR CLEANLINESS AND CONFORMANCE TO REGULATIONS. THE TIME NEEDED FOR INSPECTION AND POSSIBLE NECESSARY CORRECTIVE ACTION SHALL BE INCLUDED WITHIN THE ALLOWED CLOSURE
PERIOD.
3. LOCATION OF THE CONTRACTOR'S STAGING AND DISPOSAL AREAS ARE APPROXIMATE. VERIFY LIMITS AND LOCATIONS WITH RPR PRIOR TO MOBILIZATION. THE CONTRACTOR SHALL DISPOSE OF MATERIAL(S) WITHIN THE
DESIGNATED AREAS AS DIRECTED BY THE ENGINEER.
4. ALL VEHICLES NOT ESSENTIAL FOR CONSTRUCTION, INCLUDING CONTRACTOR-EMPLOYEE VEHICLES SHALL REMAIN OUTSIDE OF AIR OPERATIONS AREA. PARKING SHALL BE CONFINED TO THE CONTRACTOR'S STAGING AREA OR A
LOCATION DESIGNATED BY THE OWNER.
5. ALL CONSTRUCTION EQUIPMENT MUST BE MARKED WITH A 3'X3' ORANGE AND WHITE CHECKERED FLAG AND/OR AN AMBER BEACON. ALL CONSTRUCTION EQUIPMENT OPERATED PAST DUSK SHALL BE EQUIPPED WITH AN AMBER BEACON. ALL CONSTRUCTION VEHICLES MUST BE CLEARLY MARKED WITH THE COMPANY LOGO AT ALL TIMES.
6. THE CONTRACTOR SHALL USE AND MONITOR THE AIRPORT'S VHF RADIO FREQUENCY; 122.9 MHZ COMMON TRAFFIC ADVISORY FREQUENCY (CTAF) AT ALL TIMES. THE CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN FROM THE ENGINEER OR OWNER, TRAINING ON THE APPROPRIATE OPERATIONS AND PROTOCOL FOR BROADCASTING ON THE
AIRPORT FREQUENCY.
7. IF THE CONTRACTOR FAILS TO COMPLETE ANY OF THE PHASES OR RUNWAY OPENINGS WITHIN THE SPECIFIED TIME
PERIOD, LIQUIDATED DAMAGES WILL BE ASSESSED.
8. UNLESS OTHERWISE APPROVED BY THE OWNER, CONTRACTOR ACCESS TO THE PROJECT SITE SHALL BE LIMITED TO DESIGNATED LOCATIONS AND ROUTES SHOWN ON THE PLANS. SEE CONSTRUCTION SAFETY AND PHASING PLAN, AND EROSION AND SEDIMENT CONTROL PLAN FOR SPECIFIC RESTRICTIONS.
9. THE CONTRACTOR SHALL ONLY STOCKPILE MATERIALS WITHIN THE CONTRACTOR'S MATERIAL STOCKPILE AREA
UNLESS OTHERWISE APPROVED BY THE ENGINEER.
10. ENSURE PROMPT SUBMITTAL THROUGH THE AIRPORT OPERATOR FORM 7460-1 FOR THE PURPOSE OF CONDUCTING AN AERONAUTICAL STUDY OF CONTRACTOR EQUIPMENT SUCH AS TRUCKS, CRANES, CONCRETE PUMPS, OTHER TALL EQUIPMENT, STOCKPILES AND HAUL ROUTES WHEN DIFFERENT FROM CASES PREVIOUSLY FILED BY THE AIRPORT OPERATOR. THE FAA ENCOURAGES ONLINE SUBMITTAL OF FORMS FOR EXPEDIENCY. COORDINATE ALL
WORK AND SUBMITTAL OF FORMS WITH THE ENGINEER.
WEEKLY CONSTRUCTION MEETING
1. THE CONTRACTOR, ENGINEER, OWNER, OWNER'S REPRESENTATIVE AND OTHER INVITED REPRESENTATIVES OR
GUESTS WILL CONDUCT A WEEKLY CONSTRUCTION MEETING IN ORDER TO DISCUSS ACTIVITIES ON THE PROJECT.
THE MEETING SHALL BE USED TO DISCUSS CONSTRUCTION ISSUES PROJECT SCHEDULE, AIRCRAFT AND CONSTRUCTION SAFETY, AND OTHER AGENDA ITEMS RELATED TO THE PROJECT. SPECIFIC ACTIVITIES ANTICIPATED FOR THE FOLLOWING WEEK SHALL BE DISCUSSED, AND A TWO WEEK LOOK AHEAD SCHEDULE SHALL BE PROVIDED
WEEKLY BY THE CONTRACTOR.
GENERAL NOTES
1. CONTRACTOR SHALL HAVE A SUPERINTENDENT AND DESIGNATED SAFETY OFFICER ON THE PROJECT SITE ANY
TIME WORK IS BEING PERFORMED ON THE AIRPORT, INCLUDING WORK PERFORMED BY SUBCONTRACTORS OR SERVICE PROVIDERS UNLESS OTHERWISE APPROVED BY OWNER OR ENGINEER. THE SAFETY OFFICER SHALL BE RESPONSIBLE FOR EDUCATION AND TRAINING OF ALL PERSONNEL WHO ACCESS THE WORK SITE.
2. CONTRACTOR SHALL OBTAIN AND SHALL PAY FOR ALL REQUIRED PERMITS, FEES, OR CHARGES NECESSARY TO COMPLETE THIS PROJECT. PERMITS IN PROCESS OF BEING OBTAINED BY THE OWNER: 1200-C GENERAL CONSTRUCTION PERMIT. ONCE APPROVED, THE 1200-C PERMIT WILL REMAIN IN THE OWNER'S POSSESSION AND THE CONTRACTOR WILL ASSUME ALL RESPONSIBILITY FOR PERMIT COMPLIANCE. THIS INCLUDES, BUT NOT LIMITED TO THE FOLLOWING: SUPPLY A CERTIFIED EROSION AND SEDIMENT CONTROL INSPECTOR MEETING 1200-C SCHEDULE B.1 REQUIREMENTS, PERFORM ALL SITE INSPECTIONS, RECORDKEEPING AND LOGGING, REPORTING, AND TERMINATION OF COVERAGE. THE CONTRACTOR SHALL ASSUME ALL RESPONSIBILITIES UNDER SCHEDULE A.25, CORRECTIVE ACTIONS, AND SHALL BE RESPONSIBLE FOR ANY PENALTIES IMPOSED FOR PERMIT CONDITION VIOLATIONS. THE OWNER WILL SUPPLY AND THE CONTRACTOR WILL POST OR AFFIX THE 1200-C PERMIT NOTICE TO A POST, FENCE, STAKE OR OTHER ITEM(S) FOR THE DURATION OF 1200-C PERMIT COVERAGE.
3. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE AND PROTECT ALL PUBLIC AND PRIVATE UTILITIES WITHIN THE WORK LIMITS OF THIS PROJECT DURING CONSTRUCTION. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REPLACE OR REPAIR ANY UTILITIES DAMAGED DURING CONSTRUCTION. ANY NECESSARY UTILITY REPAIRS SHALL BE COORDINATED WITH THE APPROPRIATE UTILITY COMPANY/PROVIDER AND ALL REPAIRS
AND METHODS SHALL BE APPROVED BY THE UTILITY COMPANY/PROVIDER AND THE OWNER.
4. ALL HAUL ROUTES SHALL BE MAINTAINED DURING CONSTRUCTION AND RESTORED TO ORIGINAL CONDITION BY THE CONTRACTOR UPON COMPLETION OF THE PROJECT. VERIFY CONDITION WITH OWNER OR ENGINEER PRIOR TO
CONSTRUCTION.
5. CONTRACTOR SHALL ATTEND A PRE-CONSTRUCTION MEETING IN CONJUNCTION WITH COMMENCEMENT OF ONSITE CONSTRUCTION ACTIVITIES. COORDINATE WITH OWNER AND ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONDUCTING THE ON-SITE PRE-CONSTRUCTION EROSION AND SEDIMENT CONTROL MEETING.
6. CONTRACTOR SHALL PREPARE AND SUBMIT A CONSTRUCTION SCHEDULE TO THE ENGINEER FOR REVIEW 14 DAYS PRIOR TO PRE-CONSTRUCTION MEETING. THE PLAN SHALL BE ACCEPTABLE TO THE OWNER AND ENGINEER PRIOR
TO BEGINNING WORK.
7. THE CONTRACTOR'S SUPERINTENDENT AND SAFETY OFFICER SHALL HAVE A WORKING TWO-WAY RADIO CAPABLE OF OPERATING ON AVIATION FREQUENCIES. THE SUPERINTENDENT AND SAFETY OFFICERS SHALL MONITOR
AVIATION TRAFFIC FOR AIRCRAFT DURING ACTIVE CONSTRUCTION ACTIVITIES.
8. ANY AND ALL EXCESS CONSTRUCTION MATERIAL OR DEBRIS MUST BE REMOVED FROM SITE UPON COMPLETION OF
PROJECT, UNLESS OTHERWISE SHOWN ON PLANS.
9. LIMITS OF WORK SHOWN ON THE SITE PLAN ARE APPROXIMATE AND SHOW GENERAL AREAS OF WORK. SEE
SPECIFIC SHEETS FOR ACTUAL LIMITS.
10. THE CONTRACTOR SHALL TAKE SPECIAL ATTENTION TO, AND COMPLY WITH SPECIFICATION 00290.32 AND BE
ADVISED OF RESIDENCE(S) WITHIN THE SPECIFIED DISTANCES.
11. ALL PORTIONS OF WORK NOT COVERED BY PAYMENT UNDER A SPECIFIC BID ITEM OR LISTED AS INCIDENTAL TO A
BID ITEM SHALL BE CONSIDERED INCIDENTAL TO THE MOBILIZATION BID ITEM.
12. EXCESS MATERIAL SHALL BE PLACED PER SECTION 00330.41 (a)(4) EXCESS MATERIALS OR PLACED ON AIRPORT
PROPERTY IN LOCATIONS DESIGNATED BY THE ENGINEER, NO DIRECT PAYMENT.
13. THE CONTRACTOR SHALL PLACE A TEMPORARY ONSITE RAIN GAUGE WITHIN THE CONTRACTOR'S STAGING AREA FOR RAINFALL MEASUREMENTS AND RECORDS TO MEET 1200-C REQUIREMENTS, CONSIDERED INCIDENTAL. THE RAIN GAUGE SHALL BE REMOVED FROM THE SITE BY THE CONTRACTOR UPON TERMINATION OF THE 1200-C PERMIT.
14. AN ENVIRONMENTAL MANAGEMENT PLAN (EMP) HAS NOT BEEN DEVELOPED FOR THE APPROVED 1200-C PERMIT. AS REQUESTED BY DEQ OR THE CONTRACTOR, AND AS DEEMED NECESSARY BY THE ENGINEER, AN ENVIRONMENTAL
MANAGEMENT PLAN WILL BE GENERATED BY THE ENGINEER FOR DEQ APPROVAL.
2202,3BEM
REG
ISTERED PROFESSIONAL
KADEN J. KINS R1
EXPIRES 6/30/2027
TPES
RE E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
100236PE
SS
SD
SD
HANGAR
HANGAR
RUNWAY 9-27 REHABILITATION
RUNWAY SAFETY AREA
RUNWAY OBJECT FREE AREA
AIRPORT PROPERTY LINE
2575' - TORA/TODA 9
240'
240'
RUNWAY 9-27
3515' - ASDA 27
3190' - LDA 27
3640' - TORA/TODA 27
3400' - ASDA 9
3275' - LDA 9
EXISTING WINDCONE
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
3/
/ 2
- 1
1:
am kk im
P
:\O \o da -o ak rid ge
2-rw y re co ns tr\
C
AD
\D
W G
\S he et s\
O
AK
2-
C
SP
P.
dw g
THIS DRAWING IS INTENDED
TO BE PRINTED IN COLOR.
PRINTING IN BLACK AND
WHITE MAY REDUCE
READABILITY AND ALTER
ENTITY DEFINITION OR
REPRESENTATION.
PRINT IN COLOR
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
OAKRIDGE STATE AIRPORT
RUNWAY 9-27 PAVEMENT RECONSTRUCTION AND
ASSOCIATED IMPROVEMENTS
CONSTRUCTION SAFETY AND
PHASING PLAN CRITICAL AREAS
PRECISION APPROACH ENGINEERING, INC.
MAR 2026
LMT
KWK/JAW
KJK
SCALE IN FEET
150 300
NORTH
RUNWAY DECLARED DISTANCE TABLE
TAKEOFF RUN AVAILABLE (TORA)
TAKEOFF DISTANCE AVAILABLE (TODA)
ACCELERATE-STOP DISTANCE AVAILABLE (ASDA)
LANDING DISTANCE AVAILABLE (LDA)
RW 9
2,575'
2,575'
3,400'
3,275'
RW 27
3,640'
3,640'
3,515'
3,190'
AIRFIELD CRITICAL AREAS LEGEND
RUNWAY SAFETY AREA (120' WIDE*)
RUNWAY OBJECT FREE AREA (250' WIDE*)
TAXIWAY SAFETY AREA (49' WIDE*)
TAXIWAY OBJECT FREE AREA
TAXILANES (79' WIDE*)
* DIMENSION IS FULL WIDTH
2202,3BEM
REG
ISTERED PROFESSIONAL
KADEN J. KINS R1
EXPIRES 6/30/2027
TPES
RE E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
100236PE
SS
SD
SD
HANGAR
HANGAR
NEW RUNWAY REFLECTORS
REPLACED PRIMARY WINDCONE AND
SEGMENTED CIRCLE REPLACEMENT
AIRPORT PROPERTY LINE
RUNWAY 9-27 REHABILITATION
NEW WINDCONE
NEW TURN AROUND AND PARKING PAD
NEW AIRCRAFT
TURNAROUND AND
PARKING PAD
NEW DISPLACED THRESHOLD
EXISTING VEGETATION
LINE AS OF FALL 2025
RUNWAY 9-27
CONTRACTOR'S
STAGING AREA
NEW CONNECTOR
TAXIWAY, ADDITIVE B
RELOCATE CONNECTOR TAXIWAY
NEW WINDCONE
CONTRACTOR'S MATERIAL
STOCKPILE AREA
APRON PAVEMENT
RECONSTRUCTION,
ADDITIVE A
RUNWAY CLOSURE CROSS NOTES:
1. TWO PORTABLE TRAILER MOUNTED, LIGHTED CLOSURE
CROSSES WILL BE PROVIDED BY THE OWNER WHEN
CLOSURE OF RUNWAY 9-27 IS REQUIRED. THE OWNER
WILL TRANSPORT CROSSES TO AND FROM PROJECT. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR PLACEMENT,
FUELING, REPAIRING, SERVICING AND MAINTAINING THE
CONDITION OF THE CROSSES PER MANUFACTURER
RECOMMENDATIONS.
2. PLACE LIGHTED CLOSURE CROSSES AS INDICATED ON
THE PLANS ANYTIME RUNWAY 9-27 IS CLOSED. THE
ENGINEER WILL DESIGNATE ALTERNATE LOCATIONS FOR
PLACEMENT OF THE CLOSURE CROSSES WHEN
PLACEMENT CONFLICTS WITH CONSTRUCTION ACTIVITIES.
3. ANY DAMAGE TO THE CLOSURE CROSSES CAUSED
DURING THE PROJECT DUE TO NEGLIGENCE OF THE
CONTRACTOR SHALL BE REPAIRED TO THE SATISFACTION
OF THE OWNER AT THE CONTRACTOR'S EXPENSE.
RUNWAY
CL
RUNWAY CLOSURE CROSS DETAIL 1
7NTS
1. CONSTRUCTION OPERATIONS MAY BEGIN AFTER MAY 1ST. CONTRACTOR SHALL HAVE
UP TO 61 CALENDAR DAYS TO COMPLETE WORK, NOT INCLUDING PERMANENT
SEEDING AND THE SECOND COAT OF PAVEMENT MARKING. NO ADDITIONAL
CALENDAR DAYS FOR ADDITIVE WORK WILL BE AWARDED. THE BASE BID PORTION OF
THE PROJECT MUST BE DEEMED SUBSTANTIALLY COMPLETE BY JULY 31ST.
2. IF IMPROVEMENTS RELATED TO THE PRIMARY AND SUPPLEMENTAL WIND CONES
HAVE LEAD TIMES GREATER THAN 6 WEEKS, THESE IMPROVEMENTS MAY BE
COMPLETED DURING PHASE 2. ELECTRICAL TRENCHING AND CONDUIT INSTALLATION
SHALL BE COMPLETED DURING PHASE 1
3. OCTOBER 1ST IS THE ANTICIPATED DATE FOR THE TERMINATION OF FIREFIGHTING
OPERATIONS AT THE AIRPORT. SECOND COAT OF PAVEMENT MARKING AND
PERMANENT SEEDING IN THE FALL OF 2026 SHALL NOT BE ALLOWED UNTIL
FIREFIGHTING OPERATIONS HAVE CEASED AND MOBILIZED OFFSITE. THE OWNER
SHALL HAVE FINAL SAY ON THE START OF FALL 2026 CONSTRUCTION WORK.
4. BY JULY 31ST, ALL EQUIPMENT, TEMPORARY FACILITIES, STOCKPILES, AND ALL
OTHER MATERIALS ASSOCIATED WITH CONSTRUCTION SHALL BE REMOVED FROM
AIRPORT PROPERTY UNLESS OTHERWISE APPROVED BY THE OWNER.
5. AIRPORT AND GOVERNMENT AGENCIES MAY REQUIRE THE EXCLUSIVE USE OF THE
AIRPORT DURING FOREST FIRE SEASON. WHILE FIRE SEASON IS ANTICIPATED TO
OCCUR BETWEEN JULY 31ST AND OCTOBER 1ST, THESE DATES ARE VARIABLE YEAR
TO YEAR AND ARE SUBJECT TO DETERMINATION BY THE OWNER. THE AIRPORT AND
OTHER AGENCIES SHALL RECEIVE PRIORITY WHEN COORDINATING THE SCHEDULE
FOR RUNWAY, TAXIWAY, AND APRON CLOSURES.
PORTABLE LIGHTED
CROSS, SEE NOTES
PHASING NOTES
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
3/
/ 2
- 1
1:
am kk im
P
:\O \o da -o ak rid ge
2-rw y re co ns tr\
C
AD
\D
W G
\S he et s\
O
AK
2-
C
SP
P.
dw g
THIS DRAWING IS INTENDED
TO BE PRINTED IN COLOR.
PRINTING IN BLACK AND
WHITE MAY REDUCE
READABILITY AND ALTER
ENTITY DEFINITION OR
REPRESENTATION.
PRINT IN COLOR
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
OAKRIDGE STATE AIRPORT
RUNWAY 9-27 PAVEMENT RECONSTRUCTION AND
ASSOCIATED IMPROVEMENTS
CONSTRUCTION SAFETY AND
PHASING PLAN
PRECISION APPROACH ENGINEERING, INC.
MAR 2026
LMT
KWK/JAW
KJK
· MOBILIZATION
· EROSION CONTROL
· CLEARING AND GRUBBING
· DEMOLITION
· PAVEMENT REMOVAL
· EXCAVATION
· AGGREGATE PLACEMENT
· ASPHALT PAVING
· CONCRETE PLACEMENT
· PAVEMENT MARKING
· DRAINAGE/CONDUIT INSTALLATION
· WIND CONE IMPROVEMENTS
· TEMPORARY SITE STABILIZATION
· PERMANENT SEEDING AND SITE
STABILIZATION
WORK ELEMENTS
CONSTRUCTION PHASING SCHEDULE
APRIL/MAY 2026
PHASE 2
(2 CONSECUTIVE DAYS)
PHASE 0
ANTICIPATED
PROJECT
AWARD
BY JUNE 1, 2026
ANTICIPATED
NOTICE TO
PROCEED
PRIOR TO
JULY 31ST *
PROJECT
SUBSTANTIAL
COMPLETION
ANTICIPATED
OCT 1ST *
PHASE 1
(8 WEEKS ONSITE)
OCT 31, 2026
PROJECT FINAL
COMPLETION
SUBMITTAL
PERIOD
ONSITE CONSTRUCTION
ACTIVITIES
NO CONSTRUCTION
ACTIVITIES**
ONSITE CONSTRUCTION
ACTIVITIES - SECOND COAT
OF PAVEMENT MARKING
AND PERMANENT SEEDING
* SEE PHASING NOTES
** UNLESS OTHERWISE APPROVED BY OWNER
SCALE IN FEET
150 300
NORTH
RUNWAY CLOSURE CROSS, SEE DETAIL
CONSTRUCTION HAUL ROUTE
NO CONSTRUCTION TRAFFIC
LEGEND
2202,3BEM
REG
ISTERED PROFESSIONAL
KADEN J. KINS R1
EXPIRES 6/30/2027
TPES
RE E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
100236PE
SWTYP BB
EC
E
EE
SS
SD
SD
SD
SD
SD
SD SD
SW TYP
SW TYP
IP
CW
AIRPORT PROPERTY LINE
EC
IF ADDITIVE B IS NOT SELECTED FOR CONSTRUCTION,
APPLY TEMPORARY AND PERMANENT EROSION
CONTROL MEASURES
SW TYP
CE
M
AT
C H
L
IN
E
- T
H
IS
S H
EE
T
0 50 100 200
SCALE IN FEET
NORTH
M
AT
C H
L
IN
E
- T
H
IS
S H
EE
T
STANDARD PRACTICE CODING SYSTEM:
BB BIOFILTER BAGS, SEE DETAIL
STORM DRAIN INLET PROTECTION, SEE DETAIL
STRAW WATTLE, SEE NOTE 7 AND DETAIL
CONSTRUCTION ENTRANCE, SEE DETAIL
CONCRETE WASHOUT, SEE ODOT STD DRAWING RD 1070 AND
DETAIL , TO BE REMOVED AT END OF PROJECT
TEMPORARY MULCHING AND PERMANENT SEEDING OF
EXPOSED SOIL, SEE NOTES 8 AND 9
AGGREGATE SHOULDERS, 6 INCH THICK
DIRECTION OF FLOW
EXCAVATED GRANULAR MATERIAL PLACEMENT, MINIMUM 8"
DEPTH, ADDITIVE A, SEE NOTE 10
1. TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHOWN REFLECT
THE MINIMUM ANTICIPATED REQUIREMENTS. CONTRACTOR SHALL ADD
ADDITIONAL BIOFILTER BAGS AND OTHER EROSION CONTROL FACILITIES AS
REQUIRED OR DIRECTED BY THE ENGINEER OR AS REQUIRED TO MEET PERMIT
REQUIREMENTS.
2. THE CONTRACTOR IS RESPONSIBLE FOR ALL MEASURES THAT MAY BE REQUIRED
BY THE CONTRACTORS MEANS AND METHODS OF CONSTRUCTION AS NEEDED TO
CONTROL EROSION AND SEDIMENT AT THE CONSTRUCTION SITE AND TO
PREVENT VIOLATION OF SURFACE WATER QUALITY, GROUND WATER QUALITY, OR
SEDIMENT MANAGEMENT STANDARDS AND SHALL COMPLY WITH ALL APPLICABLE
FEDERAL, STATE, AND LOCAL LAWS, ORDINANCES AND STANDARDS.
CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY FOR PERMIT COMPLIANCE
AND APPLICABLE REQUIREMENTS INDICATED ON THE EROSION AND SEDIMENT
CONTROL NOTES SHEET.
3. CONTRACTOR SHALL ACCESS CONSTRUCTION SITE USING EXISTING ROADWAY,
AND SHALL REPAIR ANY DAMAGE TO THE SATISFACTION OF THE ENGINEER.
STABILIZED CONSTRUCTION ENTRANCE, SHAKER PLATES, OR OTHER MEASURES
SHALL BE PROVIDED BY THE CONTRACTOR TO ENSURE NO TRACKING OF
SEDIMENT OCCURS.
4. PUBLIC RIGHTS-OF-WAY SHALL BE KEPT IN A CLEAN AND SERVICEABLE
CONDITION AT ALL TIMES. IN THE EVENT MATERIALS ARE INADVERTENTLY
DEPOSITED ON ROADWAYS, THE MATERIAL SHALL BE PROMPTLY REMOVED.
5. ALL TEMPORARY EROSION CONTROL MEASURES INSTALLED TO PROTECT NEWLY
CONSTRUCTED FACILITIES SHALL BE LEFT IN-PLACE UNTIL THE SITE HAS BEEN
DEEMED PERMANENTLY STABILIZED.
6. ALL FACILITIES BROUGHT ONSITE BY THE CONTRACTOR TO ASSIST IN
CONSTRUCTION, INCLUDING RESTROOM FACILITIES, DUMPSTERS, JOB TRAILERS,
ETC., SHALL BE PLACED WITHIN THE CONTRACTOR'S STAGING AREA UNLESS
OTHERWISE APPROVED BY THE ENGINEER ALL FACILITIES SHALL BE REMOVED AT
THE END OF PHASE 1.
7. LOCATION OF THE STRAW WATTLES ARE APPROXIMATE AND MAY BE ADJUSTED
DUE TO CHANGES OF THE VEGETATION LINE OR TO DECONFLICT WITH GRADING
LIMITS, VERIFY LOCATIONS WITH THE ENGINEER.
8. PERMANENT SEEDING SHALL BE PLACED ON EXPOSED SOILS DURING THE
ALLOWABLE SEEDING WINDOWS AS INDICATED IN THE PROJECT SPECIFICATIONS.
ALLOWABLE TIME ONSITE SHALL BE COORDINATED WITH THE ENGINEER MINIMUM
14 DAYS PRIOR TO SEEDING AND THE OWNER SHALL HAVE FINAL SAY ON
ALLOWABLE WORKING DATES.
9. TEMPORARY MULCH SHOULD BE INSTALLED AT THE TERMINATION OF PHASE 1 TO
ALL AREAS WITHIN GRADING LIMITS TO STABILIZE THE SITE FOR FIREFIGHTING
OPERATIONS PRIOR TO PHASE 2 AND PERMANENT SEEDING. ALL WORK AND
MATERIALS SHALL BE PAID UNDER THE TEMPORARY MULCHING, STRAW BID ITEM.
IN AREAS OUTSIDE OF GRADING LIMITS, PAYMENT OF EROSION CONTROL
MEASURES REQUIRED TO BE PLACED TO MEET PERMIT REQUIREMENTS SHALL BE
PAID UNDER THE EROSION CONTROL BID ITEM.
10. PLACE MATERIAL WITH A MINIMUM DEPTH OF 8" IN AREAS WHICH ARE NOT
CURRENTLY GRAVELED.
NOTES
SW
CW
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
3/
/ 2
- 1
1:
am kk im
P
:\O \o da -o ak rid ge
2-rw y re co ns tr\
C
AD
\D
W G
\S he et s\
O
AK
2-
ES
C
P.
dw g
THIS DRAWING IS INTENDED
TO BE PRINTED IN COLOR.
PRINTING IN BLACK AND
WHITE MAY REDUCE
READABILITY AND ALTER
ENTITY DEFINITION OR
REPRESENTATION.
PRINT IN COLOR
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
OAKRIDGE STATE AIRPORT
RUNWAY 9-27 PAVEMENT RECONSTRUCTION AND
ASSOCIATED IMPROVEMENTS
EROSION AND SEDIMENT
CONTROL PLAN
PRECISION APPROACH ENGINEERING, INC.
MAR 2026
LMT
KWK/JAW
KJK
EC
IP
CE
2202,3BEM
REG
ISTERED PROFESSIONAL
KADEN J. KINS R1
EXPIRES 6/30/2027
TPES
RE E
AutoCAD SHX Text
%%UCODE
AutoCAD SHX Text
%%USYMBOL
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
100236PE
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
3/
/ 2
- 1
1:
am kk im
P
:\O \o da -o ak rid ge
2-rw y re co ns tr\
C
AD
\D
W G
\S he et s\
O
AK
2-
ES
C
P- D
E.
dw g
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
OAKRIDGE STATE AIRPORT
RUNWAY 9-27 PAVEMENT RECONSTRUCTION AND
ASSOCIATED IMPROVEMENTS
EROSION AND SEDIMENT
CONTROL NOTES
PRECISION APPROACH ENGINEERING, INC.
MAR 2026
LMT
KWK/JAW
KJK
2202,3BEM
REG
ISTERED PROFESSIONAL
KADEN J. KINS R1
EXPIRES 6/30/2027
TPES
RE E
1. EVALUATE ALL STORMWATER CONTROLS, INCLUDING IF THEY ARE PROPERLY INSTALLED AND
FUNCTIONING AS INTENDED TO PREVENT POLLUTANT DISCHARGES.
2. IDENTIFY CONDITIONS THAT COULD LEAD TO SPILLS, LEAKS, OR OTHER ACCUMULATIONS OF
POLLUTANTS.
3. IDENTIFY LOCATIONS WHERE NEW OR MODIFIED STORMWATER CONTROLS ARE NECESSARY,
INCLUDING ANY NECESSARY MAINTENANCE, CORRECTIVE ACTIONS, OR STABILIZATION MEASURES.
4. CHECK FOR PRESENCE OF VISIBLE EROSION AND SEDIMENTATION. DOCUMENT ANY INDICATION OF
SEDIMENT THAT HAS LEFT OR IS LIKELY TO LEAVE THE PROJECT SITE.
5. IF DISCHARGE IS OCCURRING DURING THE INSPECTION: EVALUATE ALL STORMWATER,
NON-STORMWATER, AND DEWATERING DISCHARGE LOCATIONS AND DOCUMENT THE VISUAL
QUALITY OF THE DISCHARGE AND TAKE NOTE OF THE CHARACTERISTICS OF THE STORMWATER
DISCHARGE, INCLUDING TURBIDITY, COLOR, ODOR, SUSPENDED SOLIDS, FOAM, OIL SHEEN, AND ANY
OTHER INDICATORS OF STORMWATER POLLUTANTS,
6. IDENTIFY ANY PORTION OF THE SITE WHERE LAND DISTURBING ACTIVITIES HAVE PERMANENTLY
CEASED AND WILL BE TEMPORARILY INACTIVE FOR 7 OR 14 OR MORE CALENDAR DAYS (PER
APPLICABLE STABILIZATION DEADLINE IN SCHEDULE A.16). NOTE INITIAL DATE OF CESSATION.
STANDARD NOTES (DEQ 1200-C PERMIT) INSPECTION FREQUENCY
1. UNTIL THIS PERMIT EXPIRES, IS MODIFIED, REVOKED, OR TERMINATED THE REGISTRANT IS
AUTHORIZED TO INSTALL AND OPERATE EROSION AND SEDIMENT CONTROL MEASURES AND
STORMWATER TREATMENT AND CONTROL FACILITIES, AND MAY DISCHARGE STORMWATER AND
AUTHORIZED NON-STORMWATER DISCHARGES TO SURFACE WATERS OF THE STATE OR CONVEYANCE
SYSTEMS LEADING TO SURFACE WATERS OF THE STATE ONLY IN CONFORMANCE WITH ALL
CONDITIONS SET FORTH IN THIS PERMIT. (CONDITION I.1)
2. REGISTRANTS MUST SUBMIT APPLICATION CHANGES TO DEQ WITHIN SEVEN CALENDAR DAYS OF;
UPDATES TO THE REGISTRANTS MAILING ADDRESS, EMAIL ADDRESS, PHONE NUMBER. CHANGES TO THE ON-SITE CONTACT PERSON’S INFORMATION. MINOR MODIFICATIONS TO THE AREA OR ACREAGE
AFFECTED BY CONSTRUCTION. (CONDITION I.8)
3. NOTICE OF TERMINATION MUST BE SUBMITTED PER CONDITION I.10 AND WITHIN 30 DAYS OF MEETING
TERMINATION CRITERIA AS INDICATED IN SCHEDULE A.17. (CONDITION I.10)
4. ALL REQUIRED DOCUMENTS AND PAYMENTS SHALL BE SUBMITTED USING DEQ’S ELECTRONIC
REPORTING SYSTEM, YOUR DEQ ONLINE (YDO). (CONDITION I.12)
5. DESIGN, INSTALL AND MAINTAIN EFFECTIVE STORMWATER CONTROL AND TREATMENT METHODS TO PREVENT DISCHARGE OF POLLUTANTS IN STORMWATER FROM CONSTRUCTION ACTIVITIES THAT MAY
CAUSE OR CONTRIBUTE TO A VIOLATION OF WATER QUALITY STANDARDS. (SCHEDULE A.1)
6. WHEN DESIGNING AND PLACING STORMWATER CONTROLS, ACCOUNT FOR MEASURES TO REDUCE VOLUME, VELOCITY, AND PEAK FLOW RATES TO PREVENT EROSION, CHANNELIZATION, AND SCOUR ON SITE AND AT DISCHARGE POINTS. (SCHEDULE A.1.e)
7. SEQUENCE CLEARING, GRADING, AND OTHER LAND DISTURBING ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE AREA AND DURATION OF EXPOSED SOILS. (SCHEDULE A.1.g)
8. INSTALL AND IMPLEMENT DOWNGRADIENT SEDIMENT CONTROLS PRIOR TO INITIATING CONSTRUCTION ACTIVITY IN A GIVEN PORTION OF THE SITE. (SCHEDULE A.1.h)
9. INSTALL EROSION PREVENTION MEASURES (E.G., MATTING, STRAW MULCH, COMPOST BLANKETS) ON CLEARED AREAS THAT ARE NOT ACTIVELY BEING WORKED. (SCHEDULE A.1.i)
10. COMPLY WITH ANY MAINTENANCE REQUIREMENTS FOR ALL STORMWATER CONTROLS. MAINTENANCE MUST REFLECT GOOD ENGINEERING. (SCHEDULE A.1.l)
11. IMMEDIATELY INITIATE REPAIRS OR REPLACE CONTROLS UPON DISCOVERY OF ANY ISSUES THAT REDUCE THE MEASURES EFFECTIVENESS. (SCHEDULE A.1.n)
12. CONDUCT AN ON-SITE PRE-CONSTRUCTION MEETING WITH KEY PERSONNEL, INCLUDING PERTINENT
SUBCONTRACTORS AND STAFF. THE DATE AND LIST OF ATTENDEES MUST BE INCLUDED IN THE
RECORDKEEPING LOGBOOK. (SCHEDULE A.2)
13. IDENTIFY AND MAINTAIN NATURAL OR ENHANCED BUFFERS FOR DISCHARGES TO ANY RECEIVING
WATER THAT IS LOCATED WITHIN 50 FEET OF CONSTRUCTION ACTIVITY. (SCHEDULE A.3)
14. WATER BODIES THAT ARE IMPAIRED FOR TURBIDITY OR SEDIMENTATION. OR ARE CATEGORY 5 (303d)
SHALL HAVE AN INCREASED BUFFER ZONE OF 125 FEET. (SCHEDULE A.3)
15. PRESERVE EXISTING VEGETATION WHERE POSSIBLE AND DIRECT STORMWATER RUNOFF TO
APPROPRIATE VEGETATED AREAS TO MAXIMIZE INFILTRATION AND FILTERING. (SCHEDULE A.4)
16. INSTALL PERIMETER CONTROLS IN AREAS THAT ARE DOWNSLOPE FROM ANY EXPOSED SOILS, STOCKPILES, STAGING AREAS OR OTHER DISTURBED AREAS. (SCHEDULE A.5.a)
17. PREVENT STORMWATER FROM CIRCUMVENTING THE EDGE OF PERIMETER CONTROLS (SCHEDULE A.5.b)
18. REMOVE ACCUMULATED SEDIMENT FROM SEDIMENT BARRIERS BEFORE IT REACHES ONE-THIRD ABOVE THE GROUND BARRIER HEIGHT. (SCHEDULE A.5.c)
19. PREVENT SEDIMENT TRACK-OUT ONTO PUBLIC AND PRIVATE ROADS BY ESTABLISHING CONTROLLED ACCESS POINTS. (SCHEDULE A.6.a)
20. SEDIMENT-CONTAINING LOADS LEAVING THE SITE MUST BE COVERED UNTIL THE POINT OF FINAL PLACEMENT OR DISPOSAL. (SCHEDULE A.6.e)
21. SATURATED SOILS LEAVING THE SITE SHALL BE IN WATER-TIGHT TRUCKS. (SCHEDULE A.6.f)
22. WHERE SEDIMENT OR ROCK HAS BEEN TRACKED OUT FROM THE SITE, REMOVE THE SEDIMENT PRIOR TO PRECIPITATION EVENTS BY SWEEPING, VACUUMING OR OTHER SIMILAR MEANS. THIS MATERIAL INTO ANY STORMWATER CONVEYANCE, INLET, OR WATER OF THE STATE IS PROHIBITED. (SCHEDULE A.6.h)
23. STOCKPILES MUST NOT BE LOCATED ON OR ADJACENT TO STORMWATER CONVEYANCES, DRAIN
INLETS, AND CONCENTRATED STORMWATER FLOW PATHS, OR WITHIN NATURAL BUFFER ZONES.
(SCHEDULE A.7.a)
24. STOCKPILES MUST BE COVERED AND THE END OF EACH WORKDAY. (SCHEDULE A.7.d)
25. PROVIDE STABLE COVER (ANCHORED TARPS, EROSION MATTING, HYDROSEED WITH TACKIFIER) FOR ANY STOCKPILES THAT WILL NOT BE USED FOR SEVEN DAYS OR MORE. (SCHEDULE A.7.e)
26. CONTAMINATED STOCKPILES MUST BE SEGREGATED AND MANAGED PER AN APPROVED
ENVIRONMENTAL MANAGEMENT PLAN. (SCHEDULE A.7.h)
27. PREVENT WIND-BLOWN SOIL AND DUST THROUGH THE APPROPRIATE APPLICATION OF WATER OR OTHER DUST SUPPRESSION TECHNIQUES. CONSISTENT WITH 40 CFR PART 279.82, USED OIL MAY NOT
BE APPLIED AS A DUST SUPPRESSANT. (SCHEDULE A.8)
28. FOR SLOPES GREATER THAN 15% IN GRADE, REDUCE THE CONTINUOUS LENGTH OF SLOPE WITH TERRACING AND DIVERSIONS, REDUCING SLOPE STEEPNESS, AND ROUGHENING SLOPE SURFACES.
DIVERT CONCENTRATED FLOWS AWAY FROM THESE SLOPES. (SCHEDULE A.9)
29. WHERE FINAL VEGETATIVE STABILIZATION WILL OCCUR, PRESERVE NATIVE TOPSOIL FOR ON-SITE
REUSE, RESTRICT VEHICLE AND EQUIPMENT TO AVOID SOIL COMPACTION, AND REHABILITATE
COMPACTED SOILS TO SUPPORT VEGETATIVE GROWTH PRIOR TO SEEDING. (SCHEDULE A.10)
30. STORM DRAIN INLET PROTECTION MUST EFFECTIVELY REMOVE SEDIMENT FROM DISCHARGES, AND BE ADEQUATELY SIZED TO PREVENT BYPASS. DO NOT WASH SEDIMENT OR DEBRIS INTO STORM INLETS.
(SCHEDULE A.11)
31. CLEAN OR REMOVE AND REPLACE, INLET PROTECTION MEASURES AS SEDIMENT ACCUMULATES. AT A MINIMUM, CLEAN CATCH BASIN INSERTS BEFORE SEDIMENT RETENTION CAPACITY IS REDUCED BY 50%. (SCHEDULE A.11.d)
32. ESTABLISH CONCRETE WASHOUT AREAS PRIOR TO BEGINNING CONCRETE WORK. DIRECT ALL CONCRETE WASH WATER AND CONCRETE WASTE INTO A CONCRETE WASHOUT FACILITY. FACILITIES MUST BE CLEANED OR REMOVED ONCE THE WASHOUT IS 75% FULL. LOCATE FACILITIES AT LEAST 50
FEET FROM ALL STORMWATER CONVEYANCE AND WATERS. (SCHEDULE A.12)
33. CONTROL ALL STORMWATER DISCHARGES, INCLUDING BOTH PEAK FLOWRATES AND TOTAL
STORMWATER VOLUME, TO PREVENT CHANNEL AND STREAMBANK EROSION AND SCOUR IN THE
IMMEDIATE VICINITY OF DISCHARGE POINTS. (SCHEDULE A.13)
34. SEDIMENT BASINS MUST BE DESIGNED, PREPARED, AND STAMPED BY AN OREGON REGISTERED PROFESSIONAL ENGINEER. (SCHEDULE A.14.a)
35. INSTALL AN ENGINEERED SEDIMENT BASINS IN ACCORDANCE WITH SCHEDULE A.14 TO CAPTURE AND TREAT HIGH pH RUNOFF IF ENGINEERED SOILS ARE USED ON-SITE. MONITOR AND RECORD pH IN
ACCORDANCE WITH SCHEDULE B.6. (SCHEDULE A.15)
36. IMPLEMENT AND MAINTAIN SOIL STABILIZATION MEASURES UNTIL VEGETATION IS ESTABLISHED.
(SCHEDULE A.16)
37. PRIOR TO PERMIT TERMINATION, THE SITE SHALL MEET ALL REQUIREMENTS OF CONDITION I.10 AND
SCHEDULE A.17. (SCHEDULE A.17)
38. IMPLEMENT POLLUTION PREVENTION CONTROLS TO PREVENT DISCHARGE OF POLLUTANTS TO
STORMWATER AND THE DISCHARGE OF POLLUTANTS FROM SPILLED OR LEAKED MATERIALS.
(SCHEDULE A.18)
39. MANAGE DEWATERING WATER IN ACCORDANCE WITH AN APPROVED EMP. (SCHEDULE A.19.d)
40. COMPLY WITH ALL PERMIT CONDITIONS TO MEET ALL WATER QUALITY COMPLIANCE STANDARDS AND REGULATIONS FOR TURBIDITY, SEDIMENTATION AND UNDERGROUND INJECTION CONTROL. (SCHEDULE A.20)
41. KEEP A CURRENT ESCP AT THE SITE AND MAKE IT AVAILABLE FOR INSPECTIONS. (SCHEDULE A.21.h)
42. TAKE CORRECTIVE ACTIONS AS REQUIRED IN SCHEDULE A.25. (SCHEDULE A.25)
43. DEQ SHALL HAVE ACCESS TO THE SITE AT ALL REASONABLE TIMES. (SCHEDULE B.8)
STANDARD NOTES (cont.)
SITE CONDITION
1. DISTURBED AND NOT PERMANENTLY
STABILIZED.
2. STABILIZED AREAS AS DEFINED IN
SCHEDULE A.17.
3. THE SITE OR PORTIONS OF THE SITE
ARE INACCESSIBLE OR UNSAFE TO
INSPECT.
4. CONSTRUCTION IS SUSPENDED DUE
TO FROZEN CONDITIONS.
MINIMUM FREQUENCY
ONCE EVERY 14 CALENDAR DAYS AND WITHIN 24 HOURS OF:
i. A STORMEVENT THAT PRODUCES 0.25 INCHES OR MORE OF RAIN
WIHTIN A 24-HOUR PERIOD.
A. IF A STORM EVENT PRODUCES 0.25 INCHES OR MORE OF RAIN
WITHIN A 24-HOUR PERIOD (INCLUDING WHEN THERE ARE
MULTIPLE, SMALLER STORMS THAT ALONE PRODUCE LESS THAN
0.25 INCHES BUT TOGETHER PRODUCE 0.25 INCHES OR MORE IN
24 HOURS), YOU ARE REQUIRED TO CONDUCT ONE INSPECTION
WITHIN 24 HOURS OF WHEN 0.25 INCHES OF RAIN OR MORE HAS
FALLEN.
B. IF A STORM EVENT PRODUCES 0.25 INCHES OR MORE OF RAIN
WITHIN A 24-HOUR PERIOD ON THE FIRST DAY OF A STORM AND
CONTINUES TO PRODUCE 0.25 INCHES OR MORE OF RAIN ON
SUBSEQUENT DAYS, YOU MUST CONDUCT AN INSPECTION WITHIN
24 HOURS OF THE FIRST DAY OF THE STORM AND WITHIN 24
HOURS AFTER THE LAST DAY OF THE STORM THAT PRODUCES
0.25 INCHES OR MORE OF RAIN (I.E., ONLY TWO INSPECTIONS
WOULD BE REQUIRED FOR SUCH A STORM EVENT).
ii. A DISCHARGE CAUSED BY SNOWMELT FROM A STORM EVENT
THAT PRODUCES 3.25 INCHES OR MORE OF SNOW WITHIN A
24-HOUR PERIOD. YOU ARE REQUIRED TO CONDUCT ONE
INSPECTION ONCE THE DISCHARGE OF SNOWMELT FROM A
3.25-INCH OR MORE SNOW ACCUMULATION OCCURS. ADDITIONAL
SNOWMELT INSPECTIONS ARE ONLY REQUIRED IF FOLLOWING
THE DISCHARGE FROM THE FIRST SNOWMELT, THERE IS A
DISCHARGE FROM A SEPARATE STORM EVENT THAT PRODUCES
3.25 INCHES OR MORE OF SNOW.
THE INSPECTOR MAY REDUCE FREQUENCY TO TWICE PER MONTH
FOR THE FIRST MONTH, NO MORE THAN 14 CALENDAR DAYS APART.
IF "WASH-OUT" OF STABILIZED AREA AND/OR SEDIMENTATION IS
OBSERVED, RESUME INSPECTION FREQUENCIES OF DISTURBED SITE.
DOCUMENT SPECIFIC REASONS AND LOCATIONS WHERE THIS SITE
CONDITION APPLIES. CONDUCT FOLLOW-UP INSPECTION OF
AFFECTED AREAS AS CONDITIONS ALLOW SAFE AND REASONABLE
ACCESS.
TEMPORARILY SUSPEND INSPECTIONS. IMMEDIATELY RESUME
REGULAR INSPECTION FREQUENCY IF DISCHARGES BECOME LIKELY
OR CONSTRUCTION ACTIVITIES RESUME.
INSPECTION REQUIREMENTS
1. ACCURATE RAINFALL AND SNOW DATA MUST COME FROM AN ON-SITE RAIN GAUGE. A NEARBY WEATHER
STATION THAT ACCURATELY REPRESENTS RAINFALL AT THE SITE MAY BE USED FOR FORECASTING. CHOSEN DATA SOURCE MUST BE DOCUMENTED IN THE INSPECTION REPORT. SNOW MEASUREMENTS MUST BE TAKEN
DIRECTLY AT THE SIRE OR OBTAINED FROM A NEARBY REPRESENTATIVE WEATHER STATION.
2. DEQ MAY REQUIRE INSPECTIONS ON A MORE FREQUENT BASIS THAN PRESCRIBED WITHIN THIS ESCP.
3. REGISTRANTS MAY NOT SWITCH INSPECTION FREQUENCIES AFTER PERMIT ISSUANCE. REQUESTS INTENDED TO REDUCE THE OVERALL NUMBER OF INSPECTIONS OVER THE COURSE OF A PROJECT ARE STRICTLY PROHIBITED. IF A FREQUENCY CHANGE IS APPROVED BY DEQ, A REVISED ESCP SHALL BE SUBMITTED WITH
THE NEW FREQUENCY.
4. INSPECTION REPORTS SHALL BE COMPLETED WITHIN 24 HOURS OF SITE INSPECTION AND AS REQUIRED IN
SCHEDULE B.5.
5. EACH INSPECTION REPORT MUST BE SIGNED BY THE INSPECTOR WITH THE FOLLOWING STATEMENT: "I CERTIFY THAT THIS REPORT IS TRUE, ACCURATE, AND COMPLETE TO THE BEST OF MY KNOWLEDGE, ABILITIES, AND BELIEF.". THE PRIMARY INSPECTOR MUST REVIEW AND SIGN INSPECTIONS REPORTS
GENERATED BY OTHER INSPECTORS WITHIN THREE BUSINESS DAYS.
6. ALL INSPECTIONS AND APPLICABLE RECORDS SHALL BE KEPT AND RETAINED IN ACCORDANCE WITH SCHEDULE B.7. A COPY OF THE RECORDKEEPING LOGBOOK SHALL BE DELIVERED TO THE ENGINEER UPON
TERMINATION OF THIS PERMIT.
INSPECTION NOTES
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
100236PE
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
3/
/ 2
- 1
1:
am kk im
P
:\O \o da -o ak rid ge
2-rw y re co ns tr\
C
AD
\D
W G
\S he et s\
O
AK
2-
ES
C
P- D
E.
dw g
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
OAKRIDGE STATE AIRPORT
RUNWAY 9-27 PAVEMENT RECONSTRUCTION AND
ASSOCIATED IMPROVEMENTS
EROSION AND SEDIMENT
CONTROL DETAILS
PRECISION APPROACH ENGINEERING, INC.
MAR 2026
LMT
KWK/JAW
KJK
PT 'B'
FLOW
NOTES:
1. STAKING OF BAGS MAY BE REQUIRED USING (2)
1"X2" WOOD STAKES OR APPROVED EQUAL PER BAG
2. PT "A" MUST BE 6" MIN HIGHER THAN PT "B"
BIO FILTER BAG DITCHES AND SWALES 1
10NTS
PT 'A'
6" OVERLAP TYP
SECTION A-A
PLAN VIEW
BIO FILTER BAG
A
A'
50' TYP
NOTES:
1. CONCRETE WASHOUT TO BE CONTAINED WITHIN THE CONTRACTOR'S STAGING AREA
OR AS OTHERWISE APPROVED BY THE ENGINEER
2. WASHOUT FACILITIES SHALL BE MAINTAINED TO PROVIDE ADEQUATE HOLDING
CAPACITY WITH A MINIMUM FREEBOARD OF 12 INCHES.
3. WASHOUT FACILITY MUST BE CLEANED OR NEW FACILITIES MUST BE CONSTRUCTED
AND READY FOR USE ONCE THE WASHOUT IS 75% FULL.
4. IF THE WASHOUT IS NEARING CAPACITY, VACUUM AND DISPOSE OF THE WASTE
MATERIAL IN AN APPROVED MANNER.
5. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE LOCATED A MINIMUM OF 50 FT
FROM SENSITIVE AREAS INCLUDING OPEN DRAINAGE FACILITIES AND WATER SOURCES.
6. CONCRETE WASHOUT FACILITIES SHALL BE CONSTRUCTED AND MAINTAINED IN
SUFFICIENT QUANTITY AND SIZE TO CONTAIN ALL LIQUID AND CONCRETE WASTE
GENERATED BY WASHOUT OPERATIONS.
7. PLASTIC LINER SHALL BE SECURED TO THE TOP OF THE PERIMETER BERM, AT 2'
SPACING, ON ALL SIDES, BY RPR APPROVED METHOD.
8. TEMPORARY CONCRETE WASHOUTS MAY BE A PREFABRICATED CONTAINER THAT IS
PORTABLE AND REUSABLE, OR PER ODOT STD DRAWING 1070. SUBMIT TO THE
ENGINEER FOR APPROVAL.
9. AT COMPLETION OF CONSTRUCTION, CONCRETE WASHOUT AND ALL WASHOUT
MATERIAL SHALL BE REMOVED AND DISPOSED OF OFF SITE. WASHOUT AREA AND
AREAS DIRECTLY ADJACENT SHALL MEET OR EXCEED EXISTING CONDITIONS.
A A
MIN 1' HIGH BERM
EXISTING GRADE
3'X3' MIN AT BOTTOM OF WASHOUT
TO CONTAIN CONCRETE9'X9' MIN TO CONTAIN
CONCRETE
PLAN
1'
MI
N
1' MIN
EXCAVATED MATERIAL MAY BE
USED FOR PERIMETER BERM
2'
MI
N
3'X3' MIN TO CONTAIN CONCRETE
SECTION A-A
EXISTING GRADE
2% SLOPE
3"-6" ROCK WITH A
MINIMUM 8" DEPTH
CONCRETE WASHOUT DETAIL 4
10NTS
10 MIL POLYETHYLENE PLASTIC
LINING, SEE NOTE 6
RADIUS = 25' MIN.
3"-6" QUARRY SPALLS
SUBGRADE REINFORCEMENT
GEOTEXTILE, AS REQUIRED
APPROVED ACCESS
POINT
8" MIN DEPTH
50' MIN
STABILIZED CONSTRUCTION ENTRANCE 3
10NTS
NOTES:
1. CONTRACTOR SHALL USE A STABILIZED CONSTRUCTION ENTRANCE AT SITE
ACCESS POINTS. CONTRACTOR MAY USE SHAKER PLATE FOR CONSTRUCTION
ACCESS AS AN ALTERNATIVE OR IN CONJUNCTION WITH STABILIZED CONSTRUCTION
ENTRANCE IF NEEDED TO CONTROL TRACKING OF MATERIAL ONTO PAVEMENT.
VERIFY WITH THE ENGINEER PRIOR TO USE. IF USED, THE SHAKER PLATE SHALL BE
REMOVED AT THE COMPLETION OF THE PROJECT.
2. ALL WORK AND MATERIALS REQUIRED TO INSTALL STABILIZED CONSTRUCTION
ENTRANCE SHALL BE CONSIDERED INCIDENTAL TO THE EROSION CONTROL BID ITEM
10'MIN
RUMBLE/SHAKER PLATE,
SEE NOTE 1
PROVIDE FULL WIDTH
OF INGRESS/EGRESS
AREA, MIN 20'
GEOTEXTILE INSERT
GEOTEXTILE
INSERT SEWN FLAP
REBAR
FLOW FLOW
FLOW
TYPE A
TYPE B
INLET PROTECTION 5
10NTS
BIO-FILTER BAG
SEDIMENT BARRIER,
TYP.
CATCH BASIN OR
INLET STRUCTURE
2STRAW WATTLE DETAIL
10NTS
WOOD STAKE
RICE OR STRAW
ROLLS, 8" DIA MIN
FLOW
0A;
NOTES:
1. WATTLES SHALL BE INSTALLED AS A SINGLE, SEDIMENT BARRIER TYPE 3 PER OREGON DEQ. INSTALL
WATTLES AS SHOWN ON PLANS OR AS DIRECTED BY THE ENGINEER.
2. SECURELY KNOT EACH END OF THE WATTLE. ABUT ADJACENT WATTLES TIGHTLY, END TO END, WITHOUT OVERLAPPING THE ENDS.
3. USE A STRAIGHT BAR TO DRIVE PILOT HOLES THROUGH THE ROLL AND INTO THE SOIL.
4. DRIVE THE STAKE THROUGH THE PREPARED HOLE, AND INTO THE SOIL. LEAVE ONLY 1 OR 2 INCHES OF
THE STAKE EXPOSED ABOVE THE ROLL.
5. WATTLES SHALL BE INSPECTED REGULARLY, AND IMMEDIATELY AFTER A RAINFALL THAT PRODUCES RUNOFF, TO ENSURE THAT THEY REMAIN THOROUGHLY ENTRENCHED AND IN CONTACT WITH THE SOIL
6. AFTER THE SITE HAS BEEN DEEMED STABILIZED, THE CONTRACTOR MAY ELECT TO CUT AND SPREAD WATTLE MATERIAL AROUND THE PROJECT SITE AS PERMANENT EROSION CONTROL. SPREADING SHALL
BE DONE IN LOCATIONS WHICH WILL NOT IMPACT AOAS IF MATERIAL IS WIND BLOWN.
7. ALL STRAW OR HAY WATTLES SHALL BE STERILE AND CERTIFIED WEED-FREE TO PREVENT
INADVERTENT NON-NATIVE PLANT SPECIES FROM BEING INTRODUCED TO THE AIRPORT.
8. STRAW WATTLE SHALL BE INSTALLED ON THE CONTOUR OF THE SLOPE AND EXTEND BOTH ENDS OF
THE CONTROL UP SLOPE TO FORM A CRESCENT RATHER THAN A STRAIGHT LINE.
IN
STERILE MATERIAL,
SEE NOTE 7
2202,3BEM
REG
ISTERED PROFESSIONAL
KADEN J. KINS R1
EXPIRES 6/30/2027
TPES
RE E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
100236PE
WC
PB-4PB-3PB-2PB-1
GB-1
E
EE
SS
SD
SD
ADDITIVE A APRON DEMOLITION
PLAN, SEE SHEET 12
CB
PB-10
PB-5PB-9
PB-8
PB-7 GB-2PB-6
M
AT
C H
L
IN
E
- T
H
IS
S H
EE
T
0 50 100 200
SCALE IN FEET
NORTH
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
3/
/ 2
- 1
1:
am kk im
P
:\O \o da -o ak rid ge
2-rw y re co ns tr\
C
AD
\D
W G
\S he et s\
O
AK
2-
D
EM
O .d w g
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
OAKRIDGE STATE AIRPORT
RUNWAY 9-27 PAVEMENT RECONSTRUCTION AND
ASSOCIATED IMPROVEMENTS
DEMOLITION PLAN
PRECISION APPROACH ENGINEERING, INC.
MAR 2026
LMT
KWK/JAW
KJK
M
AT
C H
L
IN
E
- T
H
IS
S H
EE
T
2202,3BEM
REG
ISTERED PROFESSIONAL
KADEN J. KINS R1
EXPIRES 6/30/2027
TPES
RE E
1. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED
PRIOR TO DEMOLITION ACTIVITIES, SEE EROSION AND SEDIMENT
CONTROL PLANS.
2. EXISTING PAVEMENT MARKINGS ARE TO BE REMOVED DURING
PAVEMENT REMOVAL OPERATIONS UNLESS OTHERWISE NOTED, NO
SEPARATE PAYMENT.
3. DEMOLITION OF THE EXISTING WIND CONE SHALL INCLUDE THE
EXISTING FOUNDATION AND THE REMOVAL AND DISPOSAL OF EXISTING
TIRES ACTING AS SEGMENTED CIRCLE MARKING SYSTEM.
4. IF ADDITIVE A IS NOT SELECTED FOR CONSTRUCTION, APPLY TWO
COATS OF BLACK PAINT TO EXISTING 6-INCH YELLOW TAXIWAY
CENTERLINE STRIPE ON EXISTING APRON TO REMAIN, PAID UNDER THE
LONGITUDINAL MARKINGS BID ITEM.
5. LIMITS OF PAVEMENT REMOVAL ARE APPROXIMATE. THE CONTRACTOR
SHALL LAYOUT LIMITS WITH SURVEY AND FIELD VERIFY WITH THE
ENGINEER PRIOR TO REMOVAL, SEE SHEETS FOR ADDITIONAL
INFORMATION.
6. ALL ASPHALT PAVEMENT TO BE REMOVED AND NOT INCORPORATED
INTO THE PAVEMENT SECTION SHALL BE REMOVED BY GRINDING. ALL
GRANULAR MATERIAL GENERATED DURING…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .