ITB S-10900-00015899 - ADDENDUM NO - 2.pdf
PDF 4 MB Posted
- Solicitation number
- S-10900-00015899
- Issued by
- Lane County, Oregon
About this file
Summary: Addendum No. 2 to Invitation to Bid for Oakridge State Airport Runway 9-27 Reconstruction
This Addendum No. 2, issued by the Oregon Department of Aviation (ODAV) on April 17, 2026, modifies the Invitation to Bid S-10900-00015899 for Runway 9-27 reconstruction and associated improvements at Oakridge State Airport in Oakridge, Oregon. The primary project deliverables include full-depth runway reconstruction, apron reconstruction (Additive Schedule A), and a new connector taxiway (Additive Schedule B). The addendum implements two material specification changes: Bid Item 12 and Bid Item B-3 descriptions are revised from "8-Inch RCP Pipe" to "6 Inch C900 PVC Pipe," reflecting a change to more readily available piping material. Additionally, the addendum introduces provisions for Uncrewed Aircraft Systems (UAS/drone) operations at the non-NPIAS airport and corresponding insurance requirements. The revised Pricing Form (Attachment A, Form A-2) reflects these modifications and must be used by all bidders for cost estimation. Requests for clarification on this addendum were due April 20, 2026, at 2:00 p.m. Pacific Time, and bidders were required to acknowledge receipt of the addendum on the Bidder Information and Certifications Form.
The addendum also modifies Attachment D-4, Supplemental General Conditions, to permit UAS operations with prior Owner approval, subject to Federal Aviation Administration regulations (14 CFR Part 107), Oregon Department of Aviation requirements, and state/local laws. All UAS operators must hold valid FAA Remote Pilot Certificates and appropriate airspace authorizations. Insurance requirements are expanded under Section G.3.3.12 to mandate Drone/Unmanned Aircraft Systems/Unmanned Aerial Vehicle liability insurance with a combined single limit of not less than $1,000,000 per occurrence, covering bodily injury, property damage, and personal/advertising injury. Specification revisions to Section 00315 regarding runway pavement grinding and blending clarify that finished surface elevation surveys use a grid system, with grade tolerances conforming to Section 00330.70, and vertical tolerance measurements are only required if directed by the Engineer. Drawing revisions affect Sheets 3, 7, 11, 16-24, 27, and 30, all labeled with "ADDENDUM NO. 2" dated April 16, 2026. The bid opening remains scheduled for April 21, 2026, at 2:00 p.m., with all responses submitted electronically through the OregonBuys eProcurement system.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 2
OREGON DEPARTMENT OF AVIATION
OAKRIDGE STATE AIRPORT
RUNWAY 9-27 RECONSTRUCTION AND ASSOCIATED IMPROVEMENTS PROJECT
Oakridge, Oregon
TO: All Plan Holders DATE: April 17, 2026
BID NO: S-10900-00015899
1. NOTICE TO BIDDERS
A. This Addendum #2 modifies the Invitation to Bid only the extent indicated herein. All other areas not specifically mentioned or affected by this Addendum shall remain in full force. The following changes, additions, and/or deletions are hereby made to the Invitation to Bid, as fully and completely as if the same were fully set forth therein.
B. Requests for clarification, requests for change, and protests of this Addendum must be received by ODAV by 2:00 P.M. (Pacific time) on April 20, 2026, or they will not be considered.
C. Bidders must acknowledge receipt of this addendum in the space provided on the ITB, ATTACHMENT A - FORM A-1 — BIDDER INFORMATION AND CERTIFICATIONS FORM.
2. REVISIONS TO INVITATION TO BID
The following sections in the ITB are revised as follows:
a. Attachment A; FORM A-2 – PRICING FORM is deleted in its entirety and replaced with Attachment A, FORM A-2 as set forth below. Changes to the Pricing Form include:
i. Bid items 12, Item Description: 8-Inch RCP Pipe is changed to 6 Inch C900 PVC Pipe
ii. Bid items B-3, Item Description: 8-Inch RCP Pipe is to changed to 6 Inch C900 PVC
Pipe
ITB/BID no.: S-10900-00013485 27
ATTACHMENT A
FORM A-2 — PRICING FORM
ITB/BID Solicitation no.: S-10900-00015899 Project Title: Oakridge State Airport Runway 9-27 Reconstruction and Associated Improvements
PRICING SUBMITTAL INSTRUCTIONS:
Bidder shall enter pricing and other required information for all Bid Items listed in this Pricing Form. If this Pricing Form is replaced by Addendum, Bidders shall use the Addendum form to provide pricing and other required information. If the Pricing Form is only modified by Addendum, Bidders shall follow the instructions in the Addendum for making modifications to the Pricing Form. Failure to supply the required information in the Pricing Form, as modified by subsequent Addenda, may result in Bid rejection as non-responsive.
BASE BID To include all Work described in the ITB, Plans, Specifications and any issued Addenda.
BASE BID SCHEDULE - RUNWAY RECONSTRUCTION
Item No. Item Description Unit Est.
Quantity Unit Bid Price Amount Bid
1 Mobilization LS 1 $ $
2 Sediment Barrier, Type 3 LF 2,560 $ $
3 Erosion Control LS 1 $ $
4 Temporary Mulching, Straw AC 9 $ $
5 Construction Survey Work LS 1 $ $
6 Removal of Structures and Obstructions LS 1 $ $
7 Removal of Pipes LF 250 $ $
8 Asphalt Pavement Grinding and Blending SY 16,120 $ $
9 General Excavation CY 10,160 $ $
10 Subgrade Stabilization CY 1,100 $ $
11 Shoulder and Slope Grading SY 38,000 $ $
12 6 Inch C900 PVC Pipe LF 130 $ $
13 12-Inch HDPE Pipe LF 170 $ $
14 Paved Culvert End Slope EA 2 $ $
15 Catch Basin, Type G-2 EA 1 $ $
16 Cold Plane Pavement Removal, Full Depth SY 4,830 $ $
17 Aggregate Base CY 5,600 $ $
18 Aggregate Shoulders, 6 Inches Thick SY 10,580 $ $
19 Level 2, 1/2 Inch ACP Mixture TON 4,250 $ $
20 Concrete Helipad Pavement SF 3,675 $ $
21 Longitudinal Joint Seal LF 805 $ $
ITB/BID no.: S-10900-00013485 28
22 Longitudinal Pavement Markings SF 6,960 $ $
23 Permanent Seeding AC 9 $ $
24 L-806 Wind Cone, Foundation and Power Supply EA 2 $ $
25 L-807 Wind Cone, Foundation and Power Supply EA 1 $ $
26 Segmented Circle Marker System LS 1 $ $
27 2-Inch PVC Conduit LF 120 $ $
28 Electrical Trench LF 60 $ $
29 Retroreflective Marker, Elevated EA 64 $ $
30 Retroreflective Marker, Elevated, In- Pavement EA 6 $ $
31 Vegetative Barrier Mat EA 64 $ $
Total of Extended Unit Price Items and Lump Sum Items Listed Above $
ADDITIVE BID SCHEDULE A - APRON RECONSTRUCTION
Item No. Item Description Unit Quantity Unit Bid Price Amount Bid
A-1 Mobilization LS 1
A-2 Construction Survey Work LS 1
A-3 Removal of Structures and Obstructions LS 1
A-4 General Excavation CY 2,170
A-5 Subgrade Stabilization CY 600
A-6 Shoulder and Slope Grading SY 2,510
A-7 Cold Plane Pavement Removal, Full Depth SY 6,210
A-8 Aggregate Base CY 1,620
A-9 Level 2, 1/2 Inch ACP Mixture TON 1,150
A-10 Aircraft Tie-Down Anchor EA 12
A-11 Concrete Hangar Transition LF 135
A-12 Longitudinal Joint Seal LF 280
A-13 Longitudinal Pavement Markings SF 1,540
Total of Extended Unit Price Items and Lump Sum Items Listed Above $
ADDITIVE BID SCHEDULE B - NEW CONNECTOR TAXIWAY
Item No. Item Description Unit Quantity Unit Bid Price Amount Bid
B-1 General Excavation CY 260
ITB/BID no.: S-10900-00013485 29
B-2 Subgrade Stabilization CY 30
B-3 6 Inch C900 PVC Pipe LF 160
B-4 Paved Culvert End Slope EA 2
B-5 Aggregate Base CY 170
B-6 Aggregate Shoulders, 6 Inches Thick SY 180
B-7 Level 2, 1/2 Inch ACP Mixture TON 140
B-8 Concrete Helipad Pavement SF 1,225
B-9 Longitudinal Joint Seal LF 280
B-10 Longitudinal Pavement Markings SF 410
B-11 2-Inch PVC Conduit LF 130
B-12 Electrical Trench LF 70
B-13 Retroreflective Marker, Elevated EA 3
B-14 Retroreflective Marker, Flush Mounted EA 1
B-15 Vegetative Barrier Mat EA 3
Total of Extended Unit Price Items and Lump Sum Items Listed Above $
GRAND TOTAL
(Base Bid plus Additive Bid A, and B Schedules) $
NOTE: Bid price is total contract price including contractor’s profit and overhead. Items not explicitly listed in the bid schedule above are considered incidental.
The undersigned understands that the State reserves the right to increase or decrease the above quantities at the same unit prices as shown or to remove items as necessary to meet budgetary constraints. The undersigned has carefully examined the Contract Documents and the site of the work, and agrees to furnish all necessary plant, labor, equipment, accessories, materials, permits, and perform all operations shown and specified in accordance with the Contract Documents for the price(s) set herein.
Bid submitted by:
(Legal Business Name)
(Authorized Representative Name) (Title)
(Authorized Representative Signature) (Date)
b. Attachment D-4, Supplemental General Conditions, is revised as follows:
i. SGC-14 is modified to include the following provision at the end of Section F.1 USE
OF PREMISES:
The Contractor may use Uncrewed Aircraft Systems (UAS) in performance of the Work at this non-NPIAS airport, which is closed to aircraft operations during construction, only with prior approval of the Owner. All UAS operations shall comply with applicable regulations of the Federal Aviation Administration (14 CFR Part 107), requirements of the Oregon Department of Aviation, and all state and local laws. The Contractor shall ensure operators hold valid FAA Remote Pilot Certificates, obtain required airspace authorizations, and maintain safe operations at all times. The Contractor assumes all responsibility for UAS use and shall suspend operations upon direction of the Owner.
ii. SGC-21 is modified to include the following additional insurance requirements under Section G.3 INSURANCE – G.3.3 Liability Insurance:
G.3.3.12 Drone/ Unmanned Aircraft Systems/ Unmanned Aerial Vehicle: Contractor shall provide Drone Liability Insurance covering bodily injury, property damage, and personal and advertising injury caused by owned and non-owned drones including the drone’s payload and/or dispensable loads in a form and with coverage that are satisfactory to the Owner. This insurance must include premises liability, products and completed operations, contractual liability coverage for the indemnity provided under this Contract, and have no limitation of coverage to designated premises, project, operation, or territory of operation. Coverage must be written on an occurrence basis in a combined single limit amount of not less than $1,000,000 per occurrence.
c. Attachment B; SPECIFICATIONS is revised as follows, with revisions shown in bold and underline:
i. Special Provisions to 2024 Oregon Standard Specifications for Construction, Section 00315 – Runway Pavement Grindings and Blending o 00315.12-Compaction and Grading; change the second sentence to read “The finished surface elevation shall then be surveyed using the grid system specified in 00330.70 and approved by………” o 00315.12-Compaction and Grading; changes the third sentence to read “Grade tolerances, smoothness, and finishing for work performed under this Specification shall conform with Section 00330.70, except that no measurement for vertical tolerance is required for acceptance, unless directed by the Engineer to verify material has not been unnecessarily removed as determined by the Engineer.”
d. Attachment C; PLAN AND DRAWINGS is revised as follows:
i. SHEET NOs. 3, 7, 11, 16-24, 27 and 30: Delete in their entirety and replace with the attached, like-numbered, drawings labeled “ADDENDUM NO. 2” in the revision block of the drawing.
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
4/
/ 2
- 3
:5 4p m
KK
in se r -
P :\O
\o da
-o ak rid ge
2-rw y re co ns tr\
C
AD
\D W
G \S he et s\ O
AK
2- C
O
VE
R .d w g
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
OAKRIDGE STATE AIRPORT
RUNWAY 9-27 PAVEMENT RECONSTRUCTION AND
ASSOCIATED IMPROVEMENTS
BID SCHEDULES
PRECISION APPROACH ENGINEERING, INC.
MAR 2026
LMT
KWK/JAW
KJK
AS SHOWN
OAK002
RUNWAY RECONSTRUCTION
BASE BID SCHEDULE
APRON RECONSTRUCTION
ADDITIVE BID SCHEDULE A
BID ITEM SPEC. DESCRIPTION UNIT QUANTITY CONSTRUCTION
QUANTITY
1 00210 MOBILIZATION LS 1
2 00280 SEDIMENT BARRIER, TYPE 3 LF 2,560
3 00280 EROSION CONTROL LS 1
4 00280 TEMPORARY MULCHING, STRAW AC 9
5 00305 CONSTRUCTION SURVEY WORK LS 1
6 00310 REMOVAL OF STRUCTURES AND OBSTRUCTIONS LS 1
7 00310 REMOVAL OF PIPES LF 250
8 00315 ASPHALT PAVEMENT GRINDING AND BLENDING SY 16,120
9 00330 GENERAL EXCAVATION CY 10,160
10 00331 SUBGRADE STABILIZATION CY 1,100
11 00336 SHOULDER AND SLOPE GRADING SY 38,000
12 00445 6-INCH C900 PVC PIPE LF 130
13 00445 12-INCH HDPE PIPE LF 170
14 00460 PAVED CULVERT END SLOPE EA 2
15 00470 CATCH BASIN, TYPE G-2 EA 1
16 00620 COLD PLANE PAVEMENT REMOVAL, FULL DEPTH SY 4,830
17 00641 AGGREGATE BASE CY 5,600
18 00641 AGGREGATE SHOULDERS, 6 INCHES THICK SY 10,580
19 00744 LEVEL 2, 1/2 INCH ACP MIXTURE TON 4,250
20 00759 CONCRETE HELIPAD PAVEMENT SF 3,675
21 00759 LONGITUDINAL JOINT SEAL LF 805
22 00860 LONGITUDINAL PAVEMENT MARKINGS SF 6,960
23 01030 PERMANENT SEEDING AC 9
24 L-107 L-806 WIND CONE, FOUNDATION AND POWER SUPPLY EA 2
25 L-107 L-807 WIND CONE, FOUNDATION AND POWER SUPPLY EA 1
26 L-107 SEGMENTED CIRCLE MARKER SYSTEM LS 1
27 L-110 2-INCH PVC CONDUIT LF 120
28 L-110 ELECTRICAL TRENCH LF 60
29 L-125 RETROREFLECTIVE MARKER, ELEVATED EA 64
30 L-125 RETROREFLECTIVE MARKER, ELEVATED, IN-PAVEMENT EA 6
31 L-125 VEGETATIVE BARRIER MAT EA 64
BID ITEM SPEC. DESCRIPTION UNIT QUANTITY CONSTRUCTION
QUANTITY
A-1 00210 MOBILIZATION LS 1
A-2 00305 CONSTRUCTION SURVEY WORK LS 1
A-3 00310 REMOVAL OF STRUCTURES AND OBSTRUCTIONS LS 1
A-4 00330 GENERAL EXCAVATION CY 2,170
A-5 00331 SUBGRADE STABILIZATION CY 600
A-6 00336 SHOULDER AND SLOPE GRADING SY 2,510
A-7 00620 COLD PLANE PAVEMENT REMOVAL, FULL DEPTH SY 6,210
A-8 00641 AGGREGATE BASE CY 1,620
A-9 00744 LEVEL 2, 1/2 INCH ACP MIXTURE TON 1,150
A-10 00759 AIRCRAFT TIE-DOWN ANCHOR EA 12
A-11 00759 CONCRETE HANGAR TRANSITION LF 135
A-12 00759 LONGITUDINAL JOINT SEAL LF 280
A-13 00860 LONGITUDINAL PAVEMENT MARKINGS SF 1,540
NEW TAXIWAY CONNECTOR
ADDITIVE BID SCHEDULE B
BID ITEM SPEC. DESCRIPTION UNIT QUANTITY CONSTRUCTION
QUANTITY
B-1 00330 GENERAL EXCAVATION CY 260
B-2 00331 SUBGRADE STABILIZATION CY 30
B-3 00445 6-INCH C900 PVC PIPE LF 160
B-4 00460 PAVED CULVERT END SLOPE EA 2
B-5 00641 AGGREGATE BASE CY 170
B-6 00641 AGGREGATE SHOULDERS, 6 INCHES THICK SY 180
B-7 00744 LEVEL 2, 1/2 INCH ACP MIXTURE TON 140
B-8 00759 CONCRETE HELIPAD PAVEMENT SF 1,225
B-9 00759 LONGITUDINAL JOINT SEAL LF 280
B-10 00860 LONGITUDINAL PAVEMENT MARKINGS SF 410
B-11 L-110 2-INCH PVC CONDUIT LF 130
B-12 L-110 ELECTRICAL TRENCH LF 70
B-13 L-125 RETROREFLECTIVE MARKER, ELEVATED EA 3
B-14 L-125 RETROREFLECTIVE MARKER, FLUSH MOUNTED EA 1
B-15 L-125 VEGETATIVE BARRIER MAT EA 3
2202,3BEM
REG
ISTERED PROFESSIONAL
KADEN J. KINS R1
EXPIRES 6/30/2027
TPES
RE E
ADDENDUM NO. 2 4/16/2026 KJK1
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
100236PE
AutoCAD SHX Text
DIGITALLY SIGNED
E
EE
SS
SD
SD
HANGAR
HANGAR
NEW RUNWAY REFLECTORS
REPLACED PRIMARY WINDCONE AND
SEGMENTED CIRCLE REPLACEMENT
AIRPORT PROPERTY LINE
RUNWAY 9-27 REHABILITATION
NEW WINDCONE
NEW TURN AROUND AND PARKING PAD
NEW AIRCRAFT
TURNAROUND AND
PARKING PAD
NEW DISPLACED THRESHOLD
EXISTING VEGETATION
LINE AS OF FALL 2025
RUNWAY 9-27
CONTRACTOR'S
STAGING AREA
NEW CONNECTOR
TAXIWAY, ADDITIVE B
RELOCATE CONNECTOR TAXIWAY
NEW WINDCONE
CONTRACTOR'S MATERIAL
STOCKPILE AREA
APRON PAVEMENT
RECONSTRUCTION,
ADDITIVE A
RUNWAY CLOSURE CROSS NOTES:
1. TWO PORTABLE TRAILER MOUNTED, LIGHTED CLOSURE
CROSSES WILL BE PROVIDED BY THE OWNER WHEN
CLOSURE OF RUNWAY 9-27 IS REQUIRED. THE OWNER
WILL TRANSPORT CROSSES TO AND FROM PROJECT. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR PLACEMENT,
FUELING, REPAIRING, SERVICING AND MAINTAINING THE
CONDITION OF THE CROSSES PER MANUFACTURER
RECOMMENDATIONS.
2. PLACE LIGHTED CLOSURE CROSSES AS INDICATED ON
THE PLANS ANYTIME RUNWAY 9-27 IS CLOSED. THE
ENGINEER WILL DESIGNATE ALTERNATE LOCATIONS FOR
PLACEMENT OF THE CLOSURE CROSSES WHEN
PLACEMENT CONFLICTS WITH CONSTRUCTION ACTIVITIES.
3. ANY DAMAGE TO THE CLOSURE CROSSES CAUSED
DURING THE PROJECT DUE TO NEGLIGENCE OF THE
CONTRACTOR SHALL BE REPAIRED TO THE SATISFACTION
OF THE OWNER AT THE CONTRACTOR'S EXPENSE.
RUNWAY
CL
RUNWAY CLOSURE CROSS DETAIL 1
7NTS
1. CONSTRUCTION OPERATIONS MAY BEGIN AFTER MAY 1ST. CONTRACTOR SHALL HAVE
UP TO 61 CALENDAR DAYS TO COMPLETE WORK, NOT INCLUDING PERMANENT
SEEDING AND THE SECOND COAT OF PAVEMENT MARKING. NO ADDITIONAL
CALENDAR DAYS FOR ADDITIVE WORK WILL BE AWARDED. THE BASE BID PORTION OF
THE PROJECT MUST BE DEEMED SUBSTANTIALLY COMPLETE BY JULY 31ST.
2. IF IMPROVEMENTS RELATED TO THE PRIMARY AND SUPPLEMENTAL WIND CONES
HAVE LEAD TIMES GREATER THAN 6 WEEKS, THESE IMPROVEMENTS MAY BE
COMPLETED DURING PHASE 2. EXCEPT FOR LONG LEAD TIME ITEMS, ALL WORK
ASSOCIATED WITH NEW WIND CONES, INCLUDING TRENCHING, CONDUIT
INSTALLATION, AND CONCRETE FOUNDATIONS SHALL BE COMPLETED DURING PHASE
1 UNLESS OTHERWISE REQUIRED OR DIRECTED.
3. OCTOBER 1ST IS THE ANTICIPATED DATE FOR THE TERMINATION OF FIREFIGHTING
OPERATIONS AT THE AIRPORT. SECOND COAT OF PAVEMENT MARKING AND
PERMANENT SEEDING IN THE FALL OF 2026 SHALL NOT BE ALLOWED UNTIL
FIREFIGHTING OPERATIONS HAVE CEASED AND MOBILIZED OFFSITE. THE OWNER
SHALL HAVE FINAL SAY ON THE START OF FALL 2026 CONSTRUCTION WORK.
4. BY JULY 31ST, ALL EQUIPMENT, TEMPORARY FACILITIES, STOCKPILES, AND ALL
OTHER MATERIALS ASSOCIATED WITH CONSTRUCTION SHALL BE REMOVED FROM
AIRPORT PROPERTY UNLESS OTHERWISE APPROVED BY THE OWNER.
5. AIRPORT AND GOVERNMENT AGENCIES MAY REQUIRE THE EXCLUSIVE USE OF THE
AIRPORT DURING FOREST FIRE SEASON. WHILE FIRE SEASON IS ANTICIPATED TO
OCCUR BETWEEN JULY 31ST AND OCTOBER 1ST, THESE DATES ARE VARIABLE YEAR
TO YEAR AND ARE SUBJECT TO DETERMINATION BY THE OWNER. THE AIRPORT AND
OTHER AGENCIES SHALL RECEIVE PRIORITY WHEN COORDINATING THE SCHEDULE
FOR RUNWAY, TAXIWAY, AND APRON CLOSURES.
PORTABLE LIGHTED
CROSS, SEE NOTES
PHASING NOTES
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
4/
/ 2
- 3
:5 4p m
KK
in se r -
P :\O
\o da
-o ak rid ge
2-rw y re co ns tr\
C
AD
\D W
G \S he et s\ O
AK
2- C
SP
P.
dw g
THIS DRAWING IS INTENDED
TO BE PRINTED IN COLOR.
PRINTING IN BLACK AND
WHITE MAY REDUCE
READABILITY AND ALTER
ENTITY DEFINITION OR
REPRESENTATION.
PRINT IN COLOR
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
OAKRIDGE STATE AIRPORT
RUNWAY 9-27 PAVEMENT RECONSTRUCTION AND
ASSOCIATED IMPROVEMENTS
CONSTRUCTION SAFETY AND
PHASING PLAN
PRECISION APPROACH ENGINEERING, INC.
MAR 2026
LMT
KWK/JAW
KJK
· MOBILIZATION
· EROSION CONTROL
· CLEARING AND GRUBBING
· DEMOLITION
· PAVEMENT REMOVAL
· EXCAVATION
· AGGREGATE PLACEMENT
· ASPHALT PAVING
· CONCRETE PLACEMENT
· PAVEMENT MARKING
· DRAINAGE/CONDUIT INSTALLATION
· WIND CONE IMPROVEMENTS
· TEMPORARY SITE STABILIZATION
· PERMANENT SEEDING AND SITE
STABILIZATION
WORK ELEMENTS
CONSTRUCTION PHASING SCHEDULE
APRIL/MAY 2026
PHASE 2
(5 CONSECUTIVE DAYS)
PHASE 0
ANTICIPATED
PROJECT
AWARD
BY JUNE 1, 2026
ANTICIPATED
NOTICE TO
PROCEED
PRIOR TO
JULY 31ST *
PROJECT
SUBSTANTIAL
COMPLETION
ANTICIPATED
OCT 1ST *
PHASE 1
(8 WEEKS ONSITE)
OCT 31, 2026
PROJECT FINAL
COMPLETION
SUBMITTAL
PERIOD
ONSITE CONSTRUCTION
ACTIVITIES
NO CONSTRUCTION
ACTIVITIES**
ONSITE CONSTRUCTION
ACTIVITIES - SECOND COAT
OF PAVEMENT MARKING
AND PERMANENT SEEDING
* SEE PHASING NOTES
** UNLESS OTHERWISE APPROVED BY OWNER
SCALE IN FEET
150 300
NORTH
RUNWAY CLOSURE CROSS, SEE DETAIL
CONSTRUCTION HAUL ROUTE
NO CONSTRUCTION TRAFFIC
LEGEND
2202,3BEM
REG
ISTERED PROFESSIONAL
KADEN J. KINS R1
EXPIRES 6/30/2027
TPES
RE E
ADDENDUM NO. 2 4/16/2026 KJK1
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
100236PE
WC
PB-4PB-3PB-2PB-1
GB-1
IF THE PROPOSED NEW WIND CONES ARE UNABLE TO BE INSTALLED AND
ACCEPTED PRIOR TO SUBSTANTIAL COMPLETION, REMOVE THE EXISTING
WIND CONE AND SEGMENTED CIRCLE DURING PHASE 2 TO MAINTAIN AN
OPERATIONAL WIND CONE DURING FIREFIGHTING OPERATIONS
E
EE
SS
SD
SD
ADDITIVE A APRON DEMOLITION
PLAN, SEE SHEET 12
CB
PB-10
PB-5PB-9
PB-8
PB-7 GB-2PB-6
M
AT
C H
L
IN
E
- T
H
IS
S H
EE
T
0 50 100 200
SCALE IN FEET
NORTH
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
4/
/ 2
- 3
:5 4p m
KK
in se r -
P :\O
\o da
-o ak rid ge
2-rw y re co ns tr\
C
AD
\D W
G \S he et s\ O
AK
2- D
EM
O
.d w g
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
OAKRIDGE STATE AIRPORT
RUNWAY 9-27 PAVEMENT RECONSTRUCTION AND
ASSOCIATED IMPROVEMENTS
DEMOLITION PLAN
PRECISION APPROACH ENGINEERING, INC.
MAR 2026
LMT
KWK/JAW
KJK
M
AT
C H
L
IN
E
- T
H
IS
S H
EE
T
2202,3BEM
REG
ISTERED PROFESSIONAL
KADEN J. KINS R1
EXPIRES 6/30/2027
TPES
RE E
1. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED
PRIOR TO DEMOLITION ACTIVITIES, SEE EROSION AND SEDIMENT
CONTROL PLANS.
2. EXISTING PAVEMENT MARKINGS ARE TO BE REMOVED DURING
PAVEMENT REMOVAL OPERATIONS UNLESS OTHERWISE NOTED, NO
SEPARATE PAYMENT.
3. DEMOLITION OF THE EXISTING WIND CONE SHALL INCLUDE THE
EXISTING FOUNDATION AND THE REMOVAL AND DISPOSAL OF EXISTING
TIRES ACTING AS SEGMENTED CIRCLE MARKING SYSTEM.
4. IF ADDITIVE A IS NOT SELECTED FOR CONSTRUCTION, APPLY TWO
COATS OF BLACK PAINT TO EXISTING 6-INCH YELLOW TAXIWAY
CENTERLINE STRIPE ON EXISTING APRON TO REMAIN, PAID UNDER THE
LONGITUDINAL MARKINGS BID ITEM.
5. LIMITS OF PAVEMENT REMOVAL ARE APPROXIMATE. THE CONTRACTOR
SHALL LAYOUT LIMITS WITH SURVEY AND FIELD VERIFY WITH THE
ENGINEER PRIOR TO REMOVAL, SEE SHEETS FOR ADDITIONAL
INFORMATION.
6. ALL ASPHALT PAVEMENT TO BE REMOVED AND NOT INCORPORATED
INTO THE PAVEMENT SECTION SHALL BE REMOVED BY GRINDING. ALL
GRANULAR MATERIAL GENERATED DURING THIS PAVEMENT REMOVAL
SHALL BE SPREAD AND COMPACTED AROUND THE PROJECT SITE ON
EXISTING ROADWAYS OR AS DIRECTED BY THE OWNER, OR
STOCKPILED. REMOVAL, SPREADING, AND COMPACTING SHALL BE PAID
UNDER THE COLD PLANE PAVEMENT REMOVAL, FULL DEPTH BID ITEM.
7. ALL ELEMENTS OF DEMOLITION, UNLESS OTHERWISE NOTED, WILL BE
DISPOSED OF OFFSITE AND PAID FOR UNDER THE REMOVAL OF
STRUCTURES AND OBSTRUCTIONS BID ITEM.
8. ANY ITEMS ENCOUNTERED DURING CONSTRUCTION REQUIRING
REMOVAL NOT SHOWN ON THE DEMOLITION PLAN SHALL BE
CONSIDERED INCIDENTAL TO THE REMOVAL OF STRUCTURES AND
OBSTRUCTIONS BID ITEM.
9. ALL KNOWN UTILITIES LOCATIONS SHOWN ARE APPROXIMATE. IT SHALL
BE THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY ALL UTILITY
COMPANIES/PROVIDERS AND AIRPORT OPERATIONS TO COORDINATE
UTILITY LOCATES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
LOCATING AND PROTECTING ALL UTILITIES AND REPLACING UTILITIES
DAMAGED DURING CONSTRUCTION
NOTES
LEGEND
FULL DEPTH ASPHALT PAVEMENT REMOVAL, SEE
SPECIFICATION 00620
PAVEMENT PULVERIZATION AND RECLAMATION,
SEE DETAIL
CLEARING AND GRUBBING TO CLEAR AREA, CONSIDERED
INCIDENTAL
PIPE REMOVAL, SEE DETAIL
STRUCTURE TO BE REMOVED
WC - WIND CONE AND SEGMENTED CIRCLE
CB - CATCH BASIN
TIEDOWN ANCHOR TO BE REMOVED, SEE ADDITIVE A ONLY,
SEE DETAIL
APPROXIMATE BORING LOCATION, SEE GEOTECHNICAL LOGS
PROTECT DURING CONSTRUCTION1
(ID)
ADDENDUM NO. 2 4/16/2026 KJK1
AutoCAD SHX Text
SIGN WDN POST DOUBLE "AVIATION HEIGHTS"
AutoCAD SHX Text
SIGN ALUM PADDLE "END COUNTY MAINTENANCE
AutoCAD SHX Text
MAILBOX 46979, WOODEN POST
AutoCAD SHX Text
MAILBOX 76676, METAL POST
AutoCAD SHX Text
SIGN ALUM HWY DELINEATOR
AutoCAD SHX Text
MAILBOX 47022, WOODEN POST
AutoCAD SHX Text
SIGN ALUM W TEE POST FIRE DEPT ADDRESS 47022
AutoCAD SHX Text
MAILBOX 47070, WOODEN POST
AutoCAD SHX Text
MAILBOX 47100, WOODEN POST
AutoCAD SHX Text
MAILBOX 47116, WOODEN POST
AutoCAD SHX Text
SIGN ALUM W TEE POST FIRE DEPT ADDRESS 47116
AutoCAD SHX Text
DWY
AutoCAD SHX Text
DWY
AutoCAD SHX Text
DWY
AutoCAD SHX Text
DWY
AutoCAD SHX Text
DWY
AutoCAD SHX Text
DWY
AutoCAD SHX Text
DWY
AutoCAD SHX Text
DWY
AutoCAD SHX Text
GRAVEL ROADWAY
AutoCAD SHX Text
GRAVEL ROADWAY
AutoCAD SHX Text
SD CMP CULVERT 12IN IE IN W 1385.06 IE OUT E 1384.35
AutoCAD SHX Text
SD PLASTIC CULVERT 12IN IE IN E 1390.70 IE OUT W 1389.84
AutoCAD SHX Text
GRAVEL ROADWAY
AutoCAD SHX Text
AC ROADWAY
AutoCAD SHX Text
AC ROADWAY
AutoCAD SHX Text
COUNTY ROAD
AutoCAD SHX Text
SIGN ALUM W METAL POST "DEAD END NO TURN AROUND"
AutoCAD SHX Text
SIGN ALUM W METAL POST "AIRPORT >"
AutoCAD SHX Text
SIGN WOODEN POSTS X 2 "DUKES STORAGE"
AutoCAD SHX Text
SIGN ALUM W METAL POST 30"X12" "HAVE YOU CLOSED YOUR FLIGHT PLAN?"
AutoCAD SHX Text
MAIL BOX X 3 W METAL POST "ADDRESSES 47393 47371 47379"
AutoCAD SHX Text
SIGN FIBERGLASS RISER UNDERGROUND POWER - LANE ELECTRIC
AutoCAD SHX Text
GRAVEL ROAD - AIRPORT ACCESS
AutoCAD SHX Text
PAVED DWY
AutoCAD SHX Text
GRAVEL DWY - DUKES STORAGE
AutoCAD SHX Text
SIGN FIBERGLASS RISER UNDERGROUND POWER - LANE ELECTRIC
AutoCAD SHX Text
GRAVEL DWY
AutoCAD SHX Text
DWY
AutoCAD SHX Text
DWY
AutoCAD SHX Text
DWY
AutoCAD SHX Text
DWY
AutoCAD SHX Text
SD CMP CULVERT 15IN IE IN E 1384.26 IE OUT W 1383.30
AutoCAD SHX Text
SD CMP CULVERT 18IN END CRUSHED IE IN NE 1366.52 IE OUT SW 1365.53
AutoCAD SHX Text
SD PLASTIC CULVERT 18IN IE IN NW 1358.32 IE OUT SE 1355.69
AutoCAD SHX Text
SD CMP CULVERT 12IN BURIED BROKEN IE IN W 1375.64 IE OUT E 1375.02
AutoCAD SHX Text
SD CMP CULVERT 18IN IE W 1374.71 E END SEARCHED FOR BUT NOT FOUND
AutoCAD SHX Text
POLE METAL 8 IN RADIO TOWER
AutoCAD SHX Text
AIRCRAFT TIE DOWN 6IN DIA CONC W METAL LOOP TYP
AutoCAD SHX Text
AIRCRAFT TIE DOWN 6IN DIA CONC W METAL LOOP TYP
AutoCAD SHX Text
AIRCRAFT TIE DOWN 6IN DIA CONC W METAL LOOP TYP
AutoCAD SHX Text
AIRCRAFT TIE DOWN 6IN DIA CONC W METAL LOOP TYP
AutoCAD SHX Text
PWR BOX 6X8 ON WDN POST
AutoCAD SHX Text
TEL RISER - POOR COND
AutoCAD SHX Text
CTRL BOX IN GROUND PLASTIC 16X10
AutoCAD SHX Text
PWR POLE END LINE MTR BOX ON POLE CONDUIT TO UG PWR
AutoCAD SHX Text
PWR POLE MARKED V10L2R2 NO. A1056032
AutoCAD SHX Text
POWER POLE MARKED V10L2R1 NO. A1056027
AutoCAD SHX Text
PWR POLE
AutoCAD SHX Text
PWR LINE LYING ABOVE GROUND
AutoCAD SHX Text
PWR METER LANE ELECTRIC
AutoCAD SHX Text
PWR POLE NO. A1056286
AutoCAD SHX Text PWR POLE WITH LIGHT MARKED VL1L NO. A1056287 SIGN "HAVE YOU CLOSED YOUR FLIGHT PLAN" SEE PIC FOR ADDIT. INFO.
AutoCAD SHX Text
SHELTER WDN COR POSTS TIN ROOF
AutoCAD SHX Text
KIOSK - AIRPORT INFO SEE PIC
AutoCAD SHX Text
HANGAR - ROLLING DOORS
AutoCAD SHX Text
HANGAR
AutoCAD SHX Text
CONC PAD
AutoCAD SHX Text
SD TR DRAIN 5"
AutoCAD SHX Text
CONC RUNNER FOR ROLLING DOOR
AutoCAD SHX Text
WIND SOCK 1.5 IN POLE ATTACHED TO BLD
AutoCAD SHX Text
SIGN PLANK "R-3 AIR SAR"
AutoCAD SHX Text
SIGN PLANK "COUNT ON US"
AutoCAD SHX Text SIGN ON BLD "OAKRIDGE STATE AIRPORT (5SO) ELEVATION 1393 FT MSL LENGTH 3610 FT CTAF 122.90
AutoCAD SHX Text
SECURITY POST CHAINED TO TRASH CAN
AutoCAD SHX Text
SIGN FIBERGLASS RISER FOR UG UTILITY MARKINGS UNREADABLE
AutoCAD SHX Text
RADIO TOWER 22 IN TRIANGULAR FRAME
AutoCAD SHX Text
ROCK WALL
AutoCAD SHX Text
ROCK WALL
AutoCAD SHX Text
ROCK WALL
AutoCAD SHX Text
ROCK WALL
AutoCAD SHX Text
WALKWAY STEPPED RAIL ROAD TIES
AutoCAD SHX Text
ROCK WALL FIRE PIT
AutoCAD SHX Text
HELICOPTER LANDING PAD
AutoCAD SHX Text
HELICOPTER LANDING PAD
AutoCAD SHX Text
GRAVEL PARKING AREA
AutoCAD SHX Text
SD PIPE CMP DAMAGED IE 1374.42
AutoCAD SHX Text
STRIPE 6IN YELLOW UNO
AutoCAD SHX Text
SD CB ROUND RIM 1378.03 6 IN CNC PIPE IE OUT N 1376.03
AutoCAD SHX Text
SS MH PLASTIC 25IN LID RIM 1408.89
AutoCAD SHX Text
SS CO 4IN MTL RISER
AutoCAD SHX Text
WATER HOSE BIB
AutoCAD SHX Text
WATER HOSE BIB
AutoCAD SHX Text
WATER HOSE BIB
AutoCAD SHX Text
GRAVEL ROAD
AutoCAD SHX Text
GRAVEL ROAD
AutoCAD SHX Text
PAVED DWY
AutoCAD SHX Text
AC ROADWAY
AutoCAD SHX Text
AC ROADWAY
AutoCAD SHX Text
WATER HOSE BIB
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
100236PE
6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00
N 766892.08 E 4390180.32
N 766920.27 E 4390022.75
N 766987.55 E 4389792.19
N 767103.56 E 4389822.86
N 767068.56 E 4389951.31
N 767030.99 E 4390077.78
.2
.4
20'
N 766960.03 E 4390033.16
N 767008.38 E 4390045.94
TYP ALL
SIDES
RUNWAY 9-27 CENTERLINE STA 9+80.00
N 767021.266, E 4389899.371
EL 1403.63
RUNWAY 9-27 CENTERLINE STA 11+25.00
N 766984.209, E 4390039.556
EL 1403.27
N 767058.97 E 4389909.34
1403.10
N 766983.56 E 4389889.40
1403.10
N 767034.69 E 4390001.18 1402.86
N 766959.28 E 4389981.25
1402.86
N 767011.68 E 4389935.63
SLOPE VARIES
5%
5%
SLOPE VARIES
5%
5%
5%
SLOPE
VARIES
SLOPE
VARIES
LIMITS OF GRADING, TYP
RUNWAY 9-27 CENTERLINE
SEE NOTE 1
PROPERTY LINE
MATCH EXISTING GROUND, TYP
5%
'SLOPE VARIES
5%
LIMITS OF
GRADING, TYP
EL
EV
AT
IO
N (F
T)
EL
EV
AT
IO
N (F
T)
STATION
RUNWAY 9-27 CENTERLINE PROFILE
7+60 8+00
.6
9+00
.8
.0
.3
.6
10+00
.5
.5
.4
.3
11+00
.2
.1
.0
.8
12+00
.6
.4
.3
.1
13+00
.9
.7
.5
.3
14+00
.1
.9
14+50
-0.25%
8.75%
5.00%
100.00%PV
I 8
+8 5.
PV
I E L
.3
2 PV
I 9 +2
5.
PV
I E
L
.8
2 PV
I 9
+7 9.
PV
I E L
.5
PV
I 9
+8 0.
PV
I E L
.6
8 150.00' VC
PV
C
0+
.0
PV
C E
L
.4
PV
T
+2
1.
PV
T
EL
2.
PV
I E
L
.2
PV
I 1 1+
.0
PAVEMENT REHABILITATION
PAVEMENT SECTION, SEE DETAIL .
EXISTING GROUND
FINISH GRADE
MATCH EXISTING GROUND
M
AT
C H
L
IN
E
- S
EE
S
H
EE
T
0 20 40 80
SCALE IN FEET
NORTH
RUNWAY TYPICAL SECTION,
SEE DETAIL .
FULL DEPTH PAVEMENT SECTION,
SEE DETAIL .2
SHOULDER GRADING
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
4/
/ 2
- 3
:5 4p m
KK
in se r -
P :\O
\o da
-o ak rid ge
2-rw y re co ns tr\
C
AD
\D W
G \S he et s\ O
AK
2-
PP
.d w g
THIS DRAWING IS INTENDED
TO BE PRINTED IN COLOR.
PRINTING IN BLACK AND
WHITE MAY REDUCE
READABILITY AND ALTER
ENTITY DEFINITION OR
REPRESENTATION.
PRINT IN COLOR
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
OAKRIDGE STATE AIRPORT
RUNWAY 9-27 PAVEMENT RECONSTRUCTION AND
ASSOCIATED IMPROVEMENTS
RUNWAY PLAN AND PROFILE - STA
8+00 TO 14+50
PRECISION APPROACH ENGINEERING, INC.
MAR 2026
LMT
KWK/JAW
KJK
FULL DEPTH CONCRETE PAVEMENT
SECTION, SEE DETAIL 1
FULL DEPTH PAVEMENT SECTION,
SEE DETAIL .2
2202,3BEM
REG
ISTERED PROFESSIONAL
KADEN J. KINS R1
EXPIRES 6/30/2027
TPES
RE E
1. VEGETATION LINES WERE SURVEYED AS PART OF THE TOPOGRAPHIC
SURVEY FOR DESIGN, DATED SUMMER 2025. LIMITS AS SHOWN DO NOT
REFLECT ANY CHANGES SINCE THE SURVEY WAS COMPLETED. REMOVE
OF ANY VEGETATION REQUIRED TO CONSTRUCT PROJECT
IMPROVEMENTS AS INDICATED SHALL BE CONSIDERED INCIDENTAL.
2. CONSTRUCT A 1.5" DROP AT THE EDGE OF PAVEMENT TO PREVENT
MIGRATION OF SEDIMENT ONTO PAVED AREAS, TYPICAL.
3. IF ADDITIVE B IS NOT SELECTED FOR CONSTRUCTION, CONSTRUCT
SHOULDER GRADING TO BE SIMILAR TO SURROUNDING GRADING, VERIFY
WITH THE ENGINEER PRIOR TO CONSTRUCTION.
4. PAVEMENT SECTION CONSTRUCTION IN THIS AREA SHALL ONLY BE
CONSTRUCTED IF ADDITIVE B IS SELECTED FOR CONSTRUCTION.
5. IF ADDITIVE B IS THE ONLY ADDITIVE AWARDED FOR CONSTRUCTION,
CONNECT NEW CONNECTOR TAXIWAY MATCH EXISTING APRON, VERIFY
WITH ENGINEER.
6. REMOVE MINIMUM 4" OF TOPSOIL IN ALL GRADING AREAS. TOPSOIL SHALL
BE STOCKPILED ONSITE AND APPLIED TO SURFACE DURING FINISH
GRADING, TYP. EXCAVATION SHALL BE PAID UNDER THE GENERAL
EXCAVATION BID ITEM. PLACEMENT, GRADING, AND COMPACTING SHALL
BE CONSIDERED INCIDENTAL.
7. THE CONTRACTOR SHALL SEPARATE ALL EXCAVATED AGGREGATE AND
ANGULAR GRANULAR MATERIAL FROM OTHER EXCAVATED MATERIAL AND
SHALL STOCKPILE OR PLACE AND COMPACT AROUND THE PROJECT AS
INDICATED ON PLANS OR AS DIRECTED BY THE ENGINEER. MATERIAL
SHALL PRIMARILY BE PLACED ALONG PAVEMENT EDGES AND USED TO
CONSTRUCT ACCESS ROADS.
NOTES
LEGEND
NEW FULL DEPTH PAVEMENT SECTION, SEE DETAIL
NEW FULL DEPTH PAVEMENT AREA IF ADDITIVE A IS SELECTED,
SEE DETAIL
NEW FULL DEPTH PAVEMENT AREA IF ADDITIVE B IS SELECTED,
SEE DETAIL
FULL DEPTH CONCRETE PAVEMENT SECTION, SEE DETAIL
PAVEMENT REHABILITATION PAVEMENT SECTION VIA
PULVERIZATION, SEE DETAIL
AGGREGATE SHOULDERS, 6 INCH THICK
INSTALL 12" HDPE PIPE, SEE ODOT STD DETAIL RD 300, BACKFILL
CLASS A OR B
INSTALL 6" C900 PVC PIPE, SEE ODOT STD DETAIL RD300, SAND
BEDDING, BACKFILL CLASS B, BASE BID SCHEDULE UNLESS
OTHERWISE NOTED
FULL DEPTH PAVEMENT CONNECTION, SEE DETAIL
CONCRETE HELICOPTER PAD, BASE BID UNLESS OTHERWISE
NOTED, SEE DETAIL
CONCRETE RUNWAY END MONUMENT, SEE DETAIL
FULL DEPTH ASPHALT PAVEMENT SECTION TO CONCRETE
PAVEMENT CONNECTION, SEE DETAIL
INSTALL SPARE CONDUIT CROSSING, BASE BID SCHEDULE
UNLESS OTHERWISE NOTED, SEE DETAIL
INSTALL ODOT TYPE G-2 CATCH BASIN WITH 6 INCH SUMP,
SEE DETAIL
INSTALL PAVED SLOPED END, SEE DETAIL , BID SCHEDULE
AS NOTED
9 2
ADDENDUM NO. 2 4/16/2026 KJK1
AutoCAD SHX Text
GRAVEL ROADWAY
AutoCAD SHX Text
GRAVEL ROADWAY
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
100236PE
15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00
N 766908.38 E 4390717.70
N 766777.35 E 4391045.08
N 766777.33 E 4390587.38
+0
0.
A
N 766800.93 E 4390518.82
N 766803.04 E 4391155.31
SLOPE VARIES
5%
5%
SLOPE VARIES
SLOPE VARIES
5%
5%
SLOPE VARIES
5%
SLOPE
VARIES
5'
' 30
'30
LIMITS OF GRADING, TYP
RUNWAY 9-27 CENTERLINE
MATCH EXISTING GROUND, TYP
PROPERTY LINE
5%
INSTALL L-806 SUPPLEMENTAL
WIND CONE, SEE DETAIL .
' 10
5% 5%
MATCH EXISTING GROUND, TYP
LIMITS OF GRADING, TYP
N 766777.14
E 4391096.75 1392.011
EL
EV
AT
IO
N (F
T)
EL
EV
AT
IO
N (F
T)
STATION
RUNWAY 9-27 CENTERLINE PROFILE
.9
14+50
.8
.6
15+00
.4
.2
.0
.8
16+00
.6
.4
.3
.1
17+00
.9
.7
.5
.3
18+00
.1
.9
.8
.6
19+00
.4
.2
.0
.8
20+00
.6
.4
.2
.9
21+00
.6
.4
.0
.7
22+00
.4
.0
.6
.2
23+00
-0.75%
300.00' VC
PV
C
0+
.0
PV
C E
L
.8
PV
T
+0
0.
PV
T
EL
3.
PV
I E
L
.7
PV
I 2 1+
.0
EXISTING GROUND
FINISH GRADE
PAVEMENT REHABILITATION
PAVEMENT SECTION, SEE DETAIL .
M
AT
C H
L
IN
E
- S
EE
S
H
EE
T
0 20 40 80
SCALE IN FEET
NORTH
RUNWAY TYPICAL SECTION,
SEE DETAIL .1
1. VEGETATION LINES WERE SURVEYED AS PART OF THE TOPOGRAPHIC
SURVEY FOR DESIGN, DATED SUMMER 2025. LIMITS AS SHOWN DO NOT
REFLECT ANY CHANGES SINCE THE SURVEY WAS COMPLETED. REMOVE
OF ANY VEGETATION REQUIRED TO CONSTRUCT PROJECT
IMPROVEMENTS AS INDICATED SHALL BE CONSIDERED INCIDENTAL.
2. CONSTRUCT A 1.5" DROP AT THE EDGE OF PAVEMENT TO PREVENT
MIGRATION OF SEDIMENT ONTO PAVED AREAS, TYPICAL.
3. IF ADDITIVE B IS NOT SELECTED FOR CONSTRUCTION, CONSTRUCT
SHOULDER GRADING TO BE SIMILAR TO SURROUNDING GRADING, VERIFY
WITH THE ENGINEER PRIOR TO CONSTRUCTION.
4. PAVEMENT SECTION CONSTRUCTION IN THIS AREA SHALL ONLY BE
CONSTRUCTED IF ADDITIVE B IS SELECTED FOR CONSTRUCTION.
5. IF ADDITIVE B IS THE ONLY ADDITIVE AWARDED FOR CONSTRUCTION,
CONNECT NEW CONNECTOR TAXIWAY MATCH EXISTING APRON, VERIFY
WITH ENGINEER.
6. REMOVE MINIMUM 4" OF TOPSOIL IN ALL GRADING AREAS. TOPSOIL SHALL
BE STOCKPILED ONSITE AND APPLIED TO SURFACE DURING FINISH
GRADING, TYP. EXCAVATION SHALL BE PAID UNDER THE GENERAL
EXCAVATION BID ITEM. PLACEMENT, GRADING, AND COMPACTING SHALL
BE CONSIDERED INCIDENTAL.
7. THE CONTRACTOR SHALL SEPARATE ALL EXCAVATED AGGREGATE AND
ANGULAR GRANULAR MATERIAL FROM OTHER EXCAVATED MATERIAL AND
SHALL STOCKPILE OR PLACE AND COMPACT AROUND THE PROJECT AS
INDICATED ON PLANS OR AS DIRECTED BY THE ENGINEER. MATERIAL
SHALL PRIMARILY BE PLACED ALONG PAVEMENT EDGES AND USED TO
CONSTRUCT ACCESS ROADS.
NOTES
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
4/
/ 2
- 3
:5 5p m
KK
in se r -
P :\O
\o da
-o ak rid ge
2-rw y re co ns tr\
C
AD
\D W
G \S he et s\ O
AK
2-
PP
.d w g
THIS DRAWING IS INTENDED
TO BE PRINTED IN COLOR.
PRINTING IN BLACK AND
WHITE MAY REDUCE
READABILITY AND ALTER
ENTITY DEFINITION OR
REPRESENTATION.
PRINT IN COLOR
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
OAKRIDGE STATE AIRPORT
RUNWAY 9-27 PAVEMENT RECONSTRUCTION AND
ASSOCIATED IMPROVEMENTS
RUNWAY PLAN AND PROFILE - STA
14+50 TO 23+00
PRECISION APPROACH ENGINEERING, INC.
MAR 2026
LMT
KWK/JAW
KJK
M
AT
C H
L
IN
E
- S
EE
S
H
EE
T
2202,3BEM
REG
ISTERED PROFESSIONAL
KADEN J. KINS R1
EXPIRES 6/30/2027
TPES
RE E
LEGEND
NEW FULL DEPTH PAVEMENT SECTION, SEE DETAIL
NEW FULL DEPTH PAVEMENT AREA IF ADDITIVE A IS SELECTED,
SEE DETAIL
NEW FULL DEPTH PAVEMENT AREA IF ADDITIVE B IS SELECTED,
SEE DETAIL
FULL DEPTH CONCRETE PAVEMENT SECTION, SEE DETAIL
PAVEMENT REHABILITATION PAVEMENT SECTION VIA
PULVERIZATION, SEE DETAIL
AGGREGATE SHOULDERS, 6 INCH THICK
INSTALL 12" HDPE PIPE, SEE ODOT STD DETAIL RD 300, BACKFILL
CLASS A OR B
INSTALL 6" C900 PVC PIPE, SEE ODOT STD DETAIL RD300, SAND
BEDDING, BACKFILL CLASS B, BASE BID SCHEDULE UNLESS
OTHERWISE NOTED
FULL DEPTH PAVEMENT CONNECTION, SEE DETAIL
CONCRETE HELICOPTER PAD, BASE BID UNLESS OTHERWISE
NOTED, SEE DETAIL
CONCRETE RUNWAY END MONUMENT, SEE DETAIL
FULL DEPTH ASPHALT PAVEMENT SECTION TO CONCRETE
PAVEMENT CONNECTION, SEE DETAIL
INSTALL SPARE CONDUIT CROSSING, BASE BID SCHEDULE
UNLESS OTHERWISE NOTED, SEE DETAIL
INSTALL ODOT TYPE G-2 CATCH BASIN WITH 6 INCH SUMP,
SEE DETAIL
INSTALL PAVED SLOPED END, SEE DETAIL , BID SCHEDULE
AS NOTED
9 2
ADDENDUM NO. 2 4/16/2026 KJK1
AutoCAD SHX Text
DWY
AutoCAD SHX Text
DWY
AutoCAD SHX Text
DWY
AutoCAD SHX Text
DWY
AutoCAD SHX Text
GRAVEL ROADWAY
AutoCAD SHX Text
AC ROADWAY
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
100236PE
EL
EV
AT
IO
N (F
T)
EL
EV
AT
IO
N (F
T)
STATION
RUNWAY 9-27 CENTERLINE PROFILE
.2
23+00
.8
.3
.9
.5
24+00
.1
.7
.3
.8
25+00
.4
.0
.6
.2
26+00
.7
.3
.9
.5
27+00
.1
.6
.2
.8
28+00
.4
.0
.6
.2
29+00
.8
.4
.1
.8
30+00
.5
.2
.0
.7
31+00
.5
.3
31+50
-1.68%
300.00' VC
PV
C
8+
.0
PV
C E
L
.0
PV
T
+5
0.
PV
T
EL
0.
PV
I E
L
.5
PV
I 3 0+
.0
EXISTING GROUND
FINISH GRADE
PAVEMENT REHABILITATION
PAVEMENT SECTION, SEE DETAIL .
23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00
N 766590.35 E 4391627.29
N 766557.47 E 4391751.68
N 766777.60 E 4391603.70
N 766595.66 E 4391695.24
+2
5.
B 25 N 766400.52
E 4391954.10
N 766421.45 E 4391933.63
.8
N 766632.28 E 4391683.89
1383.57
N 766621.88 E 4391723.20 1382.89
TYP ALL
SIDES
5%
5% 5%
5% 5%
VARIES SLOPE VARIES
SLOPE
VARIES
SLOPE
VARIES
SLOPE
VARIES5'
5' 5'
5' 35
RUNWAY 9-27 CENTERLINE
LIMITS OF GRADING, TYP
LIMITS OF GRADING, TYP
PRIMARY WIND CONE AND SEGMENTED
CIRCLE MARKING SYSTEM TO BE
REPLACED, SEE DETAIL
MATCH EXISTING GROUND, TYP
5% 5%
5%
5%
MATCH EXISTING GROUND, TYP
5%
SLOPE
VARIES
5%5%
N 766636.58 E 4391628.48
1382.95
N 766646.78 E 4391687.72
1382.71
N 766636.39 E 4391727.03 1382.03
N 766598.24 E 4391773.50 1380.47
FULL DEPTH PAVEMENT
REHABILITATION, SIMILAR TO
DETAIL .
0 20 40 80
SCALE IN FEET
NORTH
RUNWAY TYPICAL SECTION,
SEE DETAIL .1
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
4/
/ 2
- 3
:5 5p m
KK
in se r -
P :\O
\o da
-o ak rid ge
2-rw y re co ns tr\
C
AD
\D W
G \S he et s\ O
AK
2-
PP
.d w g
THIS DRAWING IS INTENDED
TO BE PRINTED IN COLOR.
PRINTING IN BLACK AND
WHITE MAY REDUCE
READABILITY AND ALTER
ENTITY DEFINITION OR
REPRESENTATION.
PRINT IN COLOR
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
OAKRIDGE STATE AIRPORT
RUNWAY 9-27 PAVEMENT RECONSTRUCTION AND
ASSOCIATED IMPROVEMENTS
RUNWAY PLAN AND PROFILE - STA
23+00 TO 31+50
PRECISION APPROACH ENGINEERING, INC.
MAR 2026
LMT
KWK/JAW
KJK
M
AT
C H
L
IN
E
- S
EE
S
H
EE
T
M
AT
C H
L
IN
E
- S
EE
S
H
EE
T
1. VEGETATION LINES WERE SURVEYED AS PART OF THE TOPOGRAPHIC
SURVEY FOR DESIGN, DATED SUMMER 2025. LIMITS AS SHOWN DO NOT
REFLECT ANY CHANGES SINCE THE SURVEY WAS COMPLETED. REMOVE
OF ANY VEGETATION REQUIRED TO CONSTRUCT PROJECT
IMPROVEMENTS AS INDICATED SHALL BE CONSIDERED INCIDENTAL.
2. CONSTRUCT A 1.5" DROP AT THE EDGE OF PAVEMENT TO PREVENT
MIGRATION OF SEDIMENT ONTO PAVED AREAS, TYPICAL.
3. IF ADDITIVE B IS NOT SELECTED FOR CONSTRUCTION, CONSTRUCT
SHOULDER GRADING TO BE SIMILAR TO SURROUNDING GRADING, VERIFY
WITH THE ENGINEER PRIOR TO CONSTRUCTION.
4. PAVEMENT SECTION CONSTRUCTION IN THIS AREA SHALL ONLY BE
CONSTRUCTED IF ADDITIVE B IS SELECTED FOR CONSTRUCTION.
5. IF ADDITIVE B IS THE ONLY ADDITIVE AWARDED FOR CONSTRUCTION,
CONNECT NEW CONNECTOR TAXIWAY MATCH EXISTING APRON, VERIFY
WITH ENGINEER.
6. REMOVE MINIMUM 4" OF TOPSOIL IN ALL GRADING AREAS. TOPSOIL SHALL
BE STOCKPILED ONSITE AND APPLIED TO SURFACE DURING FINISH
GRADING, TYP. EXCAVATION SHALL BE PAID UNDER THE GENERAL
EXCAVATION BID ITEM. PLACEMENT, GRADING, AND COMPACTING SHALL
BE CONSIDERED INCIDENTAL.
7. THE CONTRACTOR SHALL SEPARATE ALL EXCAVATED AGGREGATE AND
ANGULAR GRANULAR MATERIAL FROM OTHER EXCAVATED MATERIAL AND
SHALL STOCKPILE OR PLACE AND COMPACT AROUND THE PROJECT AS
INDICATED ON PLANS OR AS DIRECTED BY THE ENGINEER. MATERIAL
SHALL PRIMARILY BE PLACED ALONG PAVEMENT EDGES AND USED TO
CONSTRUCT ACCESS ROADS.
NOTES
LEGEND
NEW FULL DEPTH PAVEMENT SECTION, SEE DETAIL
NEW FULL DEPTH PAVEMENT AREA IF ADDITIVE A IS SELECTED,
SEE DETAIL
NEW FULL DEPTH PAVEMENT AREA IF ADDITIVE B IS SELECTED,
SEE DETAIL
FULL DEPTH CONCRETE PAVEMENT SECTION, SEE DETAIL
PAVEMENT REHABILITATION PAVEMENT SECTION VIA
PULVERIZATION, SEE DETAIL
AGGREGATE SHOULDERS, 6 INCH THICK
INSTALL 12" HDPE PIPE, SEE ODOT STD DETAIL RD 300, BACKFILL
CLASS A OR B
INSTALL 6" C900 PVC PIPE, SEE ODOT STD DETAIL RD300, SAND
BEDDING, BACKFILL CLASS B, BASE BID SCHEDULE UNLESS
OTHERWISE NOTED
FULL DEPTH PAVEMENT CONNECTION, SEE DETAIL
CONCRETE HELICOPTER PAD, BASE BID UNLESS OTHERWISE
NOTED, SEE DETAIL
CONCRETE RUNWAY END MONUMENT, SEE DETAIL
FULL DEPTH ASPHALT PAVEMENT SECTION TO CONCRETE
PAVEMENT CONNECTION, SEE DETAIL
INSTALL SPARE CONDUIT CROSSING, BASE BID SCHEDULE
UNLESS OTHERWISE NOTED, SEE DETAIL
INSTALL ODOT TYPE G-2 CATCH BASIN WITH 6 INCH SUMP,
SEE DETAIL
INSTALL PAVED SLOPED END, SEE DETAIL , BID SCHEDULE
AS NOTED
9 2
RUNWAY TYPICAL SECTION,
SEE DETAIL .1
2202,3BEM
REG
ISTERED PROFESSIONAL
KADEN J. KINS R1
EXPIRES 6/30/2027
TPES
RE E
20'
ADDENDUM NO. 2 4/16/2026 KJK1
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
100236PE
AT
IO
N (F
T)
EL
EV
AT
IO
N (F
T)
STATION
RUNWAY 9-27 CENTERLINE PROFILE
.3
31+50
.1
.0
32+00
.8
.6
.4
.2
33+00
.0
.8
.7
.5
34+00
.4
.3
.2
.2
35+00
.1
.1
.1
.1
36+00
.1
.2
.2
.2
37+00
.3
.3
.3
.4
38+00
.4
.5
.5
.5
39+00
.6
.6
.6
.7
40+00
-0.75%
300.00' VC
PV
C
3+
.0
PV
C E
L
.0
PV
T
+2
5.
PV
T
EL
8.
PV
I E
L
.9
PV
I 3 4+
.0
-0.75%
EXISTING GROUND
FINISH GRADE
PAVEMENT REHABILITATION
PAVEMENT SECTION, SEE DETAIL . 12" HDPE, SEE PLANS
SD
SD
SD
SD
SD
32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00
N 766223.21 E 4392605.27
N 766280.66 E 4392361.87
INV EL 1371.08
+0
0.
C
N 766349.23 E 4392793.74
N 766381.34 E 4392750.51
N 766234.43 E 4392582.38
N 766242.55 E 4392610.39
LIMITS OF GRADING, TYP
N 766432.12 E 4392401.91
RIM ELEV 1375.39
INV EL 1373.38
5%
5%
SLOPE
VARIES
5%
SLOPE
VARIES
' 35
'20
5' 35
5' 35
RUNWAY 9-27 CENTERLINE
INSTALL L-806 SUPPLEMENTAL
WIND CONE, SEE DETAIL
MATCH EXISTING GROUND, TYP
5% 5%
VERIFY END OF PIPE LOCATION AND INVERT
WITH ENGINEER PRIOR TO CONSTRUCTION
5%
5%
SLOPE VARIES SLOPE VARIES
SLOPE VARIES
5% 5%
5%
0 20 40 80
SCALE IN FEET
NORTH
RUNWAY TYPICAL SECTION,
SEE DETAIL .1
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
4/
/ 2
- 3
:5 5p m
KK
in se r -
P :\O
\o da
-o ak rid ge
2-rw y re co ns tr\
C
AD
\D W
G \S he et s\ O
AK
2-
PP
.d w g
THIS DRAWING IS INTENDED
TO BE PRINTED IN COLOR.
PRINTING IN BLACK AND
WHITE MAY REDUCE
READABILITY AND ALTER
ENTITY DEFINITION OR
REPRESENTATION.
PRINT IN COLOR
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
OAKRIDGE STATE AIRPORT
RUNWAY 9-27 PAVEMENT RECONSTRUCTION AND
ASSOCIATED IMPROVEMENTS
RUNWAY PLAN AND PROFILE - STA
31+50 TO 40+00
PRECISION APPROACH ENGINEERING, INC.
MAR 2026
LMT
KWK/JAW
KJK
M
AT
C H
L
IN
E
- S
EE
S
H
EE
T
M
AT
C H
L
IN
E
- S
EE
S
H
EE
T
1. VEGETATION LINES WERE SURVEYED AS PART OF THE TOPOGRAPHIC
SURVEY FOR DESIGN, DATED SUMMER 2025. LIMITS AS SHOWN DO NOT
REFLECT ANY CHANGES SINCE THE SURVEY WAS COMPLETED. REMOVE
OF ANY VEGETATION REQUIRED TO CONSTRUCT PROJECT
IMPROVEMENTS AS INDICATED SHALL BE CONSIDERED INCIDENTAL.
2. CONSTRUCT A 1.5" DROP AT THE EDGE OF PAVEMENT TO PREVENT
MIGRATION OF SEDIMENT ONTO PAVED AREAS, TYPICAL.
3. IF ADDITIVE B IS NOT SELECTED FOR CONSTRUCTION, CONSTRUCT
SHOULDER GRADING TO BE SIMILAR TO SURROUNDING GRADING, VERIFY
WITH THE ENGINEER PRIOR TO CONSTRUCTION.
4. PAVEMENT SECTION CONSTRUCTION IN THIS AREA SHALL ONLY BE
CONSTRUCTED IF ADDITIVE B IS SELECTED FOR CONSTRUCTION.
5. IF ADDITIVE B IS THE ONLY ADDITIVE AWARDED FOR CONSTRUCTION,
CONNECT NEW CONNECTOR TAXIWAY MATCH EXISTING APRON, VERIFY
WITH ENGINEER.
6. REMOVE MINIMUM 4" OF TOPSOIL IN ALL GRADING AREAS. TOPSOIL SHALL
BE STOCKPILED ONSITE AND APPLIED TO SURFACE DURING FINISH
GRADING, TYP. EXCAVATION SHALL BE PAID UNDER THE GENERAL
EXCAVATION BID ITEM. PLACEMENT, GRADING, AND COMPACTING SHALL
BE CONSIDERED INCIDENTAL.
7. THE CONTRACTOR SHALL SEPARATE ALL EXCAVATED AGGREGATE AND
ANGULAR GRANULAR MATERIAL FROM OTHER EXCAVATED MATERIAL AND
SHALL STOCKPILE OR PLACE AND COMPACT AROUND THE PROJECT AS
INDICATED ON PLANS OR AS DIRECTED BY THE ENGINEER. MATERIAL
SHALL PRIMARILY BE PLACED ALONG PAVEMENT EDGES AND USED TO
CONSTRUCT ACCESS ROADS.
NOTES
LEGEND
NEW FULL DEPTH PAVEMENT SECTION, SEE DETAIL
NEW FULL DEPTH PAVEMENT AREA IF ADDITIVE A IS SELECTED,
SEE DETAIL
NEW FULL DEPTH PAVEMENT AREA IF ADDITIVE B IS SELECTED,
SEE DETAIL
FULL DEPTH CONCRETE PAVEMENT SECTION, SEE DETAIL
PAVEMENT REHABILITATION PAVEMENT SECTION VIA
PULVERIZATION, SEE DETAIL
AGGREGATE SHOULDERS, 6 INCH THICK
INSTALL 12" HDPE PIPE, SEE ODOT STD DETAIL RD 300, BACKFILL
CLASS A OR B
INSTALL 6" C900 PVC PIPE, SEE ODOT STD DETAIL RD300, SAND
BEDDING, BACKFILL CLASS B, BASE BID SCHEDULE UNLESS
OTHERWISE NOTED
FULL DEPTH PAVEMENT CONNECTION, SEE DETAIL
CONCRETE HELICOPTER PAD, BASE BID UNLESS OTHERWISE
NOTED, SEE DETAIL
CONCRETE RUNWAY END MONUMENT, SEE DETAIL
FULL DEPTH ASPHALT PAVEMENT SECTION TO CONCRETE
PAVEMENT CONNECTION, SEE DETAIL
INSTALL SPARE CONDUIT CROSSING, BASE BID SCHEDULE
UNLESS OTHERWISE NOTED, SEE DETAIL
INSTALL ODOT TYPE G-2 CATCH BASIN WITH 6 INCH SUMP,
SEE DETAIL
INSTALL PAVED SLOPED END, SEE DETAIL , BID SCHEDULE
AS NOTED
9 2
2202,3BEM
REG
ISTERED PROFESSIONAL
KADEN J. KINS R1
EXPIRES 6/30/2027
TPES
RE E
ADDENDUM NO. 2 4/16/2026 KJK1
AutoCAD SHX Text
DWY
AutoCAD SHX Text
SD CMP CULVERT 18IN END CRUSHED IE IN NE 1366.52 IE OUT SW 1365.53
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
100236PE
AT
IO
N (F
T)
EL
EV
AT
IO
N (F
T)
STATION
RUNWAY 9-27 CENTERLINE PROFILE
.7
40+00
.7
.8
.8
.8
41+00
.9
.9
.9
.0
42+00
.0
.1
.1
.1
43+00
.2
.2
.2
.3
44+00
.3
.4
.4
.4
45+00
.5
.5
.5
.6
46+00
.6
47+00 48+00 49+00
0.15%
PV
I 4
6+
.0
PV
I E
L
.6
PAVEMENT REHABILITATION
PAVEMENT SECTION, SEE DETAIL .
EXISTING GROUND
FINISH GRADE
MATCH EXISTING GROUND
RUNWAY 2-20 CENTERLINE
SD SD SD SDSD SD SD SD
SD
P
40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00
N 766027.87 E 4393422.49
FL 1377.40
N 765968.61 E 4393468.89
N 766070.54 E 4393495.83
N 766176.39 E 4393584.50
MATCH EXISTING GROUND, TYP
+0
0.
D
RUNWAY 9-27 CENTERLINE STA 43+15.00
N 766168.996, E 4393123.632
EL 1379.20
N 766058.84 E 4393130.36
FL 1375.94
N 766159.38 E 4393580.00
N 766080.76 E 4393457.16
FL 1378.57
RUNWAY 9-27 CENTERLINE STA 46+40.00
N 766085.87, E 4393437.82
N 766146.65 E 4393481.82
FL 1376.95
N 766028.37 E 4393443.31
FL 1377.78
N 766211.85 E 4393536.72
FL 1377.20
N 766114.76 E 4393093.78 N 766068.74
E 4393081.61
N 766135.21 E 4393539.67
5% 5%
5%
5%
5'
R100'
10%
SL
O
PE
VA
RI
ES
SLOPE
VARIES
SLOPE VARIES
PROPERTY LINE
SEE NOTES 3 AND 4 AND SHEET 21
5%
N 766211.85 E 4393536.72
FL 1377.20
20'
SLOPE VARIES
SL
O
PE
VA
RI
ES
LIMITS OF GRADING, TYP
MATCH EXISTING GROUND, TYP
5% 5% 5%
5%
LIMITS OF GRADING, TYP
SLOPE VARIES
MATCH EXISTING GROUND, TYP
LIMITS OF GRADING, TYP
FOR GRADING,
SEE SHEET 21
N 766266.00 E 4393030.33
1376.28
0 20 40 80
SCALE IN FEET
NORTH
RUNWAY TYPICAL SECTION,
SEE DETAIL .1
SHOULDER GRADING
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
4/
/ 2
- 3
:5 5p m
KK
in se r -
P :\O
\o da
-o ak rid ge
2-rw y re co ns tr\
C
AD
\D W
G \S he et s\ O
AK
2-
PP
.d w g
THIS DRAWING IS INTENDED
TO BE PRINTED IN COLOR.
PRINTING IN BLACK AND
WHITE MAY REDUCE
READABILITY AND ALTER
ENTITY DEFINITION OR
REPRESENTATION.
PRINT IN COLOR
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
OAKRIDGE STATE AIRPORT
RUNWAY 9-27 PAVEMENT RECONSTRUCTION AND
ASSOCIATED IMPROVEMENTS
RUNWAY PLAN AND PROFILE - STA
40+00 TO 48+00
PRECISION APPROACH ENGINEERING, INC.
MAR 2026
LMT
KWK/JAW
KJK
M
AT
C H
L
IN
E
- S
EE
S
H
EE
T
FULL DEPTH PAVEMENT SECTION,
SEE DETAIL 2
2202,3BEM
REG
ISTERED PROFESSIONAL
KADEN J. KINS R1
EXPIRES 6/30/2027
TPES
RE E
1. VEGETATION LINES WERE SURVEYED AS PART OF THE TOPOGRAPHIC
SURVEY FOR DESIGN, DATED SUMMER 2025. LIMITS AS SHOWN DO NOT
REFLECT ANY CHANGES SINCE THE SURVEY WAS COMPLETED. REMOVE
OF ANY VEGETATION REQUIRED TO CONSTRUCT PROJECT
IMPROVEMENTS AS INDICATED SHALL BE CONSIDERED INCIDENTAL.
2. CONSTRUCT A 1.5" DROP AT THE EDGE OF PAVEMENT TO PREVENT
MIGRATION OF SEDIMENT ONTO PAVED AREAS, TYPICAL.
3. IF ADDITIVE B IS NOT SELECTED FOR CONSTRUCTION, CONSTRUCT
SHOULDER GRADING TO BE SIMILAR TO SURROUNDING GRADING, VERIFY
WITH THE ENGINEER PRIOR TO CONSTRUCTION.
4. PAVEMENT SECTION CONSTRUCTION IN THIS AREA SHALL ONLY BE
CONSTRUCTED IF ADDITIVE B IS SELECTED FOR CONSTRUCTION.
5. IF ADDITIVE B IS THE ONLY ADDITIVE AWARDED FOR CONSTRUCTION,
CONNECT NEW CONNECTOR TAXIWAY MATCH EXISTING APRON, VERIFY
WITH ENGINEER.
6. REMOVE MINIMUM 4" OF TOPSOIL IN ALL GRADING AREAS. TOPSOIL SHALL
BE STOCKPILED ONSITE AND APPLIED TO SURFACE DURING FINISH
GRADING, TYP. EXCAVATION SHALL BE PAID UNDER THE GENERAL
EXCAVATION BID ITEM. PLACEMENT, GRADING, AND COMPACTING SHALL
BE CONSIDERED INCIDENTAL.
7. THE CONTRACTOR SHALL SEPARATE ALL EXCAVATED AGGREGATE AND
ANGULAR GRANULAR MATERIAL FROM OTHER EXCAVATED MATERIAL AND
SHALL STOCKPILE OR PLACE AND COMPACT AROUND THE PROJECT AS
INDICATED ON PLANS OR AS DIRECTED BY THE ENGINEER. MATERIAL
SHALL PRIMARILY BE PLACED ALONG PAVEMENT EDGES AND USED TO
CONSTRUCT ACCESS ROADS.
NOTES
LEGEND
NEW FULL DEPTH PAVEMENT SECTION, SEE DETAIL
NEW FULL DEPTH PAVEMENT AREA IF ADDITIVE A IS SELECTED,
SEE DETAIL
NEW FULL DEPTH PAVEMENT AREA IF ADDITIVE B IS SELECTED,
SEE DETAIL
FULL DEPTH CONCRETE PAVEMENT SECTION, SEE DETAIL
PAVEMENT REHABILITATION PAVEMENT SECTION VIA
PULVERIZATION, SEE DETAIL
AGGREGATE SHOULDERS, 6 INCH THICK
INSTALL 12" HDPE PIPE, SEE ODOT STD DETAIL RD 300, BACKFILL
CLASS A OR B
INSTALL 6" C900 PVC PIPE, SEE ODOT STD DETAIL RD300, SAND
BEDDING, BACKFILL CLASS B, BASE BID SCHEDULE UNLESS
OTHERWISE NOTED
FULL DEPTH PAVEMENT CONNECTION, SEE DETAIL
CONCRETE HELICOPTER PAD, BASE BID UNLESS OTHERWISE
NOTED, SEE DETAIL
CONCRETE RUNWAY END MONUMENT, SEE DETAIL
FULL DEPTH ASPHALT PAVEMENT SECTION TO CONCRETE
PAVEMENT CONNECTION, SEE DETAIL
INSTALL SPARE CONDUIT CROSSING, BASE BID SCHEDULE
UNLESS OTHERWISE NOTED, SEE DETAIL
INSTALL ODOT TYPE G-2 CATCH BASIN WITH 6 INCH SUMP,
SEE DETAIL
INSTALL PAVED SLOPED END, SEE DETAIL , BID SCHEDULE
AS NOTED
9 2
SEE SHEET 21
ADDENDUM NO. 2 4/16/2026 KJK1
AutoCAD SHX Text
COUNTY ROAD
AutoCAD SHX Text
DWY
AutoCAD SHX Text
AC ROADWAY
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
100236PE
SD
SD SD SD
SD SD SD SD
SDSD SD SD
SD SD SD SD SD
SD SD
P P P P
N 766437.46 E 4393320.79
N 766231.55 E 4393476.33
N 766250.37 E 4393128.59
N 766203.79 E 4393128.69 N 766184.54
E 4393162.39 N 766221.68
E 4393061.02
N 766262.12 E 4393084.12
N 766133.05 E 4393357.20
N 766133.13 E 4393396.01
N 766173.57 E 4393419.11
N 766294.57 E 4393137.46
N 766216.38 E 4393433.24
N 766221.60 E 4393022.21
SEE NOTE 5
ADDITIVE B
134'
CONCRETE HANGAR
TRANSITION, SEE DETAIL 2
AIRCRAFT TIE-DOWN, SEE MARKING
AND RETROREFLECTIVE MARKER PLAN
N 766355.61 E 4393299.16
N 766304.93 E 4393098.25
N 766402.57 E 4393124.06
N 766141.10 E 4393434.324
N 766406.02 E 4393439.71
N 766351.74 E 4393508.11
ADDITIVE B
MATCH EXISTING ASPHALT IF ADDITIVE A
IS NOT SELECTED FOR CONSTRUCTION,
VERIFY WITH ENGINEER
N 766177.95 E 4393363.39
INV IE 1376.76
N 766226.71 E 4393178.96
INV IE 1376.51
ADDITIVE B
5'
5'
5%
5%
5%
SLOPE
VARIES
N 766229.66 E 4393099.33
N 766266.00 E 4393030.33
INV IE 1376.28
TYP ALL
SIDES
5%
5%
NORTH
0 10 20 40
SCALE IN FEET
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
4/
/ 2
- 3
:5 5p m
KK
in se r -
P :\O
\o da
-o ak rid ge
2-rw y re co ns tr\
C
AD
\D W
G \S he et s\ O
AK
2- La yo ut
-A pr on .d w g
THIS DRAWING IS INTENDED
TO BE PRINTED IN COLOR.
PRINTING IN BLACK AND
WHITE MAY REDUCE
READABILITY AND ALTER
ENTITY DEFINITION OR
REPRESENTATION.
PRINT IN COLOR
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
OAKRIDGE STATE AIRPORT
RUNWAY 9-27 PAVEMENT RECONSTRUCTION AND
ASSOCIATED IMPROVEMENTS
TAXIWAY CONNECTOR AND
ADDITIVE A APRON LAYOUT PLAN
PRECISION APPROACH ENGINEERING, INC.
MAR 2026
LMT
KWK/JAW
KJK
2202,3BEM
REG
ISTERED PROFESSIONAL
KADEN J. KINS R1
EXPIRES 6/30/2027
TPES
RE E
10'
LEGEND
NEW FULL DEPTH PAVEMENT SECTION, SEE DETAIL
NEW FULL DEPTH PAVEMENT AREA IF ADDITIVE A IS SELECTED,
SEE DETAIL
NEW FULL DEPTH PAVEMENT AREA IF ADDITIVE B IS SELECTED,
SEE DETAIL
FULL DEPTH CONCRETE PAVEMENT SECTION, SEE DETAIL
PAVEMENT REHABILITATION PAVEMENT SECTION VIA
PULVERIZATION, SEE DETAIL
AGGREGATE SHOULDERS, 6 INCH THICK
INSTALL 12" HDPE PIPE, SEE ODOT STD DETAIL RD 300, BACKFILL
CLASS A OR B
INSTALL 6" C900 PVC PIPE, SEE ODOT STD DETAIL RD300, SAND
BEDDING, BACKFILL CLASS B, BASE BID SCHEDULE UNLESS
OTHERWISE NOTED
FULL DEPTH PAVEMENT CONNECTION, SEE DETAIL
CONCRETE HELICOPTER PAD, BASE BID UNLESS OTHERWISE
NOTED, SEE DETAIL
CONCRETE RUNWAY END MONUMENT, SEE DETAIL
FULL DEPTH ASPHALT PAVEMENT SECTION TO CONCRETE
PAVEMENT CONNECTION, SEE DETAIL
INSTALL SPARE CONDUIT CROSSING, BASE BID SCHEDULE
UNLESS OTHERWISE NOTED, SEE DETAIL
INSTALL ODOT TYPE G-2 CATCH BASIN WITH 6 INCH SUMP,
SEE DETAIL
INSTA…