This document is a comprehensive set of technical drawings and detailed layouts for the SHS32400FL Biosolids Sludge Dryer System, prepared by SHINCCI-USA for Project #191BWC25C0102 for the U.S. Section of the International Boundary and Water Commission (IBWC). The drawings are dated June 2026 and include multiple revisions through Rev.03.
The design encompasses an integrated sludge processing system with four main functional areas: dehumidification/drying (Item I-1: SHS32400FL dehumidification system with 1350 kg/h standard capacity), dewatering (Items II-1 through II-4: spiral filter press model XF-721SW, chemical dosing pumps and units, and liquid sludge pump), feed inlet conveyors (Item III-1), and discharge outlet conveyance (Items IV-1 through IV-6: discharge scraper, vertical scraper, wet sludge buffer silo, twin-shaft screw conveyor, and discharge control panel). The system operates on a total power requirement of 445.4kW distributed across six electric motors, including six 75.9kW heat pump units for dehumidification, a 5.5kW slitter motor, and a 5.5kW bridge-breaker motor. The facility layout accommodates ground-floor electrical, dosing, and storage rooms; upper-level cooling fans room and press room; and includes a cable trench (W800 x H800mm) for infrastructure support. The drying unit processes wet sludge with 80% moisture content to produce dried sludge with approximately 10% moisture content, with condensate discharge directed to the owner's drainage infrastructure. All equipment is provided by SHINCCI-USA, with external provisions including bridge ceiling cranes, blowers, and the new polymer tank (Ø8'-6"x152"H) to be supplied by others.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TH
IS
D R
AW
IN
G
IS
T H
E C
O
PY
R
IG
H T
O
FS
H
IN
C C
I.U
SA
-U
SA
A N
D M
U
ST
N O
T
BE
R
ET
AI
N
ED
, C
O
PI
ED
O
R U
SE
D
W
IT
H O
U T
TH
E
C O
N
SU
LT
AN
T' S
AU
TH
O R
IZ
AT
IO
N
A
1 2 3 4 5
B
C
D
1 2 3 4 5
PROJECT# 191BWC25C0102
NIWTP BIOSOLIDS SLUDGE DRYER ALTERNATIVE
EQUIPMENT DISTRIBUTION &
SHS32400FL SYSTEM DETAILED LAYOUTS
JUNE 2026
U.S. SECTION OF THE INTERNATIONAL BOUNDARY
AND WATER COMMISSION
D R
AW
IN
G
IS
T H
E C
O
PY
R
IG
H T
O
FS
H
IN
C C
I.U
SA
-U
SA
A N
D M
U
ST
N O
T
BE
R
ET
AI
N
ED
, C
O
PI
ED
O
R U
SE
D
W
IT
H O
U T
TH
E
C O
N
SU
LT
AN
T' S
AU
TH
O R
IZ
AT
IO
N
A
1 2 3 4 5
B
C
D
1 2 3 4 5
SHS32400FL SYSTEM- EQUIPMENT DISTRIBUTION LAYOUTS
PROJECT# 191BWC25C0102
NIWTP BIOSOLIDS SLUDGE DRYER ALTERNATIVE
JUNE 2026
U.S. SECTION OF THE INTERNATIONAL BOUNDARY
ORIGINAL SLUDGE
PUMPS AREA
EXISTING
SLUDGE PUMPS
LIQUID SLUDGE LAGOON
NEW PIPES FROM THE
EXISTING PUMPS TO THE
BUFFER TANK
(PROVIDED BY OTHERS)
D
ISTR
IBU
TIO
N
BO
X
M
AIN
C O
N
TR
O L
PAN
EL
D
ISTR
IBU
TIO
N
BO
X
M
AIN
C O
N
TR
O L
PAN
EL
D
ISTR
IBU
TIO
N
BO
X
M
AIN
C O
N
TR
O L
PAN
EL
D
ISTR
IBU
TIO
N
BO
X
M
AIN
C O
N
TR
O L
PAN
EL
NEW SMALL BUFFER SLUDGE TANK
(THE ORIGINAL SLUDGE PUMPS
PUMP SLUDGE INTO THIS TANK).
404040404040
LOW
VOLTAGE
MAIN
INCOMING
CABINET
DRYING LINE A
AND LINE B
POWER
DISTRIBUTION
SWITCHES
DRYING LINE C
AND LINE D
POWER
DISTRIBUTION
SWITCHES
SUPPORTING
EQUIPMENT
AND POWER
DISTRIBUTION
SWITCHES
CAPACITOR
COMPENSATION
CABINET2
CAPACITOR
COMPENSATION
CABINET1
D
ISTR
IBU
TIO
N
BO
X
M
AIN
C O
N
TR
O L
PAN
EL
D
ISTR
IBU
TIO
N
BO
X
M
AIN
C O
N
TR
O L
PAN
EL
D
ISTR
IBU
TIO
N
BO
X
M
AIN
C O
N
TR
O L
PAN
EL
D
ISTR
IBU
TIO
N
BO
X
M
AIN
C O
N
TR
O L
PAN
EL
ROLLER SHUTTER DOOR
ELECTRICAL
ROOM
DUTY ROOM
DOSING PUMPS
DOSING UNITS
SLUDGE PUMPS
ROLLER SHUTTER DOOR
CABLE TRENCH W800 x H800MM
AC
R O
LL
ER
S H
U
TT
ER
D
O O
R
AC
R O
LL
ER
S H
U
TT
ER
D
O O
R
IV-6
I-1
IV-3
II-4
II-2
IV-1
IV-2
IV-4
DOSING
ROOM
NEW POLYMER TANK
(Ø8'-6"x152''H)
(PROVIDED BY OTHERS)
ROLLER SHUTTER DOOR ROLLER SHUTTER DOOR ROLLER SHUTTER DOOR ROLLER SHUTTER DOOR
CONVEYER'S
CEILING
OPENING
CONVEYER'S
CEILING
OPENING
U P
ST
AI
R C
AS
E
LEGEND
ITEM
CODE ITEM NAME NOTES
DEHUMIDIFICATION SYSTEM TO DRY SLUDGE CAKE
I-1 SHS32400FL DEHUMIDIFICATION SYSTEM PROVIDED BY SHINCCI-USA
DEWATERING SYSTEM
II-1 SPIRAL FILTER PRESS MODEL XF-721SW PROVIDED BY SHINCCI-USA
II-2 CHEMICAL DOSING PUMPS & UNITS PROVIDED BY SHINCCI-USA
II-4 LIQUID SLUDGE PUMP PROVIDED BY SHINCCI-USA
FEED INLET CONVEYORS TO THE DEHUMIDIFICATION SYSTEM
III-1 INLET FEEDING CONVEYOR PROVIDED BY SHINCCI-USA
DISCHARGE OUTLET CONVEYANCE SYSTEM
IV-1 DISCHARGE SCRAPER PROVIDED BY SHINCCI-USA
IV-2 VERTICAL SCRAPER PROVIDED BY SHINCCI-USA
IV-3 WET SLUDGE BUFFER SILO PROVIDED BY SHINCCI-USA
IV-4 TWIN-SHAFT SCREW CONVEYOR PROVIDED BY SHINCCI-USA
IV-6 DISCHARGE CONTROL PANEL PROVIDED BY SHINCCI-USA
TH
IS
D R
AW
IN
G
IS
T H
E C
O
PY
R
IG
H T
O
FS
H
IN
C C
I-U
SA
A N
D M
U
ST
N O
T
BE
R
ET
AI
N
ED
, C
O
PI
ED
O
R U
SE
D
W
IT
H O
U T
TH
E
C O
N
SU
LT
AN
T' S
AU
TH
O R
IZ
AT
IO
N
A
1 2 3 4 5
B
C
D
1 2 3 4 5
4743 E. 30th Place, Yuma, AZ 85365 Tel: +1 (520) 834-2433 Email:
AJ@Shincci-USA.com URL:http://www.Shincci-USA.com
Rev. Revision history Revision Date
Notes: Drawn By:
Issue Date:
Checked By:
Scale:
Drawing No.
MJ
Scale To Fit
Drawing Title:
Approved By:
RRFTP-0027-CD-GN-010-REV.03
SHS32400FL SYSTEM- EQUIPMENT DISTRIBUTION - SITE PLAN AT GROUND FLOOR LEVEL
SHS32400FL SYSTEM- EQUIPMENT DISTRIBUTION-
SITE PLAN AT GROUND FLOOR LEVEL
2026.04.02R00 SHS32400FL SYSTEM EQUIPMENT
DISTRIBUTION& DETAILED LAYOUTS
2026.06.07
Project Name:
Project# 191BWC25C0102- NIWTP Biosolids Sludge Dryer Alternative SHINCCI-USA Project Number:
SHINCCI.USA-USA-RRFTP-0027
Client Name:
U.S. Section of the International Boundary and Water Commission
2026.05.25R01 SHS32400FL SYSTEM EQUIPMENT
DISTRIBUTION& DETAILED LAYOUTS
2026.05.28R02 SHS32400FL SYSTEM EQUIPMENT
DISTRIBUTION& DETAILED LAYOUTS
2026.06.07R03 SHS32400FL SYSTEM EQUIPMENT
DISTRIBUTION& DETAILED LAYOUTS
'-2
7/ 8"
'-9
/8
'-9
/8
23'-7 1/2"28'-6 1/2" 7 7/8"
29'-10 1/4"
3' -3
/8
1'-11 5/8"1'-11 5/8"
1'
-0
/4
83'-4"
4'-6 3/8" 14'-9 1/8"
4'-9 1/2" 14'-9 1/8"
4'-9 1/2" 14'-9 1/8"
4'-9 1/2" 14'-9 1/8"
83'-4"
'-8
'-8
10'-8" 10'-8"
4'-11"
4'-11"
1' -1
3/
8"
4' -1
1"
5'-4 5/8"
11'-4 1/4" 11'-4 1/4" 11'-4 1/4" 11'-4 1/4"
GN-301
LIQUID SLUDGE LAGOON
GN-301
D
ISTR
IBU
TIO
N
BO
X
M
AIN
C O
N
TR
O L
PAN
EL
D
ISTR
IBU
TIO
N
BO
X
M
AIN
C O
N
TR
O L
PAN
EL
D
ISTR
IBU
TIO
N
BO
X
M
AIN
C O
N
TR
O L
PAN
EL
D
ISTR
IBU
TIO
N
BO
X
M
AIN
C O
N
TR
O L
PAN
EL
NEW SMALL BUFFER SLUDGE TANK
(THE ORIGINAL SLUDGE PUMPS
PUMP SLUDGE INTO THIS TANK).
404040404040
LOW
VOLTAGE
MAIN
INCOMING
CABINET
DRYING LINE A
AND LINE B
POWER
DISTRIBUTION
SWITCHES
DRYING LINE C
AND LINE D
POWER
DISTRIBUTION
SWITCHES
SUPPORTING
EQUIPMENT
AND POWER
DISTRIBUTION
SWITCHES
CAPACITOR
COMPENSATION
CABINET2
CAPACITOR
COMPENSATION
CABINET1
D
ISTR
IBU
TIO
N
BO
X
M
AIN
C O
N
TR
O L
PAN
EL
D
ISTR
IBU
TIO
N
BO
X
M
AIN
C O
N
TR
O L
PAN
EL
D
ISTR
IBU
TIO
N
BO
X
M
AIN
C O
N
TR
O L
PAN
EL
D
ISTR
IBU
TIO
N
BO
X
M
AIN
C O
N
TR
O L
PAN
EL
ROLLER SHUTTER DOOR
ELECTRICAL
ROOM
DUTY ROOM
DOSING PUMPS
DOSING UNITS
SLUDGE PUMPS
ROLLER SHUTTER DOOR
CABLE TRENCH W800 x H800MM
AC
R O
LL
ER
S H
U
TT
ER
D
O O
R
AC
R O
LL
ER
S H
U
TT
ER
D
O O
R
IV-6
I-1
IV-3
II-4
II-2
IV-1
IV-2
IV-4
DOSING
ROOM
NEW POLYMER TANK
(Ø8'-6"x152''H)
(PROVIDED BY OTHERS)
ROLLER SHUTTER DOOR ROLLER SHUTTER DOOR ROLLER SHUTTER DOOR ROLLER SHUTTER DOOR
7/
8"
Ø8'-6"
102"
GN-300
GN-300
NEW PIPES FROM THE
EXISTING PUMPS TO
THE BUFFER TANK
(PROVIDED BY OTHERS)
CONVEYER'S
CEILING
OPENING
CONVEYER'S
CEILING
OPENING
U P
ST
AI
R C
AS
E
LEGEND
ITEM
CODE ITEM NAME NOTES
DEHUMIDIFICATION SYSTEM TO DRY SLUDGE CAKE
I-1 SHS32400FL DEHUMIDIFICATION SYSTEM PROVIDED BY SHINCCI-USA
DEWATERING SYSTEM
II-1 SPIRAL FILTER PRESS MODEL XF-721SW PROVIDED BY SHINCCI-USA
II-2 CHEMICAL DOSING PUMPS & UNITS PROVIDED BY SHINCCI-USA
II-4 LIQUID SLUDGE PUMP PROVIDED BY SHINCCI-USA
FEED INLET CONVEYORS TO THE DEHUMIDIFICATION SYSTEM
III-1 INLET FEEDING CONVEYOR PROVIDED BY SHINCCI-USA
DISCHARGE OUTLET CONVEYANCE SYSTEM
IV-1 DISCHARGE SCRAPER PROVIDED BY SHINCCI-USA
IV-2 VERTICAL SCRAPER PROVIDED BY SHINCCI-USA
IV-3 WET SLUDGE BUFFER SILO PROVIDED BY SHINCCI-USA
IV-4 TWIN-SHAFT SCREW CONVEYOR PROVIDED BY SHINCCI-USA
IV-6 DISCHARGE CONTROL PANEL PROVIDED BY SHINCCI-USA
19'-4 1/4"
3'-7 1/4"
TH
IS
D R
AW
IN
G
IS
T H
E C
O
PY
R
IG
H T
O
FS
H
IN
C C
I-U
SA
A N
D M
U
ST
N O
T
BE
R
ET
AI
N
ED
, C
O
PI
ED
O
R U
SE
D
W
IT
H O
U T
TH
E
C O
N
SU
LT
AN
T' S
AU
TH
O R
IZ
AT
IO
N
A
1 2 3 4 5
B
C
D
1 2 3 4 5
4743 E. 30th Place, Yuma, AZ 85365 Tel: +1 (520) 834-2433 Email:
AJ@Shincci-USA.com URL:http://www.Shincci-USA.com
Rev. Revision history Revision Date
Notes: Drawn By:
Issue Date:
Checked By:
Scale:
Drawing No.
MJ
Scale To Fit
Drawing Title:
Approved By:
RRFTP-0027-CD-GN-100-REV.03
SHS32400FL SYSTEM- EQUIPMENT DISTRIBUTION -GROUND FLOOR PLAN
SHS32400FL SYSTEM- EQUIPMENT DISTRIBUTION-
GROUND FLOOR PLAN
2026.04.02R00 SHS32400FL SYSTEM EQUIPMENT
DISTRIBUTION& DETAILED LAYOUTS
Project Name:
Project# 191BWC25C0102- NIWTP Biosolids Sludge Dryer Alternative SHINCCI-USA Project Number:
SHINCCI.USA-USA-RRFTP-0027
Client Name:
U.S. Section of the International Boundary and Water Commission
2026.05.25R01 SHS32400FL SYSTEM EQUIPMENT
DISTRIBUTION& DETAILED LAYOUTS
2026.06.07
2026.05.28R02
2026.06.07R03 SHS32400FL SYSTEM EQUIPMENT
DISTRIBUTION& DETAILED LAYOUTS
SHS32400FL SYSTEM EQUIPMENT
HC_SUPERPART HC_SUPERPART
HC_SUPERPART
HC_SUPERPART
STORAGE
SPACE
VENTILATION
LOUVERS
FRESH AIR
FRESH AIR
FRESH AIR
1'
-0
/4
83'-4"
'-7
/8
'-4
/4
7/
8"
7/ 8"
'-9
/8
'-6
'-6
'-6
PRESSES ROOMII-1 II-1
GN-301
GN-301
COOLING FANS
ROOM
HC_SUPERPARTHC_SUPERPART HC_SUPERPART HC_SUPERPART
BRIDGE (CEILING) CRANE
(PROVIDED BY OTHERS)
CONVEYER'S
OPENING IN
THE CEILING
CONVEYER'S
OPENING IN
THE CEILING
GN-300
GN-300
STAIRCASE
LEGEND
ITEM
CODE ITEM NAME NOTES
DEHUMIDIFICATION SYSTEM TO DRY SLUDGE CAKE
I-1 SHS32400FL DEHUMIDIFICATION SYSTEM PROVIDED BY SHINCCI-USA
DEWATERING SYSTEM
II-1 SPIRAL FILTER PRESS MODEL XF-721SW PROVIDED BY SHINCCI-USA
II-2 CHEMICAL DOSING PUMPS & UNITS PROVIDED BY SHINCCI-USA
II-4 LIQUID SLUDGE PUMP PROVIDED BY SHINCCI-USA
FEED INLET CONVEYORS TO THE DEHUMIDIFICATION SYSTEM
III-1 INLET FEEDING CONVEYOR PROVIDED BY SHINCCI-USA
DISCHARGE OUTLET CONVEYANCE SYSTEM
IV-1 DISCHARGE SCRAPER PROVIDED BY SHINCCI-USA
IV-2 VERTICAL SCRAPER PROVIDED BY SHINCCI-USA
IV-3 WET SLUDGE BUFFER SILO PROVIDED BY SHINCCI-USA
IV-4 TWIN-SHAFT SCREW CONVEYOR PROVIDED BY SHINCCI-USA
IV-6 DISCHARGE CONTROL PANEL PROVIDED BY SHINCCI-USA
10'-8" 10'-8"
10'-8"10'-8"
DN
BLOWERS
(PROVIDED BY OTHERS)
CAPACITY TO BE DESIGNED
BY THE CONTRACTOR
TH
IS
D R
AW
IN
G
IS
T H
E C
O
PY
R
IG
H T
O
FS
H
IN
C C
I-U
SA
A N
D M
U
ST
N O
T
BE
R
ET
AI
N
ED
, C
O
PI
ED
O
R U
SE
D
W
IT
H O
U T
TH
E
C O
N
SU
LT
AN
T' S
AU
TH
O R
IZ
AT
IO
N
A
1 2 3 4 5
B
C
D
1 2 3 4 5
4743 E. 30th Place, Yuma, AZ 85365 Tel: +1 (520) 834-2433 Email:
AJ@Shincci-USA.com URL:http://www.Shincci-USA.com
Rev. Revision history Revision Date
Notes: Drawn By:
Issue Date:
Checked By:
Scale:
Drawing No.
MJ
Scale To Fit
Drawing Title:
Approved By:
RRFTP-0027-CD-GN-101-REV.03
SHS32400FL SYSTEM- EQUIPMENT DISTRIBUTION - UPPER LEVEL PLAN
SHS32400FL System- Equipment Distribution- Upper Level Plan
2026.04.02R00 SHS32400FL SYSTEM EQUIPMENT
DISTRIBUTION& DETAILED LAYOUTS
Project Name:
Project# 191BWC25C0102- NIWTP Biosolids Sludge Dryer Alternative SHINCCI-USA Project Number:
SHINCCI.USA-USA-RRFTP-0027
Client Name:
U.S. Section of the International Boundary and Water Commission
2026.05.25R01 SHS32400FL SYSTEM EQUIPMENT
DISTRIBUTION& DETAILED LAYOUTS
2026.06.07
2026.05.28R02
2026.06.07R03 SHS32400FL SYSTEM EQUIPMENT
DISTRIBUTION& DETAILED LAYOUTS
2'
4'-11"72'-1 3/4"
111'-0 1/4"
'-0
/2
7/
8"
'-5
/4
7 7/8"
29'-2 3/8" 7 7/8"
69'-4 1/4" 7 7/8"
25'-7 1/8" 7 7/8"
14'-9 1/8" 7 7/8"
7 7/8"
4'-1 1/4"
81'-2"
17'-8 5/8" 9'-6 1/8" 1'-11 5/8"
E
AEL
E S
ON
TRIP
TE
S
OF
F
R/
N EP
O
E
STORAGE
SPACE
HYHR
SA1
HG
AAV
PHASE A CURRENTB-PHASE CURRENTC-PHASE CURRENTVOLTMETER
PA1PA2PA3PV
C- PHASE INCOMING
POWER SUPPLY
B-PHASE INCOMING
POWER SUPPLY
A-PHASE INCOMING
POWER SUPPLY
VOLTAGE
SWITCHING SWITCH
SMART
ELECTRICITY METER
POWER DISTRIBUTION
CABINET BASE
PRESSES ROOM
DOSING ROOMDRYERS ROOM
ROLLER SHUTTER
DOOR
II-1
I-1
DOSING UNITS
COOLING FANS ROOM
R O
LL
ER
SH
U
TT
ER
D O
O R
BRIDGE (CEILING) CRANE
(PROVIDED BY OTHERS)
R O
LL
ER
S H
U
TT
ER
D
O O
R
CONVEYER'S OPENING
IN THE CEILING
8' -2
/8
NEW POLYMER TANK
(Ø8'-6"x152''H)
(PROVIDED BY OTHERS) II-2
BRIDGE (CEILING) CRANE
WALL OPENING
BRIDGE (CEILING) CRANE
WALL OPENING
LEGEND
ITEM
CODE ITEM NAME NOTES
DEHUMIDIFICATION SYSTEM TO DRY SLUDGE CAKE
I-1 SHS32400FL DEHUMIDIFICATION SYSTEM PROVIDED BY SHINCCI-USA
DEWATERING SYSTEM
II-1 SPIRAL FILTER PRESS MODEL XF-721SW PROVIDED BY SHINCCI-USA
II-2 CHEMICAL DOSING PUMPS & UNITS PROVIDED BY SHINCCI-USA
II-4 LIQUID SLUDGE PUMP PROVIDED BY SHINCCI-USA
FEED INLET CONVEYORS TO THE DEHUMIDIFICATION SYSTEM
III-1 INLET FEEDING CONVEYOR PROVIDED BY SHINCCI-USA
DISCHARGE OUTLET CONVEYANCE SYSTEM
IV-1 DISCHARGE SCRAPER PROVIDED BY SHINCCI-USA
IV-2 VERTICAL SCRAPER PROVIDED BY SHINCCI-USA
IV-3 WET SLUDGE BUFFER SILO PROVIDED BY SHINCCI-USA
IV-4 TWIN-SHAFT SCREW CONVEYOR PROVIDED BY SHINCCI-USA
IV-6 DISCHARGE CONTROL PANEL PROVIDED BY SHINCCI-USA
TH
IS
D R
AW
IN
G
IS
T H
E C
O
PY
R
IG
H T
O
FS
H
IN
C C
I-U
SA
A N
D M
U
ST
N O
T
BE
R
ET
AI
N
ED
, C
O
PI
ED
O
R U
SE
D
W
IT
H O
U T
TH
E
C O
N
SU
LT
AN
T' S
AU
TH
O R
IZ
AT
IO
N
A
1 2 3 4 5
B
C
D
1 2 3 4 5
4743 E. 30th Place, Yuma, AZ 85365 Tel: +1 (520) 834-2433 Email:
AJ@Shincci-USA.com URL:http://www.Shincci-USA.com
Rev. Revision history Revision Date
Notes: Drawn By:
Issue Date:
Checked By:
Scale:
Drawing No.
MJ
Scale To Fit
Drawing Title:
Approved By:
RRFTP-0027-CD-GN-300-REV.03
SHS32400FL SYSTEM- EQUIPMENT DISTRIBUTION-
SECTIONS
SHS32400FL SYSTEM- EQUIPMENT DISTRIBUTION- SECTIONS
2026.04.02R00 SHS32400FL SYSTEM EQUIPMENT
DISTRIBUTION& DETAILED LAYOUTS
SECTION 1-1
Project Name:
Project# 191BWC25C0102- NIWTP Biosolids Sludge Dryer Alternative SHINCCI-USA Project Number:
SHINCCI.USA-USA-RRFTP-0027
Client Name:
U.S. Section of the International Boundary and Water Commission
2026.05.25R01 SHS32400FL SYSTEM EQUIPMENT
DISTRIBUTION& DETAILED LAYOUTS
2026.06.07
2026.05.28R02
2026.06.07R03 SHS32400FL SYSTEM EQUIPMENT
DISTRIBUTION& DETAILED LAYOUTS
6'-2 3/4" 11'-4 1/4" 8'-2 3/8" 11'-4 1/4" 8'-2 3/8" 11'-4 1/4" 8'-2 3/8" 11'-4 1/4"
'-0
/2
7/ 8"
'-5
/4
83'-4"
DRYER MAIN
CONTROL BOX
EMERGENCY
STOP
TOUCH
SCREEN
OPENING
DRYER MAIN
CONTROL BOX
EMERGENCY
STOP
TOUCH
SCREEN
OPENING
DRYER MAIN
CONTROL BOX
EMERGENCY
STOP
TOUCH
SCREEN
OPENING
DRYER MAIN
CONTROL BOX
EMERGENCY
STOP
TOUCH
SCREEN
OPENING
PRESSES
ROOM
DRYERS ROOM
7'-1"
'-1
5/
8"
'-5
/4
24'-8 7/8" 4'-3 1/8"
16'-4 7/8" 4'-0 7/8"
'-4
/8
II-1
I-1
IV-3
IV-1IV-2IV-4
III-1 III-1
D O
O R
'-4
/8
ROLLER SHUTTER
DOOR
ROLLER SHUTTER
DOOR
CONVEYER'S CEILING
OPENING
CONVEYER'S CEILING
OPENING
8' -2
/8
LEGEND
ITEM
CODE ITEM NAME NOTES
DEHUMIDIFICATION SYSTEM TO DRY SLUDGE CAKE
I-1 SHS32400FL DEHUMIDIFICATION SYSTEM PROVIDED BY SHINCCI-USA
DEWATERING SYSTEM
II-1 SPIRAL FILTER PRESS MODEL XF-721SW PROVIDED BY SHINCCI-USA
II-2 CHEMICAL DOSING PUMPS & UNITS PROVIDED BY SHINCCI-USA
II-4 LIQUID SLUDGE PUMP PROVIDED BY SHINCCI-USA
FEED INLET CONVEYORS TO THE DEHUMIDIFICATION SYSTEM
III-1 INLET FEEDING CONVEYOR PROVIDED BY SHINCCI-USA
DISCHARGE OUTLET CONVEYANCE SYSTEM
IV-1 DISCHARGE SCRAPER PROVIDED BY SHINCCI-USA
IV-2 VERTICAL SCRAPER PROVIDED BY SHINCCI-USA
IV-3 WET SLUDGE BUFFER SILO PROVIDED BY SHINCCI-USA
IV-4 TWIN-SHAFT SCREW CONVEYOR PROVIDED BY SHINCCI-USA
IV-6 DISCHARGE CONTROL PANEL PROVIDED BY SHINCCI-USA
BRIDGE- CEILING- CRANE
(PROVIDED BY OTHERS)
BRIDGE- CEILING- CRANE
(PROVIDED BY OTHERS)
BLOWERS
(PROVIDED BY OTHERS)
CAPACITY TO BE DESIGNED
BY THE CONTRACTOR
TH
IS
D R
AW
IN
G
IS
T H
E C
O
PY
R
IG
H T
O
FS
H
IN
C C
I-U
SA
A N
D M
U
ST
N O
T
BE
R
ET
AI
N
ED
, C
O
PI
ED
O
R U
SE
D
W
IT
H O
U T
TH
E
C O
N
SU
LT
AN
T' S
AU
TH
O R
IZ
AT
IO
N
A
1 2 3 4 5
B
C
D
1 2 3 4 5
4743 E. 30th Place, Yuma, AZ 85365 Tel: +1 (520) 834-2433 Email:
AJ@Shincci-USA.com URL:http://www.Shincci-USA.com
Rev. Revision history Revision Date
Notes: Drawn By:
Issue Date:
Checked By:
Scale:
Drawing No.
MJ
Scale To Fit
Drawing Title:
Approved By:
RRFTP-0027-CD-GN-301-REV.03
SHS32400FL SYSTEM- EQUIPMENT DISTRIBUTION- SECTIONS
SHS32400FL SYSTEM- EQUIPMENT DISTRIBUTION-
SECTIONS
SECTION 2-2
2026.04.02R00 SHS32400FL SYSTEM EQUIPMENT
DISTRIBUTION& DETAILED LAYOUTS
Project Name:
Project# 191BWC25C0102- NIWTP Biosolids Sludge Dryer Alternative SHINCCI-USA Project Number:
SHINCCI.USA-USA-RRFTP-0027
Client Name:
U.S. Section of the International Boundary and Water Commission
2026.05.25R01 SHS32400FL SYSTEM EQUIPMENT
DISTRIBUTION& DETAILED LAYOUTS
2026.06.07
2026.05.28R02
2026.06.07R03 SHS32400FL SYSTEM EQUIPMENT
DISTRIBUTION& DETAILED LAYOUTS
D R
AW
IN
G
IS
T H
E C
O
PY
R
IG
H T
O
FS
H
IN
C C
I.U
SA
-U
SA
A N
D M
U
ST
N O
T
BE
R
ET
AI
N
ED
, C
O
PI
ED
O
R U
SE
D
W
IT
H O
U T
TH
E
C O
N
SU
LT
AN
T' S
AU
TH
O R
IZ
AT
IO
N
A
1 2 3 4 5
B
C
D
1 2 3 4 5
SHS32400FL SYSTEM DETAILED LAYOUTS
PROJECT# 191BWC25C0102
NIWTP BIOSOLIDS SLUDGE DRYER ALTERNATIVE
U.S. SECTION OF THE INTERNATIONAL BOUNDARY
JUNE 2026
C
GN-806
D
GN-806
A
GN-804
B
GN-805
[1 7'
-4
/8
[3 '-5
/8
[1
0' -0
/2
[3
'-1
1/ 2"
] [74'-9 1/4"] [2'-10 1/4"]
[69'-0 3/8"] [2'-10 5/8"]
DISTRIBUTION
BOX
MAIN
CONTROL
PANEL
[1 1'
-4
/4
[1 0'
-0
/2
[7
/8
[7
/8
[72'-1 3/4"]
[2'-5 1/2"]
[2'-3 1/2"] [66'-8 3/4"]
[7 7/8"]
SPECIFICATION
PRODUCT INTEGRATED LOW-TEMPERTURE BELT-TYPE DRYER
MODEL SHS32400FL
STANDARD DEHUMIDIFICATION CAPACITY 1350KG/H
WEIGHT
OPERATING WEIGHT
DIMENSION 21.04M(L)*3.06M(W)*2.75M(H IS NOT COVERING SLITTER)
SPECIFICATION FOR ELECTRIC MOTOR
NO. ITEM POWER(REDUCTION RATIO)
M-1 DEHUMNIDIFICATION HEAT PUMP *6 75.9KW*6
M-2 SLITTER-ELECTRIC MOTOR 5.5KW
M-3 BRIDGE-BREAKER-ELECTRIC MOTOR 5.5KW
M-4 UPPER BELT-MOTOR REDUCER 1.5KW(1/333)
M-5 LOWER BELT-MOTOR REDUCER 1.5KW(1/333)
TOTAL POWER 445.4KW
LIST OF INTERCONNECTING PIECE
NO. DIAMETER ITEM MATERIAL
N-1 RECTANGLE INLET PORT FLANGE(SUS)
N-2 RECTANGLE OUTLET PORT FLANGE(SUS)
N-3 65(DN) INTERFACE OF CONDENSATE
WATER UPVC STRAIGHT CONNECTOR
PARTS LIST
NO. ITEM MATERIAL REMARKS
1 INSUALATION PANEL INNER&OUTER SUS304
MIDDLE POLYURETHANE
2 SLITTER SQ-1600 SUS304(1 SET)
3 MAIN CONTROL CABINET SUS304(1 SET)
4 CONDENSATE WATER PIPES UPVC 、 EX-THREAD ( SUS )
5 EXTERNAL CONDENSOR COOLING FAN (FL-08) SUS304(6 SETS)
6 POWER DISTRIBUTION CABINET SUS304(1 SET)
TH
IS
D R
AW
IN
G
IS
T H
E C
O
PY
R
IG
H T
O
FS
H
IN
C C
I-U
SA
A N
D M
U
ST
N O
T
BE
R
ET
AI
N
ED
, C
O
PI
ED
O
R U
SE
D
W
IT
H O
U T
TH
E
C O
N
SU
LT
AN
T' S
AU
TH
O R
IZ
AT
IO
N
A
1 2 3 4 5
B
C
D
1 2 3 4 5
4743 E. 30th Place, Yuma, AZ 85365 Tel: +1 (520) 834-2433 Email:
AJ@Shincci-USA.com URL:http://www.Shincci-USA.com
Rev. Revision history Revision Date
Notes: Drawn By:
Issue Date:
Checked By:
Scale:
Drawing No.
MJ
Drawing Title:
Approved By:
RRFTP-0027-CD-GN-800-Rev.02
SHS32400FL SYSTEM- DETAILED LAYOUTS- PLAN
Scale To Fit
SHS32400FL SYSTEM- DETAILED LAYOUTS-
PLAN
2026.04.02R00 SHS32400FL SYSTEM EQUIPMENT
DISTRIBUTION& DETAILED LAYOUTS
2026.05.28
Project Name:
Project# 191BWC25C0102- NIWTP Biosolids Sludge Dryer Alternative SHINCCI-USA Project Number:
SHINCCI.USA-USA-RRFTP-0027
Client Name:
U.S. Section of the International Boundary and Water Commission
2026.05.25R01 SHS32400FL SYSTEM EQUIPMENT
8'-2 3/8" 6'-6 3/4"
6' -6
/4
6'
-6
/4
DISTRIBUTION
BOX
MAIN
CONTROL
PANEL
[1 '-0
/4
[3'-5 3/4"]
[3 3/4"]
[3'-11 1/2"]
[2 '-1
1"
AIR SUCTION 3/4"
LIQUID OUTLET 5/8"
TH
IS
D R
AW
IN
G
IS
T H
E C
O
PY
R
IG
H T
O
FS
H
IN
C C
I-U
SA
A N
D M
U
ST
N O
T
BE
R
ET
AI
N
ED
, C
O
PI
ED
O
R U
SE
D
W
IT
H O
U T
TH
E
C O
N
SU
LT
AN
T' S
AU
TH
O R
IZ
AT
IO
N
A
1 2 3 4 5
B
C
D
1 2 3 4 5
4743 E. 30th Place, Yuma, AZ 85365 Tel: +1 (520) 834-2433 Email:
AJ@Shincci-USA.com URL:http://www.Shincci-USA.com
Rev. Revision history Revision Date
Drawn By:
Issue Date:
Checked By:
Scale:
Drawing No.
MJ
Scale To Fit
Drawing Title:
Approved By:
RRFTP-0027-CD-GN-801-Rev.02
SHS32400FL SYSTEM- DETAILED LAYOUTS-SERVICE SPACE & EXTERNAL CONDENSER COOLING FAN
SHS32400FL SYSTEM- DETAILED LAYOUTS-
SERVICE SPACE & EXTERNAL CONDENSER COOLING FAN
SERVICE SPACE
EXTERNAL CONDENSER COOLING FAN LAYOUTS
2026.04.02R00 SHS32400FL SYSTEM EQUIPMENT
DISTRIBUTION& DETAILED LAYOUTS
2026.05.28
Project Name:
Project# 191BWC25C0102- NIWTP Biosolids Sludge Dryer Alternative SHINCCI-USA Project Number:
SHINCCI.USA-USA-RRFTP-0027
Client Name:
U.S. Section of the International Boundary and Water Commission
THE INTERIOR IS HARD GROUND
0.00
7/
8"2"
7/
8"
2" 7 7/8" 0.00
'-4
/8
'-8
/8
'-4
/4
69'-4 1/4" 69'-8 1/4"
72'-1 3/4"
72'-1 3/4"
7 7/8"
LOAD-BEARING CAPACITY: 15KN/㎡
NOTE: THE GROUNDING POINTS AROUND THE
FOUNDATION OF THE DRYER SHALL BE WELDED
WITH 4# FLAT IRON
AND ON-SITE LIGHTNING PROTECTION STEEL BARS.
2'-1 5/8"
2" 69'-4 1/4" 2"
4"
DESCRIPTION:
1. BEFORE IRRIGATING THE DRYER FOUNDATION PAD, PLEASE
PRE-EMBED DRAINAGE PIPES AND RESERVE DRAINAGE DITCHES.
REFER TO THE SHEET # (RRFTP-0027-CD-GN-803-REV.02) FOR DETAILS
2. BASIC LEVELNESS REQUIREMENTS: ALLOWABLE DEVIATION OF 5MM
PER METER, ALLOWABLE DEVIATION OF 8MM FOR TOTAL LENGTH.
'-0
/2
69'-0 3/8"
DRYER LIMIT
TH
IS
D R
AW
IN
G
IS
T H
E C
O
PY
R
IG
H T
O
FS
H
IN
C C
I-U
SA
A N
D M
U
ST
N O
T
BE
R
ET
AI
N
ED
, C
O
PI
ED
O
R U
SE
D
W
IT
H O
U T
TH
E
C O
N
SU
LT
AN
T' S
AU
TH
O R
IZ
AT
IO
N
A
1 2 3 4 5
B
C
D
1 2 3 4 5
4743 E. 30th Place, Yuma, AZ 85365 Tel: +1 (520) 834-2433 Email:
AJ@Shincci-USA.com URL:http://www.Shincci-USA.com
Rev. Revision history Revision Date
Notes: Drawn By:
Issue Date:
Checked By:
Scale:
Drawing No.
MJ
Scale To Fit
Drawing Title:
Approved By:
RRFTP-0027-CD-GN-802-Rev.02
SHS32400FL SYSTEM- BASE DETAILS-1
SHS32400FL System- Base Details-1
2026.04.02R00 SHS32400FL SYSTEM EQUIPMENT
DISTRIBUTION& DETAILED LAYOUTS
2026.05.28
Project Name:
Project# 191BWC25C0102- NIWTP Biosolids Sludge Dryer Alternative SHINCCI-USA Project Number:
SHINCCI.USA-USA-RRFTP-0027
Client Name:
U.S. Section of the International Boundary and Water Commission
7 7/8"7 7/
8"
11'-4 1/4"
0.000.00
10'-4 3/8"
0.00
THE INTERIOR IS HARD GROUND
PRE-EMBED Φ50 STRAIGHT PIPE, 1 SET
UPVC MATERIAL,L=200MM
2"
3 7/8"
2"
7/ 8"
2" 7 7/8"
2"
1/
8"
7/ 8"
3 7/8"
2"
2" 3 7/8"
2" 3 7/8"
TH
IS
D R
AW
IN
G
IS
T H
E C
O
PY
R
IG
H T
O
FS
H
IN
C C
I-U
SA
A N
D M
U
ST
N O
T
BE
R
ET
AI
N
ED
, C
O
PI
ED
O
R U
SE
D
W
IT
H O
U T
TH
E
C O
N
SU
LT
AN
T' S
AU
TH
O R
IZ
AT
IO
N
A
1 2 3 4 5
B
C
D
1 2 3 4 5
4743 E. 30th Place, Yuma, AZ 85365 Tel: +1 (520) 834-2433 Email:
AJ@Shincci-USA.com URL:http://www.Shincci-USA.com
Rev. Revision history Revision Date
Notes: Drawn By:
Issue Date:
Checked By:
Scale:
Drawing No.
MJ
Scale To Fit
Drawing Title: SHS32400FL System- Base Details-2
Approved By:
RRFTP-0027-CD-GN-803-Rev.02
SHS32400FL SYSTEM- BASE DETAILS-2
2026.04.02R00 SHS32400FL SYSTEM EQUIPMENT
DISTRIBUTION& DETAILED LAYOUTS
2026.05.28
Project Name:
Project# 191BWC25C0102- NIWTP Biosolids Sludge Dryer Alternative SHINCCI-USA Project Number:
SHINCCI.USA-USA-RRFTP-0027
Client Name:
U.S. Section of the International Boundary and Water Commission
69'-0 3/8"
'-3
/4
7/ 8"
7' -2
/8
9'
-0
/4
'-7
/4
2'-5 1/2"
7' -7
/4
9'
-0
/4
75.9kW M-1
HYHR
SA1
HG
AAV
PHASE A CURRENTB-PHASE CURRENTC-PHASE CURRENTVOLTMETER
PA1PA2PA3PV
C- PHASE INCOMING
POWER SUPPLY
B-PHASE INCOMING
POWER SUPPLY
A-PHASE INCOMING
POWER SUPPLY
VOLTAGE
SWITCHING SWITCH
SMART
ELECTRICITY METER
POWER DISTRIBUTION
CABINET BASE
N-3
DN65
TH
IS
D R
AW
IN
G
IS
T H
E C
O
PY
R
IG
H T
O
FS
H
IN
C C
I-U
SA
A N
D M
U
ST
N O
T
BE
R
ET
AI
N
ED
, C
O
PI
ED
O
R U
SE
D
W
IT
H O
U T
TH
E
C O
N
SU
LT
AN
T' S
AU
TH
O R
IZ
AT
IO
N
A
1 2 3 4 5
B
C
D
1 2 3 4 5
4743 E. 30th Place, Yuma, AZ 85365 Tel: +1 (520) 834-2433 Email:
AJ@Shincci-USA.com URL:http://www.Shincci-USA.com
Rev. Revision history Revision Date
Notes: Drawn By:
Issue Date:
Checked By:
Scale:
Drawing No.
MJ
Drawing Title:
Approved By:
RRFTP-0027-CD-GN-804-Rev.02
SHS32400FL SYSTEM- DETAILED LAYOUTS- ELEVATION (A)
Scale To Fit
SHS32400FL SYSTEM- DETAILED LAYOUTS-
ELEVATION (A)
2026.04.02R00 SHS32400FL SYSTEM EQUIPMENT
DISTRIBUTION& DETAILED LAYOUTS
2026.05.28
Project Name:
Project# 191BWC25C0102- NIWTP Biosolids Sludge Dryer Alternative SHINCCI-USA Project Number:
SHINCCI.USA-USA-RRFTP-0027
Client Name:
U.S. Section of the International Boundary and Water Commission
69'-0 3/8" 7 7/8" 2'-5 1/2"
N-1
1.5kW M-5
1.5kW M-4
UNIT
ELECTRICAL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
POWER DISTRIBUTION
CABINET BASE
N-2
7/
8" 7'
-2
/2
9' -0
/4
'-3
/4
7/ 8"
7' -2
/8
9'
-0
/4
'-7
/4
TH
IS
D R
AW
IN
G
IS
T H
E C
O
PY
R
IG
H T
O
FS
H
IN
C C
I-U
SA
A N
D M
U
ST
N O
T
BE
R
ET
AI
N
ED
, C
O
PI
ED
O
R U
SE
D
W
IT
H O
U T
TH
E
C O
N
SU
LT
AN
T' S
AU
TH
O R
IZ
AT
IO
N
A
1 2 3 4 5
B
C
D
1 2 3 4 5
4743 E. 30th Place, Yuma, AZ 85365 Tel: +1 (520) 834-2433 Email:
AJ@Shincci-USA.com URL:http://www.Shincci-USA.com
Rev. Revision history Revision Date
Notes: Drawn By:
Issue Date:
Checked By:
Scale:
Drawing No.
MJ
Drawing Title:
Approved By:
RRFTP-0027-CD-GN-805-Rev.02
Scale To Fit
SHS32400FL SYSTEM- DETAILED LAYOUTS- ELEVATION (B)
SHS32400FL SYSTEM- DETAILED LAYOUTS-
ELEVATION (B)
2026.04.02R00 SHS32400FL SYSTEM EQUIPMENT
DISTRIBUTION& DETAILED LAYOUTS
2026.05.28
Project Name:
Project# 191BWC25C0102- NIWTP Biosolids Sludge Dryer Alternative SHINCCI-USA Project Number:
SHINCCI.USA-USA-RRFTP-0027
Client Name:
U.S. Section of the International Boundary and Water Commission
10'-0 1/2"3'-11 1/4" 10'-0 1/2"
3'-11 1/4"
9' -0
/4
'-7
/4
'-3
/4
7' -2
/8
9' -0
/4
'-7
/4
9' -0
/4
POWER
DISTRIBUTION
CABINET
DRYER MAIN
CONTROL BOX
EMERGENCY
STOP
TOUCH
SCREEN
OPENING
5.5kW M-3
5.5kW M-2
3' -7
/4
N-2N-2
TH
IS
D R
AW
IN
G
IS
T H
E C
O
PY
R
IG
H T
O
FS
H
IN
C C
I-U
SA
A N
D M
U
ST
N O
T
BE
R
ET
AI
N
ED
, C
O
PI
ED
O
R U
SE
D
W
IT
H O
U T
TH
E
C O
N
SU
LT
AN
T' S
AU
TH
O R
IZ
AT
IO
N
A
1 2 3 4 5
B
C
D
1 2 3 4 5
4743 E. 30th Place, Yuma, AZ 85365 Tel: +1 (520) 834-2433 Email:
AJ@Shincci-USA.com URL:http://www.Shincci-USA.com
Rev. Revision history Revision Date
Notes: Drawn By:
Issue Date:
Checked By:
Scale:
Drawing No.
MJ
Drawing Title:
Approved By:
RRFTP-0027-CD-GN-806-Rev.02
ELEVATION C ELEVATION D
Scale To Fit
SHS32400FL SYSTEM- DETAILED LAYOUTS-
ELEVATION (C) & (D)
SHS32400FL SYSTEM- DETAILED LAYOUTS- ELEVATION (C) & (D)
2026.04.02R00 SHS32400FL SYSTEM EQUIPMENT
DISTRIBUTION& DETAILED LAYOUTS
2026.05.28
Project Name:
Project# 191BWC25C0102- NIWTP Biosolids Sludge Dryer Alternative SHINCCI-USA Project Number:
SHINCCI.USA-USA-RRFTP-0027
Client Name:
U.S. Section of the International Boundary and Water Commission
9'-2 1/4"
4' -2
/4
8'-6 1/8"
4' -6
/4
4'
-9
A
GN-811
C
GN-812
HC_SUPERPART
CONTROL PANEL
M-1 1.5kW
M-2 1.5kW
N-3
DN200
N-2
DN100
N-1
DN100
M-3 1.5kW
B
GN-812
GENERAL INFORMATION
SCREW PRESS 720 X 1
MATERIAL :SS-304
TYPE DOUBLE-SCREW WEAR-FREE SCREW PRESS
CAPACITY
TYPE
MOTOR LIST
NO. NAME POWER
M-1 MOTOR NO.1 1.5KW
M-2 MOTOR NO.2 1.5KW
M-3 MOTOR NO.3 1.5KW
TOTAL POWER 4.5KW
PIPE CONNECTION LIST
NO. SIZE NAME TYPE
N-1 DN100 SLUDGE INLET FLANGE PN10 (SS 304)
N-2 DN100 OVERFLOW OUTLET FLANGE PN10 (SS 304)
N-3 DN200 FILTRATE OUTLET FLANGE PN10 (SS 304)
N-4 DN25 WATER INLET RECESSED UNION (PVC)
N-5 DN32 POLYMER INLET RECESSED UNION (PVC)
N-6 DN50 DRAIN OUTLET RECESSED UNION (PVC)
XF-721SW
CAPACITY 180-300DS.KG/H
3' -1
1/
4"
TH
IS
D R
AW
IN
G
IS
T H
E C
O
PY
R
IG
H T
O
FS
H
IN
C C
I.U
SA
-U
SA
A N
D M
U
ST
N O
T
BE
R
ET
AI
N
ED
, C
O
PI
ED
O
R U
SE
D
W
IT
H O
U T
TH
E
C O
N
SU
LT
AN
T' S
AU
TH
O R
IZ
AT
IO
N
A
1 2 3 4 5
B
C
D
1 2 3 4 5
4743 E. 30th Place, Yuma, AZ 85365 Tel: +1 (520) 834-2433 Email:
AJ@SHINCCI.USA-USA.com URL:http://www.SHINCCI.USA-USA.com
Rev. Revision history Revision Date
Notes: Drawn By:
Issue Date:
Checked By:
Scale:
Drawing No.
MJ
Scale To Fit
Drawing Title:
Approved By:
RRFTP-0027-CD-GN-810-REV.01
PRESS MODEL XF-721SW- PLAN
SPIRAL FILTER PRESS MODEL XF-721SW-
PLAN
2026.05.28
Project Name:
Project# 191BWC25C0102- NIWTP Biosolids Sludge Dryer Alternative SHINCCI-USA Project Number:
SHINCCI.USA-USA-RRFTP-0027
Client Name:
U.S. Section of the International Boundary and Water Commission
2026.05.25R00 SHS32400FL SYSTEM EQUIPMENT
8'-6 1/8"
16'-3"
TH_SUPERPART
E
AELE
S
ON
TRIP
TE
S
O
FF
R/ NE PO
E
N-6
DN50
N-1,N2
DN100
8' -4
/4
5' -1
7/
8"
TH
IS
D R
AW
IN
G
IS
T H
E C
O
PY
R
IG
H T
O
FS
H
IN
C C
I.U
SA
-U
SA
A N
D M
U
ST
N O
T
BE
R
ET
AI
N
ED
, C
O
PI
ED
O
R U
SE
D
W
IT
H O
U T
TH
E
C O
N
SU
LT
AN
T' S
AU
TH
O R
IZ
AT
IO
N
A
1 2 3 4 5
B
C
D
1 2 3 4 5
4743 E. 30th Place, Yuma, AZ 85365 Tel: +1 (520) 834-2433 Email:
AJ@SHINCCI.USA-USA.com URL:http://www.SHINCCI.USA-USA.com
Rev. Revision history Revision Date
Notes: Drawn By:
Issue Date:
Checked By:
Scale:
Drawing No.
MJ
Scale To Fit
Drawing Title:
Approved By:
RRFTP-0027-CD-GN-811-REV.01
PRESS MODEL XF-721SW- ELEVATIONS
SPIRAL FILTER PRESS MODEL XF-721SW-
ELEVATIONS
ELEVATION (A)
2026.05.28
Project Name:
Project# 191BWC25C0102- NIWTP Biosolids Sludge Dryer Alternative SHINCCI-USA Project Number:
SHINCCI.USA-USA-RRFTP-0027
Client Name:
U.S. Section of the International Boundary and Water Commission
3'-11 1/4" 4'-11"
TH_SUPERPART
TH_SUPERPART
TH_SUPERPART
TH_SUPERPART
TH_SUPERPART
TH_SUPERPART
TH_SUPERPART
TH_SUPERPART
TH_SUPERPART
TH_SUPERPART
TH_SUPERPART
TH_SUPERPART
N-4
DN25
N-6
DN50
N-5
DN32
7' -3
/2
6' -4
/8
1' -1
/8
/4
2" 4'-7 1/8"
9 1/2" 4'-4 3/8"1 7/8" 3 1/4"
TH
IS
D R
AW
IN
G
IS
T H
E C
O
PY
R
IG
H T
O
FS
H
IN
C C
I.U
SA
-U
SA
A N
D M
U
ST
N O
T
BE
R
ET
AI
N
ED
, C
O
PI
ED
O
R U
SE
D
W
IT
H O
U T
TH
E
C O
N
SU
LT
AN
T' S
AU
TH
O R
IZ
AT
IO
N
A
1 2 3 4 5
B
C
D
1 2 3 4 5
4743 E. 30th Place, Yuma, AZ 85365 Tel: +1 (520) 834-2433 Email:
AJ@SHINCCI.USA-USA.com URL:http://www.SHINCCI.USA-USA.com
Rev. Revision history Revision Date
Notes: Drawn By:
Issue Date:
Checked By:
Scale:
Drawing No.
MJ
Scale To Fit
Drawing Title:
Approved By:
RRFTP-0027-CD-GN-812-REV.01
SPIRAL FILTER PRESS MODEL XF-721SW-
ELEVATIONS
PRESS MODEL XF-721SW- ELEVATIONS
ELEVATION (B) ELEVATION (C)
2026.05.28
Project Name:
Project# 191BWC25C0102- NIWTP Biosolids Sludge Dryer Alternative SHINCCI-USA Project Number:
SHINCCI.USA-USA-RRFTP-0027
Client Name:
U.S. Section of the International Boundary and Water Commission
'-5
/4
A
GN-830
19'-10 1/2" 3'-5 1/2"
23'-4"
'-1
7/
8"
2' -8
/8
6'
-1
7/ 8"
2' -8
/8
'-3
/8
4'-7 3/8" 15'-3 1/8"
3'-5 1/2"
23'-4"
9' -9
/4
9' -9
/2
6'
-9
/2
'-1
5/
8"
'-5
/8
11'-1 7/8"
14'-1 1/4"
8'-9" 2'-8 1/8"2'-8 1/8"
'-5
/4
1/ 4"9'
-4
3' -1
3/
4"2' -1
7/
8"
'-1
5/
8"
B
GN-830
21'-4 3/4"
IV-6:
IV-3
TH
IS
D R
AW
IN
G
IS
T H
E C
O
PY
R
IG
H T
O
FS
H
IN
C C
I-U
SA
A N
D M
U
ST
N O
T
BE
R
ET
AI
N
ED
, C
O
PI
ED
O
R U
SE
D
W
IT
H O
U T
TH
E
C O
N
SU
LT
AN
T' S
AU
TH
O R
IZ
AT
IO
N
A
1 2 3 4 5
B
C
D
1 2 3 4 5
4743 E. 30th Place, Yuma, AZ 85365 Tel: +1 (520) 834-2433 Email:
AJ@Shincci-USA.com URL:http://www.Shincci-USA.com
Rev. Revision history Revision Date
Notes: Drawn By:
Issue Date:
Checked By:
Scale:
Drawing No.
MJ
Drawing Title:
Approved By:
RRFTP-0027-CD-GN-830-Rev.01
SHS32400FL SYSTEM- SILO LAYOUTS
Scale To Fit
SHS32400FL SYSTEM- SILO LAYOUTS
ELEVATION B ELEVATION A
PLAN
2026.05.28
Project Name:
Project# 191BWC25C0102- NIWTP Biosolids Sludge Dryer Alternative SHINCCI-USA Project Number:
SHINCCI.USA-USA-RRFTP-0027
Client Name:
U.S. Section of the International Boundary and Water Commission
D R
AW
IN
G
IS
T H
E C
O
PY
R
IG
H T
O
FS
H
IN
C C
I.U
SA
-U
SA
A N
D M
U
ST
N O
T
BE
R
ET
AI
N
ED
, C
O
PI
ED
O
R U
SE
D
W
IT
H O
U T
TH
E
C O
N
SU
LT
AN
T' S
AU
TH
O R
IZ
AT
IO
N
A
1 2 3 4 5
B
C
D
1 2 3 4 5
SHS32400FL SYSTEM- P&ID DIAGRAM
PROJECT# 191BWC25C0102
NIWTP BIOSOLIDS SLUDGE DRYER ALTERNATIVE
U.S. SECTION OF THE INTERNATIONAL BOUNDARY
TH_SUPERPART
EAELE S
ON
TRIP
TES
OFF
R/NE P
O
E
TH_SUPERPART
EAELE S
ON
TRIP
TES
OFF
R/NE
PO
E
TH_SUPERPART
E
AELE
S
ONTRIP
TES
OFF
R/NE PO
E
TH_SUPERPART
E
AELE S
ONTRIP
TES
OFF
R/NE POE
TH_SUPERPART
EAELE S
ON
TRIP
TES
OFF
R/
NE PO
E
TH_SUPERPART
EAEL
E
S
ON
TRIP
TES
OFF
R/
NE PO
E
BOCKWOLDT
TH_SUPERPART
EAELE S
ON
TRIP
T
ES
OFF
R/NE POE
M
TH_SUPERPART
EAELE S
ON
TRIP
TES
OFF
R/NE POE
Dosing pumps
BOCKWOLDT
M Dosing pumps
Sludge Pumps
Sludge Pumps
BOCKWOLDT
BOCKWOLDT
Sludge Pumps
Sludge Pumps
BOCKWOLDT
BOCKWOLDT
Sludge Pumps
Sludge Pumps
BOCKWOLDT
BOCKWOLDT
Sludge Pumps
Sludge Pumps
M Dosing pumps
M
Dosing pumps
M
Dosing pumps
M
Dosing pumps
M Dosing pumps
M Dosing pumps
UNIT
ELECTRICAL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
POWER DISTRIBUTION
CABINET BASE
UNIT
ELECTRICAL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
POWER DISTRIBUTION
CABINET BASE
UNIT
ELECTRICAL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
POWER DISTRIBUTION
CABINET BASE
UNIT
ELECTRICAL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
POWER DISTRIBUTION
CABINET BASE
DOSING UNIT
DOSING UNIT
DOSING UNIT
DOSING UNIT
DOSING
PUMP
DOSING
PUMP
DOSING
PUMP
DOSING
PUMP
DOSING
PUMP
DOSING
PUMP
DOSING
PUMP
DOSING
PUMP
WET
SLUDGE
WET
SLUDGE
WET
SLUDGE
WET
SLUDGE
DRIED
SLUDGE 1
DRIED
SLUDGE 2
DRIED
SLUDGE 3
DRIED
SLUDGE 4
DRIED
SLUDGE 1
DRIED
SLUDGE 2
DRIED
SLUDGE 3
DRIED
SLUDGE 4
DRIED
SLUDGE
DRIED
SLUDGE
TH
IS
D R
AW
IN
G
IS
T H
E C
O
PY
R
IG
H T
O
FS
H
IN
C C
I-U
SA
A N
D M
U
ST
N O
T
BE
R
ET
AI
N
ED
, C
O
PI
ED
O
R U
SE
D
W
IT
H O
U T
TH
E
C O
N
SU
LT
AN
T' S
AU
TH
O R
IZ
AT
IO
N
A
1 2 3 4 5
B
C
D
1 2 3 4 5
4743 E. 30th Place, Yuma, AZ 85365 Tel: +1 (520) 834-2433 Email:
AJ@Shincci-USA.com URL:http://www.Shincci-USA.com
Rev. Revision history Revision Date
Notes: Drawn By:
Issue Date:
Checked By:
Scale:
Drawing No.
MJ
Scale To Fit
Drawing Title:
Approved By:
RRFTP-0027-CD-GN-750-Rev.02
SHS32400FL SYSTEM- PID DIAGRAM
SHS32400FL SYSTEM- PID DIAGRAM
2026.04.02R00 SHS32400FL SYSTEM EQUIPMENT
DISTRIBUTION& DETAILED LAYOUTS
2026.05.28
Project Name:
Project# 191BWC25C0102- NIWTP Biosolids Sludge Dryer Alternative SHINCCI-USA Project Number:
SHINCCI.USA-USA-RRFTP-0027
Client Name:
U.S. Section of the International Boundary and Water Commission
D R
AW
IN
G
IS
T H
E C
O
PY
R
IG
H T
O
FS
H
IN
C C
I.U
SA
-U
SA
A N
D M
U
ST
N O
T
BE
R
ET
AI
N
ED
, C
O
PI
ED
O
R U
SE
D
W
IT
H O
U T
TH
E
C O
N
SU
LT
AN
T' S
AU
TH
O R
IZ
AT
IO
N
A
1 2 3 4 5
B
C
D
1 2 3 4 5
SHS32400FL SYSTEM- MECHANICAL DIAGRAMS
PROJECT# 191BWC25C0102
NIWTP BIOSOLIDS SLUDGE DRYER ALTERNATIVE
U.S. SECTION OF THE INTERNATIONAL BOUNDARY
MOISTURE CONTENT
10% DRY SLUDGE
MOISTURE CONTENT
80% WET SLUDGE
UNITELECTRICAL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
UNITELECTRICAL
BOX
UNITELECTRICAL
BOX
UNITELECTRICAL
BOX
UNITELECTRICAL
BOX
UNITELECTRICAL
BOX
POWER DISTRIBUTION
CABINET BASE
UNIT
ELECTRICAL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
POWER DISTRIBUTION
CABINET BASE
UNITELECTRICAL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
UNITELECTRICAL
BOX
UNITELECTRICAL
BOX
UNITELECTRICAL
BOX
UNITELECTRICAL
BOX
UNITELECTRICAL
BOX
POWER DISTRIBUTION
CABINET BASE
UNIT
ELECTRICAL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
POWER DISTRIBUTION
CABINET BASE
MOISTURE CONTENT
80% WET SLUDGE
MOISTURE CONTENT
80% WET SLUDGE
MOISTURE CONTENT
80% WET SLUDGE
CONDENSATE DRAIN PIPE,
DIRECTLY DISCHARGED INTO
THE OWNER'S DRAINAGE DITCH
TH
IS
D R
AW
IN
G
IS
T H
E C
O
PY
R
IG
H T
O
FS
H
IN
C C
I-U
SA
A N
D M
U
ST
N O
T
BE
R
ET
AI
N
ED
, C
O
PI
ED
O
R U
SE
D
W
IT
H O
U T
TH
E
C O
N
SU
LT
AN
T' S
AU
TH
O R
IZ
AT
IO
N
A
1 2 3 4 5
B
C
D
1 2 3 4 5
4743 E. 30th Place, Yuma, AZ 85365 Tel: +1 (520) 834-2433 Email:
AJ@Shincci-USA.com URL:http://www.Shincci-USA.com
Rev. Revision history Revision Date
Notes: Drawn By:
Issue Date:
Checked By:
Scale:
Drawing No.
MJ
Scale To Fit
Drawing Title:
Approved By:
RRFTP-0027-CD-ME-650-Rev.02
SHS32400FL SYSTEM- EXTERNAL AIR CONDENSER
DIAGRAM
SHS32400FL SYSTEM- EXTERNAL AIR CONDENSER DIAGRAM
2026.04.02R00 SHS32400FL SYSTEM EQUIPMENT
DISTRIBUTION& DETAILED LAYOUTS
2026.05.28
Project Name:
Project# 191BWC25C0102- NIWTP Biosolids Sludge Dryer Alternative SHINCCI-USA Project Number:
SHINCCI.USA-USA-RRFTP-0027
Client Name:
U.S. Section of the International Boundary and Water Commission
LN
DN65
LN
DN65
LN
DN65
LN
DN150
LN
DN65
UNIT
ELECTRICAL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
POWER DISTRIBUTION
CABINET BASE
UNIT
ELECTRICAL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
POWER DISTRIBUTION
CABINET BASE
UNIT
ELECTRICAL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
POWER DISTRIBUTION
CABINET BASE
UNIT
ELECTRICAL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
ELECTRICAL
CONTROL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
UNIT
ELECTRICAL
BOX
POWER DISTRIBUTION
CABINET BASE
CONDENSATE DRAIN PIPE,
DIRECTLY DISCHARGED INTO
THE OWNER'S DRAINAGE DITCH
TH
IS
D R
AW
IN
G
IS
T H
E C
O
PY
R
IG
H T
O
FS
H
IN
C C
I-U
SA
A N
D M
U
ST
N O
T
BE
R
ET
AI
N
ED
, C
O
PI
ED
O
R U
SE
D
W
IT
H O
U T
TH
E
C O
N
SU
LT
AN
T' S
AU
TH
O R
IZ
AT
IO
N
A
1 2 3 4 5
B
C
D
1 2 3 4 5
4743 E. 30th Place, Yuma, AZ 85365 Tel: +1 (520) 834-2433 Email:
AJ@Shincci-USA.com URL:http://www.Shincci-USA.com
Rev. Revision history Revision Date
Notes: Drawn By:
Issue Date:
Checked By:
Scale:
Drawing No.
MJ
Scale To Fit
Drawing Title:
Approved By:
RRFTP-0027-CD-ME-651-Rev.02
SHS32400FL SYSTEM- CONDENSATE PIPE DIAGRAM
SHS32400FL SYSTEM- CONDENSATE PIPE DIAGRAM
2026.04.02R00 SHS32400FL SYSTEM EQUIPMENT
DISTRIBUTION& DETAILED LAYOUTS
2026.05.28
Project Name:
Project# 191BWC25C0102- NIWTP Biosolids Sludge Dryer Alternative SHINCCI-USA Project Number:
SHINCCI.USA-USA-RRFTP-0027
Client Name:
U.S. Section of the International Boundary and Water Commission
| Sheets and Views |
| RRFTP-0027-CD-GN-000-REV.03 |
| RRFTP-0027-CD-GN-001-REV.03 |
| RRFTP-0027-CD-GN-010-REV.03 |
| RRFTP-0027-CD-GN-100-REV.03 |
| RRFTP-0027-CD-GN-101-REV.03 |
| RRFTP-0027-CD-GN-300-REV.03 |
| RRFTP-0027-CD-GN-301-REV.03 |
| RRFTP-0027-CD-GN-002-REV.03 |
| RRFTP-0027-CD-GN-800-Rev.02 |
| RRFTP-0027-CD-GN-801-Rev.02 |
| RRFTP-0027-CD-GN-802-Rev.02 |
| RRFTP-0027-CD-GN-803-Rev.02 |
| RRFTP-0027-CD-GN-804-Rev.02 |
| RRFTP-0027-CD-GN-805-Rev.02 |
| RRFTP-0027-CD-GN-806-Rev.02 |
| RRFTP-0027-CD-GN-810-REV.01 |
| RRFTP-0027-CD-GN-811-REV.01 |
| RRFTP-0027-CD-GN-812-REV.01 |
| RRFTP-0027-CD-GN-830-Rev.01 |
| RRFTP-0027-CD-GN-003-REV.03 |
| RRFTP-0027-CD-GN-750-Rev.02 |
| RRFTP-0027-CD-GN-004-REV.03 |
| RRFTP-0027-CD-ME-650-Rev.02 |
| RRFTP-0027-CD-ME-651-Rev.02 |
File details come from the government source that posted it. Updated .