RR-24-4968 Bid Outcome Form_12182024.pdf
PDF 173 KB Posted
- Attached to
- RR-24-4968 Reagan Memorial Tollway (I-88) Bridge Rehabilitation Over Union Pacific RailRoad M. P. 92. 6
- Solicitation number
- 25-557THA-ENGCO-B-45220
- Issued by
- Dekalb County, Illinois
About this file
This is a Bid Outcome Form for RR-24-4968 from the Illinois Tollway showing bid results for a bridge rehabilitation project over Union Pacific Railroad. The form indicates that notice was given that the Illinois Tollway has identified Paint Construction Company, Inc. as the apparent low bidder on contract RR-24-4968, with the contract scheduled to be awarded by the Illinois Tollway's Board of Directors following board meeting approval.
The bid amounts shown on the form are $2,857,185.45 with an award criteria of $2,713,506.82. The document notes that bid preferences under 30 ILCS 500/45-105 may impact the designation of the apparent low bidder. No bid credits are listed on the form for any of the bidders.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N O
T
IFIC
A T
IO
N
O F B
ID
O
U T
C O
M E
C ontract #:
V endor:
D escription:
B idB uy R eference #:
V endor N am e &
L ocation*
B id
B id C redits A w ard C riteria
D esignation of the apparent low bidder m ay be im pacted by the bid preference provided for in
30 ILC
S 500/45-105.
| Contract#: RR-24-4968 |
| BidBuy Reference#: 25-557THA-ENGCO-B-4522020 |
| Company Name: Path Construction Company, Inc. |
| Description: Reagan Memorial Tollway (I-88), Bridge Rehabilitation Over Union Pacific Railroad, M.P. 92.6 |
| Text: Notice is hereby given that the Illinois Tollway has identified Path Construction Company, Inc. as the apparent low bidder on contract RR-24-4968. The contract is scheduled to be awarded by the Illinois Tollway’s Board of Directors to Path Construction Company, Inc. at an upcoming board meeting, subject to approval by the Chief Procurement Office for General Services. This Notification of Bid Outcome does not constitute a binding commitment by the Illinois Tollway. |
Pursuant to JCAR Section 6.420(a), Filing of a Protest, “All protests shall be in writing and filed with the CPO within 7 calendar days after the protester knows or should have known of the facts giving rise to the protest. Protests filed after the 7 calendar day period will not be considered…”
| Vendor Name and Location1: Path Construction Company, Inc., Illinois |
| Vendor Name and Location2: F.H.Paschen, S.N. Nielsen & Associates, Illinois |
| Vendor Name and Location3: |
| Vendor Name and Location4: |
| Bid Amount 1: $2,857,185.45 |
| Bid Amount 2: $3,713,506.82 |
| Bid Amount 3: |
| Bid Amount 4: |
| Add Row: |
| Delete Row: |
| Bid Credits 1: $0 |
| Bid Credits 2: $70,000.00 |
| Bid Credits 3: |
| Bid Credits 4: |
| Bid Credits 5: |
| Vendor Name and Location5: |
| Bid Amount 5: |
| Award Criteria 1: $2,857,185.45 |
| Award Criteria2: $3,643,506.82 |
| Award Criteria 3: |
| Award Criteria 4: |
| Award Criteria5: |
| Vendor Name and Location6: |
| Bid Amount 6: |
| Bid Credits 6: |
| Award Criteria6: |
| Vendor Name and Location7: |
| Bid Amount 7: |
| Award Criteria7: |
| Bid Credits 7: |
| Print: |
File details come from the government source that posted it. Updated .