RR-23-4886 Systemwide CCTV Camera and Ramp Queue Detection Installation
Solicitation number
23-557THA-ENGCO-B-36236
Issued by
Boone County, Illinois

About this file

This document is Addendum No. 1 to the Request for Response (RR-23-4886) for the Systemwide CCTV Camera and Ramp Queue Detection Installation project issued by the State of Illinois. The project involves the installation of CCTV cameras and ramp queue detection systems across the state. The addendum provides clarification on the electronic submission requirement, directing bidders to the attached Volume I for required documents. No other changes to the original solicitation are noted.

The pricing terms, set-asides, incumbent information, funding sources, and other salient details are not provided in this addendum. The original solicitation document would contain those specifics.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Illinois State Toll Highway Authority Contract No. RR-23-4886 Addendum 1 Page 1 of 5 5/23/2023

ADDENDUM NO. 1

TO

CONTRACT REQUIREMENTS

FOR CONTRACT RR-23-4886

ILLINOIS STATE TOLL HIGHWAY AUTHORITY

Date: 5/23/2023

For which proposals will be received by the Illinois State Toll Highway Authority through electronic bidding via BidBuy until 10:30:00 A.M. local time, June 1, 2023

NOTICE OF REVISION TO CONTRACT

NOTES:

1. A complete set of Schedule of Prices is included with this Addendum and must be inserted into the Contract Bid by the Bidder. The Bidder’s attention is called to pages P-5R through P-8R and P-11R which have been revised and included as part of the Schedule of Prices.

2. The following revised Special Provision pages are included in the Contract with this Addendum: iR, iiR, J-16R, J-17R, J-109R, and J-144R

3. The following new Special Provision pages are included in the Contract with this Addendum: J-37A through J-37E

4. The following revised Contract Drawings are included in this Addendum:

Volume 1 – Drawings 3, 5, 6, 13, 16, 20, 22, 28, 31, 33, 34, 37, 40, 41, 45, 47, 50, 54, 56, 59, 60, and 61

5. The minutes and sign-in sheet from the Optional Pre-Bid Meeting held on May 3, 2023 are included in this

Addendum.

Addendum 1 Page 2 of 5 5/23/2023

CHANGES TO THE CONTRACT REQUIREMENTS

CHANGES TO THE ADVERTISEMENT FOR SEALED BID

Change #1 Contract Requirements, Volume I, Proposal, replace pages P-5 through P-8 and P-11 with pages P-5R through P-8R and P-11R (attached). This replacement contains the following revisions:

1.1. Revised the quantity for CONDUIT ATTACHED TO STRUCTURE, 1 1/2” DIA., PVC COATED GALVANIZED

STEEL from 770 to 830.

1.2. Added pay item JT130776 DIGITAL SURVEY QL-A.

1.3. Added pay item JT130777 DIGITAL SURVEY QL-B.

1.4. Revised the quantity for ELECTRIC SERVICE INSTALLATION – ITS from 15 to 16.

1.5. Revised the UNIT PRICE DOLLAR and AMOUNT DOLLAR for CONTRACTOR’S QUALITY PROGRAM from

60,000 to 65,000.

1.6. Revised the value of TOTAL AMOUNT OF CONTINGENCY WORK + CONTRACTOR’S QUALITY PROGRAM

(CQP) from 97,000 to 102,000.

CHANGES TO THE SCHEDULE OF PRICES

SUMMARY OF REVISIONS TO PAY ITEMS QUANTITIES

SP.

PROV.

PAY ITEM

NO.

DESCRIPTION UNIT

ORIGINAL

QUANTITY

CHANGE

NEW

QUANTITY

* JS811051

CONDUIT ATTACHED TO STRUCTURE, 1 1/2" DIA.,

PVC COATED GALVANIZED STEEL

FOOT 770 +60 830

* JT130776 DIGITAL SURVEY QL-A FOOT 0 +36,449 36,449

* JT130777 DIGITAL SURVEY QL-B FOOT 0 +2,685 2,685

* JT804005 ELECTRIC SERVICE INSTALLATION - ITS EACH 15 +1 16

* Denotes Special Provision

CHANGES TO THE CONTRACT SPECIAL PROVISIONS

Change #2 Contract Requirements, Volume II, replace page i with page iR.

2.1. Revised page numbers for J – 16R and J – 17R in the Table of Contents.

Change #3 Contract Requirements, Volume II, replace page ii with page iiR.

3.1. Added DIGITAL UTILITY AS-BUILT special provision to the Table of Contents.

3.2. Revised page numbers for J – 109R and J – 144R in the Table of Contents.

Change #4 Contract Requirements, Volume II, replace page J-16 with page J-16R.

4.1. Added paragraph at the end of S.P. 115.5.

4.2. Removed the following files from S.P. 120 table.

4.2.1. RR-03-5180_V2_NR.pdf

4.2.2. RR-06-5802R_R_V3-20081230.pdf

4.2.3. RR-13-5660R_R_V3_2022125.pdf

4.2.4. RR-13-5662_R_P1_2020414.pdf

4.2.5. RR-16-4253_R_V1_20211223.pdf

Change #5 Contract Requirements, Volume II, replace page J-17 with page J-17R.

5.1. Removed RR-19-4474_R_V2_2022426.pdf (duplicate) file from S.P. 120 table.

Addendum 1 Page 3 of 5 5/23/2023

Change #6 Contract Requirements, Volume II, replace page J-109 with page J-109R.

6.1. Revised INSTALL CLOSED CIRCUIT TELEVISION (CCTV) CAMERA, ITS ASSEMBLY special provision to add information about extended CAT6 cable and remove PoE information from the Materials furnished by the Contractor section.

Change #7 Contract Requirements, Volume II, replace page J-144 with page J-144R.

7.1. Revised Fiber Distribution Panel location table.

Change #8 Contract Requirements, Volume II, added pages J-37A through J-37E.

8.1. Added DIGITAL UTILITY AS-BUILT special provision.

CHANGES TO THE CONTRACT DRAWINGS

Change #9 Contract Plans, Volume 1, Drawing 3. Abbreviations & Acronyms, Site Plan Legend, Roadway

Jurisdiction. This drawing contains the following revisions (attached):

9.1. Revised Sheet. Added note 17 to project general notes.

Change #10 Contract Plans, Volume 1, Drawing 5. Summary of Quantities (1 of 2). This drawing contains the following revisions (attached):

10.1. Revised Sheet. Added DIGITAL SURVEY QL-A and DIGITAL SURVEY QL-B pay items.

10.2. Revised Sheet. Revised total quantities for JS811051 and JT804005.

Change #11 Contract Plans, Volume 1, Drawing 6. Summary of Quantities (2 of 2). This drawing contains the following

11.1. Revised Sheet. Added DIGITAL SURVEY QL-A and DIGITAL SURVEY QL-B pay items.

11.2. Revised Sheet. Revised total quantities for JS811051 and JT804005.

Change #12 Contract Plans, Volume 1, Drawing 13. Site Locations (2 of 2). This drawing contains the following

12.1. Revised Sheet. Added location for Site 355-13.54.

Change #13 Contract Plans, Volume 1, Drawing 16. Ramp Queue Detection Site Plan, I-355 SB MP 12.51 (1 of 3).

This drawing contains the following revisions (attached):

13.1. Revised Sheet. Added DIGITAL SURVEY QL-A and DIGITAL SURVEY QL-B pay items to Schedule of

Quantities.

Change #14 Contract Plans, Volume 1, Drawing 20. CCTV Camera Site Plan, I-88 WB MP 53.48 (1 of 2). This drawing contains the following revisions (attached):

14.1. Revised Sheet. Added DIGITAL SURVEY QL-A pay item to Schedule of Quantities.

Change #15 Contract Plans, Volume 1, Drawing 22. CCTV Camera Site Plan, I-88 EB MP 61.78 (1 of 4). This drawing

15.1. Revised Sheet. Added DIGITAL SURVEY QL-A and DIGITAL SURVEY QL-B pay items to Schedule of

Change #16 Contract Plans, Volume 1, Drawing 28. CCTV Camera Site Plan, I-88 WB MP 97.39. This drawing

16.1. Revised Sheet. Added DIGITAL SURVEY QL-A pay item to Schedule of Quantities.

Addendum 1 Page 4 of 5 5/23/2023

Change #17 Contract Plans, Volume 1, Drawing 31. CCTV Camera Site Plan, I-88 EB MP 99.96 (3 of 3). This drawing contains the following revisions (attached):

17.1. Revised Sheet. Added DIGITAL SURVEY QL-A and DIGITAL SURVEY QL-B pay items to Schedule of

Change #18 Contract Plans, Volume 1, Drawing 33. CCTV Camera Site Plan, I-88 WB MP 106.39 (2 of 2). This drawing contains the following revisions (attached):

18.1. Revised Sheet. Added DIGITAL SURVEY QL-A and DIGITAL SURVEY QL-B pay items to Schedule of

Change #19 Contract Plans, Volume 1, Drawing 34. CCTV Camera Site Plan, I-88 WB MP 110.90 (1 of 3). This

19.1. Revised Sheet. Added DIGITAL SURVEY QL-A pay item to Schedule of Quantities.

Change #20 Contract Plans, Volume 1, Drawing 37. CCTV Camera Site Plan, I-88 WB MP 116.25 (1 of 3). This

20.1. Revised Sheet. Added DIGITAL SURVEY QL-A and DIGITAL SURVEY QL-B pay items to Schedule of

Change #21 Contract Plans, Volume 1, Drawing 40. CCTV Camera Site Plan, I-88 MP 117.85. This drawing contains the following revisions (attached):

21.1. Revised Sheet. Added Site Specific Note D and Detail A.

Change #22 Contract Plans, Volume 1, Drawing 41. CCTV Camera Site Plan, I-88 WB MP 126.00 (1 of 4). This

22.1. Revised Sheet. Added DIGITAL SURVEY QL-A and DIGITAL SURVEY QL-B pay items to Schedule of

Change #23 Contract Plans, Volume 1, Drawing 45. CCTV Camera Site Plan, I-88 WB MP 126.88. This drawing

23.1. Revised Sheet. Added DIGITAL SURVEY QL-A pay item to Schedule of Quantities.

Change #24 Contract Plans, Volume 1, Drawing 47. CCTV Camera Site Plan, I-90 WB & EB MP 3.55. This drawing

24.1. Revised Sheet. Added Site Specific Note D.

Change #25 Contract Plans, Volume 1, Drawing 50. CCTV Camera Site Plan, I-90 WB M.P. 10.21 (3 of 3). This

25.1. Revised Sheet. Added DIGITAL SURVEY QL-A and DIGITAL SURVEY QL-B pay items to Schedule of

Change #26 Contract Plans, Volume 1, Drawing 54. CCTV Camera Site Plan, I-90 WB & EB MP 53.83. This drawing

26.1. Revised Sheet. Added Site Specific Note D.

Change #27 Contract Plans, Volume 1, Drawing 56. CCTV Camera Site Plan, I-90 WB M.P. 70.19. This drawing

27.1. Revised Sheet. Added DIGITAL SURVEY QL-A pay item to Schedule of Quantities.

Change #28 Contract Plans, Volume 1, Drawing 59. CCTV Camera Site Plan, I-355 NB & SB MP 14.39. This drawing

28.1. Revised Sheet. Added Site Specific Note E.

Addendum 1 Page 5 of 5 5/23/2023

Change #29 Contract Plans, Volume 1, Drawing 60. CCTV Camera Site Plan, I-355 SB M.P. 20.06, NB M.P. 20.08, SB M.P. 20.15, NB M.P. 20.18. This drawing contains the following revisions (attached):

29.1. Revised Sheet. Added DIGITAL SURVEY QL-A and DIGITAL SURVEY QL-B pay items to Schedule of

29.2. Revised Sheet. Revised quantities for JS811051 and JT132830.

Change #30 Contract Plans, Volume 1, Drawing 61. CCTV Camera Site Plan, I-355 SB M.P. 22.62. This drawing

30.1. Revised Sheet. Added DIGITAL SURVEY QL-A and DIGITAL SURVEY QL-B pay items to Schedule of

END OF ADDENDUM CHANGES

S.P.

PAY ITEM

NO.

DESIGNATION UNIT QUANTITY

UNIT PRICE

DOLLAR

AMOUNT

DOLLAR

* 20100500 TREE REMOVAL, ACRES ACRE 0.25

* 50800205 REINFORCEMENT BARS, EPOXY COATED POUND 200

* 66900530 SOIL DISPOSAL ANALYSIS EACH 17

72700100

STRUCTURAL STEEL SIGN SUPPORT -

BREAKAWAY

POUND 967

73400100 CONCRETE FOUNDATIONS CU YD 2.54

81100300

CONDUIT ATTACHED TO STRUCTURE, 1" DIA.,

GALVANIZED STEEL

FOOT 780

87900200 DRILL EXISTING HANDHOLE EACH 1

89502300 REMOVE ELECTRIC CABLE FROM CONDUIT FOOT 2,475

89502350

REMOVE AND REINSTALL ELECTRIC CABLE

FROM CONDUIT

FOOT 600

* JI669015

ON-SITE MONITORING OF REGULATED

SUBSTANCES

CAL DAY 9

** JS120100

TRAILER MOUNTED FULL MATRIX PORTABLE

CHANGEABLE MESSAGE SIGNS

EACH 4

** JS213004

EXPLORATION TRENCH, UTILITIES (HAND

EXCAVATION)

FOOT 500

** JS213006

EXPLORATION TRENCH, UTILITIES (VACUUM

EXCAVATION)

FOOT 500

** JS671020 MOBILIZATION, TOLLWAY (MODIFIED) L SUM 1

* JS701010 MAINTENANCE OF TRAFFIC L SUM 1

** JS720120 SIGN INSTALLATION, TYPE 3 SQ FT 84

** JS811051

CONDUIT ATTACHED TO STRUCTURE, 1 1/2"

DIA., PVC COATED GALVANIZED STEEL

FOOT 830

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY

CONTRACT NO. RR-23-4886

SYSTEMWIDE

SCHEDULE OF PRICES

CCTV CAMERA AND RAMP QUEUE DETECTION INSTALLATION

Illinois State Toll Highway Authority

Addendum No. 1 P - 5R May 23, 2023

NO.

DESIGNATION UNIT QUANTITY

UNIT PRICE

DOLLAR

AMOUNT

DOLLAR

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY

CONTRACT NO. RR-23-4886

SYSTEMWIDE

SCHEDULE OF PRICES

CCTV CAMERA AND RAMP QUEUE DETECTION INSTALLATION

** JS813053

JUNCTION BOX, STAINLESS STEEL, ATTACHED

TO STRUCTURE, 12" X 10" X 6"

EACH 19

** JS814002 HEAVY-DUTY HANDHOLE, TOLLWAY EACH 32

** JS817212

ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE

USE) 1/C NO. 8

FOOT 46,743

** JS817213

ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE

USE) 1/C NO. 6

FOOT 1,065

* JT130776 DIGITAL SURVEY QL-A FOOT 36,449

* JT130777 DIGITAL SURVEY QL-B FOOT 2,685

* JT130790 REMOVE SOLAR GENERATOR ASSEMBLY EACH 1

* JT130822

VIDEO POWER JUNCTION BOX MODEL A,

NEMA 1

EACH 2

* JT132699

FURNISH COMMUNICATIONS SYSTEM

UPGRADE

EACH 20

* JT132800 REMOVE ITS POLE MOUNTED ENCLOSURE EACH 2

* JT132810

ITS POLE MOUNTED ENCLOSURE (CCTV OR

MVDS)

EACH 16

* JT132814 ITS DISCONNECT SWITCH ASSEMBLY EACH 18

* JT132830

FIBER OPTIC COMMUNICATIONS, ITS

ASSEMBLY

EACH 18

* JT132845

MICROWAVE VEHICLE DETECTION SYSTEM

(MVDS), ITS ASSEMBLY

EACH 1

* JT132850

STATIC SIGN FLASHING BEACON ASSEMBLY

INSTALLATION

EACH 1

* JT132859

ITS STRUCTURE MOUNTED ENCLOSURE

(MODIFIED)

EACH 2

* JT134037

ITS ELEMENT SITE GROUNDING - POLE

MOUNTED ASSEMBLY

EACH 18

* JT135006

REMOVE MICROWAVE VEHICLE DETECTION

ASSEMBLY

EACH 1

* JT135028 INSTALL CCTV CAMERA, ITS ASSEMBLY EACH 35

Illinois State Toll Highway Authority

Addendum No. 1 P - 6R May 23, 2023

NO.

DESIGNATION UNIT QUANTITY

UNIT PRICE

DOLLAR

AMOUNT

DOLLAR

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY

CONTRACT NO. RR-23-4886

SYSTEMWIDE

SCHEDULE OF PRICES

CCTV CAMERA AND RAMP QUEUE DETECTION INSTALLATION

* JT135096 ITS POLE AND BASE REMOVAL EACH 1

* JT135097 REMOVE CCTV CAMERA, POLE MOUNTED EACH 1

* JT135098

REMOVE CCTV CAMERA, STRUCTURE

MOUNTED

EACH 15

* JT140051

WIRELESS IN-PAVEMENT VEHICLE DETECTOR

SYSTEM REPEATER

EACH 1

* JT140060

WIRELESS IN-PAVEMENT VEHICLE DETECTOR

RECEIVER

EACH 2

* JT140061

WIRELESS IN-PAVEMENT VEHICLE DETECTOR

SENSOR PAIR

EACH 3

* JT160099

HANDHOLE FOR SINGLE MODE FIBER OPTIC

CABLE, TORSION ASSIST, 48"X72"X36"

EACH 7

* JT160130

HANDHOLE FOR SINGLE MODE FIBER OPTIC

CABLE, 36"X60"X36"

EACH 22

* JT160217 LOCATE POST FOR FIBER OPTIC CABLE EACH 29

* JT160218

CABLE MARKER WARNING SIGN, WITH POST,

FOR FIBER OPTIC CABLE

EACH 57

* JT160219

CABLE MARKER WARNING SIGN FOR FIBER

OPTIC CABLE

EACH 4

* JT160251

HANDHOLE REMOVAL FOR SINGLE MODE

FIBER OPTIC CABLE, NO SALVAGE

EACH 7

* JT160367 INSTALL FIBER DISTRIBUTION PANEL EACH 2

* JT202009 NON-SPECIAL WASTE DISPOSAL, TYPE 1 CU YD 183

* JT804005 ELECTRIC SERVICE INSTALLATION - ITS EACH 16

* JT810874

UNDERGROUND CONDUIT, COILABLE

NONMETALLIC CONDUIT, SDR 11, 1 1/2" DIA.

FOOT 43,941

* JT810879

UNDERGROUND CONDUIT, COILABLE

NONMETALLIC CONDUIT, SDR 11, 4" DIA.

FOOT 2,925

Illinois State Toll Highway Authority

Addendum No. 1 P - 7R May 23, 2023

NO.

DESIGNATION UNIT QUANTITY

UNIT PRICE

DOLLAR

AMOUNT

DOLLAR

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY

CONTRACT NO. RR-23-4886

SYSTEMWIDE

SCHEDULE OF PRICES

CCTV CAMERA AND RAMP QUEUE DETECTION INSTALLATION

* JT810881

UNDERGROUND CONDUIT, COILABLE

NONMETALLIC CONDUIT, SDR 11, 6" DIA.

FOOT 270

* JT830210 INSTALL GROUND MOUNTED LIGHT POLE EACH 16

* JT836022

INSTALL ITS ELEMENT POLE FOUNDATION

STEEL HELIX (12 FT)

EACH 1

* JT836024

INSTALL ITS ELEMENT POLE FOUNDATION

STEEL HELIX (10 FT)

EACH 14

* JT836027 ITS CONCRETE SERVICE PAD, TYPE A EACH 4

* JT836028 ITS CONCRETE SERVICE PAD, TYPE B EACH 11

* JT836029 ITS CONCRETE SERVICE PAD, TYPE C EACH 1

* JT836037

INSTALL LIGHT POLE FOUNDATION

(ROADWAY) STEEL HELIX (7 FT)

EACH 1

* JT871021

MULTIMODE FIBER OPTIC CABLE REMOVAL

NO SALVAGE

FOOT 500

* JT901056 LOCATOR TRACER WIRE FOOT 25,795

* JT901057 LOCATOR TRACER WIRE, DIRECTIONAL BORE FOOT 2,315

TOTAL AMOUNT OF CORE WORK

* JT155001 CONTRACTOR'S QUALITY PROGRAM L SUM 1 65,000 65,000

* JT154008

UNFORESEEN ADDITIONAL MAINTENANCE OF

TRAFFIC

UNIT 5,000 1 5,000

* JT154032

CONTRACT ALLOWANCE FOR ADDITIONAL ITS

WORK

UNIT 7,000 1 7,000

Illinois State Toll Highway Authority

Addendum No. 1 P - 8R May 23, 2023

NO.

DESIGNATION UNIT QUANTITY

UNIT PRICE

DOLLAR

AMOUNT

DOLLAR

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY

CONTRACT NO. RR-23-4886

SYSTEMWIDE

SCHEDULE OF PRICES

CCTV CAMERA AND RAMP QUEUE DETECTION INSTALLATION

* JT154067

CONTRACT ALLOWANCE FOR

CONSTRUCTIONWORKS APPRENTICES

UNIT 25,000 1 25,000

999NEG04

NON-COMPLIANCE WITH TOLLWAY

MAINTENANCE OF TRAFFIC PER TOLLWAY

SUPPL. SPEC. 701.08(a)

INC/DAY (2,500.00)

999NEG05

FAILURE TO RESPOND TO RE-ESTABLISH

DEVICES PER TOLLWAY SUPPL. SPEC.

701.08(b)

OCCUR (2,500.00)

999NEG07

LOSS OR DAMAGE TO TOLLWAY OWNED

DEVICES PER TOLLWAY SUPPL. SPEC.

701.08(d)

SQ. FT. (100.00)

999NEG08

FAILURE TO OPEN TRAFFIC LANES TO

TRAFFIC PER TOLLWAY SUPPL. SPEC.

701.08(e)(a)

15 MINUTES (3,000.00)

999NEG21

DAMAGES TO ILLINOIS TOLLWAY'S

OPERATIONAL FACILITIES PER S.P. 115.5 -

JANE ADDAMS MEMORIAL WEST

OCCUR (4,000.00)

999NEG22

DAMAGES TO ILLINOIS TOLLWAY'S

OPERATIONAL FACILITIES PER S.P. 115.5 -

JANE ADDAMS MEMORIAL EAST

OCCUR (9,000.00)

999NEG24

DAMAGES TO ILLINOIS TOLLWAY'S

OPERATIONAL FACILITIES PER S.P. 115.5 -

REAGAN MEMORIAL EAST

OCCUR (9,000.00)

999NEG25

DAMAGES TO ILLINOIS TOLLWAY'S

OPERATIONAL FACILITIES PER S.P. 115.5 -

VETERANS MEMORIAL

OCCUR (5,000.00)

999NEG30

DAMAGES TO ILLINOIS TOLLWAY'S

OPERATIONAL FACILITIES PER S.P. 115.5 - ALL

ROADWAYS OFF-PEAK

OCCUR (2,000.00)

999NEG31

DAMAGE TO ELECTRICAL FACILITIES PER

TOLLWAY SUPPL. SPEC. 107.30(b)

INC/DAY (1,000.00)

999NEG32

LIQUIDATED DAMAGES FOR DELAY IN

SUBMITTAL OF PROGRESS SCHEDULE PER

TOLLWAY SUPPL. SPEC. 108.02(e)

DAY (300.00)

999NEG44

LIQUIDATED DAMAGES FOR NON-

COMPLETION PER S.P. 105.1.1

CAL DAY (4,500.00)

999NEG45

LIQUIDATED DAMAGES FOR NON-

COMPLETION PER S.P. 105.1.2

CAL DAY (4,500.00)

999NEG49

DAMAGE TO FIBER OPTIC UTILITIES, PER S.P.

115.3

OCCUR (10,000.00)

999NEG53

NON-COMPLIANCE WITH CONTRACTOR

QUALITY PROGRAM SPECIAL PROVISION

OCCUR (1,000.00)

Illinois State Toll Highway Authority

Addendum No. 1 P - 9 May 23, 2023

NO.

DESIGNATION UNIT QUANTITY

UNIT PRICE

DOLLAR

AMOUNT

DOLLAR

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY

CONTRACT NO. RR-23-4886

SYSTEMWIDE

SCHEDULE OF PRICES

CCTV CAMERA AND RAMP QUEUE DETECTION INSTALLATION

999NEG54

DAMAGE TO TOLLWAY MULTI-MODE CABLE,

DMS SIGNS, CAMERAS,

TELECOMMUNICATION, CABLE, ELECTRICAL,

WATER AND SEWER PER S.P. 115.4

OCCUR (1,000.00)

ADJUSTMENTS

* 999ADJ45

CONSTRUCTIONWORKS APPRENCTICES

WAGE RATE PAYMENT

HOUR 15.00

* 999ADJ46 ARROW BOARD EACH 13.32

* 999ADJ47 ARROW BOARD (WINTER RATE) EACH 19.98

* 999ADJ48 TYPE I OR TYPE II BARRICADE EACH 1.00

* 999ADJ49 TYPE I OR TYPE II BARRICADE (WINTER RATE) EACH 1.50

* 999ADJ50 TYPE III BARRICADE EACH 2.35

* 999ADJ51 TYPE III BARRICADE (WINTER RATE) EACH 3.53

* 999ADJ52 PLASTIC DRUM EACH 1.25

* 999ADJ53 PLASTIC DRUM (WINTER RATE) EACH 2.34

* 999ADJ54 FLASHER LIGHT EACH 0.20

* 999ADJ55 FLASHER LIGHT (WINTER RATE) EACH 0.30

* 999ADJ56 STEADY BURN LIGHT EACH 0.30

* 999ADJ57 STEADY BURN LIGHT (WINTER RATE) EACH 0.45

* 999ADJ58 HI-INTENSITY LIGHT, SIGN MOUNTED EACH 1.70

Illinois State Toll Highway Authority

Addendum No. 1 P - 10 May 23, 2023

NO.

DESIGNATION UNIT QUANTITY

UNIT PRICE

DOLLAR

AMOUNT

DOLLAR

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY

CONTRACT NO. RR-23-4886

SYSTEMWIDE

SCHEDULE OF PRICES

CCTV CAMERA AND RAMP QUEUE DETECTION INSTALLATION

* 999ADJ59

HI-INTENSITY LIGHT, SIGN MOUNTED (WINTER

RATE)

EACH 2.55

* 999ADJ60 CMS, SOLAR POWERED EACH 45.70

* 999ADJ61 CMS, SOLAR POWERED (WINTER RATE) EACH 68.55

* 999ADJ62 SIGNS, WORK ZONE EACH 2.00

* 999ADJ63 SIGNS, WORK ZONE (WINTER RATE) EACH 3.00

* 999ADJ64

TEMPORARY MODULAR GLARE SCREEN (12.5

FT. SECTION)

UNIT 0.60

* 999ADJ65

TEMPORARY CONCRETE BARRIER (12.5 FT.

SECTION)

UNIT 0.83

* 999ADJ66

TEMPORARY CONCRETE BARRIER (10.0 FT.

SECTION)

UNIT 0.50

* 999ADJ67

TEMPORARY CONCRETE BARRIER, CROSS

BOLT CONNECTION (12.5 FT. SECTION)

UNIT 1.47

* 999ADJ69

IMPACT ATTENUATOR, TEMPORARY

(SEVERE USE, NARROW), TEST LEVEL 3

EACH 18.33

* 999ADJ70

IMPACT ATTENUATOR, TEMPORARY

(SEVERE USE, WIDE), TEST LEVEL 3

EACH 18.33

* 999ADJ71

TEMPORARY INFORMATION SIGNING-GROUND

MOUNTED, 24 SQ FT IN AREA OR LESS

SQ FT 0.25

* 999ADJ72

TEMPORARY INFORMATION SIGNING-GROUND

MOUNTED, GREATER THAN 24 SQ FT IN AREA

SQ FT 0.25

* 999ADJ73

TEMPORARY INFORMATION SIGNING-

OVERHEAD, 24 SQ FT IN AREA OR LESS

SQ FT 0.25

* 999ADJ74

TEMPORARY INFORMATION SIGNING-

OVERHEAD, GREATER THAN 24 SQ FT IN AREA

SQ FT 0.25

102,000TOTAL AMOUNT OF CONTINGENCY WORK + CONTRACTOR'S QUALITY PROGRAM (CQP)

Illinois State Toll Highway Authority

Addendum No. 1 P - 11R May 23, 2023

NO.

DESIGNATION UNIT QUANTITY

UNIT PRICE

DOLLAR

AMOUNT

DOLLAR

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY

CONTRACT NO. RR-23-4886

SYSTEMWIDE

SCHEDULE OF PRICES

CCTV CAMERA AND RAMP QUEUE DETECTION INSTALLATION

S.P. COLUMN LEGEND

* INDICATES SPECIAL PROVISION

** INDICATES TOLLWAY SUPPLEMENTAL SPECIFICATIONS

AWARD CRITERIA

TOTAL AMOUNT OF CORE WORK + TOTAL AMOUNT OF CONTINGENCY WORK +

CONTRACTOR'S QUALITY PROGRAM = TOTAL AMOUNT OF BASE BID

BID CREDIT

Illinois State Toll Highway Authority

Addendum No. 1 P - 12 May 23, 2023

Contract Number RR-23-4886

Addendum No. 1 iR May 23, 2023

ILLINOIS STATE TOLL HIGHWAY AUTHORITY (Illinois Tollway)

SPECIAL PROVISIONS

CONTRACT NUMBER RR-23-4886

SYSTEMWIDE

CCTV CAMERA AND RAMP QUEUE DETECTION INSTALLATION

VOLUME II

TABLE OF CONTENTS

S.P. 101 LOCATION AND SCOPE OF WORK ............................................................................................................... J - 1

S.P. 102 CONTRACT NUMBER RR-23-4886 INDEX OF DRAWINGS .......................................................................... J - 1

S.P. 103 CONTRACT COMPLETION DATE, SUBSTANTIAL AND INTERIM COMPLETION DATES ......................... J - 4

S.P. 104 NOTICE TO PROCEED/COMMENCEMENT OF ON-SITE WORK .................................................................. J - 4

S.P. 105 LIQUIDATED DAMAGES FOR DELAY(S) AND INCENTIVE PLAN(S) ........................................................... J - 4

S.P. 106 COOPERATION WITH UTILITIES AND OTHERS ........................................................................................... J - 5

S.P. 107 INSURANCE ..................................................................................................................................................... J - 8

S.P. 108 INDEMNIFICATION .......................................................................................................................................... J - 9

S.P. 109 WORKING HOURS AND PROSECUTION OF THE WORK ............................................................................ J - 9

S.P. 110 LIST OF INCIDENTALS TO THE PAY ITEMS ................................................................................................. J - 9

S.P. 111 EROSION AND SEDIMENT CONTROL ......................................................................................................... J - 12

S.P. 112 QUALIFIED PRODUCTS ................................................................................................................................ J - 12

S.P. 113 RESERVED ..................................................................................................................................................... J - 12

S.P. 114 DELIVERY OF SALVAGEABLE MATERIAL TO THE ILLINOIS TOLLWAY ................................................ J - 12

S.P. 115 ILLINOIS TOLLWAY OPERATIONAL FACILITIES ....................................................................................... J - 13

S.P. 116 APPROVING A PART OR PORTION OF THE WORK FOR BENEFICIAL USE ........................................ J - 16R

S.P. 117 RESERVED .................................................................................................................................................. J - 16R

S.P. 118 RIGHT-OF-WAY........................................................................................................................................... J - 16R

S.P. 119 AVAILABLE GEOTECHNICAL INFORMATION ......................................................................................... J - 16R

S.P. 120 OTHER AVAILABLE REPORTS OR AS-BUILT PLANS ............................................................................ J - 16R

S.P. 121 ELECTRONIC DATA FILES AVAILABLE ................................................................................................... J - 17R

S.P. 122 COMMITMENTS .......................................................................................................................................... J - 17R

S.P. 123 CONTRACT BOND ...................................................................................................................................... J - 17R

S.P. 124 SUBLETTING OF ASSIGNMENT OF CONTRACT ..................................................................................... J - 17R

S.P. 125 RESERVED .................................................................................................................................................. J - 17R

S.P. 126 QUALIFICATIONS AND CERTIFICATIONS ............................................................................................... J - 17R

TREE REMOVAL (ILLINOIS TOLLWAY) ............................................................................................................................. J - 18

REINFORCEMENT BARS (ILLINOIS TOLLWAY) ............................................................................................................... J - 19

DISPOSAL OF REGULATED SUBSTANCES AND UNCONTAMINATED SOIL (ILLINOIS TOLLWAY) ........................... J - 22

MAINTENANCE OF TRAFFIC ............................................................................................................................................. J - 31

EXTENDED MAINTENANCE OF TRAFFIC WORK AND EQUIPMENT RATES (ILLINOIS TOLLWAY) ............................ J - 35

Addendum No. 1 iiR May 23, 2023

DIGITAL UTILITY AS-BUILT (ILLINOIS TOLLWAY) ........................................................................................................ J - 37A

REMOVE SOLAR GENERATOR ASSEMBLY (ILLINOIS TOLLWAY) ............................................................................... J - 38

VIDEO POWER JUNCTION BOX......................................................................................................................................... J - 39

FURNISH COMMUNICATIONS SYSTEM UPGRADE ......................................................................................................... J - 46

REMOVE ITS ENCLOSURE (ILLINOIS TOLLWAY) ............................................................................................................ J - 49

ITS POLE MOUNTED ENCLOSURE, ITS ASSEMBLY (CCTV OR MVDS) ........................................................................ J - 50

ITS DISCONNECT SWITCH ASSEMBLY (ILLINOIS TOLLWAY) ....................................................................................... J - 59

FIBER OPTIC COMMUNICATIONS, ITS ASSEMBLY (ILLINOIS TOLLWAY) ................................................................... J - 62

MICROWAVE VEHICLE DETECTION SYSTEM (MVDS), ITS ASSEMBLY (ILLINOIS TOLLWAY) ................................................. J - 70

STATIC SIGN FLASHING BEACON ASSEMBLY INSTALLATION (ILLINOIS TOLLWAY) ............................................... J - 80

ITS STRUCTURE MOUNTED ENCLOSURE (MODIFIED) .................................................................................................. J - 86

ITS ELEMENT SITE GROUNDING (ILLINOIS TOLLWAY) ................................................................................................. J - 95

REMOVE MICROWAVE VEHICLE DETECTION ASSEMBLY (ILLINOIS TOLLWAY) ..................................................... J - 108

INSTALL CLOSED CIRCUIT TELEVISION (CCTV) CAMERA, ITS ASSEMBLY .......................................................... J - 109R

ITS POLE AND BASE REMOVAL (ILLINOIS TOLLWAY) ................................................................................................ J - 117

REMOVE CCTV CAMERA ................................................................................................................................................. J - 118

WIRELESS IN-PAVEMENT VEHICLE DETECTOR SYSTEM (ILLINOIS TOLLWAY) ...................................................... J - 119

CONTRACT ALLOWANCES ............................................................................................................................................. J - 133

CONTRACT ALLOWANCE FOR ADDITIONAL ITS WORK (ILLINOIS TOLLWAY) ........................................................ J - 134

CONTRACT ALLOWANCE FOR CONSTRUCTIONWORKS APPRENTICES (ILLINOIS TOLLWAY) ............................ J - 135

CONTRACTOR’S QUALITY PROGRAM (ILLINOIS TOLLWAY) ...................................................................................... J - 138

HANDHOLE FOR FIBER OPTIC CABLE, TORSION ASSIST (ILLINOIS TOLLWAY) ..................................................... J - 139

CABLE MARKER SIGN WITH POST FOR SINGLE MODE FIBER OPTIC CABLE (ILLINOIS TOLLWAY) .................... J - 141

HANDHOLE REMOVAL FOR SINGLE MODE FIBER OPTIC CABLE, NO SALVAGE .................................................... J - 143

INSTALL FIBER DISTRIBUTION PANEL ....................................................................................................................... J - 144R

ELECTRIC SERVICE INSTALLATION – ITS (ILLINOIS TOLLWAY) ................................................................................ J - 146

UNDERGROUND CONDUIT, COILABLE NON-METALLIC CONDUIT, SDR 11 (ILLINOIS TOLLWAY) ......................... J - 147

INSTALL GROUND MOUNTED LIGHT POLE ................................................................................................................... J - 152

INSTALL ITS ELEMENT POLE FOUNDATION STEEL HELIX ......................................................................................... J - 154

CONCRETE SERVICE PAD ............................................................................................................................................... J - 156

MULTI MODE FIBER OPTIC CABLE REMOVAL, NO SALVAGE .................................................................................... J - 158

LOCATE/TRACER WIRE FOR OPTIC FIBER CONDUIT RACEWAYS (ILLINOIS TOLLWAY) ....................................... J - 159

ITS DEVICE TESTING REQUIREMENTS (ILLINOIS TOLLWAY) ..................................................................................... J - 161

WARRANTY (ILLINOIS TOLLWAY) .................................................................................................................................. J - 164

PORTLAND CEMENT CONCRETE (ILLINOIS TOLLWAY) .............................................................................................. J - 166

CHECK SHEET FOR RECURRING SPECIAL PROVISIONS .................................................................................. RECURR - 1

Addendum No. 1 J - 16R May 23, 2023

Elgin O’Hare (IL-390) $2,000/hr.

(10 PM to 6 AM) All roadways $2,000/hr.

For extraordinary events, in addition to the liquidated damages the Contractor may be responsible for itemized costs associated with Emergency Responders and the Illinois Tollway’s loss of collected revenue for the duration of the affected period as calculated by recent revenues, which are indicative of the period in which the event occurred.

Access to restricted Tollway facilities will need to be coordinated with the Tollway. No additional payment will be made for restricted Tollway facilities access.

S.P. 116 APPROVING A PART or PORTION OF THE WORK FOR BENEFICIAL USE

NOT USED

S.P. 117 RESERVED

S.P. 118 RIGHT-OF-WAY

S.P. 119 AVAILABLE GEOTECHNICAL INFORMATION

S.P. 120 OTHER AVAILABLE REPORTS OR AS-BUILT PLANS

The following is a listing of other reports, environmental reports, or as-built plans that are available for review in the Illinois Tollway on-line plan room.

File Roadway Description

CIP-93-564F_SEG7B.pdf I-88 As-builts CIP-93-564F_SEG8.pdf I-88 As-builts I-07-5521_R_S-20090527.pdf I-88 As-builts

RR-13-5661_R_V4_201714.pdf I-88 As-builts

RR-16-4254_R_V1_20201019.pdf I-88 As-builts RR-17-4343_R_V1_2021520.pdf I-88 As-builts RR-17-6001_R_V1_201917.pdf I-88 As-builts RR-19-4451_R_V1_202093.pdf I-88 As-builts RR-19-4451_R_V2_202093.pdf I-88 As-builts

Addendum No. 1 J - 17R May 23, 2023

RR-19-4474_R_V2_2022426.pdf I-88 As-builts

Contract No. RR-17-4343 I-355, I-88 As-builts Contract No. CIP-93-700P I-355 As-builts Contract No. RR-17-4336 I-90 As-builts Contract No. I-15-4227R I-90 As-builts Contract No. I-05-5339 I-90 As-builts Contract No. I-05-5301 I-90 As-builts

S.P. 121 ELECTRONIC DATA FILES AVAILABLE

NONE

S.P. 122 COMMITMENTS

S.P. 123 CONTRACT BOND

S.P. 124 SUBLETTING OF ASSIGNMENT OF CONTRACT

S.P. 125 RESERVED

S.P. 126 QUALIFICATIONS AND CERTIFICATIONS

Addendum No. 1 J – 109R May 23, 2023

INSTALL CLOSED CIRCUIT TELEVISION (CCTV) CAMERA, ITS ASSEMBLY

Description. This work shall consist of installing, calibrating and testing a Closed Circuit Television

(CCTV) camera per the plans and as directed by the Engineer, and as part of a fully functional ITS site. The work under this special provision shall be in association with the installation of an ITS Pole

Mounted Enclosure (CCTV or MVDS), ITS device pole, electrical service, grounding, and communications.

Materials furnished by the Tollway. The Contractor shall submit material pickup requests to the

Engineer a minimum of 14 days prior to scheduled pickup for the following items.

• CCTV Camera: Axis Q6315-LE

• Camera Mounting Hardware: Axis T91L61 (part# 5801-721 mounting arm)

• PoE Injector o Axis T8144 for outdoor installations o Axis T8154 for indoor installations

Materials furnished by the Contractor. The main components of the system are as described below. All other ancillary connection cables and brackets for the installation of a fully functional

CCTV camera assembly are included under this specification.

Cabling. All camera models mounted on an ITS pole shall be furnished with a 60-foot long

Outdoor Rated 4 Pair 23 AWG 1000BASE-T CAT6 Cable, manufactured by Belden, model number 7953A.

Cameras mounted on a monotube or Plaza canopy shall be furnished with an Outdoor Rated 4

Pair 23 AWG 1000BASE-T CAT6 Cable, with a maximum continuous length of 300 feet from the communication switch to the camera, manufactured by Belden, model number 7953A.

Cameras mounted on a monotube with a maximum continuous length greater than 300 feet from the communication switch to the camera shall be furnished with an Outdoor Rated 4 Pair 24

AWG CAT6 Cable, manufactured by Paige, model number 258340804. Use this Extended CAT6

Cable for Plaza 61 EB, Plaza 1 EB, Plaza 9 WB, and Plaza 89 SB.

Surge Suppression. PoE CCTV camera models shall be furnished with a CAT6 Surge

Protection Device (SPD) to protect against power surges in the communication cable. For Axis cameras, the surge suppression device shall be by Axis model number T8061.

CONSTRUCTION REQUIREMENTS

The Contractor shall closely coordinate the proposed work prescribed under this special provision with the Engineer. This includes, but is not limited to, the following:

Pre-Procurement Documentation Approval. The Contractor shall submit for approval to the

Engineer, within 10 business days from Notice to Proceed (NTP), a detailed schedule showing dates for: product submittals and approvals; device configuration by the Illinois Tollway;

construction/installation; calibration; testing; burn-in period; and warranty of each CCTV camera.

This detailed schedule shall be included in the project schedule, as required per Illinois Tollway

Addendum No. 1 J – 144R May 23, 2023

INSTALL FIBER DISTRIBUTION PANEL

Description. This work shall consist of furnishing and installing a fiber optic distribution (patch) panel and all hardware and accessories per the contract plans and as required for the intended use of the panel. This work shall also include the terminating single mode fiber optic cables of the number of strands as shown on the Plans.

Materials. The Contractor shall furnish the following items for locations shown on the Plans:

• A Corning model CCH-01U Closet Connector Housing (CCH) rack-mounted fiber patch panel

• Two (2) Corning model CCH-CP12-A9 CCH panels

• Two (2) 6.5 foot (2 meter) SMFO duplex LC-LC jumper cables manufactured by Corning, model number 040402R5Z20002M

• Single mode fiber optic pigtails (1 meter in length (3.28 feet) with factory pre-connected LC ferrules on one end) of the quantity required to perform the terminations specified on the Plans.

• All material necessary to fusion splice fiber optic strands to fiber optic pigtails

The Contractor shall install the Fiber Optic patch panels as shown in the Plans and per the manufacturer’s instructions.

The Fiber Distribution Panels shall be installed at the specified location per plans:

SITE ID LOCATION

88-131.11 LISLE REPEATER

355-22.62 PLAZA 79

The Contractor shall terminate the fiber optic cable at the locations shown on the Plans. Fiber strands shown to be terminated that have existing connectors shall be cut in preparation for fusion splicing to new pigtails. Termination shall consist of fusion splicing a fiber optic strand to a factory terminated pigtail. Each splice shall be wrapped in protective heat-shrink sleeve and securely affixed in the splice holder in the fiber distribution panel. Pigtails shall be connected to a patch panel port in the fiber distribution panel. Jumpers shall be connected between patch panel ports or network equipment as shown on the Plans. All equipment and cables shall be labeled as per the Illinois Tollway’s ITS labeling guidelines.

Method of Measurement. This work will be measured in units of each.

Basis of Payment. This work will be paid for at the contract unit price per each for INSTALL FIBER

DISTRIBUTION PANEL.

Addendum No. 1 J – 37A May 23, 2023

DIGITAL UTILITY AS-BUILT (Illinois Tollway) Effective: April 27, 2022

Description. The work shall consist of the collection, and the documentation of each utility installation with subsurface attributes. This shall include all information installed by the contractor or potholed at the direction of the engineer for location confirmation. The subsurface utility quality levels for all installed underground utilities will follow the Illinois Tollway quality levels (QL) described as follows:

• QL-A indicates the precise horizontal and vertical location of utilities obtained by the actual exposure (or verification of previously exposed and surveyed utilities) and subsequent measurement of subsurface utilities, usually at a specific point. Relative local positional accuracy shall be equal to or less than 0.2’ Vertical and 0.1’ Horizontal

• QL-B indicates information obtained through the application of appropriate surface geophysical methods to determine the existence and approximate horizontal position of subsurface utilities. Survey of the surface marker shall have a relative positional accuracy equal to or less than of 0.2’ Vertical and 0.1’ Horizontal

The utilities to be relocated or installed outlined in S.P. 106 are to be collected unless installed by non-Tollway contracts. These utilities for collection may include but are not limited to the following:

Fiber Optic Cable (ISTHA) Electrical Cable (ComEd)

Equipment. Equipment for data collection may include but not limited to GPS Rovers, Base Stations and Total stations that meet the minimum accuracy requirements. Equipment used to collect this data shall be properly calibrated and capable of meeting a minimum accuracy of 0.05’ Vertical and 0.05’ Horizontal, under optimal conditions.

Notification. Prior to initiating field work, the contractor shall provide advance notification in accordance with Article 107.31 of the Illinois Tollway Supplemental Specifications.

Data Collection. Before work is started, conduct research of available utility records to assist in identifying utility owners who may have facilities at the project site and/or whose operations may be affected by the project. Sources of information may be state, city, and county agencies. Previous collected data shall be translated to the current project coordinate survey control in accordance with Article 105.09 of the Standard Specifications.

The contractor should obtain survey data during or immediately after installation of the utility for QL- A. Where contractors were unable to obtain information immediately after installation, or the utility is buried during installation, then QL-B shall be collected and documented, and state why QL-A was not obtained as a note. For open trenched or exposed utility installation, QL-A shall be obtained at intervals of 25 ft and at directional changes with a minimum of 2 points. Non-Disruptive utility installation or boring will result in a combination of quality Level A and B. QL-A will be obtained at the exposed locations at either end of the open pit for the bore machine. During installation, the receiver operator shall denote horizontal location and depth every 25’, with a minimum of 2 points approximately 1/3 of the length on shorter runs. These locations shall be surveyed and will result in a QL-B. When taking survey shots on the utility, the location on the utility needs to be documented using the survey P-code structure.

Addendum No. 1 J – 37B May 23, 2023

When collecting data, survey shots can be taken at different location along a utility. Location of collected data for round utilities the preferred survey shot is in the center of the utility. For square utilities the edges and corners should be shot. Documentation should be specified in the survey P-code structure. Manholes, catch basins, valve vaults and similar items shall be collected at the center of the actual structure and not the center of frame or access port. Frame rim elevation values should be included in the data points comment.

Exploration. Where the contractor will be required or directed by the Engineer to expose utilities, the contractor shall backfill the test survey potholing and all open trenches using the soil previously removed, unless directed otherwise by the Engineer. Potholing shall conform to EXPLORATORY POTHOLING, UTILITIES. Reuse of excavated material from trenches shall be in accordance with the Illinois Tollway Special Provision for “Disposal of Regulated Substances and Uncontaminated Soil”. Placement and compaction of the soil in the trench shall be in accordance with the Illinois Tollway Special Provision for “Embankment.” Surplus material for the trenches may be used within the project limits or disposed of off-site in accordance with the Illinois Tollway Special Provision for “Earth and Rock Excavation.”

Documentation of Utility and Deliverable. The contractor shall record the dimensions and elevations of the existing utility. If the existing utility is a circular pipe, document and provide the outside diameter. If the existing utility is rectangular in shape (e.g., concrete duct bank), document and provide outside dimensions for its height and width. Record all visible features of the utility (i.e., joints, pipe materials, bedding, etc.). Digital photographs of the utility and the test hole location shall be taken. Record time, date, location, and direction of the view of the photograph.

The utility information and photographs shall be documented using the Illinois Tollway survey coding system. The Illinois Tollway utility coding consists of five major components. These different components are combined into a full survey code. Refer to Figure 1 below for the format, table, and structure of the codes to be implemented on the as-built files and other associated documents.

Definitions

Survey Code The survey code represents the surveyed element.

Quality Level Include Quality Level on each point to provide information about the confidence of the utility.

Point Sub-Code The sub-code is information supplementing the Survey Code. These are mainly material, but also contains specific item names which are part of multiple survey codes.

Point Location A code that defines the point of reference for the survey information. The location is used to define the origin of the feature, which translates to the precise location of the asset.

Description The description will vary depending on the survey code.

Addendum No. 1 J – 37C May 23, 2023

Figure 1 {Example}

Survey Code Quality Level Point Sub-Code Point Location

Pcode

Full Description

Name

Code

Full Description

Full

Description

274 Handhole {Quality Level A} {A} 304 Tile {356} {Invert}

Double Handhole

{Quality Level B}

{B}

Meter

{703}

{Topo

Survey

Point}

276 Heavy Duty Handhole {Quality Level C} {C} 334 Regulator {761} {Bottom}

280 Junction Box {Quality Level D} {D} 340 Tee {767} {Center}

281 Above Grd Splice Box 341 Valve {792} {Floor}

282 Splice Box - Electrical 345 Vault {793} {Flowline}

283 Splice Box - Telephone 383 Cleanout {861} {Top}

284 Splice Box - Cable TV 753 Aluminum

300 Culvert - Pipe 762 Brick

301 Culvert - Pipe Arch 766 Cast Iron

302 Culvert - Pipe Elliptical 772 CMP

303 Culvert - Box 773 CMP Arch

306 Catch Basin 774 Concrete

308 Drop Inlet 784 Ductile Iron Pipe

309 End Section Flared 804 Iron

310 End Section Flared with Grate 806 Metal

339 Standard Inlet 836 PVC

342 Valve Box 840 RCP

351 Manhole 841 RCP Arch

922 Cable TV, Under Ground - MAIN 865 Vitrified Clay

923 Cable TV, Under Ground - FEED 866 Vitrified Clay Encased

925 Cable TV, Under Ground - FIBER

932 Electric, Under Ground - MAIN

933 Electric, Under Ground - FEED

942 Gas, Under Ground - MAIN

943 Gas, Under Ground - FEED

951 IDOT Electric, Under Ground

IDOT Telecommunication, Under

Ground

958 ISHTA, Fiber, Aboveground

959 ISHTA, Fiber, Underground

960 Sanitary Sewer - MAIN

962 Storm Sewer - MAIN

972 Telephone, Under Ground - MAIN

973 Telephone, Under Ground - FEED

975 Telephone, Under Ground - FIBER

980 Water - MAIN

990 Duct Bank

Addendum No. 1 J – 37D May 23, 2023

Accuracy Testing & Reporting. A post processing report from the survey equipment shall be submitted. When using the global National Satellite Systems (GNSS) on a project, this survey report shall contain standard content for that equipment. Manufacturer-specific programs are acceptable for GNSS processing. When using these programs, a least-squares network adjustment must be applied, and a statistical analysis included in the survey report. If localizing, provide a transformation report.

Data Submittal. Upon completion of installation, the Contractor shall submit to the Construction Manager, all data collected and obtained to complete the task, including but not limited to:

1. Survey unadjusted files

2. ASCII Coordinates (Point Survey codes)

3. Compiled CADD drawings

4. All field notes, associated data

5. Survey dates of collection

6. Data accuracy test report

7. Translation or similar report to demonstrate adherence to project coordinate grid.

8. Equipment data sheets and annual calibration certificate.

Survey Unadjusted files.

Conventional Survey: The raw files are the unadjusted files directly from the field equipment. This file will include the keyed in points, base station set-ups, horizontal and vertical angles of side shots.

GNSS Survey: Create point reports including collection point name, grid coordinates, point code, horizontal and vertical precisions, Position Dilution of Precision (PDOP), and the number of satellites.

American Standard Code for Information Interchange (ASCII) Coordinate. This is a file in a comma-delimited format. The columns shall be Point Number, Northing, Easting, Elevation, Survey Code, Notes.

Drawings. The contractor shall remit collected utility data in a CADD format to the construction manager. The digital CADD data shall be in a form which can be read by the Bentley software required by the Illinois Tollway. The surveyed utility information shall be included in this file. It also includes connecting data shots from point to point for each utility or element. This file shall be modified to eliminate errors. These modifications include verify points, coding discrepancies, and removing inaccurate shots.

Quality Plan. The contractor shall be responsible for maintaining the quality records. The contractor shall submit a quality plan for approval prior to utility work which includes trained staff and type of training, control point verification and collection procedures. At any point in the surveying process, the contractor will make records available to the Illinois Tollway for a quality review. Work shall consist of a check into verified control before beginning each day’s data collection, at a minimum of every 2 hours after that, and before leaving the site. In accordance with a quality plan, the contractor shall have qualified staff that is trained to perform the work and a quality manager to confirm and maintain records.

Method of Measurement. This work will be measured for payment in foot along the centerline of the utility line.

Addendum No. 1 J – 37E May 23, 2023

Basis of Payment. This work will be paid for at the contract unit prices per FOOT for DIGITAL SURVEY QL-A or DIGITAL SURVEY QL-B. Utility potholing will be paid for as EXPLORATORY POTHOLING, UTILITIES. A separate payment will be made for each utility based on the Quality level of survey completed on the utility line.

Pay Item Number

Designation Unit of

Measure

JT130776 DIGITAL SURVEY QL-A FOOT

JT130777 DIGITAL SURVEY QL-B FOOT

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY

I L L I N O I S 6 0 5 1 5

D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E

NO. DATE DESCRIPTION

REVISIONS

DRAWING NO.

OF

DRAWN BY

CHECKED BY

DATE

DATE

DR

TY

H

P r o j e c t s

E

D e s i g n

P l a n

S h e e t s

F i n a l P l a n

C

B g e n

L g n d I I .d g n

CONTRACT NO. RR-23-4886 SHT NO.04-11-23

04-11-23

I-88 XB MP XXX.XX

CCTV CAMERA SITE PLAN,

GN-02

PROJECT GENERAL NOTES ABBREVIATIONS AND ACRONYMS

PROPOSED DESCRIPTION

SITE PLAN LEGEND

NOTATION DESCRIPTION

ATS STRUCTURE TO ATTACHED

CAT-6 6 CATEGORY

CCTV TELEVISION CIRCUIT CLOSED

CHH HANDHOLE COMMUNICATIONS

CNC CONDUIT NONMETALLIC COILABLE

COMM COMMUNICATIONS

CU COPPER

ECC CONDUIT IN CABLE ELECTRICAL

EHH HANDHOLE ELECTRICAL

ELEC ELECTRICAL

EOP PAVEMENT OF EDGE

EOS SHOULDER OF EDGE

EOTW WAY TRAVELED OF EDGE

(E)EX, EXISTING

FO OPTIC FIBER

FOC CABLE OPTIC FIBER

GRN GROUND

GSC (RIGID) CONDUIT STEEL GALVANIZED

HD DEFINITION HIGH

HDHH HANDHOLE HEAVY-DUTY

HDPE POLYETHYLENE HIGH-DENSITY

HH HANDHOLE

(I) INSTALL

IP PROTOCOL INTERNET

IDOT TRANSPORTATION OF DEPARTMENT ILLINOIS

ISTHA AUTHORITY HIGHWAY TOLL STATE ILLINOIS

ITS SYSTEMS TRANSPORTATION INTELLIGENT

MH MANHOLE

MOT TRAFFIC OF MAINTENANCE

M.P. POST MILE

MVDS SYSTEM DETECTION VEHICLE MICROWAVE

PGSC (RIGID) CONDUIT STEEL GALVANIZED COATED PVC

PR PROPOSED

(R) REMOVE

R.O.W. RIGHT-OF-WAY

RQD DETECTION QUEUE RAMP

SFP TRANSCEIVER) OPTIC (FIBER PLUGGABLE FORM-FACTOR SMALL

SM MODE SINGLE

S.P. PROVISION SPECIAL

STA STATION

TEMP TEMPORARY

TYP TYPICAL

PLAN LEGEND, ROADWAY JURISDICTION

ABBREVIATIONS & ACRONYMS, SITE

ROADWAY JURISDICTION

EXISTING

T

E

C

CC

HANDHOLE, TOLLWAY (FOR ITS POWER/ELECTRICAL)

HANDHOLE, FOR SINGLE MODE FIBER OPTIC CABLE(S)

MICROWAVE VEHICLE DETECTION SYSTEM

ITS DISCONNECT SWITCH

CCTV CAMERA (FREEWAY SURVEILLANCE)

ELECTRIC SERVICE TRANSFORMER - POLE MOUNTED

ELECTRIC SERVICE INSTALLATION

C

ELECTRIC CABLE IN CONDUIT

FIBER OPTIC CABLE

ITS POLE WITH POLE-MOUNTED ENCLOSURE

T

M

E

FLASHING SIGN BEACON

DMS CONTROLLER CABINET

DYNAMIC MESSAGE SIGN

M

ROADWAY SIGN

WIRELESS IN-PAVEMENT SENSOR

WIRED RADIO ASSEMBLY (ACCESS POINT)

WIRELESS REPEATER

AP

RP

JJ VIDEO POWER JUNCTION BOX

LONG RANGE ANTENNA

STANDARD RANGE ANTENNA

LR

EX

WETLAND/WOUS BOUNDARY

EXISTING BIOSWALE

FRAME/GROUND MOUNTED ITS ENCLOSURE

POLE

RIGHT-OF-WAY FENCE

GUARDRAIL

CONCRETE BARRIER

ROUTE/ROADWAY/STREET JURISDICTION

I-55 ILLINOIS OFSTATE

I-88 TOLLWAYILLINOIS

I-90 TOLLWAYILLINOIS

I-294 TOLLWAYILLINOIS

I-355 TOLLWAYILLINOIS

ROAD BLISS COUNTY KANE

ROADBOUGHTON COUNTYWILL

ROAD BROOKLYN TOWNSHIP REYNOLDS

ROADBUTTERFIELD ILLINOIS OFSTATE

ROAD CARON ROCHELLE OF CITY

ROAD FRANKLIN COUNTY LEE

26) (IL AVE GALENA ILLINOIS OF STATE

ROADHARLEM COUNTYWINNEBAGO

ROADHART ILLINOIS OFSTATE

ROAD HOYLE TOWNSHIP NELSON

ROAD KESLINGER TOWNSHIP PIERCE

STREET MILL COUNTY DUPAGE

ROAD SHEAP TOWNSHIP GROVE FRANKLIN

STREET WASHINGTON NAPERVILLE OF CITY

ACCESS.

TOLLWAY. NO ADDITIONAL PAYMENT WILL BE MADE FOR RESTRICTED TOLLWAY FACILITIES

ACCESS TO RESTRICTED TOLLWAY FACILITIES WILL NEED TO BE COORDINATED WITH THE17.

NON-WORKING HOURS.

ACCESS DOORS IN NOISE WALL SHALL…