RPGL-2025-16_Dec_16_24_solicitation_doc.pdf
PDF 17 KB Posted
- Attached to
- Electric Vehicle Charging Station Installation
- Solicitation number
- RPGL-2025-16
- Issued by
- Hartford County, Connecticut
About this file
This is a Request for Proposals (RFP) document from the Town of Glastonbury, Connecticut, soliciting qualified vendors for the design, permitting, procurement, and construction phase services for electric vehicle (EV) charging station installations at multiple locations within the town. The RFP number is RPGL-2025-16, with responses being accepted from November 7, 2024, through December 10, 2024, at 11:00 AM EST. A mandatory pre-bid meeting will be held on Friday, November 15, 2024, at 9:00 AM at the Glastonbury Town Hall. Proposals must be submitted electronically through the Glastonbury Bonfirehub portal. The town has already determined the locations and number of charging stations to be installed at each site.
The contract is subject to state set-aside and contract compliance requirements. Payment terms are vendor-specified, with delivery terms listed as Free On Board Destination. The RFP includes multiple addenda and updated Zoom instructions, suggesting virtual participation options may be available for some aspects of the procurement process. The solicitation has been designated as having no line items, and the total estimated value is not specified in the document.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number: RPGL-2025-16
Electric Vehicle Charging Station Installation
Request for Proposal (RFP)
Glastonbury, Town of
November 07, 2024 - December 10, 2024
Page:2
General Header Information
RPGL-2025-16
No. RPGL-2025-16 Title: Electric Vehicle Charging Station Installation Start Date: November 07, 2024 at 7:00:00 AM EST End Date: December 10, 2024 at 11:00:00 AM EST Vendor Q&A Start Date:
Vendor Q&A End Date:
Estimated Total Value:
Who can respond to this bid? : All Vendors Description: The Town of Glastonbury is soliciting a Request for Proposals from qualified Respondents to assist with the design, permitting, procurement, and construction phase services to facilitate the installation of electric vehicle (EV) charging stations at multiple locations within Town. The location of the charging stations and the number of the charging stations at each location have already been determined by the Town. Responses can be submitted at the following link:
https://glastonburyct.bonfirehub.com/ under the RFP title “RPGL-2025-
16 –ELECTRIC VEHICLE CHARGING STATION INSTALLATION”. A
MANDATORY pre-bid meeting will be held on Friday November 15, 2024 at 9 A.M at the Glastonbury Town Hall: 2155 Main Street Glastonbury, CT 06033. This contract is subject to state set-aside and contract compliance requirements.
Delivery Terms: Free On Board Destination Payment Terms: Vendor Specified Contact Information: Glastonbury, Town of
Nicole Melquist 2155 Main Street P.O. Box 6523 Glastonbury CT, 06033 United States Tel: 860-652-7588 Fax: 860-652-7590 Nicole.Melquist@glastonbury-ct.gov
Contact Details: If you have any questions, please contact:
Nicole Melquist 2155 Main Street P.O. Box 6523 Glastonbury CT, 06033 United States Tel: 860-652-7588 Fax: 860-652-7590 Nicole.Melquist@glastonbury-ct.gov
Selected Categories:
Page:3
Solicitation Requirements:
This bid has no questions defined.
RPGL-2025-16
A MANDATORY Pre-bid Meeting
Pre Bid Meeting A MANDATORY pre-bid meeting will be held on Friday November 15, 2024 at 9 A.M at the
Glastonbury Town Hall: 2155 Main Street Glastonbury, CT 06033.
Page:4
Documents:
RPGL-2025-16 - E.V. Charging Station RFP- Final.pdf
RPGL-2025-16 - EV Charging Station Installations - Addendum No. 1.pdf
RPGL-2025-16 - EV Charging Station Installations - Addendum No. 2.pdf
RPGL-2025-16 -EV Charging Station Installation-Zoom Instructions.pdf
RPGL-2025-16 - EV Charging Station Installations - Addendum No. 3.pdf
RPGL-2025-16 - EV Charging Station Installations - Addendum No. 4.pdf
RPGL-2025-16 -EV Charging Station Installation-UPDATED Zoom Instructions.pdf
Page:5
Item Specifications Solicitation has been designated as having no line items.
Page:6
File details come from the government source that posted it. Updated .