RP006_24 Ad1.pdf
PDF 3 MB Posted
- Attached to
- RP006-24 Design and Construction Admin Services for the Gwinnett County New Police Headquarters
- Solicitation number
- PE-77023-NONST-2024-000000102
- Issued by
- Gwinnett County, Georgia
About this file
This document is an addendum to a solicitation issued by Gwinnett County for Design and Construction Administration Services for a new Police Headquarters. The addendum provides responses to various questions submitted by potential proposers, including clarification on the required consultant team, furniture procurement, parking, LEED certification, design package structure, and construction budget. It also confirms that the pre-proposal sign-in sheet will be posted, and that the selected architectural firm will be required to be the Architect of Record. The County indicates it will share the completed study and organizational charts with the selected design firm.
The cost proposal for this project must be submitted as a separate sealed hard copy and flash drive. The County is not able to extend the proposal due date due to the aggressive project timeline. Geotechnical and construction materials testing services will be provided by the County, while all other services are to be included in the proposer's scope.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RP006_24 Inv.pdf | ||
| RP006_24 Award Notice.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
February 7, 2024
Addendum #1 RP006-24 Design and Construction Administration Services for the Gwinnett County
New Police Headquarters
Please see below summation of questions/answers and clarifications for the above solicitation.
Q1: Is a roofing or waterproofing Consultant required to be part of the proposing team for this project?
A1: Yes
Q2: The proposal states the furniture would be purchased by the new owner. Is it the assumption that Gwinnett
County would be the owner and does the County know when they will be seeking to have furniture bids on the furniture?
A2: The County intends to use the Statewide Contract for furniture purchases for this project. It is anticipated this will be in 2027.
Q3: Due to the size and importance of this project, the consultant would like to respectfully request an extension of at least a week or longer for the due date of this submission.
A3: At this time, with the timeline for this project being aggressive, the County cannot extend the due date.
Q4: Can the County provide defined limits of the site for the survey?
A4: The limits of construction are within the existing fence line of the existing Police Headquarters building excluding the Police Fleet Maintenance Facility and the Police Annex/911 Building.
Q5: Is the parking decks of 575 spaces for secure parking only?
A5: It is anticipated this is for secure parking only.
Q6: Is Commission on Accreditation for Law Enforcement Agencies or State certification required or desired for this project?
A6: No, this will not be required or desired for this project.
Q7: How should the cost associated for the potential facility tours be documented?
A7: The cost associated with tours will be billed against the not-to-exceed amount for the project. The County does not expect any tours until construction phase.
Q8: Is there an estimated number of participants that would participate in the tour?
A8: The County expects to have some tours but it is too early to give a specific number at this time.
Q9: What LEED certification is targeted? Should costs associated with LEED registration be included in the proposal?
A9: The proposal states this will be LEED Certified at a minimum. It also states that all LEED costs are to be included in the proposal.
Q10: Please confirm services the Architect and Engineer should provide versus services that will be contracted by the County (i.e. , Surveying and Subsurface Utility Engineering, Geotech, Commissioning, Environmental, etc.).
A10: The County will provide Geotechnical and Construction Materials Testing services. All other services are to be included in the proposal as outlined in the proposal.
RP006-24 Addendum Page 2 of 4
Q11: Will the County provide drawings of the existing conditions in pdf or dwg file format?
A11: This will be given to the awarded consultant in PDF format.
Q12: The sample agreement scope 2.6 references preparing separate GMP design packages for major work.
Please advise on the quantity of packages anticipated (i.e. early works site and structure, Mechanical and Electrical, etc).
A12: The County anticipates a minimum of two GMPs, i.e., Parking Structure and either Option A or B for the Headquarters facility.
Q13: Please confirm the construction budget for Option 1, on Appendix D there is a variance with the sample agreement 7.2.
A13: On Page 59 of the proposal shows the budgets for Option 1 and Option 2. This proposal is based on the total design for construction and FF&E as the designer will be required to design FF&E as well, i.e., floor plans, furniture layout, material selections, finish boards, etc. However, the construction contract with the Construction Manager at Risk will not include FF&E which is why 7.2 of sample agreement has a construction amount less than the FF&E.
Q14: Please confirm if the cost proposal is to be submited as a printed hard copy.
A14: The cost proposal needs to be submitted in a separate sealed envelope as a hard copy and on a flash drive labeled financial.
Q15: Will the pre-proposal conference sign-in sheet be posted?
A15: Yes, the sign-in sheet is attached below in this addendum.
Q16: Please confirm the lead architectural firm (subject mater expert) is not required to be the architect of record.
A16: The firm submitting a proposal for design services for this project will be required to be the Architect of
Record.
Q17: Would the County be willing to share the study that was completed?
A17: This will be shared with the firm selected for the design.
Q18: Would the County be willing to share organiza�onal charts of the various divisions that are to be part of the new facility? I.e. Administra�on Services, Support Opera�ons, Criminal Inves�ga�ons and Uniform.
A18: This will be shared with the firm selected for the design.
Attachment: Pre-Bid Sign in Sheet
This addendum should be acknowledged on Page 13 of the Firm Information Page.
Thank You, Alexis Holland Purchasing Associate II
RP006-24 Addendum Page 3 of 4
RP006-24 Addendum Page 4 of 4
File details come from the government source that posted it. Updated .