This Room Needs Form Updated document outlines interactive flat panel (IFP) installation requirements across multiple Georgia school facilities, including CRMS, DFES, GES, GSMS, JCHS, TWES, and WES. The form specifies detailed technical specifications for approximately 45 classrooms and specialized spaces such as art rooms, gifted programs, and agricultural facilities. Installation requirements include IFP panel sizing (ranging from 72" to 80"), ceiling height clearances (9 to 10 feet), HDMI/VGA/Ethernet cable runs (30 to 65+ feet), and 3.5mm audio cable specifications (25 to 40+ feet). Additional work includes removal and replacement of existing dry erase boards with smaller boards, relocation of A/V hookups and network drops to accommodate new panel placements, and installation of adjustable stands where applicable. The document indicates a pre-bid meeting was scheduled for May 23, 2022, at 10:00 AM Eastern Time via Zoom to address questions regarding the 22-74 Viewsonic Interactive Panels contract opportunity.
The form identifies specific installation challenges and site conditions, including sheet metal walls at JCHS AG2 Lankford and sheetrock walls at JCHS AG4 Martin, which require special consideration during installation. Power requirements for panels vary by location, with some rooms requiring power above panel installation and others below. The document notes the presence or absence of existing dry erase boards and specifies whether power needs exist for each location. While pricing terms, contract duration, and funding sources are not detailed in this room needs form, this documentation serves as the technical specifications baseline for bidders responding to the Viewsonic Interactive Panels procurement, establishing the scope of work required across the school district's facilities.
Text of this file
All Rooms
| School | Room | Teacher | Ceiling Height | HDMI/VGA/Ethernet Cable Length | 3.5mm Audio Cable Length | Top of panel to be at | Dry Erase Board Needs | Power for Panel | Additional Notes |
| CRMS | A7 | 10ft | 60ft+ | 30ft+ | 80" | Remove existing, replace with 2 smaller boards | Needed above | Relocate A/V hookups by network drops at teacher desk location | |
| CRMS | A8 | 10ft | 60ft+ | 30ft+ | 80" | Remove existing, replace with 2 smaller boards | Needed above | ||
| CRMS | B6 | 10ft | 30ft+ | 40ft+ | 80" | Relocate bulletin board | Needed above | Install IFP on hall wall centered between door and teacher desk | |
| CRMS | C2 | 10ft | 60ft+ | 35ft+ | 80" | Remove existing, replace with 2 smaller boards | Needed above | ||
| CRMS | C3 | 10ft | 60ft+ | 35ft+ | 80" | Remove existing, replace with 2 smaller boards | Needed above | Install IFP on wall opposite of current SB location, move A/V hookups closer to corner | |
| DFES | Yellow 9 | Gifted | 10ft | 40ft+ | 35ft+ | Adjustable Stand | None | Needed above | install at far left end of dry erase board |
| DFES | Orange 3 | PEC | 10ft | 35ft+ | 35ft+ | Adjustable Stand | None | Present above | center on wall |
| DFES | Orange 4 | PEC | 10ft | 30ft+ | 30ft+ | Adjustable Stand | None | Present above | same location as SB |
| DFES | Purple 6 | Art | 10ft | 65ft+ | 35ft+ | Adjustable Stand | Remove existing, replace with 2 6ft boards | Present below | Needs dry erase board space |
| GES | Yellow 604 | 10ft | 35ft+ | 35ft+ | 72" | None | Present above | ||
| GES | Yellow 605 | 10ft | 35ft+ | 35ft+ | 72" | None | Present above | ||
| GES | Yellow 606 | 10ft | 35ft+ | 35ft+ | 72" | None | Present above | ||
| GES | Yellow 607 | 10ft | 35ft+ | 35ft+ | 72" | None | Present above | ||
| GSMS | A3 | 10ft | 35ft+ | 35ft+ | 80" | None | Needed above | Move AV closer to teacher desk location | |
| GSMS | A4 | 10ft | 35ft+ | 35ft+ | 80" | None | Needed above | Move AV hookups closer to exterior wall corner | |
| GSMS | B10 | 10ft | 30ft+ | 35ft+ | 80" | None | Present below | Install IFP on opposite wall from current SB location. Move AV hookup closer to outer wall corner by network drops. | |
| GSMS | B4 | 10ft | 35ft+ | 35ft+ | 80" | None | Needed above | Move AV hookups to front wall closer to outer wall corner | |
| GSMS | C1 | 10ft | 30ft+ | 35ft+ | 80" | None | Present below | Install IFP on opposite wall from current SB location. | |
| GSMS | D1 | 10ft | 60ft+ | 35ft+ | 80" | None | Present below | ||
| GSMS | E5 | Ag | 10ft | 30ft+ | 35ft+ | 80" | Remove existing, replace with 2 smaller boards | Needed above | Relocate AV hookup to wall with network drop |
| GSMS | E6 | Art | 10ft | 45ft+ | 35ft+ | 80" | Remove existing, replace with 2 smaller boards | Needed above | |
| JCHS | AG2 | Lankford | 9ft | 60ft+ | 35ft+ | 80" | Add one small dry erase board to right of IFP | Needed above | Wall is sheet metal. |
| JCHS | AG4 | Martin | 9ft | 35ft+ | 35ft+ | 80" | Remove existing bulletin board, replace with 2 smaller dry erase boards | Present below | Install IFP on opposite wall of current SB location. Move AV hookups and network drop to wall where IFP will be, near corner. Wall is sheetrock. |
| JCHS | F601 | 9ft | 35ft+ | 35ft+ | 80" | Remove existing board, replace with 2 smaller dry erase boards | Present below | ||
| JCHS | G180 | 9ft | 50ft+ | 35ft+ | 80" | None | Present below | ||
| JCHS | V102 | 9ft | 35ft+ | 40ft+ | 80" | None | Present above | ||
| TWES | 206 | Art | 10ft | 55ft+ | 40ft+ | 75" | Remove existing, replace with 2 smaller boards | Needed above | |
| WES | Blue 104 | 9ft | 35ft+ | 25ft+ | 72" | none | present below | ||
| WES | Blue 108 | Sanders | 9ft | 35ft+ | 35ft+ | 72" | none | needed above | Install IFP on wall by exterior door |
| WES | Red 303 | 9ft | 50ft+ | 30ft+ | 72" | Remove existing, replace with 2 smaller boards | present below | Relocate A/V hookups to opposite side of air return | |
| WES | Red 304 | 9ft | 50ft+ | 30ft+ | 72" | Remove existing, replace with 2 smaller boards | present below | Relocate A/V hookups to opposite side of air return | |
| WES | Red 310 | 9ft | 50ft+ | 25ft+ | 72" | Remove existing, replace with 2 smaller boards | present below | ||
| WES | Yellow 207 | 9ft | 60ft+ | 35ft+ | 72" | Remove existing, replace with 2 smaller boards | present below | ||
| WES | Yellow 208 | 9ft | 60ft+ | 35ft+ | 72" | Remove existing, replace with 2 smaller boards | present below | Center IFP on front wall | |
| WES | Yellow 210 | 9ft | 60ft+ | 30ft+ | 72" | Remove existing, replace with 2 smaller boards | present below | Center IFP on front wall |
CRMS
| School | Room | Teacher | Ceiling Height | HDMI/VGA/Ethernet Cable Length | 3.5mm Audio Cable Length | Top of panel to be at | Dry Erase Board Needs | Power for Panel | Additional Notes |
| CRMS | A7 | 10ft | 60ft+ | 30ft+ | 80" | Remove existing, replace with 2 smaller boards | Needed above | Relocate A/V hookups by network drops at teacher desk location | |
| CRMS | A8 | 10ft | 60ft+ | 30ft+ | 80" | Remove existing, replace with 2 smaller boards | Needed above | ||
| CRMS | B6 | 10ft | 30ft+ | 40ft+ | 80" | Relocate bulletin board | Needed above | Install IFP on hall wall centered between door and teacher desk | |
| CRMS | C2 | 10ft | 60ft+ | 35ft+ | 80" | Remove existing, replace with 2 smaller boards | Needed above | ||
| CRMS | C3 | 10ft | 60ft+ | 35ft+ | 80" | Remove existing, replace with 2 smaller boards | Needed above | Install IFP on wall opposite of current SB location, move A/V hookups closer to corner |
DFES
| School | Room | Teacher | Ceiling Height | HDMI/VGA/Ethernet Cable Length | 3.5mm Audio Cable Length | Top of panel to be at | Dry Erase Board Needs | Power for Panel | Additional Notes |
| DFES | Yellow 9 | Gifted | 10ft | 40ft+ | 35ft+ | Adjustable Stand | None | Needed above | install at far left end of dry erase board |
| DFES | Orange 3 | PEC | 10ft | 35ft+ | 35ft+ | Adjustable Stand | None | Present above | center on wall |
| DFES | Orange 4 | PEC | 10ft | 30ft+ | 30ft+ | Adjustable Stand | None | Present above | same location as SB |
| DFES | Purple 6 | Art | 10ft | 65ft+ | 35ft+ | Adjustable Stand | Remove existing, replace with 2 6ft boards | Present below | Needs dry erase board space |
| DFES | Yellow 6 | Adjustable Stand | None |
GES
| School | Room | Teacher | Ceiling Height | HDMI/VGA/Ethernet Cable Length | 3.5mm Audio Cable Length | Top of panel to be at | Dry Erase Board Needs | Power for Panel | Additional Notes |
| GES | 407 | 72" | None | Present above | |||||
| GES | 604 | 10ft | 35ft+ | 35ft+ | 72" | None | Present above | ||
| GES | 605 | 10ft | 35ft+ | 35ft+ | 72" | None | Present above | ||
| GES | 606 | 10ft | 35ft+ | 35ft+ | 72" | None | Present above | ||
| GES | 607 | 10ft | 35ft+ | 35ft+ | 72" | None | Present above |
GSMS
| School | Room | Teacher | Ceiling Height | HDMI/VGA/Ethernet Cable Length | 3.5mm Audio Cable Length | Top of panel to be at | Dry Erase Board Needs | Power for Panel | Additional Notes |
| GSMS | A3 | 10ft | 35ft+ | 35ft+ | 80" | None | Needed above | Move AV closer to teacher desk location | |
| GSMS | A4 | 10ft | 35ft+ | 35ft+ | 80" | None | Needed above | Move AV hookups closer to exterior wall corner | |
| GSMS | B10 | 10ft | 30ft+ | 35ft+ | 80" | None | Present below | Install IFP on opposite wall from current SB location. Move AV hookup closer to outer wall corner by network drops. | |
| GSMS | B4 | 10ft | 35ft+ | 35ft+ | 80" | None | Needed above | Move AV hookups to front wall closer to outer wall corner | |
| GSMS | C1 | 10ft | 30ft+ | 35ft+ | 80" | None | Present below | Install IFP on opposite wall from current SB location. | |
| GSMS | D1 | 10ft | 60ft+ | 35ft+ | 80" | None | Present below | ||
| GSMS | E5 | Ag | 10ft | 30ft+ | 35ft+ | 80" | Remove existing, replace with 2 smaller boards | Needed above | Relocate AV hookup to wall with network drop |
| GSMS | E6 | Art | 10ft | 45ft+ | 35ft+ | 80" | Remove existing, replace with 2 smaller boards | Needed above |
JCHS
| School | Room | Teacher | Ceiling Height | HDMI/VGA/Ethernet Cable Length | 3.5mm Audio Cable Length | Top of panel to be at | Dry Erase Board Needs | Power for Panel | Additional Notes |
| JCHS | AG2 | Lankford | 9ft | 60ft+ | 35ft+ | 80" | Add one small dry erase board to right of IFP | Needed above | Wall is sheet metal. |
| JCHS | AG4 | Martin | 9ft | 35ft+ | 35ft+ | 80" | Remove existing bulletin board, replace with 2 smaller dry erase boards | Present below | Install IFP on opposite wall of current SB location. Move AV hookups and network drop to wall where IFP will be, near corner. Wall is sheetrock. |
| JCHS | F601 | 9ft | 35ft+ | 35ft+ | 80" | Remove existing board, replace with 2 smaller dry erase boards | Present below | ||
| JCHS | G180 | 9ft | 50ft+ | 35ft+ | 80" | None | Present below | ||
| JCHS | V102 | 9ft | 35ft+ | 40ft+ | 80" | None | Present above |
TWES
| School | Room | Teacher | Ceiling Height | HDMI/VGA/Ethernet Cable Length | 3.5mm Audio Cable Length | Top of panel to be at | Dry Erase Board Needs | Power for Panel | Additional Notes |
| TWES | 206 | Art | 10ft | 55ft+ | 40ft+ | 75" | Remove existing, replace with 2 smaller boards | Needed above | |
| TWES | 513 | 72" | |||||||
| TWES | 602 | 72" | |||||||
| TWES | 72" | ||||||||
| TWES | 72" |
WES
| School | Room | Teacher | Ceiling Height | HDMI/VGA/Ethernet Cable Length | 3.5mm Audio Cable Length | Top of panel to be at | Dry Erase Board Needs | Power for Panel | Additional Notes |
| WES | Blue 104 | 9ft | 35ft+ | 25ft+ | 72" | none | present below | ||
| WES | Blue 108 | Sanders | 9ft | 35ft+ | 35ft+ | 72" | none | needed above | Install IFP on wall by exterior door |
| WES | Red 303 | 9ft | 50ft+ | 30ft+ | 72" | Remove existing, replace with 2 smaller boards | present below | Relocate A/V hookups to opposite side of air return | |
| WES | Red 304 | 9ft | 50ft+ | 30ft+ | 72" | Remove existing, replace with 2 smaller boards | present below | Relocate A/V hookups to opposite side of air return | |
| WES | Red 310 | 9ft | 50ft+ | 25ft+ | 72" | Remove existing, replace with 2 smaller boards | present below | ||
| WES | Yellow 207 | 9ft | 60ft+ | 35ft+ | 72" | Remove existing, replace with 2 smaller boards | present below | ||
| WES | Yellow 208 | 9ft | 60ft+ | 35ft+ | 72" | Remove existing, replace with 2 smaller boards | present below | Center IFP on front wall | |
| WES | Yellow 210 | 9ft | 60ft+ | 30ft+ | 72" | Remove existing, replace with 2 smaller boards | present below | Center IFP on front wall |
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .