Roof_Inspection_Schedule.docx
DOCX document 26 KB Posted
- Solicitation number
- 25-100-IFB
- Issued by
- Orange County, Orlando City, Florida
About this file
The document is a roof inspection schedule for facilities, specifically Exhibit B for a roofing maintenance contract with the Orlando International Airport (MCO) in Florida. The contract is a 5-year time and material-based project scheduled to commence on or about October 1, 2024, with contractor personnel required to be on-site Monday through Friday from 7am to 3:30pm and available for emergency responses during non-standard hours. The inspection schedule comprehensively details inspection requirements for various roof types including flat roofs, metal roofs, and built-up roofs (BUR), with detailed checklists covering membrane conditions, flashing, drainage systems, roof penetrations, structural components, and potential issues like microbial growth, debris, and water ponding.
The contract focuses on providing on-call roofing and waterproofing services for emergency and non-emergency repairs to building envelopes. The inspection schedule serves as a systematic approach to preventative maintenance, outlining quarterly, semi-annual, and annual inspection protocols across multiple roof types and building systems. While specific pricing details are not provided in the document, the contract appears designed to ensure comprehensive roof maintenance and rapid response capabilities for the airport's infrastructure, with a structured approach to identifying and addressing potential roofing issues before they become critical maintenance problems.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Roof_Repairs_and_Waterproofing_Maintenance_Contract_(Addendum_#1_Revision).pdf | ||
| Work_Ticket_Example.docx | DOCX document | |
| GOAA_Building_Master_Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building Name & Address:
Date of Inspection: Time of Inspection:
Name of Inspector
| ROOF TYPE |
| INSPECTION ITEMS |
FREQUENCY
| ISSUES |
| REMARKS/ACTION NEEDED |
| Quarterly |
| Semi-Annual |
| Annual |
| YES |
| NO |
| N/A |
| FLAT ROOFS |
| Membrane Condition (TPO, FIBERTITE, PVC) |
Flashing & Seams
| Drainage Systems (scuppers, drains & gutters, bolts & rivets) |
| ✓ |
Roof Penetrations (vents, HVAC Units)
Roof Coating (if applicable)
Skylights
Caulking
Roof Hatches
Debris
Ponding of Water
Microbial Growth on roof membrane or HVAC System
Missing Items/Roof Apparatus
INTERIOR
Ceiling Tiles
Wall Surfaces
Rusted or Deteriorated Structural Roof Components
| Metal Roofs |
| Fasteners & Seams |
Rust or Corrosion
| Gutter & Downspouts |
| ✓ |
Roof curbs & Equipment Support
Roof Insulation Condition (if applicable)
Missing Items/Roof Apparatus
INTERIOR
Ceiling Tiles
Wall Surfaces
Rusted or Deteriorated Structural Roof Components
| Built-Up Roofs (BUR) |
| Gravel Displacement |
| Drainage Systems (scuppers, drains & gutters, bolts & rivets) |
| ✓ |
Blisters or Delamination
Flashing & Seams
Skylights
Caulking
Seals on Roof Deck/Roof Deck Integrity
Missing Items/Roof Apparatus
Microbial Growth on roof membrane or HVAC System
Roof Hatches
INTERIOR
Ceiling Tiles
Wall Surfaces
Rusted or Deteriorated Structural Roof Components
EXHIBIT B