Romeo High School Furniture and Equipment Plans - High Density Storage.pdf
PDF 6 MB Posted
- Attached to
- Romeo High School High Density Storage Bid
- Solicitation number
- RFP RCS 190000002262 1
- Issued by
- Macomb County, Michigan
About this file
This file contains architectural furniture and equipment plans for Romeo Community Schools' new Romeo High School located at 62300 Jewell Road, Washington, Michigan. The project involves the procurement and installation of high-density storage furniture and equipment across multiple areas of the facility. The bid was issued on May 14, 2019, with two distinct installation phases scheduled for July 22-August 2, 2019 (Phase 1) and October 21-25, 2019 (Phase 2). The plans detail furniture placement across eleven designated areas (A, A1, B, C, C1, D, E, F, F1, G, and G1), with specific equipment designations and quantities noted throughout first and second floor layouts. The architectural design team included structural engineer E.F. Whitney, Inc., mechanical and electrical consultants Desai/Nasr Consulting Engineers, Inc., theatrical consultant Associated Controls + Design, acoustics consultant Kolano and Saha Engineers, Inc., and construction manager Barton Malow.
The documentation includes detailed furniture and equipment plans with general notes requiring contractors to coordinate utility locations, field-verify existing conditions before installation, and consult architects regarding any variations from construction documents. The plans reference furniture fixtures and equipment as shown for reference only, emphasizing the contractor's responsibility to ensure proper interfacing of all trades during delivery and installation. Previous bid dates for furniture and equipment procurement occurred on March 25, 2019, with quality management reviews and bulletins issued throughout 2017 and 2018, indicating an extended design and planning process prior to the high-density storage equipment specification and bidding phase.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RCS Romeo High School High Density Storage Bid Spec.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N O
R T
H
Project Number
Issue DateList of Drawings
ARCHITECTURAL
Code Information
Registration Seal
Date
Signature
Issued for
Date
Signature
Date
Signature
Site Map
MECHANICAL ELECTRICAL
c 2017 , LLC
LAKE R
ETC
JEWELL RD
VA
N D
YK
E
VAN D
YKE FWY
29 MILE RD
PROJECT SITE
1441 west long lake, suite 200 troy, michigan 48098
5211 cascade road se, suite 300 grand rapids, michigan 49546
248.823.2100 www.ids-troy.com
FOOD SERVICES
STRUCTURAL ENGINEER
E.F. WHITNEY, INC.
www.efwhitney.com 248-644-0990
BIRMINGHAM, MICHIGAN 48009
1000 SOUTH OLD WOODWARD AVENUE
DESAI/NASR CONSULTING ENGINEERS, INC.
www.desainasr.com
248-932-2010
WEST BLOOMFIELD, MICHIGAN 48322
6765 DALY ROAD
THEATRICAL CONSULTANT
ASSOCIATED CONTROLS + DESIGN
www.acdtheatrical.com
317-298-3961
INDIANAPOLIS, INDIANA 46268
6850 GUION ROAD
ACOUSTICS CONSULTANT
KOLANO AND SAHA ENGINEERS, INC.
www.kandse.com 248-674-4100
WATERFORD, MICHIGAN 48329
3559 SASHABAW ROAD
CONSTRUCTION MANAGER
BARTON MALOW
www.bartonmalow.com
248-436-5000
SOUTHFIELD, MICHIGAN 48034
26500 AMERICAN DRIVE
SUITE 200
C:\Revit Local\16175 Romeo High School-A18_teasthope@ids-troy.com.rvt
5/10/2019 4:40:44 PM
16175-3000
Romeo Community Schools
New Romeo High School
62300 Jewell Rd.
Washington, MI 48094
High Density Storage Bids 05-14-2019
High Density Storage
F0.1 First Floor Furniture and Equipment Plan - Phasing
F0.2 Second Floor Furniture and Equipment Plan - Phasing
F2.1C First Floor Furniture and Equipment Plan - Area C
F2.1G First Floor Furniture and Equipment Plan - Area G
High Density Storage Bid
UP
G1-1
G1-DG1-C
G1-5
G1-6
G1-7
G1-8
G-1
G-2
G-3
G-5
G1-B
G1-2
G1-A
F1-1
F1-1
F1-E
F1-J
F1-D F1-A
F1-4
F1-9
F1-3
F1-7
F1-11
F1-12
F1-6
F1-15
F1-F
F1-K
F1-L
F1-N
F1-8
E-7
G1-3
G1-F
G-4
F1-B
D-1
F1-P
D-D
D-G
D-H
F1-G
F1-R
D-A
D-B
D-C
D-E
D-F
E-8
E-9
A1-1
ZA-1
ZA-A
ZA-3
ZA-F
A-4
A-6
A-N
A-9
A-B
ZA1-C
ZA1-D
ZA1-1
A-A
C-20
C-15
C-13
A1-L
A1-9
A1-E
A1-4
A1-F
A1-7
A1-5
B-8
C1-G
C1-H
C1-E
ZA1-A
C1-1
C1-A
B-A
B-B
A-7
A1-M
ZA1-K
ZA1-BA1-A
C-1
C-B
C-G
B-1
C1-4
C-A
C-2
C-12
C-12
C-C
E-A
E-C
E-L E-M
E-D
G-6
E-B
E-F
E-J
E-5
E-4
E-3
E-2
E-6
G-7
G-8
E-1
E-G
E-H
E-E
F1-10
F1-Q
F1-13
F1-14
F1-M
C8.3
C6.3
C9.6
F1-2
F1-5
C-E.8
F1-C
F1-H D-E.8
E-N
F1-S
F1-N.8
E-K
ZA1-G
E-1.8
AREA
"G1"
AREA
"G"
AREA
"F1"
AREA
"F"
AREA
"E"
AREA
"D"
AREA
"C"
AREA
"C1"
AREA
"B"
AREA
"A1"
AREA
"A"
EXISTING
RETC BLDG
ADDITION
INSTALL PHASE (1): 7/22/19 - 8/2/19
INSTALL PHASE (2): 10/21/19 - 10/25/19
Project Title
Key Plan c
Issued for
Project Designer
Q.M. Review
Approved
Drawing Scale
Project Number Drawing Number
Issue Date
Project Architect / Engineer
Drawn By
Project Administrator
2017 , LLC
As Noted
1441 west long lake, suite 200 troy, michigan 48098
FOOD SERVICES
STRUCTURAL ENGINEER
E.F. WHITNEY, INC.
www.efwhitney.com 248-644-0990
BIRMINGHAM, MICHIGAN 48009
1000 SOUTH OLD WOODWARD AVENUE, SUITE 200
DESAI/NASR CONSULTING ENGINEERS, INC.
www.desainasr.com
248-932-2010
WEST BLOOMFIELD, MICHIGAN 48322
6765 DALY ROAD
THEATRICAL CONSULTANT
ASSOCIATED CONTROLS + DESIGN
www.acdtheatrical.com
317-298-3961
INDIANAPOLIS, INDIANA 46268
6850 GUION ROAD
5211 cascade road se, suite 300 grand rapids, michigan 49546
248.823.2100 www.ids-troy.com
F1
F
E
D
C1
B
AG1
A1
G
C
C
R e vi t L o ca l\ R o m e o H ig h S ch o o l-
A te a st h o p e id s-tr o y .c o m
.r vt
:4 :2
P
M
New Romeo High School
62300 Jewell Rd.
Washington, MI 48094
T. Nemecek
B. Sundberg
T. Easthope
16175-3000 F0.1
First Floor Furniture and Equipment Plan - Phasing
Designer
M.Beck
A.A. Kruse, C. Haas
Romeo Community Schools
BP-3 Bulletin No. 8 05-14-2018
BP-3 Bulletin No. 9 06-22-2018
BP-3 Bulletin No. 11 07-25-2018
FFE Bids 03-25-2019
High Density Storage Bids 05-14-2019
1/32" = 1'-0"
FURNITURE AND EQUIPMENT PHASING PLAN
G1-1
G1-DG1-C
G1-5
G1-6
G1-7
G1-8
G-1
G-2
G-3
G-5
G1-B
G1-2
G1-A
F1-1 F1-E
F1-J
F1-D
F1-A
F1-4
F1-9
F1-3
F1-7
F1-11
F1-12
F1-6
F1-15
F1-F
F1-K
F1-L
F1-N
F1-8
E-7
G1-3
G1-F
G-4
F1-B
D-1
F1-P
D-D
D-G
D-H
F1-G
F1-R
D-A D-B
D-C
D-E
D-F
E-8
E-9
A1-1
ZA-1
ZA-A
ZA-3
ZA-F
A-4
A-6
A-8
A-RA-N
A-9
A-B
ZA1-C
ZA1-D
ZA1-1
A-A
C-20
C-13
C-19
A1-L
A1-9
A1-E
A1-4
A1-F
A1-7
B-8
C1-G C1-E
ZA1-A
C1-1
C1-A
B-A
B-B
A-7
ZA1-K
A1-A
C-1
C-B
C-G
B-1
C1-4
C-A
C-2
E-A
E-C
E-L E-M
E-D
G-6
E-B
E-F
E-J
E-5
E-4
E-3
E-2
E-6
G-7
G-8
E-1
E-G
E-H E-E
F1-10
F1-Q
F1-13
F1-14
F1-M
C8.3
C6.3
F1-2
F1-5
C-E.8
F1-C
F1-H
D-E.8
E-N
F1-S
F1-N.8
E-K
ZA1-G
E-1.8
AREA
"C"
AREA
"B"
AREA
"G1"
AREA
"G"
AREA
"F1"
AREA
"F"
AREA
"E"
AREA
"D"
AREA
"C1"
AREA
"A1"
AREA
"A"
EXISTING
RETC BLDG
ADDITION
INSTALL PHASE (1): 7/22/19 - 8/2/19
INSTALL PHASE (2): 10/21/19 - 10/25/19
Project Title
Key Plan c
Issued for
Project Designer
Q.M. Review
Approved
Drawing Scale
Project Number Drawing Number
Issue Date
Project Architect / Engineer
Drawn By
Project Administrator
2017 , LLC
As Noted
1441 west long lake, suite 200 troy, michigan 48098
FOOD SERVICES
STRUCTURAL ENGINEER
E.F. WHITNEY, INC.
www.efwhitney.com 248-644-0990
BIRMINGHAM, MICHIGAN 48009
1000 SOUTH OLD WOODWARD AVENUE, SUITE 200
DESAI/NASR CONSULTING ENGINEERS, INC.
www.desainasr.com
248-932-2010
WEST BLOOMFIELD, MICHIGAN 48322
6765 DALY ROAD
THEATRICAL CONSULTANT
ASSOCIATED CONTROLS + DESIGN
www.acdtheatrical.com
317-298-3961
INDIANAPOLIS, INDIANA 46268
6850 GUION ROAD
5211 cascade road se, suite 300 grand rapids, michigan 49546
248.823.2100 www.ids-troy.com
F1
F
E
D
C1
B
AG1
A1
G
C
C
R e vi t L o ca l\ R o m e o H ig h S ch o o l-
A te a st h o p e id s-tr o y .c o m
.r vt
:4 :4
P
M
New Romeo High School
62300 Jewell Rd.
Washington, MI 48094
T. Nemecek
B. Sundberg
Author
16175-3000 F0.2
Second Floor Furniture and Equipment Plan - Phasing
Designer
M.Beck
A.A. Kruse, C. Haas
Romeo Community Schools
BP-3 Bulletin No. 8 05-14-2018
FFE Bids 03-25-2019
High Density Storage Bids 05-14-2019
1/32" = 1'-0"
FURNITURE AND EQUIPMENT PHASING PLAN
F1-1
F1-1
D-1 F1-P
F1-R
F1-R
D-A
C-20
C-20
C-E
C-17
C-16
C-15
C-14
C-13
C-19
C-4
B-8
C1-C
C1-B
ZA1-A
C1-1
C1-A
B-A
B-B
C-F
ZA1-B
C-1
C-9
C-18
C-B
C-G
C1-4
C-3
C-A C-D
C-2
C-5
C-7
C-8
C-11
C-10
C-12
C-6
C-C
C8.3
C6.3
C9.6
F1-2
F1-2
C-E.8
1LC-1
LOBBY
1VC-1
VESTIBULE
1CC-1
CORRIDOR
C101
3D ART ROOM
C101a
KILN ROOM
C100
MEDIA
CENTER
C100a
STUDY ROOM
C100b
STUDY ROOM
C100c
STUDY ROOM
C100d
OFFICE/
WORKROOM
C100e
ELEC
C102
TEXTBOOK
STORAGE
C104
SPECIALTY
CLASSROOM
C3
(QTY: 32)
T10
T10 T10
T10
T10 T10
T10 T10
T10 T10
T10 T10
T10 T10
T10 T10
T10a T10a
S5
(QTY: 4)
S5a
(QTY: 2)
S5
(QTY: 3)
E3 E3
E3 E3
E3 E3
C15
(QTY:6)
C9
(QTY: 4)
C9
(QTY: 4)
T7
T7
C10
(QTY: 20)
T11
T11
C9
(QTY: 4)
T7
C9
(QTY: 4)
T7
C4
L2
L2
L2
L2
T6
T6
T6
T6
L1a
C9
(QTY: 6)
C4
T12
C1
(QTY: 8)
D2
D2
S10
(QTY: 10)
S10
(QTY: 10)
S11 (QTY: 8)
S11 (QTY: 8)
S11 (QTY: 2)
S11 (QTY: 2)
S11 (QTY: 6)
S11 (QTY: 12)
S11 (QTY: 12)
S11 (QTY: 6)
S12 (QTY: 2)
S12 (QTY: 2)
M2
M2
C4
D4 D5
C7b
(QTY: 36)
T4
(QTY: 18)
S19
S20
C4
D4
D5
M1
M1
C106
SPECIALTY
CLASSROOM
1CC-2
CORRIDOR
C3
S5a
(QTY:2)
S19
S20
C7b
(QTY: 36) T4
(QTY: 18)
S5a
(QTY: 2)
S5a
(QTY: 2)
M4
M4
C7
(QTY: 4)
S2
S3
S2
S3
D2
D2
M4
S5c
S5c
L1a
L1a
L1a
L1a
L1a
L1a
L1a
S21
S5a
(QTY:2)
C7b
(QTY: 6)
D2a
(QTY: 3)
9'
/8
39' - 6 5/8"
1'
/8
3' - 2 5/8"
3'
3'
3'
FURNITURE, FIXTURES AND EQUIPMENT SHOWN ARE FOR REFERENCE ONLY.
COORDINATE THE INTERFACING OF ALL TRADES WITH RESPECT TO DELIVERY AND
INSTALLATION OF ALL FURNITURE, FIXTURES AND EQUIPMENT
CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS BEFORE INSTALLATION.
CONSULT ARCHITECT WHEN ACTUAL FIELD CONDITIONS VARY FROM THOSE SHOWN ON
CONSTRUCTION DOCUMENTS.
COORDINATE LOCATIONS OF ALL REQUIRED UTILITIES WITH THE TRADE PROVIDING
THE SAME. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
FURNITURE FIXTURES AND EQUIPMENT PLANS
GENERAL NOTES
A.
B.
C.
D.
M A
T C
H L
IN
E
MATCH LINE
M A
T C
H L
IN
E
MATCH LINE
Project Title
Key Plan c
Issued for
Project Designer
Q.M. Review
Approved
Drawing Scale
Project Number Drawing Number
Issue Date
Project Architect / Engineer
Drawn By
Project Administrator
2017 , LLC
As Noted
1441 west long lake, suite 200 troy, michigan 48098
C
B
C
B
C
C
F1
C
D
FOOD SERVICES
STRUCTURAL ENGINEER
E.F. WHITNEY, INC.
www.efwhitney.com 248-644-0990
BIRMINGHAM, MICHIGAN 48009
1000 SOUTH OLD WOODWARD AVENUE, SUITE 200
DESAI/NASR CONSULTING ENGINEERS, INC.
www.desainasr.com
248-932-2010
WEST BLOOMFIELD, MICHIGAN 48322
6765 DALY ROAD
THEATRICAL CONSULTANT
ASSOCIATED CONTROLS + DESIGN
www.acdtheatrical.com
317-298-3961
INDIANAPOLIS, INDIANA 46268
6850 GUION ROAD
5211 cascade road se, suite 300 grand rapids, michigan 49546
248.823.2100 www.ids-troy.com
F1
F
E
D
C1
B
AG1
A1
G
C
C
R e vi t L o ca l\ R o m e o H ig h S ch o o l-
A te a st h o p e id s-tr o y .c o m
.r vt
:4 :4
P
M
New Romeo High School
62300 Jewell Rd.
Washington, MI 48094
T. Nemecek
B. Sundberg
V. Grant
16175-3000 F2.1C
First Floor Furniture and Equipment Plan - Area C
M. Reaves, A. Coletta, V. Grant
M.Beck
A.A. Kruse, C. Haas
Romeo Community Schools
F
F
2.1
2.1
F
F
2.
2.
F
F
2.1
2.1
F
F
2.
2.
BP-3C Quality Management Review 08-11-2017
BP-3C Bids 09-15-2017
FFE Bids 03-25-2019
High Density Storage Bids 05-14-2019
WS4
G1-D
G1-D
G1-C
G1-C
G-1
G-2
G-3
G-5
G1-BG1-A
F1-1
F1-E F1-J
G1-F
G-4
F1-B F1-G
G-6
G-7
G-8
F1-2
F1-C F1-H
G122
SPECIAL
EDUCATION
CLASSROOM
G119
GENERAL
CLASSROOM
G121
GENERAL
CLASSROOM
G126
ELEC
1SG-1
STAIR
1CG1-1
CORRIDOR
G123
GENERAL
CLASSROOM
G128
COPY / WORK
ROOM
G130
PRINCIPAL'S
OFFICE
G132
ITINERANT
STAFF
OFFICE
G134
ITINERANT
STAFF
OFFICE
G136
ITINERANT
STAFF
OFFICE
G138
ACCOUNTANT
OFFICE
1CG-1
CORRIDOR
G127
RECORD
STORAGE
G129
TESTING
MATERIALS
G125
STAFF
TOILET ROOM
G131
STAFF
TOILET ROOM
G133
HEALTH
G135
CONFERENCE
ROOM
G141
ADMINISTRATION
STAFF
G140
LOBBY
G142
WELCOME
DESK
1CG-3
CORRIDOR
M2
M2
C4
D4
D5
S1
S1
S2
S3
C1 (QTY: 24)
D1
(QTY:24)
C4
D4
D5
M1
M1
S1 S1S2 S3
C1 (QTY: 28)
D1
(QTY:36)
C4
D4
D5
S1 S1S3S2 M2
M2 C1 (QTY: 28)
D1
(QTY:36)
C4
D4
D5
M1
M1
S1 S1S3S2
C2 (QTY: 8) D1
(QTY:36)
T18
T18
C7
(QTY: 6)
C10 (QTY: 5)
C4
C4
C4
C4
C13 (QTY: 14)
T1
G137
LOST AND
FOUND
M7
(QTY: 3)
C4
C5
L2
L2
L2
T5
T5
T5 C5
C5
C4
C4
C4
C4
C5
C5
C5
C5C5
C5
C5 C5
C5
C5C5
L7
L6
C7
T19
S6a S6a S6a S6a
S6b
S23
T20a
WS10
WS11
WS11
WS11
WS11
C2 (QTY: 8)
C2
(QTY: 8)
C1 (QTY: 28)
S23
S23
S23
S23
M4
M4
1/ 4"
8' - 0 1/2"
4'
3' - 0" 3' - 0"
2' - 0 1/2"
3' - 1 1/8"
FURNITURE, FIXTURES AND EQUIPMENT SHOWN ARE FOR REFERENCE ONLY.
COORDINATE THE INTERFACING OF ALL TRADES WITH RESPECT TO DELIVERY AND
INSTALLATION OF ALL FURNITURE, FIXTURES AND EQUIPMENT
CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS BEFORE INSTALLATION.
CONSULT ARCHITECT WHEN ACTUAL FIELD CONDITIONS VARY FROM THOSE SHOWN ON
CONSTRUCTION DOCUMENTS.
COORDINATE LOCATIONS OF ALL REQUIRED UTILITIES WITH THE TRADE PROVIDING
THE SAME. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
FURNITURE FIXTURES AND EQUIPMENT PLANS
GENERAL NOTES
A.
B.
C.
D.
MATCH LINE
MATCH LINE
Project Title
Key Plan c
Issued for
Project Designer
Q.M. Review
Approved
Drawing Scale
Project Number Drawing Number
Issue Date
Project Architect / Engineer
Drawn By
Project Administrator
2017 , LLC
As Noted
1441 west long lake, suite 200 troy, michigan 48098
G
G1
G
G
F1
FOOD SERVICES
STRUCTURAL ENGINEER
E.F. WHITNEY, INC.
www.efwhitney.com 248-644-0990
BIRMINGHAM, MICHIGAN 48009
1000 SOUTH OLD WOODWARD AVENUE, SUITE 200
DESAI/NASR CONSULTING ENGINEERS, INC.
www.desainasr.com
248-932-2010
WEST BLOOMFIELD, MICHIGAN 48322
6765 DALY ROAD
THEATRICAL CONSULTANT
ASSOCIATED CONTROLS + DESIGN
www.acdtheatrical.com
317-298-3961
INDIANAPOLIS, INDIANA 46268
6850 GUION ROAD
5211 cascade road se, suite 300 grand rapids, michigan 49546
248.823.2100 www.ids-troy.com
F1
F
E
D
C1
B
AG1
A1
G
C
C
R e vi t L o ca l\ R o m e o H ig h S ch o o l-
A te a st h o p e id s-tr o y .c o m
.r vt
:4 :0
P
M
New Romeo High School
62300 Jewell Rd.
Washington, MI 48094
T. Nemecek
B. Sundberg
V. Grant
16175-3000 F2.1G
First Floor Furniture and Equipment Plan - Area G
M. Reaves, A. Coletta, V. Grant
M.Beck
A.A. Kruse, C. Haas
Romeo Community Schools
F
F
2.1
2.1
F
F
2.1
2.1
BP-3C Quality Management Review 08-11-2017
BP-3C Bids 09-15-2017
FFE Bids 03-25-2019
High Density Storage Bids 05-14-2019
| Sheets |
| EQ9.2 - Unnamed |
| F0.1 - First Floor Furniture and Equipment Plan - Phasing |
| F0.2 - Second Floor Furniture and Equipment Plan - Phasing |
| F2.1C - First Floor Furniture and Equipment Plan - Area C |
| F2.1G - First Floor Furniture and Equipment Plan - Area G |
File details come from the government source that posted it. Updated .