This is a Solicitation Addendum No. 1 issued by the Minnesota Department of Transportation (MnDOT) for the Rochester Lift Station Pump Work project located at 2900 48th Street NW, Rochester, Minnesota. The addendum, dated November 10, 2026, modifies the original solicitation for the removal, replacement, and testing of two ABS XFP080C VX.1 PE35/4 lift pumps rated 4.7 HP at 230 volts, three-phase, along with associated components including five 50-foot normally open suspended floats and two 3-inch profile gaskets. The solicitation deadline remains November 16, 2026 at 2:00 PM CDT. Key modifications in the addendum include clarification that contractors may choose to replace both lift station pumps simultaneously to expedite the project, with full testing of each pump or pumps required before proceeding. Additionally, the State clarified that there is no existing shut-off to stop flow to the lift station, that MnDOT will shut off water to the site and provide restrooms during the project, and confirmed that both pumps can be changed at the same time at contractor discretion.
The estimated total contract value is $21,000 to $26,000, which does not constitute a minimum or maximum obligation. Freight must be included in the bid price, and responders may offer prompt-pay discounts of 1 to 5 percent or Net 30 payment terms. Bid prices remain firm for 180 days unless otherwise approved by the State. MnDOT will award to the lowest responsible bidder meeting all specifications and terms and conditions and reserves the right to award items separately, by grouping, or in total. Certified Targeted Group (TG), Economically Disadvantaged (ED), and Veteran-Owned (VO) businesses receive a 12 percent preference on total available points, while eligible DEED/DHS providers receive a 6 percent preference. Non-Minnesota contractors face an 8 percent withholding on cumulative calendar-year payments exceeding $50,000 unless exemption is granted. The work is scheduled for completion by January 29, 2027, and this is a one-time purchase with responses to be submitted through the SWIFT Supplier Portal.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Rochster_Lift_station_addendum_2.docx | DOCX document | |
| Rochester_lift_station_sample_contract_3_of_3_a.docx | DOCX document | |
| Rochester_lift_station_bid_attachments_2_of_3.docx | DOCX document | |
| Rochester_lift_station_request_for_bid_1_of_3.docx | DOCX document | |
| lift_pump_replacement_Rochester_MN_DOT_HQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MN DOT Rochester 2900 48th ST NW Rochester MN, 55901
SOLICITATION ADDENDUM
| Addendum No.: |
| #1 |
| Date of Addendum: |
| November 10, 2026 |
| Due Date, Time: |
| November 16,2026 2pm CDT |
| Revised Due Date, Time: |
| November 16,2026 2 pm CDT |
| Buyer: |
| Pete Czaplewski |
| Agency: |
| MN DOT |
| SWIFT Event/Posting Ref. No.: |
| 2000018837 |
| Title: |
| MN DOT D6 Rochester Lift Station Pump Work |
SCOPE OF ADDENDUM
This addendum containing the following revisions, additions, deletions, or clarifications is hereby made part of the Solicitation, including the Sample Contract and Exhibits if applicable.
The purpose of this addendum is to:
· Respond to questions received by the deadline stated in the Solicitation and clarifications from site visit.
Responders acknowledge receipt of this addendum by responding to SWIFT Event No. 2000018837, Version #1 (or more recent version) by the solicitation due date and time.
Except as modified by this addendum, all the terms and conditions remain in full force and effect.
ADDENDUM
I. The due date and time of the Solicitation will remain November 16,2026 2PM CT.
II. The following sections of the Solicitation or Sample Contract and Exhibits are amended as follows (strike through is used for deletions and underlining for insertions):
1. Exhibit C has been modified to add, “OR contractor choice to replace both lift station pumps at same time to speed up job. Fully test each pump or pumps for proper operation before proceeding to the next.
III. Below are the State’s responses to questions received by the deadline stated in the Solicitation
1. There is not a shut off to stop the flow to the lift station
2. MN DOT to shut off water to site and provide rest rooms during project.
3. Both lift station pumps can be changed at same time, contractor choice to speed up job