Interior Demolition and Environmental Remediation
Solicitation number
2140474
Issued by
Broome County, New York

About this file

This is a Demolition and Abatement Bid Package issued by Roberson Museum in Binghamton, New York for an office renovation project. Roberson Museum invites bids for general demolition, asbestos abatement, or combined services. Bidders may submit proposals for demolition only, abatement only, or both services; firms submitting combined bids must hold all required New York State certifications. The project scope includes demolition work on sheets A-102, M-100, E-101, and P-101, with separate pricing required for A-102 scope notes 11, 12, and 13. Abatement work encompasses removal of textured ceiling material in rooms A, B, and C; window removal in area D (to be coordinated with a separate build-out general contractor); removal of an air-handling unit in box E; and removal of induction HVAC units in areas F. A pre-bid walkthrough is scheduled for November 16, 2026 at 1:00 PM Eastern Time at the Museum's main entrance. Bids are due December 2, 2026 at 10:00 AM Eastern Time via electronic submission to mgrasso@roberson.org. Award is anticipated December 9, 2026, with abatement posting December 26, 2026 and abatement work beginning January 4, 2027. Demolition is scheduled to begin January 25, 2027 and be substantially complete by February 17, 2027. Window abatement and removal will occur in late winter or spring 2027, with completion required before June 1, 2027.

Pricing shall be submitted as lump sum bids and must include labor, materials, equipment, supervision, mobilization, protection, hauling, disposal, permits and fees, overhead, profit, and general conditions, reflecting the project's tax-exempt status. No bid or performance bond is required, and prevailing wage rates are not required. Work hours are limited to 7:30 AM–3:30 PM, Monday through Friday, and must be coordinated with Museum public hours (12:00 PM–5:00 PM Monday–Thursday; 12:00 PM–9:00 PM Friday). The successful contractor must provide proof of commercial general liability insurance naming Roberson Museum as an additional insured with primary and non-contributory coverage before commencing work. The project includes Minority and Women-Owned Business Enterprise (MWBE) goals of 30 percent and Service-Disabled Veteran-Owned Business (SDVOB) goals of 6 percent, though no required goals apply to this grant-funded project; the successful bidder must make good faith efforts toward MWBE utilization. The property is listed in the National Register of Historic Places, and all work must comply with The Secretary of the Interior's Standards for the Treatment of Historic Properties. For contracts exceeding $100,000, the contractor must submit a Vendor Responsibility Questionnaire to the State upon selection. The asbestos variance will be provided by others, and the owner is responsible for HVAC system draining, recharging, and air monitoring through separate vendors.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Roberson Museum | Demolition and Abatement | 1

ROBERSON MUSEUM

Demolition and Abatement Bid Package Office Renovation | 30 Front Street, Binghamton, NY 13905 Stantec Project No. 218012249 | Issued November 5, 2026

Roberson Museum invites bids for general demolition, asbestos abatement, or both. Firms submitting a combined bid must hold the New York State certifications required for the work they propose to perform. Complete and sign the bid form in this package.

Submission and schedule Milestone Date or requirement

Advertisement posted November 5, 2026

Pre-bid walkthrough November 16, 2026 at 1:00 PM Eastern Time Meet at the Museum main entrance, 30 Front Street, east entrance near parking lot

Bid due December 2, 2026 at 10:00 AM Eastern Time

Submission Electronic only to mgrasso@roberson.org

Anticipated award December 9, 2026

Abatement posting December 26, 2026

Abatement begins January 4, 2027

Demolition begins January 25, 2027

Demolition substantially complete February 17, 2027

Window abatement and removal Late winter or spring 2027; exact date to be determined.

Complete before June 1, 2027; coordinate with build-out GC.

Bid conditions and Museum operations The project is tax-exempt. No bid or performance bond is required. Prevailing wage rates are not required.

Work hours: 7:30 AM–3:30 PM, Monday–Friday Public hours: 12:00 PM–5:00 PM, Monday–Thursday; 12:00 AM–9:00 PM, Friday. Coordinate work with Museum operations and maintain safe public access, required exits, dust barriers, and protection of collections and existing construction.

Proof of Insurance Before commencing work, the successful contractor shall provide Roberson Museum with a certificate of insurance evidencing coverage applicable to the work. Roberson Museum shall be included as an additional insured under the contractor’s commercial general liability insurance. Coverage afforded to Roberson Museum shall be primary and non-contributory to any insurance maintained by the Museum. The contractor shall provide the applicable policy provisions or endorsements confirming additional insured status and primary and non-contributory coverage. Coverage shall remain in effect throughout the contractor’s work on the project.

Scope of Work Bid documents

• Base bids on the Roberson Museum Office Renovation drawings dated September 3, 2026; the Project Manual issued for permit August 28, 2026, including Section 02 41 00 Demolition; this scope narrative; supplemental abatement drawings A-1, A-2, and A-3; and issued bid addenda. Identify the documents used in your bid. The supplemental abatement drawings must accompany the issued package.

General demolition

• Perform the demolition shown on sheets A-102, M-100, E-101, and P-101, excluding work assigned below to asbestos abatement. Include associated disconnection and capping, protection, salvage, debris removal, disposal, and related work required for this package. New construction and replacement systems are excluded.

• Break out demolition pricing by drawing sheet. Separately identify the cost of A-102 scope notes 11, 12, and 13 as a subset of the A-102 price. Include overhead, profit, and general conditions in each price. The demolition general contractor, to be determined, will remove the top and front panels from the induction HVAC units before abatement; coordinate this prerequisite work with the abatement contractor.

Roberson Museum | Demolition and Abatement | 2

Asbestos abatement

• Provide the asbestos abatement described below and shown on the supplemental abatement drawings. The asbestos variance will be provided by others.

• Ceiling material — Drawing A-1, rooms A, B, and C. Remove and dispose of the existing textured “popcorn” ceiling material, including the same material where present on the upper portions of adjacent walls.

• Windows — Drawing A-1, area D. Remove and dispose of the existing windows. Coordinate removal with the build-out general contractor, to be determined, who will install each replacement window immediately after the corresponding existing window is removed. The build-out general contractor will pay for and provide the lift for window removal and replacement at no charge to the abatement contractor. Perform this work in late winter or spring 2027, on a date to be determined, and complete it before June 1, 2027.

• Air-handling unit — Drawing A-2, box E. Remove and dispose of the existing air-handling unit up to its transitions to the existing ductwork on both sides, to safely remove the black gaskets inside the unit that contain asbestos-containing material (ACM). Include the unit removal in HVAC abatement pricing.

• Induction HVAC units — Drawing A-3, areas F. Remove and dispose of the existing induction HVAC units around the perimeter of the space. The tape wrapping on these units contains ACM. After the demolition general contractor removes the top and front panels, remove the entire units by cutting all pipes and pipe conduits flush with the existing concrete floor. Include this work in HVAC abatement pricing.

• Owner will be responsible for draining, recharging, and/or capping HVAC systems before abatement through other vendors. Coordination on schedule/timing will be required.

• Owner will be responsible for air monitoring through another vendor. The abatement contractor will not provide it.

Scope coordination and protection Price removal of the contaminated air-handling and induction units under HVAC abatement, rather than charging for the same unit removal under demolition. Price induction-unit panel removal under demolition. Coordinate the sequence and access between contractors.

Attachments Contractor Bid Form Required Language Office Renovation drawing set dated 9/3/2026 Office Renovation project manual dated 8/28/2026 Schematic Drawings A-1, A-2, A-3 Legal Notice for Bidders Attachment A-1 – Agency Specific Terms and Conditions Attachment A-2 – Program Specific Terms and Conditions

Required Forms to be submitted with bid Contractor Bid Form Non-Collusive Bidding Certification to be submitted within seven days of award notification Equal Employment Opportunity Policy Statement Contractor’s Solicitation Log (MWBE tracking)

Sample Vendor Responsibility Questionnaire For information only. Must be submitted after award notification for contracts that equal or exceed $100,000.

Vendor Responsibility Questionnaire For-Profit Construction

Roberson Museum | Demolition and Abatement | 3

Contractor Bid Form Bid scope: ☐ Demolition only ☐ Abatement only ☐ Combined demolition and abatement

Legal company name:

Address:

Contact name and title:

Telephone and email:

NYS-certified MWBE firm: ☐ Yes ☐ No NYS-certified SDVOB firm: ☐ Yes ☐ No Project goals: MWBE: 30% | SDVOB: 6% Applicable certification or license numbers:

Lump sum pricing Include labor, materials, equipment, supervision, mobilization, protection, hauling, disposal, permits and fees, overhead, profit, and general conditions. Reflect project tax-exempt status. Allocate shared costs once. Enter “Not bid” for scopes not offered; enter $0 only for included work with no separate charge.

Item Scope Amount

A1 A-102 demolition (separate out costs for scope notes numbers 11, 12, and 13 as part of your A-102 cost above)

A2 M-100 demolition $________________

A3 E-101 demolition $________________

A4 P-101 demolition $________________

TOTAL DEMOLITION = A1 + A2 + A3 + A4 $________________

Demolition time required to complete:

Abatement basis and subcontractors Abatement documents and dates used:

Abatement contractor and license:

Testing, monitoring, and clearance included and responsible party:

Acknowledgments and authorization Addenda received, with dates, or none:

Exceptions, exclusions, allowances, and schedule deviations (attach detail or state none):

The undersigned has reviewed the identified bid documents and offers to perform the stated scope for the prices above, subject to exceptions expressly identified in this bid. The bidder acknowledges the listed work hours, public occupancy, and schedule. This bid is an offer and does not itself authorize work.

Authorized signature: Date:

Printed name and title:

Roberson Museum | Demolition and Abatement | 4

Required Language

Project identifiers:

ESD Project No. 139,490 / CFA No. 146313 DASNY Project ID 27539 – Modernization of HVAC System DASNY Project ID 27126 – Renovations to Link Planetarium GRG Project No. 2257 / CWSRF Project No. 9268-01-00 – Roberson Museum Green Initiative NYSCA C251110GM – Roberson Museum Modernization: Design Phase Initiative NYSCA C261071GM – Critical HVAC Modernization ZBGA C24ZC945GM – ZBGACap – HVAC Project ZBGA 25130 – Museum Rehabilitation Project

EEO: Roberson Museum has been and will continue to be an equal opportunity organization. All qualified Minority and Women-Owned Business Enterprise (MWBE) suppliers, contractors and/or businesses will be afforded equal opportunity without discrimination because of race, religion, national origin, sex, age, disability, sexual preference or Vietnam Era Veterans status.

Funding Credit/MWBE: This project is funded in part by a grant from the NYS Office of Parks, Recreation and Historic Preservation through an appropriation from the New York State Budget and is committed to providing Minority and Women Owned Business (MWBE) equal opportunity to participate in government contracts. Though there are no required goals for MWBE participation in this grant funded project, the successful bidder will be required to make a Good Faith Effort in the utilization of MWBE's and furnish reports showing the participation of various business enterprises of subcontractors and suppliers on the contract.

State of New York Contract for Grants citation: All bidders are subject to the terms of the State of New York Contract for Grants -Standard Terms and Conditions, which can be found online at https://grantsmanagement.ny.gov/state-agency-resources

Vendor Responsibility Questionnaire: Upon selection, for all contracts that equal or exceed $100,000, the contractor will be required to submit to the State a Vendor Responsibility Questionnaire: Construction – For Profit. The questionnaire can be found online at http://www.osc.state.ny.us/vendrep/forms_vendor.htm

Insurance Certificates: Upon selection, all contractors and subcontractors must provide proof of Workers’ Compensation and Disability Benefits Insurance Coverage for employees, or proof of exemption from the New York State Workers’ Compensation Board.

Historic Preservation Acknowledgement: This property has been determined to possess historic (e.g., architectural, engineering, artistic) significance and is listed in the National Register of Historic Places. The contractor shall recognize that all aspects of the property may potentially contribute to this significance and the contractor shall not judge the relative significance of any features nor the impact of any or all proposed work; this responsibility shall rest solely with the architect.

Consequently, no deviations from the contract documents shall be performed and no features or materials shall be altered, removed, reused, or taken from the premises, without the written approval of the architect as being consistent with the requirements of the contract documents. All work shall be consistent with The Secretary of the Interior’s Standards for the Treatment of Historic Properties.

https://grantsmanagement.ny.gov/state-agency-resources https://grantsmanagement.ny.gov/state-agency-resources http://www.osc.state.ny.us/vendrep/forms_vendor.htm

Submission and schedule
Bid conditions and Museum operations
Proof of Insurance
Scope coordination and protection
Contractor Bid Form
Lump sum pricing
Abatement basis and subcontractors
Acknowledgments and authorization
Required Language