RO_Process_Flow_Diagram_(1).pdf
PDF 613 KB Posted
- Solicitation number
- 2026-IFB-LM-0055
- Issued by
- Los Angeles County, California
About this file
RO_Process_Flow_Diagram_(1).pdf Summary
This is a process flow diagram file supporting a competitive sealed bid procurement from the City of Pasadena Water & Power Department for Reverse Osmosis, Degasification and Ion Exchange System Support Services. The solicitation seeks a qualified vendor with specialized expertise in water purification technologies to support the Glenarm Power Plant's production of approximately 8 million gallons of demineralized and deionized water annually for electric power generation. The scope of services includes bi-monthly preventative maintenance visits, emergency and maintenance service calls, supply of reverse osmosis pre-treatment chemicals and powdered resin, offsite cleaning of reverse osmosis and gas transfer membranes, provision and maintenance of ion exchange tanks or equivalent, and technical assistance. Bidders must submit pricing for 16 line items covering mixed bed deionizer tanks, bi-weekly service visits, chemicals, powdered resin, cartridge filters, offsite membrane cleaning, and maintenance and emergency service calls. A non-mandatory pre-bid meeting is scheduled for February 11, 2026 at 8:30 a.m.; questions must be submitted by February 19, 2026 at 3:00 p.m.; and sealed bids are due by 2:00 p.m. on Friday, February 27, 2026. The initial contract term is three years from the date of execution with no optional extension periods. Contract award will be made to the lowest responsive and responsible bidder based on the Grand Total Price submitted, with bids remaining open for a minimum of 180 calendar days from the date of opening.
Award is contingent upon compliance with the City of Pasadena Living Wage Ordinance, Pasadena minimum wage requirements, Equal Employment Opportunity provisions, and procurement of a Pasadena Business License if performing services within the City. A bid bond in the amount of five percent of the total bid price is required, along with 100% performance bonds and 100% labor and materials bonds. Successful bidders must submit proof of required insurance prior to contract award and a completed IRS Form W-9 within 10 calendar days of notification. All contractors must comply with Industrial Wastewater Discharge Permit No. 005171 for system discharge to the sewer. Required submittal documents include a Vendor Questionnaire, Project Workforce Utilization forms, Declaration of Non-Collusion, Relevant Experience Form documenting five previous similar projects, Federal Required Certification pursuant to 44 C.F.R. Part 18, completed Department of Information Technology Technical Questionnaire, and a Unique Entity ID (UEI) from SAM.gov. No budget range or award value is specified in the solicitation documents. The existing infrastructure at the Glenarm Power Plant includes reverse osmosis systems, degasification equipment utilizing Liqui-Cel Membrane Contactors by 3M, ion exchange systems, and chemical injection systems.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .