RFTP - BA-000-271-001 - Various Annapolis Bldgs. Modernize Elevators Comment .pdf
PDF 744 KB Posted
- Solicitation number
- BPM059209
- Issued by
- Maryland
About this file
This is a Request for Technical Proposals (RFTP) issued by the Maryland Department of General Services (DGS) for comprehensive architectural and engineering services to modernize seventeen traction and hydraulic elevators across four occupied state buildings in Annapolis: the House of Delegates Building (six elevators), Revenue Administration Building (four elevators), Miller Senate Office Building (five elevators), and James Senate Office Building (two elevators). The scope of work encompasses field investigation, design and construction documents, bidding assistance, construction administration, testing, closeout, and warranty services, with deliverables including the Basis of Design, 50%, 95%, and 100% design submissions, signed and sealed construction documents, specifications, cost estimates, schedules, and bid forms. The pre-proposal conference is scheduled for October 13, 2026, at 10:00 AM at the Central Services Building in Annapolis, with site visits immediately following at approximately 11:00 AM. Questions must be submitted by October 20, 2026, at 3:00 PM, and technical proposals are due by November 3, 2026, at 3:00 PM through the eMaryland Marketplace Advantage (eMMA) system. The contract duration is approximately 6.5 years, with phasing requirements mandating that no on-site construction, testing, or contractor occupancy occur during the Maryland General Assembly Session, generally mid-January through mid-April. The Department intends to make a single award.
This is a Small Business Reserve (SBR) procurement limited to certified small businesses meeting statutory requirements established in the Maryland State Finance and Procurement Article. An overall Minority Business Enterprise (MBE) participation goal of 20% has been established, with subgoals of 7% for African American-owned and 10% for women-owned businesses. No Veteran-Owned Small Business Enterprise (VSBE) goal is required. The contract will be awarded on a Firm Fixed Price basis following qualification-based selection procedures under Maryland Code. Insurance requirements include Commercial General Liability of $2,000,000 combined single limit per occurrence and $3,000,000 annual aggregate, Errors and Omissions/Professional Liability of $1,000,000 per claim and $2,000,000 annual aggregate, and Workers' Compensation of $1,000,000 per occurrence. The State will be listed as an additional insured on liability policies. Proposals must be submitted only through eMMA; no paper submissions are accepted. Offerors must be registered with the Maryland Department of Assessments and Taxation and maintain a Maryland resident agent or Maryland representation. The contract does not include federal funding.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix 9. Electronic Transaction Fee.docx | DOCX document | |
| BA-000-271-001_Elevator_Engineering_Scope of Services.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF MARYLAND
MARYLAND DEPARTMENT OF GENERAL SERVICES (DGS)
REQUEST FOR TECHNICAL PROPOSALS (RFTP)
VARIOUS ANNAPOLIS BLDGS. MODERNIZE ELEVATORS
RFTP NUMBER: BA-000-271-001
ISSUE DATE: OCTOBER 6, 2026
NOTICE
PROPOSALS FOR THIS SOLICITATION WILL ONLY BE
RECEIVED THROUGH EMARYLAND MARKETPLACE
ADVANTAGE. NO PAPER PROPOSALS WILL BE ACCEPTED.
A Prospective Offeror that has received this document from a source other than eMarylandMarketplace
(eMMA) https://procurement.maryland.gov should register on eMMA. See Section 4.2.
SMALL BUSINESS RESERVE PROCUREMENT
This is a Small Business Reserve Procurement for which the award will be limited to certified small businesses. Only businesses that meet the statutory requirements set forth in State Finance and Procurement Article, §§14-501—14-505, Annotated Code of Maryland, and that are certified by the Department of Social and Economic Mobility’s (DoSEM) Office of Small, Minority & Women Business Affairs (OSBA) Small Business Reserve Program are eligible for award of a contract.
Before awarding a contract under a procurement designated as a small business reserve procurement, the Procurement Officer shall verify that the apparent awardee is certified by the OSBA as a certified small business through eMMA. However, if small businesses do not show interest in this solicitation, the Procurement Officer has the right to remove the SBR designation via an Amendment on eMMA.
Title: Various Annapolis Bldgs. Modernize Elevators Solicitation #: BA-000-271-001 RFTP Document
RFTP for Maryland Department of General Services Page ii of viii Revised: 4/25/2025
VENDOR FEEDBACK FORM
To help us improve the quality of State solicitations, and to make our procurement process more responsive and business friendly, please provide comments and suggestions regarding this solicitation.
Please return your comments with your response. If you have chosen not to respond to this solicitation, please email or fax this completed form to the attention of the Procurement Officer (see Key Information Summary Sheet below for contact information).
Title: Various Annapolis Bldgs. Modernize Elevators Solicitation No: BA-000-271-001
1. If you have chosen not to respond to this solicitation, please indicate the reason(s) below:
� Other commitments preclude our participation at this time
� The subject of the solicitation is not something we ordinarily provide
� We are inexperienced in the work/commodities required
� Specifications are unclear, too restrictive, etc. (Explain in REMARKS section)
� The scope of work is beyond our present capacity
� Doing business with the State is simply too complicated. (Explain in REMARKS section)
� We cannot be competitive. (Explain in REMARKS section)
� Time allotted for completion of the Proposal is insufficient
� Start-up time is insufficient
� Bonding/Insurance requirements are restrictive (Explain in REMARKS section)
� Proposal requirements (other than specifications) are unreasonable or too risky (Explain in REMARKS section)
� MBE or VSBE requirements (Explain in REMARKS section)
� Prior State of Maryland contract experience was unprofitable or otherwise unsatisfactory.
(Explain in REMARKS section)
� Payment schedule too slow
� Other: __________________________________________________________________
2. If you have submitted a response to this solicitation, but wish to offer suggestions or express concerns, please use the REMARKS section below. (Attach additional pages as needed.)
REMARKS:
Vendor Name: ________________________________ Date: _______________________
Contact Person: _________________________________ Phone (____) _____ - _________________
Address: ______________________________________________________________________
E-mail Address: ________________________________________________________________
RFTP for Maryland Department of General Services Page iii of viii
STATE OF MARYLAND
MARYLAND DEPARTMENT OF GENERAL SERVICES (DGS)
KEY INFORMATION SUMMARY SHEET
Request for Technical Proposals
A/E – Various Annapolis Bldgs. Modernize Elevators
Solicitation Number: BA-000-271-001
RFTP Issue Date: October 6, 2026
RFTP Issuing Office: Department of General Services
Project Manager: Robert Hamilton Sr.
301 West Preston Street, Room 1405 Baltimore MD 21201
Procurement Officer: Jonathan Swiderski 301 W. Preston Street, 12th Floor Baltimore, MD 21201 e-mail:
Office Phone:
jonathan.swiderski@maryland.gov 410-767-3002
Proposals are to be sent to: PROPOSALS FOR THIS SOLICITATION WILL ONLY BE RECEIVED THROUGH eMARYLAND MARKETPLACE
ADVANTAGE. NO PAPER PROPOSALS WILL BE
ACCEPTED.
Pre-Proposal Conference: October 13, 2026 @ 10:00 AM Local Time The large conference room is located at the Central Services Building 29 St. Johns St., Annapolis, MD 21401
Site Visit October 13, 2026 @ approximately 11:00 AM Local Time The site visit will be held immediately following the Pre-Proposal Conference.
The site visit will begin at - House of Delegates Building 6 Bladen Street, Annapolis, Anne Arundel County, Maryland 21401 Revenue Administration Building 110 Carroll Street, Annapolis, Anne Arundel County, Maryland 21401 Miller Senate Office Building 11 Bladen Street, Annapolis, Anne Arundel County, Maryland 21401 James Senate Office Building mailto:jonathan.swiderski@maryland.gov
RFTP for Maryland Department of General Services Page iv of viii
110 College Avenue; Annapolis, Anne Arundel County, Maryland 21401
Questions Due Date and Time October 20, 2026, by 3:00 PM Local Time
Proposal Due (Closing) Date and Time:
November 3, 2026, 3:00 PM Local Time Offerors are reminded that a completed Feedback Form is requested if a no-bid decision is made (see page iv).
MBE Subcontracting Goal: 20% MBE (with subgoals 7% African American and 10% Women)
VSBE Subcontracting Goal: 0 %
Contract Type: Firm Fixed Prices
Contract Duration: 6.5 years
Project Location: House of Delegates Building 6 Bladen Street, Annapolis, Anne Arundel County, Maryland 21401 Revenue Administration Building 110 Carroll Street, Annapolis, Anne Arundel County, Maryland 21401 Miller Senate Office Building 11 Bladen Street, Annapolis, Anne Arundel County, Maryland 21401 James Senate Office Building 110 College Avenue; Annapolis, Anne Arundel County, Maryland 21401
SBR Designation: YES
Federal Funding: N/A
RFTP for Maryland Department of General Services Page v of viii
TABLE OF CONTENTS – RFTP
1 Minimum Qualifications
1.1 Offeror Minimum Qualifications
2 Contractor Requirements: Scope of Work
2.1 Summary Statement
2.2 Background and Purpose
3 Contractor Requirements: General
3.1 Contract Initiation Requirements
3.2 End of Contract Transition - Reserved
3.3 Invoicing
3.4 Liquidated Damages
3.5 Insurance Requirements
3.6 Security Requirements
3.7 Problem Escalation Procedure
3.8 SOC 2 Type 2 Audit Report
3.9 Experience and Personnel
3.10 Substitution of Personnel
3.11 Minority Business Enterprise (MBE) Reports
3.12 Veteran Small Business Enterprise (VSBE) Reports
3.13 Work Orders
3.14 Additional Clauses
3.15 The State of Maryland’s Commitment to Purchasing Environmentally Preferred Products and
Services (EPPs)
4 Procurement Instructions
4.1 Pre-Proposal Conference
4.2 Letter of Interest
4.3 eMaryland Marketplace Advantage (eMMA)
4.4 Questions
4.5 Procurement Method
4.6 Proposal Due (Closing) Date and Time
4.7 Multiple or Alternate Proposals
4.8 Economy of Preparation
4.9 Public Information Act Notice
RFTP for Maryland Department of General Services Page vi of viii
4.10 Award Basis
4.11 Oral Presentation
4.12 Duration of Proposal
4.13 Revisions to the RFTP
4.14 Cancellations
4.15 Incurred Expenses
4.16 Protest/Disputes
4.17 Offeror Responsibilities
4.18 Acceptance of Terms and Conditions
4.19 Proposal Affidavit
4.20 Contract Affidavit
4.21 Compliance with Laws/Arrearages
4.22 Verification of Registration and Tax Payment
4.23 False Statements
4.24 Payments by Electronic Funds Transfer
4.25 Prompt Payment Policy
4.26 Electronic Procurements Authorized
4.27 MBE Participation Goal
4.28 VSBE Goal
4.29 Living Wage Requirements
4.30 Federal Funding Acknowledgement
4.31 Conflict of Interest Affidavit and Disclosure
4.32 Non-Disclosure Agreement
4.33 HIPAA - Business Associate Agreement
4.34 Nonvisual Access
4.35 Mercury and Products That Contain Mercury
4.36 Location of the Performance of Services Disclosure
4.37 Department of Human Services (DHS) Hiring Agreement
4.38 Small Business Reserve (SBR) Procurement
4.39 Maryland Healthy Working Families Act Requirements
4.40 eMMA (eMaryland Marketplace Advantage) Electronic Transaction Fee
5 Proposal Format
5.1 Two Part Submission
5.2 Proposal Delivery and Packaging
RFTP for Maryland Department of General Services Page vii of viii
5.3 Volume I - Technical Proposal
5.4 Volume II – Financial Proposal
6 Evaluation and Selection Process
6.1 Evaluation Committee
6.2 Technical Proposal Evaluation Criteria
6.3 Financial Proposal Evaluation Criteria
6.4 Reciprocal Preference
6.5 Selection Procedures
6.6 Documents Required upon Notice of Recommendation for Contract Award
7 RFTP ATTACHMENTS AND APPENDICES
Attachment A. Pre-Proposal Conference Response Form
Attachment B. Financial Proposal Instructions
Attachment C. Proposal Affidavit
Attachment D. Minority Business Enterprise (MBE) Forms
Attachment E. Veteran-Owned Small Business Enterprise (VSBE) Forms
Attachment F. Maryland Living Wage Affidavit of Agreement for Service Contracts
Attachment G. Federal Funds Attachments
Attachment H. Conflict of Interest Affidavit and Disclosure
Attachment I. Non-Disclosure Agreement
Attachment J. HIPAA Business Associate Agreement
Attachment K. Mercury Affidavit
Attachment L. Location of the Performance of Service Disclosure
Attachment M. Contract
Attachment N. Contract Affidavit
Attachment O. DHS Hiring Agreement
Attachment P. Prime Contractor List of All Subcontractors
Attachment Q. Corporate Diversity Addendum
Attachment R. Legal Action Summary
RFTP for Maryland Department of General Services Page viii of viii
Appendix 1. – Abbreviations and Definitions
Appendix 2. – Offeror Information Sheet
RFTP for Maryland Department of General Services Page 1 of 72
1 Minimum Qualifications
1.1 Offeror Minimum Qualifications
Individuals, corporations, partnerships, and other entities performing architectural, engineering, landscape architecture or land surveying services must have the licenses and permits required by Maryland law. The licenses and permit numbers issued to corporations, partnerships, and other entities by the appropriate Maryland State Board are to be included in SF-330 Item C “Proposed Team”, Section 9, underneath each firm name. Please note that if a firm is practicing architecture, engineering, landscape architecture or land surveying in the State of Maryland and is not a sole proprietorship, that firm must be licensed by the appropriate Maryland State Board.
THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLANK.
RFTP for Maryland Department of General Services Page 2 of 72
2 Contractor Requirements: Scope of Work
2.1 Summary Statement
2.1.1 Provide complete A/E services for the comprehensive modernization of seventeen (17) traction and hydraulic elevators in four occupied State buildings in Annapolis, including field investigation, design and construction documents, bidding assistance, construction administration, testing, closeout, and warranty services. The design shall use non-proprietary elevator systems and accommodate the annual Maryland General Assembly Session blackout.
Participation in this procurement solicitation must comply with MD State Finance and Procurement Article §13–212.1 and COMAR 21.05.08.08 relating to Conflicts of Interest.
2.1.2 Consultants retained by the State to assist with the drafting of the solicitation or assisting in the selection for award are prohibited from submitting a proposal or assisting another in submitting a proposal for the subject solicitation or working for the selected awardee for a period of time. Participation in this procurement solicitation must comply with MD State Finance and Procurement Article §13–212.1 and COMAR 21.05.08.08 relating to Conflicts of Interest.
2.1.3 It is the State’s intention to obtain goods and services, as specified in this RFTP, from a Contract between the selected Offeror and the State.
2.1.4 The Department intends to make a single award as a result of this RFTP. See RFTP Section 4.10 Award Basis for more Contract award information.
2.1.5 An Offeror, either directly or through its subcontractor(s), must be able to provide all goods and services and meet all of the requirements requested in this solicitation and the successful Offeror (the Contractor) shall remain responsible for Contract performance regardless of subcontractor participation in the work.
2.1.6 Maryland State and local entities as defined in MD State Finance and Procurement Article 13-110(a)(5)(i) and not-for-profit entities within the State of Maryland may NOT purchase from the Contractor goods or services covered by the Contract at the same prices chargeable to the State.
2.2 Background and Purpose
The Department of General Services combined four elevator modernization projects into BA- 000-271-001 to obtain one coordinated design contract and one construction contract for the House of Delegates, Revenue Administration, Miller Senate Office, and James Senate Office buildings. The program includes seventeen elevators: six at the House of Delegates Building, four at the Revenue Administration Building, five at the Miller Senate Office Building, and two at the James Senate Office Building.
The selected A/E shall verify existing conditions and perform all services required by the attached BA-000-271-001 Elevator Engineering Scope of Services and four August 2026 VDA Vertical Transportation MOD Evaluation Reports. The design should provide modern, safe, reliable, accessible, code-compliant, maintainable, and non-proprietary elevator systems, together with coordinated architectural, structural, electrical, mechanical, fire/life-safety, communications, security, accessibility, hazardous-material, cost-estimating, and scheduling
RFTP for Maryland Department of General Services Page 3 of 72 work. Deliverables shall include the Basis of Design; 50%, 95%, and 100% design submissions;
signed and sealed construction documents; specifications; estimates; schedules; bid forms;
alternates; unit prices; and phasing requirements.
Phasing is a controlling requirement. No on-site construction, testing, shutdowns, deliveries, punch-list work, or contractor occupancy will normally be permitted during the Maryland General Assembly Session, generally mid-January through mid-April. Before each Session blackout, every affected elevator shall be fully operational, and the contractor shall completely demobilize. Each elevator work package shall be designed to fit within one available non- Session construction window while maintaining the required elevator capacity and accessible routes.
Services shall include permit and code coordination; pre-bid conference and four-building walkthrough; bidder questions, RFIs, addenda, bid analysis, and award recommendation;
submittal, RFI, payment, change, schedule, testing, punch-list, and closeout administration; ten
(10) A/E-led on-site progress meetings with agendas, disseminated minutes, and a simultaneous virtual option; a unit cost for additional meetings and site visits; record documents; training; an approximately 10-month warranty inspection; and an approximately 23-month DGS post-construction inspection. The anticipated total duration is approximately 6.5 years.
RFTP for Maryland Department of General Services Page 4 of 72
3 Contractor Requirements: General
3.1 Contract Initiation Requirements
THIS SECTION IS INAPPLICABLE TO THIS RFTP.
3.2 End of Contract Transition - Reserved
3.3 Invoicing
3.3.1 General
Submission of an invoice constitutes the Contractor’s verification that the information in the invoice is accurate as of the time of submission.
An invoice not satisfying the requirements of a Proper Invoice (as defined in COMAR 21.06.09) will not be processed for payment. To be considered a Proper Invoice, invoices must include the following information, without error:
1) Contractor name and address;
2) Remittance address;
3) Federal taxpayer identification (FEIN) number, social security number, as appropriate;
4) Invoice period (i.e. time period during which services covered by invoice were performed);
5) Invoice date;
6) Invoice number;
7) State assigned Contract number;
8) State assigned (Blanket) Purchase Order number(s);
9) Goods or services provided;
10) Amount due; and
11) Any additional documentation required by regulation or the Contract.
Invoices that contain both fixed price and labor hour or time and material items shall clearly identify each item as either fixed price, and labor hour, or time and material billing.
The State reserves the right to reduce or withhold Contract payment in the event the Contractor does not provide all required deliverables within the time frame specified in the Contract or otherwise fails to satisfy the terms and conditions of the Contract until such time as the Contractor brings itself into full compliance with the Contract.
The State is generally exempt from federal excise taxes, Maryland sales and use taxes, District of Columbia sales taxes and transportation taxes. The Contractor, however, is not exempt from such sales and use taxes and may be liable for the same.
Invoices for final payment shall be clearly marked as “FINAL” and submitted when all work requirements have been completed and no further charges are to be incurred under the Contract.
In no event shall any invoice be submitted later than 60 calendar days from the Contract termination date.
3.3.2 Invoice Submission Schedule
RFTP for Maryland Department of General Services Page 5 of 72
A. The Contractor shall submit invoices in accordance with agreed upon schedule.
3.3.3 For the purposes of the Contract an amount will not be deemed due and payable if:
A. The amount invoiced is inconsistent with the Contract;
B. The proper invoice has not been received by the party or office specified in the Contract;
C. The invoice or performance is in dispute or the Contractor has failed to otherwise comply with the provisions of the Contract;
D. The item or services have not been accepted;
E. The quantity of items delivered is less than the quantity ordered;
F. The items or services do not meet the quality requirements of the Contract;
G. If the Contract provides for progress payments, the proper invoice for the progress payment has not been submitted pursuant to the schedule;
H. If the Contract provides for withholding a retainage and the invoice is for the retainage, all stipulated conditions for release of the retainage have not been met; or
I. The Contractor has not submitted satisfactory documentation or other evidence reasonably required by the Procurement Officer or by the Contract concerning performance under the Contract and compliance with its provisions.
3.3.4 Travel Reimbursement
Travel will not be reimbursed under this RFTP.
3.4 Liquidated Damages
3.4.1 MBE Liquidated Damages
MBE liquidated damages are identified in Attachment M.
3.4.2 Liquidated Damages other than MBE
THIS SECTION IS INAPPLICABLE TO THIS RFTP.
3.5 Insurance Requirements
The Contractor shall maintain, at a minimum, the insurance coverages outlined below or any minimum requirements established by law if higher, for the duration of the Contract, including option periods, if exercised:
3.5.1 The following type(s) of insurance and minimum amount(s) of coverage are required:
A. Commercial General Liability - of $2,000,000 combined single limit per occurrence for bodily injury, property damage, and personal and advertising injury and $3,000,000 annual aggregate. The minimum limits required herein may be satisfied through any combination of primary and umbrella/excess liability policies.
B. Errors and Omissions/Professional Liability - $1,000,000 per combined single limit per claim and $2,000,000 annual aggregate.
C. Worker’s Compensation - The Contractor shall maintain such insurance as necessary or as required under Workers’ Compensation Acts, the Longshore and Harbor Workers’ Compensation Act, and the Federal Employers’ Liability Act, to not be less than. one million dollars ($1,000,000) per occurrence (unless a state’s law requires a greater amount of coverage). Coverage must be valid in all states where work is performed.
RFTP for Maryland Department of General Services Page 6 of 72
D. Automobile or Commercial Truck Insurance - The Contractor shall maintain Automobile or Commercial Truck Insurance (including owned, leased, hired, and non-owned vehicles) as appropriate with Liability, Collision, and PIP limits no less than those required by the State where the vehicle(s) is registered, but in no case less than those required by the State of Maryland.
3.5.2 The State shall be listed as an additional insured on the faces of the certificates associated with the coverages listed above, including umbrella policies, excluding Workers’ Compensation Insurance and professional liability.
3.5.3 All insurance policies shall be endorsed to include a clause requiring the insurance carrier provide the Procurement Officer, by certified mail, not less than 30 days’ advance notice of any non-renewal, cancellation, or expiration. The Contractor shall notify the Procurement Officer in writing, if policies are cancelled or not renewed within five (5) days of learning of such cancellation or nonrenewal. The Contractor shall provide evidence of replacement insurance coverage to the Procurement Officer at least 15 days prior to the expiration of the insurance policy then in effect.
3.5.4 Any insurance furnished as a condition of the Contract shall be issued by a company authorized to do business in the State.
3.5.5 The recommended awardee must provide current certificate(s) of insurance with the prescribed coverages, limits and requirements set forth in this section within five (5) Business Days from notice of recommended award. During the period of performance for multi-year contracts, the Contractor shall provide certificates of insurance annually, or as otherwise directed by the Project Manager. Such liability insurance shall remain in effect through design, construction, and ten years after acceptance by the State of the completed project.
3.5.6 Subcontractor Insurance
The Contractor shall require any subcontractors to obtain and maintain comparable levels of coverage and shall provide the Project Manager with the same documentation as is required of the Contractor.
Failure to comply with the insurance requirement will result in the Proposal to be deemed not susceptible for award.
3.6 Security Requirements
The following requirements are applicable to the Contract:
3.6.1 Employee Identification
A. Contractor Personnel shall display his or her company ID badge in a visible location at all times while on State premises. Upon request of authorized State personnel, each Contractor Personnel shall provide additional photo identification.
B. Contractor Personnel shall cooperate with State site requirements, including but not limited to, being prepared to be escorted at all times, and providing information for State badge issuance.
C. Contractor shall remove any Contractor Personnel from working on the Contract where the State determines, in its sole discretion that Contractor Personnel has not adhered to the Security requirements specified herein.
RFTP for Maryland Department of General Services Page 7 of 72
D. The State reserves the right to request that the Contractor submit proof of employment authorization of non-United States Citizens, prior to commencement of work under the Contract.
3.6.2 Security Clearance / Criminal Background Check
A security clearance is not required for Contractor Personnel assigned to the Contract.
3.6.3 On-Site Security Requirement(s)
A. For the conditions noted below, Contractor Personnel may be barred from entrance or leaving any site until such time that the State’s conditions and queries are satisfied.
1) Contractor Personnel may be subject to random security checks when entering and leaving State secured areas. The State reserves the right to require Contractor Personnel to be accompanied while in secured premises.
2) Some State sites, especially those premises of the Department of Public Safety and Correctional Services, require each person entering the premises to document and inventory items (such as tools and equipment) brought onto the site, and to submit to a physical search of his or her person. Therefore, Contractor Personnel shall always have available an inventory list of tools being brought onto a site and be prepared to present the inventory list to the State staff or an officer upon arrival for review, as well as present the tools or equipment for inspection. Before leaving the site, the Contractor Personnel will again present the inventory list and the tools or equipment for inspection. Upon both entering the site and leaving the site, State staff or a correctional or police officer may search Contractor Personnel. Depending upon facility rules, specific tools or personal items may be prohibited from being brought into the facility.
B. Any Contractor Personnel who enters the premises of a facility under the jurisdiction of the Department may be searched, fingerprinted (for the purpose of a criminal history background check), photographed and required to wear an identification card issued by the Department.
C. Further, Contractor Personnel shall not violate Md. Code Ann., Criminal Law Art. Section 9- 410 through 9-417 and such other security policies of the agency that controls the facility to which the Contractor Personnel seeks access. The failure of any of the Contractor Personnel to comply with any provision of the Contract is sufficient grounds for the State to immediately terminate the Contract for default.
3.7 Problem Escalation Procedure
No later than ten (10) Business Days after notice of recommended award or after the date of the Notice to Proceed, whichever is earlier, the Contractor must provide, and thereafter, maintain a Problem Escalation Procedure (PEP) for both routine and emergency situations. The PEP must state how the Contractor will address problem situations as they occur during the performance of the Contract, especially problems that are not resolved to the satisfaction of the State within appropriate timeframes and must include:
A. Contact information B. The process for establishing the existence of a problem;
C. Names, titles, and contact information for progressively higher levels of personnel in the Contractor’s organization who would become involved in resolving a problem;
RFTP for Maryland Department of General Services Page 8 of 72
D. For each individual listed in the Contractor’s PEP, the maximum amount of time a problem will remain unresolved with that individual before the problem escalates to the next contact person listed in the Contractor’s PEP;
E. Expedited escalation procedures and any circumstances that would trigger expediting them;
F. The method of providing feedback on resolution progress, including the frequency of feedback to be provided to the State;
G. Contact information for persons responsible for resolving issues after normal business hours (e.g., evenings, weekends, holidays) and on an emergency basis; and H. A process for updating and notifying the Contract Monitor of any changes to the PEP.
I. The PEP must be updated within ten (10) Business Days after any change in circumstance which changes the PEP but not less than annually within ten (10) Business Days after the start of each Contract year .
Nothing in this section shall be construed to limit any rights of the Contract Monitor or the State which may be allowed by the Contract or applicable law.
3.8 SOC 2 Type 2 Audit Report
A SOC 2 Type 2 Report is not a Contractor requirement for this Contract.
3.9 Experience and Personnel
Please refer to Section 5.3 for information regarding Key Personnel requirements.
3.10 Substitution of Personnel
3.10.1 Continuous Performance of Key Personnel
When Key Personnel are identified for the Contract, the following apply:
A. Key Personnel shall be available to perform Contract requirements as of the NTP Date.
Unless explicitly authorized by the Project Manager or specified in the Contract, Key Personnel shall be assigned to the State of Maryland as a dedicated resource.
B. Key Personnel shall perform continuously for the duration of the Contract, or such lesser duration as specified in the Technical Proposal. Key Personnel may not be removed by the Contractor from working under the Contract without the prior written approval of the Project Manager.
3.10.2 Definitions
For the purposes of this section, the following definitions apply:
A. Extraordinary Personal Event – means any of: leave under the Family Medical Leave Act;
an Incapacitating injury or Incapacitating illness; or other circumstances that in the sole discretion of the State warrant an extended leave of absence, such as extended jury duty or extended military service that precludes the individual from performing his/her job duties under the Contract.
B. Incapacitating – means any health circumstance that substantially impairs the ability of an individual to perform the job duties described for that individual’s position in the RFTP or the Contractor’s Technical Proposal.
3.10.3 Contractor Personnel General Substitution Provisions
RFTP for Maryland Department of General Services Page 9 of 72
The following provisions apply to all of the circumstances of Contractor Personnel substitution described in Section 3.10.4.
A. The Contractor shall demonstrate to the Project Manager’s satisfaction that the proposed substitute has qualifications at least equal to those of the Contractor Personnel proposed to be replaced.
B. The Contractor shall provide the Project Manager with a substitution request that shall include:
1) A detailed explanation of the reason(s) for the substitution request;
2) The resume of the proposed substitute, signed by the substituting individual and his/her formal supervisor;
3) The official resume of the current personnel for comparison purposes; and
4) Evidence of any required credentials.
C. The Project Manager may request additional information concerning the proposed substitution and may interview the proposed substitute personnel prior to deciding whether to approve the substitution request.
D. The Project Manager will notify the Contractor in writing of: (i) the acceptance or denial, or
(ii) contingent or temporary approval for a specified time limit, of the requested substitution.
The Project Manager will not unreasonably withhold approval of a proposed Contractor Personnel replacement.
3.10.4 Replacement Circumstances
A. Directed Personnel Replacement
1) The Project Manager may direct the Contractor to replace any Contractor Personnel who, in the sole discretion of the Project Manager, are perceived as being unqualified, non-productive, unable to fully perform the job duties, disruptive, or known, or reasonably believed, to have committed a major infraction(s) of law, Department policies, or Contract requirements. Normally, a directed personnel replacement will occur only after prior notification of problems with requested remediation, as described in paragraph 3.10.4.
2) If deemed appropriate in the discretion of the Project Manager, the Project Manager may give written notice of any Contractor Personnel performance issues to the Contractor, describing the problem and delineating the remediation requirement(s).
The Contractor shall provide a written response to the remediation requirements in a Remediation Plan within ten (10) days of the date of the notice and shall immediately implement the Remediation Plan upon written acceptance by the Project Manager. If the Project Manager rejects the Remediation Plan, the Contractor shall revise and resubmit the plan to the Project Manager within five (5) days, or in the timeframe set forth by the Project Manager in writing.
3) Should performance issues persist despite an approved Remediation Plan, the Project Manager may give written notice of the continuing performance issues and either request a new Remediation Plan within a specified time limit or direct the substitution of Contractor Personnel whose performance is at issue with a qualified substitute, including requiring the immediate removal of the Contractor Personnel at issue.
RFTP for Maryland Department of General Services Page 10 of 72
4) Replacement or substitution of Contractor Personnel under this section shall be in addition to, and not in lieu of, the State’s remedies under the Contract or which otherwise may be available at law or in equity.
5) If the Project Manager determines to direct substitution under 3.10.3, if at all possible, at least fifteen (15) days advance notice shall be given to the Contractor.
However, if the Project Manager deems it necessary and in the State’s best interests to remove the Contractor Personnel with less than fifteen (15) days’ notice, the Project Manager may direct the removal in a timeframe of less than fifteen (15) days, including immediate removal.
6) In circumstances of directed removal, the Contractor shall, in accordance with paragraph 3.10.4 of this section, provide a suitable replacement for approval within fifteen (15) days of the notification of the need for removal, or the actual removal, whichever occurs first.
B. Key Personnel Replacement
1) To replace any Key Personnel in a circumstance other than as described in 3.10.4.A, including transfers and promotions, the Contractor shall submit a substitution request as described in Section 3.10.3 to the Project Manager at least fifteen (15) days prior to the intended date of change. A substitution may not occur unless and until the Project Manager approves the substitution in writing.
2) Key Personnel Replacement Due to Sudden Vacancy
a) The Contractor shall replace Key Personnel whenever a sudden vacancy occurs (e.g., Extraordinary Personal Event, death, resignation, termination).
A termination or resignation with thirty (30) days or more advance notice shall be treated as a replacement under Section 3.10.4.A.1.
b) Under any of the circumstances set forth in this paragraph B, the Contractor shall identify a suitable replacement and provide the same information and items required under Section 3.10.3 within fifteen (15) days of the actual vacancy occurrence or from when the Contractor first knew or should have known that the vacancy would be occurring, whichever is earlier.
3) Key Personnel Replacement Due to an Indeterminate Absence
a) If any Key Personnel has been absent from his/her job for a period of ten (10) days and it is not known or reasonably anticipated that the individual will be returning to work within the next twenty (20) days to fully resume all job duties, before the 25th day of continuous absence, the Contractor shall identify a suitable replacement and provide the same information and items to the Project Manager as required under Section 3.10.3.
b) However, if this person is available to return to work and fully perform all job duties before a replacement has been authorized by the Project Manager the Project Manager may, at his/her sole discretion, authorize the original personnel to continue to work under the Contract, or authorize the replacement personnel to replace the original personnel, notwithstanding the original personnel’s ability to return.
3.10.5 Substitution Prior to and Within 30 Days after Contract Execution
Prior to Contract execution or within thirty (30) days after Contract execution, the Offeror may not substitute proposed Key Personnel except under the following circumstances (a) for actual
RFTP for Maryland Department of General Services Page 11 of 72 full-time personnel employed directly by the Offeror: the vacancy occurs due to the sudden termination, resignation, or approved leave of absence due to an Extraordinary Personal Event, or the death of such personnel; and (b) for any temporary staff, subcontractors or 1099 contractors:
the vacancy occurs due to an Incapacitating event or the death of such personnel. To qualify for such substitution, the Offeror must demonstrate to the State's satisfaction the event necessitating substitution. Proposed substitutions shall be of equal caliber or higher, in the State's sole discretion. Proposed substitutes deemed by the State to be less qualified than the originally proposed individual may be grounds for pre-award disqualification or post-award termination.
3.11 Minority Business Enterprise (MBE) Reports
If this solicitation includes an MBE Goal (see Section 4.27), the Contractor shall:
A. Submit the following reports by the 10th of each month to the Project Manager and the Department’s MBE Liaison Officer:
1) A Prime Contractor Paid/Unpaid MBE Invoice Report (Attachment D-4A) listing any unpaid invoices, over 45 days old, received from any certified MBE subcontractor, the amount of each invoice and the reason payment has not been made; and
2) (If Applicable) An MBE Prime Contractor Report (Attachment D-4B) identifying an MBE prime’s self-performing work to be counted towards the MBE participation goals.
B. Include in its agreements with its certified MBE subcontractors a requirement that those subcontractors submit an MBE Subcontractor Paid/Unpaid Invoice Report (Attachment D-
5) by the 10th of each month to the Project Manager and the Department’s MBE Liaison Officer that identifies the Contract and lists all payments to the MBE subcontractor received from the Contractor in the preceding reporting period month, as well as any outstanding invoices, and the amounts of those invoices.
C. Maintain such records as are necessary to confirm compliance with its MBE participation obligations. These records must indicate the identity of certified minority and non-minority subcontractors employed on the Contract, type of work performed by each, and actual dollar value of work performed. Subcontract agreements documenting the work performed by all MBE participants must be retained by the Contractor and furnished to the Procurement Officer on request.
D. Consent to provide such documentation as reasonably requested and to provide right-of-entry at reasonable times for purposes of the State’s representatives verifying compliance with the MBE participation obligations. Contractor must retain all records concerning MBE participation and make them available for State inspection for three years after final completion of the Contract.
E. Upon completion of the Contract and before final payment and release of retainage, submit a final report in affidavit form and under penalty of perjury, of all payments made to, or withheld from MBE subcontractors.
3.12 Veteran Small Business Enterprise (VSBE) Reports
If this solicitation includes a VSBE Goal (see Section 4.28), the Contractor shall:
A. Submit the following reports by the 10th of the month following the reporting period to the Project Manager and the Department VSBE representative:
RFTP for Maryland Department of General Services Page 12 of 72
1) VSBE Participation Prime Contractor Paid/Unpaid VSBE Invoice Report (Attachment E-3) listing any unpaid invoices, over 45 days old, received from any VSBE subcontractor, the amount of each invoice and the reason payment has not been made; and
2) Attachment E-4, the VSBE Participation Subcontractor Paid/Unpaid VSBE Invoice Report by the 10th of the month following the reporting period to the Project Manager and the VSBE Liaison Officer.
B. Include in its agreements with its VSBE subcontractors a requirement that those subcontractors submit monthly by the 10th of the month following the reporting period to the Project Manager and Department VSBE representative a report that identifies the prime contract and lists all payments received from Contractor in the preceding reporting period month, as well as any outstanding invoices, and the amount of those invoices (Attachment E-4).
C. Maintain such records as are necessary to confirm compliance with its VSBE participation obligations. These records must indicate the identity of VSBE and non-VSBE subcontractors employed on the contract, the type of work performed by each, and the actual dollar value of work performed. The subcontract agreement documenting the work performed by all VSBE participants must be retained by the Contractor and furnished to the Procurement Officer on request.
D. Consent to provide such documentation as reasonably requested and to provide right-of-entry at reasonable times for purposes of the State’s representatives verifying compliance with the VSBE participation obligations. The Contractor must retain all records concerning VSBE participation and make them available for State inspection for three years after final completion of the Contract.
E. At the option of the Department, upon completion of the Contract and before final payment and release of retainage, submit a final report in affidavit form and under penalty of perjury, of all payments made to, or withheld from VSBE subcontractors.
3.13 Work Orders
THIS SECTION IS INAPPLICABLE TO THIS RFTP.
3.14 Additional Clauses
3.14.1 No-Cost Extensions
In accordance with BPW Advisory 1995-1 item 7, in the event there are unspent funds remaining on the Contract, prior to the Contract's expiration date the Procurement Officer may modify the Contract to extend the Contract beyond its expiration date for a period up to, but not exceeding, one-third of the base term of the Contract (e.g., eight-month extension on a two-year contract) for the performance of work within the Contract's scope of work. Notwithstanding anything to the contrary, no funds may be added to the Contract in connection with any such extension.
RFTP for Maryland Department of General Services Page 13 of 72
3.15 The State of Maryland’s Commitment to Purchasing Environmentally Preferred Products and Services (EPPs)
Maryland’s State Finance & Procurement Article §14-410 defines environmentally preferable purchasing as “the procurement or acquisition of goods and services that have a lesser or reduced effect on human health and the environment when compared with competing goods or services that serve the same purpose.” Accordingly, Bidders are strongly encouraged to offer EPPs to fulfill this contract, to the greatest extent practicable.
Contractors must comply with Maryland’s Green Purchasing Reporting Requirements.
The Contractor shall submit quarterly sales data to the State over the life of this contract.
This information must include details about the recycled content, third-party sustainability certifications, and other environmental attributes of products and services provided under the contract.
To facilitate consistent reporting, the Contractor must use a standardized Vendor Green Sales Report template for the quarterly reporting, which the state will provide.
By submitting a response to this solicitation, the Bidder/Offeror acknowledges a commitment to submitting the quarterly Vendor Green Sales Report to the State. Any vendor who fails to submit the quarterly reporting may be out of compliance and, therefore, may be issued a cure notice from the Procurement Officer.
3.16 Offeror Requirements
A) The Offeror must have a Maryland resident agent or Maryland representation through the Maryland Department of Assessment and Taxation at time of award.
https://trackbill.com/bill/maryland-house-bill-629-environmentally-preferable-procurement-maryland-green-purchasing-committee/647077/
RFTP for Maryland Department of General Services Page 14 of 72
4 Procurement Instructions
4.1 Pre-Proposal Conference
4.1.1 A pre-proposal conference (Conference) will be held at the date, time, and location indicated on the Key Information Summary Sheet.
4.1.2 Attendance at the Conference is recommended. All interested parties should attend in order to facilitate better preparation of their Proposals. If the solicitation includes an MBE goal, failure to attend the Conference will be taken into consideration as part of the evaluation of an Offeror’s good faith efforts if there is a waiver request.
4.1.3 It is highly recommended that ALL Prime Contractors bring their intended subcontractors to the Conference/Site Visit to ensure that all parties understand the requirements of the contract and the MBE Goal.
4.1.4 MBE subcontractors are encouraged to attend the Conference to market their participation to potential prime contractors.
4.1.5 Following the Conference, the attendance record and summary of the Conference will be distributed via the same mechanism described for amendments and questions (see Section
4.3.1 eMMA).
4.1.6 In order to assure adequate seating and other accommodations at the Conference, please e-mail the Pre-Proposal Conference Response Form (Attachment A) no later than the time and date indicated on the form. In addition, if there is a need for sign language interpretation or other special accommodations due to a disability, please notify the Procurement Officer at least five (5) Business Days prior to the Conference date. The Department will make a reasonable effort to provide such special accommodation.
4.2 Letter of Interest
THIS SECTION IS INAPPLICABLE TO THIS RFTP.
4.3 eMaryland Marketplace Advantage (eMMA)
4.3.1 eMMA is the electronic commerce system for the State of Maryland. The RFTP, Conference summary and attendance sheet, Offerors’ questions and the Procurement Officer’s responses, addenda, and other solicitation-related information will be made available via eMMA.
4.3.2 In order to receive a contract award, a vendor must be registered on eMMA. Registration is free. Go to https://emma.maryland.gov, click on “New Vendor? Register Now” to begin the process, and then follow the prompts.
4.3.3 In order for a Joint Venture (JV) to be awarded a contract as a result of this solicitation, the JV must be registered in eMMA (must have a FEIN). The Joint Venture does not need to be registered prior to being informed of the intent to award.
4.3.4 PROPOSALS FOR THIS SOLICITATION WILL ONLY BE RECEIVED
THROUGH eMARYLAND MARKETPLACE ADVANTAGE. NO PAPER
PROPOSALS WILL BE ACCEPTED.
RFTP for Maryland Department of General Services Page 15 of 72
4.4 Questions
4.4.1 All questions, including concerns regarding any applicable MBE or VSBE participation goals, shall identify in the subject line the Solicitation Number and Title (BA-000-271-001
– Various Annapolis Bldgs. Modernize Elevators), and shall be submitted in writing via e-mail to the Procurement Officer no later than the date and time specified the Key Information Summary Sheet. The Procurement Officer, based on the availability of time to research and communicate an answer, shall decide whether an answer can be given before the Proposal due date.
4.4.2 Answers to all questions that are not clearly specific only to the requestor will be distributed via the same mechanism as for RFTP amendments, and posted on eMMA.
4.4.3 The statements and interpretations contained in responses to any questions, whether responded to verbally or in writing, are not binding on the Department unless it issues an amendment in writing.
4.5 Procurement Method
A Contract will be awarded in accordance with Maryland Code State Finance and Procurement Article §13-112, Qualification Based Selection, COMAR 21.05.01.01.H and COMAR 21.12.02.03-05.
4.6 Proposal Due (Closing) Date and Time
4.6.1 Proposals, in the form set forth in Section 5 Proposal Format, must be received in eMMA no later than the Proposal due date and time indicated on the Key Information Summary Sheet in order to be considered.
4.6.2 Requests for extension of this date or time shall not be granted.
4.6.3 Offerors submitting Proposals should allow sufficient time to upload the Proposal to eMMA to ensure timely receipt by the Procurement Officer. Except as provided in COMAR 21.05.03.02.F and 21.05.02.10, Proposals received after the due date and time listed in the Key Information Summary Sheet will not be considered.
4.6.4 Proposals may be modified or withdrawn by written notice received by the Procurement Officer before the time and date set forth in the Key Information Summary Sheet for receipt of Proposals.
4.6.5 Proposals may not be submitted by paper submission, e-mail or facsimile. Proposals will not be opened publicly.
4.6.6 Potential Offerors not responding to this solicitation are requested to submit the “Notice to Vendors” form, which includes company information and the reason for not responding (e.g., too busy, cannot meet mandatory requirements).
4.7 Multiple or Alternate Proposals
Multiple or alternate Proposals will not be accepted.
4.8 Economy of Preparation
Proposals should be prepared simply and economically and provide a straightforward and concise description of the Offeror’s Proposal to meet the requirements of this RFTP.
RFTP for Maryland Department of General Services Page 16 of 72
4.9 Public Information Act Notice
4.9.1 The Offeror should give specific attention to the clear identification of those portions of its
Proposal that it considers confidential and/or proprietary commercial information or trade secrets, and provide justification why such materials, upon request, should not be disclosed by the State under the Public Information Act, Md. Code Ann., General Provisions Article, Title 4 (See also RFTP Section 5.3.2.B “Claim of Confidentiality”). This information should be identified by page and section number and placed after the Title Page and before the Table of Contents in the Technical Proposal and if applicable, separately in the Financial Proposal.
4.9.2 Offerors are advised that, upon request for this information from a third party, the Procurement Officer is required to make an independent determination whether the information must be disclosed.
4.10 Award Basis
A Contract shall be awarded after considering the technical proposals and qualifications of the persons submitting the proposals, and by following the evaluation and award processes as set forth in State Finance and Procurement Article §13-112 and COMAR 21.12.02.05.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .