RFQP 22-11-005 Addendum 2

218 KB Posted

Attached to
Elevated Tank Maintenance Program
Solicitation number
22-11-005
Issued by
Oconee County, Georgia

About this file

This is Addendum 2 to a Request for Qualifications and Proposals (RFQP 22-11-005) issued by the Oconee County Board of Commissioners in Georgia for an Elevated Tank Maintenance Program. The solicitation seeks qualified companies to provide a fifteen-year full-service maintenance program for five elevated water storage tanks located within the county. The five tanks include Dove Creek (250,000 gallon capacity, 43-foot diameter), Mars Hill No. 1 (1,000,000 gallon capacity, 70-foot diameter), Mars Hill No. 2 (500,000 gallon capacity, 50-foot diameter), Watkinsville No. 1 (250,000 gallon capacity, 43-foot diameter), and Watkinsville No. 2, which is currently under construction (750,000 gallon capacity, 64-foot diameter). Addendum 2, dated December 10, 2021, provides detailed technical specifications for each tank, including bottom bowl elevation, overflow elevation, and the difference in elevation between tank bottom and top.

This addendum supplements the original solicitation documents from November 16, 2021 and provides essential technical data required for bidders to develop comprehensive maintenance proposals. The specifications include elevation measurements ranging from 25.5 feet to 40.0 feet for the bottom-to-top difference across the tanks. All prospective bidders are instructed to incorporate this addendum into their proposal documents and direct any questions regarding tank elevations to the Procurement Officer, Jessica Ellis, at ocbids@oconee.ga.us.

Text of this file

Oconee County Board of Commissioners

Addendum 2

DATE: December 10, 2021

TO: All Prospective Bidders/Offerors

FROM: Procurement Officer

RE: Addendum 2, RFQP# 22-11-005 Elevated Tank Maintenance Program

The following changes are to be incorporated into the solicitation documents dated November 16, 2021. All those receiving this addendum should modify their documents to show the below described changes.

1. Below you will find information regarding elevation of the water storage tanks.

All questions shall be directed to the Owner Contact, Jessica Ellis, Procurement Officer via email to ocbids@oconee.ga.us .

ELEVATED STORAGE TANK CHARACTERISTICS

Name Capacity

(gal) Tank

Diameter (ft) Bottom Bowl Elevation (ft)

Overflow Elevation (ft)

Bottom/Top difference (ft)

Dove Creek 250,000 43 981.6 1010.0 28.4

Mars Hill No. 1 1,000,000 70 934.0 974.0 40.0

Mars Hill No. 2 500,000 50 936.5 974.0 37.5

Watkinsville No. 1 250,000 43 894.5 920.0 25.5

Watkinsville No. 2 (Under Construction)

750,000 64 885.0 920.0 35.0

End of Addendum 2

Other files

File Type Posted
RFQP 22-11-005 Addendum 1 —
RFQP 22-11-005 11.16.21 —
Award Information —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .