att 30 PPQ.doc

DOC document 42 KB Posted

Attached to
FITNESS FOR DUTY PHYSICAL EXAMS
Solicitation number
RFQ-OSCU-FFDPE2011-SB
Issued by

About this file

ATTACHMENT 30

View the file

Other files

File Type Posted
AWARD NOTICE FFD2011-SB.docx DOCX document
ANCHORAGE.PRICE MATRIX.AMEND3.xls XLS spreadsheet
AMEND 3.SB.doc DOC document
BALTIMORE.PRICE MATRIX.AMEND3.xls XLS spreadsheet
Q A FFD2011.sb.doc DOC document
QUESTIONS-SB.doc DOC document
fd-816.pdf PDF
FD-484.pdf PDF
BALTIMORE.PRICE MATRIX.AMEND2.xls XLS spreadsheet
SECTION III. SOW. AMEND2.doc DOC document
AMEND 2 SB.doc DOC document
ANCHORAGE.PRICE MATRIX.AMEND2.xls XLS spreadsheet
AMEND 1.SB.doc DOC document
FD-946-Respiratory REVISION 12312010.doc DOC document
FD-963 - PILOT 12312010.doc DOC document
fd-995 032010.pdf PDF
scanDS65610001.pdf PDF
FD-731 Hazardous Devices School Form.pdf PDF
FD-943-PeriodicREVISION 12312010.doc DOC document
Attachment 28.instructions.SB.doc DOC document
FD-965-Hazardousdevice school 12312010.doc DOC document
fd-960 032010.pdf PDF
fd-1065.pdf PDF
FD-947-HazmatPeriodicREVISION 12312010.doc DOC document
fd-967.pdf PDF
DOS 3389-5 and ISO3389-5.pdf PDF
sf93.pdf PDF
FD-964 CDL-DOT 12312010.doc DOC document
fd-899 - 032010.pdf PDF
fd-900 1999.pdf PDF
sf88.pdf PDF
FD-949 DOS FORM Revised12312010.doc DOC document
fd-864 rev 032010.pdf PDF
fd-300 10212009.pdf PDF
fd-966.pdf PDF
att 30 PPQ.doc DOC document
fd-866.pdf PDF
fd-948 06122003.pdf PDF
FD-944-HAZMAT-IREVISION 12312010.doc DOC document
att 29 SF -3881.doc DOC document
FD-945-ApplicantREVISION 12312010.doc DOC document
FAA8500-7.pdf PDF
11. SECTION IX.PROVISIONS.SB.doc DOC document
Attachment 28.instructions.SB.doc DOC document
attachments part II.pdf PDF
BA.PRICING.xls XLS spreadsheet
SB SOLICITATION I THRU VIII.doc DOC document
AN.PRICING.xls XLS spreadsheet
1. letter.sb.doc DOC document
attachments part I.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST PERFORMANCE QUESTIONNAIRE

I. Reference Identification A. Name of Reference/Activity

(Include point of contact/ Phone #/Fax #/Email )

II. CONTRACT IDENTIFICATION

A. Contractor [Insert Name of Offeror]

B. Contract Number C. Contract Type Competitive [ ] Yes [ ] No

Follow-On [ ] Yes [ ] No

D. Period of Performance E. Estimated Contract Total Including all option periods)

F. Description of Services Provided G. Geographic Distribution of Services Under This

Contract, (i.e., Local, Nationwide, Worldwide)

H. Number of Locations serviced by this Contract

III. EVALUATION

Below are listed specific questions relating to the following five categories fo contractor performance: quality, timeliness, cost, control, business relations, and customer satisfaction. Please rate the contractor for each question on a scale from 1 to 5, 5 being the best rating and 1 being the worst rating, or N/A for not applicable. There is a comment section provided below each question. Please document any responses receiving a rating of 2 or 1.

[ ] 5 - Considerably surpassed minimum requirements

[ ] 4 - Exceeded minimum requirements

[ ] 3 - Met minimum requirements

[ ] 2 - Less than minimum requirements

[ ] 1 - Efforts had a negative effect

A. QUALITY OF PRODUCT OR SERVICE

1. To what extent did the contractor comply with the specific contract requirements?

[ ] 5 [ ] 4 [ ] 3 [ ] 2 [ ] 1 [ ] N/A

Comment:

2. How effective has the contractor been in providing the required supplies and/or services?

[ ] 5 [ ] 4 [ ] 3 [ ] 2 [ ] 1 [ ] N/A

Comment:

3. To what extent did the contractor respond to technical directions, quality improvement recommendations, contract change orders, etc.?

[ ] 5 [ ] 4 [ ] 3 [ ] 2 [ ] 1 [ ] N/A

Comment:

4. Did the contractor commit adequate resources in timely fashion to the contract?

[ ] 5 [ ] 4 [ ] 3 [ ] 2 [ ] 1 [ ] N/A

Comment:

B. TIMELINESS OF PERFORMANCE

1. To what extent did the contractor adhere to contract delivery of performance schedules?

[ ] 5 [ ] 4 [ ] 3 [ ] 2 [ ] 1 [ ] N/A

Comment:

2. To what extent did the contractor meet the response times in the contract?

[ ] 5 [ ] 4 [ ] 3 [ ] 2 [ ] 1 [ ] N/A

Comment:

C. COST CONTROL

1. To what extent did the contractor provide current, accurate, and complete billings?

[ ] 5 [ ] 4 [ ] 3 [ ] 2 [ ] 1 [ ] N/A

Comment:

2. To what extent did the contractor ensure only the supplies and/or services ordered were provided (unless required for intervention in life threatening emergencies)?

[ ] 5 [ ] 4 [ ] 3 [ ] 2 [ ] 1 [ ] N/A

Comment:

3. To what extent did the contractor exhibit efforts to control costs while providing quality supplies and/or services?

[ ] 5 [ ] 4 [ ] 3 [ ] 2 [ ] 1 [ ] N/A

Comment:

D. BUSINESS RELATIONS

1. To what extent was the contractor able to solve contract performance problems without extensive guidance from Government counterparts (COTR)?

[ ] 5 [ ] 4 [ ] 3 [ ] 2 [ ] 1 [ ] N/A

Comment:

2. To what extent was the contractor effective in interfacing with Government staff?

[ ] 5 [ ] 4 [ ] 3 [ ] 2 [ ] 1 [ ] N/A

Comment:

E. CUSTOMER SATISFACTION

1. Has this contract been partially or completely terminated for default or convenience?

[ ] Yes for: [ ] Default [ ] Convenience

[ ] No

If yes, please explain (e.g., inability to meet cost, performance, or delivery schedules).

2. Are there any pending terminations?

[ ] Yes [ ] No

If yes, please explain and indicate the status.

3. How would you describe the level of health care services provided by the contractor?

[ ] Excellent [ ] Good [ ] Fair [ ] Unacceptable Comment:

4. Would you recommend this contractor for the award of additional contracts?

[ ] Yes [ ] No

Comment:

NARRATIVE SUMMARY

Use this section to explain additional information not included above.

Attachment 30

File details come from the government source that posted it. Updated .