RFQ415 - Attachment 1 - Requirements Specifications - Barricade Hauling Trailers.docx
DOCX document 1 MB Posted
- Attached to
- TYPE III Barricade Hauling Trailers
- Solicitation number
- 415
- Issued by
- Ada County, Idaho
About this file
This document is a Request for Quotation (RFQ) issued by the Idaho Transportation Department (ITD) for the design and manufacture of six (6) Type III barricade hauling trailers. The trailers must be capable of hauling a minimum of twelve (12) highway Type III closure barricades and be fully assembled and operational at the time of delivery to ITD District 4 in Shoshone, Idaho. The desired delivery timeframe is within 180 calendar days after award. Vendors must provide a drawing of the offered trailer and documentation demonstrating the item meets the requirements. Award will be made to the responsive, responsible vendor with the lowest cost.
The RFQ specifies the trailers must meet detailed technical requirements, including dimensions, frame and suspension design, hitch, electrical, lighting, and other features. Vendors must provide a standard one-year warranty covering the entire trailer and paint defects. ITD reserves the right to require remedial action or terminate the contract for cause, fiscal necessity, or convenience. Pricing must be submitted on the provided price sheet, and invoices will be paid upon acceptance of the delivered trailers.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ415
TYPE III BARRICADE HAULING TRAILERS
GENERAL INFORMATION
1. Purpose The Idaho Transportation Department (ITD) is requesting quotes for the design and manufacture of six (6) Type III barricade hauling trailers (Trailers) as further detailed below.
2. Solicitation Contact The contact for this RFQ is:
Name: Douglas Buswell , Contracting and Grants Officer Email: Doug.buswell@itd.idaho.gov (preferred method of contact)
3. Restrictions on Communications From the issue date of this RFQ, until a contract/purchase order is awarded or the RFQ is cancelled, vendors and their representatives are prohibited from communications (written or verbal) regarding this RFQ with the ITD staff, other than the ITD RFQ Lead. Any communications (written or verbal) with ITD staff other than the RFQ Lead may result in the submitting vendor being found Non-Responsible and Non-Responsive.
4. Requirements and Specifications See Sections 1 and 2.
5. Quote Your Quote may be submitted electronically via IPRO Powered by LUMA or email (see below for additional details). ITD will not be accepting manual submissions for this solicitation. Your Quote must include the Required Submittals listed below and be received prior to the deadline established in IPRO Powered by LUMA.
Electronic Submission:
IPRO – Enter your pricing in IPRO (https://purchasing.idaho.gov/information-for-vendors/) and upload all Required Submittals.
Email:
Send an email to the Solicitation Contact (see Section 2) and attach all Required Submittals.
6. Required Submittals:
Attachment 2 – Price Sheet Attachment 3 – Signature Page Submitting Vendor Type III Barricade Hauling Trailer drawing.
Documentation, which demonstrates, to ITD’s satisfaction, that the offered item meets the requirements of the solicitation. Failure to provide satisfactory documentation may eliminate the Vendor from further consideration.
(See Attachment 1 – Requirements and Specifications)
7. Award
| 7.1 | Award will be made to the responsive responsible vendor(s) with the lowest cost on Attachment 2 – Price Sheet and; |
| 7.2 | The State reserves the right not to evaluate or make an award in the best interest of the State. The State also reserves the right to make multiple awards per manufacturer, in accordance with Section 67-9211 of Idaho Code in the best interest of the State. |
Though it is not mandatory to submit your Quotation electronically via IPRO, all vendors participating in a solicitation issued through IPRO must establish an account in the IPRO system (even if submitting a quote outside of IPRO). It is free to establish an account and only takes a few minutes of your time.
RFQ415
ATTACHMENT 1 – REQUIREMENTS & SPECIFICATIONS
TYPE III BARRICADE HAULING TRAILERS
Section 1 - Requirements
1. Brand Name The brand names specified in this solicitation are intended to be descriptive, but not restrictive; indicative of the quality and characteristics of items that meet the minimum requirements. Vendors offering an “equal” must include documentation, which demonstrates, to ITD’s satisfaction, that the offered item(s) meets the requirement of the solicitation. In the event documentation is not satisfactory, ITD reserves the right to seek clarification from the Vendor. Failure to provide satisfactory documentation or a clarifying response to ITD may eliminate the Vendor from further consideration.
1. Warranty
2.1. Manufacturer standard warranty must cover the entire Trailer for a minimum period of one (1) year. Manufacturer standard warranty and extended warranty must cover paint defects, with the exception of normal wear and tear under normal working conditions and;
2.2. Warranty must include all tools, parts, equipment, labor, and freight to repair or replace a defective warranted item, which may also include the entire Trailer. All warranty work must be completed within thirty (30) calendars days after receipt of written notice from ITD. If approved in writing by ITD, the Contractor may perform warranty work on-site, at the Delivery location identified in Section 6, in lieu of pick-up and return shipping. The Contractor shall be responsible for all travel costs and work-site clean-up associated with any necessary repairs. The timeframe for corrective action will still be as identified above. If the Contractor is unable to repair the Trailer on-site within thirty (30) calendars days, or if the Trailer(s) continuously malfunctions and causes it to be out of service on multiple occasions, ITD reserves the right to require the Contractor to pick-up, repair, and return the Trailer at no additional cost to ITD.
Awarded vendor is responsible for all warranty requirements. No third-party warranties will be allowed.
1. Acceptance
3.1. Documenting Acceptance - ITD’s Contract Monitor will be responsible for documenting Acceptance, in writing, using Attachment 4 - Deliverable Acceptance Form. This document will be emailed to the Contractor’s Contract Manager as proof of Acceptance and approval to proceed with the invoicing procedures and required in Section 7, Invoicing;
3.2. Documenting Non-Compliance - ITD’s Contract Monitor will be responsible for documenting non-compliance, in writing, using Attachment 5 - Contract Discrepancy Notice. This document will be emailed to the Contractor’s Contract Manager, providing details for each discrepancy that require corrective action. Invoicing shall not occur until non-compliance has been corrected and;
3.3. Correcting Non-Compliance - After receipt of the Contract Discrepancy Notice, the Contractor’s Contract Manager must respond, using the document, explaining how and when each discrepancy will be corrected. All discrepancies must be corrected and brought back into compliance with the Contract within thirty (30) calendar days after receipt of the notice from ITD. If the Contractor does not correct the discrepancies within this timeframe, ITD reserves the right to take further remedial action as detailed in Section 4, Remedial Action.
1. Remedial Action
4.1. In addition to any remedies available to the State under law or equity, the State may it its sole discretion require one (1) or more of the following remedial actions if any of the service does not conform to the Contract requirements: 1) require the Contractor to take corrective action to ensure that performance conforms to the Contract requirements, 2) require the Contractor to subcontract all or part of the Contract at no additional cost to the State, 3) withhold payment or require payment of actual damages caused by the Discrepancy, 4) terminate the Contract pursuant to Section 5, Termination of Contract, in addition to any remedies imposed by the State and;
4.2. If ITD must perform or hire a separate contractor to perform any of the Contract’s requirements, which is the responsibility of the Contractor under the terms of the Contract, ITD may withhold the actual cost to ITD from the Contractor’s payment(s).
1. Termination of Contract
5.1. For Cause - See Section 2, Termination, of the State of Idaho Standard Terms and Conditions.
5.2. For Fiscal Necessity – See Section 27, Termination for Fiscal Necessity, of the State of Idaho Standard Terms and Conditions;
5.3. For Convenience – Either party may terminate this Contract for its convenience at any time upon providing its written notification at least ninety (90) calendar days prior to the desired termination date and;
5.4. The Contractor’s sole obligation shall be to complete the delivery of any Orders placed prior to receiving (or providing) a written notice of termination. ITD’s sole responsibility shall be to pay for Orders placed prior to receiving (or providing) a written notice of termination.
6. Delivery
6.1. Delivery is desired within one hundred eighty (180) calendar days after ARO, FOB Destination, freight prepaid and allowed. ITD reserves the right to accept delivery dates outside of the desired delivery date if in the best interest of the State of Idaho. The Contractor must deliver the Trailers to the location listed below by the desired delivery date or the date provided on Attachment 2 – Price Sheet if determined to be in the best interest of the State of Idaho. The contractor will be responsible for the unloading of the Trailers. Towing of the Trailers in lieu of flatbed delivery is acceptable. Please indicate your intended method of delivery in Attachment 2 – Price Sheet. If Contractor elects to tow the Trailers as their delivery method, Contractor must have insurance sufficient enough to cover any damage caused to the Trailer(s) during shipping, up to and including coverage to replace the entire Trailer(s) if needed;
6.2. Delivery must be made Monday through Friday, 8:00 am to 4:00 pm local time excluding state of Idaho recognized holidays https://sos.idaho.gov/state-holidays/ unless otherwise approved in writing by ITD and;
6.3. Delivery Location:
6.3.1. ITD District 4 – 63 West Highway 26
Shoshone, Idaho 83352
7. Invoicing The Contractor must submit its invoice within thirty (30) calendar days of acceptance to the billing contact identified on the Contract. Invoices submitted prior to acceptance, or without the required information listed below, will be returned to the Contractor for correction and resubmission. The following information must be included with each invoice:
Purchase Order Name and Number Invoice Number and Date Contractor Contact Information Itemization of Property delivered and accepted – description, quantity, unit of measure, unit price, and total invoice amount.
Invoices must be submitted electronically to:
HQAP@ITD.IDAHO.GOV
Section 2 – Specifications
The Trailers must meet the minimum specifications provided below. Trailers must be new, not used. Though they are not specifically covered herein, all parts necessary to provide complete and functional Trailers must be included. All parts must conform in design, strength, quality of materials, and workmanship to current engineering practices and accepted standards of the industry. All parts must be the manufacture’s standard unless otherwise specified in this RFQ.
Trailers must be completely assembled when delivered to the ITD location listed in Attachment 1 - Section 1, 6. Delivery (above), with all accessories and equipment in place or furnished. All equipment and accessories must be installed as per the manufacture’s specifications, and the Trailers must be serviced and ready for continuous operation at the time of delivery.
1. Design
1.1. Trailer will be custom designed and built to haul a minimum of twelve (12) highway Type III closure barricades measuring ninety-six (96) in. wide x sixty-six (66) in. high with thirty-six (36) in. long support legs. Trailers must be fully assembled, and operational at time of delivery to include but not limited to the options and features detailed below.
2. Paint
2.1. Each Trailer must be cleaned, prime coated, and then powder or prime coated per the paint manufacturer’s process for the application. The prime coat(s) and finish coat(s) must be a minimum dry thickness of four (4) mil total, two (2) mil prime coat & two (2) mil coat. The Trailers must be smooth and free of rust, runs, overspray, peeling, weld splatter, and other defects.
3. Color
3.1. Trailer – Fleet White
3.1.1. A paint chip must be provided to ITD for approval within seven (7) calendar days after award of the Contract. Further details will be provided upon award.
4. Trailer
4.1. Overall Length – Fourteen (14) ft. long;
4.2. Overall Width – Must not exceed one-hundred (100) in;
4.3. Frame – Three-sixteenth (3/16) in. steel tube design;
4.4. Tongue and Vertical Uprights – Four (4) in. x four (4) in. steel square tubing;
4.5. Suspension Frame – Two (2) in. x four (4) in. steel tubing;
4.6. Barricade Racks – Two (2) in. x four (4) in. steel tubing x thirty-six (36) in. long welded to vertical supports. Racks must have a minimum of ten (10) degree slant from horizontal to prevent barricades from sliding off. Racks must have a two (2) in. lip on end to retain barricades;
4.7. Rear Storage Tray – Placed between tires at rear of trailer. Minimum of five (5) ft. wide x eighteen (18) in. long x six (6) in. deep. Constructed from expanded metal with steel frame.
4.8. Hitch – Two and five sixteenths (2-5/16) in. ball coupler;
4.9. Drop Leg Lack – Swivel/Pivot type;
4.10. Electrical plug – Must extend twenty-four (24) in beyond hitch and equipped with a seven (7) prong recreational vehicle (RV) style with flat blades plug;
4.11. Safety chains – Two (2) ft. of five-sixteenth (5/16) in. chains attached to trailer tongue and equipped with safety hooks;
4.12. Axles – Solid mount directly to frame;
4.13. Hubs – Must be equipped with easy lube feature;
4.14. Tires – Two (2) ST205/75R15;
4.15. Fenders – Single wheel steel and;
4.16. Lights – Must be Light Emitting Diode (LED), compliant with Federal Highways Administration (FHWA) requirements. https://highways.dot.gov/
5. Drawing Submitting Vendor must include a drawing of the Type III Barricade Hauling Trailer offered.
Illustrations Are For Informational Purposes Only
8 | Page dhb
RFQ415 TYPE III BARRICADE HAULING TRAILERS 01/24
image1.jpeg image2.jpeg image3.jpeg
File details come from the government source that posted it. Updated .