RFQ27007140_Drawings.pdf

PDF 5 MB Posted

Attached to
URI Washburn Hall Renovations Upper College Road Multi-Use Development Enabling
Solicitation number
RFQ27007140
Issued by
Providence County, Rhode Island

About this file

Construction Documents Summary

This file comprises the architectural and structural construction drawings for the Washburn Hall renovation project at the University of Rhode Island located at 75 Briar Lane, Kingston, Rhode Island 02881 (Project No. 2503449). The project scope includes structural reinforcements at the basement and first floor levels, with interior space reconfiguration proposed on the third floor of this existing educational facility classified as Group B (Business) Occupancy under the 2021 International Building Code. The building is a four-story structure with an attic level, designed as Type III-B construction with sprinkler protection. The work includes selective demolition of non-structural interior elements, installation of new structural supports including footings, bearing walls, headers, and posts, floor joist reinforcement through sistering, and comprehensive interior finishes on affected floors. All construction shall conform to the 2021 Rhode Island State Building Code and applicable national standards including the 2021 IBC, 2023 NEC, 2024 IECC, and NFPA codes. The project documents indicate that the contractor must obtain a ground penetrating radar survey of existing concrete slabs within thirty days of contract execution to identify embedded utilities and structural conditions.

The construction documents establish detailed technical requirements for all trades including structural, architectural, mechanical, electrical, fire protection, and plumbing work. Key structural requirements specify concrete with 4,000 PSI minimum compressive strength, lumber framing per NDS standards with specific grades and design values, and welding/fastening per applicable codes. The contractor is responsible for providing all temporary bracing and shoring during demolition and construction, field verification of all existing conditions and dimensions, coordination of building system penetrations, and proper handling of hazardous materials in coordination with the owner's abatement contractor. The documents note that flooring demolition in areas requiring hazardous materials abatement shall be completed by others under separate contract, with the general contractor assuming preparation of these areas for new finishes. All work outside designated project limits requires prior written owner approval, and the contractor must maintain operational continuity of existing life safety systems throughout construction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO THE LATEST ADOPTED BUILDING CODE EDITION, AND TO CONDITIONS AND

SPECIFICATIONS OF ALL GOVERNING AUTHORITIES.

2. VERIFY AND CONFIRM ALL CONDITIONS, DIMENSIONS, AND LAYOUT INFORMATION PRIOR TO START OF CONSTRUCTION. NOTIFY CONSULTANT OF ANY DISCREPANCIES PRIOR TO START OF WORK. ANY CORRECTION WORK REQUIRED AS A RESULT OF NOT REPORTING SUCH DISCREPANCIES SHALL BE PERFORMED AT NO ADDITIONAL COST TO THE TENANT.

3. CONTRACTOR AND SUBCONTRACTORS SHALL CAREFULLY EXAMINE THE SITE AND THE CONSTRUCTION DOCUMENTS OF THE ENTIRE WORK. INCONSISTENCIES IN THE PLANS OR SPECIFICATIONS SHALL BE CALLED TO THE ATTENTION OF THE CONSULTANT AND

TENANT.

4. REFER TO ENLARGED PLANS AND ELEVATIONS WHERE INDICATED FOR ADDITIONAL INFORMATION. ENLARGED PLANS TAKE PRECEDENCE OVER PLANS OF SMALLER SCALE, AND DETAILS TAKE PRECEDENCE OVER PLANS. IN THE CASE OF A CONFLICT, THE

HIGHEST COST OPTION SHOULD BE PRICED.

5. DETAIL REFERENCES SHALL BE APPLIED TO ALL INSTANCES WHERE THE SAME CONDITIONS OCCUR, UNLESS NOTED OTHERWISE.

6. DIMENSIONS ARE TO STRUCTURAL GRID, CENTER LINE OF COLUMNS, AND FACE OF STUDS/CONCRETE WALL, UNLESS NOTED

OTHERWISE.

7. THE TERMS "ABOVE FINISH FLOOR" (AFF) AND "FINISH FLOOR ELEVATION" (FFE) REFER TO FINAL FINISHED FLOOR ELEVATION, WHETHER BUILT-UP SLAB, COMPOSITE DECK AND/OR RAISED ACCESS FLOOR.

8. DO NOT SCALE DRAWINGS.

9. CUTTING AND DRILLING OF STRUCTURAL MEMBERS NOT DETAILED REQUIRES THE WRITTEN PERMISSION OF THE STRUCTURAL

ENGINEER OF RECORD.

10. SAVE AND RECYCLE DEMOLITION DEBRIS AS APPLICABLE. ALL DEMOLISHED OR REMOVED EXISTING MATERIAL SHALL BE LEGALLY

DISPOSED. COORDINATE WITH AUTHORITY HAVING JURISDICTION FOR REQUIREMENTS FOR RECYCLING AND RE-USE OF

DEMOLITION DEBRIS.

11. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE RESULTING FROM THEIR WORK. THE CONTRACTOR WILL COORDINATE CLEAN UP OF ALL AREAS AFFECTED BY DUST OR ANY MATERIALS, BOTH DURING CONSTRUCTION AND UPON COMPLETION OF THE PROJECT, INCLUDING THE INSIDE OF ALL WINDOWS AS NECESSARY SO THAT THE SPACE IS READY FOR OCCUPANCY BY TENANT.

N

DATE ISSUED:

PROJECT LOCATIONOWNER / DEVELOPER

PROJECT NO.:

DATE:

REVIEWED:

DRAWN BY:

DESIGNER:

TITLE:

SHEET NO.

ISSUED FOR:

BLDG.

Architecture Engineering

Environmental

Land Surveying

DESIGN STANDARDS

TRUE NORTH

PREPARED BY

CONSULTANT CONSULTANT

GENERAL NOTES

NOT FOR CONSTRUCTION

VICINITY MAP

UNIVERSITY OF RHODE ISLAND WASHBURN HALL

75 BRIAR LANE

KINGSTON, RHODE ISLAND 02881

09/21/2026

G0.00

COVER SHEET

2503449

09/21/2026

BR

LA, LR, MS

JM

BID

PROJECT LOCATION

BUILDING LOCATION

R E

V

SHEET NUMBER SHEET NAME

GENERAL

G0.00 COVER SHEET

G0.01 CODE ANALYSIS

STRUCTURAL

S0.01 STRUCTURAL GENERAL NOTES

S1.00 BASEMENT AND FOUNDATION PLAN

S1.01 FIRST FLOOR FRAMING PLAN

S1.02 SECOND FLOOR FRAMING PLAN

S1.03 THIRD FLOOR FRAMING PLAN

S2.00 STRUCTURAL SECTIONS

S3.00 TYPICAL DETAILS

ARCHITECTURAL

A0.01 GENERAL INFORMATION, PARTITION TYPES AND DETAILS

AD1.00 BASEMENT DEMOLITION PLAN

AD1.01 FIRST FLOOR DEMOLITION PLAN

AD1.02 SECOND FLOOR DEMOLITION PLAN

AD1.03 THIRD FLOOR DEMOLITION PLAN

AD1.04 ATTIC DEMOLITION PLAN

AD1.05 ROOF DEMOLITION PLAN

AD2.00 BASEMENT DEMOLITION RCP

AD2.01 FIRST FLOOR DEMOLITION RCP

AD2.02 SECOND FLOOR DEMOLITION RCP

AD2.03 THIRD FLOOR DEMOLITION RCP

A1.00 BASEMENT FLOOR PLAN

A1.01 FIRST FLOOR PLAN

A1.02 SECOND FLOOR PLAN

A1.03 THIRD FLOOR PLAN

A1.04 ATTIC PLAN

A1.05 ROOF PLAN

A2.00 BASEMENT FLOOR REFLECTED CEILING PLAN

A2.01 FIRST FLOOR REFLECTED CEILING PLAN

A2.02 SECOND FLOOR REFLECTED CEILING PLAN

A2.03 THIRD FLOOR REFLECTED CEILING PLAN

A6.01 DOOR SCHEDULE, ELEVATIONS, AND DETAILS

A8.00 BASEMENT AND FIRST FLOOR FINISH PLAN

A8.01 SECOND FLOOR FINISH PLAN & FURNITURE PLAN

A8.02 THIRD FLOOR FINISH PLAN & FURNITURE PLAN

FIRE PROTECTION

FP001 FIRE PROTECTION NOTES, DESIGN CRITERIA, LEGEND, &

ABBREVIATIONS

FP102 SECOND FLOOR & THIRD FLOOR PLAN

FP501 DETAILS

MECHANICAL

M001 NOTES, SYMBOL LEGEND, & ABBREVIATIONS

MD102 SECOND FLOOR MECHANICAL DEMOLITION PLAN

MD103 THIRD FLOOR MECHANICAL DEMOLITION PLAN

M102 BASEMENT & SECOND FLOOR MECHANICAL PLANS

M103 THIRD FLOOR MECHANICAL PLAN

M104 ATTIC & ROOF MECHANICAL PLAN

M501 MECHANICAL DETAILS

M502 MECHANICAL DETAILS

M601 MECHANICAL SCHEDULES

ELECTRICAL

E001 ELECTRICAL SYMBOL LEGENDS, NOTES & ABBREVIATIONS

E002 TELECOMMUNICATION NOTES

ED101 BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN

ED102 SECOND & THIRD FLOOR ELECTRICAL DEMOLITION PLANS

E101 BASEMENT & SECOND FLOOR POWER PLANS

E102 THIRD FLOOR & ATTIC POWER PLANS

E122 SECOND & THIRD FLOOR LIGHTING PLANS

E501 DETAILS

E502 DETAILS

E601 PANELBOARD SCHEDULES

E602 SCHEDULES & PARTIAL RISER DIAGRAM

E603 PARTIAL FIRE ALARM RISER DIAGRAM & MATRIX

R E

V

IS

IO

N

S

N O

D A

T E

D E

S C

R

IP

T

IO

N

PROJECT LOCATION:

PROJECT DATA:

KINGSTON, RI

BUILDING DEPARTMENT:

APPLICABLE CODES:

TOWN OF SOUTH KINGSTOWN BUILDING INSPECTION & ZONING DEPARTMENT

180 HIGH STREET

WAKEFIELD, RI 02879

CHAPTER 8 - INTERIOR FINISHES

OCCUPANCY B

AUTOMATIC SPRINKLER SYSTEM PROVIDED

AUTOMATIC SPRINKLER SYSTEM MONITORING AND ALARMS WILL BE PROVIDED.

PORTABLE FIRE EXTINGUISHERS - SHALL BE PROVIDED PER THIS SECTION - AS SHOWN ON FIRE EXTINGUISHER PLANS.

A FIRE COMMAND CENTER REQUIRED

YES

YES

YES

NO

VERTICAL EXITS & EXIT PASSAGEWAYS -

EXIT ACCESS CORRIDORS & OTHER EXITS -

ROOMS AND ENCLOSED SPACES -

CLASS B

CLASS C

CLASS C

MINIMUM CLASS FINISH ALLOWED

302.1 - CLASSIFICATION:

CHAPTER 3 - USE & OCCUPANCY CLASSIFICATION:

GROUP IBC SECTION

DESCRIPTION OF OCCUPANCY

304.1

THE EXISTING BUILDING IS USED AS AN EDUCATIONAL FACILITY FOR POST-SECONDARY STUDENTS. THE PROJECT SCOPE INCLUDES STRUCTURAL REINFORCEMENTS AT THE BASEMENT AND FIRST FLOOR LEVELS, WITH INTERIOR SPACE

RECONFIGURATION PROPOSED ON THE THIRD FLOOR.

DESCRIPTION CLASSIFICATION

CONSTRUCTION TYPE:

CHAPTER 5 - GENERAL BUILDING HEIGHTS & AREAS:

III-B

B / BUSINESS

SPRINKLER SYSTEM: SPRINKLERED

BUSINESS

CHAPTER 6 - TYPE OF CONSTRUCTION:

CONSTRUCTION CLASSIFICATION: SECTIONS 601 & 602

FIRE RESISTANCE RATING REQUIREMENTS (TABLE 601)

NR = NO RATING

N/A = NOT APPLICABLE, CONDITION NOT PRESENT IN

DESIGN

MAIN USE

CONSTRUCTION TYPE: III-B, SPRINKLERED

CHAPTER 9 FIRE PROTECTION SYSTEM

CHAPTER 10 - MEANS OF EGRESS

B/ BUSINESS

(SPRINKLERED)

GROUP

MAXIMUM TRAVEL

DISTANCE

(TABLE 10 17.2)

300'

CORRIDOR WIDTH

MIN. 36"

COMMON PATH

OF TRAVEL

(TABLE 1006.2.1)

100'

SECTION 1004 OCCUPANT LOAD (See table provided under occupancy SHEET G0.01)

1005.3.1 STAIRWAYS. MEANS OF EGRESS CAPACITY OF 0.3" PER OCCUPANT

1005.3.2 OTHER EGRESS COMPONENTS. THE CAPACITY OF MEANS OF EGRESS COMPONENTS OTHER THAN STAIRWAYS SHALL BE 0.2 INCHES

PER OCCUPANT.

1006.2.1 TWO EXITS SHALL BE PROVIDED WHERE TRAVEL DISTANCE AND OCCUPANT LOAD EXCEED VALUES IN TABLE 1006.2.1

1006.2.1.1 THREE EXITS SHALL BE PROVIDED FROM ANY SPACE WITH AN OCCUPANT LOAD OF 301 TO 1,000. FOUR EXITS SHALL BE PROVIDED FOR

SPACES OVER 1,000 OCCUPANTS.

CORRIDOR FIRE RESISTANCE RATING - TABLE 1020.1

OCCUPANCY (A, B, S) WITH OCCUPANCY > 30 - WITH SPRINKLERS - 0 HOURS

OCCUPANCY TABLE

FUNCTION

AREA SF

OCCUPANCY

TYPE

NUMBER OF

EXITS

LOAD FACTOR

SF/PERSON

(GROSS/NET)

OCCUPANT

LOAD

BASEMENT

USE 1

UNOCCUPIED AREA

1ST FLOOR

USE 2 OCCUPANCY

USE 3 OCCUPANCY

2ND FLOOR

USE 1

UNOCCUPIED AREA

3RD FLOOR

USE 1 OCCUPANCY

USE 2 OCCUPANCY

USE 3 OCCUPANCY

0SF

0 SF

N/A

N/A

EXIST.

EXIST.

EXIST.

EXIST.

EXIST.

EXIST.

TOTAL OCCUPIABLE AREA

DEAD END

CORRIDOR

(TABLE 1020.5)

50'

N/A

B B B

0SF

349 SF

4,258 SF

1,331 SF

EXIST.

15 NET

150 GROSS

20 NET

EXIST.

EXIST.

ETR

ETR

FUNCTION OF SPACE

BUSINESS AREAS

349 SF

= 24P

CONFERENCE

15 594 SF

= 30P

CLASSROOM

716 SF

= 36P

CLASSROOM

ETR EMERGENCY EXIT,

EXTERIOR STAIR ETR EMERGENCY EXIT,

EXTERIOR STAIR

ETR EMERGENCY EXIT,

EXTERIOR STAIR

O

C C

18 OCC

O

C C

15 OCC

61 OCC

25 OCC

OFFICE

= 29

DN

DN

DN

EXIST. F.E.

EXIST. F.E.

F

F

F F

F

F

F

F

F

LIFE SAFETY LEGEND

OCCUPANCY LOADS

ROOM NAME

150 SF

= 15P

ROOM SQUARE FOOTAGE

OCCUPANCY LOAD

FLOOR AREA IN SQ. FT. / OCCUPANT

SYMBOLS

DOORS STAIRS

ACTUAL EGRESS LOAD

ALLOWABLE EGRESS LOAD

CUMULATIVE OCCUPANCY LOAD ON EGRESS ROUTE

COMMON PATH OF TRAVEL (? MAX)

MAXIMUM TRAVEL DISTANCE TO FURTHEST EXIT

(300' MAX - SPRINKLERED)

EXIT SIGN

F

HORN/STROBE

F F

PULL STATION & HORN/STROBE

EXISTING EXIT SIGN TO REMAIN

PROJECT NO.:

DATE:

REVIEWED:

DRAWN:

DESIGNED:

TITLE:

SHEET NUMBER

© 2025 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.

ISSUED FOR:

C o m p a n ie s

A rc h it e ct u re

E n g in ee ri n g

E n vi ro n m en ta l

L a n d

S u rv ey in g

C :\U se rs

\la nd re ia nu \D oc um en ts

\2

_U R

I_ W as hb ur n

H al l_ A rc h_

R

_l an dr ei an u.

rv t

/2

2/

2:

:5

A M

G0.01

CODE ANALYSIS

2503449

09/21/2026

BR

LA, LR

JM

B

R

IA

R L

A N

E

K

IN

G S

T O

N , R

H O

D E

IS

LA

N D

U N

IV

E

R S

IT

Y

O F

R H

O D

E

IS

LA

N

D W

A S

H B

U R

N H

A

LL

BID

355 Research Parkway

Meriden, CT 06450

(203) 630-1406

(203) 630-2615 Fax

BUILDING CODES - RHODE ISLAND

ALL CONSTRUCTION SHALL CONFORM WITH THE FOLLOWING CODES:

LAST UPDATE: 07/13/2026

RHODE ISLAND FIRE SAFETY CODE

1. 2021 INTERNATIONAL FIRE CODE (AS AMENDED BY THE STATE OF RHODE ISLAND)

2. 2021 NFPA 101 LIFE SAFETY CODE (AS AMENDED BY THE STATE OF RHODE ISLAND)

3. 2022 NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE

PURSUANT TO THE RHODE ISLAND STATE BUILDING CODE, R.I. GEN. LAWS CHAPTER

23-27.3, AND THE RHODE ISLAND CODE OF REGULATIONS, TITLE 510, THE FOLLOWING

NATIONAL MODEL CODES, AS AMENDED BY THE STATE OF RHODE ISLAND, ARE

ADOPTED AND SHALL BE KNOWN AS THE RHODE ISLAND STATE BUILDING CODE.

RHODE ISLAND’S CURRENT STATE BUILDING CODES ARE BASED PRIMARILY ON THE

2021 ICC CODES, WITH THE 2023 NEC AND 2024 IECC

1. 2021 INTERNATIONAL BUILDING CODE

2. 2021 INTERNATIONAL EXISTING BUILDING CODE

3. 2021 IBC CHAPTER 11 ACCESSIBILITY AND ICC A117.1-2017 ACCESSIBLE AND USABLE

BUILDINGS AND FACILITIES

4. 2021 INTERNATIONAL PLUMBING CODE

5. 2021 INTERNATIONAL MECHANICAL CODE

6. 2024 INTERNATIONAL ENERGY CONSERVATION CODE

7. 2023 NFPA 70, NATIONAL ELECTRICAL CODE, OF THE NATIONAL FIRE PROTECTION

ASSOCIATION INC.

1/8" = 1'-0"

3RD FLOOR

TRAVEL DISTANCE

PATH NO. TRAVEL DISTANCE MAX. DISTANCE ALLOWED

(IBC TABLE 1017.2)

1 97' - 8" 300'

R E

V

IS

IO

N

S

N O

D A

T E

D E

S C

R

IP

T

IO

N

RECORD DRAWINGS FROM PRIOR RENOVATIONS INDICATE THAT THIS

STAIR ENCLOSURE AND DOORS PROVIDING ACCESS TO THE STAIR

FROM ADJACENT INTERIOR SPACES ARE 1-HOUR FIRE-RESISTANCE-

RATED. RECORD DRAWINGS FURTHER INDICATE THAT INTERIOR

DOORS INSTALLED WITHIN 1-HOUR FIRE-RESISTANCE-RATED

PARTITIONS IN THIS AREA ARE ALSO 1-HOUR FIRE-RESISTANCE-RATED.

AS THIS AREA IS OUTSIDE THE LIMITS OF NEW WORK, NO

INDEPENDENT FIELD VERIFICATION OF THESE CONDITIONS HAS BEEN

PERFORMED AS PART OF THIS PROJECT. THIS AREA IS EXISTING TO

REMAIN AND IS NOT INCLUDED IN THE SCOPE OF WORK.

GENERAL NOTES:

EGRESS INFORMATION IS PROVIDED FOR THE THIRD FLOOR ONLY. THE PROPOSED WORK

ON THE THIRD FLOOR RESULTS IN A REDUCTION IN OCCUPANT LOAD FROM THE PREVIOUS

USE; THEREFORE, THIRD FLOOR EGRESS INFORMATION HAS BEEN INCLUDED TO

DOCUMENT APPLICABLE EXIT ACCESS AND EXIT CAPACITY CONDITIONS FROM THIS FLOOR.

EGRESS INFORMATION FOR THE BASEMENT, FIRST FLOOR, SECOND FLOOR, AND ATTIC

HAS NOT BEEN PROVIDED. NO CHANGES TO EXISTING OCCUPANCY, OCCUPANT LOAD, EXIT

ACCESS, NUMBER OF EXITS, EGRESS CAPACITY, OR OTHER MEANS OF EGRESS

COMPONENTS ARE PROPOSED ON THOSE LEVELS. ALL EXISTING EGRESS FEATURES AND

OCCUPANCY CONDITIONS ON THOSE LEVELS ARE TO REMAIN, AND NO EGRESS

MODIFICATIONS ARE REQUIRED FOR EXECUTION OF THE WORK INDICATED IN THESE

CONSTRUCTION DOCUMENTS.

WORK IS OCCURRING WITHIN PORTIONS OF THE BASEMENT, FIRST, SECOND, AND THIRD

FLOORS. THE SCOPE OF WORK SHALL NOT REDUCE THE EXISTING NUMBER OF EXITS,

ALTER REQUIRED MEANS OF EGRESS COMPONENTS, INCREASE THE OCCUPANT LOAD

SERVED BY EXISTING EXITS, OR INCREASE THE REQUIRED EGRESS CAPACITY OF THE

EXISTING MEANS OF EGRESS SYSTEM. EXISTING EXIT ARRANGEMENTS, EXIT CAPACITY,

AND EGRESS REQUIREMENTS SHALL REMAIN UNCHANGED EXCEPT AS SPECIFICALLY

INDICATED IN THESE DOCUMENTS.

EXISTING FIRE ALARM DEVICES, INITIATING DEVICES, NOTIFICATION APPLIANCES, EXIT

SIGNS, EMERGENCY LIGHTING, AND OTHER LIFE SAFETY SYSTEM COMPONENTS LOCATED

OUTSIDE THE LIMITS OF NEW WORK SHALL REMAIN IN PLACE AND ARE NOT REQUIRED TO

BE REPLACED UNDER THIS CONTRACT UNLESS SPECIFICALLY NOTED OTHERWISE. ALL

EXISTING-TO-REMAIN DEVICES SHALL BE PROTECTED DURING CONSTRUCTION.

EXISTING LIFE SAFETY SYSTEMS SHALL REMAIN OPERATIONAL THROUGHOUT

CONSTRUCTION EXCEPT WHERE TEMPORARY INTERRUPTION IS REQUIRED TO COMPLETE

THE WORK. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL

REQUIRED NOTIFICATIONS AND OBTAINING ALL REQUIRED APPROVALS FROM THE

AUTHORITIES HAVING JURISDICTION PRIOR TO COMMENCEMENT OF ANY WORK THAT MAY

IMPACT THE OPERATION OR EFFECTIVENESS OF THE EXISTING FIRE ALARM SYSTEM.

THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL

CONNECTIONS, MODIFICATIONS, TESTING, AND COMMISSIONING REQUIRED FOR

INTEGRATION OF NEW FIRE ALARM DEVICES INTO THE EXISTING FIRE ALARM SYSTEM.

COORDINATE ALL SUCH WORK WITH URI FACILITIES MANAGEMENT, URI PUBLIC SAFETY,

THE EXISTING FIRE ALARM SYSTEM SERVICE PROVIDER, THE BUILDING OFFICIAL, FIRE

DEPARTMENT, AND OTHER AUTHORITIES HAVING JURISDICTION AS REQUIRED.

THE GENERAL CONTRACTOR SHALL ANTICIPATE PROVIDING A FIRE ALARM TIE-IN PLAN,

NARRATIVE, AND/OR OTHER DOCUMENTATION REQUIRED BY THE AUTHORITIES HAVING

JURISDICTION AS PART OF THE PERMITTING PROCESS FOR FIRE ALARM SYSTEM

ALTERATIONS. REFER TO THE ELECTRICAL DRAWINGS FOR FIRE ALARM SCOPE OF WORK,

DEVICE LOCATIONS, AND ASSOCIATED REQUIREMENTS.

THESE CONSTRUCTION DOCUMENTS DO NOT REPRESENT A COMPREHENSIVE AS-BUILT

RECORD OF THE EXISTING FIRE ALARM SYSTEM. EXISTING FIRE ALARM DEVICES AND

SYSTEM COMPONENTS LOCATED OUTSIDE THE LIMITS OF NEW WORK MAY NOT BE SHOWN.

ONLY NEW DEVICES AND EXISTING DEVICES BEING MODIFIED, RELOCATED, OR

OTHERWISE IMPACTED BY THE WORK ARE INDICATED. THE GENERAL CONTRACTOR SHALL

FIELD VERIFY EXISTING CONDITIONS AND COORDINATE WITH URI FACILITIES MANAGEMENT

AND THE EXISTING FIRE ALARM SYSTEM SERVICE PROVIDER TO DETERMINE THE FULL

EXTENT OF THE EXISTING SYSTEM.

GENERAL NOTES:

DESIGNED IN ACCORDANCE WITH THE 2021 RHODE ISLAND BUILDING CODE, 2021 IBC, WITH STATE

AMENDMENTS.

IF ANY FIELD CONDITIONS PRECLUDE COMPLIANCE WITH THESE DRAWINGS AND/OR CONDITIONS SPECIFIED, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER AND SHALL NOT PROCEED

WITH THE AFFECTED WORK.

TYPICAL DETAILS AND NOTES SHOWN HEREIN SHALL APPLY UNLESS SPECIFICALLY SHOWN OR NOTED OTHERWISE. CONSTRUCTION DETAILS NOT FULLY SHOWN OR NOTED SHALL BE SIMILAR TO DETAILS

SHOWN FOR SIMILAR CONDITIONS.

WORK AREAS SHALL BE MARKED, FENCED, AND OTHERWISE SECURED SO AS TO PROVIDE PROPER

PROTECTION FOR THE PUBLIC, AND AS REQUIRED BY THE BUILDING INSPECTOR.

IT SHALL BE THE CONTRACTORS SOLE RESPONSIBILITY TO DESIGN AND PROVIDE ADEQUATE SHORING, BRACING AND FORMWORK, ETC., AS REQUIRED FOR THE PROTECTION OF LIFE AND PROPERTY DURING CONSTRUCTION. THIS INCLUDES PROVIDING TEMPORARY BRACING, SHORING, GUYS OR TIE-DOWNS.

THESE TEMPORARY SUPPORTS SHALL REMAIN IN PLACE UNTIL ALL STRUCTURAL COMPONENTS ARE

STABLE AND COMPLETED.

DEAD LOADS:

3/4 HARDWOOD FLOORING 3.1 PSF

DROP CEILING 1.0 PSF

MEP 3.0 PSF

SHELVING 25.0 PSF

PARTITION WALLS 5.5 PSF

MISCELLANEOUS 0.4 PSF

TOTAL 38.0 PSF

ROOF LIVE LOADS:

LIVE LOAD = 20 PSF (MIN.)

GROUND SNOW LOAD, Pg = 30 PSF EXPOSURE FACTOR, Ce = 1.0 THERMAL FACTOR, Ct = 1.0 IMPORTANCE FACTOR, Is = 1.0 CALCULATED FLAT ROOF SNOW LOAD, Pf = 25.2 PSF DESIGN SNOW LOAD, Pf = 30.0 PSF (PER RI MINIMUM)

SNOW LOADS INCREASED FOR DRIFT, SLIDING, ETC. WHERE APPLICABLE.

WIND LOADS:

RISK CATEGORY II

ULTIMATE DESIGN WIND SPEED (3-SECOND GUST) = 129 MPH

IMPORTANCE FACTOR, Iw = 1.0

EXPOSURE = "B"

TOPGRAPHICAL FACTOR, Kzt = 1.0

COMPONENT AND CLADDING ITEMS NOT DESIGNED BY THE ENGINEER OF RECORD: REFER TO

COMPONENTS AND CLADDING WIND PRESSURE TABLES

SEISMIC DESIGN CRITERIA:

Ss = 0.188 S1 = 0.052 SEISMIC IMPORTANCE FACTOR, Ie = 1.0

SITE CLASS = "D"

SDS = 0.201 SD1 = 0.084

SEISMIC DESIGN CATEGORY = "B"

BUILDING FRAME SYSTEMS -

LIGHT-FRAMED WOOD WALLS SHEATHED WITH STRUCTURAL PANELS

(R = 6.5, Cd = 3) SEISMIC RESPONSE COEFFICIENT, Cs = 0.031 DESIGN BASE SHEAR, V = Cs x W

ANALYSIS PROCEDURE = ELFP

ALL SPECIAL INSPECTION REPORTS PERFORMED IN ACCORDANCE WITH THE STATEMENT OF SPECIAL INSPECTIONS SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW IN A TIMELY MANNER. THE FINAL REPORT OF SPECIAL INSPECTIONS SHALL NOT BE ISSUED UNTIL ALL SPECIAL INSPECTION REPORTS

HAVE BEEN RECEIVED AND APPROVED BY THE ENGINEER.

CONCRETE NOTES:

ALL CONCRETE WORK SHALL CONFORM TO ACI "BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE", ACI-318 - LATEST EDITION, AND "MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE STRUCTURES", ACI-315 - LATEST EDITION.

ALL CONCRETE FORMWORK SHALL CONFORM WITH ACI "RECOMMENDED PRACTICES FOR CONCRETE FORMWORK", ACI-347.

ALL STRUCTURAL CONCRETE SHALL CONFORM WITH ACI "SPECIFICATIONS FOR STRUCTURAL CONCRETE BUILDINGS", ACI-301.

AIR ENTRAIN ALL EXTERIOR CONCRETE AND CONCRETE EXPOSED TO WEATHER..

ALL CONCRETE FOR FOOTINGS, SLABS, AND FOUNDATIONS SHALL BE NORMAL WEIGHT CONCRETE WITH A MINIMUM COMPRESSIVE

STRENGTH AT 28 DAYS OF 4,000 PSI.

ALL CONCRETE SHALL BE CONTINUOUSLY MOIST CURED FOR SEVEN (7) DAYS MINIMUM. CONCRETE SHALL BE KEPT MOIST BY FOG

SPRAYING, CURING PAPER AND/OR ACCEPTABLE CURING COMPOUNDS.

CONTRACTOR SHALL SUBMIT MIX DESIGNS FOR APPROVAL. MIX DESIGN SHALL INDICATE 28-DAY STRENGTHS, CEMENT CONTENT, AIR CONTENT, WATER-CEMENT RATIO, AMOUNT OF FINE AND COARSE AGGREGATES, AND ADMIXTURES.

MAX. WATER-CEMENT RATIO = 0.45

MAX. SLUMP = 4"

MAX. AGGREGATE SIZE = 3/4" TO 1"

CEMENT SHALL BE PORTLAND CEMENT, TYPE I OR II, CONFORMING TO ASTM C-150. AGGREGATES SHALL CONFORM TO ASTM C-33. AIR ENTRAINING ADMIXTURES SHALL CONFORM TO ASTM C-260. NON-SHRINK GROUT SHALL CONFORM TO ASTM C-109. EXPANSION JOINTS SHALL BE 1/2" THICK ASPHALT IMPREGNATED FIBERBOARD JOINT MATERIAL, CONFORMING TO ASTM D-1751. CURING COMPOUND SHALL

BE CLEAR, CONFORMING TO ASTM C-309.

COLD WEATHER CONCRETE WORK SHALL CONFORM TO ACI-306.

HOT WEATHER CONCRETE WORK SHALL CONFORM TO ACI-305.

ALL REINFORCING STEEL SHALL CONFORM TO ASTM A615 GRADE 60. WELDED WIRE MESH SHALL CONFORM TO ASTM A185 AND ASTM A82.

WELDED WIRE MESH SHALL HAVE MINIMUM END AND SIDE LAPS OF 1'-0".

CONCRETE ACCESSORIES SHALL BE ADEQUATE TO MAINTAIN REINFORCING ACCURATELY IN PLACE AND BE NON-CORROSIVE, NON-

STAINING TYPE.

LAP ALL BAR REINFORCING PER ACI-318. STAGGER SPLICES IN WALLS AND SLABS AND ALL HORIZONTAL REINFORCEMENT.

CONCRETE SHALL NOT BE DROPPED THROUGH REINFORCING STEEL (AS IN WALLS AND COLUMNS) SO AS TO CAUSE SEGREGATION OF AGGREGATES. USE HOPPERS, CHUTES OR TRUNKS OF VARYING LENGTHS SO THAT THE FREE UNCONFINED FALL OF CONCRETE SHALL

NOT EXCEED FIVE (5) FEET.

MINIMUM REINFORCEMENT COVER, UNLESS NOTED OTHERWISE:

-CONCRETE CAST AGAINST EARTH: 3"

-CONCRETE EXPOSED TO EARTH OR WEATHER:

No. 6 TO No. 18 BARS - 2" No. 5 AND SMALLER - 1 1/2"

-CONCRETE NOT EXPOSED TO EARTH OR WEATHER:

No. 11 AND SMALLER - 3/4"

ALL CONCRETE WORK, REINFORCING PLACEMENT, AND FORMWORK SHALL BE INSPECTED BY AN INDEPENDENT TESTING AGENCY

RETAINED BY THE OWNER FOR THE FOLLOWING ITEMS:

• INSPECT BOTTOM OF FOOTING SOIL CONDITIONS.

• INSPECT FORMWORK AND PLACEMENT OF CONCRETE.

• SAMPLING FRESH CONCRETE PER ASTM C-172, MODIFIED FOR SLUMP BY ASTM C-94.

• SLUMP PER ASTM C-143. ONE TEST AT POINT OF DISCHARGE FOR EACH DAYS POUR FOR EACH TYPE OF CONCRETE.

• AIR CONTENT PER ASTM C-173 (VOLUMETRIC) OR ASTM C-231 (PRESSURE). ONE TEST FOR EACH DAYS POUR FOR EACH TYPE

OF CONCRETE.

• COMPRESSION TEST CYLINDERS PER ASTM C-31 (4 CYLINDERS)

• CONCRETE TEMPERATURE - TEST EACH TIME A SET OF CYLINDERS IS CAST.

• COMPRESSION STRENGTH TEST PER ASTM C-39. ONE SET FOR EACH DAYS POUR PLUS ADDITIONAL SETS FOR EACH 50 cy

OVER AND ABOVE THE FIRST 25 cy. ONE CYLINDER TESTED AT 7 DAYS, TWO CYLINDERS TESTED AT 28 DAYS, AND ONE

CYLINDER RETAINED FOR LATER TESTING IF REQUIRED.

ABBREVATIONS:

AASHTO AMERICAN ASSOCIATION OF STATE HIGHWAY

TRANSPORTATION OFFICIALS

A.B. ANCHOR BOLT OR ANCHOR ROD

A.A.S. ADHESIVE ANCHORING INSTITUTE

ACI AMERICAN CONCRETE INSTITUTE

AESS ARCHITECTURALLY EXPOSED STRUCTURAL STEEL

AFPA AMERICAN FOREST AND PAPER ASSOCIATION

AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION

ALT. ALTERNATE

ALUM ALUMINUM

ANCH. ANCHOR OR ANCHORAGE

ARCH. ARCHITECTURAL OR ARCHITECT

ASD ALLOWABLE STRESS DESIGN

ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS

AWS AMERICAN WELDING SOCIETY

B, BOTT. BOTTOM

B/, B.O. BOTTOM OF

BLDG. BUILDING

BM. BEAM

B.O.F. BOTTOM OF FOOTING

B.O.S. BOTTOM OF STEEL

BRG. BEARING

B/S BOTH SIDES

CF COLD-FORMED

CFMF COLD-FORMED METAL FRAMING

C.G. CENTER OF GRAVITY

C.I.P. CAST IN PLACE

C.J. CONTROL JOINT

CLR. CLEAR

CMU CONCRETE MASONRY UNIT

C.O. CLEAN OUT

COL. COLUMN

CONC. CONCRETE

CONN. CONNECTION

CONST. CONSTRUCTION

CONST. JT. CONSTRUCTION JOINT

CONT. CONTINUOUS

CRSI CONCRETE REINFORCING STEEL INSTITUTE

CTR. CENTER

CWA COORDINATE WITH ARCHITECTURAL DRAWINGS

D-B DESIGN BUILD

DEPR. DEPRESSION

DEPT. DEPARTMENT

DET. DETAIL

DIA. DIAMETER

DIM. DIMENSION

DIR. DIRECTION

DN DOWN

D.O. DITTO (SAME AS ABOVE)

D.O.T. DEPARTMENT OF TRANSPORTATION

DWG. DRAWING

DWL. DOWEL(S)

EA. EACH

E.E. EACH END

E.F. EACH FACE

EL., ELEV. ELEVATION

ELEC. ELECTRICAL

EMBED. EMBEDMENT

ENGR. ENGINEER

E.O.D. EDGE OF DECK

E.O.S. EDGE OF STEEL

EQ. EQUAL

E.W. EACH WAY

EX., EXIST. EXISTING

EXP. EXPANSION

EXP. JT., E.J. EXPANSION JOINT

EXT. EXTENSION

F.D. FLOOR DRAIN

F.F. FAR FACE

FND. FOUNDATION

FIN. FINISH

FL. FLOOR

FLG. FLANGE

F.M. FACTORY MUTUAL

F.S. FAR SIDE

FT. FEET OR FOOT

FTG. FOOTING

F.O.W. FACE OF WALL

GA. GAUGE

G.B. GRADE BEAM

GALV. GALVANIZED

G.C. GENERAL CONTRACTOR

GEN., GENL GENERAL

GR. GRADE

HDR. HEADER

HOR., HORIZ. HORIZONTAL

H.P. HIGH POINT

H.S. HIGH STENGTH

HSS HOLLOW STRUCTURAL SECTION

HT. HEIGHT

ICC INTERNATIONCODE COUNCIL

I.D. INSIDE DIAMETER

I.F. INSIDE FACE

IN. INCH OR INCHES

INCL. INCLUDING

INFO INFORMATION

INT. INTERIOR

INV. INVERT

JST. JOIST

JT. JOINT

K KIP (1000 LBS.)

KLF KIPS PER LINEAR FOOT

KSF KIPS PER SQUARE FOOT

KSI KIPS PER SQUARE INCH

L.B. ANGLE BRACE (ALSO SEE SYMBOLS)

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LOC. LOCATION

L.P. LOW POINT

L.W. LIGHT WEIGHT

MAS. MASONRY

MATL. MATERIAL

MAX. MAXIMUM

MECH. MECHANICAL

M/E/P MECHANICAL/ELECTRICAL/PLUMBING

MEZZ. MEZZANINE

MID. MIDDLE

MID-PT MIDPOINT

MIN. MINIMUM

MM MILLIMETER

M.O. MASONRY OPENING

MTL METAL

N.F. NEAR FACE

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

N.I.C. NOT IN CONTRACT

NO. NUMBER

N.S. NEAR SIDE

N.T.S. NOT TO SCALE

N.W. NORMAL WEIGHT

O.C. ON CENTER

O.D. OUTSIDE DIAMETER

O.F. OUTSIDE FACE

O.H. OPPOSITE HAND

O/H OVERHANG

OPNG. OPENING

OPP. OPPOSITE

P.A.F. POWER-ACTUATED FASTENER

PART. PARTIAL

PL. PLATE

PCA PORTLAND CEMENT ASSOCIATION

PCI PRE-STRESSED CONCRETE INSTITUTE

P/C PRECAST CONCRETE

PEN. PENETRATION

PLF, #/FT POUNDS PER SQUARE FOOT

PREFAB. PREFABRICATED

PSF POUNDS PER SQUARE FOOT

PSI POINDS PER SQUARE INCH

PSL PARALLEL STRAND LUMBER

PT. POINT

P/T PRESERVATIVE TREATED

PTD. PAINTED

PVC POLYVINYL CHLORIDE

R RADIUS

R/C REINFORCED CONCRETE

R.C.P. REINFORCED CONCRETE PIPE

R.D. ROOF DRAIN

REF. REFERENCE

REINF. REINFORCING

REQ'D REQUIRED

RET. RETURN

R.F. ROOF FRAME

RFT. RAFTER

R.O. ROUGH OPENING

RTU ROOF TOP UNIT

SDI STEEL DECK INSTITUTE

SECT. SECTION

S.F. STEP FOOTING

SHTG. SHEATHING

SIM. SIMILAR

SJI STEEL JOIST INSTITUTE

SL. SLOPING BEAM OR GIRDER

S.O.G. SLAB ON GRADE

SPA. SPACES

SQ. SQUARE

S.S. STAINLESS STEEL

STD. STANDARD

STL. STEEL

STIFF. STIFFENER

T/, T.O. TOP OF

T&B TOP AND BOTTOM

TEMP. TEMPORARY

THK. THICK OR THICKNESS

THRD. THREADED

THRU THROUGH

T.O.C. TOP OF CONCRETE

T.O.S. TOP OF STEEL

T.O.W. TOP OF WALL

TS TUBE STEEL

TSF TONS PER SQUARE FOOT

TYP. TYPICAL

UL UNDERWRITER'S LABORATORIES

U.O.N. UNLESS OTHERWISE NOTED

VERT. VERTICAL

V.I.F. VERIFY IN FIELD

w/ WITH

W.O. WINDOW OPENING

W.P. WORKING POINT

W.W.F. WELDED WIRE FABRIC

GEOTECHNICAL NOTES:

ALL UNDERGROUND UTILITY LOCATIONS SHALL BE VERIFIED PRIOR TO STARTING EXCAVATION WORK.

CALL BEFORE YOU DIG PRIOR TO STARTING ANY EXCAVATION.

THE CONTRACTOR WILL PERFORM EXCAVATIONS, FOOTING CONSTRUCTION, AND PREPARATION OF THE SUBGRADE UNDER FOUNDATIONS IN ACCORDANCE WITH THE RECOMMENDATIONS CONTAINED IN THESE

DRAWINGS.

ALL FOOTINGS HAVE BEEN DESIGNED FOR AN ASSUMED ALLOWABLE NET SOIL BEARING PRESSURE OF 2,000 PSF PER SECTION 1806 OF THE BUILDING CODE. WHERE THE BUILDING OFFICIAL OR 3RD PARTY INSPECTOR DEEMS THE SOILS SUPPORTING THE STRUCTURAL FOOTINGS IS INADEQUATE, A FORMAL

GEOTECHNICAL INVESTIGATION SHALL BE REQUIRED TO CONFIRM THAT THE MINIMUM DESIGN

REQUIREMENTS NOTED IN THE GENERAL NOTES CAN BE MET. FOOTINGS SHALL BEAR ON UNDISTURBED SUBBASE. NO FOOTINGS SHALL BEAR ON LOAM OR SOIL FILL. IF ROCK IS ENCOUNTERED PRIOR TO THE PROPOSED BOTTOM OF FOOTING ELEVATION, THE ROCK SHALL BE OVEREXCAVATED BY 1'-0", AND BACKFILLED WITH 3/4" CRUSHED STONE TO THE BOTTOM OF FOOTING, AND COVERED WITH FILTER

FABRIC.

ALL COMPACTED CONTROLLED FILL BEING PLACED MUST BE TESTED BY AN APPROVED TESTING

LABORATORY DURING THE FILL OPERATION. ALL FOUNDATION SUBGRADES SHALL BE INSPECTED AND APPROVED UNDER THE SUPERVISION OF A REGISTERED PROFESSIONAL ENGINEER PRIOR TO BEING CONCRETED. SLABS AND FOOTINGS SHALL NOT BE PLACED UNTIL FILL TEST REPORTS HAVE BEEN CHECKED AND APPROVED BY THE ENGINEER. PROIR TO PLACING CONCRETE, EXISTING SOIL CONDITIONS SHALL BE INSPECTED AND VERIFIED BY THE ENGINEER. ALL UNSUITABLE SOIL SHALL BE REMEDIATED AS DIRECTED BY THE ENGINEER. CONTROLLED FILL, EITHER STRUCTURAL FILL OR SLAB BASE SHALL BE INERT, GRANULAR FILL, FREE FROM ORGANICS AND DEBRIS. ALL CONTROLLED FILL PLACED SHALL BE COMPACTED TO A MINIMUM OF 95% OF MAXIMUM DRY UNIT WEIGHT AS DETERMINED BY THE MODIFIED

PROCTOR TEST, ASTM D1557.

WOOD NOTES:

WOOD CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHAPTER 23 OF THE BUILDING CODE.

ALL LUMBER FRAMING MEMBERS ARE TO HAVE THE FOLLOWING MINIMUM BASE DESIGN VALUES IN

ACCORDANCE WITH THE LATEST ISSUE OF THE NATIONAL DESIGN SPECIFICATION FOR WOOD

CONSTRUCTION (NDS) AS PUBLISHED BY THE AMERICAN FOREST AND PAPER ASSOCIATION (AFPA):

PSL 2.0E:

Fb = 2900 PSI Fv = 290 PSI Ft = 2300 PSI Fcll = 2900 PSI Fc,PERP = 525 PSI

E = 2,000,000 PSI.

ALL SILLS SHALL BE DOUGLAS FIR #2 OR GREATER

ALL FRAMING LUMBER SHALL BE AS GRADED PER AMERICAN LUMBER STANDARDS (U.N.O.) WITH

MINIMUM GRADES AS FOLLOWS:

STUDS: 2x - DOUGLAS FIR No.2 & BETTER, OR 1.5E LSL.

POSTS: MULTIPLE 2x - DOUGLAS FIR No. 2 & BETTER, OR 2.0E PSL.

PLATES, BLOCKS, AND MISC.: DOUGLAS FIR No. 2 OR BETTER, OR 2.0E PSL.

JOISTS: 2x - DOUGLAS FIR No. 2 OR BETTER, OR 2.0E PSL.

BEAMS AND HEADERS: MULTIPLE 2x - DOUGLAS FIR No. 2 OR BETTER, OR 2.0E PSL.

ALL WOOD SHEATHING SHALL BE STRUCTURAL 1 APA-RATED.

PLYWOOD SHALL BE CONTINUOUS OVER TWO (2) OR MORE SPANS AND FACE GRAIN PERPENDICULAR TO

SUPPORT.

NAILING OF MULTIPLE MEMBERS SHALL BE AS REQUIRED BY THE MANUFACTURER. BEARING OF ALL

BEAMS SHALL BE THREE (3) INCHES MINIMUM.

ALL WOOD OR ENGINEERED LUMBER MEMBERS IN CONTACT WITH CONCRETE OR MASONRY SHALL BE

PRESSURE TREATED.

ROOF SHEATHING FASTENERS SHALL BE SPACED AT 6" o.c. AT EDGES, AND AT 12" o.c. AT INTERMEDIATE

SUPPORTS, U.N.O.

COMMON NAILS ARE REQUIRED FOR SHEAR WALLS, INCLUDING PLATE NAILING, TIE-DOWNS, HANGERS, AND LEDGERS.

BOX NAILS REQUIRE 1/3 MORE NAILS THAN LISTED ABOVE. CEMENT COATED SINKERS ARE CONSIDERED

BOX NAILS.

DF: DOUGLAS FIR, No. 2 OR BETTER:

Fb = 900 PSI Fv = 180 PSI Ft = 575 PSI Fcll = 1350 PSI Fc,PERP = 625 PSI

E = 1,600,000 PSI

STUDS:

NOTCHED AND/OR CUT STUDS TO CLEAR ANCHOR BOLTS ARE NOT ALLOWED. STUDS SHALL HAVE FULL

BEARING TO THE BOTTOM PLATES.

SEE ARCHITECTURAL DRAWINGS FOR ALL NON-BEARING AND NON-SHEAR WALLS.

STACK ALL BEARING STUDS, CRIPPLE STUDS AND POSTS FROM ROOF AND ALL FLOOR LEVELS DOWN TO

THE CONCRETE SLAB.

PROVIDE SOLID BLOCKING BETWEEN FLOORS FOR ALL POSTS. ALL POSTS SHALL STACK AND BE

CONTINUOUS TO THE CONCRETE SLAB.

CARPENTRY NOTES-

WALLS SHOWN ARE BELOW FRAMING LEVEL AT FLOOR AND ROOF FRAMING PLANS.

VERIFY ALL DIMENSIONS WITH ARCHITECTURAL DRAWINGS.

SEE ARCHITECTURAL DRAWINGS FOR WALLS AND DIMENSIONS NOT SHOWN OR NOTED.

SEE ARCHITECTURAL OR CIVIL DRAWINGS FOR WALKS, RAMPS, PATIOS, ETC., NOT SHOWN OR NOTED.

VERIFY PLATE AND FRAMING ELEVATIONS WITH ARCHITECTURAL DRAWINGS.

SEE ARCHITECTURAL DRAWINGS FOR ROOF SLOPES, ELEVATION, AND DRAINAGE.

USE POWDER ACTUATED FASTENERS AT 16" OC MAX. WITH 2x PRESSURE TREATED SILL PLATES AT NON-

BEARING AND NON-SHEAR WALLS AT CONCRETE SLAB ONLY.

CRIPPLE WALLS SHALL BE A MINIMUM OF 12" IN HEIGHT. FOR LESSER HEIGHTS, STACK 2x PLATES (AND

SHIM AS REQUIRED).

NOTCHED AND/OR CUT JOISTS ARE NOT ALLOWED. VERIFY ALL JOIST OPENINGS WITH STRUCTURAL

ENGINEER PRIOR TO STARTING WORK.

WOOD CONSTRUCTION SHALL BE PER AMERICAN INSTITUTE OF TIMBER CONSTRUCTION (AITC)

STANDARDS AND SPECIFICATIONS, AND NATIONAL DESIGN SPECIFICATION FOR WOOD CONSTRUCTION

(NDS) AS PUBLISHED BY THE AMERICAN FOREST AND PAPER ASSOCIATION (AFPA).

PROVIDE TWO (2) JACK STUDS AND TWO (2) KING STUDS AT EACH END OF WOOD HEADERS, TYPICAL, UNLESS NOTED OTHERWISE.

SHEATHING SHALL BE CONTINUOUS OVER TWO (2) OR MORE SPANS AND FACE GRAIN PERPENDICULAR

TO SUPPORT.

SHEATHING FOR ROOF: 5/8" STRUCTURAL 1 APA-RATED SHEATHING. SEE ARCHITECTURAL DRAWINGS

FOR EXPOSED OVERHANGS AND CEILINGS.

SHEATHING FOR SUBFLOORS: 3/4" STRUCTURAL 1 APA-RATED TONGUE AND GROOVE SHEATHING, U.N.O.

SHEATHING FOR EXTERIOR WALLS: 7/16" APA-RATED ZIP-SHEATHING, U.N.O.

SHEATHING FOR EXTERIOR AND INTERIOR SHEAR WALLS: STRUCTURAL 1 APA RATED SHEATHING, THICKNESS PER SHEARWALL SCHEDULE

JOIST HANGERS, STRAPS, CLIPS AND TIE-DOWNS SHALL BE MANUFACTURED BY THE "SIMPSON STRONG-

TIE COMPANY, INC." OR APPROVED EQUAL.

NAILING OF MULTIPLE MEMBERS SHALL BE AS REQUIRED BY THE MANUFACTURER. BEARING OF ALL

BEAMS SHALL BE 1 1/2" INCHES MINIMUM.

LAMINATED BEAMS SHALL NOT BE USED IN LOCATIONS EXPOSED TO WEATHER, UNLESS THEY HAVE

BEEN PRESSURE TREATED AND WATER REPELLENT APPLIED.

ALL WOOD OR ENGINEERED LUMBER MEMBERS IN CONTACT WITH CONCRETE OR MASONRY SHALL BE

PRESSURE TREATED.

NAILING SCHEDULE - IN ACCORDANCE WITH CHAPTER 23, THE BUILDING CODE.

IF NAILING IS NOT NOTED OR SHOWN IN THE DETAILS OR PLANS, USE THE FOLLOWING MINIMUM CRITERIA:

JOIST TO SILL OR GIRDER, TOE NAIL.......................................(3)-8d CONTINUOUS RIM JOIST TO DBL TOP PLATES........................16d @ 8" o.c.

BRIDGING TO JOIST, TOENAIL EACH END................................(2)-8d SOLE PLATE TO JOIST OR BLOCKING, FACE NAIL..................16d @ 8" o.c.

TOP PLATE TO STUD, END NAIL.............................................(2)-16d STUD TO SOLE PLATE...............................................................(4)-8d, TOENAIL OR (2)-16D, END NAIL DOUBLE STUDS, FACE NAIL......................................................16d @ 24" o.c.

DOUBLE TOP PLATES, FACE NAIL............................................16d @ 16" o.c.

TOP PLATES, LAPS AND INTERSECTIONS, FACE NAIL............(2)-16d CONTINUOUS HEADER, TWO PIECES.........................................16d @ 16" o.c.

STAGGERED ALONG EDGE

CEILING JOISTS TO PLATE, TOE NAIL.......................................(3)-8d CONTINUOUS HEADER TO STUD, TOE NAIL..............................(4)-8d CEILING JOISTS, LAPS OVER PARTITION, FACE NAIL..............(3)-16d CEILING JOISTS TO PARALLEL RAFTERS, FACE NAIL..............(3)-16d RAFTER TO PLATE, TOE NAIL..................................................(3)-8d 1" BRACE TO EACH STUD AND PLATE, FACE NAIL...............(2)-8d 1"x8" SHEATHING OR LESS TO EACH BRG, FACE NAIL.........(3)-8d WIDER THAN 1"x8" SHEATHING TO EACH BRG, FACE NAIL...(3)-8d BUILT-UP CORNER STUDS........................................................16d @ 16" o.c.

PLYWOOD OR OSB:

FLOOR, WALL, AND ROOF SHEATHING (TO FRAMING):

1/2", 5/8", 3/4"..................................................10d

SUBFLOOR FASTENERS SHALL BE SPACED AT 6" OC. AT EDGES, AND AT 12" OC. AT INTERMEDIATE

SUPPORTS, UNLESS OTHERWISE NOTED. USE RING SHANK NAILS.

WALL SHEATHING FASTENERS SHALL BE SPACED AS NOTED ON THE SECTIONS AND DETAILS.

ROOF SHEATHING FASTENERS SHALL BE SPACED AT 6" OC AT EDGES, AND AT 12" OC AT INTERMEDIATE

SUPPORTS, U.N.O.

BOX NAILS MAY BE USED FOR ABOVE NAILING WITH APPROVAL FROM THE ENGINEER.

COMMON NAILS ARE REQUIRED FOR SHEAR WALLS, INCLUDING PLATE NAILING, TIE-DOWNS, HANGERS, AND

LEDGERS.

BOX NAILS REQUIRE 1/3 MORE NAILS THAN LISTED ABOVE. CEMENT COATED SINKERS ARE CONSIDERED BOX

NAILS.

355 Research Parkway Meriden, CT 06450

(203) 630-1406

(203) 630-2615 Fax

Project No.:

Date:

Reviewed:

Drawn:

Designed:

Title:

Sheet No.

© 2022 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.

Issued for:

C o m p a n ie s

A rc h it e c tu re

E n g in e e ri n g

E n v ir o n m e n ta l

La n d S u rv e y in g

C U s e rs \K

P itz e r\

D o c u m e n ts

\r e v it_ lo c a l\

U R

I_ W a s h b u rn H a ll_

S tr u c t_

R k p it z e rP D

M

L .r v t

/2

/2

:2 :3

P

M

S0.01

STRUCTURAL GENERAL

NOTES

2503449

10/21/2026

JRM

KJP

KJP

B

R

IA

R L

A N

E K

IN

G

S

TO

N , R

H O

D E

IS

LA

N D

U R

I - W

A S

H B

U R

N H

A

LL

BID

R E

V

IS

IO

N

S

N O

D A

T E

D E

S C

R

IP

T

Existing Bearing Walls, Typ.

Existing bearing walls, typ.

Existing Bearing Walls, Typ.

S2.00

S2.00

F35

F34

F3.5

F3.5

11'-9" V.I.F.

5'-6 3/4"

Existing Wall Footing, TO

REMAIN, V.I.F.

(7'-6" MAX.)

6'-4 1/2" V.I.F.

(7'-6" MAX.)

6'-4 1/2" V.I.F.

(7'-6" MAX.)

6'-11 3/4" V.I.F.

S3.00

S3.00

DOWEL INTO EXISTING FTG.,

SEE SECTION 6/S3.00

S3.00

TYP.

6'-2 1/2" 3'-6"

DOWEL INTO EXISTING

FTG. W/ #5 @ 12" O.C.

EMBED = 6", TYP.

3'-2 7/8" 3'-6"

3'-2 7/8" V.I.F. 3'-6" V.I.F.

F3.5

1' -6

V .I.

F.

2' -0

1'

-6

SEE NOTE 9

9' -0

/8

" V .I.

F.

9' -6

" V .I.

F.

7' -9

" V .I.

F.

5' -5

" V .I.

F.

8' -1

5/

8" V

.I.

F.

TYP. WALL

FTG.

S3.00

TYP. WALL

FTG.

SEE DETAIL xxxx

FOR TYPICAL

CONCRETE

PENETRATIONS

13/S3.00

S3.00

TYP. WALL

FTG.

S3.00

Existing Wall Footing, V.I.F.

DOWEL INTO EXISTING

FTG. W/ #5 @ 12" O.C.

EMBED = 6"

DOWEL INTO EXISTING

FTG. W/ #5 @ 12" O.C.

EMBED = 6", TYP.

DOWEL INTO EXISTING

FTG. W/ #5 @ 12" O.C.

EMBED = 6"

Existing Wall Footing, TO

REMAIN, V.I.F.

Existing Wall Footing, TO

REMAIN, V.I.F.

MIN.

1'-0"

Existing Wall Footing, TO

REMAIN, V.I.F.

F3.5

2'-0"

3' -0

S3.00

TYP.

TYP.

S3.00

TYP.

S3.00 TYP.

S3.00

TYP.

S3.00

F3.5

2'-0"

Existing Wall Footing, V.I.F. REMOVE AT NEW

FOOTING

Existing CMU Wall, REMOVE AND REBUILD

AT NEW FOOTING

DOWEL INTO EXISTING

FTG. W/ #5 @ 12" O.C.

EMBED = 6", TYP.

DOWEL INTO EXISTING

FTG. W/ #5 @ 12" O.C.

EMBED = 6", TYP.

7' -8

" V .I.

F.

2'

-0

FOUNDATION PLAN NOTES:

1. THE EXISTING PLANS ARE BASED OFF OF EXISTING DRAWINGS AND FIELD MEASUREMENTS. ALL

DIMENSIONS AND ELEVATIONS SHALL BE FIELD VERIFIED.

2. COORDINATE ALL DIMENSIONS WITH ARCHITECTURAL DRAWINGS.

3. FLOOR FRAMING SHOWN IS SUPPORTING THE FLOOR ABOVE. SEE THE FIRST FLOOR FRAMING FOR WALL

AND HEADER SIZES.

4. CONTRACTOR TO PERFORM PRICING OPTION FOR JACKING OF THE EXISTING 1ST FLOOR. JACKING WILL

CONSIST OF USING JACK POSTS AND UNIFORMLY JACKING THE FLOOR IN 1/4 INCH INCREMENTS OVER THE COURSE OF 2 WEEKS UNTIL A UNIFORM TOLERANCE IS ACCEPTED. CURRENT DEFLECTIONS ARE

REPORTED BETWEEN 2" TO 4".

5. SEE SHEET S1.01 FOR WALL TYPES.

6. DIMENSIONS TO NEW SUPPORTS ARE APPROXIMATE. FIELD SHIFTING IS ALLOWABLE TO AVOID UTILITIES.

7. SHIMMING IS ALLOWABLE WHERE REQUIRED TO AVOID UTILITIES. VERIFY HEADER AND WALL HEIGHTS IN

FIELD.

8. CONTRACTOR TO PROVIDE NEW FRAMING PRIOR TO REMOVAL OF EXISTING SUPPORTS. ADDITIONAL

SHORING WILL BE REQUIRED WHERE STAGING CAN NOT BE SATISFIED TO LIMIT DEFLECTIONS.

9. AREA ASSUMED TO BE OFF-LIMITS FOR EXCAVATIONS. COORDINATE WITH ELECTRICAL PLANS

TO LIMIT DISTURBANCE IN THIS AREA.

10. CONTRACTOR SHALL FIELD VERIFY THE CONDITION, LOCATION, AND EXTENTS OF EXISTING

FOUNDATIONS PRIOR TO DRILLING OR DOWELING. IF DETERIORATED OR OTHERWISE UNSUITABLE

CONCRETE IS ENCOUNTERED, COORDINATE WITH THE EOR PRIOR TO PROCEEDING.

11. PROVIDE NEW UNDERSLAB VAPOR RETARDER BELOW ALL SLAB PATCHES ASSOCIATED WITH NEW

FOOTINGS. INSTALL IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS AND MAINTAIN

CONTINUITY THROUGHOUT PATCH AREA. UNDERSLAB VAPOR RETARDER IS PROVIDED ONLY WITHIN LIMITS OF NEW WORK AND IS NOT INTENDED TO SERVE AS A COMPLETE BASEMENT WATERPROOFING SYSTEM OR TO CORRECT EXISTING MOISTURE, WATER INFILTRATION, GROUNDWATER, OR DRAINAGE

CONDITIONS.

12. THE GENERAL CONTRACTOR SHALL, WITHIN THIRTY (30) DAYS OF EXECUTION OF THE CONTRACT, OBTAIN A GROUND PENETRATING RADAR (GPR) SURVEY AND/OR SLAB X-RAY OF EXISTING CONCRETE SLABS IN AREAS AFFECTED BY THE WORK TO IDENTIFY REINFORCING, EMBEDDED ITEMS, SUBSURFACE STRUCTURES, UTILITIES, OR OTHER EXISTING CONDITIONS THAT MAY IMPACT THE EXECUTION OF THE WORK. UPON RECEIPT, THE GENERAL CONTRACTOR SHALL PROMPTLY SUBMIT THE SURVEY RESULTS

AND ALL ASSOCIATED FINDINGS TO THE OWNER AND ENGINEER OF RECORD FOR REVIEW AND

COORDINATION OF EXISTING CONDITIONS WITH THE PROPOSED WORK. ANY CONDITIONS THAT

CONFLICT WITH THE CONSTRUCTION DOCUMENTS OR MAY IMPACT THE EXECUTION OF THE WORK

SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER AND ENGINEER OF RECORD PRIOR TO

PERFORMANCE OF THE AFFECTED WORK.

N

355 Research Parkway Meriden, CT 06450

(203) 630-1406

(203) 630-2615 Fax

Project No.:

Date:

Reviewed:

Drawn:

Designed:

Title:

Sheet No.

© 2022 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.

Issued for:

TRUE NORTH

C o m p a n ie s

A rc h it e c tu re

E n g in e e ri n g

E n v ir o n m e n ta l

La n d S u rv e y in g

C U s e rs \K

P itz e r\

D o c u m e n ts

\r e v it_ lo c a l\

U R

I_ W a s h b u rn H a ll_

S tr u c t_

R k p it z e rP D

M

L .r v t

/2

/2

:2 :3

P

M

S1.00

BASEMENT AND

FOUNDATION PLAN

2503449

10/21/2026

JRM

JRM

KJP

B

R

IA

R L

A N

E K

IN

G

S

TO

N , R

H O

D E

IS

LA

N D

U R

I - W

A S

H B

U R

N H

A

LL

BID

1/4" = 1'-0"

BASEMENT AND FOUNDATION PLAN

R E

V

IS

IO

N

S

N O

D A

T E

D E

S C

R

IP

T

IO

N

FOOTING SCHEDULE

FOOTING MARK SIZE (LxWxH) REINFORCING (BOTTOM, UON) REFERENCE

F3.5 3'-6"x3'-6"x1'-0" w/ (5) - #5 Bars Each Way 7/S3.00

F34 3'-0"x4'-0"x1'-0" w/ (5) - #5 Bars Each Way 7/S3.00

F35 3'-0"x5'-0"x1'-0" w/ (5) - #5 Bars Each Way 7/S3.00

(E) STEEL GIRDER

(E

2x

4" O

.C

(E

2x

4" O

.C

(E

2x

4" O

.C

(E

2x

4" O

.C

(E

2x

4" O

.C

(E

2x

4" O

.C

(E

2x

4" O

.C

(E

2x

4" O

.C

S2.00

H4 H4

H4

S2.00

H4 H3H4

2X12 BLOCKING @ 24"

O.C., (2) BAYS EA SIDE OF

OFFICE PARTITIONS, TYP

P3

P2P3

P2

P3

P3

P3

P3

P2 P2

2X12 BLOCKING @ 24"

O.C., (2) BAYS EA SIDE OF

OFFICE PARTITIONS, TYP

W-3 W-3 W-3

2X12 BLOCKING @ 24"

O.C., (2) BAYS EA SIDE OF

OFFICE PARTITIONS, TYP2X12 BLOCKING @ 24"

O.C., (2) BAYS EA SIDE OF

OFFICE PARTITIONS, TYP

W-3

Existing Granite Bearing Walls

Existing Granite Bearing Walls

TYP. @

BLOCKING

S3.00

TYP.

S3.00

H

P2

P3

H 4W-3

W-3 W-3 W-3

P2 P2 P2 P2

H3 H3

FLOOR PLAN NOTES:

1. THE EXISTING PLANS ARE BASED OFF OF EXISTING DRAWINGS AND FIELD MEASUREMENTS. ALL

DIMENSIONS AND ELEVATIONS SHALL BE FIELD VERIFIED.

2. COORDINATE ALL DIMENSIONS WITH ARCHITECTURAL DRAWINGS.

3. FLOOR FRAMING SHOWN IS FOR FRAMING BELOW SUPPORTING THE CURRENT FLOOR.

4. "P-x" DENOTES POST TYPE. SEE POST SCHEDULE ON THIS SHEET FOR SIZE AND TYPE.

5. "Hx" DENOTES HEADER TYPE. SEE HEADER SCHEDULE ON THIS SHEET FOR SIZE AND TYPE.

6. "W-x" DENOTES WALL TYPE. SEE WALL SCHEDULE ON THIS SHEET FOR SIZE, SPACING, AND FASTENING

REQUIREMENTS.

7. PROVIDE SIMPSON MGU5.5 HANGER AT PSL BEAM TO BEAM CONNECTION LOCATIONS.

8. SEE DETAIL xxxxx FOR TYPICAL FASTENING OF EXISTING FLOOR JOIST TO NEW SUPPORTS.

9. DIMENSIONS TO NEW SUPPORTS ARE APPROXIMATE. FIELD SHIFTING IS ALLOWABLE TO AVOID UTILITIES.

10. SHIMMING IS ALLOWABLE WHERE REQUIRED TO AVOID UTILITES. VERIFY HEADER AND WALL HEIGHTS IN

FIELD.

11/S3.00

WALL SCHEDULE

WALL

MARK

STUDS TOP PLATE BOTTOM PLATE

W-1 OPTION 1: 2x6 @ 16" O.C.

OPTION 2: (2) 2x4 @ 24" O.C.

DOUBLE 2x

MATCH STUD WIDTH

SINGLE 2x

MATCH STUD WIDTH

W-3 2x6 @ 16" O/C DOUBLE 2x6 SINGLE 2x6

W-2 OPTION 1: 2x6 @ 16" O.C.

OPTION 2: (2) 2x4 @ 16" O.C.

DOUBLE 2x

MATCH STUD WIDTH

SINGLE 2x

MATCH STUD WIDTH

NOTES:

1. ALL WOOD BEARING WALLS, SHALL BE BLOCKED AND SHEATHED W/ 1/2" PLYWOOD, ONE

SIDE.

2. SHEATHING SHALL BE FASTENED WITH 8d NAILS AT 6" O.C. AT ALL PANEL EDGES, AND 8d

NAILS AT 12" O.C. ALONG INTERMEDIATE FRAMING MEMBERS.

3. SEE DETAIL FOR WALL PANEL LAYOUT.

4. AT SILL TO CONCRETE CONNECTIONS, PROVIDE TITAN HD 1/2" W/ 3 1/4" EMBED AT 32" O.C.

5. AT SILL TO WOOD FLOOR CONNECTIONS, PROVIDE SIMPSON SDS 1/4x6" SCREW AT 16" O.C.

3/S3.00 N

355 Research Parkway Meriden, CT 06450

(203) 630-1406

(203) 630-2615 Fax

Project No.:

Date:

Reviewed:

Drawn:

Designed:

Title:

Sheet No.

© 2022 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.

Issued for:

TRUE NORTH

C o m p a n ie s

A rc h it e c tu re

E n g in e e ri n g

E n v ir o n m e n ta l

La n d S u rv e y in g

C U s e rs \K

P itz e r\

D o c u m e n ts

\r e v it_ lo c a l\

U R

I_ W a s h b u rn H a ll_

S tr u c t_

R k p it z e rP D

M

L .r v t

/2

/2

:2 :3

P

M

S1.01

FIRST FLOOR FRAMING

PLAN

2503449

10/21/2026

JRM

JRM

KJP

B

R

IA

R L

A N

E K

IN

G

S

TO

N , R

H O

D E

IS

LA

N D

U R

I - W

A S

H B

U R

N H

A

LL

BID

R E

V

IS

IO

N

S

N O

D A

T E

D E

S C

R

IP

T

IO

N

1/4" = 1'-0"

STRUCTURAL FIRST FLOOR FRAMING PLAN

HEADER SCHEDULE

HEADER MARK HEADER TYPE

H1 3.5x7 PARALLAM PSL 2.0E

H3 5.25x7 PARALLAM PSL 2.0E

H4 5.25x14 PARALLAM PSL 2.0E

POST SCHEDULE

MARK SIZE TYPE

P1 (2)-2x6 DF #2

P2 (3)-2x6 DF #2

P3 5 1/4x5 1/4 PSL

POST SCHEDULE NOTES:

1. PROVIDE SIMPSON PB66 POST BASES, OR EQUIVALENT, AT P3

POSTS.

2. PROVIDE SIMPSON CC66 POST CAPS, OR EQUIVALENT, AT P3

POSTS.

3. OPTION TO SUBSTITUTE P1 W/ (3)-2x4 WHERE 2X4 WALL OPTION

IS SELECTED.

4. OPTION TO SUBSTITUTE P2 W/ (4)-2x4 WHERE 2X4 WALL OPTION

IS SELECTED.

(E

2x

4" O

.C

(E

2x

4" O

.C

(E

2x

4" O

.C

(E

2x

4" O

.C

(E

2x

4" O

.C

(E

2x

4" O

.C

(E

2x

4" O

.C

S2.00

S2.00

H1 H1 H1 H1 H1 H1

P1P1 P1 P1 P1 P2 P2 P1 P1 P1 P1 P1

H4

W-2

W-2

W-2 W-2 W-2 W-2W-2 W-2

P1

2X12 BLOCKING @ 24"

O.C., (2) BAYS EA SIDE OF

OFFICE PARTITIONS, TYP

Existing Granite Bearing Walls

Existing Granite Bearing Walls

S3.00

TYP.

S3.00

TYP.

WALL SCHEDULE

WALL

MARK

STUDS TOP PLATE BOTTOM PLATE

W-1 OPTION 1: 2x6 @ 16" O.C.

OPTION 2: (2) 2x4 @ 24" O.C.

DOUBLE 2x

MATCH STUD WIDTH

SINGLE 2x

MATCH STUD WIDTH

W-3 2x6 @ 16" O/C DOUBLE 2x6 SINGLE 2x6

W-2 OPTION 1: 2x6 @ 16" O.C.

OPTION 2: (2) 2x4 @ 16" O.C.

DOUBLE 2x

MATCH STUD WIDTH

SINGLE 2x

MATCH STUD WIDTH

NOTES:

1. ALL WOOD BEARING WALLS, SHALL BE BLOCKED AND SHEATHED W/ 1/2" PLYWOOD, ONE

SIDE.

2. SHEATHING SHALL BE FASTENED WITH 8d NAILS AT 6" O.C. AT ALL PANEL EDGES, AND 8d

NAILS AT 12" O.C. ALONG INTERMEDIATE FRAMING MEMBERS.

3. SEE DETAIL FOR WALL PANEL LAYOUT.

4. AT SILL TO CONCRETE CONNECTIONS, PROVIDE TITAN HD 1/2" W/ 3 1/4" EMBED AT 32" O.C.

5. AT SILL TO WOOD FLOOR CONNECTIONS, PROVIDE SIMPSON SDS 1/4x6" SCREW AT 16" O.C.

3/S3.00

FLOOR PLAN NOTES:

1. THE EXISTING PLANS ARE BASED OFF OF EXISTING DRAWINGS AND FIELD MEASUREMENTS. ALL

DIMENSIONS AND ELEVATIONS SHALL BE FIELD VERIFIED.

2. COORDINATE ALL DIMENSIONS WITH ARCHITECTURAL DRAWINGS.

3. FLOOR FRAMING SHOWN IS FOR FRAMING BELOW SUPPORTING THE CURRENT FLOOR.

4. "P-x" DENOTES POST TYPE. SEE POST SCHEDULE ON THIS SHEET FOR SIZE AND TYPE.

5. "Hx" DENOTES HEADER TYPE. SEE HEADER SCHEDULE ON THIS SHEET FOR SIZE AND TYPE.

6. "W-x" DENOTES WALL TYPE. SEE WALL SCHEDULE ON THIS SHEET FOR SIZE, SPACING, AND FASTENING

REQUIREMENTS.

7. PROVIDE SIMPSON MGU5.5 HANGER AT PSL BEAM TO BEAM CONNECTION LOCATIONS.

8. SEE DETAIL xxxxx FOR TYPICAL FASTENING OF EXISTING FLOOR JOIST TO NEW SUPPORTS.

9. DIMENSIONS TO NEW SUPPORTS ARE APPROXIMATE. FIELD SHIFTING IS ALLOWABLE TO AVOID UTILITIES.

10. SHIMMING IS ALLOWABLE WHERE REQUIRED TO AVOID UTILITES. VERIFY HEADER AND WALL HEIGHTS IN

FIELD.

11/S3.00

N

355 Research Parkway Meriden, CT 06450

(203) 630-1406

(203) 630-2615 Fax

Project No.:

Date:

Reviewed:

Drawn:

Designed:

Title:

Sheet No.

© 2022 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.

Issued for:

TRUE NORTH

C o m p a n ie s

A rc h it e c tu re

E n g in e e ri n g

E n v ir o n m e n ta l

La n d S u rv e y in g

C U s e rs \K

P itz e r\

D o c u m e n ts

\r e v it_ lo c a l\

U R

I_ W a s h b u rn H a ll_

S tr u c t_

R k p it z e rP D

M

L .r v t

/2

/2

:2 :3

P

M

S1.02

SECOND FLOOR FRAMING

PLAN

2503449

10/21/2026

JRM

JRM

KJP

B

R

IA

R L

A N

E K

IN

G

S

TO

N , R

H O

D E

IS

LA

N D

U R

I - W

A S

H B

U R

N H

A

LL

BID

R E

V

IS

IO

N

S

N O

D A

T E

D E

S C

R

IP

T

IO

N

1/4" = 1'-0"

STRUCTURAL SECOND FLOOR FRAMING PLAN

HEADER SCHEDULE

HEADER MARK HEADER TYPE

H1 3.5x7 PARALLAM PSL 2.0E

H3 5.25x7 PARALLAM PSL 2.0E

H4 5.25x14 PARALLAM PSL 2.0E

POST SCHEDULE

MARK SIZE TYPE

P1 (2)-2x6 DF #2

P2 (3)-2x6 DF #2

P3 5 1/4x5 1/4 PSL

(E

2x

4" O

.C

(E

2x

4" O

.C

(E

2x

4" O

.C

(E

2x

4" O

.C

(E

2x

4" O

.C

(E

2x

4" O

.C

(E

2x

4" O

.C

S2.00

S2.00

Existing Granite Bearing Walls

Existing Granite Bearing Walls

1' -0

T

Y P

2x

2x

2x

2x

2x

2x

S

IS

T E

R E

D

S

IS

T E

R E

D

S

IS

T E

R E

D

S

IS

T E

R E

D

S

IS

T E

R E

D

S

IS

T E

R E

D

S3.00

TYP.

WALL SCHEDULE

WALL

MARK

STUDS TOP PLATE BOTTOM PLATE

W-1 OPTION 1: 2x6 @ 16" O.C.

OPTION 2: (2) 2x4 @ 24" O.C.

DOUBLE 2x

MATCH STUD WIDTH

SINGLE 2x

MATCH STUD WIDTH

W-3 2x6 @ 16" O/C DOUBLE 2x6 SINGLE 2x6

W-2 OPTION 1: 2x6 @ 16" O.C.

OPTION 2: (2) 2x4 @ 16" O.C.

DOUBLE 2x

MATCH STUD WIDTH

SINGLE 2x

MATCH STUD WIDTH

NOTES:

1. ALL WOOD BEARING WALLS, SHALL BE BLOCKED AND SHEATHED W/ 1/2" PLYWOOD, ONE

SIDE.

2. SHEATHING SHALL BE FASTENED WITH 8d NAILS AT 6" O.C. AT ALL PANEL EDGES, AND 8d

NAILS AT 12" O.C. ALONG INTERMEDIATE FRAMING MEMBERS.

3. SEE DETAIL FOR WALL PANEL LAYOUT.

4. AT SILL TO CONCRETE CONNECTIONS, PROVIDE TITAN HD 1/2" W/ 3 1/4" EMBED AT 32" O.C.

5. AT SILL TO WOOD FLOOR CONNECTIONS, PROVIDE SIMPSON SDS 1/4x6" SCREW AT 16" O.C.

3/S3.00

FLOOR PLAN NOTES:

1. THE EXISTING PLANS ARE BASED OFF OF EXISTING DRAWINGS AND FIELD MEASUREMENTS. ALL

DIMENSIONS AND ELEVATIONS SHALL BE FIELD VERIFIED.

2. COORDINATE ALL DIMENSIONS WITH ARCHITECTURAL DRAWINGS.

3. FLOOR FRAMING SHOWN IS FOR FRAMING BELOW SUPPORTING THE CURRENT FLOOR.

4. "P-x" DENOTES POST TYPE. SEE POST SCHEDULE ON THIS SHEET FOR SIZE AND TYPE.

5. "Hx" DENOTES HEADER TYPE. SEE HEADER SCHEDULE ON THIS SHEET FOR SIZE AND TYPE.

6. "W-x" DENOTES WALL TYPE. SEE WALL SCHEDULE ON THIS SHEET FOR SIZE, SPACING, AND FASTENING

REQUIREMENTS.

7. PROVIDE SIMPSON MGU5.5 HANGER AT PSL BEAM TO BEAM CONNECTION LOCATIONS.

8. SEE DETAIL xxxxx FOR TYPICAL FASTENING OF EXISTING FLOOR JOIST TO NEW SUPPORTS.

9. DIMENSIONS TO NEW SUPPORTS ARE APPROXIMATE. FIELD SHIFTING IS ALLOWABLE TO AVOID UTILITIES.

10. SHIMMING IS ALLOWABLE WHERE REQUIRED TO AVOID UTILITES. VERIFY HEADER AND WALL HEIGHTS IN

FIELD.

11/S3.00

N

355 Research Parkway Meriden, CT 06450

(203) 630-1406

(203) 630-2615 Fax

Project No.:

Date:

Reviewed:

Drawn:

Designed:

Title:

Sheet No.

© 2022 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.

Issued for:

TRUE NORTH

C o m p a n ie s

A rc h it e c tu re

E n g in e e ri n g

E n v ir o n m e n ta l

La n d S u rv e y in g

C U s e rs \K

P itz e r\

D o c u m e n ts

\r e v it_ lo c a l\

U R

I_ W a s h b u rn H a ll_

S tr u c t_

R k p it z e rP D

M

L .r v t

/2

/2

:2 :3

P

M

S1.03

THIRD FLOOR FRAMING

PLAN

2503449

10/21/2026

JRM

JRM

KJP

B

R

IA

R L

A N

E K

IN

G

S

TO

N , R

H O

D E

IS

LA

N D

U R

I - W

A S

H B

U R

N H

A

LL

BID

R E

V

IS

IO

N

S

N O

D A

T E

D E

S C

R

IP

T

IO

N

1/4" = 1'-0"

STRUCTURAL THIRD FLOOR FRAMING PLAN

POST SCHEDULE

MARK SIZE TYPE

P1 (2)-2x6 DF #2

P2 (3)-2x6 DF #2

P3 5 1/4x5 1/4 PSL

HEADER SCHEDULE

HEADER MARK HEADER TYPE

H1 3.5x7 PARALLAM PSL 2.0E

H3 5.25x7 PARALLAM PSL 2.0E

H4 5.25x14 PARALLAM PSL 2.0E

FOUNDATION

-11' - 0"

FOUNDATION

-11' - 0"

ATTIC

33' - 0"

ATTIC

33' - 0"

3RD FLOOR

22' - 0"

3RD FLOOR

22' - 0"

2ND FLOOR

11' - 0"

2ND FLOOR

11' - 0"

1ST FLOOR

0' - 0"

1ST FLOOR

0' - 0"

GRADE

-6' - 0"

GRADE

-6' - 0"

BEARING WALL, SEE PLAN

HEADER, SEE PLAN

NEW FOOTING,

SEE PLAN

HEADER, SEE PLAN

POST, SEE PLAN

NEW FOOTING,

SEE PLAN

S3.00

8S3.00

NEW SISTERED JOIST, SEE PLAN

FOR SIZE AND LOCATIONS

S3.00

FOUNDATION

-11' - 0"

FOUNDATION

-11' - 0"

ATTIC

33' - 0"

ATTIC

33' - 0"

3RD FLOOR

22' - 0"

3RD FLOOR

22' - 0"

2ND FLOOR

11' - 0"

2ND FLOOR

11' - 0"

1ST FLOOR

0' - 0"

1ST FLOOR

0' - 0"

GRADE

-6' - 0"

GRADE

-6' - 0"

BEARING WALL, SEE PLAN

HEADER, SEE PLAN

BEARING WALL, SEE PLAN

HEADER, SEE PLAN

JOIST BLOCKING,

SEE PLAN

JOIST BLOCKING,

SEE PLAN

NEW FOOTING, SEE PLAN

HEADER, SEE PLAN

SECTION NOTES:

1. DRAWINGS ARE BASED OFF OF EXISTING DRAWINGS AND FIELD MEASUREMENTS. ALL DIMENSIONS AND

ELEVATIONS SHALL BE FIELD VERIFIED.

2. COORDINATE ALL DIMENSIONS WITH ARCHITECTURAL DRAWINGS.

3. SEE GENERAL NOTES ON SHEET S0.01

355 Research Parkway Meriden, CT 06450

(203) 630-1406

(203) 630-2615 Fax

Project No.:

Date:

Reviewed:

Drawn:

Designed:

Title:

Sheet No.

© 2022 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.

Issued for:

C o m p a n ie s

A rc h it e c tu re

E n g in e e ri n g

E n v ir o n m e n ta l

La n d S u rv e y in g

C U s e rs \K

P itz e r\

D o c u m e n ts

\r e v it_ lo c a l\

U R

I_ W a s h b u rn H a ll_

S tr u c t_

R k p it z e rP D

M

L .r v t

/2

/2

:2 :3

P

M

S2.00

STRUCTURAL SECTIONS

2503449

10/21/2026

JRM

KJP

KJP

B

R

IA

R L

A N

E K

IN

G

S

TO

N , R

H O

D E

IS

LA

N D

U R

I - W

A S

H B

U R

N H

A

LL

BID

1/4" = 1'-0"

SECTION AT OFFICES

1/4" = 1'-0"

SECTION AT OFFICES

R E

V

IS

IO

N

S

N O

D A

T E

D E

S C

R

IP

T

NOTES:

1. CONNECT BUILT-UP POSTS WITH NAILS OR BOLTS TO ALLOW FINISHED

MEMBER TO ACT COMPOSITELY. COMPLY WITH THE REQUIREMENTS OF

THE LATEST EDITION OF THE NDS, BUT IN NO CASE LESS THAN THE

FOLLOWING.

· (2) PLY 2x4: (1) ROW OF STAGGERED 10d COMMON NAILS AT 12" O.C, SPACED AT 11/2" HORIZ. AND 6" VERT. CENTERED ON MEMBER, WITH

ADJACENT NAILS DRIVEN FROM OPPOSITE SIDES OF THE BUILT-UP

MEMBER.

· (2) PLY 2x6: (1) ROW OF STAGGERED 10d COMMON NAILS AT 12" O.C, SPACED AT 21/2" HORIZ. AND 6" VERT. CENTERED ON MEMBER, WITH

ADJACENT NAILS DRIVEN FROM OPPOSITE SIDES OF THE BUILT-UP

MEMBER.

· (3) PLY 2x4: (1) ROW OF STAGGERED 30d COMMON NAILS AT 16" O.C, SPACED AT 11/2" HORIZ. AND 8" VERT. CENTERED ON MEMBER, WITH

ADJACENT NAILS DRIVEN FROM OPPOSITE SIDES OF THE BUILT-UP

MEMBER.

· (3) PLY 2x6: (2) ROWS OF 30d COMMON NAILS AT 8" O.C EA. SIDE, SPACED AT 11/2" HORIZ. FROM EDGE.

· (4) PLY 2x6: (2) ROWS OF SIMPSON SDS25600 SCREWS AT 8" O.C EA.

SIDE, SPACED AT 11/2" HORIZ. FROM EDGE.

2. "+" DENOTES NAIL LOCATIONS DRIVEN FROM BACK FACE OF ADDITIONAL

NAILS WHERE (2) ROWS OF NAILS ARE REQUIRED.

3 PLY 2x4:(1) ROW 30d

COMMON NAILS.

3 PLY 2x6:(2) ROW 30d

COMMON NAILS.

4 PLY 2x6:(2) ROW SDS25600

SCREWS.

5 PLY 2x6:(2) ROW SDS25600

SCREWS.

DRIVE FROM OPPOSITE

SIDE AT STAGGERED

ROWS

0'

1/

2" 0'

6"

0'

6"

0' - 1"

2 1/2" AT 2x6 1 1/2" AT 2x4

0' - 1"

2 PLY: ONE ROW OF

STAGGERED 10d

COMMON NAILS.

0'

8" 0'

8"

0'

1/

2"

0' - 1 1/2"

0' - 1 1/2"

LVL BEAM OR

HEADER

JACK STUDS

STRAP PER CODE IF TOP PLATE

IS NOT CONTINUOUS OVER

HEADER

LVL BEAM

WOOD POST

BELOW

SIMPSON 'CC/ECC'

COLUMN CAP SERIES

WOOD BEAM

NOTE:

2 ROWS OF 16d NAILS @12" OC FOR 9 1/2" DEPTH 3 ROWS OF 16d NAILS @12" OC FOR 11 7/8" DEPTH

3 ROWS OF 1/2" Ø BOLTS @24" OC FOR 16" & 18" DEPTH

3 ROWS OF 16d NAILS @12" OC FOR UP TO 16" DEPTH (TOP LOAD)

(TYPICAL UNLESS OTHERWISE NOTED)

3 ROWS OF 1/2" Ø BOLTS @24" OC, STAGGERED EVERY 8" FOR 20"

DEPTH

WALL BOUNDARY

APA RATED PANEL

NAIL SPACING AT WALL

BOUNDARY AND

SUPPORTED EDGES

NAILING TO INTERMEDIATE

FRAMING MEMBERS

WOOD STUDS

PROVIDE 2x BLOCKING

AT ALL AT PANEL

EDGES, IF PANEL EDGES

DO NOT SPAN TOP TO

BOTTOM

Existing Wall, TO REMAIN

NEW POST, SEE PLAN

Existing Foundation (V.I.F.), TO REMAIN

#5 DOWEL x 12" LONG, DRILL AND

EPOXY TO EXIST. FTG. W/ 6" EMBED

NEW FOOTING, SEE PLAN.

MATCH DEPTH OF EXISTING

FOOTING

Existing Slab, SAW CUT

FOR NEW FOUNDATION

#5 @ 12" O.C., EACH WAY

SAWCUT EXIST. SLAB AT NEW FTG.

DRILL AND EPOXY #5 @ 12"…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .