About this file

This is a Request for Quotation (RFQ) for audio and visual equipment support services for the Med Log Symposium, conducted by the Air Force Medical Command (AFMEDCOM) under FAR Part 13 Simplified Acquisition Procedures. The requirement is a competitive total small business set-aside limited to SBA-certified firms under NAICS code 532490 and PSC W099. The contract will be awarded as a single Firm-Fixed-Price (FFP) Purchase Order using a Best Value Tradeoff (BVTO) methodology, evaluating technical approach and price. The event will be held June 8-12, 2026, at the Sheraton Marriott Hotel in New Orleans, Louisiana, with daily operations from 0730-1700 (general sessions 0730-1200, breakout sessions 1300-1700). Setup must be complete by 1700 on June 8 with all systems fully operational, and teardown begins after event conclusion on June 12.

The critical deadline for questions is 10:00 A.M. Eastern Time on May 26, 2026, with responses posted to GSA eBuy. Quotations must be submitted by 10:00 A.M. ET on May 28, 2026, via email to the Contracting Officer (Capt. Samantha Durlauf) and Contract Specialist (SSgt Luke Tiffany). Quotations must be valid for a minimum of 60 days from submission and organized as two separate files: File 1 containing administrative and technical sections (PDF or MS Word format) and File 2 containing the completed pricing spreadsheet (MS Excel format). The administrative section must include company information, CAGE Code, Unique Entity ID, GSA MAS Contract Number confirmation under SIN 561920, authorized point of contact details, and an Organizational Conflict of Interest disclosure. Contractors must coordinate with the hotel regarding access, load-in/load-out, and ensure compatibility with hotel AV systems, with all equipment failures impacting training to be corrected immediately.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION (RFQ)

RFQ1811576

Audio and Visual Equipment Support Services for Med Log Symposium

In support of:

Department of Air Force (AF)

Air Force Medical Command (AFMEDCOM)

Issued to:

SMALL BUSINESS CONTRACTORS

Conducted under Federal Acquisition Regulation (FAR) 13

REQUEST FOR QUOTATION (RFQ)

RFQ1811576

1.0 GENERAL INFORMATION

1.1 Introduction, Background & Purpose.

You are invited to submit a quotation for the Audio and Visual Equipment Support Services for Med Log Symposium on behalf of Air Force Medical Command (AFMEDCOM). This Request for Quotation (RFQ) is a competitive action conducted through SAM.gov in accordance with (IAW) Federal Acquisition Regulation (FAR) Part 13 Simplified Acquisition Procedures (SAP).

This requirement is a competitive total small business set-aside for SBA certified firms under North American Industry Classification System (NAICS) code 532490 and Product Service Code (PSC) W099. Only vendors certified as a small business firm are invited to submit quotations.

Be aware: FAR Part 15 procedures do NOT apply to this acquisition. The Government is not establishing a competitive range, conducting formal "discussions," or requesting "Final Proposal Revisions" (FPRs). The Government intends to evaluate quotations and award without engaging in communications with Quoters. Therefore, Quoters are highly encouraged to submit their best technical and pricing terms in their initial quotation. However, the Government reserves the right to communicate with some, all, or none of the quoters to clarify elements of the quotations, request price discounts, or resolve administrative issues.

The Government intends to award a single Firm-Fixed-Price (FFP) Purchase Order utilizing a Best Value Tradeoff (BVTO) methodology.

PERIOD AND PLACE OF PERFORMANCE

Dates: 8-12 June 2026 Location: Sheraton Marriot Hotel, 500 Canal St, New Orleans, LA 70130

Event Schedule Daily Event Hours: 0730-1700 General Sessions: 0730-1200 Breakout Sessions: 1300-1700

Setup & Teardown:

Setup: Complete by 1700 on 8 Jun 2026, with systems fully operational and available for testing.

Teardown: Begin after the event conclusion on 12 June 2026.

1.2 Government Points of Contact (POCs). The Contracting Officer (CO) and the Contract Specialist (CS) are the sole points of contact for this acquisition. All communication, including questions, shall be submitted in writing via email to both POCs listed below.

Contracting Officer Contract Specialist Capt. Samantha Durlauf, 771 ESS/EGA SSgt Luke Tiffany, 771 ESS/EGA Email: samantha.durlauf@us.af.mil Email: luke.tiffany@us.af.mil mailto:samantha.durlauf@us.af.mil mailto:luke.tiffany@us.af.mil

1.3 Critical Deadlines. All times are Eastern Time (ET).

• Questions & Answers. All questions must be submitted by 10:00 A.M. on 26 May 2026.

Responses will be posted to GSA eBuy (www.ebuy.gsa.gov).

• Quotation Submission. Quotations must be submitted by 10:00 A.M. on 28 May 2026.

Quotations received after this deadline will not be considered for award.

1.4 General Terms and Conditions.

• Compliance: The quotation must comply with the terms and conditions of this RFQ. Non-conformance may result in an unfavorable evaluation or the quotation being removed from consideration.

• Discrepancies: If a Quoter believes these instructions contain an error, omission, or ambiguity, they shall immediately notify the Government POCs via email with supporting rationale prior to the quotation deadline.

• Exceptions: Any exceptions to the specific terms and conditions of this RFQ (e.g., the

Statement of Work (SOW) or evaluation criteria) must be clearly identified and explained within the quotation's Cover Letter, detailing the specific RFQ document, page, paragraph, and a complete rationale. The Government reserves the right to deem any quotation containing exceptions unacceptable, which may result in the quote being ineligible for award.

• Quote Validity Period: Quotations must stipulate that the quoted pricing and terms remain valid for a minimum of 60 days from the date of submission.

1.5. PERFORMANCE STANDARDS & ACCEPTANCE

• All AV systems must be fully functional before each day’s sessions

• Equipment failures impacting training must be corrected immediately

• Services will be considered acceptable when:

o All equipment is installed as specified in this SOW o Systems operate without disruption during sessions o Equipment is removed, and space is restored post-event

1.6. OPERATING CONSTRAINTS

• The Contractor shall coordinate with the Sheraton Marriot Hotel regarding access, load-in/load-out, and house AV integration

• The Contractor is responsible for ensuring compatibility with hotel systems.

http://www.ebuy.gsa.gov/

2.0 QUOTATION PREPARATION & SUBMISSION INSTRUCTIONS.

2.1 General Submission Instructions.

To ensure uniformity and streamline the evaluation process, Quotations shall be formatted for standard 8.5 x 11-inch paper with pages numbered consecutively. The Government will not evaluate any pages that exceed the stated page limits. Tables of Contents will not count against any stated page limits. Quotations must be submitted via email to the POCs identified in Section

1.2 prior to the deadline established in Section 1.3.

Quoters shall submit their entire quotation in a maximum of two (2) separate electronic files, formatted and organized exactly as follows:

Table 1. Quotation Organization.

File Name Quotation Section Format

File 1: Non-Price Quotation Part I: Administrative PDF or MS Word Part II: Technical Approach with Equipment List

PDF or MS Word

File 2: Price Quotation Part III: Price Attachment 2 MS Excel

Any submissions containing more than two files or formatted as separate "Volumes" in individual documents may be deemed non-conforming.

2.2. Detailed Part Instructions.

2.2.1. Part I: Administrative.

This part shall not contain any technical or pricing information. The Administrative part shall consist of a Cover Letter providing the following information:

• Company Name, Address, and Date of Submission

• CAGE Code and Unique Entity ID (UEI)

• GSA MAS Contract Number and confirmation of award under SIN 561920

• Name, phone number, and email address of the Quoter’s authorized POC

• A statement confirming the Quote Validity Period is a minimum of 120 days from the submission deadline, as required by Section 1.4

• A clear identification and explanation of any exceptions taken to the terms and conditions of this RFQ, as required by Section 1.4 (if applicable)

• Organizational Conflict of Interest (OCI) Disclosure: Quoters must include a statement that either: (a) affirmatively declares that, after due inquiry, no actual or potential OCI exists for the quoter or any teaming partners in relation to this requirement; or (b) discloses all relevant facts concerning any actual or potential OCI. If a potential OCI is disclosed, the Government reserves the right to require an OCI Mitigation Plan. Failure to submit a requested Mitigation Plan may render the quotation ineligible for award.

2.2.2 Part II: Technical Approach & Equipment List

Description of how the services will be executed including a list of equipment to be used during the event.

2.2.3. Part III: Price Quotation. The Quoter shall complete and submit the Government-provided Pricing Spreadsheet (Attachment 2).

3.0 EVALUATION METHODOLOGY

3.1 Basis for Award.

The Government intends to award a single Firm-Fixed-Price (FFP) Purchase Order to the responsible Quoter whose quotation conforms to the RFQ requirements and represents the best value to the Government. This is a SAP procurement conducted under FAR Part 13; therefore, the formal source selection procedures of FAR Part 15 do NOT apply.

3.2 Best Value Tradeoff (BVTO) Process.

Award will be made utilizing a Best Value Tradeoff (BVTO) methodology. The Government may elect to award to other than the lowest-priced Quoter, or other than the highest technically rated Quoter, where the perceived benefits of a higher technically rated quotation merit the additional price. The Government will evaluate the following factors:

Factor 1: Technical Evaluation

Factor 2: Price

4.0 LIST OF ATTACHMENTS.

The following documents are attached to and made a part of this Request for Quote (RFQ). Quoters are responsible for reviewing all attachments prior to submitting a quotation.

Table 2. List of RFQ Attachments.

Attachment # Document Title Note / Action Required by Quoter

1 Statement of Work (SOW) Read Only - Defines the scope requirements.

2 Pricing Schedule Action Required - Complete and submit as File 2 (Price Quotation).

3 Provisions & Clauses Action Required – Fill applicable clauses and submit with quote.

4 Questions & Answers Read Only

1.0 GENERAL INFORMATION
1.1 Introduction, Background & Purpose.
1.2 Government Points of Contact (POCs).
1.3 Critical Deadlines. All times are Eastern Time (ET).
1.4 General Terms and Conditions.
2.0 QUOTATION PREPARATION & SUBMISSION INSTRUCTIONS.
2.1 General Submission Instructions.
2.2. Detailed Part Instructions.
2.2.1. Part I: Administrative.
2.2.3. Part III: Price Quotation.
3.0 EVALUATION METHODOLOGY
3.1 Basis for Award.
3.2 Best Value Tradeoff (BVTO) Process.

4.0 LIST OF ATTACHMENTS.

File details come from the government source that posted it. Updated .