The document is a Request for Quotation (RFQ) issued by the Oregon Department of State Lands for the Wasson Creek Boardwalk project at the South Slough National Estuarine Research Reserve in Coos Bay, Oregon. The project involves constructing a boardwalk on 38 previously installed helical piles and regrading 150-200 feet of existing trail, with the goal of restoring public access to the Wasson Creek Valley as part of the Wasson Ridgetop to Estuary Restoration Project. Bids are due by June 10, 2025, at 10AM PST, with an in-water work period from July 1 to September 15, 2025, and a project completion date of November 15, 2025.
The RFQ specifies unique requirements for the sensitive wetland construction site, including no heavy equipment in the wetland, strict containment of debris, compliance with an Inadvertent Discovery Plan, and limitation of removal/fill to less than 50 cubic yards. Contractors will be evaluated on a 100-point scale, with 40 points allocated to cost, 25 points for demonstrating experience with similar projects in sensitive waterways, 20 points for project scheduling, and 15 points for references. All permanently installed materials must be made in the US, and contractors must hold a valid Oregon Contractor's License. Prevailing wage rates apply for contracts valued over $50,000, and contractors must submit a separate price proposal along with project references, a draft schedule, and a list of subcontractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attchment C Phase 2 Construction Set.pdf | ||
| Trail.jpg | JPG image | |
| helical piles.jpg | JPG image | |
| helical piles2.jpg | JPG image | |
| Attach A Wasson Creek updated IDP_2024.pdf | ||
| Exhibit A Specifications~3.docx | DOCX document | |
| TH and shed Looking East.jpg | JPG image | |
| TH and shed looking West.jpg | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTN: Michelle Johnson Phone:503-986-5261 Dept of State Lands 775 Summer St NE Suite 100 Salem, OR 97301
REQUEST FOR QUOTATION
***THIS IS NOT AN ORDER******
Return Bid To: Michelle Johnson, Contract Officer michelle.j.johnson@dsl.oregon.gov no later than June 10, 2025, by 10AM PST.
Description: Install boardwalk at Wasson Creek Watershed in Coos Bay, Oregon.
South Slough National Estuarine Research Reserve
Availability Date: Upon executed contract.
Contact for project: Juliana Ruble – 971-493-2898
Vendor Name: ________________________________Federal ID No:_____________________
Address:______________________________________ Phone:__________________________
City, State, Zip:_____________________________________ Fax:________________________
All Pricing Must Be Held Firm For 30 Days
As part of the Wasson Ridgetop to Estuary Restoration Project, the public access to the Wasson Valley was altered. This boardwalk project will restore public trail access to the Wasson Creek Valley. The project coupled with new trail development currently in construction will increase accessibility in the South Slough trail system. HGE architects was contracted in 2023 to design the boardwalk. In 2024, 38 helical piles were installed in the wetland in preparation for the boardwalk construction.
The construction project will provide an accessible boardwalk for the public to walk above the wetland area to view the Wasson Creek Valley and the restoration work occurring there. The boardwalk connects to an existing South Slough hiking trail.
The Department of State Lands requests for quote is for the construction and installation of the Wasson boardwalk on the existing helical piles in the Wasson Creek Valley.
Specifications:
Construct the Wasson boardwalk on the existing helical piles in the Wasson Creek Valley and regrade 150’-200’ of the existing trail leading up to the boardwalk per the HGE drawings and specifications.
PREVAILING WAGE RATES: Pursuant to ORS 279C.800 through 279C.870, the Contractor and all subcontractors are required to pay Prevailing Wage Rates for any contract valued at more than $50,000
Existing Site Conditions:
• Access is limited to 6’ wide down a trail to the construction site
• There is very limited staging available and the access road to the trail head is single lane, gravel road with some wide spots for turning around.
RFQ- Wasson Creek Boardwalk
• Preserve and protect existing shed on the National Historic Registry and all trees along the trail
• All locations and elevations of the existing helical piles needs to be field verified
• There is a Trimble benchmark nearby in the Wasson Valley that can be used with a total station for verifying elevations
• The west and east ends of the trail regrade area must be transitioned smoothly back into the existing trail
Unique Requirements:
• The construction of the boardwalk occurs over a sensitive wetland area. Contractor is responsible for providing containment and ensuring that no debris (wood, shavings, screws, plastic, fluids, etc.)
contact the waters of the state.
• No heavy equipment in the wetland area
• There is an Inadvertent Discovery Plan for the Wasson Creek Valley. Contractor must comply with and have the IDP onsite at all times.
• Contractor must limit removal/fill to less than 50 cu yds in the wetland area
• All permanently installed materials must be made in the US.
• All work impacting wetland must be completed during in water work period
Quote requirements:
• Descriptions of similar projects especially over sensitive waterways
• List of Project References (minimum of 3)
• Draft Project Schedule
• List of Subcontractors (if any)
• Oregon Contractor’s License
• Price proposal to be submitted separately
Evaluation Criteria
Proposal demonstrates previous work on similar types of projects especially over sensitive waterways
References validate good previous project performance
Proposal includes a draft schedule demonstrating the interim and final completion dates can be met
Cost 40
Total Points Possible: 100
In-Water Work Period: July 1 – September 15, 2025 Substantial Completion Date: September 15, 2025 Project Completion Date: November 15, 2025
Attachments:
• Attachment A: Wasson IDP
• Attachment B: Pictures of site and helical piles
• Attachment C: Drawings and Sheet Specifications