About this file
This is a background and qualifications document for a Request for Qualifications (RFQ) issued by the City of Bradenton Department of Public Works for Construction Manager at Risk (CMAR) services. The City of Bradenton seeks to relocate and consolidate its Public Works and Utilities facilities from an existing site that is being displaced by expansion of an adjacent spring training complex. The new facility will be located on a City-owned parcel near Tropicana at 1706 9th Street East, Bradenton, Florida, encompassing approximately 28 acres bounded by 9th Street East, U.S. 41, and U.S. 301. The project site is designated as a Brownfield and will serve as a modern, consolidated campus for the City's public works operations, designed to support long-term growth and infrastructure needs for the next 50 years. Primary site access will be from 9th Street East, with egress to U.S. 41 and an emergency exit across an adjacent railway requiring a cross-access agreement with Tropicana.
Proposers must be Florida-licensed Certified General Contractors at the time of submittal and must possess demonstrated experience providing Construction Management Services. Specific qualifications required include completion of a minimum of two large-scale facilities and two site development projects in Southwest Florida within the past five years, Florida Stormwater, Erosion, and Sedimentation Control Inspector certification from FDEP, and demonstrated knowledge of Florida Generic Permit requirements and Best Management Practices. Proposers must guarantee continuity of services throughout all project phases and submit a maximum of five comparable projects completed within the past ten years, including project references, dates, budgets, and actual costs to demonstrate capabilities, project management techniques, and lessons learned.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.0 BACKGROUND
The City of Bradenton Department of Public Works is undertaking a master plan to establish a new, modern Public Works and Utilities Facility. This initiative is driven by the need to relocate the existing facility, which is being displaced by the ongoing expansion of the adjacent spring training complex. The expansion requires additional land and infrastructure, making continued operations at the current site no longer feasible. The new facility represents an opportunity not only to relocate but also to consolidate the City ’s previously dispersed service operations into a single, efficient campus.
The proposed site encompasses approximately 28 acres, bounded by 9th Street East to the east, U.S. 41 to the west, and U.S. 301 to the south. This property is designated a Brownfield. The plan envisions relocating and expanding the facilities to meet the City ’s current and future operational needs. The existing Public Works facility is at the end of its service life, with outdated infrastructure and insufficient space for staff, equipment, and materials —conditions that hinder efficiency and growth. Primary access to the site will be from 9th Street East, with egress provided to U.S. 41 near Shepard ’s Red Barn Ltd. An emergency exit is proposed across the adjacent railway, requiring a cross-access agreement with Tropicana. This exit would utilize an existing roadway and railway gate to support emergency operations. This project sets the foundation for a resilient, efficient, and consolidated Public Works and Utilities campus that supports the City ’s long-term growth and infrastructure needs for the next 50 years.
2.0 QUALIFICATIONS
2.1 The Proposer must be a Certified General Contractor (CGC) licensed from the State of Florida, Department of Business and Professional Regulations at the time of submittal.
2.2 The Proposer must have experience providing Construction Management Services.
2.3 Necessary Qualifications
2.3.1 Proposer must demonstrate experience in the construction of a minimum of two (2) large scale facilities in Southwest Florida within the past five (5) years.
2.3.2 Proposer must demonstrate experience in the construction of a minimum of two (2) site development projects in Southwest Florida within the past five (5) years.
2.3.3 Proposer must guarantee continuity of services for all phases of the project.
2.3.4 Proposer must possess Florida Stormwater, Erosion, and Sedimentation Control (FSESCI) Inspector certification from FDEP.
2.3.5 Proposal must demonstrate understanding of Florida Generic Permit (CGP) for large and small construction activities.
2.3.6 Proposal must demonstrate knowledge of Best Management Practices (BMP’s) and practical application of BMP’s, site stabilization techniques, and pollution prevention on construction sites.
Experience & Capabilities Provide a maximum of five (5) projects that have been completed within the past ten (10) years for considerations that are similar in size and scope. Projects submitted should demonstrate the experience of the Proposer, sub-contractors, and current team members who may have worked for other firms on similar projects and provide detailed information regarding the Proposer’s capabilities, project management techniques and project controls, and provide any lessons learned on similar projects. Projects submitted should also include project reference name and telephone number, project start date, scheduled end date and actual end date, project budget and actual cost.