Corrugated Fiber Boxes IAW Special Packaging Instruction (SPI) for DLA Distribution Oklahoma City, OK.
Solicitation number
SP330026Q5002
Issued by

About this file

This is a Request for Quote (RFQ) issued by DLA Distribution Acquisition Operations for a Fixed Price Requirements Contract to procure Special Packaging Instruction (SPI) Corrugated Fiber Boxes. The solicitation is a 100% Small Business Set-Aside with NAICS code 322211 and a size standard of 1,250 employees. The contract will have a one-year base period with four one-year option periods, anticipated to run from 15 December 2025 through 14 December 2029, with delivery orders to be issued by DLA Distribution for corrugated fiber boxes used for blade packing.

Key requirements include delivering boxes within 21 calendar days (maximum 30 days) of receiving a delivery order, with first article testing required to validate product specifications. The government will evaluate quotes using a lowest price, technically acceptable approach, considering technical capability, past performance, and total price across all contract line items and option years. Contractors must be registered in the System for Award Management (SAM), provide supply chain traceability documentation, and comply with various federal acquisition regulations regarding small business representation, product origin, and telecommunications equipment restrictions.

View the file

Other files

File Type Posted
Amendment 0004.pdf PDF
Attachment 01 - Schedule of Supplies 12.12.2025.xlsx XLSX spreadsheet
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
OC8400001 Latest Rev 12.9.2025.pdf PDF
Amendment 0001.pdf PDF
Attachment 01 - Schedule of Supply and Services.xlsx XLSX spreadsheet
Attachment 02 - Special Packaging Instructions (SPI).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SP330026Q5002

NOTICE TO OFFERORS

1. Issuing Office:

DLA Distribution Acquisition Operations (J7)

430 Mifflin Avenue, Suite 3102A

New Cumberland, PA 17070-5008

2. This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with the format in the Federal Acquisition Regulations (FAR) Subpart 12.6 – Streamlined

Procedures for Evaluation and Solicitation for Commercial Products and Commercial Services in conjunction with FAR Subpart 13.5 - Simplified Procedures for Certain Commercial Products and Commercial Services.

This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation will not be issued. This is a Request for Quote (RFQ) and the RFQ number is SP330026Q5002.

3. This notice incorporates provisions and clauses in effect under:

REGULATION IDENTIFICATION EFFECTIVE DATE

Federal Acquisition Regulations 2025-06 01 October 2025

Defense Federal Acquisition Regulation

Supplement (DFARS) DFARS Publication

Notice (DPN)

20251110 10 November 2025

Defense Logistics Acquisition Directive

(DLAD) Current to Revision 5 through

PROCLTR

2026-01 06 November 2025

The complete text of any of the clauses and provisions are available electronically from the following sites:

FAR - https://www.ecfr.gov/current/title-48/chapter-1

DFARS - https://www.acq.osd.mil/dpap/dars/dfarspgi/current/

DLAD - https://www.dla.mil/HQ/Acquisition/Policy-and-Directives/

4. This Request for Quotation (RFQ) is being issued to establish a Fixed Price (FP) w/Economic Price Adjustment (EPA) Requirements Contract, with Firm-Fixed Price (FFP) delivery orders, for Special Packaging Instruction (SPI) Corrugated Fiber Boxes as described in the Schedule of Supplies & Services (Attachment 1) and in accordance the Special Packaging Instruction (Attachment 02).

5. The Government intends to award one (1) contract as a result of this RFQ and will be issued on Standard Form (SF) 1449. This acquisition is NOT a Defense Priorities and Allocations System (DPAS) rated procurement.

6. This RFQ is being solicited as a 100% Small Business Set-Aside. The North American Industry Classification System (NAICS) code for this project is 322211 Corrugated and Solid Fiber Box Manufacturing and the size standard is 1,250 Employees. The Product or Service Code (PSC) for this acquisition is 8115.

7. PERIOD OF PERFORMANCE: The period of performance for this contract action will be established for a one-year base period, with four one-year option periods. The estimated period of performance for this contract will begin on or around the following:

Base Year: 15 December 2025 – 14 December 2026

Option Year One: 15 December 2026 – 14 December 2027

Option Year Two: 15 December 2026 – 14 December 2027

Option Year Three: 15 December 2026 – 14 December 2027

Option Year Four: 15 December 2026 – 14 December 2027 https://www.ecfr.gov/current/title-48/chapter-1 https://www.acq.osd.mil/dpap/dars/dfarspgi/current/ https://www.dla.mil/HQ/Acquisition/Policy-and-Directives/

The Government reserves the rights to exercise the option year(s) in accordance with FAR 52.217-9 – Option to

Extend the Term of the Contract.

8. DELIVERY INFORMATION:

DoDAAC: SW3211

DLA DISTRIBUTION OKLAHOMA CITY, OKLAHOMA

CEN REC 3301 F AVE, BLDG 506 DR 22

TINKER AFB, OKLAHOMA 73145-8000

M/F BUILDING 18 DOOR 17

FOB point shall be Destination.

9. DELIVERY ORDERS: This contract is only for use by DLA Distribution. All delivery orders will be issued via email by any DLA Distribution contracting officer or ordering officer. Delivery orders will be issued on a FFP basis.

10. DELIVERY ORDER LEAD TIME: The Government desires delivery of the item(s) identified on delivery orders within 21 calendar days after the contractor receives a delivery order. The Government requires delivery of the item(s) identified on the delivery order within 30 calendar days after receipt of a delivery order.

11. PROOF OF DELIVERY: Acceptable Proof of Delivery documents include: Shipping Documentation;

Materials Inspection and Receiving Report (DD250), Bill of Lading, Packing List, Tracking/Delivery

Confirmation or Invoice. To ensure prompt payment to your company, the Proof of Deliveries must include the following:

• Contract number or original document number

• Delivery Order number (as applicable)

• Contract Line-Item Number (CLIN) / Material Number

• Specific quantity shipped in reference to quantity ordered

• Printed name and signature of an authorized Government employee

12. PACKING AND MARKING REQUIREMENTS:

A. All shipping containers shall be packaged best commercial practice in accordance with ASTM D3951-10 and marked in accordance with MIL-STD-129R.

B. All shipments shall contain proper shipping documentation. Contractor shall attach a water-resistant envelope containing all mandatory commercial shipping documentation to the exterior of the shipment.

C. Special Marking Requirements. Each shipping container shall have special markings as required by the applicable ASTM guideline(s).

13. SYSTEM FOR AWARD MANAGEMENT (SAM): A prospective awardee shall be registered in the System for Award management (SAM) database by the quotation submission date, during performance and through final payment of any contract resulting from this solicitation. Offerors may obtain information on registration and annual confirmation requirements via the SAM website at http://www.sam.gov. Contractor shall type company name, address, and CAGE code exactly as it appears in the DoD System for Award Management

(SAM) Database.

Company Name:

Company Address:

Telephone:

Cage code:

Point of Contact:

Email:

http://www.sam.gov/

Manufacturer (OEM):

14. INVOICING AND PAYMENT: Invoicing and Payment will be made via Wide Area Workflow. See DFARS

Clause 252.232-7006.

15. MARK CONTRACT NUMBER ON ALL CORRESPONDENCE: Contractor must mark the contract or purchase order number on all paperwork and shipments. The order number must appear on the exterior of the shipment. Failure to follow these instructions will hold up payment to you and could result in the return of merchandise at your expense.

16. REQUIREMENTS FOR PALLETS: Material must be shipped on serviceable, winged pallets in accordance with MD00100452, Revision C, dated 09/2016. Please reference the following link for more information:

https://www.dla.mil/LandandMaritime/Offers/Services/TechnicalSupport/Logistics/Packaging/Palletization.asp x

The complete specification for winged pallets can be found in Part 9 of ANSI MH1. The pallet must be heat treated, certified, and stamped or branded with the appropriate certification markings in accordance with DOD

Manual 4140.65-M. Please reference the DLA Master List of Technical and Quality Requirements for information at this link:

https://www.dla.mil/HQ/Acquisition/Offers/DLAD/TechnicalandQualityMLofRequirements/

Additional information can be found at:

https://www.dla.mil/LandandMaritime/Offers/Services/TechnicalSupport/Logistics/Packaging/WoodPack.aspx

Failure to deliver supplies on pallets with these specifications will result in the Government not accepting the shipment when it arrives at destination. The offeror must quote shipment of supplies in accordance with this requirement.

17. QUESTIONS: Questions regarding this solicitation shall be submitted by electronic mail to the Acquisition

Specialist, via email to Steven Lesh at steven.lesh@dla.mil, Subject: SP330026Q5002 RFQ Question.

Question(s) must be received by 2:00 PM EST on December 2, 2025. Answers to questions will be posted to the SAM.GOV website via an amendment to the solicitation.

18. SINGLE AWARD: The Government intends to award a single contract as a result of this solicitation. The

Government will evaluate the total price for all CLINS over the entire five (5) year period of performance for the lowest priced, technically acceptable offeror.

19. FIRST ARTICLE TEST (FAT): The Contractor shall submit one (1) sample of each Special Packaging

Instruction (SPI) Corrugated Fiber Boxes for Blade Packing within 30 calendar days after date of contract award to the Government Point of Contact at DLA Distribution Oklahoma City for approval. Within 10 calendar days after receipt of the sample, the Government POC shall notify the contractor concerning acceptability of the sample. The Government will issue a delivery order to accept and reimburse the Contractor for the acceptable samples. If the sample does not comply with the technical specifications, the Contractor shall be responsible for correction and resubmittal of the sample at no cost to the Government. If the Contractor cannot provide acceptable samples, the Government reserves the right to terminate the contract award and either issue an award to the next lowest offeror or resolicit the requirement.

20. ORGANIZATIONAL CONFLICT OF INTEREST: The contractor shall be ineligible from participation as a contractor, subcontractor, or consultant in any procurement arising or resulting from any of the services provided to DLA on this contract. This restriction includes providing services to any potential bidders on such procurements. The contractor shall not incorporate its product or services in any Performance Work Statement or specification unless directed to do so in writing by the Contracting Officer.

If the contractor, in the performance of this contract, obtains access to information such as plans, policies, reports, studies, financial data, internal data, or any other non-public information or information by the Privacy https://www.dla.mil/LandandMaritime/Offers/Services/TechnicalSupport/Logistics/Packaging/Palletization.aspx https://www.dla.mil/LandandMaritime/Offers/Services/TechnicalSupport/Logistics/Packaging/Palletization.aspx https://www.dla.mil/HQ/Acquisition/Offers/DLAD/TechnicalandQualityMLofRequirements/ https://www.dla.mil/LandandMaritime/Offers/Services/TechnicalSupport/Logistics/Packaging/WoodPack.aspx

Act, the contractor agrees not to release such information without prior written approval from the Contracting

Officer. The use of such information for personal gain is prohibited.

In addition, the contractor agrees that to the extent it receives or is given access to proprietary data, or other confidential or privileged technical, business, or financial information under this contract, it shall treat such information in accordance with any restrictions imposed on such information.

21. INDEPENDENT PRICING:

Offeror is the Manufacturer (MANF) OR Distributor (DIST) of this product:

_________MANF or _________DIST

If a Distributor, Offeror is quoting a product made by the following manufacturer_________________________________

If a Distributor, Offeror is free to set their own pricing: _______YES or _______NO

SCHEDULE OF SUPPLIES/SERVICES

See attachment 01 – Schedule of Supplies and Services

CLAUSES AND PROVISIONS

FAR 52.212-4 -- Contract Terms and Conditions – Commercial Products and Commercial Services

The clause at FAR 52.212-4 and the following addenda are applicable to this acquisition.

ADDENDA TO 52.212-4 Contract Terms and Conditions—Commercial Products and Commercial Services (Nov

2023)

The following clauses are incorporated by reference:

FAR 52.203-3 Gratuities

FAR 52.203-12 Limitation on Payments to Influence Certain Federal Transactions

FAR 52.204-9 Personal Identity Verification of Contractor Personnel

FAR 52.204-13 System for Award Management Maintenance

FAR 52.204-18 Commercial and Government Entity Code Maintenance

FAR 52.204-19 Incorporation by Reference of Representations and Certifications

FAR 52.204-21 Basic Safeguarding of Covered Contractor Information Systems

FAR 52.204-27 Prohibition on a ByteDance Covered Application

FAR 52.229-3 Federal, State, and Local Taxes

FAR 52.232-1 Payments

FAR 52.232-17 Interest

FAR 52.232-23 Assignment of Claims

FAR 52.232-39 Unenforceability of Unauthorized Obligations

FAR 52.233-1 Disputes

FAR 52.237-2 Protection of Government Buildings, Equipment, and Vegetation

FAR 52.232-40 Providing Accelerated Payments to Small Business Subcontractors

FAR 52.242-13 Bankruptcy

FAR 52.243-1 Changes – Fixed Price

FAR 52.246-2 Inspection of Supplies – Fixed Price

FAR 52.246-16 Responsibility for Supplies

FAR 52.247-34 F.O.B. Destination

DFARS 252.203-7000 Requirements Relating to Compensation of Former DoD Officials

DFARS 252.203-7002 Requirement to Inform Employees of Whistleblower Rights

DFARS 252.203-7005 Representation Relating to Compensation of Former DoD Officials

DFARS 252.204-7003 Control of Government Personnel Work Product https://www.acquisition.gov/node/31790

DFARS 252.204-7009 Limitations on the Use or Disclosure of Third Party Contractor Reported Cyber

Incident Information

DFARS 252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

DFARS 252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications

Equipment or Services.

DFARS 252.204-7022 Expediting Contract Closeout

DFARS 252.209-7004 Subcontracting with Firms That Are Owned or Controlled by the Government of a

Country That Is a State Sponsor of Terrorism

DFARS 252.223-7008 Prohibition of Hexavalent Chromium

DFARS 252.225-7001 Buy American and Balance of Payments Program

DFARS 252.225-7002 Qualifying Country Sources as Subcontractors

DFARS 252.225-7012 Preference for Certain Domestic Commodities

DFARS 252.225-7021 Trade Agreements

DFARS 252.225-7048 Export Controlled Items

DFARS 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime

DFARS 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports

DFARS 252.232-7010 Levies on Contract Payments

DFARS 252.243-7001 Pricing of Contract Modifications

DFARS 252.244-7000 Subcontracts for Commercial Products or Commercial Services

DFARS 252.247-7023 Transportation of Supplies by Sea

THE FOLLOWING CLAUSES ARE INCORPORATED BY FULL TEXT:

52.212-5 Contract Terms and Conditions Required to Implement Statutes Executive Orders –Commercial

Products and Commercial Services (Mar 2025) (Deviation 2025-O0003)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017)

(section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.

113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by

Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or

Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) (31 U.S.C. 3903 and

10 U.S.C. 3801).

(6) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).

(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 (19 U.S.C.

3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

FAR 52.203-6 Restrictions on Subcontractor Sales to the Government with Alternate I (Nov 2021)

(41 U.S.C. 4704 and 10 U.S.C. 2402)

FAR 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020)

(Pub. L. 109-282) (31 U.S.C. 6101 note).

FAR 52.204-30 Federal Acquisition Supply Chain Security Act Orders – Prohibition (Dec 2023) (Pub.

L. 115–390, title II).

(End of Clause)

THE FOLLOWING CLAUSES ARE INCORPORATED BY FULL TEXT:

FAR 52.209-4 First Article Approval-Government Testing (Sep 1989)

(a) The Contractor shall deliver one (1) unit of each size of the nine (9) sizes of the Special Packaging Instruction

(SPI) Corrugated Fiber Boxes for Blade Packing within 30 calendar days from the date of this contract to the

Government Point of Contact (GPOC) at DLA Distribution Oklahoma City, Oklahoma (DDOO) for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.

(b) Within 10 calendar days after the Government receives the first article, the Contracting Officer shall notify the

Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the

Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the

Government. The Government shall act on this first article within the time limit specified in paragraph (b) of this clause. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, the Contractor-

(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and

(2) Shall remove and dispose of any first article from the Government test facility at the Contractor’s expense.

(f) If the Government does not act within the time specified in paragraph (b) or (c) of this clause, the Contracting

Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

FAR 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors

Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Jan 2025)

( 31 U.S.C. 6101 note).

FAR 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Oct

2018) (41 U.S.C. 2313).

FAR 52.222-3 Convict Labor (June 2003) (E.O. 11755).

FAR 52.222-19 Child Labor—Cooperation with Authorities and Remedies (Jan 2025)( E.O. 13126).

FAR (i) 52.222-35 Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212).

FAR (i) 52.222-36 Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C. 793).

FAR 52.222-37 Employment Reports on Veterans (Jun 2020) (38 U.S.C. 4212).

FAR (i) 52.222-50 Combating Trafficking in Persons (Oct 2025) (22 U.S.C. chapter 78 and E.O. 13627).

FAR 52.225-13 Restrictions on Certain Foreign Purchases (Feb 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the

Treasury).

FAR 52.226-8 Encouraging Contractor Policies to Ban Text Messaging while Driving (May 2024)

(E.O. 13513).

FAR 52.232-33 Payment by Electronic Funds Transfer-System for Award Management (Oct2018) ( 31

U.S.C. 3332).

FAR (i) 52.247-64 Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2021) (46 U.S.C.

55305 and 10 U.S.C. 2631).

https://www.govinfo.gov/link/uscode/31/6101

(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.

(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.

(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.

(End of clause)

FAR 52.211-9 Desired and Required Delivery (JUN 1997)

(a) The Government desires delivery to be made according to the following schedule:

DESIRED DELIVERY SCHEDULE – All items within 21 days.

If the offeror is unable to meet the desired delivery schedule, it may, without prejudicing evaluation of its offer, propose a delivery schedule below. However, the offeror’s proposed delivery schedule must not extend the delivery period beyond the time for delivery in the Government’s required delivery schedule as follows:

REQUIRED DELIVERY SCHEDULE – All items with 30 days.

Offers that propose delivery of a quantity under such terms or conditions that delivery will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. If the offeror proposes no other delivery schedule, the desired delivery schedule above will apply.

OFFEROR'S PROPOSED DELIVERY SCHEDULE: All items with _____ days after date of contract award.

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed or otherwise furnished to the successful offeror results in a binding contract. The

Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day the award is dated. Therefore, the offeror shall compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor’s date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term “working day” excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

FAR 52.216-2 -- Economic Price Adjustment -- Standard Supplies (Nov 2021)

(a) The Contractor warrants that the unit price stated in the Schedule for all line items is not in excess of the

Contractor’s applicable established price in effect on the contract date for like quantities of the same item. The term

“unit price” excludes any part of the price directly resulting from requirements for preservation, packaging, or packing beyond standard commercial practice. The term “established price” means a price that --

(1) Is an established catalog or market price for a commercial item sold in substantial quantities to the general public; and

(2) Is the net price after applying any standard trade discounts offered by the Contractor.

(b) The Contractor shall promptly notify the Contracting Officer of the amount and effective date of each decrease in any applicable established price. Each corresponding contract unit price shall be decreased by the same percentage that the established price is decreased. The decrease shall apply to those items delivered on and after the effective date of the decrease in the Contractor’s established price, and this contract shall be modified accordingly.

(c) If the Contractor’s applicable established price is increased after the contract date, the corresponding contract unit price shall be increased, upon the Contractor’s written request to the Contracting Officer, by the same percentage that the established price is increased, and the contract shall be modified accordingly, subject to the following limitations:

(1) The aggregate of the increases in any contract unit price under this clause shall not exceed 10 percent of the original contract unit price.

(2) The increased contract unit price shall be effective --

(i) On the effective date of the increase in the applicable established price if the Contracting Officer receives the Contractor’s written request within 10 days thereafter; or

(ii) If the written request is received later, on the date the Contracting Officer receives the request.

(3) The increased contract unit price shall not apply to quantities scheduled under the contract for delivery before the effective date of the increased contract unit price, unless failure to deliver before that date results from causes beyond the control and without the fault or negligence of the Contractor, within the meaning of the Default clause.

(4) No modification increasing a contract unit price shall be executed under this paragraph (c) until the

Contracting Officer verifies the increase in the applicable established price.

(5) Within 30 days after receipt of the Contractor’s written request, the Contracting Officer may cancel, without liability to either party, any undelivered portion of the contract items affected by the requested increase.

(d) During the time allowed for the cancellation provided for in subparagraph (c)(5) of this clause, and thereafter if there is no cancellation, the Contractor shall continue deliveries according to the contract delivery schedule, and the Government shall pay for such deliveries at the contract unit price, increased to the extent provided by paragraph

(c) of this clause.

FAR 52.216-18 – Ordering (Aug 2020)

(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from _________ through ____________ [insert dates].

(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.

(c) A delivery order or task order is considered "issued" when—

(1) If sent by mail (includes transmittal by U.S. mail or private delivery service), the Government deposits the order in the mail;

(2) If sent by fax, the Government transmits the order to the Contractor's fax number; or

(3) If sent electronically, the Government either—

(i) Posts a copy of the delivery order or task order to a Government document access system, and notice is sent to the Contractor; or

(ii) Distributes the delivery order or task order via email to the Contractor's email address.

(d) Orders may be issued by methods other than those enumerated in this clause only if authorized in the contract.

FAR 52.216-19 Order Limitations (Oct 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than 20 EA, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor-

(1) Any order for a single item in excess of 1,000 EA;

(2) Any order for a combination of items in excess of 50,000 EA; or

(3) A series of orders from the same ordering office within thirty (30) days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal

Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the

Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.

(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within thirty (30) days after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

52.216-21 – Requirements (Oct 1995)

(a) This is a requirements contract for the supplies or services specified, and effective for the period stated, in the

Schedule. The quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government’s requirements do not result in orders in the quantities described as “estimated’’ or “maximum” in the Schedule, that fact shall not constitute the basis for an equitable price adjustment.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. Subject to any limitations in the Order Limitations clause or elsewhere in this contract, the Contractor shall furnish to the Government all supplies or services specified in the Schedule and called for by orders issued in accordance with the Ordering clause. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(c) Except as this contract otherwise provides, the Government shall order from the Contractor all the supplies or services specified in the Schedule that are required to be purchased by the Government activity or activities specified in the Schedule.

(d) The Government is not required to purchase from the Contractor requirements in excess of any limit on total orders under this contract.

(e) If the Government urgently requires delivery of any quantity of an item before the earliest date that delivery may be specified under this contract, and if the Contractor will not accept an order providing for the accelerated delivery, the Government may acquire the urgently required goods or services from another source.

(f) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and

Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after completion of the last exercised option period of performance.

FAR 52.217-9 Option to Extend the Term of the Contract (Mar 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within thirty (30) days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least sixty (60) days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed

Five (5) years.

FAR 52.252-2 Clauses Incorporated By Reference (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the contracting officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

The complete text of any of the clauses and provisions are available electronically from the following sites:

FAR - https://www.ecfr.gov/current/title-48/chapter-1

DFARS - https://www.acq.osd.mil/dpap/dars/dfarspgi/current/

DLAD - https://www.dla.mil/HQ/Acquisition/Policy-and-Directives/

DFARS 252.232-7006 Wide Area Workflow Payment Instructions (JAN 2023)

(a) Definitions. As used in this clause— https://www.ecfr.gov/current/title-48/chapter-1 https://www.acq.osd.mil/dpap/dars/dfarspgi/current/ https://www.dla.mil/HQ/Acquisition/Policy-and-Directives/

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area

WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003 , Electronic Submission of

Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS)

252.232-7003 , Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training

Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data

Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the

Contracting Officer.

_Invoice Only_

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

N/A_

(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC SL4701

Issue By DoDAAC SP3300

Admin DoDAAC** SP3300

Inspect By DoDAAC SW3211

Ship To Code SW3211

Ship From Code N/A

Mark For Code N/A

Service Approver (DoDAAC) N/A

Service Acceptor (DoDAAC) SW3211

Accept at Other DoDAAC N/A

LPO DoDAAC N/A

DCAA Auditor DoDAAC N/A

Other DoDAAC(s) N/A

(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert

“See Schedule” or “Not applicable.”)

(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the

DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition

Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS

Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact. Steven.Lesh@dla.mil (Contracting Officer: Insert applicable information or

“Not applicable.”)

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

DLAD Procurement Notes:

C02 Manufacturing Phase-Out or Discontinuation of Production, Diminishing Sources, and Obsolete

Materials or Components (Dec 2016)

The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer.

In the event that manufacturing phase-out or discontinuance of production of such items is contemplated, the contractor is required to notify the contracting officer and publish the discontinuance in the Government-Industry

Data Exchange Program (GIDEP), where feasible; and to provide immediate advance notice of production phase-out to DLA DMSMS at dscc.dmsms@dla.mil.

(End of Procurement Note)

C03 Contractor Retention of Supply Chain Traceability Documentation (Jun 2023)

(1) By submitting a quotation or offer, the contractor is confirming it currently has, or will obtain before delivery, and shall retain supply chain traceability documentation, as described in paragraph (2) of this procurement note, demonstrating the item conforms to the technical requirements, and, for part numbered items, is from an approved manufacturer.

(2) Supply Chain Traceability Documentation

(i) Supply chain traceability documentation shall include basic item description; part number; drawing or specification; national stock number; manufacturing source; manufacturing source’s Commercial and Government

Entity (CAGE) code; and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to Government acceptance.

mailto:Steven.Lesh@dla.mil mailto:dscc.dmsms@dla.mil

(ii) Supply chain traceability documentation shall also include, when available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers.

For part numbered items, contractors can find examples of acceptable supply chain traceability documentation at the

Counterfeit Detection and Avoidance Program (CDAP) website

(http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection- Avoidance Program/).

(iii) In addition, the contractor will obtain, retain, and provide to the contracting officer written documentation of all inspections and tests necessary to substantiate that the supplies furnished under this contract conform to contract requirements, including any applicable technical requirements for specified manufacturers’ parts. Such records shall include, without limitation, test reports, test data, material certification, and manufacturing process sheets, in addition to any other information identified in the technical specifications applicable to the item.

(3) The contractor shall make supply chain traceability documentation available to the contracting officer within three business days upon the contracting officer’s request. The contracting officer determines the acceptability and sufficiency of documentation. The contractor shall retain supply chain traceability documentation for ten years after final payment under this contract for audit and other valid government purposes. If the contractor fails to retain or provide the documentation, or the contracting officer finds the documentation to be unacceptable, the contracting officer may take corrective action, including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies.

(End of Procurement Note)

C13 Economic Price Adjustment – Standard Supplies (Aug 2017)

(a) The contractor warrants that the unit price stated in the schedule for _________ [offeror insert schedule line item number] is not in excess of the contractor’s applicable established price in effect on the contract date for like quantities of the same item. The term “unit price” excludes any part of the price directly resulting from requirements for preservation, packaging, or packing beyond standard commercial practice. The term “established price” means a price that --

(1) Is an established catalog or market price for a commercial item sold in substantial quantities to the general public; and

(2) Is the net price after applying any standard trade discounts offered by the contractor.

(b) The contractor shall promptly notify the contracting officer of the amount and effective date of each decrease in any applicable established price. Each corresponding contract unit price shall be decreased by the same percentage that the established price is decreased. The decrease shall apply to those items ordered on and after the effective date of the decrease in the contractor’s established price, and this contract shall be modified accordingly.

(c) If the contractor’s applicable established price is increased after the contract date, the corresponding contract unit price shall be increased, upon the contractor’s written request to the contracting officer, by the same percentage that the established price is increased, and the contract shall be modified accordingly, subject to the following limitations:

(1) The aggregate of the increases in any contract unit price under this procurement note shall not exceed 10 percent of the contract unit price [at the outset of each performance/ordering period].

(2) The increased contract unit price shall be effective --

(i) On the effective date of the increase in the applicable established price if the contracting officer receives the contractor’s written request within 10 days thereafter; or

(ii) If the written request is received later, on the date the contracting officer receives the request.

(3) The increased contract unit price shall not apply to quantities [ordered] under the contract before the effective date of the increased contract unit price.

(4) No modification increasing a contract unit price shall be executed under this paragraph (c) until the contracting officer verifies the increase in the applicable established price.

(5) Within 30 days after receipt of the contractor’s written request, the contracting officer may cancel, without liability to either party, any undelivered portion of the contract items affected by the requested increase.

(d) During the time allowed for the cancellation provided for in subparagraph (c)(5) of this procurement note, and thereafter if there is no cancellation, the contractor shall continue deliveries according to the contract delivery schedule, and the Government shall pay for such deliveries at the contract unit price, increased to the extent provided by paragraph (c) of this clause.

http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection-%20Avoidance%20Program/

C14 Correction of Nonconforming Packaging or Marking (MAY 2020)

(1) The Government may correct nonconforming packaging or marking for receipts of DLA-owned materiel if the estimated costs of correction are $1,000 or less. The contracting officer will advise the contractor of the discrepancy and that the Government has corrected the packaging or marking. The contracting officer will make a determination concerning appropriate reimbursement by the contractor for the Government’s costs to correct the deficiencies. Upon determining that reimbursement is required, the contracting officer will send a notice to the contractor. Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies.

(2) If the estimated costs of correction for receipts of DLA-owned materiel are more than $1,000, the contracting officer will advise the contractor of the discrepancy and have the materiel returned to the contractor for correction/resubmittal; or, if there are urgent requirements, have the Government remediate the discrepancy at the contractor’s expense. If the Government remediates the discrepancy, the contracting officer will make a determination concerning appropriate reimbursement by the contractor for the Government’s costs to correct the deficiencies. Upon determining that reimbursement is required, the contracting officer will send a notice to the contractor. Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies.

E05 Product Verification Testing (May 2020)

(1) Product verification testing (PVT) under this procurement note will only apply when the contracting officer specifically invokes it in writing. The contracting officer may invoke PVT at or after contract award. If the contracting officer invokes PVT at contract award, the contract will explicitly state this testing requirement. If the contracting officer invokes PVT after contract award, the contracting officer shall notify the contractor and the cognizant DCMA ACO. The Government will perform PVT testing at a Government-designated testing laboratory.

(2) The contractor shall not ship or deliver any material until it receives notification of the acceptable PVT results, unless the contracting officer directs it to do so in writing The Government will provide the PVT results to the contractor within 20 business days after receipt at the Government testing facility, unless the Government specifies otherwise in writing.

(3) The contractor shall provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3; and maintain and make available all records evidencing those details if requested by the Government. When the Government finds evidence of risk associated with the contractor’s sampling process, the Government may witness and evaluate the contractors sampling process. The contractor shall randomly select samples from the production lot(s), unless the contracting officer specifies otherwise in writing. The contractor shall ship the selected PVT samples with a copy of the system of record receiving report (i.e., WAWF, DD Form 250, or commercial shipping document) and the contractor’s signed DD Form 1222. The contractor shall prepare the shipping container(s) by marking the external packages in bold letters, “Product Verification Test

Samples – Do Not Post to Stock," Contract Number [contractor insert] and Lot/Item Number [contractor insert]” adjacent to the MIL-STD-129 (latest revision) identification markings. The contractor shall use a hard copy of the system of record receiving report as a packing list, in accordance with DFARS Appendix F. The contractor shall mark the exterior of the shipping container in accordance with MIL-STD- 129 (latest revision), paragraph 5.11. The contractor shall send samples by traceable means (e.g., certified or registered mail, United Parcel Service, Federal

Express). The contractor shall include the following in the interior package:

(a) Hard copies of the contract;

(b) Material certifications/process operation sheets; and

(c) Drawings used to manufacture the units and return shipping information.

(4) The Government will return samples that pass testing and are not destroyed during evaluation to the contractor at the Government's expense for the contractor to include as part of the total contract quantity to be delivered under the contract. The contractor and Government may agree to dispose of samples not destroyed when the cost of the item does not justify the shipping expense. If the Government does not return approved samples that pass testing to the contractor, the Government will consider those samples as part of the contract quantity for payment and delivery.

(5) If samples fail testing, the Government may reject the entire contract lot from which the contractor took the samples. The Government may, at its discretion, retain samples that fail testing without obligation to the contractor.

E08 First Article Testing Requirements (Mar 2025)

(1) If there is not a separate contract line item number (CLIN) for FAT, the offeror shall include all…