RFQ - Questions (Fort Lyon P051036) .pdf
PDF 157 KB Posted
- Attached to
- Ft Lyon Inspection, Lab Analysis & Testing
- Solicitation number
- RFQ NHAA 2027000004 2
- Issued by
- Larimer County, Denver City, Colorado
About this file
This is a Requests for Qualifications (RFQ) and Final Addendum document issued by the State of Colorado, Department of Local Affairs (DOLA), for professional environmental consulting services related to exterior restoration at Fort Lyon, Project P051036 (Notice Number: FtLyon-2026PXQZ2). The solicitation seeks qualified consulting firms to conduct pre-construction hazardous materials testing, including visual inspection, sampling, laboratory analysis, and hazard assessment reporting for exterior components across 110 affected structures at the Fort Lyon campus, a designated Historic District. The scope is limited to testing specific damaged components listed in Appendix D and excludes roofs, playgrounds, and water towers (except as specified in Appendix D). The mandatory pre-proposal site walk was held on October 22, 2026, at 10:00 a.m., with qualifications due November 2, 2026, followed by oral interviews the subsequent business day. The fieldwork is scheduled to commence in early January 2027, with all work and reporting to be completed by December 2027. On-site coordination will be managed by DOLA's Facility and Project Management team in conjunction with the Fort Lyon Maintenance Supervisor from the Colorado Coalition for the Homeless.
This is a Qualifications-Based Selection (QBS) procurement conducted under Colorado Revised Statutes 24-30-1401 through 24-30-1408 and Office of the State Architect (OSA) guidelines, with an estimated project cost of $2,000,000 establishing the contractual benchmark. Compensation will be structured as a not-to-exceed price billed monthly, with all travel, lodging, and reimbursable expenses included in the fee proposal to be negotiated after selection of the highest-ranked firm; no fee estimate is required with the qualifications submission. The RFQ mandates compliance with CDPHE Regulation No. 8, Part B, EPA NESHAP, and OSHA standards, with lead-based paint testing acceptable via paint-chip sampling alone (without XRF) provided sampling and analysis follow all regulatory protocols. Qualified firms must demonstrate design experience on at least four similar projects each exceeding $20,000 in hard costs utilizing Colorado-based expertise. There are no set-aside requirements for Service-Disabled Veteran-Owned Small Businesses or historically disadvantaged businesses. The qualifications response is limited to 10 double-sided pages (or 20 single-sided pages in electronic PDF format), excluding the cover letter, tab dividers, covers, table of contents, and the required Acknowledgment and Attestation Form; a 72-hour window was provided between question responses and the proposal deadline to allow firms to incorporate clarifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix A123 (A#1) (1).docx | DOCX document | |
| Appendix A123.docx | DOCX document | |
| Fort Lyon_RFQ_AE 2025-R3_FINAL_Amendment 2_10.30.docx | DOCX document | |
| Appendix F Fort Lyon Campus Map.pdf | ||
| SOW 6.16.2023 - Ft. Lyons Exterior Scope Only-20260922T151335Z-1-001.zip | ZIP file | |
| Fort Lyon_RFQ_AE 2025-R3_FINAL.docx | DOCX document | |
| Appendix B SC5.3 Consultant Agrmt_2026.docx | DOCX document | |
| Appendix E Fort Lyon Master Building Inventory Table.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Notice Number: FtLyon-2026PXQZ2
Project Number: P051036
Project Title: Exterior Restoration - Professional Environmental Consulting Services
Final Addendum
(State of Colorado Responses are in Blue)
Section VIII.2.a requires tabs "1 through 7" matching Appendix A, but Appendix A1 lists six criteria. What should Tab 7 contain?
Responding firms are not required to provide a Tab 7. Structuring the technical qualifications with Tabs 1 through 6 matching the Evaluation Criteria is fully responsive.
The reference in Section VIII.2.a to tabs "1 through 7" was a typographical carryover from standard State Buildings Program templates
Do tab divider sheets count toward the 10 double-sided page limit?
No, blank tab divider sheets (or section divider pages used solely for organizational labeling and tab navigation) do not count toward the ten (10) double-sided page limit.
Will the weights for the Appendix A1 criteria be published?
Appendix A1 and A2 have been republished on BidNet with weights. [Appendix A123 (A#1)]
Appendix C calls for a corporate officer signature, a secretary signature and a corporate seal.
For a limited liability company with no seal, may two members or managers sign without a seal?
Yes. For an LLC, a single signature by an Officer/Owner of the LLC is acceptable.
Roofs are excluded from this scope.
Yes
Testing is limited to the specific components in the claim scope (for example, a single window on one elevation). Please also confirm: (a) which document controls the component list
(Appendix D, or the "Exhibit F" cited in Section II); (b) whether DOLA will provide elevations or photos identifying the specific components for each building; and (c) that each report may state that components outside the claim scope were not inspected and must be tested before any future disturbance.
(a)Appendix D controls the component list; Section II’s "Exhibit F" reference is a typographical cross-reference to the Appendix F campus map.
(b)The consultant is responsible for visually locating and field-verifying the specific damaged components defined in Appendix D.
(c)Confirmed. Reports may explicitly state testing was strictly limited to exterior claim-damaged components and that all uninspected areas must be tested prior to future disturbance
Lead-based paint testing by paint-chip sampling alone is acceptable, without XRF.
Yes. Section II of the RFQ specifies "on-site XRF testing and/or laboratory paint-chip analysis."
Paint-chip sampling alone is acceptable if sampling, chain of custody, and accredited testing follow all CDPHE and federal regulations.
Fieldwork is expected to begin in early January 2027, and on-site coordination will be with
Fort Lyon staff leaders.
Coordination will be handled by the Department of Local Affairs Facility and Project
Management team in conjunction with the Maintenance Supervisor from the Colorado
Coalition for the Homeless at Fort Lyon.
Should organically bound materials (caulks, mastics, glazing) that test below 1% by PLM be confirmed by TEM?
The RFQ does not explicitly mandate TEM confirmation for non-friable organically bound
(NOB) materials. The chosen consultant must execute industry-standard protocols to certify non-ACM status before repair and abatement contracts are awarded.
Per Section II (Project Overview), all work must fully comply with applicable State and
Federal regulations (including CDPHE Regulation No. 8, Part B, EPA NESHAP, and OSHA).
Under Section X.A.4 (Project Approach & Quality Control Methodology), evaluation focuses on technical approach and quality control:
Firms must detail their sampling and analytical protocols for NOB materials (e.g., PLM
Gravimetric Reduction/Point Count vs. TEM) to ensure defensible data.
Do you want one report per building, a single campus report, or both? Is a specific format or a summary spreadsheet required?
One report per building. One campus Summary. Formatting will be discussed after the award.
Will a fee proposal be requested only during negotiation? Will compensation be a lump sum, or a not-to-exceed amount with unit rates (per sample, per building)? Are travel and lodging reimbursable?
Fees will be negotiated after selection of the most qualified firm. Compensation will entail a not to exceed price and may be billed monthly. Travel, lodging and all other reimbursables must be included in the fee as a not to exceed price. Refer to Articles 2 and 3 of Appendix B:
SC5.3 Consultant Agreement.
Does the 500,000 2, 000, 000𝑒𝑠𝑡𝑖𝑚𝑎𝑡𝑒𝑑𝑝𝑟𝑜𝑗𝑒𝑐𝑡𝑐𝑜𝑠𝑡𝑠𝑒𝑡𝑡ℎ𝑒𝐴𝑝𝑝𝑒𝑛𝑑𝑖𝑥𝐵𝑝𝑟𝑜𝑓𝑒𝑠𝑠𝑖𝑜𝑛𝑎𝑙𝑙𝑖𝑎𝑏𝑖𝑙𝑖𝑡𝑦𝑡𝑖𝑒𝑟( per claim / $1,000,000 aggregate)?
For the purposes of the RFQ and contract execution under Office of the State Architect (OSA) guidelines, the $2,000,000 Estimated Project Cost published on the RFQ cover establishes the contractual benchmark for this procurement.The $500,000 per claim / $1,000,000 aggregate coverage limits satisfy the State's requirement for this solicitation.
Will abatement project design, air monitoring and clearance be added to this contract, or procured separately?
Project design, air monitoring and clearance will be procured separately. The immediate scope of work under this RFQ is strictly limited to pre-construction hazardous materials testing (visual inspection, sampling, laboratory analysis, and hazard assessment reporting) for the exterior components across the 110 affected structures.
Do any Fort Lyon structures carry a historic designation that limits destructive sampling or requires coordination with the State Historic Preservation Office?
Yes. Fort Lyon is listed as a Historic District with the State Historic Preservation Office.
Will the consultant provide its own lifts or ladders for second-story exterior components, and are there site rules for equipment on campus?
Yes, state and federal safety standards govern site equipment rules.
Given that the responses to questions are anticipated on Friday, October 30, and proposals are due the following business day, November 2, would the Department consider extending the submission deadline by one week to allow firms sufficient time to review and incorporate any clarifications or changes?
The State of Colorado has incorporated a 72-hour window for companies to build clarifications and updates into their proposals. The posting duration for this RFQ exceeds the standard
14-day allocation set by the Office of the State Architect. Under C.R.S. 24-30-1405, state agencies and institutions of higher education are required to publish both a public notice
(advertisement) and an RFQ for professional services fees estimated above $100,000 or construction costs exceeding $1 million. The mandatory minimum solicitation timeframe is 15 days. Notice Number: FtLyon-2026PXQZ2 will be posted for 20 days.
Given that oral interviews are tentatively scheduled for the day following the qualifications submission deadline, would the Department consider allowing additional time between submission and interviews to accommodate evaluation of qualifications and coordination of key personnel? Additionally, if the proposal deadline is extended, would the interview schedule be adjusted accordingly?
Yes - Yes
Could the Department please clarify which elements are included in the page limit? In addition to the cover letter and Acknowledgment and Attestation Form, are front and back covers, tab/divider pages, a table of contents, or resumes excluded from the page count?
The single-page cover letter, front and back covers, a standalone table of contents, blank navigational tab dividers, and the required Appendix C form are excluded from the page count; however, all personnel resumes, bios, narrative text, project cut sheets, charts, and graphics addressing the evaluation criteria are included and must not exceed the allowable 10 double-sided pages (or 20 single portrait pages in the PDF). Any excluded page (such as a cover, table of contents, or tab divider) that contains substantive evaluation material will be counted toward the 20-page limit.
The RFQ limits responses to 10 double-sided pages; could the Department please confirm whether firms may submit a standard 20-page electronic PDF, rather than formatting the document as double-sided spreads?
Yes. Electronic submission via BidNet submitting a standard single-page view, 20-page electronic PDF (portrait format, 8½" x 11", minimum 10-point font) is fully acceptable and satisfies the "ten (10) double-sided pages" requirement.
Appendix A1 references a surety letter; however, this requirement is not identified elsewhere in the RFQ. Could the Department please confirm whether a surety letter is required as part of the qualifications submittal?
A surety letter is not required for professional services.
Could the Department please clarify whether a corporate seal is required on the
Acknowledgment and Attestation Form for firms organized as limited liability companies
(LLCs) rather than corporations?
For an LLC, a single signature by an Officer/Owner of the LLC is acceptable.
Will methodologies for LBP sampling and assessment be subject to HUD regulations?
No, the methodologies are not subject to HUD regulations because funding comes from an insurance claim rather than federal housing assistance. Legal authority defaults to State and
Federal laws—specifically CDPHE, EPA, and OSHA Regulations However, consultants should still follow Chapter 7 of the HUD Guidelines for the Evaluation and Control of Lead-Based Paint
Hazards in Housing as the industry standard for XRF testing, sampling, and clearance wipe protocols. For an OSA Consultant Agreement (SC5.3), omit 24 CFR Part 35 to avoid federal audit obligations, enforce CDPHE Regulation 19 as the legal authority, and reference the HUD
Guidelines as the technical protocol.
Will the following structures be included in the scope?
1. Water Tower
i. Review Appendix D and Appendix F
2. Playground
i. No
Will a fee estimate be requested with our package? If so will a form be provided?
No, a fee estimate is not to be submitted with your qualification package, and no fee form will be provided for this submittal.
Per Section II of the RFQ, this procurement is conducted strictly as a Qualifications-Based
Selection (QBS) for professional services pursuant to C.R.S. § 24-30-1401 through § 24-30-1408 under Colorado Office of the State Architect (OSA) guidelines.
Will direct expenses be included in our fee estimate?
Yes, reimbursable direct expenses will be addressed during contract negotiations with the highest-ranked firm, but no fee estimate or cost information should be submitted at this time.
Is a minimum number of samples requested to be collected for lead and asbestos? Do we follow OSHA or CDPHE regulations?
Follow OSHA and CDPHE regulations. When regulations overlap, follow the most stringent rule, guideline, or requirement to ensure full legal and safety compliance.
Can you provide a timeline for when the buildings must be completed and reports delivered?
January 2027 - December 2027
Do we have to submit a signed appendix B or by submitting are we acknowledging that we will accept this contract if chosen
Appendix B is provided strictly as a sample contract for your review. Instead of signing
Appendix B now, offerors formalize their agreement and acceptance of the contract terms by executing and submitting Appendix C: Acknowledgment and Attestation Form at the back of the qualification package:
Is there an Service-Disabled Veteran Owned Small Businesses or historically disadvantaged businesses percentage requirement for this project?
No, there is no mandatory percentage quota or set-aside requirement for Service-Disabled
Veteran-Owned Small Businesses (SDVOSB) or historically disadvantaged businesses for this project. See Appendix A1 Section 5 Equity, Diversity and Inclusion.
The RFQ states that the SOQ is limited to 10 double-sided pages, excluding the cover letter and required forms. Please confirm that this equates to 20 single-sided pages of content (10 sheets printed front and back), and that the cover letter and Appendix C are excluded from the page count.
Confirmed. The 10 double-sided page limit allows up to 20 single-sided page views of substantive narrative in your electronic PDF submittal (portrait format, 8½" x 11", minimum
10-point font). The 1-page cover letter, executed Appendix C, blank tab dividers, covers, and table of contents are excluded from the 20-page limit, provided they omit substantive evaluation narrative.
Please confirm that the following items are excluded from the page count: front cover page, back cover page, section divider pages, and table of contents
Submissions can be formatted as properly bookmarked PDFs and are restricted to a maximum of 10 double-sided pages (equivalent to 20 single-sided pages).
Can the State confirm whether the requirement for two similar projects exceeding $100,000 may be satisfied by projects that included assessment and abatement planning/design services, even if the consulting fees were not solely associated with testing and sampling activities?
Per Amendment #1: This has been updated to “ Demonstrated design experience in projects of similar scope and complexity for at least four (4) projects each in excess of $20,000 (hard costs), utilizing the expertise present in their Colorado Office” This may be satisfied by projects that include assessment, planning, design services, and consulting fees - associated with testing and sampling projects.
Can the State provide the attendee/sign-in list from the mandatory pre-proposal meeting to all prospective proposers?
10/22/2026 - 10:00 am Fort Lyon Site-Walk Attendees
● Billie Lusk – Herron Enterprises USA, Inc.
● Martin Dehlinger – ECS Southwest
● Matt Little – Accenture
● Tony Nibert – LTS Resource, LLC
● Jeff Clausen – Sedgwick - Insurance
● James Ewing – UBS - Insurance
● Kyle Schlafer – EFI Global
● Doug Jamison – Pinyon Environmental
● Michael Cope – Terracon
● Brandon Sobraske – Ayuda Companies
● Christopher Johnson – White Hat Services LLC
● Eric Mareck – State of Colorado - DOLA
● Michael Weber – State of Colorado - DOLA
● Willy Patterson – Fort Lyon Maintenance – CCH
File details come from the government source that posted it. Updated .