Fort Lyon_RFQ_AE 2025-R3_FINAL_Amendment 2_10.30.docx
DOCX document 65 KB Posted
- Attached to
- Ft Lyon Inspection, Lab Analysis & Testing
- Solicitation number
- RFQ NHAA 2027000004 2
- Issued by
- Larimer County, Denver City, Colorado
About this file
Summary
This is a Request for Qualifications (RFQ) Amendment #2 issued by the State of Colorado Department of Local Affairs for professional environmental consulting and industrial hygiene services at Fort Lyon Supportive Residential Community in Las Animas, Colorado. The project, titled "Exterior Restoration - Professional Environmental Consulting Services" (Project Number P051036), addresses hazardous materials testing required following damage sustained during a June 16, 2023, hailstorm. The scope of work includes pre-construction asbestos-containing materials (ACM) visual inspection, sampling, and laboratory analysis, as well as lead-based paint (LBP) XRF testing and paint-chip analysis across 110 affected exterior structures on the 110-structure campus. The mandatory pre-submittal conference and site tour is scheduled for Thursday, October 22, 2026, from 10:00 a.m. to 12:00 p.m. at Building 5A. Qualifications submittals are due Monday, November 2, 2026, by 5:00 p.m. Mountain Time via Bidnet/Rocky Mountain E-Purchasing System (RMEPS). Optional oral interviews are anticipated for November 3–6, 2026, with selection announcement scheduled for Monday, November 9, 2026, at 4:00 p.m. Contract negotiation is anticipated to occur between November 10 and December 31, 2026, with design commencing January 8, 2027, and construction anticipated March through September 2027.
The estimated project cost is $2,000,000. Minimum requirements include two years of business operation under the same name, demonstrated design experience on at least four projects each exceeding $20,000 in hard costs, and mandatory attendance at the pre-submittal conference. Qualifications submittals are limited to 10 double-sided pages (excluding cover letter and required Acknowledgment and Attestation Form) and must follow the specified evaluation form format in Appendix A. Evaluation criteria include project team qualifications, firm/team capabilities, prior experience with similar projects, project approach, equity/diversity/inclusion initiatives, and work location. Colorado labor must constitute at least 80 percent of work performed under C.R.S. 8-17-101, with preference given to Colorado resident vendors. The Buy Clean Colorado Act applies to this project as a public construction project exceeding $500,000, requiring Environmental Product Declarations (EPDs) meeting maximum global warming potential limits for eligible materials. The selection process comprises two steps: prequalification submittal review and optional oral interviews, with an anticipated two to five firms invited to interview. Contact points are Eric Mareck (eric.mareck@state.co.us, 720-668-0383) and Brenda Lujan (Brenda.lujan@state.co.us).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix A123 (A#1) (1).docx | DOCX document | |
| RFQ - Questions (Fort Lyon P051036) .pdf | ||
| Appendix A123.docx | DOCX document | |
| Appendix F Fort Lyon Campus Map.pdf | ||
| SOW 6.16.2023 - Ft. Lyons Exterior Scope Only-20260922T151335Z-1-001.zip | ZIP file | |
| Fort Lyon_RFQ_AE 2025-R3_FINAL.docx | DOCX document | |
| Appendix B SC5.3 Consultant Agrmt_2026.docx | DOCX document | |
| Appendix E Fort Lyon Master Building Inventory Table.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUALIFICATIONS
ARCHITECTURAL / ENGINEERING / CONSULTING SERVICES
State of Colorado Department of Local Affairs, Fort Lyon Notice Number: FtLyon-2026PXQZ2 RFQ# NHAA-2027000004 Project Number: P051036 Project Title: Exterior Restoration - Professional Environmental Consulting Services Estimated Project Cost: $2,000,000
AMENDMENT #2
Table of Contents
| I. NOTICES | 1 | |
| II. PROJECT OVERVIEW | 2 | |
| III. MINIMUM REQUIREMENTS | 3 | |
| IV. MANDATORY PRE-SUBMITTAL CONFERENCE AND SITE TOUR | 3 | |
| V. SCHEDULE | 4 | |
| VI. QUESTIONS, CLARIFICATIONS AND ADDENDA | 4 | |
| VII. POINT OF CONTACT/CLARIFICATION | 4 | |
| VIII. SUBMITTALS OF QUALIFICATIONS | 5 | |
| IX. METHOD OF SELECTION AND AWARD | 5 | |
| A. | Short List | 5 |
| B. | Oral Interview | 5 |
| X. EVALUATION OF QUALIFICATIONS | 6 | |
| A. | PREQUALIFICATION SUBMITTAL CRITERIA | 6 |
| 1. | PROJECT TEAM | 6 |
| 2. | FIRM/TEAM CAPABILITIES | 6 |
| 3. | PRIOR EXPERIENCE | 6 |
| 4. | PROJECT APPROACH | 7 |
| 5. | EQUITY DIVERSITY AND INCLUSION | 7 |
| 6. | WORK LOCATION | 7 |
| XI. ORAL INTERVIEWS EVALUATION CRITERIA | 8 | |
| 1. | PROJECT TEAM | 8 |
| 2. | TEAM CAPABILITIES | 8 |
| 3. | PRIOR EXPERIENCE | 8 |
| 4. | PROJECT APPROACH | 8 |
| Appendix A: | Evaluation Forms | 1 |
| Appendix B: | Architect/Engineer/Consultant Contract (Standard or CM/GC Format) | 1 |
| Appendix C: | 1 | |
| Appendix D: Scope of Work Program Plan etc. | 1 |
RFQ-AE R3 pg. 5
REV 9/2025
I. NOTICES
For State Public Works C.R.S. §8-17-101 - Colorado labor shall be employed to perform at least 80% of the work. Colorado labor means any person who is a resident of the state of Colorado at the time of the Public Works project.
All respondents accept the conditions of this RFQ, including but not limited to, the following:
a. All submittals shall become the property of the State of Colorado and will not be returned.
b. Late submittals shall not be evaluated.
c. The State reserves the right to reject any or all submittals on the basis of being unresponsive to this RFQ or for failure to disclose requested information.
d. The State shall not be liable for any costs incurred by respondents in the preparation of submittals and proposals nor in costs related to any element of the selection and contract negotiation process.
e. Any restriction as to the use of submitted materials must be clearly indicated as proprietary. The requested limitation or prohibition of use or release shall be identified in writing on a cover sheet. Blanket claims of proprietary submittals will not be honored. Fee proposals will be considered proprietary.
f. The respondent has reviewed Appendix B and by responding has agreed that the terms and conditions of the sample Architect/Engineer/Consultant Contract are expressly workable without reservation.
The respondent has reviewed Appendix B and by responding has agreed that the terms and conditions of the sample Architect/Engineer/Consultant Contract are expressly workable without reservation. Any exceptions to the contract must be communicated formally in writing before the solicitation closes. Bearing in mind any and all exceptions may be considered non-negotiable.
Per C.R.S. §24-92-117, a public construction project in the amount of five hundred thousand dollars or more shall be subject to the Buy Clean Colorado (BCCO) Act program requirements. The BCCO Act requires the Office of the State Architect to establish a maximum acceptable global warming potential (GWP) limit for each category of eligible materials, which include asphalt and asphalt mixtures, cement and concrete mixtures, glass, post-tension steel, reinforcing steel, structural steel, and wood structural elements. For any solicitation for a contract for the design of an eligible project, a State Agency or institution shall require the designer who is awarded the contract to include in project specifications when final construction documents are released, a current Environmental Product Declaration (EPD) that meets the maximum acceptable GWP limits for each eligible material specified for the project. A contractor that is awarded a contract for an eligible project shall not install any eligible materials on the project until the contractor submits an EPD for each eligible material procured for the project.
Preference shall be given to Colorado resident vendors and for Colorado labor, as provided by law.
II. PROJECT OVERVIEW
Introduction
The State of Colorado, Department of Local Affairs (DOLA), is issuing this Request for Qualifications (RFQ) to solicit qualifications from industrial hygiene and environmental consulting firms.
The selected firm will conduct pre-construction hazardous materials testing across the exterior components of 110 affected structures at the Fort Lyon Supportive Residential Community campus. This scope of work addresses damage sustained during the June 16, 2023, hailstorm (Claim #P051036) work includes:
- Pre-construction Asbestos-Containing Materials (ACM) visual inspection, sampling, and laboratory analysis
- Lead-Based Paint (LBP) XRF testing and/or paint-chip analysis
Project Address:
Fort Lyon Supportive Residential Community 30999 County Road 15, Las Animas, CO 81054
Background
· Selection Process: Qualifications-Based Selection for Professional Environmental Consulting / Industrial Hygiene Services.
· Statutory Compliance: Full compliance with C.R.S. § 24-30-1401 through § 24-30-1408 (Procurement of Professional Services) under Colorado Office of the State Architect guidelines.
· Insurance Claim Reference: Claim No. P051036 (June 16, 2023, Hail Event).
· For State Public Works C.R.S. §8-17-101 - Colorado labor shall be employed to perform at least 80% of the work. Colorado labor means any person who is a resident of the state of Colorado at the time of the Public Works project.
· Preference shall be given to Colorado resident vendors and for Colorado labor, as provided by law.
· The testing applies strictly to exterior building components tied to the insurance claim scope of work. (Exhibit F)
· Asbestos-Containing Materials (ACM) Survey: Visual inspection, sampling, and laboratory analysis of suspected materials.
· Lead-Based Paint (LBP) Inspection: On-site XRF testing and/or laboratory paint-chip analysis of exterior painted/coated surfaces.
· Hazard Assessment Reporting: Comprehensive reporting detailing locations, analytical results, and specific abatement/remediation protocols required prior to physical repair.
The Department of Local Affairs anticipates using the report provided by the consultant to procure hazardous material removal. The consultant will be retained to complete inspections as required per State and federal requirements. The Engineer is expected to provide Basic Services as described in the sample Consultant Agreement.
The process to be used in the selection of the Consultant is comprised of two steps. In STEP I submittals will be screened and scored as described in detail in Section X. STEP II is the Oral Interview as described in detail in Section XI. A Jury Panel of individuals who will be involved in the project and/or understand the required services associated with the project will evaluate responses upon completion of the evaluation of the Submittals, oral interviews appear necessary, a limited number of firms will be invited to oral interviews.
III. MINIMUM REQUIREMENTS
Notice is hereby given to all interested parties that all firms will be required to meet all minimum requirements to be considered for this project. Interested parties should be prepared to show evidence of the following to be considered as qualified, as a minimum:
1. Not previously terminated by the State for non-performance on a State Buildings contract or procurement.
1. The consultant must have been in the same business under the same name for the last two (2) years.
Demonstrated design experience in projects of similar scope and complexity for at least four (4) projects each in excess of $20,000 (hard costs), utilizing the expertise present in their Colorado Office; and Attended and signed in at the Mandatory Pre-Submittal Conference The Acknowledgment and Attestation Form, Appendix C is a mandatory requirement for a respondent to be considered responsive to this RFQ Prequalification Submittal.
a. Qualifications made by a respondent in executing this form may render a submittal non-responsive as determined by the State.
IV. MANDATORY PRE-SUBMITTAL CONFERENCE AND SITE TOUR
To ensure sufficient information is available to firms preparing submittals, a mandatory pre-submittal conference has been scheduled. The intent of this conference is to tour the site and to have Department of Local Affairs staff able to discuss the project. Firms preparing submittals must attend and sign-in to have their submittals accepted.
A mandatory Pre-Submission Meeting will be held at:
Address: Fort Lyon: 3099 County Rd. 15 Las Animas, CO 81054
Building/Room: Building 5A. Park in the north parking lot, enter the north doors The boardroom will be down the hallway, on your left.
Date/Time: Thursday, October 22nd, 2026 10:00 am – 12:00 pm
V. SCHEDULE
The following is a tentative schedule of events for the Submittal process and an outline of the schedule for the balance of the project. All dates are subject to change and changes in the schedule will be issued via addendum.
| Request for Qualifications Issued | Wednesday, October 14th, 2026, | |||
| Mandatory Pre-Submittal Conference and Tour | Thursday, October 22nd 10:00 am | Request for Clarifications Due | Friday, October 23rd 5:00 pm | |
| Final Addendum Issued (anticipated) | Friday, October 30th at 5:00 pm | |||
| Submittals Due (Prequalification: Step I) | Monday, November 2nd, 2026, at 5:00 pm | |||
| Oral Interviews (Optional) | Tuesday, November 3 – Friday, November 6 | |||
| Selection Announced | Monday, November 9th, 2026, at 4:00 pm | |||
| Negotiation of Contract | November 10 – December 31st, 2026 | |||
| Anticipated Design Start | January 8th, 2027 | |||
| Anticipated Construction Start/Finish | March 2027 – September 2027 |
The above schedule is tentative. Responding firms shall be notified of revisions in a timely manner by email or posted on [Bidnet/Rocky Mountain E-Purchasing System (RMEPS)] website. Respondents may elect to verify times and dates by email, but no earlier than 36 hours before the scheduled date and time.
VI. QUESTIONS, CLARIFICATIONS AND ADDENDA
Owner initiated changes to this RFQ will be issued under numerically sequenced addenda.
Owner initiated changes to this RFQ will be posted in the form of addenda on Bidnet/Rocky Mountain E-Purchasing System (RMEPS).
Questions and requests for clarification regarding this project shall be submitted before the deadline listed in the above Schedule.
Communication regarding the project during the procurement, outside of this submission process or scheduled procurement milestones is not permitted.
VII. POINT OF CONTACT/CLARIFICATION
| Name: | Eric Mareck, PMP | Agency: | Department of Local Affairs – Division of Housing |
| Email Address: | eric.mareck@state.co.us | Phone: | 720-668-0383 |
| Name: | Brenda Lujan | Agency: | Department of Local Affairs |
| Email Address: | Brenda.lujan@state.co.us |
VIII. SUBMITTALS OF QUALIFICATIONS
1. This RFQ document, it’s appendices, and any written addenda issued prior to the closing of the solicitation, and written clarifications shall serve as the only basis for the submittal.
1. All submittals must comply with the following items, a through h. The State retains the right to waive any minor irregularity, or requirement should it be judged to be in the best interest of the State.
Qualifications shall be formatted and tabbed in the exact form and numeric sequence of the Evaluation Form (1 through 7) in Appendix A. A single-page cover letter addressed to Eric Mareck outlining the firm(s) qualifications is required at the front of the submittal. Not counting the cover letter and required Acknowledgement and Attestation form, the entire submittal is to be no more than (10) doubled sided 8 ½’ x 11” sized pages in portrait format, at least 10-point font in one single pdf submittal.
Qualifications shall be evaluated in accordance with criteria as indicated in PREQUALIFICATION SUBMITTAL CRITERIA and ranked on the corresponding Evaluation Form in Appendix A.
Response to all items shall be complete.
All references shall be current and relevant.
Complete and execute the Appendix C: Acknowledgment and Attestation Form and submit at the back of the Qualification Submittal.
An electronic copy of the qualification package is due Monday, November 2nd and shall be received no later than 5:00 PM (MT). Sent in via Bidnet/Rocky Mountain E-Purchasing System (RMEPS). Contact Brenda Lujan.
IX. METHOD OF SELECTION AND AWARD
A. Short List
1. From the submittals received, a short list of qualified respondents shall be identified using the scoring indicated on the enclosed Evaluation Form, Appendix A.
2. Firms failing to meet the minimum required qualifications will not receive further consideration.
B. Oral Interview
1. Optional oral interviews shall be conducted for the short-listed firm(s) only. Interview times and location will be arranged by the Department of Local Affairs, and all short-listed firms will be notified in advance.
C. Method of Selection and Award
1. Submittals will be evaluated by a panel of individuals selected in accordance with state policies. The panel will review and score the submittals. Firms ranked the highest may be invited to an oral interview. It is anticipated that no fewer than two (2) or no more than five (5) may be interviewed.
X. EVALUATION OF QUALIFICATIONS
A. PREQUALIFICATION SUBMITTAL CRITERIA
Firms will be judged not only on their past experience of the type of work involved, but also on their ability to address issues critical to the success of the project requirements outlined in this RFQ document. The primary focus of the prequalification evaluation will be the firm(s) capability.
1. PROJECT TEAM
Identify the project principal, the project manager, key staff and subconsultants. Present a brief discussion regarding how the team's qualifications and experience relate to the specific project.
Qualifications and relevant individual experience.
Unique knowledge of key team members relating to the project.
Experience on projects as a team.
Key staff involvement in project management and on-site presence.
Time commitment of key staff.
Qualifications and relevant subconsultant experience.
2. FIRM/TEAM CAPABILITIES
Organization charts and graphs depicting your capacity may be included.
Are the lines of authority and coordination clearly identified?
Are essential management functions identified?
Are the functions effectively integrated? (e.g., subconsultants’ role delineated)?
Current and projected workload.
3. PRIOR EXPERIENCE
Include the name and current telephone number of the owner’s project manager for every project listed.
Experience of the key staff and firm with projects of similar scope and complexity.
Demonstrated success on past projects of similar scope and complexity.
References.
4. PROJECT APPROACH
For the project and services outlined in the RFQ document, describe how you plan to accomplish the following project control and management issues:
Budget Methodology / Cost Control Establish and maintain estimates of probable cost within owner's established budget.
Control consultant contract costs Coordinate value engineering activities Budget Considerations Quality Control Methodology
0. Insure State procedures are followed Insure the project is designed for durability and maintainability Schedule
0. Manage the required work to meet the established schedule
5. EQUITY, DIVERSITY AND INCLUSION
0. Describe how your firm is incentivized to hire and promote diverse individuals
0. Describe how your team attempts to partner with Service-Disabled Veteran Owned Small Businesses or historically disadvantaged businesses
6. WORK LOCATION
Describe where the prime and subconsultants will do the key work elements of this project.
0. Proximity of firm’s office as it may affect coordination with the State's project manager and the potential project location.
Firm's familiarity with the project area.
Knowledge of the local labor and material markets.
XI. ORAL INTERVIEWS EVALUATION CRITERIA
(Note that the primary focus of the Oral Interview will be the proposed project management team members’ capabilities).
It is anticipated that oral interviews may be conducted during the week of Tuesday, November 3rd. Interviews will be conducted virtually. The time for interviews is to be determined. Key personnel from the firm and major consultants who will be directly involved with the project should attend the interview. The interview panel will, in particular, be interested in knowing about the specific project approach proposed and in meeting the individuals who will act as the primary contacts with the Department of Local Affairs.
RFQ-AE R3
Rev 09/2025 Appendix A: Evaluation Forms
Appendix A1: Prequalification Submittal/Evaluation Form Appendix A3: Submittal and Interview Ranking Matrix
Appendix B: Consultant Contract (SC 5.3)
Appendix C:
ACKNOWLEDGEMENT AND ATTESTATION FORM
By responding to this RFQ, the respondent(s) certify that they have reviewed the Agreement and its Exhibits contained herein and is familiar with their terms and conditions and finds them expressly workable without change or modification.
We certify and declare that the foregoing is true and correct.
| Subscribed on _______________________________ at _________________________, | ||
| Date | City |
| ___________________________, State of _____________________________________. | |
| County | State |
| _____________________________________________________________________ | |
| Corporate Officer Signature | Date |
| _____________________________________________________________________ | |
| Secretary | Date |
Note: Use full corporate name and attach corporate seal here.
Offeror Acknowledges Receipt of Addendum No. ____, ____, ____, ____ (Addenda MUST be acknowledged)
(SEAL)
Appendix D: Insurance Claim P051036 - Scope of Work
Appendix E: Master Building Inventory Table
Appendix F: Fort Lyon Campus Map
END