RFQ_PWD260316_Henry_Street_Water_Tower_Cleaning_-_Addendum_1.pdf

PDF 97 KB Posted

Attached to
Henry Street Water Tower Cleaning
Solicitation number
RFQ# PWD/260316
Issued by
Marion County, Orlando City, Florida

About this file

This is Addendum 1 to a Request for Quotation issued by the City of Ocala, Florida for exterior cleaning services at the Henry Street Water Tower. The addendum, dated January 7, 2026, clarifies requirements and answers bidder questions regarding the soft scrub, low-pressure cleaning project for the 500,000-gallon elevated steel water tank located at 841 NE 8th Avenue. The project scope encompasses comprehensive exterior cleaning of the water tower sphere, riser, supports, and foundation to remove algae, grime, and bird droppings. A mandatory pre-bid meeting was held on December 29, 2025, at 1:00 PM EST at the project site. Work must commence within 15 days of contract finalization and be completed within 120 days of the Notice to Proceed. The procurement requires vendors with a minimum of 10 years' experience cleaning elevated steel tanks of similar size and mandates that vendors perform at least 80 percent of work using their own forces with a dedicated Project Manager assigned as primary point of contact.

The addendum specifies critical environmental and operational requirements that all bidders must follow. All cleaning products must be environmentally safe and fully biodegradable with no bleach permitted in any quantity. The City will provide water at no cost; however, vendors must place a refundable deposit for a water meter at Customer Service with installation on the fire hydrant near the site. Work is permitted only on days with wind speeds of 15 miles per hour or less to prevent spray drift, and tarping is not required. Lane closures on NE 8th Avenue or 9th Street are strongly discouraged; if necessary, vendors must obtain a Right-of-Way permit at their own expense and ensure compliance with FDOT regulations. The preferred staging area is within the fenced area at the water tower site. The solicitation excludes paint touch-up and repair work. Vendors must maintain Commercial General Liability insurance of $1,000,000 per occurrence/$2,000,000 aggregate, Commercial Automotive Liability of $1,000,000 combined limit, Workers' Compensation, Garage Keepers insurance, and Pollution Liability coverage for three years post-completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum # 1

Date: January 7, 2026

To: All bidders

From: Caley Conard, Buyer

Solicitation Number: RFQ# WRS/260316

Solicitation Title: Mast Arm Painting

SECTION 1. QUESTIONS AND ANSWERS

1.1 QUESTION: Is any bleach allowed to be used for cleaning, even a small percentage?

ANSWER: No. Bleach is not allowed in any quantity. All cleaning products must be environmentally safe and fully biodegradable.

1.2 QUESTION: Will the City provide water free of charge to the awarded vendor for use in cleaning the water tower?

ANSWER: Yes. The City will provide water at no cost; however, the awarded vendor must visit Customer

Service to place a refundable deposit for a water meter. This meter can then be installed on the fire hydrant near the Henry St. Water Tower.

Note: Water is also available inside the water tower, but a backflow prevention device must be connected.

1.3 QUESTION: Are lane closures permitted on NE 8th Avenue or 9th Street

ANSWER: Lane closures are strongly discouraged. If a lane closure becomes necessary, the Vendor must submit a Right-of-Way permit application to the City for approval. All associated costs will be the responsibility of the Vendor, and the work must comply with FDOT regulations.

The preferred staging area is inside the fenced area within the tower site.

1.4 QUESTION: What is the specifications for tarping?

ANSWER: Tarping will not be required for the fence line or the water tower. However, the Vendor must exercise reasonable care to prevent spray drift. Work should only be performed on days when the wind speed is 15 mph or less.

1.5 QUESTION: Will paint touch up be addressed with this solicitation?

ANSWER: No. This solicitation will only address the soft scrub, low-pressure cleaning project, and will not include any provisions for paint touch-up or repair.

SECTION 1. QUESTIONS AND ANSWERS