About this file
This is a scope of work document from the Ohio Department of Natural Resources (ODNR) for the development of Well #3 at Hocking Hills State Park in Logan, Ohio. The project involves installing a submersible well pump, piping, valves, and electrical connections to integrate a new well into the existing raw water system. Key specifications include installing a Goulds 65L10 stainless steel submersible pump rated at 65 GPM with 450 feet TDH and 10 HP motor, pitless adapter, check valves, 4" piping with Y adapter and gate valves, concrete pad, and removable bollards. The work must be completed by April 30, 2025, with work restricted to daylight hours. Site visits are encouraged at 19852 State Route 664 South, Logan, with Eric Borchers (740-253-5865) as the contact.
The contract will be awarded to the lowest responsive and responsible bidder based on low lot total, calculated by multiplying unit costs by estimated usage. The lowest apparent bidder must provide examples of two similar completed projects with photos and references, and complete a pre-award meeting with DNR staff. Invoicing must be submitted directly to Ohio Shared Services with specific requirements for proper documentation. The project drawings include site plans, well details, and electrical diagrams showing the integration of Well #3 into the existing system.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev. 6/3/22
Needed Service or Supply: Development of Hocking Hills State Park Well #3 to include pump, piping, valves and electrical
Ordering Location and Address: Hocking Hills State Park, 19852 SR 664, Logan Ohio, 43138
Project Background: Develop Drilled Well #3 at Hocking Hills State and attach to existing raw water feed line
Specifications/Scope of Work
Shipping costs must be included in the cost of the items.
All equipment used on-site shall be free of sediment and debris from off-site to minimize the introduction of invasive species. Any timber matting used shall be new. Previously used matting will not be permitted.
Provide and install pit less adapter and related items necessary to connect well pump to raw water supply line
Provide and install well piping, pump, check valve and related wiring in well
Provide and install piping and valving to connect well #3 to existing raw water line at well #2
Provide and install electrical wiring and transfer switch and connections as specified in drawings
Provide concrete pad and removable bollards at well head
Pump specification's: Submersible, Stainless steel, Goulds 65L10, 65 GPM flow rate, Design TDH 450 feet, motor 10 HP 3 phase 60 Hz 208 volts
Pump will use existing pump controls
Vendor is responsible to supply all supplies, materials, and labor
Vendor is responsible for site cleanup and restoration
Work time is restricted to daylight hours
Work completion date is April 30, 2025
1. Install double throw disconnect switch and electric feed to well pump #3
2. Install pitless adapter, well pump, check valve, wiring, and pipe in well.
3. Install 4” pipe, Y adapter, Gate valves and valve boxes to tie into existing raw well line.
4. Install 4-foot concrete pad around well casing to drain water away from well head.
5. Install 2 removable bollards at well.
Maps and/or Photos: Drawings are attached
Completion Date: April 30, 2025, completion Date
Site Visit & Point of Contact
Prior to submitting a bid response, offerors are encouraged to visit the site Located in the campground located at 19852 State Route 664 South, Logan, Ohio 43138. Contact person on site is Eric Borchers cell 740-253-5865.
Once a contract is awarded, failure of the bidder to have requested a site visit to become familiar with the facility and requirements of the bid will be insufficient reason to support any request to be released from the contract.
Project Award
For bids involving service projects on DNR property, the lowest apparent bidder will be required to provide 2 examples of similar completed projects including photos. Provide the person’s name, organization name, phone number and email address for each project example. In addition, the bidder must complete a pre-award meeting with appropriate DNR staff to ensure that the materials and scope are mutually understood.
Evaluation. The contract will be awarded to the lowest responsive and responsible bidder as determined by the State.
Contract Award. The contract will be awarded to the lowest responsive and responsible bidder by low lot total. Low lot total will be determined by multiplying the unit cost by the estimated usage listed in the bid and then adding each of the totals together to arrive at a total for all items. Failure to bid all items may result in the bidder being deemed not responsive.
Bill to information: (FSS requirement)
Origin-DNR-480 All invoices must be submitted DIRECTLY to Ohio Shared Services (OSS).
-EMAIL the invoice to: invoices@ohio.gov -FAX the invoice to: 1-614-485-1039 -MAIL the invoice to: Ohio Shared Services, PO Box 182880, Columbus, Ohio 43218-2880
In order to process your invoice, please make sure all the required information listed below is on your invoice before submitting it to OSS or they will be returned for not being a proper invoice.
1. Must include the Purchase Order (PO) number assigned and Origin Number listed above
2. Supplier full name as it appears on your PO
3. The Ship to and/or service facility name and full address
4. Unique invoice number
5. Date of service or date work was completed.
6. Complete itemization of services performed, materials or goods supplied and/or labor furnished
7. Line charge(s). If parts are included, please break out lines with product and charges separately.
8. No State of Ohio sales tax
9. Remit to address must match our records for payment
10. This PO is only valid for the goods and/or services received through June 30, 20XX.
11. Any goods/services received after June 30, 20XX will require a new PO.
For the purchase of services use the following statement: The awarded supplier will be required to sign an Addendum to Bid Quote or Personal Services Agreement. Example attached.
File details come from the government source that posted it. Updated .