This is a Request for Qualifications (RFQ) issued by Alamance Community College in North Carolina for engineering design services related to the Technology Infrastructure Replacement Project (SCO #28434, NCCCS #2861). The project encompasses two integrated work elements: design of a campus conduit infrastructure system providing minimum two separate and independent connectivity paths to each building on the Carrington-Scott Campus at 1247 Jimmie Kerr Road, Graham, NC, and design of a redundant 24-strand single-mode fiber optic network operating over the newly installed conduit system with connections to both on-campus data centers. The RFQ was advertised on May 14, 2026, with a submission deadline of June 2, 2026, at 3:00 PM. A non-mandatory pre-proposal site visit meeting was scheduled for May 20, 2026, at 10:00 AM in the Main Building Auditorium, Room 301. The Selection Committee will evaluate proposals between June 2-12, 2026, with contract approval anticipated by June 15, 2026, design completion targeted for July 31, 2026, and bidding/award occurring in September 2026. Responses to questions submitted via email to the Chief Information Officer (Jay Mayer) by May 26, 2026, will be posted by May 28, 2026.
Applicants must submit three copies of current SF 254 Forms and an information package not exceeding twenty single-sided 8.5" x 11" pages (excluding transmittal letter, title page, table of contents, and SF 254). The project budget is estimated at $700,000, and the successful firm will enter into a fixed-fee contract utilizing the State of North Carolina Standard Form of Agreement Between Owner and Designer. Qualified firms must be licensed to practice architecture and/or engineering in North Carolina and maintain Professional Liability Insurance coverage with limits to be determined prior to award. The evaluation criteria include specialized expertise in the project type, past performance on similar projects, adequate staffing and consultant team composition, current workload, proposed design approach, experience with project costs and schedules, construction administration capabilities, proximity and familiarity with the project location, and record of successfully completed projects without major legal or technical problems.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IT Infrastructure Engineer Designer Advertisement May 2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Alamance Community College Advertisement for Request for Qualifications (RFQ) for Engineering Services
RFQ PROJECT BRIEF
Technology Infrastructure Replacement Project (SCO # 28434 and NCCCS # 2861)
Project: Technology Infrastructure Replacement Project Alamance Community College Advertised: May 14, 2026 Closing Date for Submittals: June 2, 2026 at 3:00 PM
Alamance Community College is soliciting Statement of Qualifications (SoQs) from firms interested in providing engineering design services for this project. Individual/Firm must be licensed to practice architecture and/or engineering in the State of North Carolina in accordance with the laws of the State of North Carolina and must have Professional Liability Insurance coverage. Limits shall be determined prior to award of the design contract(s). The successful Team will be required to enter into a fixed fee contract utilizing the State of North Carolina STANDARD FORM OF AGREEMENT BETWEEN OWNER AND DESIGNER.
1. Project Description
The Project consists of two integrated work elements:
Campus Conduit Infrastructure: Design of a diverse underground conduit pathway system providing a minimum of 2 separate and independent connectivity paths to each building on the Carrington-Scott Campus at 1247 Jimmie Kerr Road, Graham, NC, linking all campus buildings to a central distribution point(s). Work includes, but is not limited to, directional boring, trenching, conduit installation, pull boxes, handholes, and restoration of all disturbed surfaces.
Fiber Optic Network: Design of a redundant 24-strand single-mode fiber optic (SMF) network operating over the newly installed conduit system, with all strands terminated, tested and connected to both of the College’s on-campus data centers (Located in T Bldg and Main Bldg).
The network architecture shall provide fully redundant pathways to eliminate single points of failure.
The project budget is estimated at $700,000
A tentative project schedule is shown below.
Contract approval: June 15, 2026 Programming start: June 22, 2026 Project design complete: July 31, 2026
Bidding/Award: September 2026
2. Project Scope
The engineering design team is to:
Assist coordination between College stakeholders and the Project Contact (Chief
Information Officer).
Prepare all contract documents for the project. The contract documents shall be in compliance with provisions regarding the North Carolina Building Codes. The project delivery system shall be Design/Bid/Build.
Prepare costs, schedules and phasing plans for the construction/installation.
3. Engineering Design Team
The College expects prospective engineering design teams and the individuals identified as members of those teams to have demonstrated experience in programming, designing, and preparing contract documents for the construction of this type of project. Statements of Qualifications should include a comprehensive listing of all consultants, including engineering, and others needed to address the specific needs of the project.
Alamance Community College may retain special consultants under direct contract with the College for specialty services as needed.
4. Selection Process
The Selection Committee will consist of the Chief Information Officer and other members of the campus community as required.
There will be a NON-MANDATORY pre-proposal/site visit meeting on May 20, 2026 at 10:00am located at the Main Building Auditorium, Room 301 where interested firms will be able to learn more about the project
All proposals are due on June 2, 2026 on or before 3:00 PM. The Selection Committee will meet June 2 – 12, 2026 to discuss, evaluate and rank the proposals. The highest ranked firm will be contacted to provide a project fee proposal. If agreement cannot be reached on the fee proposal, the next highest ranked firm will be contacted for a project fee proposal.
5. Submittals
Alamance Community College seeks letters of interest from firms who have recent experience with similar projects. In selecting engineering designer firms, the selection committee will take into consideration qualification information including such factors as:
1. Specialized or appropriate expertise in the type of project.
2. Past performance on similar projects.
3. Adequate staff and proposed design or consultant team for the project.
4. Current workload and State projects awarded.
5. Proposed design approach for the project including design team and consultants.
6. Recent experience with project costs and schedules.
7. Construction administration capabilities.
8. Proximity to and familiarity with the area where the project is located.
9. Record of successfully completed projects without major legal or technical problems.
10. Other factors which may be appropriate for the project.
Please submit THREE (3) copies of current SF 254 Form with the required letters of interest and THREE
(3) copies of the information package. In the interest of costs-savings to the designers, consistency of the submittals and more efficient use of time by the pre-selection committee, the submitted information package should not include any notebooks, binders, tab, clips, etc. The format should be a maximum of twenty (20), single-sided 8-1/2" x 11" pages or equivalent (e.g. 11" x 17" fold out sheets for charts, schedules, etc. count as 2 pages). This page limit excludes a transmittal letter, title page, table of contents and SF 254. The page limit includes resumes of key personnel and any unsolicited supplementary information such as corporate brochures, etc..
Please contact only the Chief Information Officer for any matters related to this submittal. No other College staff, The College’s Board of Trustees, or any College officials is to be contacted other than the project manager – Chief Information Officer, Jay Mayer. All questions and project submittals are to be directed to:
Jay Mayer Chief Information Officer Alamance Community College 1247 Jimmie Kerr Road PO Box 8000 Graham, NC 27253 jnmayer503@alamancecc.edu
Questions will only be received via email to jnmayer503@alamancecc.edu until 5:00 pm MAY 26, 2026.
Responses to questions will be posted on NCeVP website by 3:00 pm MAY 28, 2026.