1301003656
FAR 36.204 Disclosure of the magnitude of construction project:
- Physical characteristics: Building 447. Approximately 15 rooms. Approximately 8,600 surface sq ft.
- Estimated price is betw een $100,000 and $250,000.
Site Visit: 9:30 AM ET Thursday 2 Jun 2022. Register separately w ith both the NUWC Security and the NUWC Contracts Departments.
See Sections A, I, J, and L.
Questions accepted up to one w eek prior to proposal due date. Email to joseph.scarpa6.civ@us.navy.mil and michael.h.broomfield.civ@us.navy.mil. See Section L.
Quotes due: Wednesday 8 Jun 2022 before 2:00 pm ET. Email to joseph.scarpa6.civ@us.navy.mil and michael.h.broomfield.civ@us.navy.mil
100% Small Business Set-Aside: NAICS 238320 – Painting and Wall Covering Contractors; Size Standard $16,500,000.00.
Fill-ins, representations, and technical information required w ith proposal. See Sections B, G, J, K, L and M.
Method of Payment: Government Purchase Card. Include processing fee in CLIN 0001 price. See Sections G and I.
Bid Bond not required. Performance Bond required if contract over $150,000. Payment Bond required if using subcontractors.
See Sections H, I, and L.
JOSEPH SCARPA 401-832-1499
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
27-May-2022
(RFP)
(IFB)
CALL:
Building 447 Painting and Lead Based Paint Abatement and Remediation Statement of Work dated March 2022 w ith its attachments.
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________75 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Sections F & H
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________08 Jun 2022 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______30 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
NAVAL UNDERSEA WARFARE CENTER
JOSEPH SCARPA, CODE 0222, 401-832-1499,
CONTRACTS DEPARTMENT
1176 HOWELL STREET, BLDG. 1258
NEWPORT RI 02841-1708
N66604
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
W2022-B447
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: 401-832-1499 TEL: FAX:
N6660422Q0395 60
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
N6660422Q0395
Section A - Solicitation/Contract Form
GENERAL INFORMATION
Distribution: TBD
NUWCDIVNPT Requisition: 1301003656
NUWCDIVNPT PID: N66604-22-SIMACQ-NPT-10-0326
NUWCDIVNPT Point of Contact: Joseph Scarpa, joseph.scarpa6.civ@us.navy.mil, (401) 832-1499
NAVAL UNDERSEA WARFARE CENTER DIVISION NEWPORT
NUWCDIVNPT Site Visit Instructions
Building 447 Interior Painting and Lead Based Paint Abatement & Remediation.
Visitors must check-in at NUWCDIVNPT Building 80, Naval Undersea Warfare Center (NUWC), located at Access Road, Middletown, Rhode Island. Maintain distance and observe COVID-19 precautions.
Directions/map available at https://www.navsea.navy.mil/Portals/103/Documents/NUWC_Newport/NUWC-Gate- Detail.pdf
Visitor parking is on northeast side of Building 80. Do not approach nor drive through vehicle gate.
Heading west down Access Road, go past the traffic signal and then first right into Building 80 parking lot.
You should see small “Bldg 80” sign mounted on the two-story brick exterior wall that is facing the parking lot. Once checked in and further authorized, we will caravan as a supervised group of individual vehicles to the project site. Advise if special accommodations needed.
Visitor Control is in NUWC Building 80 outside of NUWC Gate 23 and is open Monday- Friday from 7 a.m. to 3:30 p.m. (except holidays).
• This will be an unclassified site visit.
• Follow-up questions can be submitted via email to joseph.scarpa6.civ@us.navy.mil and michael.h.broomfield.civ@us.navy.mil.
• The use of any type of camera during the site visit is prohibited.
• All participants MUST have an approved Visit Request from NUWC Visitor Control. See Section J.
• Instructions for submitting a visit request can be found at the following link:
http://www.navsea.navy.mil/Home/Warfare-Centers/NUWC-Newport/Contact-Us/Mandatory-Visit-Request/
• Access to NUWC Division Newport WILL NOT be granted without a valid visit authorization request on file.
See Section J.
• Indicate Joseph Scarpa, Code 0232, and Michael Broomfield, Code 0232 as the Government POC on the visit request. Allow up to five business days for NUWC Security to process your visit request.
• Separately and in addition to NUWC Security Visitor Control request, attendees must pre-register by email to the NUWC Contracts Department: joseph.scarpa6.civ@us.navy.mil and michael.h.broomfield.civ@us.navy.mil.
• Personally identifiable information is required by the Security Department; not the Contracts Department.
Therefore, separately register your intent to attend via email to the Contracts Department (J Scarpa and M Broomfield) after you submit your Visitor Control request to NUWC Security. Submit company name and individual names of attendees (including your subcontractors)(no birthdates and no social security numbers) to joseph.scarpa6.civ@us.navy.mil and michael.h.broomfield.civ@us.navy.mil.
Visiting NUWCDIVNPT during COVID-19
Review COVID-19 related attachments in Section J and COVID-19 County Check for Newport County, Rhode Island, at https://www.cdc.gov/ in determining access and protocols for NUWCDIVNPT.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job B447 Interior Painting
FFP
Building 447 Painting and Lead Based Paint Abatement & Remediation in accordance with Statement of Work and Sketch Set dated March 2022.
FY of Funding: Not Applicable Fund Type: NWCF - Overhead Customer: NUWCDIVNPT Code 102
PURCHASE REQUEST NUMBER: 1301003656
PSC CD: Z2AZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Lot Submittals
FFP
Submittals in accordance with Statement of Work and its attachments.
Not separately priced (NSP). Enter "NSP" or "$0.00" in Contract Line Item Number (CLIN) 0002.
FY of Funding: Not Applicable Fund Type: NWCF - Overhead Customer: NUWCDIVNPT Code 102
PSC CD: Z2AZ
NET AMT
Section C - Descriptions and Specifications
STATEMENT OF WORK
NAVAL UNDERSEA WARFARE CENTER DIVISION NEWPORT
Interior Painting Project
Building 447
1.0 BACKGROUND/SCOPE
The Naval Undersea Warfare Center, Division Newport (NUWCDIVNPT) Newport, Rhode Island has a requirement for interior painting in Building 447, located on Naval Station, Newport, Rhode Island.
2.0 ENCLOSURES
(1) Building 447 Design Drawings
(2) Reference Photos
(3) Surface Areas Calculations Chart
(4) B447 Asbestos Results - 2018
(5) B447 Lead and Asbestos Results - 2022
(6) Lead Paint Training ECATTS Guide 2021
(7) Asbestos Training ECATTS Guide 2021
(8) Section 02 83 00 Lead Remediation
(9) Lead Based Paint NSN Instruction 5090.9C
3.0 PROJECT REQUIREMENTS
Contractor shall provide all materials, labor, services, and equipment necessary to complete the work described in this Statement of Work, and as indicated in the enclosures.
3.1 Surface Preparation
Prepare surfaces in areas indicated in enclosures (1) and (2):
Remove and dispose of any nails, screws, stickers, tape, Velcro, and adhesives. Remove and dispose of any bulletin boards and tack boards prior to painting.
Remove and store any signs before painting. Reinstall upon completion.
Remove all electrical outlet and light switch plates/covers before painting. Replace with new Nylon wall plates in white.
Protect all communications/data outlets/housing covers and lighting while painting. Wipe and clean as needed.
Protect all fire alarm panels and electrical panels while painting. Wipe and clean as needed.
Smooth and blend all patches to match existing adjacent surfaces.
Patch any imperfections along wall surfaces greater than the size of a dime.
Caulk any cracks in places such as seams between walls and trim, soffits, and anywhere else requiring caulk. Remove and clean, then re-caulk any damaged or missing caulk around windows.
Wipe clean baseboard radiator covers and vacuum radiator grills prior to prime/paint.
Wipe windowsills and any other necessary surfaces prior to prime/paint.
Wipe and paint all insulation to match adjacent painted surface color.
Clean surfaces prior to painting.
Remove old window blinds, silk drapes and curtains, header, and all associated tracks, hardware and brackets.
Patch all holes, dispose of all drapes and mounts, and store old window blinds in Room 122.
See enclosure (2) Ref. Photo: IMG_1539 and IMG_1502.
Ensure all new materials installed and used are compatible with the substrate or surface material receiving the new product.
Ensure any damage incurred to surfaces such as walls and floors during any action of the project is repaired to equal or better than prior condition.
3.2 Building 447
Refer to enclosure (1) for room locations and enclosure (3) for all room dimensions and surface areas.
General:
Walls: Prepare, prime, paint.
See enclosure (2) Ref. Photo: IMG_1490.
Metal Door Trim: Clean.
See enclosure (2) Ref. Photo: IMG_1506.
Painted Wood and Metal Doors: Clean.
See enclosure (2) Ref. Photo: IMG_1506.
Sealed Wood Doors: Clean and seal with translucent wood polish.
See enclosure (2) Ref. Photo: IMG_1490.
Baseboard Covers: Clean, prime, and paint with metal paint and primer.
See enclosure (2) Ref. Photo: IMG_1502.
Cove Base: Not applicable
Conduits: Paint to match adjacent wall color (if within 1/2-inch of adjacent wall surface or otherwise specified).
See enclosure (2) Ref. Photo: IMG_1502.
Rm 116, Rm 125, Rm 127, Rm 224, Rm 324, Rm 326, Rm 426, and Rm 427:
Protect the floors in Rooms 116 and 127 (West and East Lobbies) prior to and during painting as the carpet will not be replaced after painting.
Prime, then paint.
Rm 227, Rm 327:
Perform lead abatement as outlined in Section 3.3 of this SOW.
Patch and repair CMU Wall in Rooms 227 and 327 in the Northeast corner above cove base.
If new carpet tile is installed (by others) prior to beginning work in Room 227 and Room 327, protect new carpet floor with heavy-duty, water resistant temporary floor protection such as Builder Board with Liquid Shield, or similar.
See enclosure (2) Ref. Photo: IMG_1539 and IMG_1536.
Restrooms: Rm 133, Rm 134, Rm 404, Rm 405:
Remove all fixtures, holders, and mounts attached to wall surface.
Patch holes from wall fixtures Prime repairs.
Paint two coats, semi-gloss zero VOC interior paint.
Flooring in restrooms will not be replaced. Protect floors prior to and during painting; clean as necessary.
Touch-up painting to be completed in all locations where wall sconces, electrical outlets, and switches were replaced, relocated, or capped. This includes all lobby areas and room 403. Paint color to match surrounding surface areas. Feather into surrounding wall surface.
3.3 Hazardous Materials
3.3.1 Lead Paint and Asbestos:
Contractor shall provide all labor, equipment, materials, and incidentals necessary to perform this line item. All work and material shall be in accordance with enclosure (8), enclosure (9), and in accordance with federal, state and local regulations.
For areas of work impacted by lead and asbestos, please see enclosures (4) and (5). Asbestos-containing materials shall not be disturbed during the project.
The floors surrounding areas specified to contain lead or asbestos per enclosures (4) and (5) shall be protected with a plastic covering and disposed of as hazardous waste in accordance with enclosure (9) and state/local/federal regulations.
Any rags used to wipe down surfaces specified to contain lead paint per enclosure (4) and (5) must be disposed of as hazardous waste in accordance with enclosure (9) and state/local/federal regulations. Any disposable PPE worn (as mentioned in Section 10 of this SOW) shall be disposed of as hazardous waste in accordance with state/local/federal regulations.
The contractor shall supply the hazardous waste container and dispose of off government property in a manner subject to state/local/federal regulations. A NUWC Environmental Representative will review and inspect all waste and sign a hazardous waste manifest prior to being transported off site for disposal.
3.3.2 Lead Paint Removal Process:
Remove scaled and peeling paint from surface. The removal of scaling paint is considered completed when particles do not detach as a result of hand rubbing-pressure applied vertically and horizontally, and when the new paint mill thickness encapsulates all surfaces evenly.
After removal of the peeled/chipped paint:
Remove and clean any and all remaining efflorescence.
Patch any cracks and holes with masonry patching compound.
Apply a thick alkali-resistant primer.
Apply second coat of primer.
Paint with masonry latex paint.
Surfaces that have been tested and found to have lead content, but are in good condition, may be painted over without removal.
3.3.3 NUWC requested analysis of potential lead-containing paint samples in B447 through New England Testing Laboratory on 09/28/2018 and 03/25/2022. Refer to enclosures (4) and (5) for results and details.
3.3.4 All Contractor employees painting surfaces specified to contain lead or asbestos shall take the ECATTS Asbestos and Lead Paint awareness trainings for managing the site as outlined in enclosures (6) and (7).
Technicians providing the removal of lead paint shall be certified competent persons and provide certifications in the Lead Abatement plan submittal per the Specification.
4.0 SITE SPECIFIC REQUIREMENTS NAVAL UNDERSEA WARFARE CENTER
4.1 All equipment and materials shall be delivered and offloaded on the south side of Building 447 under the overhang. Material storage and drop, ship locations must be approved by the government prior to start of project. All paints shall be stored properly as specified as best practice by the manufacturer.
4.2 Work shall be conducted to cause the least possible disturbance to pedestrians entering and exiting the building and vehicle traffic entering and exiting the parking lot. To the greatest extent practicable, equipment and materials shall not be left in the paths of travel into the parking lot.
4.3 All vehicles are subject to search which enter on NAVSTA and NUWC.
4.4 Contractor shall ensure their personnel employed at the activity become familiar with and obey Activity regulations. Keep within the limits of the work and stay clear of avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry.
The Contractor’s equipment shall be conspicuously marked for identification.
5.0 BASE ACCESS
A visit request is required to visit NUWC. The preferred method is JPAS. If the company does not have JPAS, then they must fax or email a visit request with the information required in the visit request form. You may also use Department of Defense Secure Access File Exchange (DoD SAFE) to submit your visitor request (https://safe.apps.mil/). Incomplete visit requests will be rejected. There is a minimum of 15 business days to process.
Note: If born outside the U.S., you must provide a Naturalization number or Passport number. All visitors accessing NUWCDIVNPT are required to be U.S. or Naturalization Citizens.
Naval Station requires one of the following in order to enter the base, along with your NUWC visitor badge:
(a) CAC card
(b) DBIDS card
(c) Retired Military ID
To obtain a DBIDS card a vetting spreadsheet is required and can be acquired from Naval Station to conduct the vetting. You will need a DBIDS card if you do not have the other required IDs. The spreadsheet should be submitted to Visitor Control (group email is nuwc_npt_access_control@navy.mil). The other option is to use DoD SAFE (https://safe.apps.mil/). DoD SAFE is certified to protect Privacy Act information. You must use our individual emails (deanna.l.monell.civ@us.navy.mil; gina.m.santos2.civ@us.navy.mil). DBIDS requests are consolidated and submitted each day. Naval Station will not accept DBIDS vetting spreadsheets directly from the companies requiring vetting.
Naval Station requires 7-15 days to process a vetting spreadsheet. This 7 to 15 days’ period does not include the day of submission nor does it include weekends and holidays. The results except for denials are not returned, if it has been more than five days excluding day of submission and weekends/holidays, and there has been no response, then vetting has been approved.
In addition, visitors must stop at Building 80 and get their NUWC visitor pass before going to Naval Station Gate 1 to get a DBIDS card. Visitors must not try to enter NUWC with only their visitor pass and no DBIDS (or CAC) as the gate guard will confiscate their NUWC visitor pass and you will be turned around at the gate.
Please keep in mind, DBIDs is only good for 179 days. The company must resubmit their DBIDS vetting spreadsheet every 170 days in order to stay active with their DBIDS card. 170 days is requested so that the vetting can be sent and cleared before the 179-day expiration. If DBIDS is not sent every 170 days, when the 179-day period expires, they will be denied access to the base and will have to wait five business days in order for their vetting to clear again. DBIDS is separate from the visitor request.
If you have any questions on the DBIDS portion, please contact NAVSTA Pass & ID at 401-841-3126.
If you have questions on the visitor request portion, please contact NUWC Visitor Control at 401-832-2152.
6.0 NUWCDIVNPT RESTRICTIONS
6.1 Photography
Unofficial photography is prohibited on NUWCDIVNPT. When required to record progress and existing conditions, a permit must be obtained from NUWC Security. Justification and camera details will be required.
Coordinate permit application with NUWCDIVNPT Government Sponsor.
6.2 Computer Use
Non-NUWC Owned Computers are prohibited on NUWCDIVNPT. When required for daily reports, a permit must be obtained from the NUWC Information Security Manager. Based upon the use and justification, use of a computer may be permitted. Computers permitted onto NUWC are prohibited from using Wi-Fi and may not contain a camera. If internet access is required, the computer must connect using a cellular signal though a Wireless Internet card or smart phone. Coordinate permit application with NUWCDIVNPT Government Sponsor.
6.3 Wi-Fi
The use of Wi-Fi is prohibited on NUWCDIVNPT. Electronics with built in Wi-Fi must turn their Wi-Fi signals off prior to coming on board.
6.4 Radio Transmitter Restrictions
Contractor shall conform to the restrictions and procedures for the use of radio transmitting equipment as directed. Contractor shall not use transmitters without prior approval from the Explosive Safety Officer. Two-way radios are prohibited on NUWCDIVNPT.
6.5 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas.
This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. If needed, the Government will identify designated smoking areas.
6.6 Failure to obtain entry approval will not affect the contract price or time of completion.
6.7 The contractor shall park vehicles where directed by the Government.
7.0 ADMINISTRATIVE REQUIREMENTS
7.1 Provide a contact list of personnel.
The contact list must contain the names of key contractor and subcontractor points of contact, their title, addresses, and telephone numbers for use in the event of an emergency. Regularly update the contact list as needed to maintain currency.
7.2 Project Superintendent
Provide a Project Superintendent at the work site to implement and manage quality control and to serve as the Site Safety and Health Officer (SSHO). The Project Superintendent is required to attend all planning meetings, perform submittal review and approval, and ensure construction is performed in accordance with contract requirement.
7.3 Submittals
Contractor shall provide two copies of submittals for approval purposes for all materials to be used on the project. Submittals shall be complete with manufacturer’s name, catalog number, specifications, and any other information necessary to approve the materials. Submit Safety Data Sheets (SDS) with the product data for any potentially hazardous materials such as paints, adhesives, caulking, gypsum board compound, flux materials, etc. Use low VOC materials wherever possible or where specifically called out.
7.4 Warranty
Contractor shall provide warranty services for all new items installed for one year following acceptance by the Government. Warranty period begins at final system acceptance. If there is a failure of the system, the contractor shall respond within 48 hours of notification. See paragraph entitled “Closeout Procedures” for additional information regarding warranties.
7.5 Work Schedules
Prior to start of Work, prepare and submit to the Contracting Officer a Baseline Construction Schedule. Update the Construction Schedule at monthly intervals or when the schedule has been revised. Keep the updated schedule current, reflecting actual activity progress and plan for completing the remaining work.
Complete Project as indicated in Section F.
8.0 PLACE OF PERFORMANCE: NAVAL STATION NEWPORT, NEWPORT, RHODE ISLAND
Work must take place between 7 a.m. and 6 p.m. Monday through Friday, excluding Federal Holidays. During periods of darkness, provide light to illuminate the various parts of work in a manner approved by the Government.
Work outside regular working hours requires Government approval and Government escort. Submit an application 15 calendar days prior to such work to allow arrangements to be made by the Government. In the request, provide the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Government may approve work outside regular hours.
9.0 PRE-CONSTRUCTION CONFERENCE
Contractor shall attend a pre-construction conference at the Naval Undersea Warfare Center to discuss all aspects of the project, including scheduling, safety concerns, fire department concerns, submission of submittals and the approval process, security concerns, environmental issues, customer concerns, and any concerns that the contractor may have.
10.0 SAFETY
10.1 Personal Protective Equipment (PPE)
Work and PPE shall be in accordance with safety standards of U.S. Army Corps of Engineers Engineering Manual EM 385-1-1. PPE shall also be in accordance with enclosure (9). EM 385-1-1 available at https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/
10.2 Sanitation
Contractor is permitted to use Building 447 restroom facilities for personal hygiene. Contractor shall provide own facilities to wash and clean its equipment and supplies and otherwise perform Work.
10.3 Activity Hazard Analysis (AHA)
The principal purpose of an AHA is to reduce the overall risk of the hazards associated with construction work.
Provide an AHA for every operation involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform work.
The analysis must identify and evaluate hazards and outline the proposed methods and techniques for the safe completion of each phase of work. At a minimum, define the activity being performed, sequence of work, specific safety and health hazards anticipated (slip or trips, cuts, dust or chips in eyes), control measures (to include personal protective equipment) to eliminate or reduce each hazard to acceptable levels, equipment to be used (hand tools, backhoe), inspection requirements (list the inspect ion requirements for the activity to ensure the controls are working, and equipment is inspected to ensure proper operation), training requirements for all involved (any unique training required to make the established controls work) and the competent person in charge of that phase of work.
The AHA shall be continuously reviewed and, when appropriate, modified to address changing site conditions or operations. The analysis should be used during daily inspections to ensure the implementation and effectiveness of the activity's safety and health controls. Activity Hazard Analysis shall be updated as necessary to provide an effective response to changing work conditions and activities.
10.4 Accident Reports and Notifications
10.4.1 Accident Report
For recordable injuries and illnesses, and property damage accidents resulting in a least $2,000 in damages, the prime Contractor shall conduct an accident investigation to establish the root cause of the accident, complete the Navy Contractor Significant Incident Report (CSIR) and provide the report to the Contracting Officer within five calendar days of the accident. The Contracting Officer will provide copies of any required or special forms.
10.4.2 Accident Notification
Notify the Contracting Officer as soon as practical, but not later than four hours after any accident meeting the definition of recordable injuries or illnesses or high visibility accidents, property damage equal to or greater than $2,000. Information shall include Contractor name, contract title, type of contract, name of activity, installation or location where accident occurred, date and time of accident, names of personnel injured, extent of property damage (if any), extent of injury (if known) and brief description of accident (to include Type of construction equipment used, PPE used, etc.). Preserve the conditions and evidence on the accident site until the Government investigation team arrives on site and Government investigation is conducted.
10.4.3 Definition of Recordable Injury or Illness: Any work related injury or illness that results in:
(1) Death, regardless of the time between the injury and death or the length of the illness;
(2) Days away from work;
(3) Restricted work;
(4) Transfer to another job;
(5) Medical treatment beyond first aid;
(6) Loss of consciousness;
(7) A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in (1) through (6) listed above.
10.4.4 Emergency Medical Treatment
Contractors shall arrange for their own emergency medical treatment. The Government has no responsibility to provide emergency medical treatment.
10.4.5 Periodic Inspections
The work site may be inspected periodically for OSHA and Navy violations. Abatement of violations shall be the responsibility of the Contractor and/or the Government as determined by the Contracting Officer. The Contractor shall provide assistance to the Safety Office escort and the federal or state OSHA inspector if a complaint is filed. Any fines levied on the Contractor by federal or state OSHA offices due to safety/health violations shall be paid promptly.
If the Contractor fails or refuses to promptly comply with safety requirements, the Contracting Office may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop order shall be made the subject of claim for extension of time or for excess costs or damages to the Contractor.
The Safety Office will investigate all complaints of unsafe or unhealthful working conditions received from Contractor’s employees, federal civilian employees, or military personnel. The Safety Office will notify the Contracting Officer of the results of such investigations.
11.0 ENVIRONMENTAL PROTECTION
Contractor shall provide and maintain, during the life of the contract, environmental protective measures to control pollution that develops during normal construction practice. Plan for and provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the project. Comply with Federal, state, and local regulations pertaining to the environment, including but not limited to, water, air, solid waste, hazardous waste and substances, oily substances, and noise pollution, reporting, and permitting requirements.
During the pre-construction conference, Contractor shall meet with Government environmental representative(s) to develop a mutual understanding relative to the details of environmental protection, including measures for protecting natural resources, required reports, required permits, and other measures to be taken.
12.0 PRODUCTS
The interior wall surfaces shall be painted with Sherwin Williams zero-VOC interior paint, or equivalent, unless otherwise specified. All paint color selections must be approved by the Government. See NUWCDIVNPT enclosure (1) for all wall surfaces requiring preparation and paint. Basis of design colors are Sherwin Williams:
Primary Color - Walls: SW 7013 - Ivory Lace (Egg Shell) Secondary Color: SW 7641 - Colonnade Gray (Egg Shell) or SW 9178 - In The Navy (Egg Shell)
13.0 EXECUTION
See section 3.0 Requirements for Interior Painting
14.0 CLOSEOUT PROCEDURES
Prior to receiving final payment, the contractor shall be responsible for the following at the completion of the project:
14.1 The provision of an “As Built” Record of Materials, which shall include a list of items, along with the Manufacturer’s name, Manufacturer’s model and colors, paint colors (mix formula), etc.
14.2 The provision of Warranty Information including the warranty duration, the actual date of warranty expiration, warranty contact information, and any items that have an extended warranty beyond the standard one year.
14.3 The contractor shall be required to remove all unused materials from the site, including such items as excess primers, paint, and cleaning solvents, remove everything from the site.
CLAUSES INCORPORATED BY FULL TEXT
C-223-W002 ON-SITE SAFETY REQUIREMENTS (NAVSEA) (OCT 2018)
(a) The Contractor shall ensure that each Contractor employee reads any necessary safety documents within 30 days of commencing performance at any Government facility. Required safety documents can be obtained from the respective safety office. Contractors shall notify the Safety Office points of contact below to report completion of the required training via email. The email shall include the Contractor employee’s name, work site, and contract number.
(b) It is expected that Contractor employees will have received training from their employer on hazards associated with the areas in which they will be working and know what to do in order to protect themselves. Contractors are required to adhere to the requirements of 29 CFR 1910, 29 CFR 1926, and applicable state and local requirements while in Government spaces. The Contractor shall ensure that all on-site Contractor work at the Government facility is in accordance with any local safety instructions as provided via the Technical Point of Contact (TPOC) or Contracting Officer’s Representative (COR). The Contractor shall report all work-related injuries or illnesses that occurred while working at the Government site to the TPOC/COR.
(c) Contractors whose employees perform work within Government spaces in excess of 1,000 hours per calendar quarter during a calendar year shall submit the data elements on OSHA Form 300A, Summary of Work Related Injuries and Illnesses, for those employees to the safety office, via the TPOC/COR by 15 January for the previous calendar year, even if no work related injuries or illnesses occurred. If a Contractor’s injury or illness rates are above the Bureau of Labor Statistics industry standards, a safety assessment may be performed by the Safety Office to determine if any administrative or engineering controls can be utilized to prevent further injuries/illnesses, or if any additional Personal Protective Equipment or training will be required.
(d) Any Contractor employee exhibiting unsafe behavior may be removed from the Government site. Such removal shall not relieve the contractor from meeting its contractual obligations and shall not be considered an excusable delay as defined in FAR 52.249-10.
(e) The Naval Undersea Warfare Center Division Newport Safety Office phone number is (401) 832-3534.
(End of text)
C-228-H002 MINIMUM INSURANCE REQUIREMENTS (NAVSEA) (JAN 2019)
(a) In accordance with the clause(s) of this contract entitled "Insurance--Work On a Government Installation" (FAR 52.228-5) and “Liability and Insurance” (DFARS 252.217-7012), as applicable, the Contractor shall procure and maintain insurance, of at least the kinds and minimum amounts set forth below:
(i) Workers' compensation and employer’s liability coverage shall be at least $100,000, except as provided in FAR 28.307-2(a), if applicable
(ii) Bodily injury liability insurance coverage shall be written on the comprehensive form of policy of at least $500,000 per occurrence.
(iii) Automobile liability policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.
(b) To be approved by the Contracting Officer, insurance certificates must include the following cancellation policy statement: Prior to cancellation or material change in coverage, the contractor shall give 30 days written notice to the Contracting Officer.
(c) Physical work cannot begin until the insurance certificate has been approved by the Contracting Officer. Failure to provide an acceptable insurance certificate will not remove the contractor’s responsibility to meet the delivery requirements outlined in Section F and FAR 52.211-11, Liquidated Damages – Supplies, Services, or Research and Development, if applicable.
C-237-H002 SUBSTITUTION OF KEY PERSONNEL (NAVSEA) (OCT 2018)
(a) The Contractor agrees that a partial basis for award of this contract is the list of key personnel proposed. Accordingly, the Contractor agrees to assign to this contract those key persons whose resumes were submitted with the proposal necessary to fulfill the requirements of the contract. No substitution shall be made without prior notification to and concurrence of the Contracting Officer in accordance with this requirement.
Substitution shall include, but not be limited to, subdividing hours of any key personnel and assigning or allocating those hours to another individual not approved as key personnel.
(b) All proposed substitutes shall have qualifications equal to or higher than the qualifications of the person to be replaced. The Contracting Officer shall be notified in writing of any proposed substitution at least forty-five (45) days, or ninety (90) days if a security clearance is to be obtained, in advance of the proposed substitution. Such notification shall include: (1) an explanation of the circumstances necessitating the substitution; (2) a complete resume of the proposed substitute; (3) an explanation as to why the proposed substitute is considered to have equal or better qualifications than the person being replaced; (4) payroll record of the proposed replacement; and (5) any other information requested by the Contracting Officer to enable him/her to judge whether or not the Contractor is maintaining the same high quality of personnel that provided the partial basis for award.
(c) Key personnel are identified in an attachment in Section J.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 75 dys. ADC 1 NAVAL UNDERSEA WARFARE CENTER, DIV NPT
SEE STATEMENT OF WORK
SEE STATEMENT OF WORK
NEWPORT RI 02841-1708
FOB: N/A
N66604
0002 75 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
FOB: N/A
N66604
CLAUSES INCORPORATED BY REFERENCE
52.246-12 Inspection of Construction AUG 1996
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives notice of award, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 75 days after award. The time stated for completion shall include final cleanup of the premises.
(End of clause)
Section G - Contract Administration Data
252.204-7006 BILLING INSTRUCTIONS (OCT 2005)
When submitting a request for payment, the Contractor shall--
(a) Identify the contract line item(s) on the payment request that reasonably reflect contract work performance; and
(b) Separately identify a payment amount for each contract line item included in the payment request.
G-232-H002 PAYMENT INSTRUCTIONS AND CONTRACT TYPE SUMMARY FOR PAYMENT
OFFICE (NAVSEA) (JUN 2018)
(a) The following table of payment office allocation methods applies to the extent indicated.
For Government Use Only
Contract/Order Payment Clause
Type of Payment Request
Su pp ly
Se rv ic e
C on st ru ct io n
Payment Office Allocation Method
52.212-4 (Alt I), Contract Terms and Conditions— Commercial Items 52.216-7, Allowable Cost and Payment 52.232-7, Payments under Time-and-Materials and Labor-Hour Contracts
Cost Voucher X X N/A Line item specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN on the deliverable line or deliverable subline item for which payment is requested.
52.232-1, Payments Navy Shipbuilding Invoice (Fixed Price)
X N/A N/A Line Item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.
Clause
Type of Payment Request
Su ic e
C on st ru ct io n
Payment Office Allocation Method
52.232-1, Payments;
52.232-2, Payments under Fixed-Price Research and Development Contracts;
52.232-3, Payments under Personal Services Contracts;
52.232-4, Payments under Transportation Contracts and Transportation-Related Services Contracts; and 52.232-6, Payments under Communication Service Contracts with Common Carriers
Invoice X X N/A Line Item Specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN on the deliverable line or deliverable subline item for which payment is requested.
52.232-5, Payments Under Fixed-Price Construction Contracts
Construction Payment Invoice
N/A N/A X Line Item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.
52.232-16, Progress Payments
Progress Payment*
X X N/A Contract-wide proration. Funds shall be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN. Progress Payments are considered contract level financing, and the “contract price” shall reflect the fixed price portion of the contract per FAR 32.501-3.
52.232-29, Terms for Financing of Purchases of Commercial Items;
52.232-30, Installment Payments for Commercial Items
Commercial Item Financing*
X X N/A Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2) and 32.1007(b)(2).
52.232-32, Performance- Based Payments
Performance- Based Payments*
X X N/A Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2) and 32.1007(b)(2).
252.232-7002, Progress Payments for Foreign Military Sales Acquisitions
Progress Payment*
X X N/A Allocate costs among line items and countries in a manner acceptable to the Administrative Contracting Officer.
Clause
Type of Payment Request
Su ic e
C on st ru ct io n
Payment Office Allocation Method
*Liquidation of Financing Payments. Liquidation will be applied by the payment office against those ACRNs which are identified by the payment instructions for the delivery payment and in keeping with the liquidation provision of the applicable contract financing clause (i.e., progress payment, performance-based payment, or commercial item financing).
(b) This procurement contains the following contract type:
Contract Line Item Number (CLIN) 0001: Fixed Price Contract Line Item Number (CLIN) 0002: Not separately priced (NSP)
G-232-H004 GOVERNMENT PURCHASE CARD METHOD OF PAY (NAVSEA) (OCT 2018)
(a) Payment will be made via the Government Purchase Card once evidence of material receipt or service completion and an invoice are received. At the time of shipment, or completion of services, but no later than two business days after shipment, contact the individual identified below to obtain the account number to be charged. The Government Purchase Card must not be charged without first obtaining final authorization from the appropriate Government Purchase Cardholder.
(b) To facilitate delivery, clearly mark all boxes, cartons, containers and packing slips with the order number referenced on the order. Include an itemized and serialized invoice. (NOTE: these numbers can be found on the face of the order or contract.)
(c) To expedite payment, do not include your invoice with your shipment. Email invoice separately to address below.
An invoice is required for payment to be authorized using the Government Purchase Card.
(d) Mail invoices to:
NUWCDIVNPT
Purchasing Agent, Code 1071 1176 Howell Street Newport RI 02841-1708
E-Mail Address: call (401) 832-5552 for email address.
G-242-H001 GOVERNMENT CONTRACT ADMINISTRATION POINTS-OF-CONTACT AND
RESPONSIBILITIES (NAVSEA) (OCT 2018)
(a) The Government reserves the right to administratively substitute any of the points of contact listed below at any time.
(b) The contracting officer is the only person authorized to change this contract or orders issued thereunder. The Contractor shall not comply with any order, direction or request of Government personnel - that would constitute a change - unless it is issued in writing and signed by the Contracting Officer or is pursuant to specific authority otherwise included as part of this contract. If, in the opinion of the contractor, an effort outside the existing scope of this contract is requested, the contractor shall promptly comply with the Notification of Changes clause of this contract.
(c) The points of contact are as follows:
(i) The Procuring Contracting Officer (PCO) is:
Name: Michael Broomfield Address: NUWC Division Newport, Code 0232 1176 Howell St Newport RI 02841-1708 Phone: (401) 832-8469 E-mail: michael.h.broomfield.civ@us.navy.mil
(ii) The Contract Specialist is:
Name: Joseph Scarpa Address: NUWC Division Newport, Code 0232.10 1176 Howell St Newport RI 02841-1708 Phone: (401) 832-1499 E-mail: joseph.scarpa6.civ@us.navy.mil
(d) The Technical Point of Contact (TPOC) is the contracting officer’s representative for technical matters when a COR is not appointed. The TPOC is responsible for technical issues of contract administration, such as providing all items of Government Furnished Information (GFI), Government Furnished Material (GFM) and Government Furnished Equipment (GFE) if specified in the contract as well as the inspection and acceptance of all contract deliverables.
The Technical Point of Contact (TPOC) is:
[ To be provided by Government upon award.]
(e) The Alternate Technical Point of Contact (ATPOC) is responsible for TPOC responsibilities and functions in the event that the TPOC is unavailable due to leave, illness, or other official business.
The Alternate Technical Point of Contact (ATPOC) is:
[ To be provided by Government upon award.]
(f) The Ombudsman will review complaints from the contractors and ensure that all contractors are afforded a fair opportunity to be considered, consistent with the procedures in the contract.
The Ombudsman is:
Name: Stephen Lamb Address: NUWC Division Newport, Code 02 1176 Howell St Newport RI 02841-1708 Phone: (401) 832-8526 E-mail: stephen.a.lamb1@navy.mil
(g) The Contractor's point of contact for performance under this contract is *:
Name: [______________________________________________________________]
Title: [_______________________________________________________________]
Address:
Phone: [___________________________________]; Fax: [___________________]
E-mail: [_____________________________________________________________]
[ * ] To be provided by Contractor with quote and completed by Government at contract award
Section H - Special Contract Requirements
NOTICE OF BONDING REQUIREMENTS
Within 10 days after receipt of award, the offeror to whom the award is made shall furnish the bonds, if any, required by FAR Clause 52.228-15.
Offerors are hereby notified that the contract time for purposes of fixing the completion date will be as stated in Section F - Clause 52.211-10 Commencement, Prosecution, and Completion of Work, regardless of when performance and payment bonds or deposits in lieu of surety are executed.
End of text
PERFORMANCE ON A NAVSEA SITE
CONTRACTOR REQUIREMENTS FOR PERFORMANCE ON A GOVERNMENT SITE (APR 2018)
(a) Control of Contractor Personnel
All persons engaged in work while on Government property shall be subject to search of their persons and vehicles at any time by the Government, and shall report any known or suspected security violations to…