This document is a Request for Quote (RFQ) issued by the Illinois Department of Human Services for the removal and installation of LED lighting in three buildings located at the Illinois School for the Visually Impaired in Jacksonville, IL. The contractor will be responsible for removing and replacing all existing lighting with compatible LED lighting, including specific bulb types and quantities detailed in the scope of work. A mandatory pre-bid conference is scheduled for December 9, 2021, and the vendor must attend to be considered responsive.
The RFQ outlines pricing requirements, including separate line items for the cost of removing the old lighting and the total labor and materials for installing the new LED lighting. Vendors must provide a total cost for the removal and installation of the new LED lighting. The State reserves the right to reject any or all offers and will choose the winning vendor based on the lowest total bid. Vendors must agree to partial shipments in case of delays in the full order. The State may require evidence of the vendor's qualifications during the evaluation process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Covid Notice~9.docx | DOCX document | |
| RMU50~90.docx | DOCX document | |
| Mandatory Onsite Visit Guidance for Vendors_36~4.docx | DOCX document | |
| FormsBSectionV201 blank~10.docx | DOCX document | |
| Clarification on how many bulbs and fixtures needing swapped.docx | DOCX document | |
| StandardTermsConditions~20.pdf | ||
| StandardCertifications~19.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications and Requirements:
Bulb Replacement Building’s Two, Nine, and Eleven General Scope:
1) Contractor will remove and replace all existing lighting in three buildings and replace it with compatible L.E.D. lighting
2) Contractor shall be solely responsible for obtaining and providing all materials, equipment, supplies, labor and other services as may be necessary to fulfill the requirements of the Contract in a timely and appropriate manner. The Contractor will be responsible for the proper disposal of old equipment. A COVID-19 Safety Plan will also be required and submitted to the Chief Engineer.
3) Bulb Requirements Building #Two:
| a) F32 T8 4’-181 bulbs |
| b) Deluxe DE 26 4 pin-18 bulbs |
| c) Phillips PL-L 18w 35/45 12 bulbs |
| d) Phillips 75 75 W 130V Halogen Flood-212 bulbs |
| e) Phillips PL-L 40w 30RS/IS- 132 this will be a 1:1 swap both fixtures and lightbulbs. 46 Fixtures to be replaced. |
4) Bulb Requirements Building #9 Dietary:
a) F32 T8 4’ -142 bulbs
b) F32 T8 8’- 24 bulbs
c) Conventional bulbs 65 W
d) Phillips MS 400/BU/PS- 20 bulbs
5) Bulb Requirements Building #9 Receiving:
a) F32 T8 4’ two tube – 2 bulbs
b) F32 T8 4’ four tube- 158 bulbs
c) Conventional bulbs - 16 bulbs 65 W
6) Bulb Requirements Building #9 Housekeeping:
a) F32 T8 4’ two tube – 6 bulbs
b) F32 T8 4’ four tube- 48 bulbs
7) Bulb Requirements Building #9 Greenhouse:
a) F32 T8 4’ two tube – 30 bulbs
b) F32 T8 4’ four tube - 20 bulbs
8) Building #2 basement 52 4’ bulbs
9) Bulb Requirements Building #11 TLC
| a) F32 T8 4’ two tube – 50 bulbs |
| b) Conventional bulbs 60W- 31 |
| c) TL70 F17T8/TL370 Single bulb- 18 Bulbs |
| d) FC12T9CW Circular-31 Bulbs this will be a 1:1 swap fixtures and bulbs. |
| e) Dulux D/E 26 W Can Lights 42 Bulbs |
| f) Sylvania TL 70F32T8/TL735/6 U Shaped Bulb-50 Bulbs |
| g) Phillips 120BR/Fl60 Core Overhead-8 Bulbs |
| H) Phillips MH 175 /C/U/MED Core Walls-8 Bulbs |
10) F40T12 bulbs will be replaced with F32T8
11) Buildings #2 and #11 have emergency lighting built into the existing lighting. This will be eliminated, and wall pack LED emergency lighting will be installed.
12) All work will be done in compliance with all applicable electrical codes.
13) The Contractor will be responsible for verifying that the work site is safe, considering visually impaired students are on campus.
COVID-19 PROTECTIONS: In response to the COVID-19 pandemic, Governor J.B. Pritzker issued Executive Order 2021-22 and 2021-23. These Executive Orders mandate certain contractors shall use face coverings, have COVID-19 vaccinations, or undergo testing for COVID-19 when in indoor public places, Health Care Facilities, Schools, Institutions of Higher Education, and State owned and operated congregate facilities. Vendor shall adhere to the requirements of these Executive Orders as applied by the Agency. The Agency may also implement vaccination or testing requirements that exceed those in the Executive Orders.
Bidder Conference/Site Visit/Walk Through:
Mandatory Bidder Conference/Site Visit/Walk Through: ☒Yes ☐No Time:
Vendor is required to attend the mandatory bidder conference to review the project. Mandatory prebid meeting on December 9th, 2021 at Illinois School for the Visually Impaired 658 E. State St Jacksonville, IL. 62650 Auditorium.
Bidder (current Vendor included) will be disqualified and considered non-responsive if Bidder does not attend, is not on time, leaves early or fails to sign the attendance sheet. Bidder must allow adequate time to accommodate security screenings at the site.
Vendor Pricing
Cost of Removal of Old Lighting:
Total of Removal of Old Lighting
Labor and Materials for Install*:
Total Labor and Materials
| Total Cost of Removal and Installation of New LED Lighting |
| $ ____________ |
IF THIS FORM IS NOT FILLED OUT IN ITS ENTIRETY THE QUOTE MAY BE DISQUALIFIED
| VENDOR’S NAME: | _____________________ | |||
| CONTACT: | _____________________ | |||
| PHONE: | _____________________ | |||
| EMAIL: | _____________________ | |||
| VENDOR’S SIGNATURE: | _____________________ | |||
| DATE: | _____________________ |
Notes to Vendor: All Quoted prices must be valid for 90 days from date of submission. All prices must include shipping and handling charges. No price increased will be accepted. In the event of a price decrease, the agency is guaranteed to receive the lowest price. We reserve the right to reject all offers; to reject individual offers for failure to meet any requirement; to award by item, part or portion of an item, group of items, or total; and to waive minor defects. Vendor must agree to partial ship equipment in case of a delay on total order. Vendor may attach separate page describing this proposal for equipment or services. Winning vendor will be chosen on low total bid for all product. Bidder offers and agrees if this response is accepted within 45 calendar days following the date the response is due to furnish all the items upon which prices are quoted. DHS may require bidder(s) to submit evidence of their qualifications at such times and under conditions, as it may deem necessary. The question of whether a particular bidder is a responsible bidder may involve an evaluation of the bidder’s experience, type of facility, expertise or financial resources regarding the particular items requested by the pertinent solicitation. If a bidder has been determined to be non-responsible, the bid shall be rejected. All equipment to be provided in response to a State of Illinois solicitation shall be new and latest model in current production.
STATE OF ILLINOIS
DEPARTMENT OF HUMAN SERVICES
REQUEST FOR QUOTE
B-26042 Removal and Installation of LED lighting