RFQ - EmergBatteryInspMaintFY25~2.docx

DOCX document 24 KB Posted

Attached to
REBID- DHS SP Emergency Battery Bank Maintenance and Inspection FY25-27
Solicitation number
25-444DHS-DEVDI-B-43274
Issued by
Lake County, Illinois

About this file

This document is a Request for Quote (RFQ) issued by the Illinois Department of Human Services for the Ann Kiley Center located in Waukegan, Illinois. The RFQ is seeking a vendor to establish a multi-year contract for the inspection, maintenance, and repair of the Main Administration Building's emergency battery bank and uninterrupted power system (UPS). The contract will cover semi-annual and annual inspections, maintenance, and repairs of 40 batteries and associated capacitors in the UPS system. The contract will begin on July 1, 2024 and run through June 30, 2027.

The quote shall include the annual cost of three inspections, the cost of one complete battery removal and replacement, one complete capacitor change-out, and an allowance of $1,200 for other miscellaneous maintenance costs. Services are to be performed Monday through Friday between the hours of 7:00 AM and 3:00 PM. Applicable safety precautions and personal protective equipment must be observed, and only original equipment manufacturer (OEM) parts or OEM-approved parts may be used for any repairs.

View the file

Other files

File Type Posted
Terms-and-conditions~4.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Illinois Department of Human Services Ann Kiley Center

R E Q U E S T F O R Q U O T E

Facility:Ann Kiley Center
Address:1401 Dugdale Rd
City:Waukegan, IL 60085
Contact:Delourdes Roney, Methods and Procedures I
Phone:847-249-0605
Fax:847-249-4587
E-Mail:delourdes.roney@illinois.gov

Open Market Bid 25-444DHS-DEVDI-B-43274

Item
Specifications and Requirements:
Qty.

Establish Multi-Year Inspection, Maintenance, and Repair Contract for Main Administration Building Emergency Battery Bank / UPS System

1) Performing Semi-Annual and Annual Inspection, Maintenance and Repairs for Emergency Battery Bank System Batteries (40).

2) Perform Annual Maintenance Service for Uninterrupted Power System (UPS).

System is an Emerson Network Power/Liebert designed system. Bank includes 40 batteries 12v, 540WPC.

Capacitors include 4 7900uF, 350VDC, stud mount; 3 28uF, 600VAC; 9 90uF, 310VAC, 50/60HZ; 3 46uF, 580VAC; 3 490,000uF, 35VDC

Contract shall begin FY25 (1 July 2024) and complete 30 June 2027.

Semi-Annual Inspection, Maintenance and Repair Actions shall Include (but not be limited to):

Inspect appearance and cleanliness of batteries and battery cabinet, and clean as necessary.

Measure and record total battery float voltage and charging current.

Measure and record overall AC ripple voltage.

Measure and record overall AC ripple current.

Inspect battery jars and covers for proper liquid level, cracks and leakage.

Inspect for evidence of corrosion, NO-OX grease or oil on all connections.

Measure and record ambient temperature

Verify and assess condition of ventilation equipment.

Verify integrity of battery rack and cabinet.

Measure and record 100% of cell temperatures

Measure and record float voltage of all cells.

Measure and record all internal impedance readings.

Annual Inspection, Maintenance and Repair of Batteries shall Include (but not be limited to):

All semi-annual service requirements (as above)

Conduct thermal scans on electrical connections and re-tighten all connections to the battery manufacturer’s specifications.

Measure and record all battery connection resistances in micro-ohms (when applicable).

Annual Inspection, Maintenance and Repair of UPS Shall Include (but not be limited to):

Perform temperature check on all breakers, connections, and associated controls. Repair and/or report all high temperature areas.

Perform visual inspection of equipment including subassemblies, wiring harness, contacts, cables, and major components.

Check air filters for cleanliness

Check rectifier and inverter snubber boards for discoloration.

Record all voltage and current meter readings on the module/system control cabinet

Check for DC capacitor vent caps that have extruded more than 1/8”.

Measure and record harmonic trap filter currents.

Check inverter and rectifier snubbers for burned or broken wires.

Check all nuts, bolts, screws, and connectors for tightness and heat discoloration.

Check fuses on the DC capacitor deck for continuity.

With Facility approval, perform operational test on the system, including unit transfer and battery discharge.

Calibrate and record all electronics to system specifications.

Check and perform Engineering Field Change Notices (FCN) as necessary.

Measure and record all low voltage power supply levels.

Record phase-to-phase input voltage and currents.

Note: Detailed written report noting deficiencies and any corrective action completed or still required must be submitted after all inspections

Note: Applicable safety precautions shall be observed, and personal protective equipment worn as required by NFPA 70E (National Electric Code) and OSHA electrical safety standards.

Note: Repair parts must be original equipment manufacturer (OEM) parts or parts approved by OEM.

Note: Quote shall include annual cost of 3 inspections per above, cost of one complete battery removal (including proper disposal per EPA requirements) and replacement, 1 complete capacitor change out, and an allowance of $1200 for other miscellaneous maintenance costs.

Note: Services are to be performed Monday-Friday between the hours of 07:00 AM- 03:00 PM.