RFQ 693JJ326Q000018 ADAS Technologies_4_20_2026_final.pdf

PDF 501 KB Posted

Attached to
Identification of Roadway Design and Infrastructure Factors Influencing ADAS Systems in Mitigating Rural Roadway Departure Crashes
Solicitation number
693JJ326Q000018
Issued by

About this file

This is a Request for Quotation (RFQ) issued by the Federal Highway Administration (FHWA) for research services related to Advanced Driver Assistance Systems (ADAS) and rural roadway safety. The RFQ number is 693JJ326Q000018, with a solicitation release date of April 20, 2026, technical questions due by May 4, 2026 at 11:00am ET, and quotations due by May 11, 2026 at 11:00am ET. This is a Firm-Fixed-Price (FFP) procurement under FAR Part 12 for commercial services (NAICS code 541990 – All Other Professional, Scientific and Technical Services). The contract will be a non-set-aside award with a 30-month period of performance.

The contractor must conduct a comprehensive study to identify roadway design and infrastructure factors that influence the effectiveness of ADAS technologies (Lane Departure Warning, Lane Keeping Assistance, and Lane Centering Assistance) in mitigating rural roadway departure crashes. The four contract line items include: (1) attendance at a kick-off meeting with bi-weekly check-ins and quarterly progress reports; (2) collection, extraction, integration, and evaluation of roadway geometric design elements and infrastructure data from at least four states over five years, including historical crash data with VIN decoding to distinguish vehicles with and without ADAS; (3) development of a comprehensive technical report with multiple draft iterations and public affairs review; and (4) development of outreach materials including a peer-reviewed journal/conference paper or webinar presentation. All deliverables must be 508-compliant, submitted in Microsoft Word and Google Docs/platform formats. The contractor must have a current active SAM.gov registration at time of quote submission and must include Google Map Platform subscription costs in pricing. The Government will evaluate quotations using Lowest Price Technical Acceptability (LPTA) methodology, with technical acceptability based on two factors: technical approach with acceptable understanding of requirements and management plan, and staffing approach with qualified key personnel. Quotations must be submitted electronically in a single email not exceeding 10 megabytes, including technical and pricing components, organizational information, and past performance references from the last five years.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION (RFQ) 693JJ326Q000018

Issuing Office: United States Department of Transportation

Federal Highway Administration (FHWA) Office of Acquisition & Grants Management (HCFA)

1200 New Jersey Avenue, SE Washington, DC 20590-0001

Agency Contact: Amy Morrissette, Contracting Officer

Phone: 404-562-3574 Email: amy.morrissette@dot.gov

Title: Identification of Roadway Design and Infrastructure Factors

Influencing ADAS Systems in Mitigating Rural Roadway Departure Crashes

Solicitation Release Date: April 20, 2026

Technical Questions Due Date: May 4, 2026, by 11:00am Eastern Time (ET)

Questions must be e-mailed to Agency Contact’s email at amy.morrissette@dot.gov

Quotation Due Date: May 11, 2026, by 11:00am Eastern Time (ET)

Quotes must be e-mailed to both the Agency Contact’s email at amy.morrissette@dot.gov and hccacquisitionsandgrants@dot.gov

Note: Issuance of this solicitation does not guarantee that an award will be made. Any resulting awards are subject to the availability of funding and the discretion of the awarding entity, including cancellation or amendment based on a determination of change in agency needs.

mailto:amy.morrissette@dot.gov mailto:amy.morrissette@dot.gov mailto:hccacquisitionsandgrants@dot.gov

PART I

RFQ INFORMATION AND INSTRUCTIONS FOR PREPARATION OF QUOTATION

RFQ INFORMATION

This Request for Quotation (RFQ) will result in a Firm-Fixed-Price (FFP) purchase order. It is prepared in accordance with the policies and procedures for solicitation, evaluation, and award as prescribed in Federal Acquisition Regulation (FAR) Part 12, Acquisition of Commercial Products and Commercial Services (Overhauled 2025). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2026-01.

This RFQ is a non-set-aside and the North American Industry Classification System (NAICS) code is 541990 – All Other Professional, Scientific and Technical Services. A responsible quoter is one whose quotation conforms to the solicitation and will be most advantageous to the Government. It is the vendor’s responsibility to be familiar with applicable clauses and provisions. FAR Provisions and Clauses may be viewed and/or downloaded from http://www.acquisition.gov/far.

The vendor must have a current active registration in the System for Award Management (www.SAM.gov) at the time of quote submission in order to be eligible to receive an award under this RFQ.

INSTRUCTIONS FOR PREPARATION OF QUOTATION

In responding to this RFQ, the quotation MUST include the following:

1. Technical Quote: Discussion addressing the technical factors below:

Factor 1 – Technical Approach. Discuss the quoter’s understanding of the requirements, and proposed approach and management plan to accomplish the work tasks.

MINIMUM ACCEPTABILITY CRITERIA: The Technical Approach contains sufficient detail to determine the quoter provides an acceptable understanding of the requirements and has an acceptable management plan and approach.

Factor 2 – Staffing Approach. Provide a staffing plan that identifies proposed key personnel, and their qualifications, expertise, and education to ensure successful order completion.

MINIMUM ACCEPTABILITY CRITERIA: The Staffing Approach provides the names of key personnel who will perform the key tasks, and sufficient detail to determine the proposed staffing have acceptable expertise and experience to perform the work.

2. Price Quote: Submitted pricing must be for the Contract Line Item Numbers as identified in

Part II, Schedule of Services. Vendors must complete the Pricing Schedule which was provided along with the RFQ (see Attachment 1 – Pricing Worksheet).

http://www.acquisition.gov/far http://www.sam.gov/

3. Organizational Information: The quotation must include the following mandatory business information regarding your company in the body of the cover email message:

a. Confirmation your company accepts government purchase orders

b. Business Size (Small, Woman-Owned, Disadvantaged, Hub-Zone, Large, Non-

Profit, etc.)

c. Payment Terms (Government Standard is NET 30)

d. Unique Entity Identifier

e. Federal Tax Identification Number (TIN) (9-Digits)

f. Correct Mailing Address for the order (include name, telephone, email address);

Note: Mailing address and entity name must match the information in www.sam.gov

g. Verification company information listed in the System for Award Management (SAM) current and accurate? https://www.sam.gov/SAM/

4. Past Performance: Provide examples of recent (within the last five years) and relevant (similar in nature to the requirements of the PWS) past experience performed by the quoter.

Each past performance reference must contain contact information (contact name, email address/phone number), business name, total value of the order, period of performance, and description of work performed. If a quoter is without a record of relevant and recent past performance, the quoter will be assigned a neutral or unknown rating. In this Lowest Price Technical Acceptable process, this unknown rating is considered “acceptable”.

5. Instructions for Preparation of the Quotation: The quotation must be submitted electronically with the technical and pricing factors submitted in a SINGLE email whose size must not exceed 10 Megabytes.

6. Evaluation of Quotation: The Government will evaluate the quotation based on Lowest

Price Technical Acceptability (LPTA). Under LPTA, the purchase order is awarded to the lowest-priced quote that meets all technical criteria or factors. Technical quotes are rated on an acceptable/unacceptable basis.

NOTE: Failure to furnish all information required above may result in your quotation being considered non-responsive and eliminated from further consideration.

http://www.sam.gov/ https://www.sam.gov/SAM/

PART II

SCHEDULE OF SERVICES

The Schedule of Services is below, and the quoter shall provide a quote utilizing Attachment 1 – Pricing Worksheet.

CONTRACT

LINE ITEM

(CLIN)

ITEM DESCRIPTION QUANTITY UNIT UNIT

PRICE

TOTAL

PRICE

00101

Task 1: Attend Kick-Off Meeting

Pricing: Firm-Fixed Price

Period of Performance: 30 Months from Date of Award

1 EACH $0.00 $0.00

00201

Task 2: Collect, Extract, Integrate, and Evaluate Roadway Geometric Design Elements and Infrastructure Factors Affecting RwD Avoidance

ADAS

Pricing: Firm-Fixed Price

Period of Performance: 30 Months from Date of Award

1 EACH $0.00 $0.00

00301

Task 3: Develop Technical Report

Pricing: Firm-Fixed Price

Period of Performance: 30 Months from Date of Award

1 EACH $0.00 $0.00

00401

Task 4: Develop Outreach Materials

Pricing: Firm-Fixed Price

Period of Performance: 30 Months from Date of Award

1 EACH $0.00 $0.00

TOTAL QUOTED PRICE FOR ALL CLINs $0.00

PART III

PERFORMANCE WORK STATEMENT

Identification of Roadway Design and Infrastructure Factors Influencing ADAS

Systems in Mitigating Rural Roadway Departure Crashes

1.0 Overview

This is a non-personal services purchase order to provide services for identifying roadway design and infrastructure factors influencing Advanced Driver Assistance Systems (ADAS) in mitigating rural roadway departure crashes. The Government will not exercise any supervision or control over the service providers performing the services herein. The Contractor is responsible to the Government as defined in this Performance Work Schedule (PWS) and must perform to the standards herein.

1.1 Background

The mission of the Federal Highway Administration (FHWA) is to improve safety and mobility on our nation’s highways through national leadership, innovation, and program delivery. As part of this mission, FHWA allocates funding to develop and deliver technical assistance, research, data analysis, and training aimed for reducing roadway departure (RwD) crashes and fatalities through the implementation of safety action plans and proven safety countermeasures. With the rapid growth of vehicles with ADAS, it is critical to investigate the infrastructures required to support these systems and to assess their safety effectiveness in reducing RwD crashes.

As human error accounts for more than 90% of traffic crashes, Advanced Driver Assistance Systems (ADAS) are expected to provide significant safety benefits by supporting drivers with timely warnings and/or active interventions, thereby reducing traffic crashes, and migrating the risk of fatal and serious injuries. In recent years, continuous technological advancements, and growing consumer awareness of safety have accelerated adoption of new vehicles equipped with Lane Departure Warning (LDW), Lane Keeping Assistance (LKA), and Lane Centering Assistance (LCA) features as standard. These systems, designed to address RwD crashes, are expected to play a significant role in reducing fatalities and serious injuries associated with such crashes.

However, these expected safety benefits are based on the assumption that roadway geometry and infrastructure factors fully support these technologies, which is not always available. Existing roadway infrastructure, particularly rural roadways, remains insufficient to fully support the functionality and safety potential of evolving ADAS technologies. Many rural roadways lack consistent and well-maintained lane marking, adequate lighting, and uniform signage, which are essential for sensor-based systems to function reliably. In addition, geometric variations such as sharp curves, narrow lane and shoulder widths, and unpaved edges introduce challenges for vehicle detection and control algorithms.

This purchase order aims to investigate and identify roadways characteristics, geometric design, and infrastructure factors necessary to optimize the safety benefits of relevant RwD prevention ADAS technologies for reducing RwD crashes in rural roads. It also quantifies the potential safety benefits of these systems and identifies corresponding and prioritized infrastructure improvements to maximize those benefits.

1.2 Objective

The objective of this purchase order is to conduct a comprehensive review and assessment of geometric design elements and infrastructure factors that contribute to optimize the performance of RwD prevention ADAS technologies such as LDW, LKA, and LCA. By systematically reviewing and analyzing these contribution factors, this study seeks to provide evidence-based insights and actionable recommendation to improve roadway geometric design and infrastructure in support of vehicles equipped with these ADAS features, thereby maximizing their safety benefits in reducing RwD crashes and fatalities, particularly on rural roadways.

This purchase order seeks to support FHWA mission to improve safety on our nation’s roadways in accordance with 23 U.S.C. §503(b)(1)(A, B, C & D); 23 U.S.C. §503(b)(2)(B)(i, ii, iii, iv, v & vi);

23 U.S.C. §503(b)(2)(C)(i, ii, iii, vi, & viii); and 23 U.S.C. §503(b)(3)(B)(ii).

1.3 Detailed Requirement

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform this purchase order. Also, project management, administrative support and periodic or recurring progress meetings shall be considered integral to each task as described here in. To accomplish the objectives of this order, the Contractor shall complete the following tasks:

TASK 1: Attend Kick-Off Meeting

The Contractor shall coordinate and facilitate a kick-off meeting with the Technical Point of Contact (TPOC) and others as appropriate within two weeks of award date. The Kick-Off meeting will be held virtually and will discuss the overall project to ensure that desired outcomes are understood and achieved. The Contractor shall prepare a draft work plan that is consistent with the technical quote, and provide a detailed schedule of milestones and deliverables. The Contractor shall send the draft agenda, presentation, and work plan to the TPOC one-week in advance of the kick-off meeting, at the latest, for review. After the kick-off meeting, the Contractor shall - submit a revised final work plan and work breakdown structure that incorporates comments and feedback provided from FHWA.

In addition, the Contractor shall arrange bi-weekly check-in meetings with TPOC and FHWA’s stakeholders to discuss the progress, possible risks, and comments under this order.

Deliverables:

- Kick-Off Meeting Agenda, Draft work Plan and Draft Kick-off Meeting presentation

- Kick-Off Meeting

- Kick-Off Meeting Summary Note

- Revised Work Plan

- Bi-weekly Check-in Meeting

- Bi-weekly Check-in Meeting Summary Note

- Quarterly Progress Report

TASK 2: Collect, Extract, Integrate, and Evaluate Roadway Geometric Design Elements and Infrastructure Factors Affecting RwD Avoidance ADAS

The Contractor shall conduct a comprehensive data-driven process to collect, extract, integrate, and analyze various data from various resources including, but are not limited to, geometric design elements, infrastructure features, historical crash data and vehicle trajectory data to identify and evaluate factors affecting the safety performance of RwD avoidance ADAS features on rural roads.

The Contractor shall identify, extract and compile roadway geometric design elements and infrastructure features that are potentially associated with operational effectiveness of RwD prevention ADAS features, which may include, but are not limited to, horizontal and vertical alignment characteristics, advanced signs and delineation, pavement and longitudinal markings (e.g., color, function, widths and patterns), roadside features, lane configuration, shoulder and median features, etc. through the integrated use of Geographic Information System (GIS) and image-based feature extraction processes. The Contractor shall use roadway map resource incorporating the Highway Performance Monitoring Systems (HPMS), or All Road Network of Linear Reference Data (ARNOLD), or comparable GIS-based Linear Reference System (LRS) developed and maintained by Federal and State agencies to ensure consistent spatial alignment and accurate location referencing across roadway networks.

The Contractor’s proposed and performed image-based feature extraction process shall employ vision technologies (e.g., aerial or street-level imagery) to detect, classify, assess, and extract roadway geometric design and infrastructure attributes. Furthermore, the extracted roadway and infrastructure attributes must be integrated with the GIS LRS framework, enabling a repeatable and scalable workflow that accurately assigns spatial attributes along roadways.

The contractor shall also collect historical crashes occurred on rural roads, including vehicle VIN information, at least four (4) States over the past five (5) years (since 2018), and use the NHTSA VIN Decoder API or a similar tool to decode the VIN to distinguish between vehicles equipped with and without RwD prevention ADAS. During this process, if necessary, the FHWA TPOC can provide decoded individual vehicle VIN information along with crash database (crash, vehicle and person data) collected from multiple States to support this project. However, this information must be used solely for this project. As with the previous process, the Contractor shall integrate the historical crash location into a GIS LRS framework using the crash XY-coordinates of the individual crash location. The Contractor shall conduct a safety analysis to identify and quantify the roadway geometric design and infrastructure factors that affect crash frequency and severities for vehicles equipped with RwD avoidance ADAS features. The analysis shall also include differences in safety performance between vehicles equipped with RwD avoidance ADAS features and those without, based on roadway geometric design, infrastructure characteristics and relevant situation factors.

To support successful execution of the project, the Contractor shall develop and present a detailed data-driven plan outlining the proposed data collection, extraction, integration, analysis and evaluation processes to TPOC and FHWA Technical Advisory Panel (TAP). The study plan shall describe data sources, methodologies, quality control procedures, analytical approaches, limitations, and anticipated deliverables, and shall be submitted for FHWA review and approval prior to conduct.

Deliverables:

- Detailed Data-Driven and Analysis Plan Draft and presentation

- Revised Data-Driven and Analysis Plan Draft and presentation

- Data-Driven and Analysis Plan Presentation

- Monthly Data-Driven and Analysis Progress Update

TASK 3: Develop Technical Report

The Contractor shall develop and submit a technical report, including an outline enumerating the needs of this effort. The Contractor shall prepare a comprehensive outline of the technical report first, and then revise it after FHWA review to reflect comments or inputs from the TPOC and the FHWA technical panel. With approval of the final outline, the Contractor shall develop and submit the first draft of final technical report for review by the TPOC and FHWA technical review panels.

The contractor shall use plain language and advice novice for the report1. The TPOC will submit consolidated comments for the contractor to address in a second draft report. The contractor shall address any remaining technical comments and prepare a third draft for review by FHWA Office of Safety R&D leadership and the Office of the Chief Counsel (if needed). The Contractor shall also prepare a presentation material on the findings and contents of the final report and present it to TPOC and FHWA technical panels.

The Contractor shall clearly address all received comments and prepare a final draft report for Public Affairs review and approval. After public affairs approval, the Contractor shall submit the final report in both Microsoft Word and Google document/platform formats. All final deliverables must be 508-conformant. The Contractor shall also submit all project related documentation, collected raw and compiled data files, including source code, metadata, and data dictionaries, to TPOC.

Deliverables:

- Draft of Technical Report Outline

- Revised Technical Report Outline

- First Draft Technical Report

- Second Draft Technical Report

- Third Draft Technical Report

- Final Draft Technical Report (for Office of Chief Counsel [HCC] and Office of Public Affairs

[HPA] review)

- Draft Presentation material

- Revised Presentation material

- Final Deliverables

TASK 4: Develop Outreach Materials

The Contractor shall develop marketing and outreach materials to promote findings of this research which may include a peer-reviewed journal/conference paper or a webinar. For this, the Contractor shall develop a draft journal/conference paper and submit it to the TPOC for review. The Contractor shall submit a final paper that incorporates the TPOC’s comments and edits, which will then be reviewed and approved by HCC and HPA for publication.

1 http://www.plainlanguage.gov http://www.plainlanguage.gov/

Deliverables:

- Draft Journal/Conference Paper or Webinar Presentation PPT

- Final Journal/Conference Paper or Webinar Presentation PPT

- Final Technical Report

2.0 Period of Performance

The period of performance for this purchase order shall be for 30 months that consists of 24 months for project completion and 6 months for HCC and HPA review of the paper. The Contractor shall notify the Contracting Officer (CO) and TPOC in writing when a delay threatens to exceed the period of performance. As part of the notification, the Contractor shall provide a revised schedule for performing the order’s requirements.

3.0 General

3.1 Place of Performance

The work will be performed at the Contractor’s facility.

3.2 Physical Security

The Contractor shall be responsible for safeguarding all government equipment, information, and property provided for Contractor use.

3.3 Periodic Progress Meetings

The Contractor agrees to attend progress meetings. The TPOC and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings, the TPOC will apprise the Contractor of how the government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced.

Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

3.4 Identification of Contractor Employees

All contractor personnel attending meetings and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

3.5 Contractor-Provided Material(s)

This project necessitates the use of the Google Map Platform. If the Contractor does not currently have access, they must purchase a monthly subscription from Google. All subscription costs for Google Map Platform must be included in the Contractor’s price quote. As this is a firm-fixed-price purchase order, the Government will not reimburse the Contractor for Google Map Platform costs.

3.6 Organizational Conflict of Interest

The Contractor and subcontractor personnel performing work under this award may receive, have access to, or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.), or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the CO immediately whenever he/she becomes aware that such access or participation may result in any actual or potential OCI, and may merit the submittal of a plan to the CO to avoid or mitigate any such OCI.

This mitigation plan would be determined to be acceptable solely at the discretion of the CO, and in the event the CO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the CO may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the

OCI.

3.7 Data Rights

Data Rights shall be executed in accordance with the relevant clauses and provisions in the purchase order.

4.0 Applicable Publications (Current Editions)

The Contractor must abide by the following regulations, publications, manuals, and local policies and procedures. TFHRC Communication Reference Guide (CRG) – https://www.fhwa.dot.gov/publications/research/general/15058/15058.pdf

5.0 Technical Exhibit List

• Technical Exhibit 1 - Performance Requirements Summary

• Technical Exhibit 2 - Deliverables Schedule https://www.fhwa.dot.gov/publications/research/general/15058/15058.pdf

TECHNICAL EXHIBIT 1

Performance Requirements Summary (PRS) The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective Performance Standard

Performance Threshold (This is the maximum error rate.)

Method of Surveillance

PRS # 1.

Task 1 – Attend Kick-Off Meeting

The Contractor provided:

- Kick-Off meeting agenda, draft work plan and draft kick-off meeting presentation

- Kick-Off meeting

- Kick-off meeting summary memo

- Revised work plan

- Bi-weekly check-in meeting

- Bi-weekly check-in meeting summary note

- Quarterly progress report

- No technical and grammatical errors in documents

100% Review by the TPOC

PRS # 2

Task 2 – Collect, Extract, Integrate and Evaluate Roadway Geometric Design Elements and Infrastructure Factors Affecting RwD Avoidance ADAS

The Contractor provided:

- Detailed data-driven and analysis plan draft and presentation

- Revised data-driven and analysis draft and presentation

- Data-driven and analysis plan presentation

- Monthly data-driven and analysis progress update

- Acceptable quality assessment and control for data-driven and collection

- Consensus among

TPOC, FHWA

technical panels and contractor

- No technical and grammatical errors in documents and presentations

100% Review by the TPOC

Performance Objective Performance Standard

Performance Threshold (This is the maximum error rate.)

Method of Surveillance

PRS # 3

Task 3 – Develop Technical Report

The Contractor provided:

- Draft of technical report outline

- Revised technical report outline

- First draft technical report

- Second draft technical report

- Third draft technical report

- Final draft technical report (for

Office of Chief Counsel [HCC] and Office of Public Affairs [HPA] review)

- Draft presentation

- Revised presentation

- Final deliverables

- No technical and grammatical errors in documents and presentations

100% Review by the TPOC

PRS # 4

Task 4 – Develop Outreach Materials

The Contractor provided:

- Draft journal/conference paper or webinar presentation

- Final journal/conference paper or Webinar presentation

- No technical and grammatical errors in documents and presentations

100% Review by the TPOC

TECHNICAL EXHIBIT 2

DELIVERABLES SCHEDULE

This technical exhibit lists any reports or documentation that is required as a deliverable to include the frequency, # of copies, medium/format and who/where it is to be submitted. A deliverable is anything that can be physically delivered but may include non-physical things such as meeting minutes. Note: If necessary, the due dates in the “Due Date” column may be changed with concurrence from both the TPOC and the Contractor.

Task Number Deliverable 508

Compliance

Due Date (from date of award/contract start)

Medium/ Format

Submit To

Task 1

Kick-Off Meeting Agenda, draft work plan and draft kick-off meeting presentation

No At least 3 business days before kick-off meeting

Virtual TPOC

Kick-Off Meeting No Within 2 weeks after the award

MS Word, PDF, Google

Docs

TPOC

Kick-Off Meeting Summary Note

No Within 3 days after kick-off meeting

MS Word, PDF, Google

Docs

TPOC

Revised Project Work Plan

No Within 2 weeks after

TPOC provides comments

MS Word, PDF, Google

Docs

TPOC

Bi-weekly check-in meetings

No Bi-weekly MS Word, PDF, Google Docs

TPOC

Bi-weekly check-in meeting summary note

No Within 3 days after each Bi-weekly meeting

MS Word, PDF, Google

Docs

TPOC

Quarterly progress reports

No Every Quarter MS Word, PDF, Google Docs

TPOC

Task 2

Detailed data-driven and analysis plan draft and presentation

PPT

No Within 16 weeks after the award

MS PPT,

Google Docs TPOC

Compliance

Due Date (from date of award/contract start)

Medium/ Format

Submit To

Revised data-driven and analysis plan draft and presentation plan PPT

No Within 2 weeks after

TPOC provides comments

MS PPT,

Google Docs TPOC

Data-Driven and Analysis Plan presentation

No Within 20 weeks after the award

MS Word, PPT, Google

Docs

TPOC

Monthly data-driven and analysis progress update

No Monthly MS Word, Google Docs TPOC

Task 3

Draft of Technical Report Outline

No Within 68 weeks after the award

MS Word, Google Docs TPOC

Revised Technical Report Outline

No Within 2 weeks after

TPOC provides comments

MS Word, Goole Docs TPOC

First Draft Technical Report

No Within 84 weeks after the award

MS Word, Google Docs TPOC

Second Draft Technical Report

No Within 2 weeks after

TPOC provides comments

MS Word, Google Docs TPOC

Third Draft Technical Report

Yes Within 2 weeks after

TPOC provides comments

MS Word, Google Docs TPOC

Final Draft Technical Report (for HCC and HPA review)

Yes Within 96 weeks after the award

MS Word, Google Docs TPOC

Draft Presentation

PPT

No Within 92 weeks after the award

MS PPT,

Goole Docs TPOC

Revised Presentation PPT and Presentation

Yes Within 2 weeks after

TPOC provides comments

MS PPT and Google

Platform

TPOC

Compliance

Due Date (from date of award/contract start)

Medium/ Format

Submit To

Final Deliverables Yes Within 120 weeks after the award

MS Word, Excel, MS

PPT, Google Docs, and dB

TPOC

Task 4

Draft Presentation PPT and/or Journal Article

No Within 100 weeks after the award

MS Word, MS PPT, Google Docs

TPOC

Final Presentation PPT and/or Journal Article

Yes

Within 2 weeks after TPOC provides comments, and 120 weeks after the award

MS Word, PPT, Google

Docs

TPOC

Final Technical Report Yes Within 120 weeks after the award

MS Word, Google Docs

TPOC

PART IV

FEDERAL ACQUISITION REGULATION (FAR) AND TRANSPORTATION

ACQUISITION REGULATION (TAR) PROVISIONS AND CLAUSES

FAR & TAR PROVISIONS INCORPORATED BY REFERENCE

52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at https://www.acquisition.gov/far

52.204-7 System for Award Management (Nov 2024) 52.204-16 Commercial and Government Entity Code Reporting (Aug 2020) 52.212-1 Instructions to Offerors -- Commercial Products and Commercial Services

(Sep 2023) 52.212-3 Offeror Representations and Certifications -- Commercial Products and Commercial

Services (Oct 2025) 1252.239-71 Information Technology Security Plan and Accreditation (Nov 2022)

FAR & TAR PROVISIONS IN FULL TEXT

52.204-24 Representation Regarding Certain Telecommunications and Video

Surveillance Services or Equipment (Nov 2021)

The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in paragraph (c)(1) in the provision at 52.204-26, Covered Telecommunications Equipment or Services—Representation, or in paragraph (v)(2)(i) of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Products or Commercial Services. The Offeror shall not complete the representation in paragraph (d)(2) of this provision if the Offeror has represented that it "does not use covered telecommunications equipment or services, or any equipment, system, or service that uses covered telecommunications equipment or services" in paragraph (c)(2) of the provision at 52.204-26, or in paragraph (v)(2)(ii) of the provision at 52.212-3.

(a) Definitions. As used in this provision— Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, and substantial or essential component have the meanings provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

https://www.acquisition.gov/far

(b) Prohibition. (1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Nothing in the prohibition shall be construed to—

(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract or extending or renewing a contract with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system.

This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract. Nothing in the prohibition shall be construed to—

(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for "covered telecommunications equipment or services".

(d) Representation. The Offeror represents that—

(1) It □ will, □ will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation. The Offeror shall provide the additional disclosure information required at paragraph (e)(1) of this section if the Offeror responds "will" in paragraph (d)(1) of this section; and

(2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that— It □ does, □ does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services. The Offeror shall provide the additional disclosure information required at paragraph (e)(2) of this section if the Offeror responds "does" in paragraph (d)(2) of this section.

(e) Disclosures. (1) Disclosure for the representation in paragraph (d)(1) of this provision. If the Offeror has responded "will" in the representation in paragraph (d)(1) of this provision, the Offeror shall provide the following information as part of the offer:

(i) For covered equipment—

(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the original equipment manufacturer (OEM) or a distributor, if known);

(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and

(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.

(ii) For covered services—

(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or

(B) If not associated with maintenance, the Product Service Code (PSC) of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.

(2) Disclosure for the representation in paragraph (d)(2) of this provision. If the Offeror has responded "does" in the representation in paragraph (d)(2) of this provision, the Offeror shall provide the following information as part of the offer:

(i) For covered equipment—

(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known);

(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and

(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.

(ii) For covered services—

(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or

(B) If not associated with maintenance, the PSC of the service being provided;

and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.

(End of provision) 1252.237-71 Certification of Data (Nov 2022)

NOTICE: The Secretary of Transportation has determined that this certification shall be retained in accordance with Section 4301(b)(1)(B)(i)(II) of the Federal Acquisition Reform Act (Public Law 104-106, 41 U.S.C. 425, note) and DOT Memorandum dated July 17, 1996.

(a) The offeror represents and certifies that to the best of its knowledge and belief, the information and/or data (e.g., company profile; qualifications; background statements; brochures) submitted with its offer is current, accurate, and complete as of the date of its offer.

(b) The offeror understands that any inaccurate data provided to the Department of Transportation may subject the offeror, its subcontractors, its employees, or its representatives to: (1) prosecution for false statements pursuant to 18 U.S.C. 1001 and/or; (2) enforcement action for false claims or statements pursuant to the Program Fraud Civil Remedies Act of 1986, 31 U.S.C. 3801-3812 and 49 CFR Part 31 and/or; (3) termination for default under any contract resulting from its offer and/or; (4) debarment or suspension.

(c) The offeror agrees to obtain a similar certification from its subcontractors.

Signature:

Date:

Typed Name and Title:

Company Name:

This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under 18 U.S.C. 1001.

(End of provision)

***End of provisions**

FAR CLAUSES INCORPORATED BY REFERENCE

52.252-2 Clauses Incorporated by Reference (Feb 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.

Also, the full text of a clause may be accessed electronically at https://www.acquisition.gov/far

52.204-18 Commercial and Government Entity Code Maintenance (Aug 2020) 52.212-4 Alt 1. Contract Terms and Conditions - Commercial Items (Nov 2023) 52.222-21 Prohibition of Segregated Facilities (Apr 2015) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023)

TAR CLAUSES INCORPORATED BY REFERENCE

The following TAR clauses are incorporated by reference. The full text of the clauses can be accessed electronically at https://www.acquisition.gov/tar

1252.222-70 Strikes or Picketing Affecting Timely Completion of the Contract Work

(Nov 2022) 1252.223-71 Accident and Fire Reporting (Nov 2022) 1252.223-73 Seat Belt Use Policies and Programs (Nov 2022) 1252.237-73 Key Personnel (Nov 2022) 1252.242-72 Dissemination of Contract Information (Nov 2022) https://www.acquisition.gov/far https://www.acquisition.gov/tar

FAR & TAR CLAUSES IN FULL TEXT

52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders—

Commercial Products and Commercial Services (Mar 2026)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) (31 U.S.C. 3903 and 10 U.S.C. 3801).

(6) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).

(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 ( 19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

[Contracting Officer check as appropriate.]

__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun 2020), with Alternate I (Nov 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).

__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C. 3509)).

__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

__ (4) 52.203-17, Contractor Employee Whistleblower Rights (Nov 2023) (41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).

_X (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).

__ (6) [Reserved].

https://www.acquisition.gov/far/52.203-19#FAR_52_203_19 https://www.acquisition.gov/far/52.204-23#FAR_52_204_23 https://www.acquisition.gov/far/52.204-25#FAR_52_204_25 https://www.acquisition.gov/far/52.209-10#FAR_52_209_10 https://www.acquisition.gov/far/52.232-40#FAR_52_232_40 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3801&num=0&edition=prelim https://www.acquisition.gov/far/52.233-3#FAR_52_233_3 https://www.acquisition.gov/far/52.233-4#FAR_52_233_4 https://www.acquisition.gov/far/52.203-6#FAR_52_203_6 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section4655&num=0&edition=prelim https://www.acquisition.gov/far/52.203-13#FAR_52_203_13 https://www.acquisition.gov/far/52.203-15#FAR_52_203_15 https://www.acquisition.gov/far/52.203-17#FAR_52_203_17 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section4712&num=0&edition=prelim https://www.acquisition.gov/far/3.900#FAR_3_900 https://www.acquisition.gov/far/52.204-10#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim

__ (7) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

__ (8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

_X (9) 52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of Division R of Pub. L. 117-328).

__ (10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders—Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (Dec 2023) (Pub.

L. 115–390, title II).

__ (11)

(i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (Dec 2023) (Pub.

L. 115–390, title II).

__ (ii) Alternate I (Dec 2023) of 52.204-30.

_X (12) 52.209-6, Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Jan 2025) (31 U.S.C. 6101 note).

__ (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).

__ (14) [Reserved].

__ (15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022) (15 U.S.C. 657a).

__ (16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

__ (17) [Reserved]

__ (18)

(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).

__ (ii) Alternate I (Mar 2020) of 52.219-6.

__ (19)

(i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).

__ (ii) Alternate I (Mar 2020) of 52.219-7.

__ (20) 52.219-8, Utilization of Small Business Concerns (Jan 2025)(15 U.S.C. 637(d)(2) and (3)).

__ (21)

(i) 52.219-9, Small Business Subcontracting Plan (Jan 2025) (15 U.S.C. 637(d)(4)).

https://www.acquisition.gov/far/52.204-14#FAR_52_204_14 https://www.acquisition.gov/far/52.204-15#FAR_52_204_15 https://www.acquisition.gov/far/52.204-27#FAR_52_204_27 https://www.acquisition.gov/far/52.204-28#FAR_52_204_28 https://www.govinfo.gov/link/plaw/115/public/390 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/52.204-30#FAR_52_204_30 https://www.govinfo.gov/link/plaw/115/public/390 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/52.204-30#FAR_52_204_30 https://www.acquisition.gov/far/52.209-6#FAR_52_209_6 https://www.govinfo.gov/link/uscode/31/6101 https://www.acquisition.gov/far/52.209-9#FAR_52_209_9 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section2313&num=0&edition=prelim https://www.acquisition.gov/far/52.219-3#FAR_52_219_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637a&num=0&edition=prelim https://www.acquisition.gov/far/52.219-4#FAR_52_219_4 https://www.acquisition.gov/far/52.219-6#FAR_52_219_6 https://www.acquisition.gov/far/52.219-6#FAR_52_219_6 https://www.acquisition.gov/far/52.219-7#FAR_52_219_7 https://www.acquisition.gov/far/52.219-7#FAR_52_219_7 https://www.acquisition.gov/far/52.219-8#FAR_52_219_8 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim

__ (ii) Alternate I (Nov 2016) of 52.219-9.

__ (iii) Alternate II (Nov 2016) of 52.219-9.

__ (iv) Alternate III (Jun 2020) of 52.219-9.

__ (v) Alternate IV (Jan 2025) of 52.219-9.

__ (22)

(i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) (15 U.S.C. 644(r)).

__ (ii) Alternate I (Mar 2020) of 52.219-13.

__ (23) 52.219-14, Limitations on Subcontracting (Oct 2022) (15 U.S.C. 657s).

__ (24) 52.219-16, Liquidated Damages—Subcontracting Plan (Sep 2021) (15 U.S.C. 637(d)(4)(F)(i)).

__ (25) 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran- Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (Feb 2024) (15 U.S.C. 657f).

_X (26)

(i) 52.219-28, Postaward Small Business Program Rerepresentation (Jan 2025) (15 U.S.C. 632(a)(2)).

__ (ii) Alternate I (Mar 2020) of 52.219-28.

__ (27) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Oct 2022) (15 U.S.C. 637(m)).

__ (28) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Oct 2022) (15 U.S.C. 637(m)).

__ (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (Mar 2020) (15 U.S.C. 644(r)).

__ (30) 52.219-33, Nonmanufacturer Rule (Sep 2021) (15 U.S.C. 637(a)(17)).

_X (31) 52.222-3, Convict Labor (Jun 2003) (E.O. 11755).

__ (32) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Mar 2026)(E.O.

13126).

__ (33) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

_X (34)

(i) 52.222-26, Equal Opportunity (Sep 2016) (E.O. 11246).

__ (ii) Alternate I (Feb 1999) of 52.222-26.

__ (35) https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-13#FAR_52_219_13 https://www.acquisition.gov/far/52.219-13#FAR_52_219_13 https://www.acquisition.gov/far/52.219-14#FAR_52_219_14 https://www.acquisition.gov/far/52.219-16#FAR_52_219_16 https://www.acquisition.gov/far/52.219-27#FAR_52_219_27 https://www.acquisition.gov/far/52.219-28#FAR_52_219_28 https://www.acquisition.gov/far/52.219-28#FAR_52_219_28 https://www.acquisition.gov/far/52.219-29#FAR_52_219_29…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .